Loading...
HomeMy WebLinkAbout06/04/2025 4F AGENDA BILL CITY OF BREMERTON 4F CITY COUNCIL SUBJECT:Study SessionDate: May 28, 2025 Professional Services Agreement with COUNCIL MEETING Date: June 4, 2025 CONSORNorth America, Inc.for the Eastside Department: Public Works & Utilities Treatment Plant UV ReplacementProject Presenter: David Powell Phone: (360) 473-5268 SUMMARY: The sewer conveyance system in East Bremerton is a combined system. During heavy rainfall events, the system can surcharge, potentially leading toa combined sewer overflow (CSO) event. The Eastside Treatment Plant (East Plant)is designed to providedisinfectionof sewage during these heavy rainfall events using ultraviolet (UV) light before dischargingto the Port Washington Narrows. The East Plant was constructed in 2001and the UV disinfection equipment has becomeobsolete since replacement parts are no longer manufactured. This project replaces the old equipmentand controlswith modern and reliable equipment.CONSOR was selected as the design engineer. A scope of work and fee to provide detailed design and engineering services during construction were negotiated for $637,239. Attachments:1)Professional Services Agreement;2)Location Map FISCAL IMPACTS(Include Budgeted Amount):The Eastside Treatment Plant UV Replacement Project is identified in the Wastewater Capital Improvement Plan (CIP), with a total budget of $4.97M. The project is partially funded by a$3.84M CWSRF loan. STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to approvethe Professional Services Agreementfor Eastside Treatment Plant UV ReplacementProject withCONSOR North America, Inc.in the amount of $637,239,and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024