Loading...
HomeMy WebLinkAbout2023 CIPP Contract & Specs (9)City of Bremerton 2023 SEWER REHABILITATION Addendum No. 1 Page 1 of 2 City of Bremerton Project No. 5877 2023 SEWER REHABILITATION Addendum #1 Date of Issue: March 22, 2023 Interpretation Deadline: March 24, 2023, 11:00 a.m. Date of Opening: Unchanged – March 29, 2023, 11:00 a.m. Notice to All Plan holders: This Addendum No. 1, containing the following revisions, additions, deletions and/or clarifications, is hereby made part of the Plan and Contract Documents for the above-named project. Bidders shall take this Addendum into consideration when preparing and submitting their Bids and it shall be attached to the Contract Documents. Bidders shall acknowledge receipt of this Addendum #1 in the place provided on the Bid Form (Acknowledgement of Bid and Addenda). Failure to do so may disqualify the Bidder from consideration of its Bid. Contents: This addendum contains revisions to the Specifications and/or the Contract Drawings and response to bidder questions. Revisions to the Specifications are made by reissuing entire sections, reissuing specific pages of sections, OR by directing a change in writing, herein. Revisions to the Drawings are made by re-issuing a drawing, issuing a revision to a specific detail from a drawing, OR by directing a change in writing, herein. Bidders are cautioned to check the addendum contents carefully for the presence of all listed revisions. Distribution: This addendum is distributed to all plan holders of record. All questions regarding this addendum shall be addressed to Nick Ataie, Project Manager for the City of Bremerton, at (360)-473-2306 or nick.ataie@ci.bremerton.wa.us The technical material and data contained in Addenda #1 for the City of Bremerton project titled 2023 SEWER REHABILITATION, were prepared under the supervision and direction of the licensed Engineer, whose seal is affixed. City of Bremerton 2023 SEWER REHABILITATION Addendum No. 1 Page 2 of 2 Modifications to the Contract Documents The following modifications are hereby made to the contract documents: MODIFICATION #A1-1 Project Plans (Page C-2): Plan sheet C-2 (Pump Station Influent Pipes – Multiple Locations) has been modified to denote an existing plugged sewer bypass line which shall be utilized in lieu of bypass pumping at Pump Station EB-3 only. Replace with attached revised plan sheet C-2 in Appendix B – Project Plans. MODIFICATION #A1-2 Section 7-08.3(5)C (Pumping Requirements for Flow Diversion System Design): Modify notes for “Pump Station Influent EB-3” under this section as follows: Pump Station Influent EB-3 · 300 gpm minimum for bypass pumping. Bypass pumping not required. · Bypass from upstream lining manhole to wet well. Access to the wet well is through an access hatched located inside the pump station building. Bypass utilizing existing plugged 8” bypass line as shown on plans. Bypass plug will be removed by City forces immediately prior to CIPP operation. · The site around the pump station is owned by the City. · Beach access is not required; the Contractor can bypass from manhole located immediately outside the pump station. MODIFICATION #A1-3 Project Plans (Page C-6): Plan sheet C-6 (Naval Ave – 1st to 7th St) has been modified to correct improperly labeled street names. Replace with attached revised plan sheet C-6 in Appendix B – Project Plans. ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. General Clarifications The following clarifications are provided for informational purposes only and do not modify the plans or contract documents. In the event of a discrepancy between these clarifications and the plans or contract documents, the plans and contract documents (including official modifications per issued addenda) will prevail. The intent of these clarifications is to ensure all Bidder’s are aware of questions received and responses provided. No questions have been received by the City as of the date of this addendum. END OF ADDENDUM NO. 1 19TH STOFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-25877138PUMP STATION INFLUENT PIPES - MULTIPLE LOCATIONSSANITARY - CIPP2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALOLYMPIC AVEPUMP STATION CW-1FLOW 9 LF 18" CONCCW-1PUMPSTATIONMH R11-3013DEPTH TO IE: 7 FTWET WELL (20.5 FT DEPTH)DEPTH TO IE: 8.5 FTFLOWSHORE DRSHORE DRFLOW 9 LF 18" CONCEB-3PUMPSTATIONMH R13-4034DEPTH TO IE: 18 FTWET WELL (30.5 FT DEPTH)DEPTH TO IE: 18.5 FTPUMP STATION EB-3PUMP STATION KL-4MH R08-3000DEPTH TO IE: 7.9 FTKL-4PUMPSTATIONFLOW178 LF 10" CIWET WELL (18 FT DEPTH)DEPTH TO IE: 14 FTCO R08-3035HAYWARD AVE IRONSIDES AVE ACCESS FROM KITSAP WAYNOTES:1.SEE SPECIAL PROVISION SECTION 7-08AND 7-21 FOR DESCRIPTION OF BYPASSPUMPING AND LINING REQUIREMENTS FORPUMP STATION INFLUENT LINES2.STRUCTURE DEPTHS AND LOCATIONSWHERE SHOWN ARE PROVIDED BASED ONAVAILABLE RECORDS AND FIELDINSPECTIONS. CONTRACTOR ISRESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNINGWORK.3.CONTRACTOR SHALL AVOIDDISTURBANCE TO EXISTING KITSAPTRANSIT BUS STOP. UNLESS OTHERWISEAPPROVED BT ENGINEER.EXISTING 10FT. WIDE SEWER EASEMENTOVER SEWERPUMP STATION EB-3 8" PLUGGED BYPASS LINE PHOTOS8" PLUGGED BYPASS OUTLET8" PLUGGED BYPASS INLET8" PLUGGED BYPASS LINE TO ADJACENT GRAVITY SEWER(REFER TOEB-3 PHOTOS). PLUG WILL BE REMOVED BY CITY FORCESIMMEDIATELY PRIOR TO CIPP OPERATION TO ALLOW BYPASS.NO BYPASS PUMPING REQUIRED FOR EB-3(CONTRACTOR TO UTILIZE EXISTING 8" BYPASS LINE DEPICTED) 1ST STMH R14-3075DEPTH TO IE: 7.9 FTMATCHLINE - SEE BELOW OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-658771312NAVAL AVE - 1ST ST TO 7TH STSANITARY AND STORM SEWER - CIPP2023 SEWER REHABILITATIONMATCHLINE - SEE ABOVE SCALE:1" = 40' HORIZONTALGREGORY WAY BURWELL ST 4TH ST 5TH ST BURWELL PL 4TH ST 5TH ST NAVAL AVENAVAL AVE6TH ST FLOWFLOWFLOWFLOWFLOWFLOWCO R14-3076MH R14-3-D71DEPTH TO IE: 8.2 FTMH R14-3-D52DEPTH TO IE: 5.0 FTMH R14-3-D51DEPTH TO IE: 5.6 FTMH R14-3074DEPTH TO IE: 7.1 FTMH R14-3073DEPTH TO IE: 7.2 FTMH R14-3072DEPTH TO IE: 7.1 FTMH R14-3-D27DEPTH TO IE: 5.4 FTMH R14-3-D28DEPTH TO IE: 5.0 FTMH R14-3-D29DEPTH TO IE: 2.7 FTMH R14-3071DEPTH TO IE: 6.8 FTMH R14-3071DEPTH TO IE: 6.8 FTMH R14-3070DEPTH TO IE: 7.0 FTCO R14-3069MH R14-3-D6MH R14-3-D7DEPTH TO IE: 3.3 FTMH R14-3-149SEE SHEET 9NOT IN CONTRACT303 LF 12" CLAY262 LF 15" CONC85 L F 1 5 " C O N C 172 LF 12" CLAY105 LF 12" CLAY281 LF 10" CLAY71 LF 15" CONC266 LF 15" CONC283 LF 10" CLAYNOT IN CONTRACT269 LF 12" CONCMH R14-3-D133DEPTH: UNKNOWN194710511120921921013012109405194619471946312/316410416STORM SEWER LATERAL COUNTSUPSTREAM MH/CB DOWNSTREAM MH/CB# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-3-D71R14-3-D5202R14-3-D52R14-3-D5100R14-3-D29R14-3-D2814R14-3-D28R14-3-D2700R14-3-D133R14-3-D703R14-3-D7R14-3-D601SANITARY SEWER LATERAL COUNTSUPSTREAM MH DOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-3075R14-3074110R14-3074R14-307315R14-3072R14-307303R14-3071R14-307224R14-3070R14-307137FLOWFLOWFLOWFLOWFLOWFLOWFLOWNOTE:1. WORK ON 6TH ST AND NAVAL AVE SHALLBE DONE AT NIGHT. SEE CONTRACTPROVISIONS SECTION 1-08.0(2).2. CONTRACTOR SHALL SUBMIT TRAFFICCONTROL PLAN TO INCLUDINGDEPLOYMENT OF TWO (2) PCMS BOARDSFOR WORK OCCURRING AT THE 6TH ST.AND NAVAL AVE. INTERSECTION.2. BYPASS PUMPING SYSTEM SHALL BESIZED FOR MINIMUM 100 GPM.7TH ST CITY OF BREMERTON 2023 SEWER REHABILITATION BID DOCUMENTS March 2023 Bid Opening: March 29, 2023 @ 11:00 AM The bid opening will be conducted virtually using Zoom. The Zoom meeting link will be posted at the City’s project bid website at: http://www.bremertonwa.gov/bids.aspx Pre-Bid Conference: March 16, 2023 @ 10:30 AM The voluntary pre-bid conference will be conducted in person at the Bremerton Public Works & Utilities building (North Parking Lot) located at 100 Oyster Bay Ave, Bremerton, WA 98312 Contact Person: Nick Ataie, P.E. Department of Public Works and Utilities (360) 473-2306 nick.ataie@ci.bremerton.wa.us THIS PAGE INTENTIONALLY LEFT BLANK 2023 SEWER REHABILITATION MARCH 2023 i TABLE OF CONTENTS CERTIFICATION BY ENGINEER .............................................................................. 4 BID FORMS ............................................................................................................... 5 NOTICE INVITING BIDS ...................................................................................... 5 BIDDER CHECKLIST ........................................................................................... 8 ACKNOWLEDGEMENT OF BID AND ADDENDA ............................................... 9 BID CERTIFICATE (IF CORPORATION) ........................................................... 11 BID CERTIFICATE (IF PARTNERSHIP) ............................................................ 12 BID CERTIFICATE (IF JOINT VENTURE) ......................................................... 13 BID CERTIFICATE (IF LIMITED LIABILITY COMPANY) ................................... 14 BID SCHEDULE ................................................................................................. 15 BID BOND 17 LIST OF SUBCONTRACTORS .......................................................................... 18 INFORMATION REQUIRED OF BIDDER .......................................................... 20 PROJECT REFERENCES & GENERAL INFORMATION .................................. 21 NON-COLLUSION AFFIDAVIT .......................................................................... 22 CERTIFICATION BY PROPOSED CONTRACTOR REGARDING EQUAL EMPLOYMENT OPPORTUNITY PLAN ........................................ 23 CERTIFICATION OF NON-SEGREGATED FACILITIES ................................... 24 CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION ....... 25 CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES...... 26 CONTRACT 27 CONTRACT CERTIFICATE (IF CORPORATION) ............................................. 30 CONTRACT CERTIFICATE (IF PARTNERSHIP) ............................................... 31 CONTRACT CERTIFICATE (IF JOINT VENTURE) ............................................ 32 CONTRACT CERTIFICATE (IF LIMITED LIABILITY COMPANY) ...................... 33 PERFORMANCE BOND .................................................................................... 35 PAYMENT BOND ............................................................................................... 37 INTRODUCTION TO THE SPECIAL PROVISIONS ................................................ 39 DIVISION 1 .............................................................................................................. 40 GENERAL REQUIREMENTS ............................................................................. 40 DESCRIPTION OF WORK ................................................................................. 40 1-01 DEFINITIONS AND TERMS ............................................................... 40 1-01.3 Definitions .................................................................................... 40 1-02 BID PROCEDURES AND CONDITIONS ........................................... 43 1-02.2 Plans and Specifications .............................................................. 44 1-02.3 Estimated Quantities .................................................................... 44 1-02.5 Proposal Forms ............................................................................ 44 1-02.7 Bid Deposit ................................................................................... 45 1-02.9 Delivery of Proposal ..................................................................... 45 1-02.13 Irregular Proposals ........................................................................ 45 1-02.16 Addenda and Interpretations of Documents (NEW SECTION) ..... 46 1-03 AWARD AND EXECUTION OF CONTRACT ..................................... 47 1-03.1 Consideration of Bids ................................................................... 47 2023 SEWER REHABILITATION MARCH 2023 ii 1-03.3 Execution of Contract ................................................................... 47 1-03.4 Contract Bond .............................................................................. 48 1-03.7 Judicial Review ............................................................................ 48 1-04 SCOPE OF THE WORK ..................................................................... 48 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda ......................................................... 48 1-04.4 Changes ....................................................................................... 48 1-04.6 Variation in Estimated Quantities ................................................. 49 1-05 CONTROL OF WORK ................................................................................ 49 1-05.7 Removal of Defective and Unauthorized Work ............................ 49 1-05.8 Vacant .......................................................................................... 50 1-05.8 Submittals .................................................................................... 50 1-05.10 Guarantees ................................................................................... 51 1-05.11 Final Inspection ............................................................................. 51 1-06 CONTROL OF MATERIAL ................................................................. 53 1-06.1 Approval of Materials Prior to Use ................................................ 53 1-06.1(4) Fabrication Inspection Expense .................................................... 54 1-06.6 Recycled Materials ....................................................................... 54 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC .... 54 1-07.1 Laws to be Observed .................................................................... 54 1-07.2 State Taxes ................................................................................... 54 1-07.3 Fire Prevention and Merchantable Timber Requirements ............ 55 1-07.13 Contractor’s Responsibility for Work ............................................. 55 1-07.15 Temporary Water Pollution Prevention ......................................... 56 1-07.16 Protection and Restoration of Property ......................................... 56 1-07.17 Utilities and Similar Facilities ......................................................... 57 1-07.23 Public Convenience and Safety .................................................... 59 1-07.24 Rights of Way ................................................................................ 61 1-08 PROSECUTION AND PROGRESS ................................................... 62 1-08.0 Preliminary Matters ....................................................................... 62 1-08.3 Progress Schedule ....................................................................... 64 1-08.5 Time for Completion ...................................................................... 65 1-08.6 Suspension of Work ..................................................................... 65 1-08.7 Maintenance During Suspension ................................................. 65 1-08.8 Extensions of Time ....................................................................... 66 1-09 MEASUREMENT AND PAYMENT ..................................................... 66 1-09.1 Measurement of Quantities .......................................................... 66 1-09.6 Force Account ............................................................................... 67 1-09.8 Payment for Material on Hand...................................................... 69 1-09.9 Payments ..................................................................................... 69 1-09.11 Disputes and Claims ..................................................................... 70 1-09.13 Claims Resolution ......................................................................... 70 1-10 TEMPORARY TRAFFIC CONTROL .................................................. 70 1-10.1 General ........................................................................................ 70 1-10.2 Traffic Control Management ......................................................... 72 1-10.3 Traffic Control Labor, Procedures, and Devices ........................... 73 1-10.4 Measurement ............................................................................... 76 1-10.5 Payment ....................................................................................... 76 2023 SEWER REHABILITATION MARCH 2023 iii DIVISION 7 .............................................................................................................. 77 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER MAINS, AND CONDUITS ............................................................. 77 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS ................................. 77 7-08.3 Construction Requirements .......................................................... 77 7-08.4 Measurement ............................................................................... 80 7-08.5 Payment ....................................................................................... 80 7-20 PIPE CLEANING, INSPECTION AND ACCEPTANCE (NEW SECTION) ..................................................................................... 81 7-20.1 Description ................................................................................... 81 7-20.1(1) Submittals ..................................................................................... 81 7-20.3 Construction Requirements ................................................................ 81 7-20.4 Measurement ..................................................................................... 87 7-20.5 Payment ............................................................................................. 87 7-21 CURE-IN-PLACE PIPE (CIPP) REHABILITATION (NEW SECTION) 88 7-21.1 Description ................................................................................... 88 7·21.2 Materials ............................................................................................ 90 7-21.3 Construction Requirements ........................................................... 95 7-21.4 Measurement ................................................................................... 102 7-21.5 Payment ........................................................................................... 102 LIST OF APPENDICES APPENDIX A – Construction Forms .......................................................................A-1 APPENDIX B - Project Plans .................................................................................B-1 2023 SEWER REHABILITATION MARCH 2023 4 2023 SEWER REHABILITATION CERTIFICATION BY ENGINEER The technical material and data contained in these Specifications for the City of Bremerton project titled 2023 SEWER REHABILITATION, were prepared under the supervision and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below. Prepared by: William J. Davis, P.E. City of Bremerton March 3, 2023 2023 SEWER REHABILITATION MARCH 2023 5 BID FORMS NOTICE INVITING BIDS for 2023 Sewer Rehabilitation RECEIPT OF BIDS: Bids for 2023 Sewer Rehabilitation will be accepted by mail (Attn: Angela Hoover), or in person by the City Clerk or designated staff on March 29, 2023 between 9:00 AM and 10:00 AM in the lobby of the Norm Dicks Government Center located at 345 6th Street, Bremerton, WA 98337. OPENING OF BIDS: The bids will be publicly opened and read via Zoom on March 29, 2023 at 11:00 a.m. PDT. The link for the bid opening is located on the City’s website at: http://www.bremertonwa.gov/Bids.aspx COMPLETION OF WORK: The WORK must be completed within 135 calendar days of the date of issuance of the Notice to Proceed. The Notice to Proceed is anticipated to be issued on or around May 3, 2023 DESCRIPTION OF WORK: The WORK includes rehabilitating sanitary and storm sewer pipes by cure-in-place pipe (CIPP) methods AND the cleaning and video inspection of sanitary and storm sewer pipes in support of future lining projects. SCHEDULE A: The WORK to be completed includes: - The video inspection and cleaning of approximately 13,300 linear feet of sanitary sewer pipe. AND - Rehabilitating approximately 8,000 linear feet of sanitary sewer pipe using heat-cured or ultra-violet (UV) CIPP methods, reinstating side sewers and removing protruding laterals. Heat-cured CIPP lining methods shall only use styrene-free resin. SCHEDULE B: The WORK to be completed includes: - The video inspection and cleaning of approximately 3,500 linear feet of storm sewer pipe AND - Rehabilitating approximately 3,500 linear feet of storm sewer pipe using the heat-cured or UV CIPP method and reinstating side sewers and removing protruding laterals. Heat-cured CIPP lining methods shall only use styrene-free resin. The Work for both schedules also includes installing flow diversion and temporary bypass pumping, temporary traffic control, and all other work as identified in the Contract Documents. A portion of the work must be performed at night since the project route is along several principal arterials. ESTIMATE: $1,050,000 - $1,600,000 PREVIEWING CONTRACT DOCUMENTS: Contract Documents may be previewed at the ARC Document Solutions website (www.e-arc.com). Go to http://www.e-arc.com/tacoma/, then click on “Quick Links” and “Public Planroom”. Scroll down or search to find the project. 2023 SEWER REHABILITATION MARCH 2023 6 PURCHASING CONTRACT DOCUMENTS: The Contract Documents may be ordered and purchased online from ARC Document Solutions in Tacoma, WA (http://www.e-arc.com/tacoma/). Payment is typically cost of reproduction (non-refundable). AVAILABILITY OF PIPE INSPECTION VIDEOS AND PIPE DOCUMENTATION: The City has performed video inspections, where possible, for the piping scheduled for rehabilitation. These videos and associated documentation are available on a USB thumb drive and may be requested from the City by contacting Noreen Bolo, Project Assistant, at Noreen.bolo@ci.bremerton.wa.us or 360-473-2323. The City will overnight mail the USB thumb drive to interested parties upon request, or may coordinate a pickup. The requestor(s) shall be solely responsible for contacting the City and coordinating retrieval of files from the City for bidding purposes. PROPOSALS: All bid proposals must be made on the blank forms furnished in the Contract Documents. Sealed envelopes containing bids shall be entitled: 2023 Sewer Rehabilitation. BID SECURITY: Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. The failure to furnish a bid deposit of a minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. PERFORMANCE BOND: The successful bidder will also be required to provide a Performance Bond for 100 percent of the Contract Price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. WAGE RATES: Contractor shall file a “Statement of Intent to Pay Prevailing Wages” with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. Contractor will be required to pay Kitsap County Prevailing Wage Rates current on the bid opening date. The Kitsap County prevailing wage rates are available at the Dept. of Labor and Industries website. PRE-BID CONFERENCE: A non-mandatory pre-bid conference will be conducted by the City. The objective of the pre-bid conference is to acquaint prospective bidders with the work, specifically the pump station sites, and answer any questions. Only pump station influent sites will be visited. The pre-bid conference is scheduled for: March 16, 2023 at 10:30 AM and will be held at the Bremerton Public Works & Utilities building (North Parking Lot) located at 100 Oyster Bay Ave, Bremerton, WA 98312. Pre-bid conference may include site visits at specific project locations included in the contract. Please notify the City of your intent to attend this meeting by contacting Noreen Bolo, Project Assistant, at Noreen.bolo@ci.bremerton.wa.us or 360-473-2323 at least 24 hours prior to the meeting. PROJECT COMMUNICATION: All communications related to the project shall be written and directed to the City prior to opening of Bids: Nick Ataie, P.E. nick.ataie@ci.bremerton.wa.us CITY’S RIGHTS RESERVED: The City of Bremerton reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine 2023 SEWER REHABILITATION MARCH 2023 7 which bid or bidders is the most satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. PUBLIC DISCLOSURE: All Proposals, including attachments and any documentation, submitted to and accepted by the City in response to this Notice Inviting Bids become the property of the City and are subject to the disclosure provisions of the Washington Public Records Act. Submittals shall become property of the City and considered public documents under applicable Washington State laws. All documentation provided to the City may be subject to disclosure in accordance with Washington State public disclosure laws. CONTRACTOR RESPONSIBILITY: It is the Contractor’s responsibility to examine all specifications and conditions thoroughly and comply fully with specifications and all attached terms and conditions. Contractors must comply with all Federal, State, and City laws, ordinances and rules, and meet any and all registration requirements where required for Contractors as set forth in the Washington Revised Statutes RIGHT TO CANCEL: The City of Bremerton reserves the right to cancel or reissue all or part of this solicitation at any time, as allowed by law, without obligation or liability. The Notice Inviting Bids documents are not intended to constitute, or be interpreted as, a call for tenders, and the submission of a Bid is not intended to create any contractual or other legal obligations or duties whatsoever owed to any qualified Vendor by the City, including any obligation or duty to accept or reject a Bid, to enter into negotiations or decline to enter into or continue negotiations, or to award or not award a Contract. Without restricting the generality of the foregoing, no contractual relations shall exist between the City and any qualified Vendor until the execution of a Contract with that qualified Vendor. EQUAL EMPLOYMENT OPPORTUNITY STATEMENT: It is the policy of the City of Bremerton to offer equal employment opportunity to all individuals. The City of Bremerton will administer all actions with respect to employment practices in compliance with federal, state and local laws, and will not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental or sensory disability. ADA STATEMENT: The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services, and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. END OF NOTICE INVITING BIDS BID FORMS 2023 SEWER REHABILITATION MARCH 2023 8 BIDDER CHECKLIST This section lists the contract forms required for this project. The bidder's attention is especially directed to the bid forms that must be executed in full as required and submitted with the bid. BID FORMS Bid forms shall be submitted with the bid. All forms in this section must be executed and submitted to the City with your bid, not later than the designated bid closing date and time (unless noted otherwise). Bids that do not include all of the forms, properly completed, may be declared unresponsive. a. Acknowledgement of Bid and Addenda b. Bid Certificate c. Bid Schedule d. Bid Bond (This form to be executed by the bidder and the surety company unless bid is accompanied by a certified check. The amount of this check or bond shall be not less than 5% (five percent) of the total amount bid and may be shown in dollars or on a percentage basis) e. List of Subcontractors (Submit with bid or within 1 hour of bid opening) f. Information Required of Bidder g. Project References and General Information (This information must be submitted within 24 hours of the bid opening) h. Non-Collusion Affidavit (This form is to be completed and signed by the contractor and notarized) i. Certification by Proposed Contractor Regarding Equal Employment Opportunity Plan j. Certification of Non-Segregated Facilities k. Certification of Federal Non-Debarment and Suspension l. Certification of Compliance with Wage Rate Statutes DOCUMENTS TO BE EXECUTED BY THE SUCCESSFUL BIDDER The following forms are to be executed and submitted to the City after the contract is awarded by the Bremerton City Council. These forms follow the contract forms in Part 1. Unless noted otherwise, these must be submitted within thirty (30) calendar days after the date of Notice of Award of Contract. a. Contract b. Contractor Certificate c. Performance Bond (Bond is for 100% of the Contract Amount) d. Payment Bond (Bond is for 100% of the Contract Amount) e. Insurance Certificates DOCUMENTS TO BE EXECUTED PRIOR TO FIRST PAYMENT a. Statement of Intent to Pay Prevailing Wages - Note: Certified Payroll shall be submitted weekly to document wages paid DOCUMENTS TO BE EXECUTED PRIOR TO FINAL PAYMENT AND RELEASE OF RETAINAGE a. Acceptance of Compensation and Release of All Claims (See Appendix B) b. Affidavit of Wages Paid (available from Department of Labor & Industries) THIS PAGE INTENTIONALLY LEFT BLANK 2023 SEWER REHABILITATION MARCH 2023 39 INTRODUCTION TO THE SPECIAL PROVISIONS The work on this project shall be accomplished in accordance with the Standard Specifications for Road, Bridge and Municipal Construction, 2023 edition, as issued by the Washington State Department of Transportation (WSDOT) and the American Public Works Association (APWA), Washington State Chapter (hereafter “Standard Specifications”). The Standard Specifications, as modified or supplemented by the Amendments to the Standard Specifications and these Special Provisions, all of which are made a part of the Contract Documents, shall govern all of the Work. These Special Provisions are made up of both General Special Provisions (GSPs) from various sources, which may have project-specific fill-ins; and project-specific Special Provisions. Each Provision either supplements, modifies, or replaces the comparable Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion of the Standard Specifications is meant to pertain only to that particular portion of the section, and in no way should it be interpreted that the balance of the section does not apply. The GSPs are labeled under the headers of each GSP, with the date of the GSP and its source, as follows: (May 18, 2007 APWA GSP) (August 7, 2006 WSDOT GSP) (November 11, 2014 COB GSP) Also incorporated into the Contract Documents by reference are the following documents, which are available online: · Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted edition, with Washington State modifications, if any · Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current edition · City of Bremerton Construction Standard Plans and Details 2023 SEWER REHABILITATION MARCH 2023 40 DIVISION 1 GENERAL REQUIREMENTS DESCRIPTION OF WORK (March 13, 1995, WSDOT GSP) This Contract provides for the improvement of 2023 Sewer Rehabilitation and includes, but is not limited to the removal of protruding sewer laterals as shown in the appendices all in accordance with the Contract Plans, these Contract Provisions including the Technical Specifications, and the Standard Specifications. 1-01 DEFINITIONS AND TERMS 1-01.3 Definitions This section is supplemented with the following: All references in the Standard Specifications to the terms “State”, “Department of Transportation”, “Washington State Transportation Commission”, “Commission”, “Secretary of Transportation”, “Secretary”, “Headquarters”, and “State Treasurer” shall be revised to read “Contracting Agency”. All references to “State Materials Laboratory” shall be revised to read “Contracting Agency designated location”. The venue of all causes of action arising from the advertisement, award, execution, and performance of the contract shall be in the Superior Court of Kitsap County where the Contracting Agency’s headquarters are located. Additive A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. Alternate One of two or more units of work or groups of bid items, identified separately in the proposal, from which the Contracting Agency may make a choice between different methods or material of construction for performing the same work. Business Day A business day is any day from Monday through Friday except holidays as listed in Section 1-08.5. City The word “City” shall mean the City of Bremerton, Department of Public Works and Utilities, with offices at 345 6th Street, Suite 100, Bremerton, Washington, 98337 2023 SEWER REHABILITATION MARCH 2023 41 Commission, Washington State Transportation Commission Substitute the following: The words “Commission” or “Washington State Transportation Commission” shall refer to the City of Bremerton City Council. Contract Bond The definition in the Standard Specifications for “Contract Bond” applies to whatever bond form(s) are required by the Contract Documents, which may be a combination of a Payment Bond and a Performance Bond. Contract Documents See definition for “Contract”. Contract Time The period of time established by the terms and conditions of the Contract within which the Work must be substantially complete. The Contract Time is in calendar days. Contracting Agency The City of Bremerton, Department of Public Works and Utilities, with offices at 345 6th Street, Suite 100, Bremerton, Washington, 98337 acting through its legally constituted officials, agents, officers, or employees, is responsible for the execution and administration of the Contract. Dates Bid Opening Date The date on which the Contracting Agency publicly opens and reads the Bids. Award Date The date of the formal decision of the Contracting Agency to accept the lowest responsible and responsive Bidder for the Work. Contract Execution Date The date the Contracting Agency officially binds the Agency to the Contract. Notice to Proceed Date The date stated in the Notice to Proceed on which the Contract time begins. For work that is phased, multiple Notice to Proceed dates may be required. Substantial Completion Date The day the Engineer determines the Contracting Agency has full and unrestricted use and benefit of the facilities, both from the operational and safety standpoint, any remaining traffic disruptions will be rare and brief, and only minor incidental work, replacement of temporary substitute facilities, plant establishment periods, or correction or repair remains for the Physical 2023 SEWER REHABILITATION MARCH 2023 42 Completion of the total Contract. For work that is phased, multiple completion dates may be required. Physical Completion Date The day all of the Work is physically completed on the project. All documentation required by the Contract and required by law does not necessarily need to be furnished by the Contractor by this date. Completion Date The day all the Work specified in the Contract is completed and all the obligations of the Contractor under the Contract are fulfilled by the Contractor. All documentation required by the Contract and required by law must be furnished by the Contractor before establishment of this date. Final Acceptance Date The date on which the Contracting Agency accepts the Work as complete. Department, Department of Transportation Substitute the following: The words “Department” or “Department of Transportation” shall mean the City of Bremerton, Department of Public Works and Utilities, with offices at 345 6th Street, Suite 100, Bremerton, WA 98337. Engineer Substitute the following: The word “Engineer” shall mean the City of Bremerton City Engineer and his/her authorized representatives. Force Account Work Additional Work that may be required because of City-directed changes in the Work, differing site conditions, emergencies or other reasons that the Engineer determines is not included in the Contract unit prices, and for which payment is to be determined as required by Sections 1-04 and 1-09 of this Contract. Force Account Work shall be authorized only by written Work Change Directive issued by the Engineer. Imported Material Materials obtained from sources outside the project site that are not furnished by the City. Materials excavated from anywhere on the project or from designated borrow areas, or that are furnished by the City, shall not be considered imported material. Laboratory Delete this definition and substitute the following: 2023 SEWER REHABILITATION MARCH 2023 43 The word “Laboratory” shall mean the official laboratories of the City of Bremerton, or other laboratories the City of Bremerton authorizes to test work, soils, and materials. Notice of Award The written notice from the Contracting Agency to the successful bidder signifying the Contracting Agency’s acceptance of the Bid. Notice to Proceed The written notice from the Contracting Agency or Engineer to the Contractor authorizing and directing the Contractor to proceed with the Work and establishing the date on which the Contract time begins. For work that is phased, multiple Notice to Proceeds will be required. Owner The City of Bremerton, Department of Public Works and Utilities, 345 6th Street, Suite 100, Bremerton, WA 98337 acting through its legally constituted officials, agents, officers, or employees, is responsible for the execution and administration of the Contract. Plans Add the following: Plans consist of the project Plans included in the Appendix. Provide The word “provide” shall be understood to mean “furnish and install, complete in place.” Secretary, Secretary of Transportation Substitute the following: All reference to the words “Secretary” or “Secretary of Transportation” shall mean the City of Bremerton City Council, Mayor or their authorized representatives. Traffic Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. Work Change Directive A written order issued by the Engineer directing a change in the design, specifications, quantities, materials or methods of the Work. A Work Change Directive may, or may not, alter the Contract Price or Contract Time. 1-02 BID PROCEDURES AND CONDITIONS 2023 SEWER REHABILITATION MARCH 2023 44 1-02.2 Plans and Specifications Delete this section and replace it with the following: Information as to where Bid Documents can be obtained or reviewed can be found in the Request for Bids. After award of the contract, plans and specifications will be issued to the Contractor at no cost as detailed below: To Prime Contractor No. of Sets Basis of Distribution Contract Documents 3 Furnished automatically upon award. (Specifications and Plans) Additional plans and Contract Provisions may be obtained by the Contractor from the source stated in the Request for Bids at the Contractor’s own expense. 1-02.3 Estimated Quantities Delete this section and replace with the following: The estimated quantities shown in the bid forms are estimates only, being given only as the basis for the comparison of bids, and the City does not warrant, expressly or by implication, that the actual amount of work will correspond therewith. The right to increase or decrease the amount of any class or portion of the Work or to make changes in the Work required may be deemed necessary is reserved by the City as provided elsewhere in these specifications. The basis of payment will be the actual unit bid items of work performed and measured in accordance with the contract. All prospective bidders should note that certain bid items might be included in the Bid Form to establish a unit price should the use of those items become necessary during construction. Allowance will not be made for loss of anticipated profits or additional compensation should the use of these items be deemed unnecessary. 1-02.5 Proposal Forms Delete this section and replace it with the following: The Bid Forms will identify the project and list estimated quantities, units of measurement, the items of work, and the materials to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal form that call for, but are not limited to, unit prices; extensions; summations; the total bid amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s UDBE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor’s Registration Number; and a Business License Number, if applicable. 2023 SEWER REHABILITATION MARCH 2023 45 Bids shall be completed by typing or shall be printed in ink by hand, preferably in black ink. The required certifications are included as part of the Proposal Form. The Contracting Agency reserves the right to arrange the proposal forms with alternates and additives, if such be to the advantage of the Contracting Agency. The bidder shall bid on all alternates and additives set forth in the Proposal Form unless otherwise specified. 1-02.7 Bid Deposit (March 8, 2013 APWA GSP) Supplement this section with the following: Bid bonds shall contain the following: 1. Contracting Agency-assigned number for the project; 2. Name of the project; 3. The Contracting Agency named as obligee; 4. The amount of the bid bond stated either as a dollar figure or as a percentage which represents five percent of the maximum bid amount that could be awarded; 5. Signature of the bidder’s officer empowered to sign official statements. The signature of the person authorized to submit the bid should agree with the signature on the bond, and the title of the person must accompany the said signature; 6. The signature of the surety’s officer empowered to sign the bond and the power of attorney. If so stated in the Contract Provisions, bidder must use the bond form included in the Contract Provisions. If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. 1-02.9 Delivery of Proposal Replace Section 1-02.9 with the following: Reference the Request for Bids for requirements for proposal delivery. 1-02.13 Irregular Proposals 2023 SEWER REHABILITATION MARCH 2023 46 Delete this section and replace it with the following: 1. A Proposal will be considered irregular and will be rejected if: · The Bidder is not prequalified when so required; · The authorized Proposal form furnished by the Contracting Agency is not used or is altered; · The completed Proposal form contains any unauthorized additions, deletions, alternate Bids, or conditions; · The Bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract; · A price per unit cannot be determined from the Bid Proposal; · The Proposal form is not properly executed; · The Bid Proposal does not constitute a definite and unqualified offer to meet the material terms of the Bid invitation; or · More than one Proposal is submitted for the same project from a Bidder under the same or different names. 2. A Proposal may be considered irregular and may be rejected if: · The Proposal does not include a unit price for every Bid item; · Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential detriment of the Contracting Agency; · Receipt of Addenda is not acknowledged; · A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in such an instance, both Bids may be rejected); or · If Proposal form entries are not made in ink. 1-02.16 Addenda and Interpretations of Documents (NEW SECTION) No oral interpretation of the meaning of the plans, specifications, or other pre-bid documents will be made to any bidder. Every request for such interpretation shall be submitted in writing, addressed to the City’s contact person (listed on the cover page of these contract documents), and to be given consideration, shall be received at least three (3) working days prior to date fixed for Bid Opening. Any and all such interpretations and supplemental instructions will be in the form of written addenda to the Specifications which, if issued, will be mailed or otherwise delivered to each prospective bidder. Failure of any bidder to receive any such addendum shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become a part of the Contract documents. 2023 SEWER REHABILITATION MARCH 2023 47 1-03 AWARD AND EXECUTION OF CONTRACT 1-03.1 Consideration of Bids (January 23, 2006 APWA GSP) Revise the first paragraph to read: After opening and reading proposals, the Contracting Agency will check them for correctness of extensions of the prices per unit and the total price. If a discrepancy exists between the price per unit and the extended amount of any bid item, the price per unit will control. If a minimum bid amount has been established for any item and the bidder’s unit or lump sum price is less than the minimum specified amount, the Contracting Agency will unilaterally revise the unit or lump sum price, to the minimum specified amount and recalculate the extension. The total of extensions, corrected where necessary, including sales taxes where applicable and such additives and/or alternates as selected by the Contracting Agency, will be used by the Contracting Agency for award purposes and to fix the Awarded Contract Price amount and the amount of the contract bond. Add the following paragraph: In order to not exceed the City’s overall budget on this project, the City reserves the right to reduce the Total Bid Price by deleting individual pipe sections from the project, resulting in a reduction in quantities. This will done after Bid Opening but prior to Bid Award. 1-03.3 Execution of Contract Replace Section 1-03.3 with the following: The City will email the contract to the Contractor for electronic signature. The Contractor shall electronically sign and return to the City with insurance certificates and satisfactory bond as required by law and Section 1-03.4 of these Contract Documents within 7 calendar days. Before execution of the contract by the City, the successful bidder shall provide any pre-award information the City may require under Section 1-02.15. Until the City executes a contract, no proposal shall bind the City nor shall any work begin within the project limits or within City-furnished sites. The Contractor shall bear all risks for any work begun outside such areas and for any materials ordered before the contract is executed by the City. If the bidder’s performance of the requirements of this section is delayed by circumstances beyond the bidder’s control, the City may grant up to 20 calendar days of additional time, provided that the City agrees that circumstances warrant an extension. 2023 SEWER REHABILITATION MARCH 2023 48 1-03.4 Contract Bond This section is deleted. 1-03.7 Judicial Review Delete all occurrences of “Thurston County” in this section and replace with “Kitsap County”. 1-04 SCOPE OF THE WORK 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda (December 10, 2020 APWA GSP) Revise the second paragraph to read: Any inconsistency in the parts of the contract shall be resolved by following this order of precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 1. Addenda, 2. Proposal Form, 3. Agreement 4. Special Provisions, 5. Contract Plans, 6. Standard Specifications, 7. Contracting Agency’s Standard Plans or Details (if any), and 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 1-04.4 Changes 1-04.4(1) Minor Changes Section 1-04.4(1) title is revised to read as follows: 1-04.4(1) Minor Changes and Force Account Revise this section to read as follows: 2023 SEWER REHABILITATION MARCH 2023 49 Payments or credits for changes and extra work shall be made under the Bid Item “Minor Changes and Force Account”. At the discretion of the City of Bremerton, this procedure for Minor Changes may be used in lieu of the more formal procedure as outlined in Section 1-04.4, Changes of the Standard Specifications. Use and payment of money from the “Minor Changes and Force Account” bid item shall be only upon written authorization by the City via a Work Change Directive. A determination will be made before the extra work starts about whether the Work will be paid as a lump sum cost or tracked as force account (time and materials). A Work Change Directive shall be executed by both parties prior to starting the extra work. If the Contractor is in disagreement with anything required by the Work Change Directive, the Contractor may protest the order as provided in Section 1-04.5, Procedure and Protests by the Contractor, in the Washington State Department of Standards and Specifications Manual. Payments or credits will be determined in accordance with Section 1-09.4, Equitable Adjustment, in the Standard Specifications. For the purpose of providing a common bid amount for all Bidders, the Contracting Agency has entered an amount for “Minor Changes and Force Account” in the Bid Schedule to become part of the Bid by the Contractor. If the total cost of extra work and additional quantities exceeds the contract amount, the City and Contractor will execute a Change Order, which must be signed by the Bremerton Mayor. 1-04.6 Variation in Estimated Quantities Delete this section and replace with the following: Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. No adjustment to the unit cost will be made due to variation of the quantity. 1-05 CONTROL OF WORK 1-05.7 Removal of Defective and Unauthorized Work (October 1, 2005 APWA GSP) Supplement this section with the following: If the Contractor fails to remedy defective or unauthorized work within the time specified in a written notice from the Engineer or fails to perform any part of the Work required by the Contract Documents, the Engineer may correct and remedy such work as may be identified in the written notice, with Contracting Agency forces or by such other means as the Contracting Agency may deem necessary. 2023 SEWER REHABILITATION MARCH 2023 50 If the Contractor fails to comply with a written order to remedy what the Engineer determines to be an emergency situation, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have work the Contractor refuses to perform completed by using Contracting Agency or other forces. An emergency situation is any situation when, in the opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or damage to the public. Direct or indirect costs incurred by the Contracting Agency attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from monies due, or to become due, the Contractor. Such direct and indirect costs shall include in particular, but without limitation, compensation for additional professional services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor’s unauthorized work. No adjustment in contract time or compensation will be allowed because of the delay in the performance of the Work attributable to the exercise of the Contracting Agency’s rights provided by this Section. The rights exercised under the provisions of this section shall not diminish the Contracting Agency’s right to pursue any other avenue for additional remedy or damages with respect to the Contractor’s failure to perform the work as required. 1-05.8 Vacant Section 1-05.8, including title, is replaced with the following: 1-05.8 Submittals 1-05.8(7)B Construction Submittals The following items shall be submitted, as applicable, at least two weeks prior to the associated construction activity to allow ample time for review and resubmittal if necessary. Use the submittal transmittal sheet when sending in submittals. Submittals shall be emailed to the City. · Shop drawings, catalog information and data sheets for all materials to be installed on project, including but not limited to CIPP materials, bypass equipment, and grout. · Temporary Erosion and Sedimentation Control (TESC) Plan · Spill Control and Countermeasure (SPCC) Plan · Construction Sequencing Plans · Temporary Traffic Control Plans · Certification for Traffic Control Supervisor (TCS) and Flagger cards 2023 SEWER REHABILITATION MARCH 2023 51 · Manufacturer’s certification for trench boxes to be utilized · Temporary flow bypass plans · Any other construction-related submittal identified elsewhere in the Contract Documents. 1-05.8(7)C Additional Administrative Submittals The following administrative submittals shall be submitted when noted: · Retainage account information – Submit prior to first invoice · Intent to Pay Prevailing Wage Rates for prime contractor and subcontractors – Submit prior to issuance of Notice to Proceed · Certified Payrolls – Submit weekly · Affidavit of Wages Paid – Submit upon completion of Work · Additional submittals where identified in the Contract Documents and as requested by the Engineer 1-05.10 Guarantees Add the following paragraphs to this section: The Contractor shall return to the project and repair or replace all defects in workmanship and material discovered within one year after Final Acceptance of the Work. The Contractor shall start work to remedy any such defects within 7 calendar days of receiving Contracting Agency’s written notice of a defect, and shall complete such work within the time stated in the Contracting Agency’s notice. In case of an emergency, where damage may result from delay or where loss of services may result, such corrections may be made by the Contracting Agency’s own forces or another contractor, in which case the cost of corrections shall be paid by the Contractor. In the event the Contractor does not accomplish corrections within the time specified, the work will be otherwise accomplished and the cost of same shall be paid by the Contractor. When corrections of defects are made, the Contractor shall then be responsible for correcting all defects in workmanship and materials in the corrected work for one year after acceptance of the corrections by Contracting Agency. This guarantee is supplemental to and does not limit or affect the requirements that the Contractor’s work comply with the requirements of the Contract or any other legal rights or remedies of the Contracting Agency. 1-05.11 Final Inspection Replace Section 1-05.11 with the following new Subsections 1-05.11(1). 1-05.11(1) Substantial Completion Date New Section 2023 SEWER REHABILITATION MARCH 2023 52 When the Contractor considers the work to be substantially complete, the Contractor shall so notify the Engineer in writing and request the Engineer to establish the Substantial Completion Date. The Contractor’s request shall list the specific items of work that remain to be completed in order to reach physical completion. The Engineer will schedule an inspection of the work with the Contractor to determine the status of completion. The Engineer may also establish the Substantial Completion Date unilaterally. If, after this inspection, the Engineer concurs with the Contractor that the work is substantially complete and ready for its intended use, the Engineer, by written notice to the Contractor, will set the Substantial Completion Date. If, after this inspection the Engineer does not consider the work substantially complete and ready for its intended use, the Engineer will, by written notice, so notify the Contractor giving the reasons therefore. Upon receipt of written notice concurring in or denying substantial completion, whichever is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized interruption, the work necessary to reach Substantial and Physical Completion. The Contractor shall provide the Engineer with a revised schedule indicating when the Contractor expects to reach substantial and physical completion of the work. The above process shall be repeated until the Engineer establishes the Substantial Completion Date and the Contractor considers the work physically complete and ready for final inspection. Add the following new sections: 1-05.16 Water and Power (NEW SECTION) The Contractor shall supply their own power. Water may be obtained from the Owner’s hydrants. No charge for water will be made unless there is obvious waste. The Contractor will be required to deposit $3,000.00 for use of a hydrant meter and backflow preventer assembly with the Owner. The deposit will be refunded upon return of the undamaged meter/backflow preventer assembly. Email the City at DCDPermits@ci.bremerton.wa.us to obtain a meter and assembly. Upon receipt of the deposit and approval of application, Public Works staff will install the meter at a location requested by the Contractor. 1-05.17 Oral Agreements (NEW SECTION) No oral agreement or conversation with any officer, agent, or employee of the Contracting Agency, either before or after execution of the contract, shall affect or modify any of the terms or obligations contained in any of the documents comprising the contract. Such oral agreement or conversation shall be considered as unofficial information and in no way binding upon the Contracting Agency, unless subsequently put in writing and signed by the Contracting Agency. 2023 SEWER REHABILITATION MARCH 2023 53 1-06 CONTROL OF MATERIAL 1-06.1 Approval of Materials Prior to Use Section 1-06.1 is supplemented with the following: Shop Drawings. In addition to notification of material suppliers and fabricators, the Contractor shall also furnish for the Engineer’s review and approval all required shop drawings. Shop drawings are defined as drawings or data, which illustrate how specific items, shall be fabricated, manufactured, or installed. Shop drawings are required for all shop, field fabricated or manufactured items and shall include all information necessary for the fabrication and installation of the item and to show conformance with these contract documents. The information shall include, but not be limited to: 1. For fabricated items or those constructed in place, component sizes, layout, materials, and connection details including, but not limited to, connectors, weld type, reinforcement schedules and sizes, and boring and jacking equipment. 2. Shop drawings for reinforced concrete structures shall include, but not be limited to, reinforcement bending and placing drawings. 3. Piping Fabrication and Placement Drawings. 4. Erection Drawings. 5. Diagrams, Illustrations and Data (product, design, or other). Manufacturers’ standard catalog information and details maybe submitted; however, standard manufacturers’ information and advertising literature may not necessarily be sufficient. Samples are physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. Samples submitted shall be of sufficient size and quantity to clearly illustrate functional characteristics of products or materials and full range of colors available. Shop drawings and samples shall be submitted in accordance with Section 1- 05.8. 2023 SEWER REHABILITATION MARCH 2023 54 1-06.1(4) Fabrication Inspection Expense (June 27, 2011 AWPA GSP) Delete this section in its entirety. 1-06.6 Recycled Materials This section is deleted in entirety. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.1 Laws to be Observed (October 1, 2005 APWA GSP) Supplement this section with the following: In cases of conflict between different safety regulations, the more stringent regulation shall apply. The Washington State Department of Labor and Industries shall be the sole and paramount administrative agency responsible for the administration of the provisions of the Washington Industrial Safety and Health Act of 1973 (WISHA). The Contractor shall maintain at the project site office, or other well-known place at the project site, all articles necessary for providing first aid to the injured. The Contractor shall establish, publish, and make known to all employees, procedures for ensuring immediate removal to a hospital, or doctor’s care, persons, including employees, who may have been injured on the project site. Employees should not be permitted to work on the project site before the Contractor has established and made known procedures for removal of injured persons to a hospital or a doctor’s care. The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the Contractor’s plant, appliances, and methods, and for any damage or injury resulting from their failure, or improper maintenance, use, or operation. The Contractor shall be solely and completely responsible for the conditions of the project site, including safety for all persons and property in the performance of the work. This requirement shall apply continuously, and not be limited to normal working hours. The required or implied duty of the Engineer to conduct construction review of the Contractor’s performance does not, and shall not, be intended to include review and adequacy of the Contractor’s safety measures in, on, or near the project site. 1-07.2 State Taxes Delete this section, including its sub-sections, in its entirety and replace it with the following: 2023 SEWER REHABILITATION MARCH 2023 55 Washington State Department of Revenue Tax Rule 170 will apply to this project. The Contractor shall include all Contractor-paid taxes in the unit bid prices or other contract amounts. In some cases, however, state retail sales tax will not be included. Section 1-07.2(2) describes this exception. The Contracting Agency will pay the retained percentage (or release the Contract Bond if a FHWA-funded Project) only if the Contractor has obtained from the Washington State Department of Revenue a certificate showing that all contract- related taxes have been paid (RCW 60.28.051). The Contracting Agency may deduct from its payments to the Contractor any amount the Contractor may owe the Washington State Department of Revenue, whether the amount owed relates to this contract or not. Any amount so deducted will be paid into the proper State fund. 1-07.3 Fire Prevention and Merchantable Timber Requirements This section is deleted in entirety. 1-07.13 Contractor’s Responsibility for Work 1-07.13(1) General Section 1-07.13(1) is supplemented with the following: It shall be the responsibility of the Contractor to coordinate all work to be performed under this Contract, including the ordering and acquisition of all equipment and materials. This coordination shall encompass all work to be performed by the Contractor, their subcontractor, the City of Bremerton and any public utilities that may be involved. The Contractor shall submit a performance bond in accordance with the City of Bremerton, State of Washington, Public Works performance and payment bond requirements. The performance bond shall be in the full amount of Contract. Whether or not there appears here or elsewhere herein specific reference to guarantees of all items of materials, equipment, and workmanship, they nevertheless shall be so guaranteed against mechanical, structural, or other defects for which the Contractor is responsible that may develop or become evident within a period of one year from and after acceptance of the work by the City. Such guarantees shall include care of backfilling of ditches or at structures should the fill settle to such extent as to require refilling or resurfacing roadway surfaces to restore the original or intended condition or grade. This guarantee shall be understood to imply prompt attention to any remedy of such defects as those mentioned above if and as they occur after the Contractor shall have written notice of their existence. If the defect, in the opinion of the City, is of such nature as to demand immediate repair, the City shall have the right to correct and cost thereof shall be borne by the Contractor. 2023 SEWER REHABILITATION MARCH 2023 56 To support the above guarantee, the Contractor’s performance bond shall remain in full force and effect for one year following the acceptance of the Project by the City. The bond shall be executed by a surety company authorized to do business within the State of Washington and it shall be subject to the approval of the attorney for the City. 1-07.15 Temporary Water Pollution Prevention Section 1-07.15 is supplemented with the following: Contractor shall take necessary measures to prevent siltation of downstream facilities, adjacent properties and Washington Narrows, Puget Sound. When submitting erosion control plan as outlined in the Standard Specification (Section 8-01), the Contractor shall address the following items: 1. Protection of existing storm sewer system. 2. Disposal of water from dewatering systems. 3. Disposal of water from normal trench dewatering. The Contractor shall prepare and submit a temporary erosion and sedimentation control (TESC) plan using figures and narrative which describes how these items will be addressed. Preparation and implementation of the TESC plan and best management practices (BMPs) shall be paid under the lump sum bid item “TESC Plan.” 1-07.15(1) Spill Prevention, Control, and Countermeasures Plan Section 1-07.15(1) is supplemented with the following: All costs associated with the SPCC plan shall be included in the lump sum price for “Mobilization” and will include: 1. All costs associated with developing the SPCC plan. 2. All costs associated with providing and maintaining on-site standby materials and equipment described in the SPCC plan. Costs associated with cleanup of spills resulting from Contractor’s operations, negligence, or omissions shall not be measured for payment. 1-07.16 Protection and Restoration of Property 1-07.16(1) Private/Public Property Section 1-07.16(1) is supplemented with the following: 2023 SEWER REHABILITATION MARCH 2023 57 Asphalt concrete pavement or bituminous surfacing outside the project area that is disturbed by the work shall be restored to its original condition. Asphalt pavement restoration shall comply with the provisions of Section 5-04 (Hot Mix Asphalt) of the Standard Specifications. All other surfaces, mailboxes, fences, signs, etc., disturbed by the project shall be promptly replaced or relocated to original or better than condition. The Contractor shall restore all disturbed landscaping in conformance with Section 8-02 (Roadside Restoration). All costs associated with Protection and Restoration of Property, as described under Section 1-07.16, shall be considered incidental to the project. Add the following new subsections: 1-07.16(1)A Lot Corners or Permanent Control Points (NEW SECTION) All lot corners or corners of tracts, section corners or permanent markers of subdivisions therein as well as street monuments and right-of-way monuments shall be carefully noted and maintained by the Contractor. Some monuments are shown on the Plans and there may be others. The Contractor shall notify the Engineer of any existing federal, state, county, city, and private land monuments encountered prior to pipeline construction. The Contractor shall preserve such monuments intact and undisturbed or they shall be referenced by a land surveyor licensed to practice in the State of Washington prior to any disturbance. Any such pin, pipe, stone, plaque, or monument that is removed or disturbed by the Contractor shall be accurately located and replaced by a licensed surveyor at the expense of the Contractor. Replacement of survey monuments and lot corners shall conform in all respects to the requirements of RCW 58.09 and Chapter 332 120 WAC. Applicable permits as required by the Washington Department of Natural Resources shall be obtained by the contractor’s surveyor. This work shall be incidental to Contract pay items. The City will provide copies of Records of Survey to the Contractor prior to construction for the contractor’s use in protecting monument, corners, and other markers. 1-07.17 Utilities and Similar Facilities 1-07.17(4) Contractor’s Responsibility for Utility Properties and Services (NEW SECTION) Where the Contractor’s operations could cause damage or inconvenience to railway, telegraph, telephone, television, power, oil, gas, water, sewer, storm sewer, or irrigation systems, operations shall be suspended until all arrangements necessary for the protection of these utilities and services have been made by the Contractor. 2023 SEWER REHABILITATION MARCH 2023 58 The Contractor shall protect, in place, all railway, telegraph, telephone (including poles, guy wires and anchors), television, power (including poles, guy wires, and anchors), oil, gas, water, sewer, storm sewer, or irrigation systems from damage. If interfering railway, telegraph, telephone (including poles, guy wires, and anchors), television, power (including poles, guy wires, and anchors), oil, gas, water, sewer, storm sewer, or irrigation systems are encountered notify the Engineer and the appropriate utility company at least two (2) working days in advance of construction operations to permit the necessary arrangements for protection or relocation of the interfering structure. The Contractor shall pay all costs of protecting and/or relocation of such facilities. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a result on accidental breakage due to construction operations, the Contractor shall promptly notify the proper authority, cooperate with said authority in restoration of service as promptly as possible and bear all associated costs of repair subject to determination of responsibility. In no case shall interruption of any water or utility service be allowed to exist outside working hours unless prior approval is granted. All costs of repairing utilities interrupted or uprooted, replacing driveway and roadside culverts, fences, guard posts, landscape shrubs, traffic signs, and mailboxes shall be considered incidental. In the event the Contractor encounters water and sewer service lines that interfere with trenching or that must be relocated to avoid the new pipeline, the services may be cut, and the trench dug through, only after obtaining prior approval of the Engineer. All work and repairs to the water system shall be performed by City forces only. The services will be restored with similar or equal materials. The Contractor shall replace, at his own expense, any and all other existing utilities or structures removed or damaged during construction, unless otherwise provided for in these Contract Documents or ordered by the Engineer. The Contractor shall take every possible precaution to preserve the existing improvements. All damages to existing improvements from the Contractor’s operation, whether within the road right-of-way or in private property, shall be the sole responsibility of the Contractor to remedy. The Engineer will review the pre- construction photographs for confirmation of possible damage by the Contractor’s activities. All such areas identified by the Engineer shall be restored to their preconstruction equivalent to the satisfaction of the Owner. 1-07.17(5) List of Utility Owners (NEW SECTION) Following is a list of the utilities serving the work area indicating the name (if available) and telephone number of the responsible authority of the various utilities which should be notified if emergencies arise during the progress of the work. Outside normal working hours, report emergencies and initiate contact with the appropriate individual by calling 911. 2023 SEWER REHABILITATION MARCH 2023 59 UTILITY CONTACT TABLE UTILITY UTILITY NAME CONTACT TELEPHONE # Within City of Bremerton, Department of Public Works and Utilities (PWU): Storm and San Sewers PWU Darrell Clauson (360) 473-5479 Water PWU Larry Reed (360) 473-5249 Streets PWU Dave Carter (360) 473-5333 Contact City Engineer Ned Lever at (360) 473-2398 if unable to contact PWU individuals above. OTHER UTILITIES Power Puget Sound Energy Victor Ibarra (425) 429-4574 (cell) Telephone Century Link Dioni Cariaga (206) 733-5261 Gas Cascade Natural Gas Shawn O’Neil (360) 405-4225 (360) 328-6845 (cell) Cable TV Comcast John Doane (253) 508-2081 Fiber Optic Convergence John Stockwell 425-213-6016 Fiber Optic KPUD Jim LeCompte (360) 689-3132 Underground Utilities Locate Service 800-424-5555 1-07.23 Public Convenience and Safety 1-07.23(1) Construction Under Traffic Section 1-07.23(1) is supplemented with the following: The Contractor shall do whatever work is necessary for safety and be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property during the Contract period. This requirement shall apply continuously and not be limited to normal working hours. The Contractor shall at all times provide proper facilities for safe access to the work by authorized government officials. Work areas shall be barricaded to prevent public access and provide a buffer between the work zone and the public. GENERAL REQUIREMENTS The Contractor shall conform with the following requirements where applicable: 1. At all times, the Contractor shall furnish, install, and maintain additional signage and other measures to safely route vehicular and pedestrian traffic through the construction area and protect the public from construction activities during both working and non-working hours. 2023 SEWER REHABILITATION MARCH 2023 60 2. Pedestrian traffic shall be maintained at all times through the construction area. Signage and flaggers shall be provided to direct pedestrians to ADA- compliant routes during construction. During non-working hours, the Contractor shall also provide ADA-compliant pedestrian facilities through the work area. Appropriate signage, in conformance with the MUTCD, shall be installed to inform pedestrians of sidewalk closures and other conditions. 3. Open trench length at a single time shall be limited to a maximum length of 200 feet. On-street parking may be prohibited within this area; however, parking for local traffic shall be allowed on the roadway up to within 50 feet each side of the trench area. An exception to these requirements requires written approval from the Owner. 4. Where roadways are closed to traffic during working hours and open to traffic during non- working hours, the Contractor shall cover or remove all signage that does not apply to the existing condition (open or closed). 5. All signage and traffic control devices installed by the Contractor shall be in accordance with the MUTCD. 7. All additional signage and traffic control measures needed to provide detours, to route pedestrians and vehicles through the construction area, and to protect the public and workers shall be furnished by the Contractor and the cost thereof included in the lump sum payment item for the temporary traffic control. SPECIFIC TRAFFIC REQUIREMENTS AND CONSTRAINTS Two-way traffic must be maintained at all times during non-working hours. At least one lane must remain open with proper traffic control to ensure two-way access during working hours. Flaggers shall be used as necessary to safely route traffic through the work area. Maintain local and driveway access for residents and businesses at all times. Prepare traffic control plans for each intersection. 1. The signals at 6th Street/Naval Avenue, 6th Street/High Ave, 6th Street/Veneta Ave, 6th Street/Warren Ave and Burwell St/Naval Ave will be set to blinking red (4-way stop) while working near those intersections. Provide at least 7 working days notice prior to working near these intersections to allow sufficient time for City electronics staff to modify signals. Add the following new section: 1-07.23(3) Communication/Dissemination of Information (NEW SECTION) It shall be the Contractor’s responsibility to coordinate daily, all construction activities and scheduling, with local residents, businesses, and the 2023 SEWER REHABILITATION MARCH 2023 61 Owner/Engineer for work within the construction segment. Coordination shall include, but not be limited to: a. Time and location of all roadway and sidewalk closures (minimum 5 working days’ notice). b. Schedule and location of active trench construction and restoration as it affects parking restrictions and driveway closures (minimum 2 working days’ notice). c. Schedule and location of all utility shut-offs to specific properties (minimum 5 working days’ notice). d. At each weekly construction meeting, the Contractor shall provide a list of upcoming notifications. This shall be an agenda item at each meeting. Submit to City staff a copy of any notifications that will be sent out at least one week prior to dissemination to allow the City to review and ensure completeness of the list. 1-07.24 Rights of Way Replace Section 1-07.24, in its entirety, with the following: Street right of way lines, limits of easements, and limits of construction permits are indicated in the Plans. The Contractor’s construction activities shall be confined within these limits, unless arrangements for use of private property are made. Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of way and easements, both permanent and temporary, necessary for carrying out the work. Exceptions to this are noted in the Bid Documents or will be brought to the Contractor’s attention by a duly issued Addendum. Whenever any of the work is accomplished on or through property other than public right of way, the Contractor shall meet and fulfill all covenants and stipulations of any easement agreement obtained by the Contracting Agency from the owner of the private property. Copies of the easement agreements may be included in the Contract Provisions or made available to the Contractor as soon as practical after they have been obtained by the Engineer. Whenever easements or rights of entry have not been acquired prior to advertising, these areas are so noted in the Plans. If applicable, the Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. If the Contractor is delayed due to acts of omission on the part of the Contracting Agency in obtaining easements, rights of entry or right 2023 SEWER REHABILITATION MARCH 2023 62 of way, the Contractor will be entitled to an extension of time. The Contractor agrees that such delay shall not be a breach of contract. The Contractor shall be responsible for providing, without expense or liability to the Contracting Agency, any additional land and access thereto that the Contractor may desire for temporary construction facilities, storage of materials, or other Contractor needs. However, before using any private property, whether adjoining the work or not, the Contractor shall file with the Engineer a written permission of the private property owner, and, upon vacating the premises, a written release from the property owner of each property disturbed or otherwise interfered with by reasons of construction pursued under this contract. The statement shall be signed by the private property owner, or proper authority acting for the owner of the private property affected, stating that permission has been granted to use the property and all necessary permits have been obtained or, in the case of a release, that the restoration of the property has been satisfactorily accomplished. The statement shall include the parcel number, address, and date of signature. Written releases must be filed with the Engineer before the Completion Date will be established. 1-08 PROSECUTION AND PROGRESS Add the following new sections: 1-08.0 Preliminary Matters (May 25, 2006 APWA GSP) 1-08.0(1) Preconstruction Conference (October 10, 2008 APWA GSP) Prior to the Contractor beginning the work, a preconstruction conference will be held between the Contractor, the Engineer and such other interested parties as may be invited. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule; 2. To establish a working understanding among the various parties associated or affected by the work; 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc.; 4. To establish normal working hours for the work; 5. To review safety standards and traffic control; and 6. To discuss such other related items as may be pertinent to the work. The Contractor shall prepare and submit at the preconstruction conference the following: 1. A breakdown of all lump sum items; 2023 SEWER REHABILITATION MARCH 2023 63 2. A preliminary schedule of working drawing submittals; and 3. A list of material sources for approval if applicable. 1-08.0(2) Hours of Work (City of Bremerton GSP) The Work shall be performed between the hours of 7:30 a.m. and 4:00 p.m. unless other working hours are approved in writing by the Owner. All traffic control devices shall be removed from the street and the road fully open to traffic by 4:00 p.m. each day. REQUIREMENT FOR NIGHT WORK: Lining work performed on Naval Ave, 6th St, and Burwell Ave (at the intersection of Bryan Ave and Olympic Ave) must be done at night unless other working hours are approved in writing by the Owner. The Contractor may begin traffic control setup at 7:00 p.m. and the road shall be fully reopened to traffic by 5:30 a.m. Work shall be done on consecutive nights to reduce the amount of night work required. The Contractor must notify the City minimum 7 working days prior to performing any night work so that the City inspector can be notified and adjust to an alternate work schedule. The agency normal straight time working hours for the contract shall be any consecutive 8-hour period plus breaks and a 5-day work week. Written permission from the Engineer is required, if a Contractor desires to perform work on holidays, Saturdays, or Sundays or outside the regular designated working hours. Contractor shall apply in writing to the Engineer for such permission to work outside the work window at least 7 days in advance. Additionally, where the Contractor, for their benefit and when not directed by the Owner or contract, elects to work on a Saturday, Sunday, holiday, at night or longer than an 8-hour shift on a regular working day as defined in the Standard Specifications, such work shall be considered overtime work and the City may, at their discretion, request compensation for overtime by the City inspector. If the Owner permits the Contractor to work outside the agreed upon work hours, this does not imply that the Owner agrees to pay for any wages or costs associated with overtime or extra work. Costs associated with overtime work shall always be borne by the Contractor, unless the Owner specifically directs in writing that overtime work must be used to accomplish a task. The City will not pay overtime to the Contractor unless the overtime work is directed by the City. 2023 SEWER REHABILITATION MARCH 2023 64 Add the following new section: 1-08.0(3) Weekly Construction Meetings Weekly meetings shall be held at a mutually agreed-upon location and day of the week and time. The purpose of the meeting will be to discuss the work, resolve any quantity or force account disagreements, review the Contractor’s Progress and Schedule, and review the as- built drawings. The Contracting Agency shall develop an agenda for each weekly meeting. The Contractor shall prepare an updated 3-week look-ahead schedule and submit it to the Engineer a minimum of 24 hours before each weekly meeting. 1-08.3 Progress Schedule 1-08.3(1) General Requirements Section 1-08.3(1) is supplemented with the following: The Contractor shall submit a Type A construction schedule to the Owner at least 3 calendar days before the pre-construction conference. The Owner will have the right to review the schedule, and must approve the schedule prior to mobilization or any material purchase. Include minimum of 3 non-work days in the schedule for weather-related delays. Include the holidays listed in Section 1-08.5 as non-working days. Prepare the schedule using Microsoft Project or an equivalent scheduling software that is acceptable to the Owner. A monthly schedule update shall be submitted concurrently with every payment request. Payment shall not be made until the schedule has been submitted and approved by the Owner. Delete Section 1-08.4 and replace it with the following section: 1-08.4 Prosecution of Work Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of insurance have been approved and filed by the Contracting Agency. The Contractor shall not commence with the work until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the project site within ten days of the Notice to Proceed Date, unless otherwise approved in writing. The Contractor shall diligently pursue the work to the physical completion date within the time specified in the contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the contract. There are specific completion and phasing requirements for this project. It is critical that the Contractor order materials and begin construction as soon as possible to meet these deadlines. 2023 SEWER REHABILITATION MARCH 2023 65 1-08.5 Time for Completion Replace Section 1-08.5 with the following: Unless agreed upon otherwise in writing by the Owner, the Contractor shall mobilize equipment to the site and begin work within ten (10) calendar days of the Notice to Proceed date. The Work shall obtain Substantial Completion within the times designated in Paragraph 2 of the Public Works Agreement. Time lost in replacing improper work or material shall not furnish any grounds to the Contractor for claiming an extension of time for the completion of the work and shall not release the Contractor from damages or liabilities for failure to complete the work within the time stipulated. The following shall be non-workdays for both the Contractor and City: 2023 HOLIDAY SCHEDULE NEW YEAR’S DAY MONDAY, JANUARY 2ND MARTIN LUTHER KING DAY MONDAY, JANUARY 16TH PRESIDENT’S DAY MONDAY, FEBRUARY 20ST MEMORIAL DAY MONDAY, MAY 29TH JUNTEENTH MONDAY, JUNE 19TH INDEPENDENCE DAY TUESDAY, JULY 4TH LABOR DAY MONDAY, SEPTEMBER 4TH VETERAN’S DAY FRIDAY, NOVEMBER 10TH THANKSGIVING DAY THURSDAY, NOVEMBER 23RD DAY AFTER THANKSGIVING FRIDAY, NOVEMBER 24TH CHRISTMAS DAY MONDAY, DECEMBER 25TH 1-08.6 Suspension of Work Section 1-08.6 is supplemented with the following: The Engineer may order suspension of all or any part of the work if unsuitable weather, private utility relocation efforts by others, and other such conditions beyond the control of the Contractor prevent satisfactory and timely performance of the work. If the work is suspended for these reasons, the period of work stoppage will be counted as unworkable days. The Engineer will set the number of unworkable days (or parts of days) by deciding how long the suspension delayed the entire project. 1-08.7 Maintenance During Suspension 2023 SEWER REHABILITATION MARCH 2023 66 Revise the second paragraph of Section 1-08.7 to read: At no expense to the Contracting Agency, the Contractor shall provide through the construction area a safe, smooth, and unobstructed roadway, sidewalk, and path for public use during suspension (as required in Section 1-07.23 or the Special Provisions). This may include a temporary road or detour. 1-08.8 Extensions of Time Section 1-08.8 is supplemented with the following: The Contractor shall consider and make allowances for normal seasonal weather patterns in the scheduling and sequencing of the work in order to complete the work by the specified deadlines. The Owner will not extend the specified completion dates for reasons of unfavorable weather unless the Contractor can demonstrate that weather patterns have been extraordinary and the Contractor has made a good faith effort to limit the amount of area exposed to the weather at any given time. Due to the nature of the project, the Contractor shall anticipate there will be numerous unforeseen conflicts with underground utilities. The Owner will have representatives on site during working hours to make decisions when a deviation from the design is required. The time required for the Contractor and the Owner to make adjustments for unforeseen conditions shall not be grounds for additional compensation due to delay nor an extension of the completion deadline. The only exceptions to this rule are as follows: 1. The Owner has failed to make a decision within 8 working hours when an unforeseen conflict is discovered on a critical path time of work. 2. The unforeseen conflict involves hazardous materials or historical artifacts which prevent the Contractor for proceeding with critical path elements of the work. 1-09 MEASUREMENT AND PAYMENT 1-09.1 Measurement of Quantities Add the following new section: 1-09.1(1) Quantity Reporting Requirements (NEW SECTION) General Requirement: Preparation of daily Quantity Reports generally as described in this section is hereby required of both the City and Contractor. 2023 SEWER REHABILITATION MARCH 2023 67 Controlling Record: City and Contractor hereby acknowledge that the purpose of such daily Quantity Reports is to create a valid, contemporaneous record of all bid-item work performed by the Contractor, with the goal of limiting disputes by tracking and agreeing on the various quantities of work as it is performed. The daily Quantity Reports required herein shall become the controlling record and source documentation of the work performed and the materials provided by the Contractor each day. Correction of Errors: Nothing in this section shall bar later adjustment of quantities for the purpose of correcting errors or omissions when such adjustment is authorized by the Engineer. City and Contractor hereby agree that the Engineer’s decision regarding corrections shall be final, as provided in Standard Specifications Section 1-05.1. Dispute Resolution: For the purposes of this section only, daily Quantity Reports for the preceding week shall be reviewed by the Contractor and Engineer at each weekly construction meeting and, to the extent possible, any dispute related to the quantity of work performed during the preceding week shall be resolved and final bid item quantities agreed upon. Daily Quantity Report Report Preparation: The Engineer will complete a daily Quantity Report for each day that work is performed. The Contractor shall furnish any required material invoices or load receipts to the Engineer each day in time for completion of the day’s report. The Engineer and Contractor shall review each day’s report not later than the end of the next business day. Both the Engineer and Contractor shall sign/initial each day’s Quantity Report, acknowledging the quantities of work and materials indicated in the Report. The City uses an approved-equivalent of WSDOT Form #422-635, titled Field Note Record for daily quantity reports. A sample form is included in the appendices. 1-09.6 Force Account Section 1-09.6 is supplemented with the following: The bid items, “Minor Changes and Force Account”, has been included in the Bid Proposal for the following changes resulting in extra work: · As directed by the Owner in accordance with Section 1-04.4. · Due to differing site conditions, as described in Section 1-04.7, for which the Engineer determines the Contractor is due additional compensation per Section 1-04.7 and which is not covered by the contract unit prices. These changes will be issued via signed Work Change Directives (WCDs). Payment from this bid item is only permitted by written approval from the Engineer in accordance with Sections 1-04.4 and 1-09.6. If the total amount of 2023 SEWER REHABILITATION MARCH 2023 68 changes exceeds the contract amount, then a Change Order will be executed, which will require the signature of the Mayor. Add the following new section: 1-09.6(1) Force Account Reporting Requirements (NEW SECTION) General Requirement: Preparation of daily reports generally as described in this section, of all Force Account Work authorized by the City, is hereby required of both the City and Contractor. Controlling Record: City and Contractor hereby acknowledge that the purpose of such daily reports is to create a valid, contemporaneous record of all work performed by the Contractor in response to Work Change Directives (WCD) issued by the City, with the goal of limiting disputes by agreeing on the amounts and costs of work as the work is performed. The daily reports required herein shall become the controlling record and source documentation of the work actually performed, and the materials actually provided, by the Contractor for Force Account Work. Error Correction: Nothing in this section shall bar later adjustment of quantities or costs for the purpose of correcting errors or omissions when such adjustment is authorized by the Engineer. City and Contractor hereby agree that the Engineer’s decision regarding corrections shall be final, as provided in Standard Specifications Section 1-05.1. Dispute Resolution: For the purposes of this section only, Daily Force Account Reports for the preceding week shall be reviewed by the Contractor and Engineer at each weekly Construction Meeting and, to the extent possible, any dispute related to the quantity of Force Account work performed during the preceding week shall be resolved and final material quantities, labor hours and equipment hours agreed upon. Daily Force Account Report Report Preparation: The Engineer will complete a daily Force Account report for each unit of Force Account work, for each day that such work is performed. The Contractor shall furnish the material and equipment invoices required by Standard Specification Section 1-09.6 to the Engineer each day in time for completion of that day’s reports. The Engineer and Contractor shall review each day’s reports not later than the end of the next business day. Both the Engineer and Contractor shall sign each day’s Force Account reports, acknowledging the quantities of materials and hours of use of labor and equipment indicated in the report. The City uses a form equivalent to WSDOT Form #422-008 titled ‘Daily Report of Force Account Worked’ for tracking force account work. A sample of the City-provided form that will be used for all such reports is included in the appendices. 2023 SEWER REHABILITATION MARCH 2023 69 1-09.8 Payment for Material on Hand Delete all the provisions of Section 1-09.8 and substitute with the following: For lump sum pay items, the Owner will pay 75% of the actual invoice value for materials on hand with an invoice value over $5,000. Unit price bid items will not be reimbursed when on hand. 1-09.9 Payments (March 13, 2012 APWA GSP) Delete the first four paragraphs and replace them with the following: The basis of payment will be the actual quantities of Work performed according to the Contract and as specified for payment. The Contractor shall submit a breakdown of the cost of lump sum bid items at the Preconstruction Conference, to enable the Project Engineer to determine the Work performed on a monthly basis. A breakdown is not required for lump sum items that include a basis for incremental payments as part of the respective Specification. Absent a lump sum breakdown, the Project Engineer will make a determination based on information available. The Project Engineer’s determination of the cost of work shall be final. Progress payments for completed work and material on hand will be based upon progress estimates prepared by the Engineer. A progress estimate cutoff date will be established at the preconstruction conference. The initial progress estimate will be made not later than 30 days after the Contractor commences the work, and successive progress estimates will be made every month thereafter until the Completion Date. Progress estimates made during progress of the work are tentative, and made only for the purpose of determining progress payments. The progress estimates are subject to change at any time prior to the calculation of the final payment. The value of the progress estimate will be the sum of the following: 1. Unit Price Items in the Bid Form — the approximate quantity of acceptable units of work completed multiplied by the unit price. 2. Lump Sum Items in the Bid Form — based on the approved Contractor’s lump sum breakdown for that item, or absent such a breakdown, based on the Engineer’s determination. 2023 SEWER REHABILITATION MARCH 2023 70 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or other storage area approved by the Engineer. 4. Change Orders — entitlement for approved extra cost or completed extra work as determined by the Engineer. Progress payments will be made in accordance with the progress estimate less: 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; 2. The amount of progress payments previously made; and 3. Funds withheld by the Contracting Agency for disbursement in accordance with the Contract Documents. Progress payments for work performed shall not be evidence of acceptable performance or an admission by the Contracting Agency that any work has been satisfactorily completed. The determination of payments under the contract will be final in accordance with Section 1-05.1. 1-09.11 Disputes and Claims 1-09.11(3) Time Limitation and Jurisdiction Replace all references to Thurston County with Kitsap County. 1-09.13 Claims Resolution 1-09.13(3) Claims $250,000 or less Delete this section and any subsections in entirety and replace with the following section: 1-09.13(3) Claims, any value The Contractor and the Contracting Agency mutually agree that claims, whatever the value, submitted in accordance with Section 1-09.11 and not resolved by nonbinding arbitration ADR processes, shall be resolved by litigation unless the parties mutually agree to resolve the claim through binding arbitration. Each party is responsible for its own attorney fees and litigation costs. 1-09.13(4) Claims in Excess of $250,000 Delete this section in entirety. 1-10 TEMPORARY TRAFFIC CONTROL 1-10.1 General 2023 SEWER REHABILITATION MARCH 2023 71 Section 1-10.1 is supplemented with the following: Project specific traffic control requirements are included in Section 1-07.23(1). All traffic signs, barricades, and devices shall conform to Section 1-07.23 of the Standard Specifications and the MUTCD. The Contractor shall be responsible for directing and controlling pedestrian and vehicular traffic, including all approved temporary re-routing at all times during construction activity. The Contractor, at his expense, shall be required to maintain sufficient warning signs and adequate barricades at all open excavation to warn moving vehicles and pedestrians. This shall include not only open excavation, but also recently filled and/or paved areas which have not yet been fully compacted and rolled to return the surface to a state required to withstand normal use. All necessary flagmen, barricades, and directional signs shall be furnished and maintained by the Contractor at all times and also if the work is suspended during the construction period. The Contractor shall provide such additional barricades and protective devices as will be required to reasonably protect workmen and others, as well as animals, from injury resulting from excavation and other site work during the construction period. Upon failure of the Contractor to provide immediately and maintain adequate suitable barricades, lights, and detour signs when ordered to do so, the Capital Engineer shall be at the liberty, without further notice to the Contractor or the surety, to provide the same and to deduct the costs thereto from any monies or payment due or to become due to Contractor, and the Engineer assumes no liability connected therewith. Emergency traffic such as police, fire, and disaster units, shall be provided access at all times. The Contractor shall be liable for any damages, which may result from failure to provide reasonable access or coordination. Required Notification of Businesses and Residents: The Contractor shall notify all affected businesses and residents by door hanger or other similar method approved by the Engineer at least one calendar week in advance of construction activities adjacent to their business or home. Additionally, the Contractor shall notify all affected businesses and residents at least 48 hours and not more than 72 hours in advance of construction activities that would block or restrict access to their businesses or homes. Blockage shall occur only during working hours and shall be removed during non-working hours. Existing Signs, Devices, and Pavement Markings: Existing traffic control and street name signs which interfere with construction shall be relocated, covered, or removed by the Contractor and temporarily stored in a safe place. “Stop”, “Yield’, and “One-Way” signs shall be removed, covered or relocated only upon approval of the Engineer. Existing signs shall not be removed until the Contractor has provided temporary measures sufficient to 2023 SEWER REHABILITATION MARCH 2023 72 safeguard and direct traffic after the existing signs have been removed. Except as otherwise specifically provided in the contract documents, preservation and maintenance of traffic control and street name signs shall be the sole responsibility of the Contractor. As work progresses and as permits, temporarily relocated or removed traffic and street name signs shall be reset in their permanent location by the Contractor. Signs and other traffic control devices damaged or lost by the Contractor, shall be replaced or repaired by the Contractor at no cost to the City. The option of whether a sign can be repaired or shall be replaced shall be the Engineer’s, and such decision shall be final and binding on the Contractor. When paint lines are obliterated due to construction activities or pavement restoration, temporary pressure sensitive pavement marking tape, traffic buttons or delineators shall be installed where designated by the Engineer. These temporary features shall be removed only upon installation of permanent traffic channelization. Unless otherwise provided for by a separate bid item in the proposal, removal of permanent striping and installation and removal of temporary striping shall be incidental to the unit contract price for other items in the proposal. Maintaining Two-way Traffic and Access: Except as authorized by the Engineer, two-way traffic shall be maintained at all times. No dead-end streets will be allowed to have less than one way access at any time. During normal working hours, the Contractor shall maintain, in a safe, acceptable condition, all approaches and intersections with roads, streets, alleys, and driveways to businesses, parking lots, residences, etc. All streets shall be open to local traffic at the end of each working day unless otherwise noted in the approved Traffic Control Plans or approved in writing by the Engineer. During non- working hours, the Contractor shall keep existing traffic lanes clear, without interference from construction operations, equipment or materials. The Contractor shall conduct the work so as to obstruct and inconvenience traffic as little as possible. The Contractor shall not open sections of the work and leave them in an unfinished condition. Except where permitted elsewhere in the Contract Documents or authorized by the Engineer in writing, during non-working hours, excavations within roadways, driveways, pedestrian pathways, or similar areas within rights of way or easements used by the public shall be backfilled, compacted and covered with cold mix asphalt or covered with steel plates or other approved temporary bridging. 1-10.2 Traffic Control Management 1-10.2(1) General Section 1-10.2(1) is supplemented with the following: 2023 SEWER REHABILITATION MARCH 2023 73 The Traffic Control Supervisor (TCS) shall be on-site while work or unloading/loading is occurring within the City ROW. The TCS shall be responsible for placement, maintenance, correctness and adequacy of the contractor’s temporary traffic control. The TCS will be contacted to correct any traffic control or signing deficiencies during normal working hours or during evenings or weekends as necessary or required. The TCS shall respond as required by Standard Specification 1- 10.2(1)B. If the TCS or the Contractor’s forces do not respond within the required time, the City will make any necessary corrections using its own or other forces and shall deduct the entire cost of all such work from sums due, or to become due, to the Contractor. All such charges against the Contractor’s payments shall be made at the City’s then current rates for labor, equipment, and materials. The TCS shall be certified by one of the following organizations or an equivalent approved entity by the Owner: American Traffic Safety Services Association (ATSSA), Evergreen Safety Council, Northwest Laborer-Employers Training Trust. The TCS certification shall be submitted to the City prior to any construction. 1-10.2(2) Traffic Control Plans Section 1-10.2(2) is supplemented with the following: The Contractor shall be responsible for developing an approved Traffic Control Plan consistent with MUTCD and the project Contract Documents. The Traffic Control Plan may consist of approved WSDOT K-Plans where applicable. Payment for developing an approved Traffic Control Plan shall be considered incidental to the lump sum price in the Proposal for “Project Temporary Traffic Control” and no additional compensation will be made. Where needed and as directed by the Owner, the Contractor shall provide and install detour signage to direct traffic onto alternate routes. 1-10.3 Traffic Control Labor, Procedures, and Devices 1-10.3(3) Traffic Control Devices Section 1-10.3(3) is supplemented with the following: Signs, barricades, lights, portable changeable message sign, and other warning devices shall be installed on or adjacent to the roadway per the requirements of the Manual on Uniform Traffic Control Devices for Streets and Highways and shall be maintained 24 hours a day until the roadway work is completed and ready for traffic. The Contractor shall not begin any work on or adjacent to the roadway at any time until all signs and other traffic control devices are in place and operating as outlined in the Standard Specifications, Special Provisions, and 2023 SEWER REHABILITATION MARCH 2023 74 approved Traffic Control Plan. The Contractor shall maintain the work area to ensure that all traffic signs and other traffic control devices are properly placed and in effect. The Contractor shall replace, without delay, signs and traffic control devices that are misplaced, mutilated, or destroyed. All signs and traffic control devices, which become soiled such that their effectiveness is diminished as determined by the Engineer or the Inspector, shall be replaced or cleaned by the Contractor without delay. Traffic control devices intended for use during the hours of darkness shall be equipped with flashing lights (i.e. barricades) or reflective tape (i.e. cones/barrels) or as determined by the Engineer. The Contractor shall provide all construction signs and safety equipment required. The Contractor, at his expense, shall be required to maintain sufficient warning lights and adequate barricades on all trenches and open excavation to protect moving traffic and pedestrians. This shall include not only open trenches, but also recently closed trenches that have not been returned to full and safe operating surface for normal use. All necessary state-certified flagmen, barricades, and detour signs shall be furnished and supplied/installed by the Contractor, both during working hours and also when the work is suspended during the construction period. The Contractor shall provide such additional barricades and protective devices as will be required to reasonably protect the workmen, vehicles, bicyclists, pedestrians, and animals from excavated areas during the construction period. Upon failure of the Contractor to immediately provide and maintain adequate suitable barricades, lights, and detour signs when ordered to do so, the City shall be at liberty, without further notice to the Contractor or the surety, to provide the same and deduct the cost thereof from monies or payments due or to become due the Contractor, and the City assumes no liability connected therewith. The Contractor shall be responsible for proper notification to, and coordination with, all school districts, fire departments, waste management, local postal service, and all other persons and services which will be affected by this project. It shall be the Contractor’s responsibility to keep the school district and fire departments and others fully advised of his construction progress and also the time of completion of the project. Street rights-of-way that are restricted will require special care in construction to maintain two-way traffic flow. The Contractor shall maintain safe and adequate pedestrian access along the street during the construction of the project. The Contractor shall make every attempt to provide access to the adjacent properties and to minimize dust nuisances. 1-10.3(3)A Construction Signs Section 1-10.3(3)A is revised to read as follows: All signs required by the approved traffic control plan(s) as well as any other appropriate signs prescribed by the Engineer shall be furnished, maintained, and operated by the Contractor. The Contractor shall provide the posts or supports and erect and maintain the signs in a clean, neat, and presentable condition until 2023 SEWER REHABILITATION MARCH 2023 75 the necessity for them has ceased. All non-applicable signs shall be removed or completely covered with metal, plywood, or an Engineer approved product specifically manufactured for sign covering during periods when they are not in effect. When the need for these signs has ceased, the Contractor, upon approval of the Engineer, shall remove all signs, posts, and supports from the project and they shall remain the property of the Contractor. All orange background signs shall utilize materials, and be fabricated in accordance with, Section 9-28. All orange background signs shall be fabricated with Type X fluorescent orange sign sheeting. All post mounted signs with Type X sheeting shall use a nylon washer between the twist fasteners (screw heads, bolts, or nuts) and the reflective sheeting. There shall be no intermixing of signs with non-fluorescent orange reflective sign sheeting and signs with fluorescent orange reflective sign sheeting on the same signpost. If it is necessary to add weight to signs for stability, only a bag of sand that will rupture on impact shall be used. The bag of sand shall: (1) be furnished by the Contractor, (2) have a maximum weight of 40 pounds, and (3) be suspended no more than 1 foot from the ground. Signs, posts, or supports that are lost, stolen, damaged, destroyed, or which the Engineer deems to be unacceptable while their use is required on the project, shall be replaced by the Contractor without additional compensation. Add the following new section: 1-10.3(3)L Parking Restriction Sign (NEW SECTION) Where, in the opinion of the Engineer, parking is a hazard to thru-traffic, or to the construction work, parking may be restricted either entirely or during the time when it creates a hazard. Signs for restricting parking shall be approved by the Engineer and provided and placed by the Contractor. The Contractor shall be responsible for and shall maintain the signs, if they are used in any street that is directly involved in the construction work. If parking signs are used beyond the confines of the work area, such as in another street being used as a detour, the signs will be the responsibility of the Contractor. The placement of signs restricting parking shall be as approved by the Engineer. Parking restriction signs shall be placed two working days in advance of needing the parking removed, with the start date of the “no parking” clearly shown. The area to be restricted shall be clearly marked with Type I barricades carrying signs that give the specific period (dates and times) that the area is to be clear of vehicles. Signs shall be large enough to be easily read from a distance of 50 feet and shall advise where impounded vehicles will be stored or indicate a 24-hour telephone number for obtaining that information. A minimum of 72 hours advance notice is required before towing vehicles. All signs must be approved by the Engineer prior to use. Example wording of the signs is as follows: 2023 SEWER REHABILITATION MARCH 2023 76 W A R N I N G ! T O W A W A Y Z O N E N O P A R K I N G FROM: DATE and TIME TO: DATE and TIME FOR CONSTRUCTION WORK ALL VEHICLES REMAINING WILL BE TOWED 1-10.4 Measurement 1-10.4(3) Reinstating Unit Items With Lump Sum Traffic Control Section 1-10.4(3) is supplemented with the following: The bid proposal contains the item “Project Temporary Traffic Control,” lump sum and the additional temporary traffic control items listed below. The provisions of Section 1-10.4(1), Section 1-10.4(3), and Section 1-10.5(3) shall apply. *** “Portable Changeable Message Sign”, per sign per week. *** 1-10.5 Payment Section 1-10.5 is supplemented with the following: Payment for “Project Temporary Traffic Control”, for both Schedule A and B, lump sum, shall be for project temporary traffic control as described in Sections 1-07.23 and 1-10. “Portable Changeable Message Sign”, per week. The unit contract price per week for “Portable Changeable Message Sign” shall be full pay for all labor, costs, and equipment necessary to furnish, setup/install, operate, relocate, and remove up to two (2) Portable Changeable Message Signs for the overall weekly duration bid. The cost shall for each sign per week. END OF DIVISION 1 2023 SEWER REHABILITATION MARCH 2023 77 DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER MAINS, AND CONDUITS 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS (City of Bremerton GSP) 7-08.3 Construction Requirements Section 7-08.3 is supplemented with the following: 7-08.3(5) Temporary Flow Diversion 7-08.3(5)A General Requirements In the performance of the work, the Contractor shall ensure that existing sanitary sewer service to customers is maintained by the design, installation, and operation of a temporary bypass system throughout the duration of the project. The system shall consist of pumps, piping, flow-through plugs, sandbags and other means/materials for temporarily diverting flow from the upstream manhole and directing it to a manhole downstream of the rehabilitation operation. When bypass pumping is necessary, it shall be done in such a manner as not to damage private or public property or create a nuisance or public menace. The pumped sewage shall be in enclosed hoses or pipes that are adequately protected from traffic and shall be redirected into the appropriate sewer system. The discharge of sewage to private property, city streets, sidewalks, storm sewer, wetlands, or any location other than an approved sanitary sewer is prohibited. The Contractor shall be liable for all cleanup, damages, and resultant fines should the Contractor’s operation cause any backups, overflows, or property damage. The Contractor shall schedule the work during dry weather to avoid unmanageable flow in the sanitary sewers and storm sewers during rainfall events. Storm sewer bypass flows may be discharged to the nearest downstream ditch or catch basin. The Contractor shall notify property and business owners prior to the work in accordance with Special Provision 1-07.16. 7-08.3(5)B Backup Equipment and Monitoring Bypass pumping shall be scheduled for continuous operation with back-up pumps, generators, and/or other equipment available on-site at all times for periods of maintenance and refueling or failure of the primary bypass pump(s). The Contractor 2023 SEWER REHABILITATION MARCH 2023 78 shall provide experienced monitoring personnel on site to verify the bypass pumping system remains functional. These individuals shall have the experience to operate and maintain the bypass system to ensure there is continuous operation of the bypass system. Prior to performing any work which requires bypass pumping (e.g. cleaning, video lining and cleaning, video), the primary and backup pump shall be installed, connected and tested with a piping manifold and isolation valves at the discharge so both pumps are always connected to the bypass piping, which allows switching between the primary and backup pump. Bypass pumping with only a single pump installed and operational will not be permitted, except in cases where the Engineer determines that the flow is sufficiently low and the backup pump is nearby and immediately available on- site. 7-08.3(5)C Pumping Requirements for Flow Diversion System Design All bypass pumps should be able to pass 1-inch solids. The City has a combined sewer system, therefore during rain events the flow rate can suddenly increase. The Contractor shall monitor the weather conditions in order to perform the work during dry weather only unless agreed upon in writing by the Engineer. The Engineer reserves the right to stop the Contractor’s work if the Inspector believes that the provided pumping equipment is inadequate for the anticipated weather conditions. In this case, the Contractor will be required to schedule the work for another day. Information, including manhole depths, flow rates, flow direction and pipe sizes, has been provided in the Project Plans to assist the Contractor in preparing a flow diversion plan. The Contractor can reasonably rely on this information for bidding. However, prior to preparing and submitting a flow diversion plan and installing any type of temporary bypass system, the Contractor must independently verify the sewer piping system in the field and independently develop a flow diversion plan most suitable for the video inspection and removal work. Following is a description to support the bypass pumping operation at each location. The contractor is responsible for confirming correct lengths for discharge hoses. The Contractor is encouraged to attend the pre-bid walkthrough to estimate hose lengths, understand the sites, and view the wet well and access. Design bypass pumping rates provided are for dry weather flows and the contractor’s bypass system must meet these flow rates at a minimum during dry weather. Pump Station Influent EB-3 · 300 gpm minimum for bypass pumping. · Bypass from upstream lining manhole to wet well. Access to the wet well is through an access hatched located inside the pump station building. · The site around the pump station is owned the City. · Beach access is not required; the Contractor can bypass from manhole located immediately outside the pump station. 2023 SEWER REHABILITATION MARCH 2023 79 Pump Station Influent CW-1 · Bypass pumping will be required from two locations: o 300 gpm for bypass from vault to the west of pump station o 100 gpm from manhole located in sidewalk for local flow. · Bypass discharge will be to wet well access hatch located outside on west side of pump station. · The site around the pump station is owned the City. Pump Station Influent KL-4 · 100 gpm minimum for bypass pumping. · Upstream manhole is located on private property in backyard. The City has an easement to access the manhole and walk through the private property between the manhole and the pump station. · The City will laydown plywood as needed to protect the grass around the upstream manhole. · The site around the pump station is owned the City; access to the upstream manhole is on private property. All other locations · 100 gpm minimum for bypass pumping. · All work to be done from the City ROW. 7-08.3(5)D Bypass Side Sewer Laterals If the Contractor is unable to reconnect an active side sewer(s) within the time duration specified to the property owner, bypass pumping of the side sewer to the sanitary sewer system shall be required if directed by the Engineer. The Contractor shall verify whether service at a property is able to be interrupted prior to lining operations. When there exist situations where impacted properties cannot be disconnected, plugged, or subjected to any other service interruption, i.e., hospitals, care facilities, restaurants, etc., bypass pumping of the side sewer to the downstream sanitary sewer system shall be required prior to removal work. If necessary, the contractor may install a cleanout to facilitate bypass pumping. Payment for bypassing a side sewer and/or installing a clean out for a specific property or business in order to maintain sanitary service, where directed by the Engineer, shall be paid via force account as described in Section 1-09.6. 7-08.3(5)E Temporary Bypass Plan The Contractor shall prepare and submit a bypass plan in accordance with Section 1- 05. The plan shall show bypassing from the upstream to a downstream sanitary sewer manhole. The Contractor’s plan for diverting flow shall be reviewed by the City before 2023 SEWER REHABILITATION MARCH 2023 80 the Contractor will be allowed to commence with lining work at a particular site. Submit the plan at least 2 weeks before the actual work to allow sufficient time for review by the City. The review of the plan by the Engineer shall in no way relieve the Contractor of his responsibility and public liability. At a minimum, the plan shall include the following information: · A plan showing the location of the pumps, tanks, generators, piping, and plugs · Plugs: Method, type, and size · Piping: Size, material, location, method of installation, and sizing calculations · Pumps: capacity, number, performance curve, method of noise control; Include calculations demonstrating the pump can hydraulically perform with consideration of static lift, friction losses, and flow velocity · Primary and standby power generator: Power and sizing calculations for application · List of backup equipment including pumps, hoses, generators, and pipe · Method of sound attenuation for mechanical equipment if work is performed at night Work shall not begin at a site without an approved temporary bypass plan for that site. 7-08.4 Measurement This section is supplemented with the following: No specific measurement shall apply to temporary flow diversion. Bypassing side sewer laterals shall be paid by Force Account in accordance with Section 1-09.6. 7-08.5 Payment This section is supplemented with the following: Temporary flow diversion shall include the preparation and implementation of the plan, equipment, personnel, fuel, monitoring, power, pumps, piping, barricades, emergency stand-by equipment, trenching for burial of pipe, removal of pipe, pavement restoration costs, and all other work necessary to maintain uninterrupted sanitary sewer services by bypassing the applicable sewer system flows associated with cleaning, video inspection, lateral removal, and reinstating the respective laterals and sewers. There is no separate bid item for 2023 SEWER REHABILITATION MARCH 2023 81 temporary flow diversion and it shall be considered incidental to the pre- lining video inspection and lateral removal bid items. For specific pump station influent lines included in the bid, payment shall be considered incidental to lump sum work described in Section 7-21.5. 7-20 PIPE CLEANING, INSPECTION AND ACCEPTANCE (NEW SECTION) 7-20.1 Description This work shall generally consist of cleaning, removing and disposing of waste materials, and performing CCTV inspections of all sanitary and storm sewer pipes on the project, including both sewers that will be lined as part of this project (Sheets C-1 to C-7) and sewers that will NOT be lined as part of this project (Sheets V-1 to V-4). 7-20.1(1) Submittals Submittals shall be in accordance with Section 1-05 of these specifications. Submittals shall include, but not be limited to, the items identified in these specifications and in Section 1-05. The following items shall be submitted following the pipe cleaning and inspection work: Pre-Lining Inspection Reports: After each video inspection has been completed, the Contractor shall provide the Engineer with copies of the video inspection and associated inspection report for each sewer main segment in digital format on a USB thumb drive. The pre-lining video inspection and associated inspection report for a sewer main segment shall be submitted to the Engineer at least five (5) working days prior to requesting “wet-out” on that sewer main segment. The video inspection and report is required for all pipes on the project, including pipes that will be lined and those that will not be lined. 7-20.3 Construction Requirements 7-20.3(1) Equipment Cleaning Equipment Cleaning equipment shall be capable of removing dirt, grease, rocks, concrete intrusions, sand, roots and other materials and obstructions from the sewer lines. Selection of equipment shall be based on field condition such as access to manholes, quantity of debris, size of sewer main pipe, condition of sewer main pipe, and lateral removal activities. Video Inspection Equipment 2023 SEWER REHABILITATION MARCH 2023 82 The Contractor shall inspect and record the sewer interior walls of the sewer main pipe using a color closed circuit television (CCTV) camera with a lens capable of rotating 360 degrees to allow the Contractor to look directly up tees, joints and wyes. It is entirely the Contractor's responsibility to choose and provide the correct equipment and software which will produce CCTV inspections and reports that meet the minimum CCTV inspection standards of this specification. Should any of the CCTV inspection equipment become damaged or degraded during the course of this project, such that it is not capable of producing the minimum standards, it shall be the Contractor's responsibility to repair or replace the equipment. No additional working days or payment will be granted for the repair or replacement of damaged or degraded equipment. 7-20.3(2) Personnel All CCTV inspections shall be performed by a trained operator who documents the date of the inspection, manhole numbers, the condition of the pipe at each phase including before and after liner installation, breaks, obstacles, and side sewers by closed circuit television. 7-20.3(3) Cleaning Prior to conducting CCTV inspection, the Contractor shall clean the sewer main segment. Clean shall be defined as the removal of all accumulations including sludge, dirt, sand, rocks, asphalt, concrete, grout, grease, roots, and any other solid or semi- solid material existing in the pipe with total debris removal. It will be the Contractor's responsibility to make as many cleaning passes as necessary to meet the above definition of 'clean'. Sludge, dirt, sand, rocks, grease, and other solids or semi-solid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned. Passing materials from manhole section to manhole section is not permitted. All roots shall be removed from the sewer lines. Special attention shall be used during the cleaning operation to assure removal of roots from the joints and side sewer connections. Procedures may include the use of mechanical equipment such as rodding machines, root cutters, porcupines, and high-velocity hydro-jet cleaner. During sewer cleaning operations, precautions shall be taken by the Contractor in the use of cleaning equipment to avoid any damage to the existing pipe. Any damage of the sewer main pipe resulting from the Contractor's cleaning operations, regardless of the existing condition of the pipe, shall be the responsibility of the Contractor. The Contractor shall use extreme care to not further damage the pipe during cleaning operations. 2023 SEWER REHABILITATION MARCH 2023 83 7-20.3(4) Waste Material Disposal The Contractor shall dispose of the waste material removed from the sewer system at an off-site facility that accepts this waste material with exception of the liquid portion of the waste material which may be decanted into the City sewer system. The City Wastewater Treatment Plant will not accept the waste material. The contractor shall be responsible for determining the facility where the solid waste material will be disposed and make all applications and permits as needed for disposal. Provide the disposal facility information to the City before starting the work. Trucks hauling solids or semi-solids from the site shall be watertight so that no leakage or spillage will occur. Under no circumstances shall sewage or solids be dumped onto the ground surface, streets, catch basins, sewer manholes or storm drains. 7-20.3(5) CCTV Inspection The Contractor shall perform CCTV inspection after cleaning the sewer lines to document the condition of the host pipe, verify the number and footages of side sewer connections and protruding laterals and verify the lines were cleaned in accordance with these Specifications. This Work shall be done for all pipe segments included in this Contract, to be lined or not. In order to allow for an accurate analysis of the condition of the existing sewer main/host pipe and laterals, the Contractor shall ensure that the entire surface of the sewer main under inspection is clearly visible. If the depth of sewage, which may be caused by existing defects (such as sags, offsets, voids, etc.), obstructs the ability of the Engineer to clearly view the sewer main/host pipe surface, the Contractor shall halt the inspection and remove the sewage from the main. This may be done by using high velocity jetting machines, or other non-destructive methods acceptable to the Engineer. Once the main section under inspection is clear of sewage the inspection may resume. When obtaining video footage of the side sewer connections, the video shall provide sufficient detail to allow the Engineer to determine whether the connection is still active. If the incoming flows are sufficient to obstruct the ability of the Engineer to clearly view the entire surface of the sewer main/host pipe under inspection, the Contractor shall temporarily plug all incoming flows to the upstream manhole, and bypass pump around the plugged segment and the sewer main segment under inspection. Bypass pumping from the upstream manhole shall be utilized as needed. Flows introduced by laterals are unavoidable and expected, however, should these flows introduce sufficient fluids to obscure the visibility of the pipe, the Contractor shall halt the inspection until the sewage has been removed. 2023 SEWER REHABILITATION MARCH 2023 84 The Contractor shall remove all rocks and sediments, grease, grout, concrete, protruding laterals, or other obstructions that would otherwise prevent the installation of a liner. This shall be done prior to completing the CCTV inspection. The Contractor shall maintain a clean and clear lens for the duration of the CCTV inspection. Should the lens become soiled, or fogged, or otherwise impaired to any degree that impedes the ability to clearly see the condition of the pipe, the Contractor shall halt the inspection and clean/clear the lens of any foreign matter impeding the visual inspection. No additional compensation will be made for re-inspections required by the Engineer due to soiled, fogged, or otherwise impaired camera lenses. The Contractor shall maintain sufficient light levels within the sewer main to allow for visual inspection of the pipe walls for a minimum distance of three (3) feet in front of the camera lens for all 8-inch to 10-inch pipe, and four (4) feet for all pipe sizes 12-inch and up. Additionally, the Contractor shall make certain that the light levels are not so bright that visual inspection is impeded. Should the camera get stuck in the sewer, the Contractor shall be responsible for all costs in extracting it. Costs related to difficulties encountered during internal video inspection are incidental to the contract, and claims will not be considered. Information to be included for video and inspection reports: The video files shall be recorded and submitted in MPEG-4 format and be PACP compliant databases. No other file format will be accepted unless approved by the Engineer. The CCTV recordings shall include the following information: Continuous display: · Date of inspection · Main segment street name · Upstream and downstream manhole numbers · Current distance along the mainline · Show a gauge (i.e. ball of size) attached to the CCTV Audio: · Date of inspection · Confirmation of upstream and downstream pipe manhole numbers · Description of pipe size and pipe material · Description of setup · Description and location of defects · Description and location of lateral connections. · Upstream and downstream manhole numbers · Current distance along the mainline 2023 SEWER REHABILITATION MARCH 2023 85 · Segment street name The inspection report shall include the following information: · Date of inspection · Reference to name of video (manhole to manhole) · Corresponding plan sheet number for segment · Upstream and downstream manhole numbers · Street location · Setup (normal or reverse flow) · Pipe size and material · Status (active or inactive) of all side sewers · Location, length, and depth of water of sags · Location and description of defects · Confirmation of ability or inability to rehabilitate the subject sewer main segment using CIPP 7-20.3(6) Assessment of Sewer Lines 7-20.3(6)A General This work shall generally consist of assessing the existing condition and ability to remove protruding laterals. In addition to the videos, the Contractor shall prepare and submit a Pre-Lining Inspection Report which shall note the pipe condition, lateral footages and clock position, root protrusions and any other information required to understand the pipe condition for protruding lateral removal. Based on a review of the video and report, the Engineer will make a determination of which laterals must be restored (active) and whether spot repairs of the pipe (i.e. grouting) are required prior to the work. 7-20.3(6)B Protruding Lateral Removal Feasibility Minimum Acceptable Conditions: The Contractor is responsible for determining whether or not a sewer main segment is suitable for CIPP lining. The Contractor shall not install a CIPP liner in any sewer main segment with existing defects that interfere with or cause a reduction in hydraulic capacity, or which may interfere with future CCTV inspection operations, or which may hinder in any way the quality of installation of the CIPP liner system. If a protruding lateral is not suitable for removal it shall be noted in the Pre-Lining Inspection Report and presented to the Engineer. 2023 SEWER REHABILITATION MARCH 2023 86 The following shall be considered as guidelines when performing CCTV Inspection review and making removal feasibility assessments: Sags: Any section of a sewer main segment that has a sag which causes sewage levels to continuously reach half pipe or greater, and which is longer than ten (10) feet in length shall be noted on the Pre-lining inspection report and presented to the Engineer. The Engineer shall make the final determination of whether the sag is acceptable or needs repair prior to lining. Protruding Laterals: Any side sewer lateral that encroaches into the inside diameter of the sewer main host pipe more than a half of an inch (1/2-inch) shall be considered a protruding lateral. The Contractor shall take appropriate measures to internally remove that portion of the lateral that is protruding. The method used to remove the protrusion shall not be destructive to that portion of the side sewer lateral outside of the inside surface of the of the sewer main host pipe, or to the host pipe, and shall result in a smooth, non-jagged edge which will not hinder in any way the quality of the installation of the future CIPP liner system. For protruding lateral removal in clay pipe, the removal method must be approved by the Engineer prior to removal. If the Contractor is unable to remove the protruding lateral it shall be noted in the Pre-Lining Inspection Report and presented to the Engineer. The Engineer shall make the final determination of whether the protruding lateral is acceptable or needs repair. Bends and Curves: If, in the opinion of the Contractor, there exists a section in the sewer main segment with bends or curves which may prevent future lining operations or CCTV inspections after a liner has been installed, or which may hinder in any way the quality of installation of the CIPP liner system, it shall be noted in the Pre-Lining Inspection Report and presented to the Engineer. Offset Joints: Any joint that is offset by more than one half (1/2) of an inch in an 8-inch diameter pipe or one (1) inch in a 10-inch diameter pipe or larger shall be noted on the Pre-Lining Inspection Report and presented to the Engineer. The Engineer shall review the defect and make a final determination of whether the offset is acceptable or needs to be repaired prior to lining. Roots: 2023 SEWER REHABILITATION MARCH 2023 87 The contactor is required to remove all roots within the sewer main pipe as part of the cleaning operations. If there are any roots growing into the main from a side sewer lateral the Contractor shall take measures to cut them back to the point that they are no longer in the main. The Contractor shall note these occurrences in the Pre-Lining Inspection Report. Other Defects: Any other defects in a sewer main segment that, in the Contractor’s opinion, will impede the Contractor’s ability to clean and/or perform the work to the level of quality required within these Contract Provisions shall be noted in the Pre-Lining Inspection Report and presented to the Engineer. 7-20.4 Measurement Measurement for cleaning, and video inspection of sanitary and storm sewers shall be per linear foot as shown on the plan sheets along the pipe length. The quantity has been determined by the Engineer from GIS and is measured from center of upstream manhole lid to the center of the downstream manhole lids. This value is fixed and will only be revised in the event of a major discrepancy. If the Contractor believes that a major discrepancy exists, they shall bring it to the attention of the Engineer immediately and prior to lining. Measurement for removal of protruding laterals shall be per each protruding lateral that is removed. 7-20.5 Payment “Cleaning and Video Inspection”, per linear foot. “Cleaning and Video Inspection – Pump Station Influent”, per linear foot. As described in this section and elsewhere in the contract documents, payment for cleaning, video inspection and evaluation of all sewer pipes in both Schedule A and Schedule B shall be per linear foot. In Schedule A, the bid item for cleaning and video inspection of pump station influent sewers are a separate bid item from all other sanitary sewers. Disposal of waste materials is incidental to the Bid Item. Traffic control is paid in a separate bid item. Where the Engineer directs spot repairs of the pipe, including excavation, exposing and repair/replacement of portions of the pipe, prior to the lining installation work, these shall be paid via the minor changes and force account bid item in accordance with Section 1- 09.6. “Remove Protruding Lateral”, per each. 2023 SEWER REHABILITATION MARCH 2023 88 As described in this section and elsewhere in the Contract Provisions, payment shall be for all labor, equipment and materials for removal of protruding laterals to provide a clean, non-jagged edge flush against the face of the pipe wall and post-removal video inspection of the finished product. Additional protruding laterals found will performing the Work shall be paid under this bid item. 7-21 CURE-IN-PLACE PIPE (CIPP) REHABILITATION (NEW SECTION) 7-21.1 Description The Work shall consist of rehabilitating sanitary and storm sewer pipelines using steam, water or UV CIPP lining methods within the existing pipe. Heat-cured CIPP lining methods shall only use styrene-free resin. The rehabilitation of pipelines utilizing CIPP shall generally consist of the installation of a resin-impregnated flexible felt tube or composite felt and carbon or glass fiber tube which, when cured, shall extend the full length of the original pipe and provide a structurally sound, smooth, joint-less and watertight pipe. The Contractor is responsible for proper, accurate and defect free installation of the new pipe regardless of the methods described herein. 7-21.1(1) Reference Specifications, Codes, and Standards The following documents form a part of this specification to the extent stated herein and shall be the latest editions thereof. Where differences exist between codes and standards, the one affording the greatest protection shall apply, as determined by the City: ASTM F2019-20 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic Cured-in- Place (GRP-CIPP) Using the UV-Light Curing Method ASTM F1216-21 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube ASTM F1743-21 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP) ASTM D543-21 – Standard Practices for Evaluating the Resistance of Plastics to Chemical Reagents ASTM D578 - Standard Specification Glass Fiber Strands ASTM D638-22 - Standard Test Method for Tensile Properties of Plastics 2023 SEWER REHABILITATION MARCH 2023 89 ASTM D790-17 - Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials ASTM D2122-16 - Standard Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings ASTM D3567-17 - Standard Practice for Determining Dimensions of "Fiberglass” (Glass-Fiber-Reinforced Thermosetting Resin) Pipe and Fittings ASTM D5813-04 (2018) - Standard Specification for Cured-in-Place Thermosetting Resin Sewer Piping Systems NASTT Paper A-5-02 - Styrene Free Resins for Cured-in-Place-Pipe (CIPP) Provide Comparable Mechanical Properties and Ease (2011) 7-21.1(2) Contractor Submittals Submittals shall be in accordance with Section 1-05.5 of these specifications. Submittals shall include, but not be limited to, the items identified in these specifications and in Section 1-05.5 of these specifications: A. The rehabilitation technique to be used: a. Proposed materials of construction b. Written guarantee indicating intent to comply with the manufacturer's standards for all materials and techniques being used in CIPP process. Any proposed modifications to the manufacturer's recommended standards shall be approved by the Engineer prior to installation of the product. Submit prior to purchase of any materials. c. Certified test results from the manufacturers which indicate that all materials conform to the applicable requirements. Submit prior to purchase of lining materials. B. Wall thickness calculations, stamped by a professional engineer, per section 7-21.2(5). C. Chemical Resistance Data – The Contractor shall submit CIPP test results that meet the chemical resistance requirements of ASTM F1216 and ASTM F1743. CIPP samples tested shall be of fabric tube and the specific resin proposed for actual construction. It is required that CIPP samples without plastic coating meet these chemical testing requirements. Also refer to Section 7-21.2(6). 2023 SEWER REHABILITATION MARCH 2023 90 D. CIPP Field Samples – The Contractor shall submit test results from previous field installations of the same resin system and tube materials as proposed for the actual installation, Field sampling procedure shall be in accordance with ASTM F1216 or ASTM F1743 and in accordance with ASTM D5813. E. MSDS Sheets – The Contractor shall submit Material Safety Data Sheets for all resins, and other additives such as accelerants, colorants, and lubricants utilized in the pipe liner/lining process. F. Informational Handout for Public – The Contractor shall submit an informational handout that describes the materials, processes, installation, pressures, temperature limitations, and odors associated with the lining process that shall be provided at the request of concerned residents. G. “Wet-out” sheets – Refer to section 7-21.3(1) H. Post-Installation Inspection Report. Refer to section 7-21.3(5). 7·21.2 Materials 7·21.2(1) General Neither the CIPP product, nor installation, shall cause adverse effects to any of the City processes or facilities. The use of the product shall not result in the formation or production of any detrimental compounds or by-products at the wastewater treatment plant. The Contractor shall notify the City and identify any by-products produced as a result of the operations, test and monitor the levels, and comply with any and all local waste discharge requirements. 7.21.2(2) Product Storage and Handling All materials shall be accompanied by test reports certifying that the material conforms to the ASTM standards listed herein. Materials shall be shipped, stored, and handled in a manner consistent with written recommendations of the manufacturer. Storage locations shall be approved by the Engineer. All damaged materials and pipe rejected by the Engineer shall be promptly removed from the site at the Contractor's expense and disposed of in accordance with current applicable regulations. Damage Includes, but is not limited to, gouging, abrasion, flattening, cutting, puncturing, or ultra-violet (UV) degradation. 7·21.2(3) Tube A. The tube shall consist of one or more layers of flexible, needled felt or an equivalent non-woven or woven material, or a combination or non- 2023 SEWER REHABILITATION MARCH 2023 91 woven and woven materials, capable of carrying resin, and withstanding installation pressures and curing temperatures, as required in ASTM F1216 or ASTM F1743 and ASTM D5813. The tube may also contain felt layers reinforced with glass or carbon fibers. B. The fabric tube shall be manufactured to a size and length that when installed will tightly fit the internal circumference, meeting applicable ASTM standards or better, of the original pipe. Allowance shall be made for circumferential stretching during installation. The tube shall be properly sized to the diameter of the existing pipe and the length to be rehabilitated and be able to stretch to fit irregular pipe sections and negotiate bends. The Contractor shall determine the minimum tube length necessary to effectively span the designated run between manholes. The Contractor shall verify the lengths in the field prior to ordering and prior to impregnation of the tube with resin to ensure that the tube will have sufficient length to extend the entire length of the run. The Contractor shall also measure the inside diameter of the existing pipelines in the field prior to ordering liner so that the liner can be installed in a tight-fitted condition. C. The outside and/or inside layer of the fabric tube (before inversion/pull- in, as applicable) shall be coated with an impermeable, flexible membrane that will contain the resin and facilitate, if applicable, vacuum impregnation and monitoring of the resin saturation during the resin impregnation (wet-out) procedure. D. The tube felt shall be homogeneous across the entire wall thickness containing no intermediate or encapsulated elastomeric layer. No material shall be Included in the tube that may cause de-lamination in the cured CIPP. No dry or unsaturated layers shall be acceptable upon visual inspection as evident by color contrast between the felt fabric and the activated resin containing a colorant. E. The wall color of the interior pipe surface of CIPP after installation shall be a light reflective color so that a clear detailed examination with CCTV Inspection may be made. The hue of the color shall be dark enough to distinguish a contrast between the fully resin saturated felt fabric and dry or resin lean areas. F. Seams in the tube shall be equal to, or greater in strength than the non-seamed felt material. G. The outside of the fabric tube shall be marked a maximum of every 5 feet with the name of the manufacturer or CIPP system, manufacturing lot and production footage. 2023 SEWER REHABILITATION MARCH 2023 92 H. The nominal tube wall thickness shall be constructed to the nearest 1.5 mm increment, rounded up from the design thickness for that section of installed CIPP. Wall thickness transitions, in 1.5 mm increments or greater as appropriate, may be fabricated into the fabric tube between installation entrance and exit access points. I. The minimum length of the tube for any sewer main segment shall be that deemed necessary by the installer to effectively span the distance from the starting manhole to the terminating manhole or access point, plus that amount required to run-in and run-out for the installation process. J. Normally a pre-liner will not be required. Where groundwater is observed entering the pipe in the pre-lining video inspection, the Contractor shall install a pre-liner in the pipe prior to the felt liner. The pre-liner tube shall be a reinforced plastic sheet formed to fit the host pipe being lined and shall be continuous from manhole to manhole. The cost for the pre-liner shall be considered incidental to the cost of CIPP lining. K. For pipe configurations that contain pipe diameter transitions, the transition liner tube must be formed by the manufacturer prior to installation to ensure proper wall thickness per ASTM F1216. 7-21.2(4) Resin Heat-cured: A. The resin/liner system shall meet the 10,000 hour test in accordance with ASTM D2990 or equivalent testing. B. The resin shall be a chemically resistant thixotropic vinyl ester resin that is compatible with the installation process. The resin shall be styrene-free. The resin should be able to cure both in the presence and without the presence of water and the initiation temperature for cure should be less than 180 degrees Fahrenheit. When properly cured the resin/liner system shall meet the structural and chemical resistance requirements of ASTM F1216 and or ASTM F1743. C. Resin shall be Corezyn CORVE8295S, VIPEL L040-TNVG-33, or equivalent that meets the specifications. D. The activated resin shall contain a colorant compatible with the resin, organic peroxides and the installation and curing process, such as CreaNova® CHROMA CHEM 844-7260 Phthalo-Blue, or equivalent, at a level of 0.01-0.035 % by the weight of the resin. The colorant shall be 2023 SEWER REHABILITATION MARCH 2023 93 added concurrently with the organic peroxide activator solution, or immediately after adding it to the resin, to serve as a multi-purpose visual quality assurance indicator. For systems using a photo-initiator catalyst no colorant in the activated resin is required. UV-Cured: A. The resin system shall be polyester, vinylester, or orthothalic (either ppg or npg grade) depending on the choice of the engineer, with a catalyst system that when properly cured within the tube composite meets the physical properties of: a. Flexural Modulus (minimum) 725,000 psi b. Flexural Strength (minimum) 15,000 psi c. Long term E-modulus 675,000 psi d. Long term tensile bending strength 13,500 psi B. The resin used with this product shall use UV light to cure the pipe. The liquid UV resin shall saturate the tube and produce a properly cured liner, which is resistant to abrasion due to solids, grit, and sand. C. Polyester, vinyl ester and catalyst system shall comply with the following requirements and when properly cured meet the requirements of ASTM F1216. D. Resins created from recycled materials are not allowed. 7-21.2(5) CIPP Structural Requirements A. Except where the liner thickness has already been provided by the City, the thickness of each liner installed shall be determined using calculation methods that are consistent with industry standards and the requirements of all applicable ASTMs. The Contractor's Design Engineer shall submit stamped and signed designs prior to the installation of any liner. The designs shall include a step-by-step calculation that shows all equations, defines all variables, lists all assumptions, and clearly indicates all values used for the design. B. The minimum liner thickness to be used in all cases, regardless of the calculated thickness, shall never be less than 4.5 mm (0.177”). C. For a particular bid item, the liner thickness shall be the same for all sections of pipe. For the design depth, use the maximum structure depth for each bid item. 2023 SEWER REHABILITATION MARCH 2023 94 D. The design engineer shall set the long term (50 year extrapolated) Creep Retention Factor at 50% of the initial design flexural modulus as determined by ASTM D790 test method. E. The cured in place pipe material (CIPP) shall conform to the structural properties as listed in the following table: Minimum Physical Properties Property Test Method Cured Composite Wall Thickness ASTM D2122 Per ASTM F1216 Flexural Modulus of Elasticity ASTM D-790 (short term) 300,000 psi Flexural Strength ASTM D-790 4,500 psi F. The required structural CIPP wall thickness shall be based as a minimum on the physical properties indicated above, the Design Equations in the appendix of ASTM F1216, and the following design parameters: Design Safety Factor 2.0 Creep Retention Factor 50% Ovality 2% Modulus of passive soil reaction 1,000 psi Groundwater Depth Assume at surface Soil Depth See Plan Set Live Load H-20 (Highway Loading) Soil Load (assumed)* 134 lb./cu. Ft. Pipe Condition Fully Deteriorated Minimum service life 50 years *No soils investigation related to this project has be performed 7-21 .2(6) Chemical Resistance Chemical resistance tests should be completed in accordance with Test Method D543. Exposure should be for a minimum of one month at 73.4 degrees F. During this period, the CIPP test specimens should lose no more than 20 percent of their initial flexural strength and flexural modulus when tested in accordance with ASTM F1216 and ASTM F1743, whichever is applicable, when subjected to the following: Chemical Solution Concentration, percent 2023 SEWER REHABILITATION MARCH 2023 95 Tap Water (pH 6-9) 100 Nitric Acid 5 Phosphoric Acid 10 Sulfuric Acid 10 Gasoline 100 Vegetable Oil 100 Detergent 0.1 Soap 0.1 The Contractor shall be responsible for all costs associated with the chemical resistance tests. 7-21.3 Construction Requirements 7-21.3(1) Preparatory Work A. Notification of property owners along project route. See Section 1-07.16(5) for notification requirements. B. Cleaning and video inspection of pipes per Section 7-20 of these Specifications. C. The values for pipe diameter and length given in the contract documents are based on best available information. Do not order materials based on the information provided in the contract. The Contractor shall independently verify pipe inner diameter and length in the field prior to ordering and prior to impregnation of the tube with resin to ensure that the tube will have sufficient length to extend the entire length of the run. D. Active Side Sewers: Sewers 8-inch in diameter and greater shall be controlled by a temporary bypass as needed or required by City staff. All bypassing shall be coordinated with City staff. The Contractor shall submit a bypass plan for controlling flow into the pipe for review as described in Section 7-08.3(5). E. “Wet-Out” Process for Resin/Tube Composite: a. The quantity of resin used for the tube impregnation shall be sufficient to fill the volume of all voids in the tube material with additional allowances for polymerization shrinkage and the loss of resin through cracks and irregularities in the host pipe wall. b. A vacuum impregnation process shall be used. To ensure thorough resin saturation throughout the length of the tube, the level of the vacuum and the speed of the resin advance shall be coordinated so 2023 SEWER REHABILITATION MARCH 2023 96 that white spots (dry areas) at the inside surface of the flexible membrane shall be small, shallow, less than 10% of the tube wall thickness or 3-mm, whichever is less, and be less than 1% of the volume of the resin per unit length. c. A roller system shall be used to uniformly distribute the resin throughout the tube. The roller gap dimension shall be calculated by a method that determines the correct volume of resin/tube per foot contained within the confining perimeter of the flexible membrane. d. The “wet-out” tube shall meet ASTM F 1216, 7.2 or ASTM F 1743, 6.2 as applicable, and shall have a uniform thickness and excess resin distribution that when compressed at installation pressures will meet or exceed the design thickness after cure. e. No dry or unsaturated layers shall be acceptable upon visual inspection as evident by color contrast between the felt fabric and the activated resin containing a colorant. f. The person in charge of the "wet-out” process, as identified in the Statement of Qualifications for CIPP Rehabilitation, shall complete and sign a "wet-out" sheet for each liner to be delivered to the site. The certified “wet-out" sheet shall include, but is not limited to, "wet- out" date, resin identification, tube length, diameter, and thickness. The Contractor shall submit to the Engineer the signed "wet-out" sheet for each liner delivered to the site within 3 business days of wet out. Additionally, the Contractor shall submit a sample "wet-out" sheet from a previous job for the Engineer's review prior to the start of the “wet-out" process for the current project. g. The City reserves the right to inspect all phases of production and testing of materials, from manufacturing, shipping, “wet-out", installation, and cure, to finished product. 7·21.3(2) Pipe Liner Installation 7.21.3(2)A General The CIPP liner shall be installed and cured in the host pipe per the manufacturer's specifications as described and submitted in Section 1-05.5 of these Special Provisions. CIPP Installation shall be in accordance with applicable ASTM F1216, Section 7, or ASTM F1743, Section 6, with the following modification: a. Final Cleaning and Inspection: The existing host pipe shall be given a final cleaning just prior to insertion of the liner to remove any 2023 SEWER REHABILITATION MARCH 2023 97 loose material that may have entered the line after the pre- installation cleaning. No more than one hour may elapse between this final cleaning/flushing pass and the insertion of the liner. After the cleaning is complete, make a final camera pass to verify the cleanliness of the line. This final pass shall be completed in the presence of the Engineer and accepted as ‘clean’. b. Bypass pumping from upstream manholes shall be utilized in accordance with Section 7-08 of these Special Provisions to exclude any sewage from entering the line during inspection and to maintain sewer service for adjacent piping. All standing sewage shall be removed from the main during final cleaning to provide the Contractor with a completely unobstructed view of the host pipe. c. Prior to installation of the liner, the heat source shall be fitted with suitable monitors to gauge the temperature of the incoming and outgoing heat supply. Additional monitors (typically thermocouple probes) are required and shall be installed between the impregnated tube and the pipe invert at the termination to allow for the monitoring and logging of temperatures during the cure cycle. The Contractor shall have back-up monitors available at all times. d. Tube Insertion - The wet-out tube shall be positioned in the pipeline using either air or water inversion, or a pull-in method. The tube shall be pulled-in or inverted through an existing manhole or approved access point and fully extended to the next designated manhole or termination point. The pressure head shall remain constant to avoid wrinkles in the liner. The Contractor shall protect the manholes to withstand forces generated by equipment, water, or air pressures used while installing the tube. If a lubricant is used during the installation process the Contractor shall submit a material data to the Engineer prior to its use for approval. No petroleum-based lubricants, such as mineral oil, shall be approved for use. The Contractor may be required to place an absorbent material in the area of installation (i.e. around truck area, gutter line, or where appropriate). If a pulling method is used, a cable shall be strung through the existing pipe to be rehabilitated and attached to the liner through an existing manhole or access point. The liner shall be pulled through the existing manhole and through the existing pipe by this cable. Care shall be taken not to damage the liner or host pipe during the installation. Liners installed in pipe segments that contain a vertical or horizontal curve shall utilize the inversion method. If, in the opinion of the Contractor, it is deemed suitable to utilize the pull-in method for any pipe with a vertical or horizontal curve, it shall be noted on the pre-installation pre-lining inspection report and presented to the Engineer for approval 2023 SEWER REHABILITATION MARCH 2023 98 for this method. If neither method is deemed suitable for liner installation the line segment will be removed from the contract. 7-21.3(2)B Curing and Cool Down for Heated Water or Steam a. After liner placement is completed, a suitable heat source and distribution equipment shall be provided to distribute or re-circulate hot water or steam throughout the pipe. The equipment shall be capable of delivering hot water or steam throughout the section to uniformly raise the temperature above the temperature required to cure the resin. This temperature shall be determined by the manufacturer based upon the resin/catalyst system employed. The curing of the CIPP must take into account the existing pipe material, the resin system, and ground conditions (temperature, moisture level, and thermal conductivity of the soil). b. To ensure that each phase of the process is achieved at the approved manufacturer's recommended temperatures, suitable monitors to gauge and record temperatures of the incoming and outgoing heat source during the curing and cooling shall be placed between the tube and pipe invert at each end. A back-up monitor is required in the event of monitor failure. c. The Contractor shall submit the cure and cool down periods as recommended by the resin manufacturer. If an accelerant is used the Contractor shall submit the adjusted cure and cool down periods based on the accelerant Manufacturer's recommendations. Recirculation of the hot water or steam shall be maintained continuously throughout this period. d. During the cure and cool down process, the Contractor shall keep logs, charts and/or graphs of the liner temperatures at the specified locations to ensure that proper temperatures and cure times have been achieved. Certified cure logs and cool down schedules shall be submitted for each installed liner. e. The contractor shall maintain the maximum and minimum pressure required to hold the tube tight against the host pipe during the curing process until finished curing, per manufacturer’s recommendation. f. When cooling with water or air, the exterior “skin” (interface) temperature on both ends reaches 80 F or less, the processing shall be finished. The equipment may then be disconnected. 2023 SEWER REHABILITATION MARCH 2023 99 g. Care shall be taken in the release of the static head so that a vacuum will not develop that could damage the newly installed liner. h. The steam vent discharge opening during the cooling process shall be minimum 10 feet above the roadway so that steam venting does not create safety hazard for vehicles and pedestrians. Use supports as necessary to elevate discharge opening. The opening shall be directed away from walkways. 7·21.3(2)C Finished Pipe Liner a. The finished lining shall be continuous over the entire length of an installation run and be free of visual defects, including but not limited to, foreign inclusions, cracks, dry spots or unsaturated layers, pinholes, wrinkles, blisters, bulges, soft spots, and de- lamination. The lining shall be impervious and free of any leakage from the pipe to the surrounding ground or from the ground to the inside the lined pipe. If these conditions are present, the affected portions of CIPP will be removed and replaced with an equivalent repair equal to the product installed. Exceptions to these requirements are noted on the Plans. b. Any defect, which will or could affect the structural integrity, strength, capacity, or future maintenance of the installed liners, shall be repaired at the Contractor’s expense, in a manner approved by the Engineer. c. The beginning and end of the CIPP shall be cut flush at the inlet and outlet points in the manhole. The annular space at the ends shall be sealed with quick-setting cement grout and provide a watertight seal at both ends of the pipe. Sealing material and installation method shall be submitted and approved by the Engineer prior to start of construction. 7-21.3(3) Internal Reinstatement of Laterals After the CIPP lining has properly cured and cooled and within 8 hours of starting the lining operation, the Contractor shall cut a temporary opening to relieve sewage flow at each lateral. This opening is temporary and full reinstatement will occur as further described. The temporary opening shall be minimum 4-inch diameter. 2023 SEWER REHABILITATION MARCH 2023 100 Full side sewer (lateral) reinstatement shall be completed within 48 hours and shall be performed by a qualified individual with experience in successful internal lateral cuttings. The cutting device shall produce a neat, clean and smooth opening 95% minimum and 100% maximum of the same size and configuration of the existing side sewer lateral. Side sewer laterals shall not be overcut beyond the tolerances specified in these Special Provisions. In the event a side sewer lateral is overcut, the Contractor shall repair using a short liner and re-cut the side sewer lateral. The Contractor shall use extra care when reinstating connections that are PVC so as not to cut through the fitting. Cut PVC fittings will require repairs with a lateral sealing system. Overcut side sewer laterals or lateral sealing shall be repaired at the contractor’s expense. The Contractor shall independently verify the location and total number of all side sewer laterals. The Owner will review the videos and pre-lining Inspection report to determine which lines are active and require reinstatement. The Engineer will submit to the Contractor a list of all laterals that must be re-instated. For this reason, it is critical that the Contractor provide all Pre-Lining Inspection Reports to the Engineer as soon as possible to allow the Engineer sufficient time to review them. The Contractor shall only reinstate laterals that the Owner identifies as being "live'. If the contractor reinstates a side sewer lateral that is inactive, the Contractor has effectively introduced a point for infiltration to enter the sewer main segment. In this circumstance, the Contractor shall perform, at their expense, an appropriate internal or external spot repair to remove this potential source of infiltration. Spot repair methods and materials shall be approved by the Engineer prior to implementation. No additional payment shall be paid for the spot repair of side sewer lateral reinstatements. If the Contractor fails to reconnect an active side sewer lateral the Contractor shall use whatever means necessary to reinstate the side sewer lateral at his/her own expense. The Contractor shall be held financially liable for all claims for damages resulting from the missed or untimely sewer reinstatements. Where two laterals come together at a common location at the pipe wall, this shall be considered a single reinstatement. Coupons from side sewer reinstatements shall be collected and disposed of off-site. 7·21.3(4) Post-Installation Video Inspection and Acceptance The Contractor shall perform a CCTV inspection in accordance with section 8.6 of ASTM 1216 and ASTM F1743 after installation of the CIPP liner and reconnection of the active side sewer laterals. The quality of the Post-Installation CCTV inspection shall be held to the same standards as the Pre-Installation CCTV inspection. During the CCTV 2023 SEWER REHABILITATION MARCH 2023 101 inspection the pipe invert shall be clear of any standing water and the pipe shall be continuously visible during the inspection. The Contractor shall submit to the Engineer, for acceptance and approval, copies of unedited Post-Installation videos and associated Inspection Reports in a digital format on a USB thumb drive for each sewer main segment within fourteen (14) calendar days of the liner installation. The inspection report shall note the inspection date, video name (Manhole number to Manhole number), location of all reconnected side sewer laterals, debris, as well as any other defects in the liner, including, but not limited to, gouges, cracks, bumps, or bulges. Immediately prior to conducting the post-installation CCTV inspection, the Contractor shall clean and flush the newly installed liner. Acceptance of the line as 'clean', (as previously defined in this Specification), shall be determined by the Engineer based upon the subsequent CCTV inspection of the line. If the CCTV Inspection reveals any deficiencies in the cleaning, such as remaining coupons of reinstated laterals, the contractor shall immediately correct these deficiencies at their own expense. The Post-Installation videos and Inspection Report submittals shall be reviewed by the Engineer within ten (10) working days of receipt. Payment for CIPP bid items will not occur until post-Installation videos and Inspection Reports have been submitted, reviewed, and approved by the Engineer. 7·21.3(5) Lining Sanitary Sewer Pump Station Influent Piping The influent piping for three (3) sanitary sewer pump stations have been included in this contract. These are being considered separately from other lining work in the contract due to the higher flow rates which will require more extensive bypass pumping, wet well access, and safety considerations that are required for working around a sanitary sewer pump station. The pipe sections to be lined are also significantly shorter and the work will be done as a lump sum bid item, inclusive of temporary flow diversion required. 7-21.3(5) Clean-Up After the liner installation has been completed and inspected, the Contractor shall clean up the entire project area. All excess material and debris shall be disposed of by the Contractor in accordance with State and Federal laws and regulations. 7-21.3(6) Sampling and Laboratory Testing 2023 SEWER REHABILITATION MARCH 2023 102 The physical properties of the installed CIPP liner shall meet the minimum physical properties per Section 7-21.2(5) verified through field sampling and certified third-party laboratory testing. Per Section 8 of ASTM F1216 and ASTM F1743, the Contractor shall obtain samples from all actual installed CIPP liners. All samples shall be labeled with the following: · Date of installation · Main segment number · Upstream and downstream manhole ID number All material testing shall be performed at the Contractor’s expense. Final payment for the project shall be withheld pending receipt and approval of the test results. If properties tested do not meet minimum requirements, the CIPP liner is subject to rejection, replacement or a reduction in payment. The Contractor shall supply samples to an agreed upon certified third-party testing laboratory. The laboratory name and accreditation information must be submitted to the City prior to any lining work. Payment for laboratory testing will be incidental to the CIPP lining process. 7-21.4 Measurement Live lateral reinstatement will be measured per each lateral that is restored. Measurement for rehabilitation of sanitary and storm sewers using cure-in-place-pipe method shall be the linear foot along the pipe length. The quantity has been determined by the Engineer from GIS and is measured from center of upstream manhole lid to the center of the downstream manhole lids. This value is fixed and will only be revised in the event of a major discrepancy as agreed upon by both the City and the Contractor. Measurement for rehabilitation of pump station influent piping using cure-in-place-pipe method shall be lump sum inclusive of temporary flow diversion required. 7-21.5 Payment “Live Lateral Reinstatement”, per each. Payment for Live Lateral Reinstatement per each, shall be considered full compensation for all labor, equipment, and materials necessary to perform Live Lateral Reinstatement as described in Section 7-21.3(3). Actual quantities will be determined in the field as the work progresses, and will be paid at the original bid price, regardless of final quantity. These bid items shall not be subject to the provisions of 1-04.6 of the Standard Specifications. “CIPP for __-inch ______ Sewer”, per linear foot. 2023 SEWER REHABILITATION MARCH 2023 103 Payment for rehabilitation of sanitary and storm sewers using cure-in-place-pipe method shall be per linear feet and shall include all costs for flow diversion/bypass, installing liner, testing, curing, final video inspection of the installed liner and all other work described in this Section to provide a complete and rehabilitated sewer main. “CIPP for Pump Station Influent (___________), lump sum Payment for rehabilitation of sewer pump station influent piping using cure-in-place-pipe method shall be lump sum and shall include all costs for flow diversion/bypass, installing liner, testing, curing, final video inspection of the installed liner and all other work described in this Section to provide a complete and rehabilitated sewer main for the pump station influent piping. “CIPP Transitional Liner for ___________”, per linear foot. Payment for rehabilitation of transitional sanitary sewer (10” to 12”) using cure-in-place- pipe method shall be per linear feet and shall include all costs for flow diversion/bypass, manufacturing, submittal of proposed transition method, installation, testing, curing, final video inspection of the installed 10-inch to 12-inch transitional liner and all other work described in this Section to provide a complete and rehabilitated sewer main with a smoother transition between the 10-inch and 12-inch sewer pipe. END OF DIVISION 7 2023 SEWER REHABILITATION App. A – Construction Forms MARCH 2023 A-1 APPENDIX A – Construction Forms 2023 SEWER REHABILITATION App. A – Construction Forms MARCH 2023 A-2 2023 SEWER REHABILITATION App. A – Construction Forms MARCH 2023 A-3 2023 SEWER REHABILITATION App. A – Construction Forms MARCH 2023 A-4 2023 SEWER REHABILITATION App. A – Construction Forms MARCH 2023 A-5 2023 SEWER REHABILITATION App. A – Construction Forms MARCH 2023 A-6 2023 SEWER REHABILITATION App. B – Project Plans MARCH 2023 B-1 APPENDIX B - Project Plans 106303GORSTPORT ORCHARDBREMERTONINDEX TO DRAWINGS COVER SHEETGENERAL NOTES, LEGEND AND ABBREVIATIONSSANITARY SEWER - VIDEO INSPECTIONOYSTER BAY AVE S - WWTP TO KEAN BLVD 1SANITARY SEWER - VIDEO INSPECTIONOYSTER BAY AVE S - WWTP TO KEAN BLVD 2SANITARY SEWER - VIDEO INSPECTIONUNION AVE - SOUND RIDGE DR TO HASELWOOD STSANITARY SEWER - VIDEO INSPECTIONFIR AVE - MAGNUSON WAY TO EASEMENTSANITARY SEWER - CIPPBRYAN AVE/OLYMPIC AVE - BURWELL ST TO 6TH STSANITARY SEWER - CIPPPUMP STATION INFLUENT PIPES - MULTIPLE LOCATIONSSANITARY SEWER - CIPPLAKEHURST DR/CEDARWOOD DRSANITARY AND STORM SEWER - CIPP6TH ST - NAVAL AVE TO HIGH AVESANITARY AND STORM SEWER - CIPP6TH ST - HIGH AVE TO WARREN AVESANITARY AND STORM SEWER - CIPPNAVAL AVE - 1ST TO 7TH STSANITARY SEWER - CIPPHIGHLAND AVE - 6TH TO 11TH ST PL12345678910111213DWG NO.SHT NO.SHEET TITLEG-1G-2V-1V-2V-3V-4C-1C-2C-3C-4C-5C-6C-7Know what'sbelow.before you dig.CallRDetermina lo que estabajo tierra.antes de excavar.LlamaLOCATION MAPNO SCALEREMERTONBC I T Y O FCITY PROJECT #58772023 SEWER REHABILITATIONMARCH 2023LAKEHURST DR/CEDARWOOD DRSEE DWG C-3OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FG-15877131COVER SHEET2023 SEWER REHABILITATIONUNION AVESEE DWG V-3OYSTER BAY AVE SSEE DWG V-1/V-26TH STSEE DWG C-4 & 5BRYAN AVE/OLYMPIC AVENAVAL AVESEE DWG C-1/C-6HIGHLAND AVESEE DWG C-7PUMP STATION CW-1SEE DWG C-2FIR AVESEE DWG V-4PUMP STATION EB-3SEE DWG C-2PUMP STATION KL-4SEE DWG C-2GENERAL SHEETSVIDEO INSPECTION ONLY LOCATIONSCIPP LOCATIONS GENERAL NOTES1.AFTER COMPLETION OF ALL ITEMS SHOWN ON THESE PLANS AND BEFOREACCEPTANCE OF THE PROJECT THE CONTRACTOR SHALL OBTAIN A “PUNCHLIST” PREPARED BY THE CITY DETAILING REMAINING ITEMS OF WORK TO BECOMPLETED. ALL ITEMS OF WORK SHOWN ON THESE PLANS SHALL BECOMPLETED TO THE SATISFACTION OF BREMERTON PRIOR TO ACCEPTANCE OFTHE WORK.2.A COPY OF THESE APPROVED PLANS AND THE PROJECT'S SPECIFICATIONS ANDDETAILS SHALL BE ON SITE DURING CONSTRUCTION.3.ANY REVISIONS MADE TO THESE PLANS MUST BE REVIEWED AND APPROVED INWRITING BY THE ENGINEER AND BREMERTON PRIOR TO IMPLEMENTATION INTHE FIELD. BREMERTON SHALL NOT BE RESPONSIBLE FOR ANY ERRORSAND/OR OMISSIONS ON THESE PLANS.4.THE CONTRACTOR SHALL HAVE ALL UTILITIES VERIFIED ON THE GROUND PRIORTO ANY EXCAVATION. CALL (811) AT LEAST TWO WORKING DAYS IN ADVANCE.THE OWNER AND HIS/HER ENGINEER SHALL BE CONTACTED IMMEDIATELY IF ACONFLICT EXISTS.5.THE LOCATION OF KNOWN EXISTING UTILITIES ARE SHOWN APPROXIMATE;TAKEN FROM UTILITY LOCATE MARKINGS AND/OR AVAILABLE RECORDINFORMATION AT THE TIME OF DESIGN. EXACT LOCATION AND DEPTH OFUTILITIES ARE UNKNOWN AND SHALL BE DETERMINED BY THE CONTRACTOR INTHE FIELD BY POTHOLING PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALLBE RESPONSIBLE FOR ALL DAMAGES CAUSED DUE TO FAILURE TO LOCATE ANDPRESERVE EXISTING UTILITIES.6.THE CONTRACTOR IS RESPONSIBLE FOR FULL RESTORATION OF ALL EXISTINGFEATURES DISTURBED DURING CONSTRUCTION TO THEIR ORIGINAL CONDITIONUNLESS OTHERWISE INDICATED BY THE ENGINEER.7.CONTRACTOR IS REQUIRED TO PROVIDE A COMPETENT PERSON(S) TRAINED TOIDENTIFY EXISTING OR PREDICTING HAZARDS RELATED TO TRENCH SAFETY,SOIL CONDITIONS, AND SHORING REQUIREMENTS, IN ACCORDANCE WITH WAC296-155 PART N. REPRESENTATIVES OF BREMERTON AND BHC SHALL NOT BEREQUIRED TO PERFORM THE ROLE OF COMPETENT PERSON FOR THE PROJECT.NO WORKERS SHALL ENTER A TRENCH OR OTHER EXCAVATION FOUR (4) FEETOR MORE IN DEPTH WITHOUT TRENCH SAFETY IN PLACE.8.THE CONTRACTOR SHALL MEET THE CONDITIONS OF ALL PROJECT PERMITSAND LOCAL, STATE, AND FEDERAL LAWS AND REGULATIONS.9.REFERENCES TO "CITY", "ENGINEER", "CITY ENGINEER", AND "OWNER" AREUSED INTERCHANGEABLY AND REFER TO THE CITY OF BREMERTON AND IT'SAUTHORIZED REPRESENTATIVES. "PROPERTY OWNER" IS USED WHENREFERRING TO OWNERS OF PRIVATE PROPERTY.ABNDABANDONEDCBCATCH BASINCONCCONCRETEDIDUCTILE IRONEPEDGE OF PAVEMENTEXEXISTINGFMFORCE MAINFTFEETIEINVERT ELEVATIONMHMANHOLEPVC POLYVINYL CHLORIDESD STORM DRAINCIPPCURED-IN-PLACE-PIPEGPMGALLONS PER MINUTESSSANITARY SEWERTYPTYPICALWWATERABBREVIATIONS:EXISTING SANITARY SEWER MANHOLEEXISTING SANITARY SEWER LAMPHOLE OR CLEANOUTEXISTING STORMWATER CATCH BASINEXISTING SANITARY SEWER MAINEXISTING STORMWATER MAINEXISTING SANITARY SEWER MAINTO BE LINED OR VIDEO INSPECTEDEXISTING STORMWATER MAINTO BE LINED OR VIDEO INSPECTEDPROPERTY/RIGHT OF WAY LINELEGEND:OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FG-25877132GENERAL NOTES, LEGEND AND ABBREVIATIONS2023 SEWER REHABILITATION MATCHLINE - SEE BELOW OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FV-15877133OYSTER BAY AVE S - WWTP TO KEAN BLVD 1SANITARY SEWER - VIDEO INSPECTION2023 SEWER REHABILITATIONMATCHLINE - SEE ABOVE SCALE:1" = 40' HORIZONTALMATCHLINE - SEE SHEET V-2 FLOWMH R22-3098DEPTH TO IE: 26 FT87 LF 21" CONC1000/1100520MH R22-3091DEPTH TO IE: 24.3 FTMH R22-3002DEPTH TO IE: 19.2 FTMH R22-3003DEPTH: UNKNOWNMH R22-3004DEPTH: UNKNOWNMH R22-3005DEPTH TO IE: 19.4 FTMH R22-3006DEPTH TO IE: 19.9 FTMH R22-3006DEPTH TO IE: 19.9 FTMH R22-3007DEPTH TO IE: 25+ FTMH R22-2052DEPTH TO IE: 23.3 FTMH R22-2051DEPTH: UNKNOWNMH R22-2050DEPTH: UNKNOWNMH R21-1005DEPTH: UNKNOWNHWY 3HWY 3H STOYSTER BAY AVE SFLOWFLOWFLOW117 LF 21" CONC320 LF 21" CONC47 LF 21" CONC257 LF 21" CONC29 LF 21" CONC227 LF 21" CONC230 LF 21" CONC102 LF 21" CONC61 LF 21" CONC397 LF 24" CONCOYSTER BAY AVE TO NORTHNOTES:1.SANITARY SEWER DEPICTED ON THIS SHEETINCLUDE PIPE CLEANING AND INSPECTION ONLYIN ACCORDANCE WITH SPECIAL PROVISION 7-20AND WILL NOT INCLUDE CIPP UNDER THIS CONTRACT2.STRUCTURE DEPTHS AND LOCATIONS WHERESHOWN, ARE PROVIDED BASED ON AVAILABLERECORDS AND FIELD INSPECTIONS. CONTRACTORIS RESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNING WORK. OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FV-25877134OYSTER BAY AVE S - WWTP TO KEAN BLVD 2SANITARY SEWER - VIDEO INSPECTION2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALMATCHLINE - SEE SHEET V-1HWY 3OYSTER BAY AVE SK E A N B L V DFLOW 409 LF 24" CONC4503510W WERNER RD4650/46704501/45054525MH R21-1005DEPTH: UNKNOWNMH R21-1007DEPTH TO IE: 10.3 FTMH R21-1024DEPTH TO IE: 6.19 FTMH R21-1025DEPTH TO IE: 11.43 FTMH R21-1086DEPTH TO IE: 12.5 FT227 LF 24" CONC224 LF 24" CONC10 LF 18" CINOTES:1.SANITARY SEWER DEPICTED ON THIS SHEETINCLUDE PIPE CLEANING AND INSPECTION ONLYIN ACCORDANCE WITH SPECIAL PROVISION 7-20AND WILL NOT INCLUDE CIPP UNDER THIS CONTRACT2.STRUCTURE DEPTHS AND LOCATIONS WHERESHOWN, ARE PROVIDED BASED ON AVAILABLERECORDS AND FIELD INSPECTIONS. CONTRACTORIS RESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNING WORK. OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FV-35877135UNION AVE - SOUND RIDGE DR TO HASELWOOD STSANITARY SEWER - VIDEO INSPECTION2023 SEWER REHABILITATIONMATCHLINE - SEE ABOVE SCALE:1" = 40' HORIZONTALMATCHLINE - SEE BELOW SINCLAIR WY ROOSEVELT BLVDMH R21-4012DEPTH TO IE: 7.3 FT121 LF 8" CONC 4801LANSING AVEHUMPHREY AVEPOINDEXTER AVE3RD AVE WUNION AVEUNION AVELINDEN S T 130013091307500050041309MH R21-4013DEPTH TO IE: 7.5 FTMH R21-4014DEPTH TO IE: 7.8 FTMH R21-4015DEPTH TO IE: 11.8 FTMH R21-4077DEPTH TO IE: 12.7 FTMH R21-4016DEPTH TO IE: 13.1 FTMH R21-4017DEPTH TO IE: 12.7 FTMH R21-4018DEPTH TO IE: 11.5 FTMH R21-4019DEPTH TO IE: 16.1 FTMH R21-4020DEPTH TO IE: 11.9 FTMH R21-4021DEPTH TO IE: 6.8 FTMH R21-4021DEPTH TO IE: 6.8 FTMH R21-4022DEPTH TO IE: 9.9 FTMH R21-4023DEPTH TO IE: 12.0 FTMH R21-4024DEPTH TO IE: 11.2 FT41 LF 8" CONC170 LF 8" CONC55 LF 8" CONC95 LF 8" CONC150 LF 8" CONC110 LF 8" CONC160 LF 8" CONCFLOW188 LF 8" CONC165 LF 8" CONC315 LF 8" CONCFLOWFLOW300 LF 8" CONC320 LF 8" CONCNOTES:1.SANITARY SEWER DEPICTED ON THIS SHEETINCLUDE PIPE CLEANING AND INSPECTION ONLYIN ACCORDANCE WITH SPECIAL PROVISION 7-20AND WILL NOT INCLUDE CIPP UNDER THIS CONTRACT2.STRUCTURE DEPTHS AND LOCATIONS WHERESHOWN, ARE PROVIDED BASED ON AVAILABLERECORDS AND FIELD INSPECTIONS. CONTRACTORIS RESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNING WORK. FIR AVEMH R12-4053DEPTH TO IE: 10.0 FTOFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FV-45877136FIR AVE - MAGNUSON WY TO FILBERT AVESANITARY SEWER - VIDEO INSPECTION2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALMAGNUSON WAYFILBERT AVEMH R12-4052DEPTH TO IE: 11.0 FTMH R12-4051DEPTH TO IE: 13.0 FTMH R12-4050DEPTH TO IE: 6.0 FTMH R12-4046DEPTH: UNKNOWN135 LF 8 " CLAY362 LF 8" CLAY157LF 8" CLAY201 LF 8" CLAYFLOWFLOWJENNER AVE NOTES:1.SANITARY SEWER DEPICTED ON THIS SHEETINCLUDE PIPE CLEANING AND INSPECTION ONLYIN ACCORDANCE WITH SPECIAL PROVISION 7-20AND WILL NOT INCLUDE CIPP UNDER THIS CONTRACT2.STRUCTURE DEPTHS AND LOCATIONS WHERESHOWN, ARE PROVIDED BASED ON AVAILABLERECORDS AND FIELD INSPECTIONS. CONTRACTORIS RESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNING WORK. LH R14-30132DEPTH TO IE: 9 FTOFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-15877137BRYAN AVE/OLYMPIC AVE - BURWELL ST TO 6TH ST SANITARY CURED-IN-PLACE PIPE2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALMH R14-30135DEPTH TO IE: 8.6 FTMH R14-30134DEPTH: UNKNOWNMH R14-30133DEPTH: UNKNOWNMH R14-30115DEPTH TO IE: 8.8 FT132 LF 8" CONCMH R14-30113DEPTH TO IE: 7.5 FT304BRYAN AVEOLYMPIC AVEBURWELL ST 6TH STMH R14-30138DEPTH TO IE: 7.3 FTMH R14-30114DEPTH TO IE: 9.8 FT3143203283342315230831932350150723013063144005022135301315333NOTES:1.FOR WORK THAT REQUIRES ACCESS TOTHE MANHOLES ON BURWELL ST. THECIPP LINING WORK SHALL BE DONE ATNIGHT (SEE CONTRACT PROVISION1-08.0(3) CLEANING AND VIDEOINSPECTION MAY BE DONE BETWEEN THEHOUSR OF 8 A.M. AND 3P.M.2.WHEN ACCESSING BURWELL ST.MANHOLES, CLOSE TWO INSIDE LANESAND KEEP OUTSIDE LANES OPEN.3.BYPASS PUMPING SYSTEM SHALL BESIZED FOR MINIMUM 100 GPM4.STRUCTURE DEPTHS AND LOCATIONSWHERE SHOWN ARE PROVIDED BASED ONAVAILABLE RECORDS AND FIELDINSPECTIONS. CONTRACTOR ISRESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNINGWORK.221 LF 8" CONC270 LF 8" CONC141 LF 8" CONC80 LF 8" CONCFLOWFLOWFLOWSANITARY SEWER LATERAL COUNTSUPSTREAM MHDOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-30133R14-3013425R14-30134R14-3013504R14-30113R14-3011404R14-30114R14-3011513R14-30115R14-3013826 19TH STOFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-25877138PUMP STATION INFLUENT PIPES - MULTIPLE LOCATIONSSANITARY - CIPP2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALOLYMPIC AVEPUMP STATION CW-1FLOW 9 LF 18" CONCCW-1PUMPSTATIONMH R11-3013DEPTH TO IE: 7 FTWET WELL (20.5 FT DEPTH)DEPTH TO IE: 8.5 FTFLOWSHORE DRSHORE DRFLOW 9 LF 18" CONCEB-3PUMPSTATIONMH R13-4034DEPTH TO IE: 18 FTWET WELL (30.5 FT DEPTH)DEPTH TO IE: 18.5 FTPUMP STATION EB-3PUMP STATION KL-4MH R08-3000DEPTH TO IE: 7.9 FTKL-4PUMPSTATIONFLOW178 LF 10" CIWET WELL (18 FT DEPTH)DEPTH TO IE: 14 FTCO R08-3035HAYWARD AVE IRONSIDES AVE ACCESS FROM KITSAP WAYNOTES:1.SEE SPECIAL PROVISION SECTION 7-08AND 7-21 FOR DESCRIPTION OF BYPASSPUMPING AND LINING REQUIREMENTS FORPUMP STATION INFLUENT LINES2.STRUCTURE DEPTHS AND LOCATIONSWHERE SHOWN ARE PROVIDED BASED ONAVAILABLE RECORDS AND FIELDINSPECTIONS. CONTRACTOR ISRESPONSIBLE FOR FIELD VERIFYING ALLINFORMATION PRIOR TO BEGINNINGWORK.3.CONTRACTOR SHALL AVOIDDISTURBANCE TO EXISTING KITSAPTRANSIT BUS STOP. UNLESS OTHERWISEAPPROVED BT ENGINEER.EXISTING 10FT. WIDE SEWER EASEMENTOVER SEWER PUMP STATIONKL-3SCALE:1" = 40' HORIZONTALMATCHLINE - SEE BELOWFLOW OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-35877139LAKEHURST DR/CEDARWOOD DRSANITARY SEWER - CIPP2023 SEWER REHABILITATIONHARLOW DRMAPLEVIEW DRCEDA R W O O D D R EASTLAKE DRLAKEHURST DRMH R17-1036DEPTH TO IE: 13.8 FTMH R17-1046DEPTH TO IE: 11.1 FTMH R17-1045DEPTH TO IE: 11.1 FTMH R17-1038DEPTH TO IE: 6.17 FTMH R17-1098DEPTH TO IE: 17.0 FTNO VEHICLE ACCESSMH 17-1099DEPTH TO IE: 15.0 FTACCESS THROUGH GATE ON HARLOW DROUTSIDE DROPSTRUCTURE60'UNMAINTAINED RIGHT OF WAYMATCHLINE - SEE ABOVE ACCESS GATEMH R17-1098DEPTH TO IE:NO VEHICLE ACCESSMH R17-1037DEPTH TO IE: 14.8 FTFLOW324 LF 8" CONC223 LF 8" CONC296 LF 8" CONC345 LF 8" CONCFLOWFLOW 13311336136014511349/1351132915151531623763106223/6225SANITARY SEWER LATERAL COUNTSUPSTREAM MHDOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR17-1046R17-104502R17-1045R17-103705R17-1037R17-103602R17-1038R17-103702R17-1098R17-103705R17-1099R17-109806FLO W 45° DROP INTO MANHOLEWRINKLING AROUND BEND ACCEPTABLE223 L F 1 0 " C I 209 LF 8 " C O N C SEE NOTE 1SEE NOTE 1NOTES:1.BYPASS PUMPING SYSTEM SHALL BE SIZEDFOR MINIMUM 100 GPM 6TH STMATCHLINE - SEE SHEET C-5 OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-4587713106TH ST - NAVAL AVE TO HIGH AVESANITARY AND STORM SEWER - CIPP2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALMATCHLINE - SEE ABOVE HIGH AVE HEWITT AVE HEWITT AVEFLOW FLOWMH R14-3039DEPTH TO IE: ? FTMH R14-3035.1DEPTH TO IE: 4 FTMH R14-3022DEPTH TO IE: 5.8 FTMH R14-3013DEPTH TO IE: 5.8 FTMH R14-3008DEPTH TO IE: 4 FTMH R14-4095DEPTH : UNKNOWNMH R14-4095.1DEPTH TO IE: 8.7 FT131 LF 8" CLAY258 LF 8" CLAY69 LF 8" CLAY289 LF 8" CLAY190218141806/1804170215461516PENNSYLVANIA AVE 171017471737172917231711517154515271523MH R14-3039DEPTH: UNKNOWNMATCHLINE - SEE BELOW6TH STNAVAL AVE ROOSEVELT AVE HEWITT AVE MH R14-3069MH R14-3070DEPTH TO IE: 7.8 FTMH R14-3061DEPTH TO IE: 6.3 FTFLOWFLOW 330 LF 8" CLAY335 LF 8" CLAY6012020193019201912210120212003192119151907SDMH R14-3-D6DEPTH TO IE: 4.6 FTSDMH R14-3-D7DEPTH TO IE: 4.6 FTCB R14-3-149DEPTH TO IE: 5.0 FTCB R14-3-491DEPTH TO IE: 4.0 FTSDMH R14-3-D9DEPTH TO IE: 4.0 FTSDMH R14-3-D10DEPTH TO IE: 5.0 FTSDMH R14-3-D11DEPTH TO IE: 8.0 FTSDMH R14-3-D12DEPTH TO IE: 3.0 FTSDMH R14-3-D13DEPTH TO IE: 4.0 FT36 LF 15" CONC65 LF 15" CONC115 LF 15" CONCFLOW124 LF 12" CONC355 LF 12" CONC401 LF 15" CONC197 LF 12" CONCSEE SHEET 11STORM SEWER LATERAL COUNTSUPSTREAM MH/CBDOWNSTREAM MH/CB# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-3-D15R14-3-D1300R14-3-D13R14-3-D1200R14-3-D12R14-3-D1102R14-3-D11R14-3-D1000R14-3-D10R14-3-D901R14-3-D9R14-3-49100R14-3-491R14-3-14901R14-3-149R14-3-D702R14-3-D7R14-3-D601SANITARY SEWER LATERAL COUNTSUPSTREAM MHDOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-3069R14-307011R14-3061R14-3070012R14-3039R14-3061417R14-3035.1R14-303905R14-3022R14-3035.1111R14-3013R14-302213R14-3008R14-3013112R14-4095R14-4095.1110NOTE:1.WORK ON 6TH ST AND NAVAL AVE SHALLBE DONE AT NIGHT. SEE CONTRACTPROVISIONS SECTION 1-08.0(2).2.CONTRACTOR SHALL SUBMIT TRAFFICCONTROL PLAN TO INCLUDINGDEPLOYMENT OF TWO (2) PCMS BOARDSFOR WORK OCCURRING AT THE 6TH ST.AND NAVAL AVE. INTERSECTION.3.BYPASS PUMPING SYSTEM SHALL BESIZED FOR MINIMUM 100 GPMSDMH R14-4-D41DEPTH TO IE: ? FT 6TH STSDMH R14-4-D64DEPTH TO IE: 6.6 FTOFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-5587713116TH ST - HIGH AVE TO WARREN AVESANITARY AND STORM SEWER - CIPP2023 SEWER REHABILITATIONSCALE:1" = 40' HORIZONTALMATCHLINE - SEE ABOVECHESTER AVE BROADWAY AVE WARREN AVEFLOWMH R14-4039DEPTH TO IE: 8.4 FTMH R14-4038DEPTH TO IE: 11.6 FTFLOWFLOWSDMH R14-4-D37DEPTH TO IE: 6.0 FTSDMH R14-4-D30DEPTH TO IE: 6.8 FT303 LF 12" CONC662 LF 10" CLAY310 LF 24" CONC1120111211061102100051011131109110310231021MATCHLINE - SEE BELOW MATCHLINE - SEE SHEET 9 6TH STVENETA AVE CHESTER AVEFLOWFLOWMH R14-4095.1DEPTH: UNKNOWNMH R14-4040DEPTH: UNKNOWNMH R14-4039DEPTH TO IE: 8.4 FT305 LF 8" CLAY300 LF 8" CLAYMH R14-4040.1DEPTH: UNKNOWN359 LF 10" CLAY1516150260060260460612421234122812221212603517122512151201STORM SEWER LATERAL COUNTSUPSTREAM MH/CBDOWNSTREAM MH/CB# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-4-D41R14-4-D3402R14-4-D34R14-4-D3501R14-4-D35R14-4-D3601R14-4-D64R14-4-D3702R14-4-D37R14-4-D30UNKNOWNUNKNOWNSANITARY SEWER LATERAL COUNTSUPSTREAM MHDOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-4095.1R14-4040011R14-4040R14-4040.1214R14-4040.1R14-4039211R14-4039R14-4038UNKNOWNUNKNOWNNOTE:1.WORK ON 6TH ST AND NAVAL AVE SHALLBE DONE AT NIGHT. SEE CONTRACTPROVISIONS SECTION 1-08.0(2).2.BYPASS PUMPING SYSTEM SHALL BESIZED FOR MINIMUM 100 GPMSDMH R14-4-D34DEPTH TO IE: 4.3 FT286 LF 8" CONCSDMH R14-4-D35DEPTH TO IE: 4.3 FT25 LF 10" CONCSDMH R14-4-D36DEPTH TO IE: 7.0 FT356 LF 10" CONC 1ST STMH R14-3075DEPTH TO IE: 7.9 FTMATCHLINE - SEE BELOW OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-658771312NAVAL AVE - 1ST ST TO 7TH STSANITARY AND STORM SEWER - CIPP2023 SEWER REHABILITATIONMATCHLINE - SEE ABOVE SCALE:1" = 40' HORIZONTALGREGORY WAY BURWELL ST GREGORY WAY 5TH ST BURWELL PL 4TH ST 5TH ST NAVAL AVENAVAL AVE6TH ST FLOWFLOWFLOWFLOWFLOWFLOWCO R14-3076MH R14-3-D71DEPTH TO IE: 8.2 FTMH R14-3-D52DEPTH TO IE: 5.0 FTMH R14-3-D51DEPTH TO IE: 5.6 FTMH R14-3074DEPTH TO IE: 7.1 FTMH R14-3073DEPTH TO IE: 7.2 FTMH R14-3072DEPTH TO IE: 7.1 FTMH R14-3-D27DEPTH TO IE: 5.4 FTMH R14-3-D28DEPTH TO IE: 5.0 FTMH R14-3-D29DEPTH TO IE: 2.7 FTMH R14-3071DEPTH TO IE: 6.8 FTMH R14-3071DEPTH TO IE: 6.8 FTMH R14-3070DEPTH TO IE: 7.0 FTCO R14-3069MH R14-3-D6MH R14-3-D7DEPTH TO IE: 3.3 FTMH R14-3-149SEE SHEET 9NOT IN CONTRACT303 LF 12" CLAY262 LF 15" CONC85 L F 1 5 " C O N C 172 LF 12" CLAY105 LF 12" CLAY281 LF 10" CLAY71 LF 15" CONC266 LF 15" CONC283 LF 10" CLAYNOT IN CONTRACT269 LF 12" CONCMH R14-3-D133DEPTH: UNKNOWN194710511120921921013012109405194619471946312/316410416STORM SEWER LATERAL COUNTSUPSTREAM MH/CBDOWNSTREAM MH/CB# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-3-D71R14-3-D5202R14-3-D52R14-3-D5100R14-3-D29R14-3-D2814R14-3-D28R14-3-D2700R14-3-D133R14-3-D703R14-3-D7R14-3-D601SANITARY SEWER LATERAL COUNTSUPSTREAM MHDOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR14-3075R14-3074110R14-3074R14-307315R14-3072R14-307303R14-3071R14-307224R14-3070R14-307137FLOWFLOWFLOWFLOWFLOWFLOWFLOWNOTE:1.WORK ON 6TH ST AND NAVAL AVE SHALLBE DONE AT NIGHT. SEE CONTRACTPROVISIONS SECTION 1-08.0(2).2.CONTRACTOR SHALL SUBMIT TRAFFICCONTROL PLAN TO INCLUDING DEPLOYMENT OF TWO (2) PCMS BOARDSFOR WORK OCCURRING AT THE 6TH ST.AND NAVAL AVE. INTERSECTION.2.BYPASS PUMPING SYSTEM SHALL BESIZED FOR MINIMUM 100 GPM. HIGHLAND AVEMH R13-3021DEPTH TO IE: 8.1 FTOUTSIDE DROP STRUCTUREAPPROX. 13 LF FROM MH R13-2046MATCHLINE - SEE BELOW OFSHEETCITY OF BREMERTONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONPN:DWGREMERTONBC I T Y O FC-758771313HIGHLAND AVE - 6TH ST TO 11TH ST PLSANITARY SEWER - CIPP2023 SEWER REHABILITATIONMATCHLINE - SEE ABOVE SCALE:1" = 40' HORIZONTALHIGHLAND AVE6TH ST 11TH ST 11TH ST PLWASHINGTON AVE 9TH ST FLOWFLOWFLOWMH R13-3020DEPTH : UNKNOWNMH R13-3020DEPTH : UNKNOWNLAMPHOLE 19DEPTH TO IE: 10 FTMH R13-2046DEPTH: UNKNOWNFUTURE MANHOLE TO BE INSTALLED(BY OTHERS)PRIOR TO CIPP13 LF 12" PVC184 LF 10" CONC419 LF 8" CONC10 LF 10" CONC387 LF 8" CONCSANITARY SEWER LATERAL COUNTSUPSTREAM MHDOWNSTREAM MH# OFPROTRUDINGLATERALS# OF LATERALS TOBE RESTOREDR13-3021R13-3020114R13-3020FUTURE MH320FUTURE MHR13-204605601602611621627637645651657903610616626632-644652658904911917925931935941936930/9289229149129519523041102NOTE:1.TRANSITIONAL LINER NEEDED FORSEGMENT BETWEEN FUTURE MH AND MHR13-2046. LINE THROUGH LAMPHOLE 19AND DO NOT REINSTATE.2.BYPASS PUMPING SYSTEM SHALL BESIZED FOR MINIMUM 100 GPM.