Loading...
HomeMy WebLinkAbout06/04/2025 4E AGENDA BILL CITY OF BREMERTON 4E CITY COUNCIL SUBJECT:Study SessionDate: May 28, 2025 Contract Award toSound Pacific COUNCIL MEETING Date: June 4, 2025 Construction, LLC for the Central Bremerton Department: Public Works & Utilities Force Main Replacement Project Presenter: David Powell Phone: (360) 473-5268 SUMMARY: The Central Bremerton Force Main conveys wastewater from downtown Bremerton and the U.S. Navybase to the wastewater treatment plant. Failures along the main were discovered in December 2023. The projectincludes replacing approximately 3100 feet ofthe existing 14-inch st ductile iron main along Gregory Way, Naval Avenue, and 1Street with14-inch and 18-inch PVC pipe. The City received 4 bids,which were opened on May 7, 2025andrangedin cost from $3.69M to $4.04M. Sound Pacific Construction, LLC is the lowest responsive, responsible bidder at $3,699,974.46, which includes sales tax. ATTACHMENTS:1. Contract; 2. Location Map; 3. Bid Tabulation FISCAL IMPACTS(Include Budgeted Amount):This project is included in the Wastewater CIP as with a $8.0M budget. The construction is fully funded by a federal grant through the Office of Local Defense Community Cooperation (OLDCC). STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to award the contract for the Central Bremerton Force Main Replacement Project to Sound Pacific Construction, LLC in the amount of $3,699,974.46, including sales tax, and authorize the Mayor to finalize and execute the agreement with substantially thesame terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024