SUBJECT:Study SessionDate: May 28, 2025
Professional Services Agreement with COUNCIL MEETING Date: June 4, 2025
CONSORNorth America, Inc.for the Eastside
Department: Public Works & Utilities
Treatment Plant UV ReplacementProject
Presenter: David Powell
Phone: (360) 473-5268
SUMMARY:
The sewer conveyance system in East Bremerton is a combined system. During heavy rainfall
events, the system can surcharge, potentially leading toa combined sewer overflow (CSO) event.
The Eastside Treatment Plant (East Plant)is designed to providedisinfectionof sewage during these
heavy rainfall events using ultraviolet (UV) light before dischargingto the Port Washington Narrows.
The East Plant was constructed in 2001and the UV disinfection equipment has becomeobsolete
since replacement parts are no longer manufactured. This project replaces the old equipmentand
controlswith modern and reliable equipment.CONSOR was selected as the design engineer. A
scope of work and fee to provide detailed design and engineering services during construction were
negotiated for $637,239.
Attachments:1)Professional Services Agreement;2)Location Map
FISCAL IMPACTS(Include Budgeted Amount):The Eastside Treatment Plant UV Replacement
Project is identified in the Wastewater Capital Improvement Plan (CIP), with a total budget of $4.97M.
The project is partially funded by a$3.84M CWSRF loan.
STUDY SESSION ACTION:Consent Agenda General Business Public Hearing
RECOMMENDED MOTION:
Move to approvethe Professional Services Agreementfor Eastside Treatment Plant UV
ReplacementProject withCONSOR North America, Inc.in the amount of $637,239,and authorize the
Mayor to finalize and execute the agreement with substantially the same terms and conditions as
presented.
COUNCIL ACTION: Approve Deny Table Continue No Action