HomeMy WebLinkAbout01/15/2025 CITY COUNCIL AGENDA PACKET______________________________________________________________
CITY COUNCIL 345 6th Street, Suite 100, Bremerton, WA 98337 - Phone (360) 473-5280
WEDNESDAY, JANUARY 15, 2025
CITY COUNCIL MEETING AGENDA
Council Members and staff will be participating in the meeting in -person, and the public is invited to attend. Or
beginning at 5:30 PM, the public may participate remotely through one of the following options:
To stream online only (via BKAT Feed, with no interaction possible):
https://bremerton.vod.castus.tv/vod/?live=ch1&nav=live
Members of the public are invited to join the Zoom Meeting by clicking on the link below:
https://bremertonwa-gov.zoom.us/j/89694813320?pwd=Z0JvSXNhSFp1c0xhL1NxUjRhN20xUT09
Or One tap mobile:
US: +12532050468,,89694813320#,,,,*173061# or +12532158782,,89694813320#,,,,*173061#
Or Telephone: Dial (for higher quality, dial a number based on your current location):
US: +1 253 205 0468 or +1 253 215 8782 or +1 669 444 9171 or +1 669 900 6833
Webinar ID: 896 9481 3320
Passcode: 173061
Public questions or comments may be submitted ahead of time to City.Council@ci.bremerton.wa.us
1. BRIEFING: 5:00 – 5:30 P.M. in COUNCIL CONFERENCE ROOM 603
A. Review of Agenda
B. General Council Business (Only as necessary...)
2. CALL TO ORDER: 5:30 P.M. in FIRST FLOOR CHAMBERS
3. MAYOR'S REPORT
4. CONSENT AGENDA
A. Claims and Check Register
B. Minutes of Council Meeting – January 2, 2025
C. Minutes of Study Session – January 8, 2025
D. Confirm Appointment of Tia Hudson to the Arts Commission
E. Interlocal Cooperative Agreement with Kitsap County for Housing Incarcerated Individuals
F. Resolution No. 3392 to approve provision of Wastewater Utility Services to 1910 SW Cook Road
G. Resolution No. 3393 to approve provision of Wastewater Utility Services to 13 properties on
Sherman Heights Road
H. Alternative Transportation Program Grant Agreement with the WA State Transportation
Improvement Board for the Warren Avenue Sidewalk Gap Project
5. PUBLIC RECOGNITION – To address the Council on any issues not already on the agenda.
Please state your name for the record in person, and limit your comments to under 3-minutes
Continued on next page…
Americans with Disabilities Act (ADA) accommodations provided upon request. Those requiring special
accommodations please contact the City Clerk at (360) 473-5323 at least 24 hours prior to the meeting.
6. GENERAL BUSINESS
A. Public Works Agreement for Purchase of Playground Equipment from Landscape Structures, Inc.
for Haddon Park
B. Supplemental Agreement No. 4 with HDR Engineering, Inc. for the Naval Ave: 1st Street to 15th
Street Pedestrian and Bicycle Enhancements Project
7. COUNCIL MEMBER REPORTS
8. ADJOURNMENT OF CITY COUNCIL BUSINESS MEETING
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: N/A
Claims & Check Register COUNCIL MEETING Date: January 15, 2025
Department: Legal Services
Presenter: Angela Hoover
Phone: (360) 473-5323
SUMMARY:
Approval of the following checks and electronic fund transfers:
1. Check Numbers 409625 – 409738 and EFT Numbers V42580 - V42636 in the grand total
amount of $2,230,155.05
2. Regular Payroll for pay period ending December 31, 2024 in the amount of $1,170,511.60
3. Retiree Payroll for pay period ending December 31, 2024 in the amount of $30,386.28
ATTACHMENTS:
FISCAL IMPACTS (Include Budgeted Amount):
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Claims & Check Register as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
4A
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Minutes of Council Meeting – January 2,
2025
Study Session Date: N/A
COUNCIL MEETING Date: January 15, 2025
Department: City Council
Presenter: Council President
Phone: (360) 473-5280
SUMMARY: The Minutes for the Council Meeting held on January 2, 2025 are attached.
ATTACHMENTS: Council Meeting Minutes
FISCAL IMPACTS (Include Budgeted Amount): None
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Mo ve to approve the January 2, 2025 Council Meeting Minutes as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/3/17
4B
DIGITAL RECORDING
CITY COUNCIL HYBRID MEETING MINUTES
Thursday, January 2, 2025
The weekly meeting of the City Council of the City of Bremerton was called to order Thursday,
January 2, 2025, at 5:00 PM in Council Conference Room 603 of the NORM DICKS GOVERNMENT
CENTER, 345 6th Street, Bremerton, Washington, with Council President Jennifer Chamberlin
presiding. Council Members present were Eric Younger, Anna Mockler, Michael Goodnow, Jane
Rebelowski, Jeff Coughlin, and Denise Frey (5:09 PM). At 5:30 PM, the meeting moved to the First
Floor Meeting Chambers. Also present were Assistant City Attorney Brett Jette; City Clerk Angela
Hoover; Legislative Office Manager Lori Smith; and IT Manager Dave Sorensen.
President Chamberlin announced the City Council is conducting the Council Meeting in-person,
and because community involvement is encouraged, the public is invited to also join the meeting in
person, or participate via a remote option through Zoom or view on BKAT; and that tonight’s
agenda was amended to add Consent Agenda Item 5C…
COUNCIL OFFICER ELECTIONS
President Chamberlin opened nominations for 2025 Council President.
Mockler nominated Eric Younger. Rebelowski Seconded. Nomination was accepted.
With no further nominations, President Chamberlin opened for public comment.
There were no public comments…
President Chamberlin established that since there was only one nomination, a Motion was
directed to the City Clerk.
5:32 PM M/S/C/U (Mockler/Chamberlin) Move to cast the ballot for Eric Younger for the position of
Council President. Motion carried unanimously.
By a unanimous vote, Eric Younger was elected to serve as 2025 Council President; and chaired
the remainder of the meeting.
President Younger then opened nominations for 2025 Council Vice-President.
Goodnow nominated Jennifer Chamberlin. Nomination was accepted.
Coughlin nominated Jane Rebelowski. Nomination was accepted
With no further nominations, President Younger opened for public comment.
There were no public comments…
President Younger called for signed ballots to be submitted, with a reading of the Vote by the City
Clerk:
Voted in favor of Chamberlin: Goodnow, Chamberlin
Voted in favor of Rebelowski: Rebelowski, Coughlin, Frey, Younger, Mockler
By a Vote of 5 for Rebelowski, and 2 for Chamberlin, Jane Rebelowski was elected to serve as
2025 Council Vice President.
MAYOR’S REPORT – There was no Mayor’s Report…
City Council Reg. Mtg. Minutes
Thursday, January 2, 2025
Page 2 of 3
CONSENT AGENDA
5A – Check Numbers 409545 through 409624 and Electronic Fund Transfers V42524 through
V42579 in the grand total amount of $1,530,629.26; Regular Payroll for pay period ending
December 15, 2024 in the amount of $1,087,144.06; Regular Payroll Correction for the pay
period ending December 15, 2024 in the amount of $67.93
5B – Minutes of Meeting – December 18, 2024
5C – Collective Bargaining Agreement By and Between the City of Bremerton and the Bremerton
Police Officers’ Guild (BPOG)
There were no questions or comments from the public…
5:38 PM M/S/C/U (Mockler/Coughlin) Move to approve the CONSENT AGENDA as presented.
Motion carried unanimously.
President Younger announced that as indicated on the Agenda, Public Recognition provides an
opportunity for attendees to address the Council on any issue not already on tonight’s Agenda, and
there will be no public comments accepted via Zoom, unless prior arrangements were made
through the City Clerk by calling (360) 473-5323 at least 24-hours prior to the meeting. We only
ask that you state your name for the record and please limit your comments to 3-minutes or less.
A timer system will be used so that everyone is treated fairly.
PUBLIC RECOGNITION – Questions and comments from the public were submitted by Karen
Vargas.
GENERAL BUSINESS – There were no General Business items…
COUNCIL MEMBER REPORTS
Jennifer Chamberlin congratulated new 2025 Council Chairs and looks forward to serving with
this group of Council Members in the coming year; and announced that she will begin hosting
District 1 Meetings at Heathen’s Bakery beginning in February.
Denise Frey looks forward to the new year, and hopes to listen more and talk less in 2025, and
was happy that local stores were reporting good sales and hope it continues.
Jeff Coughlin was excited about the Quincy Square project, thanked Ms. Vargas for her efforts
with Juneteenth, and was happy that the Bremerton Police Officers Guild Labor Agreement was
approved.
Jane Rebelowski planned a District 4 Meeting on Thursday, February 16 from 5:00 to 6:30 PM at
Bremerton Foodline.
Michael Goodnow wished everyone a Happy New Year and looked forward to the opening of
Quincy Square, which will be soon
Anna Mockler invited the public to attend the monthly District 6 Town Hall Meeting to be held on
Monday, January 13, 2025 from 5:00 to 6:30 PM at the Bremerton Public Works Facility located at
100 Oyster Bay Avenue North featuring a discussion on “Chronic Nuisance Properties”. And the
Meeting in February will focus on the City Budget. Looked forward to working on affordable
housing.
City Council Reg. Mtg. Minutes
Thursday, January 2, 2025
Page 3 of 3
Eric Younger appreciates the Council for their support in electing him Council President for his
final year as a Council Member.
COUNCIL PRESIDENT BRIEFING
President Younger welcomed everyone to the new year; and requested that Council Members
submit their preferences for 2025 Council Committee Assignments by Friday; and announced the
next Study Session will be on Wednesday, January 8 beginning at 5:00 PM in the Council
Conference Room, and the public is welcome and encouraged to attend all of these meetings in-
person or remotely via Zoom, but there will be no opportunity to comment.
With no further business, President Younger adjourned the Council Meeting at 6:04 PM.
Prepared and Submitted by:
______________________________
LORI SMITH
Legislative Office Manager
APPROVED by the City Council on the 15th day of January, 2025.
________________________________________
ERIC YOUNGER, City Council President
Attest:
________________________________________
ANGELA HOOVER, City Clerk
EY:AH:ls:cg
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Minutes of Study Session – January 8, 2025
Study Session Date: N/A
COUNCIL MEETING Date: January 15, 2025
Department: City Council
Presenter: Council President
Phone: (360) 473-5280
SUMMARY: The Minutes for the Study Session held on January 8, 2025 are attached.
ATTACHMENTS: Council Meeting Minutes
FISCAL IMPACTS (Include Budgeted Amount): None
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Mo ve to approve the January 8, 2025 Study Session Minutes as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/3/17
4C
CITY COUNCIL STUDY SESSION MINUTES
Wednesday, January 8, 2025
A Study Session of the City Council of the City of Bremerton was called to order on Wednesday,
January 8, 2025 at 5:00 PM in Council Conference Room 603 located in the Norm Dicks Government
Center at 345 6th Street, with Council President Eric Younger presiding. Other Council Members
present were Denise Frey (remotely), Jeff Coughlin, Jane Rebelowski, Michael Goodnow, and Anna
Mockler. Council Member Jennifer Chamberlin was absent. Legislative Office Manager Lori Smith
provided staff support.
President Younger announced that Study Sessions are always open for the public to attend
in-person or view remotely, and that any of the items approved for action by the Council tonight will
be placed on the January 15, 2025 Council Meeting Agenda (or as otherwise determined).
It was further established that questions or comments by the public may be submitted on any item
at any time by email to City.Council@ci.bremerton.wa.us. And reminded everyone that audio
recordings will be available online within a few days following the meeting…
A. INFORMATION ONLY PRESENTATION
1. 6th Street Active Transportation Project Update – Nick Ataie, Engineering Project Manager
B. AGENDA BILL BRIEFINGS
1. Confirm Appointment of Tia Hudson to the Arts Commission Consent Agenda
2. Interlocal Cooperative Agreement with Kitsap County for Housing Incarcerated Individuals
Consent Agenda
3. Resolution to approve provision of Wastewater Utility Services to 1910 SW Cook Road
Consent Agenda
4. Resolution to approve provision of Wastewater Utility Services to 13 Properties on Sherman
Heights Road Consent Agenda
5. Alternative Transportation Program Grant Agreement with the WA State Transportation
Improvement Board for the Warren Avenue Sidewalk Gap Project Consent Agenda
President Younger announced that Item 7 will be heard prior to Item 6…
7. Public Works Agreement for Purchase of Playground Equipment from Landscape
Structures, Inc. for Haddon Park General Business
President Younger called a break from 7:02 to 7:12 PM…
6. Supplemental Agreement No. 4 with HDR Engineering, Inc. for the Naval Avenue: 1st Street
to 15th Street Pedestrian & Bicycle Enhancements Project General Business
C. GENERAL COUNCIL BUSINESS
1. Briefing on Ordinance to Modify Rules for Safe Off-Street Parking – Jane Rebelowski
2. Public Works Committee Briefing (Last Meeting on 12/17/24) – Chair Jane Rebelowski
3. Regional and Other Committee/Board Briefings
4. Other General Council Business was discussed, including the formation of an Ad Hoc
Advisory Committee to find a replacement for a retiring Council Department staff member.
City Council Study Session Minutes
Wednesday, January 8, 2025
Page 2 of 2
President Younger closed the Study Session by announcing the next Council Meeting will be on
Wednesday, January 15, 2025 beginning at 5:30 PM in the First Floor Meeting Chambers of the Norm
Dicks Government Center. He further established that the public is invited to attend in person or
remotely, but anyone wishing to speak during Public Recognition via Zoom must submit their request
through the City Clerk by calling (360) 473-5323 at least 24-hours prior to the meeting.
With no further business, the Study Session was adjourned at 8:54 PM.
Prepared and Submitted by:
______________________________
LORI SMITH
Legislative Office Manager
APPROVED by the City Council on the 15th day of January, 2025.
ERIC YOUNGER, Council President
ATTEST:
______________________________
ANGELA HOOVER, City Clerk
EY:AH:ls:cg
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Confirm Appointment of Tia Hudson to the
Arts Commission
COUNCIL MEETING Date: January 15, 2025
Department: Executive
Presenter: Mayor Wheeler
Phone: (360) 473-5266
SUMMARY: The Mayor is seeking confirmation for the appointment of Tia Hudson to Position #7 on
the Bremerton Arts Commission. The term expires December 31, 2025. Ms. Hudson has been a
resident for over 20 years.
ATTACHMENTS: Application for City Boards/Commissions/Committees
FISCAL IMPACTS (Include Budgeted Amount): None.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to confirm the appointment of Tia Hudson to the Arts Commission for the term expiring
December 31, 2025
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
4D
1
Jennifer Hayes
From:noreply@civicplus.com
Sent:Wednesday, September 11, 2024 3:21 PM
To:WebMaster; Greg Wheeler; Jennifer Hayes
Subject:Online Form Submittal: Application for City Boards / Commissions / Committee
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize
the sender and know the content is safe.
Application for City Boards / Commissions / Committee
Date 9/11/2024
First Name Tia
Middle Name M.
Last Name M Hudson
Home Phone
Address1
Address2 Field not completed.
City Bremerton
State WA
Zip 98312
Occupation Retired
Employer Field not completed.
Work Address1
Work Address2 Field not completed.
City Bremerton
State WA
Zip 98312
Work Phone
Fax Field not completed.
2
Email
Education MFA Creative Writing
Local References Arts Commission, Mayor Greg Wheeler
I am interested in
serving:
Arts Commission
Is this an application for
reappointment?
No
How long have you lived
in Bremerton
20 + years
Why are you applying for
this appointment?
We need a representative of the written arts
Which of your personal
and / or professional
interests prompted you
to apply for this
appointment?
Being Poet Laureate
Have you ever served on
any other Bremerton
board, commission,
committee or task
force? If yes, please list.
te
Please list your
qualifications for this
appointment (include
skills, activities,
training, education):
Three terms as Poet Laureate, 17 years teaching English
creative writing, composition, and literature at Olympic College
What are your
community interests
(committee,
organizations, special
activities)?
Ten Minute Typewriter Poems on First Friday Art Walks;
Episcopal Church - currently working on national level
regardiong Bi-vocational Ministries.
Please list any
accommodations you
need to perform
volunteer duties:
Field not completed.
3
We welcome your willingness to serve Bremerton.
Pursuant to the Washington Public Disclosure Act, (RCW 42.56), this form
constitutes a public record and is subject to public release upon request. Prior to
release, the following information may be redacted pursuant to RCW 42.56.250(3):
Residential addresses, residential telephone numbers, personal wireless telephone
numbers, personal electronic mail addresses, social security numbers, driver’s
license numbers, identicard numbers, and emergency contact information of
employees or volunteers of a public agency, and the names, dates of birth,
residential addresses, residential telephone numbers, personal wireless telephone
numbers, personal electronic mail addresses, social security numbers, and
emergency contact information of dependents of employees or volunteers of a
public agency.
Applicants are considered for appointment without regard to race, color, religion,
gender, national origin, sexual orientation, age, genetic information, marital or
veteran status, or the presence of any disability.
Updated 3/24/2020
Email not displaying correctly? View it in your browser.
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Interlocal Cooperative Agreement with
Kitsap County for Housing Incarcerated
Individuals
COUNCIL MEETING Date: January 15, 2025
Department: Police
Presenter: Ryan Heffernan
Phone: 370.473-5777
SUMMARY: The City of Bremerton and Kitsap County entered into an agreement for incarceration
of prisoners on January 22, 2018 (“Agreement”), and subsequently entered into amended
agreements through December 31, 2024. The 2025 daily rate has been increased to $204.00, from
the 2024 daily rate of $157.05, per calendar day for each incarcerated individual.
ATTACHMENTS: Interlocal Cooperative Agreement for Housing Incarcerated Individuals
FISCAL IMPACTS (Include Budgeted Amount): $1,948.425 budgeted for 2025.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Interlocal Agreement with Kitsap County for Housing Incarcerated Individuals,
and authorize the Mayor to finalize and execute the agreement with substantially the same terms and
conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
4E
1
8.15.2024
KC-
INTERLOCAL COOPERATIVE AGREEMENT
FOR HOUSING INCARCERATED INDIVIDUALS
THIS INTERLOCAL COOPERATIVE AGREEMENT FOR HOUSING INCARCERATED
INDIVIDUALS (“Agreement”) is between Kitsap County, a Washington state political subdivision
(“County”), and the City of Bremerton, a Washington state municipal corporation (“Agency”).
WHEREAS, the Interlocal Cooperation Act, chapter 39.34 RCW, allows public agencies to enter into
interlocal cooperative agreements to provide services and activities each agency is authorized to
perform by law.
WHEREAS, the County is authorized to operate a facility to house adult persons arrested and
sentenced for criminal activities not exceeding one year for punishment, correction, and
rehabilitation.
WHEREAS, the Agency does not own or operate a jail and desires access to the Kitsap County
Sheriff’s Office (“KCSO”) Jail (“Jail”) to house persons arrested, charged, and/or convicted of a
criminal offense.
WHEREAS, the County is amenable to accepting and keeping Incarcerated Individuals received
from the Agency for compensation paid at its true and full value as required by RCW 43.09.210
subject to the terms and conditions of this Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing recitals, which are incorporated herein by
reference and the mutual promises and covenants, the parties agree as follows:
1. DEFINITIONS
A. Bed–Day means the calendar day an Incarcerated Individual is booked and held in
custody at the Jail, which includes the booking process. This definition excludes persons
booked and released on the same day.
B. Book and Release Rate means the rate charged to book and release a person on behalf
of the Agency. This is a flat rate, which is half of the current Daily Rate, when a person
is physically present in Jail for 12 hours or less.
C. Booking means registering, screening, fingerprinting, inventorying, and safekeeping
personal property, warrant checks, and other activities associated with processing a
person for confinement in the Jail.
D. Capacity means the maximum number of Incarcerated Individuals the Jail has the
operational capacity to house while providing safe and humane conditions of
confinement as determined by the County. The determination of capacity is based on a
variety of factors such as the physical layout and design of the Jail, staffing, emergencies
(e.g., riots, pandemics, and other natural disasters), and other resources available to
provide the basic necessities such as shelter, food, water, and medical care.
E. Chief means the person designated as the KCSO Chief of Corrections or designee.
F. Daily Rate means the rate charged the Agency for every Bed-Day an Incarcerated
2
8.15.2024
Individual is housed in the Jail on behalf of the Agency, which commences from the time
the Incarcerated Individual arrives at the Jail for booking and ends as provided herein.
The last day will be charged as a half day, regardless of the release time. The Daily Rate
reflects the actual cost to the County for housing a person in the Jail as provided in RCW
43.09.210 and includes the cost of the Jail Health Care Provider.
G. Health Care Services means the medical, mental health, and dental care services and
treatment, prosthetics devices, prescriptions, laboratory tests, imaging, medical
equipment, emergency services, supplies, medications, and all other services,
treatment, and the like provided for Incarcerated Individuals.
H. Incarcerated Individual means a person housed, pretrial and post-conviction, in the Jail
on behalf of the Agency for a violation of law. It includes any person whose arrest results
from charges initiated by the Agency. Arrests made by Agency officers on extraditable
warrants issued by agencies outside Kitsap County will be considered County inmates.
I. Intake Standards means the Jail policies and procedures identifying the requirements
for accepting persons for confinement. The Jail agrees to provide the Agency prior notice
when the Intake Standards are changed. The Jail may change Intake Standards in an
emergency without prior notice. In such an event, notice will be provided to the Agency
as soon as practicable.
J. Jail Health Care Provider means the inhouse entity that contracts with the County to
provide Health Care Services for Incarcerated Individuals housed in the Jail.
K. Jail Policies means the KCSO Jail policies, rules, procedures, and standards governing
the Jail's operation, including any emergency security rules.
L. Lawful Basis means the Agency has determined and is certifying to the County that the
person the Agency is presenting for incarceration in the Jail is legally detainable by the
Jail. The Agency is solely responsible for making this determination. It shall defend,
indemnify, and hold the County harmless for and from any claim or action resulting from
the wrongful detention of such person.
M. Other Costs means all costs incurred by the County on behalf of the Agency’s
Incarcerated Individuals, which includes Health Care Services that are not the financial
responsibility of the Jail Health Care Provider, Outside Health Care Services, off-site
transportation, and security provided by County staff and not paid by Washington State
Department of Social and Health Services, Medicaid, the Incarcerated Individual, or any
other responsible third party.
N. Outside Health Care Services means Health Care Services provided for an Incarcerated
Individual by an entity other than the Jail Health Care Provider.
O. Shared Bed-Day means the period an Incarcerated Individual is held in the Jail on behalf
of the Agency under this Agreement while also being held by another agency and/or the
County. The rate for Shared Bed-Days is divided by the number of agencies with current
holds. Non-contract agencies will not be factored in when calculating Shared Bed-Days.
The Shared Bed-Day also applies when calculating the Book and Release Rate.
P. WASPC means the Washington Association of Sheriffs & Police Chiefs.
2. PURPOSE. The purpose of this Agreement is to provide the Agency access to the Jail located
3
8.15.2024
at 614 Division Street, Port Orchard, Washington, 98366, to house Incarcerated Individuals
and define the responsibilities of the parties as contemplated in RCW 39.34.030.
3. ORGANIZATION. This Agreement does not create, nor do the parties intend to establish a
separate legal or administrative entity subject to suit through this Agreement.
4. ADMINISTRATOR. The Chief shall function as the administrator of this Agreement in
coordination and cooperation with the Agency’s Chief of Police or designee. Neither party
intends to assume responsibility or liability for the actions or failures to act of the other party
and/or their respective employees.
5. EFFECTIVE DATE, DURATION. The Agreement shall be effective on January 1, 2025, and
remain in effect until December 31, 2025, unless terminated or extended. This Agreement
may be extended for additional consecutive terms upon the parties' written agreement.
6. FILING. Prior to entry into force, this Agreement will be filed with the Kitsap County Auditor’s
Office or, alternatively, listed by subject on a public agency’s website or other electronically
retrievable public source in compliance with RCW 39.34.040.
7. PROPERTY. The parties do not anticipate acquiring property to perform this Agreement. Any
property acquired by a party during this Agreement shall be held by and remain the property
of the acquiring party.
8. TERMINATION. Either party may terminate this Agreement with 120 days prior written notice
to the other party. A terminated party assumes no responsibility for the acts or omissions
occurring after the termination effective date (assuming all Agency inmates have been
removed from the Jail) but will remain liable for all costs, acts, or omissions occurring prior to
the termination effective date. In the event of termination, the parties agree to meet within 30
days of receipt of notice to coordinate the transportation and removal of all Incarcerated
Individuals from the Jail to a new location prior to the termination date. The terminating party
shall be responsible for the cost of such transportation and security.
9. SCOPE OF SERVICES
A. Custody. The County will accept persons the Agency presents to the Jail for confinement,
punishment, and/or rehabilitation and hold the Incarcerated Individuals until the Agency
resumes custody or the Incarcerated Individual is lawfully released from Jail custody,
subject to the terms of this Agreement.
B. Lawful Basis for Confinement. Custody of any person is not transferred to the Jail until
the Jail has accepted physical control of the person as provided in this Agreement, the
Agency has provided the Jail with proper documentation identifying a Lawful Basis for
confinement and, when requested by Jail staff, the person has been medically cleared by
the hospital. Adequate documentation means a valid and confirmed arrest warrant,
judicial order of commitment, or other lawful order of a court of competent jurisdiction.
C. Right to Refuse. Notwithstanding the foregoing, the Jail has the discretion to refuse to
admit any person when: i) the person reasonably appears in need of immediate medical,
mental health, or dental care until the Agency has provided the requisite care to the
reasonable satisfaction of the Jail as evidenced by medical clearance documentation
from the hospital; ii) the Jail is at Capacity; iii) acceptance of the person would violate
Jail Policies or Intake Standards; or iv) the person’s paperwork is not adequate or
complete.
4
8.15.2024
D. Compliance with Jail Policies, Notice of Health Care Issue. The Agency and its agents
delivering a person to the Jail for confinement shall comply with this Agreement, Jail
Policies, and Intake Standards, which includes informing Jail staff of the Incarcerated
Individual’s reasonably known physical and mental health care issues. This advisory shall
include any injuries the Incarcerated Individual may have sustained during the
investigation, arrest, and transport to the Jail.
E. Responsibilities upon Assumption of Custody. Upon accepting custody of the
Incarcerated Individual, the County agrees to house the Incarcerated Individual as
provided in this Agreement.
10. COMPENSATION
A. Compensation. The parties intend the Agency to bear all costs for housing an
Incarcerated Individual, including the cost of Health Care Services.
1. Book and Release Rate. The Agency agrees to pay the Book and Release Rate for
each person Booked and Released in the Jail on behalf of the Agency, charged at
half of the Daily Rate.
2. Daily Rate. The Agency agrees to pay the County a Daily Rate of $204.00 per
calendar day for each Incarcerated Individual housed in the Jail, which shall be
apportioned as appropriate for Shared-Bed Days.
3. Standard Mileage. The Agency agrees to reimburse the County for mileage at the
then-current standard mileage rate set by the Internal Revenue Service when the
County is responsible for transporting the Incarcerated Individual off-site.
4. Correction’s Officer rate. The Agency agrees to pay the correction’s officer rate of
$63.30 per hour for the cost of each County staff person providing transportation and
security for the Incarcerated Individual to receive Outside Health Care Services.
5. Other Costs. Unless otherwise provided herein, the agency shall pay all Other Costs
to the County and third parties incurred on behalf of Incarcerated Individuals.
B. Billing. The County will send the Agency an itemized invoice monthly for amounts due.
The Agency shall pay the invoiced amount within 30 days of receipt of the invoice.
C. Determination of Case Status. The Agency will not be responsible for the Daily Rate for
an Incarcerated Individual charged with a felony, in the Agency-initiated case, by the
Kitsap County Prosecutor’s Office. However, the Agency will remain responsible for
reimbursing the County for Other Costs.
11. HEALTH CARE SERVICES
A. Health Care Services. The County will make Health Care Services available to
Incarcerated Individuals consistent with Jail Policies.
B. Outside Health Care Services. The Agency will pay all costs associated with providing
Outside Health Care Services for Incarcerated Individuals (“Other Costs”), except:
1. The originating agency will be responsible for persons arrested and confined on
5
8.15.2024
warrants issued in Kitsap County.
2. The County will be responsible for Persons arrested and confined on warrants issued
by agencies outside Kitsap County.
3. The County will be responsible for Outside Health Care Services resulting from
physical injuries sustained by the Incarcerated Individual while housed in the Jail.
4. The County will be responsible for the Incarcerated Individual convicted of a felony
on the Agency-initiated case.
C. Emergency, Non-emergent, and Non-Hospital Care outside the Jail - Notification. For
emergency care, the County will notify the Agency by email within four (4) business hours
of transport (Monday through Friday, 8 a.m. to 5 p.m. PST). The County will notify the
Agency before noon on the next business day for non-emergent and non-hospital care
outside of the jail. The Agency is responsible for providing the Chief with current contact
information for the person to whom emergency notice should be provided.
D. Return for Health Care Services. The Agency may resume custody of an ill or injured
Incarcerated Individual by picking the person up at the Jail, except when the County
determines the Incarcerated Individual requires emergency Health Care Services; the
County may arrange for emergency Health Care Services at the Agency's expense.
E. No Waiver of Right to Seek Reimbursement. Nothing contained in this Agreement shall
be construed to waive the rights of either party to seek reimbursement for costs from the
Washington State Department of Social and Health Services, Medicaid, the Incarcerated
Individual, or any other responsible third party.
F. Medication. The cost of providing medication for Incarcerated Individuals is included in
the Daily Bed Rate to the extent included in the County’s contract with the Jail Health
Care Provider. This consists of providing a prescription and/or a supply of medication
upon release in compliance with WASPC accreditation standards. Medications not paid
by the Jail Health Care Provider or a third party are Other Costs the Agency pays.
G. HIPAA and HITECH Compliance. The parties agree to comply with all applicable
requirements of the Federal Health Insurance Portability and Accountability Act of 1996
(HIPAA), Health Information Technology for Economic and Clinical Health Act (HITECH
Act), and laws and regulations, including chapter 70.02 RCW.
H. Prison Rape Elimination Act. The parties agree to comply with the standards established
by the Prison Rape Elimination Act (PREA) of 2003 (P.L. 108-79).
12. HOUSING, JAIL, CLASSIFICATION, DISCIPLINE, RECORDS
A. Jail Housing. The County will house Incarcerated Individuals on behalf of the Agency,
subject to the terms and conditions of this Agreement and Jail Policies.
B. Bail. The Jail will serve as an agent for the Agency in receiving bail bonds and monies
posted for or by an Incarcerated Individual with the County, which will be promptly
forwarded to the Agency as required by law.
C. Classification. The Jail will classify and house Incarcerated Individuals consistent with
Jail Policies. The Agency shall provide the Jail with sufficient information regarding each
6
8.15.2024
Incarcerated Individual to enable the Jail to make classification determinations.
D. Jail Policies, Discipline. All Incarcerated Individuals are subject to and must comply with
Jail Policies. The jail will discipline Incarcerated Individuals in a manner consistent with
jail policies.
E. Early Release Credit. Jail Policies will apply to determine early release credits for
Incarcerated Individuals, including the removal of earned release credits for
administrative sanctions for disciplinary violations.
F. Records. The Jail will maintain a comprehensive records management system for all
Incarcerated Individuals as required by law and make copies of such records reasonably
available to the Agency in compliance with the law.
G. Video Court Appearance. The Jail will make Incarcerated Individuals available to appear
for court appearances via video. Additions to the Agency video court calendar must be
received by 0600 the day of the requested appearance. Additions received later than
0600 will be scheduled the following judicial day. Video court will not be used for non-
criminal traffic violations or any other civil matter.
H. Accounts. The Jail will establish and maintain an account for each Incarcerated Individual
and credit the account with all money received from or on behalf of the same. The Jail
may make disbursements from the account for items purchased from the Commissary
and other expenditures, garnishments, and the like as authorized by law.
I. Programs. The Jail will provide Incarcerated Individuals with the same access to
educational, recreational, and social service programs as other persons housed in the
Jail, consistent with Jail Policies.
J. Visitation. The Jail will provide Incarcerated Individuals with the same access to visitation
available to all persons housed in the Jail consistent with Jail Policies.
13. TRANSPORTATION, REMOVAL, ACCESS
A. Transportation. The Jail will provide transportation and security for Incarcerated
Individuals when necessary to secure Outside Health Care Services or when required to
support the orderly operation of the jail, as required by court order and/or extraditions,
which shall be reimbursed as provided herein. Transportation and security will be
provided by County corrections officers and/or KCSO Deputies. The jail will determine
the number of staff needed to provide transportation securely.
B. Removal. The Agency’s Incarcerated Individuals may be removed from the Jail for any of
the reasons identified below:
1. Agency Request. The Incarcerated Individual may be returned to the Agency upon
written request from an authorized representative of the Agency. The transport will
be by the Agency or the Jail as provided herein.
2. Court Order. The transportation will be provided by an order of a court having
jurisdiction over the Incarcerated Individual.
3. Treatment Outside of Jail. To receive Outside Health Care Services or other services
unavailable within the Jail.
7
8.15.2024
4. Emergency. In the event of an emergency that presents an imminent threat to the
health, safety, or welfare of the Incarcerated Individual, County personnel, and/or the
public. In its discretion, the County will determine whether to remove and/or release
the Incarcerated Individuals. In such cases, the County will exercise reasonable care
for the safekeeping, custody, and relocation of the Incarcerated Individual and inform
the Agency of the same.
5. Agreement Termination. If the Agency terminates this Agreement, the Agency shall
provide transport for its Incarcerated Individuals, at its sole expense, on or before the
effective date of termination. If the County terminates the Agreement, the County will
provide transport to remove Incarcerated Individuals. The Agency shall remain
responsible for paying for the Daily Bed Rate and Other Costs for each Individual
Incarcerated until removed.
C. Agency Resumption of Custody. The Agency shall be deemed to have resumed custody
of an Incarcerated Individual upon the County's presentation of the Incarcerated
Individual to the Agency or when the Agency takes physical control of the same.
D. Jail Access. The Agency may inspect, at mutually agreeable times, the Jail to confirm
compliance with this Agreement and the treatment of Incarcerated Individuals.
E. Access to Incarcerated Individual. Agency public safety personnel may interview its
Incarcerated Individuals at reasonable times within the Jail. The Jail interview rooms will
be made available for use.
14. ESCAPE, DEATH
A. Escape. The Jail will notify the Agency as soon as practicable in the event of the escape
of an Incarcerated Individual. The County will have the primary authority to direct the
investigation and to pursue the Incarcerated Individual within its jurisdiction. Any costs
related to the investigation and pursuit within its jurisdiction will be the responsibility of
the County. The County will not be required to pursue and return the escaped
Incarcerated Individual from outside the County.
B. Death. The Jail will notify the Agency as soon as practicable in the event of an
Incarcerated Individual's death. The Port Orchard Police Department or the Kitsap Critical
Response Team will investigate the circumstances. The Agency may join in the
investigation and receive copies of all records and documents from the investigation. The
Kitsap County Medical Examiner’s Office will take possession of and handle the
disposition of the remains as required by law, RCW 68.50.160.
15. INDEMNIFICATION
A. Agency Indemnification Obligations. The Agency agrees to defend, indemnify, and hold
harmless the County, its appointed and elected officials, employees and agents from and
against all liability, loss, cost, damage, and expense, including costs and attorneys’ fees
in the defense thereof because of actions, claims or lawsuits alleging damages sustained
by any person or property including death at any time resulting thereof, arising from or
alleged to have arisen from (i) the Agency’s performance under this Agreement or as a
consequence of any wrongful or negligent acts or omission of the Agency, its appointed
and elected officials, employees, and agents; (ii) wrongful detention of an Incarcerated
Individual as a result of the Agency’s actions; (iii) failure or refusal to timely release an
8
8.15.2024
Incarcerated Individual as a result of the Agency’s actions, and (iv) any liability or
responsibility which arises in whole or part from the existence or effect of the Agency’s
ordinances, policies, rules or regulations.
To the extent the claim, damages, losses, and expenses are caused by intentional acts
of or by the concurrent negligence of the County, its officers, agents, or employees, the
Agency’s indemnification obligation hereunder shall be limited to the Agency’s
proportionate share of liability as agreed to by the parties to this Agreement or determined
by a court of competent jurisdiction.
B. County Indemnification Obligations. The County agrees to defend, indemnify, and hold
harmless the Agency, its appointed and elected officials, employees, and agents from
and against all liability, loss, cost, damage, and expense, including costs and attorneys’
fees in the defense thereof, because of actions, claims or lawsuits alleging damages
sustained by any person or property, including death at any time resulting thereof, arising
from, or alleged to have arisen from (i) County’s performance under this Agreement or as
a consequence of any wrongful or negligent acts or omission of the County, its appointed
and elected officials, employees, and agents; (ii) wrongful detention of an Agency
Prisoner as a result of the County’s actions; and (iii) the County’s failure or refusal to
release an Incarcerated Individual timely.
To the extent the claim, damages, losses, and expenses are caused by intentional acts
of or by the concurrent negligence of the Agency, its officers, agents, or employees, the
County’s indemnification obligation hereunder shall be limited to the County’s
proportionate share of liability as agreed to by the parties to this Agreement or determined
by a court of competent jurisdiction.
C. Participation in Defense, No Waiver. A party has the right, but not the obligation, to
participate in the defense of any claim, damages, losses, or expenses, and such
participation shall not constitute a waiver of the party’s indemnity obligations under this
Agreement.
16. INSURANCE. Each party shall maintain in good standing during the term of this Agreement
sufficient general liability insurance to protect both parties against claims that arise out of or
are related to this Agreement in such amounts as are prudent and customary for the
jurisdiction. Such insurance shall be placed with responsible insurers, self-insured, or carried
through participation in an insurance pool at levels of coverage adequate to protect the
parties against loss and as ordinarily carried by municipalities engaged in similar operations.
The lack of sufficient insurance shall not limit the liability of the indemnifying party under this
Agreement. Each party shall provide the other with a certification of insurance or self -
insurance upon request.
17. WAIVER OF ARBITRATION RIGHTS. The parties, being familiar with the provisions of RCW
39.34.180(3), expressly waive all rights under RCW 39.34.180(3), now in effect and as
amended, to arbitrate the level of compensation for incarceration services charged under this
Agreement or any renewal thereof, that either party may possess. The parties further agree
that such level of compensation and all other issues related to the purpose of this Agreement
will only be as agreed to herein or as otherwise agreed to in writing executed by the parties.
18. NOTICE. All notices required under this Agreement will be delivered in writing to the Chief of
Corrections or Police Chief. Notice mailed by regular post (including first class) shall be
deemed to have been given on the second business day following the date of mailing if
properly mailed and addressed. Notices sent by certified or registered mail shall be deemed
9
8.15.2024
to have been given on the day next following the date of mailing if properly mailed and
addressed. For all types of mail, the postmark affixed by the United States Postal Service
shall be conclusive evidence of the date of mailing.
19. GOVERNING LAW, VENUE, FEES. The Agreement will be governed in all respects by the
laws of the State of Washington, both as to interpretation and performance, without regard to
conflicts of law or choice of law provisions. Any action arising out of or in connection with the
Agreement may be instituted and maintained only in a court of competent jurisdiction in Kitsap
County, Washington, or as provided by RCW 36.01.050. Should any party bring any legal
action, each party in such action shall bear the cost of its attorney’s fees and court costs.
20. COMPLIANCE WITH LAWS. The parties shall comply with all applicable laws, rules,
regulations, and standards pertaining to them in connection with or related to this Agreement.
21. PUBLIC RECORDS ACT. Notwithstanding any provisions of this Agreement to the contrary,
to the extent any record, including any electronic, audio, paper, or other media, is required to
be kept or indexed as a public record in accordance with the Washington Public Records Act,
chapter 42.56 RCW, each party agrees to maintain all records constituting public records and
to produce or assist the other party in producing such records, within the time frames and
parameters set forth in state law.
22. INDEPENDENT CAPACITY. Each party and its respective employees or agents will act as
independent contractors and continue to be the employees or agents of that party, which will
be solely and exclusively responsible for their employees and agents. Employees and agents
of one party will not be considered for any purpose whatsoever under this Agreement to be
employees or agents of the other party to this Agreement. No party will have the authority to
bind the other party, absent a written agreement of the parties, nor the authority to control
the employees, agents, or contractors of the other party to this Agreement. All employer
rights, duties, and obligations will remain with the employing party.
23. NONDISCRIMINATION. No party shall discriminate against any person based on race, color,
creed, religion, national origin, age, sex, marital status, sexual orientation, veteran status,
disability, or other circumstances prohibited by federal, state, or local law. Each party shall
comply with Title VI of the Civil Rights Act of 1964, P.L. 88-354 and Americans with
Disabilities Act of 1990 in the performance of this Agreement.
24. HEADINGS/CAPTIONS. Headings and captions used are for convenience only and are not
a part of the Agreement. They do not limit or amplify the terms and provisions hereof.
25. NO PARTY THE DRAFTER. The Agreement is the product of negotiation between the
parties; no party is deemed the Agreement's drafter.
26. NO THIRD-PARTY BENEFICIARY. Nothing in this Agreement will be construed as giving
any benefits, rights, remedies, or claims to any other person, firm, corporation, or other entity,
including the public or any member thereof, or to authorize anyone other than the County and
the Agency to maintain a suit for breach of contract, personal injuries, property damage, or
any other relief in law or equity in connection with this Agreement.
27. DISPUTE RESOLUTION. In the event of a dispute between the parties regarding the terms
and conditions or performance of this Agreement, the parties shall use their best efforts to
resolve the differences on an informal basis.
10
8.15.2024
28. NO JOINT VENTURE. Nothing in this Agreement shall be construed as creating any type or
manner of partnership, joint venture, or other joint enterprise between the parties.
29. IMPLIED CONTRACT TERMS. Each provision of law and any terms required by law to be
in the Agreement are made a part of the Agreement as if fully stated in it.
30. DISCLAIMER. Nothing in this Agreement will be construed in any manner that would limit a
party’s authority or powers under law.
31. ASSIGNMENT. The rights or obligations under this Agreement and any claims arising
thereunder are not assignable or delegable by any party.
32. NO WAIVER. No waiver of any right under this Agreement shall be effective unless made in
writing by an authorized representative of the party to be bound thereby. Failure to insist
upon full performance on any occasion shall not constitute consent to or waiver of any
continuation of nonperformance or any later nonperformance, nor does the payment of a
billing or continued performance after notice of a deficiency in performance constitutes
acquiescence to it.
33. AMENDMENT. The parties may amend this Agreement as they deem appropriate, provided
any such amendment shall not become effective unless it is written and signed by the parties
with the same formality as this Agreement.
34. ENTIRE AGREEMENT. This Agreement contains all terms and conditions agreed upon by
the parties, except necessary operational agreements. It supersedes any other Agreement
or understanding of the parties relating to the subject matter of this agreement. No other
understanding, oral or otherwise, regarding the subject matter of this Agreement shall be
deemed to exist or to bind the parties.
35. SURVIVAL. Those provisions of the Agreement that by their sense and purpose should
survive expiration or termination shall survive. Those provisions include the respective
responsibilities of each party, compensation, and indemnification.
36. SEVERABILITY. The provisions of this Agreement are severable. Any term or condition of
this Agreement or application thereof deemed to be illegal, invalid or unenforceable, in whole
or in part, shall not affect any other terms or conditions of the Agreement and the parties’
rights and obligations will be construed and enforced as if the Agreement did not contain the
particular provision.
37. COUNTERPARTS, ELECTRONIC SIGNATURE. The Agreement may be executed in
several counterparts, each of which will be deemed an original, but all will constitute the same
agreement. A facsimile, email, or other electronically delivered signatures of the parties shall
be deemed to constitute original signatures and deemed to constitute duplicate originals.
38. AUTHORIZATION. Any authorizations, actions required or permitted to be taken, and any
document required or permitted to be executed under this Agreement will be taken or
executed only by a duly authorized representative of the party. Each party warrants and
represents to the other that the person signing below has been properly authorized and
empowered to execute this Agreement on behalf of the party they sign.
11
8.15.2024
DATED this ____ day of _________, 2024 DATED this ____ day of _________, 2024
CITY OF BREMERTON KITSAP COUNTY
______________________________ ______________________________
TOM WOLFE, Chief of Police JOHN GESE, SHERIFF
DATED this ____ day of _________, 2024
CITY OF BREMERTON
______________________________
GREG WHEELER, Mayor
DATED or ADOPTED this ____ day of _____________________, 2024.
BOARD OF COUNTY COMMISSIONERS
KITSAP COUNTY, WASHINGTON
__________________________________
KATHERINE T. WALTERS, Chair
__________________________________
CHRISTINE ROLFES, Commissioner
__________________________________
CHARLOTTE GARRIDO, Commissioner
ATTEST:
___________________________
Dana Daniels, Clerk of the Board
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Resolution No. 3392 to approve provision of
Wastewater Utility Services to 1910 SW
Cook Road
COUNCIL MEETING Date: January 15, 2025
Department: Public Works
Presenter: Janelle Hitch
Phone: (360) 473-5285
SUMMARY:
The applicant has requested wastewater service for a residence at 1910 SW Cook Road. This
property is outside the City limits, City Wastewater Service Area, and Urban Growth Area (UGA).
The request is being made due to the failure of the existing septic system; the condition was
confirmed by the Kitsap Public Health District.
The City has received a letter from the Kitsap Public Health District certifying the f ailure of the septic
system and the indicates the system cannot be repaired or replaced. The letter indicates that
connection is necessary to protect public health and safety. The action before the Council is to adopt
a Resolution for a Policy Exception for Wastewater service outside the service area.
ATTACHMENTS:
Resolution No. 3392, and Staff Memorandum
FISCAL IMPACTS (Include Budgeted Amount):
There are no fiscal impacts associated with this request.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to pass Resolution No. 3392 to allow 1910 SW Cook Road to receive wastewater service from
the City of Bremerton pursuant to BMC 15.03.040.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
4F
Page 1 of 2
Resolution Document Reference
Rev. 01/2023
RESOLUTION NO. 3392
A RESOLUTION of the City Council of the City of
Bremerton, Washington, authorizing the provision of wastewater
utility services to 1910 SW Cook Road, located outside the City
limits and outside the Urban Growth Area.
WHEREAS, the City of Bremerton has established a general policy for providing
City utility services beyond city limits in Bremerton Municipal Code (BMC) 15.03.040 per
Ordinance 5306 passed on August 17, 2016; and
WHEREAS, Section 15.03.040 of the BMC established a general policy that
properties located outside the City limits seeking wastewater utility services to said property
must first annex into the City; and
WHEREAS, Subsection 15.03.040(b) of the BMC identifies policy exceptions in
which the City Council, in its sole and absolute discretion, may provide City wastewater utility
service to properties outside the City limits without annexation; and
WHEREAS, Subsection 15.03.040(b)(2) allows an exception for cases where an
existing septic system serving a property has failed, and (i) The Health District local health
official certifies that an existing septic system has failed and is physically incapable of being
repaired or replaced in a manner meeting applicable health standards; and (ii) Connection is
shown to be necessary to protect basic public health and safety and the environment; and (iii) For
property located outside an urban growth area, the utility services provided by the connection are
financially sustainable at rural densities and do not permit urban development pursuant to
RCW 36.70A.110(4); and
WHEREAS, at the subject property at 1910 SW Cook Road (tax parcel 332401-4-
096-2005), the Kitsap Public Health District has provided certification that the existing septic
system has failed and is physically incapable of being repaired or replaced in a manner meeting
applicable health standards; and
WHEREAS, the Kitsap Public Health District has indicated that connection to the
wastewater system is necessary to protect basic public health and safety and the environment;
and
WHEREAS, property located outside an urban growth area, the utility services
provided by the connection are financially sustainable at rural densities and do not permit urban
development pursuant to RCW 36.70A.110(4); and
WHEREAS, the owner of the subject properties has agreed to construct
wastewater infrastructure in and near the property and connect to existing City infrastructure;
and
Page 2 of 2
Resolution Document Reference
Rev. 01/2023
WHEREAS, the Director of Public Works & Utilities finds the proposed
extension of the wastewater utility services necessary; NOW THEREFORE,
THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON,
DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. Recitals Incorporated. The recitals set forth above in this
resolution are hereby incorporated by reference and adopted herein.
SECTION 2. Based on the findings set forth in the recitals above, the City
Council shall exercise its discretion as authorized pursuant to BMC 15.03.040, and the City will
provide wastewater utility services to 1910 SW Cook Road (tax parcel 332401-4-096), located
outside the City limits and the Urban Growth Area. A vicinity map of the subject property is
shown as Exhibit A. This service will be provided as the existing system has failed. Service to
this property is provided conditioned upon the owner of the property for which service is
authorized execute an Outside Utility Agreement with the City which grants the City of
Bremerton a limited power of attorney to include owner’s consent to annexation of the property
as part of any notice of intent or petition for annexation presented to the City of Bremerton. This
service is further conditioned on the owner of the property obtaining any necessary permits,
reviews, and approvals from any necessary permitting authorities.
SECTION 3. Severability. If any one or more sections, subsections, or
sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not
affect the validity of the remaining portion of this Resolution and the same shall remain in full
force and effect.
SECTION 4. Effective Date. This Resolution shall take effect and be in force
immediately upon its passage.
PASSED by the City Council of the City of Bremerton, Washington this _____
day of __________________, 20____.
JENNIFER CHAMBERLIN, Council
President
APPROVED AS TO FORM: ATTEST:
KYLIE J. FINNELL, City Attorney ANGELA HOOVER, City Clerk
R:\Legal\Legal\Forms\FORMS ON COBWEB\Resolution Rev. 01 2023.doc
To: City Council From: Janelle Hitch, Managing Engineer – Development, of Public Works and Utilities Date: 11/26/2024 Re: 1910 SW Cook Road - Request for Utility Services Outside Bremerton City Limits Request: The Applicant, Ben Shank, has requested City wastewater utility services for a parcel located at 1910 SW Cook Road, the property tax parcel number is: 332401-4-096-2005. The property location is shown in Exhibit 1 Site Map. This property is outside City limits within the jurisdiction of Kitsap County. The property is outside the City of Bremerton wastewater service area and outside of an Urban Growth Area (UGA). City Council’s Decision: Pursuant to Bremerton Municipal Code (BMC) 15.03.040, “It is the general policy of the City of Bremerton that properties located outside the City limits annex into the City before wastewater utility services are provided to those properties.” For the purpose of this section, “service” means extension of and/or service connections to City wastewater utilities to property located outside City limits. The City Council may, in its sole and absolute discretion, provide wastewater utility services to properties outside of the City limits if certain conditions are met. The relevant exception for the Council to allow wastewater utility services without annexation falls under 15.03.040 (b) (2) Failed Systems. In cases where an existing septic system serving a property has failed, and: (i) The Health District local health official certifies that an existing septic system has failed and is physically incapable of being repaired or replaced in a manner meeting applicable health standards; and (ii) Connection is shown to be necessary to protect basic public health and safety and the environment; and (iii) For property located outside an urban growth area, the utility services provided by the connection are financially sustainable at rural densities and do not permit urban development pursuant to RCW 36.70A.110(4) Kitsap Public Health District Finding: Exhibit 2 is a letter from the Kitsap Public Health District certifying the failure of the septic system and the indicates the system cannot be repaired or
DEPARTMENT OF PUBLIC WORKS, UTILITIES & ENGINEERING MEMORANDUM
replaced. Further the letter indicates that connection is necessary to protect public health and safety. As indicated above, this property is outside a UGA and is zoned Rural Residential. Proposed Wastewater Service Extension: For the City to provide wastewater service to the subject parcel the owner will be required to extend the existing sewer collection system. Summary: As demonstrated the attached letter from Kitsap Public Health District the property at 1910 SW Cook Road has a failed septic system and is requesting connection to the City of Bremerton wastewater system. Annexation as currently infeasible as the property is not located within a UGA. The City Council must decide in its sole and absolute discretion whether to provide wastewater service to this property in accordance with BMC 15.03.040 (b)(2) – Failed Systems.
October 9, 2024
Janelle Hitch, P.E.
Managing Engineer – Development
Public Works & Utilities
345 6th Street, Suite 100
Bremerton, WA 98337
RE: DOCUMENTATION OF A PUBLIC AND ENVIRONMENTAL HEALTH HAZARD FOR
ALLOWING THE PROPERTY LOCATED AT 1910 SW COOK RD, PORT ORCHARD,
WA 98367 TO BE CONNECTED TO SEWER
Dear Janelle:
The purpose of this letter is to document the site conditions at the above referenced
property that the Health District believes meet the criteria set forth in Section B. (1) of
Kitsap County Resolution 090-1998 that allow the properties to connect to sanitary sewer
when located outside an Urban Growth Area boundary. This letter also details how the
property conditions meet the requirements of connecting to sanitary sewer as set forth in
Section 6.H of the Kitsap County Board of Health Ordinance No. 2008A-01, "Onsite Sewage
System and General Sewage Sanitation Regulations".
The Health District has determined that the property listed above meets the criteria set
forth in Section B. (1) of Kitsap County Resolution 090-1998 due to the lack of a suitable
onsite sewage system that is causing both a public and environmental health hazard.
Franklin J. Clark (a state licensed onsite wastewater treatment system designer) has
provided information as to the inability to provide for a replacement septic drainfield on the
lot due to a lack of adequate space and horizontal setback issues. The Health District
concurs with these findings.
The Health District requests that the Bremerton Public Works & Utilities Department and
the Kitsap County Department of Community Development review this documentation as
part of an application and approve a sewer connection for this property. If you have any
questions, or need any additional information, please call me at (360) 728-2225.
Page 2 of 2
kitsappublichealth.org
Respectfully,
Eric Evans, RS
Assistant Division Director
Environmental Health Division
Cc: Scott Diener, Kitsap County Department of Community Development
1Janelle Hitch
From:Scott Diener <SDiener@kitsap.gov>Sent:Thursday, October 10, 2024 10:15 PMTo:Eric Evans; Janelle HitchCc:Kimberly JonesSubject:RE: 1910 SW Cook RD Sewer Letter - Failing Septic SystemAttachments:2024-10-09 15-49.pdf; 1910 SW Cook Rd Sewer Letter.pdfCAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Eric, Janelle: DCD has no objections to the subject property connecting to sanitary sewer, and it meets the documented ‘failed septic’ test by which a rural property may be served and is in the best interest of the public. Please advise if further Qs. Regards, Scott Diener Manager, Planning and Environmental Programs SEPA Responsible Official Kitsap County Department of Community Development 360-536-5452 Your Partner in Building Safe, Resilient, and Sustainable Kitsap County Communities! Kitsap.gov/DCD SIGN UP HERE FOR DCD NEWS UPDATES NOTICE OF PUBLIC DISCLOSURE: All incoming and outgoing email messages are public records subject to disclosure pursuant to the Public Records Act, Chapter 42.56 RCW. From: Eric Evans <Eric.Evans@kitsappublichealth.org> Sent: Wednesday, October 9, 2024 4:01 PM To: Janelle Hitch <Janelle.hitch@ci.bremerton.wa.us> Cc: Scott Diener <SDiener@kitsap.gov>; Kimberly Jones <kimberly.jones@kitsappublichealth.org> Subject: 1910 SW Cook RD Sewer Letter - Failing Septic System [CAUTION: This message originated outside of the Kitsap County mail system. DO NOT CLICK on links or open attachments unless you were expecting this email. If the email looks suspicious, contact the Helpdesk immediately at 360-337-5555, or email at Helpdesk@kitsap.gov] Hello,
2Please find the attached letter requesting that the home serving 1910 SW Cook RD be connected to sewer. Scott, you are cc'd because this is outside the UGA. Thanks! Eric Evans, RS Assistant Division Director, Environmental Health Division (360) 728-2225 Office | (360) 728-2235 Main | (360) 509-2197 Cell eric.evans@kitsappublichealth.org | website | social media
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Resolution No. 3393 to approve provision of
Wastewater Utility Services to 13 properties
on Sherman Heights Road
COUNCIL MEETING Date: January 15, 2025
Department: Public Works
Presenter: Janelle Hitch
Phone: (360) 473-5285
SUMMARY:
The applicant has requested wastewater service for 13 properties that are outside of the City limits,
but within both the West Bremerton Urban Growth Area (UGA) and the City’s Wastewater Service
Area. The applicant has requested the provision of the City wastewater service to his properties and
is proposing to connect 4 existing and 5 new single-family residences and 23 units of apartments in
conformance with Kitsap County zoning. The 13 properties include parcel numbers: 4624-068-004-
0001, 4624-068-016-0007, 4624-068-002-0003, 4624-068-001-0202, 4624-068-001-0103, 4624-068-
001-0301, 282401-4-040-2009, 282401-4-041-2008, 282401-4-044-2005, 282401-4-037-2004,
282401-4-038-2003, 282401-4-042-2007, 282401-4-043-2006.
Pursuant to the Bremerton Municipal Code (BMC) 15.03.040, properties located outside of the City
limits must annex to obtain wastewater services. However, BMC 15.03.040(b) allows the City
Council to approve wastewater service when annexation is infeasible.
Staff have analyzed the subject properties and consider annexation infeasible at this time due to lack
of overall support from the area property owners.
ATTACHMENTS:
Resolution No. 3393 Updated 1/14/25 8:43 AM and Staff Memorandum
FISCAL IMPACTS (Include Budgeted Amount):
There are no fiscal impacts associated with this request.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to pass Resolution No. 3393 to allow the Sherman Heights properties to receive wastewater
service from the City of Bremerton pursuant to BMC 15.03.040.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 04/19/2024
4G
Page 1 of 2 Resolution Document Reference
Rev. 01/2023 RESOLUTION NO. ________ A RESOLUTION of the City Council of the City of Bremerton, Washington, authorizing the extension of wastewater
utility services to 13 properties on Sherman Heights Road, located outside the City limits by within the West Bremerton Urban Growth Area.
WHEREAS, the City of Bremerton has established a general policy for providing
City utility services beyond city limits in Bremerton Municipal Code (BMC) 15.03.040 per
Ordinance 5306 passed on August 17, 2016; and
WHEREAS, Section 15.03.040 of the BMC established a general policy that
properties located outside the City limits seeking wastewater utility services to said property
must first annex into the City; and
WHEREAS, Subsection 15.03.040(b) of the BMC identifies policy exceptions in
which the City Council, in its sole and absolute discretion, may provide City wastewater utility
service to properties outside the City limits without annexation; and
WHEREAS, Subsection 15.03.040(b)(1) allows an exception for cases where the
City Council determines that annexation of a property located within the City’s urban growth
area (UGA) is not currently feasible; and
WHEREAS, the subject properties (tax parcels 4624-068-004-0001, 4624-068-016-
0007, 4624-068-002-0003, 4624-068-001-0202, 4624-068-001-0103, 4624-068-001-0301, 282401-4-040-
2009, 282401-4-041-2008, 282401-4-044-2005, 282401-4-037-2004, 282401-4-038-2003, 282401-4-042-
2007, & 282401-4-043-2006 ), are located within the West Bremerton UGA; and
WHEREAS, per annexation provisions set forth in Chapter 35.13 RCW, the City
may only annex properties that are contiguous to the city limits; and
WHEREAS, the subject properties are not currently adjacent to City limits, and
thus would require a larger area to be annexed to make annexation feasible; and
WHEREAS, to annex, through the petition methods of annexation as codified in
Chapter 35.13 RCW, a larger area would be difficult to annex at this time, as the City does not
have sufficient annexation agreements in place for this to be successful; and
WHEREAS, the owner of the subject properties has agreed to construct
wastewater infrastructure in and near the properties and connect to existing City infrastructure; and WHEREAS, the Director of Public Works & Utilities finds the proposed
extension of the wastewater utility services consistent with the Wastewater Comprehensive Plan
for the West Bremerton Urban Growth Area; NOW THEREFORE,
3393
Page 2 of 2 Resolution Document Reference Rev. 01/2023 THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. Recitals Incorporated. The recitals set forth above in this resolution are hereby incorporated by reference and adopted herein. SECTION 2. Based on the findings set forth in the recitals above, the City Council shall exercise its discretion as authorized pursuant to BMC 15.03.040, and the City will provide wastewater utility services to the 13 properties on Sherman Heights Road (tax parcels 4624-068-004-0001, 4624-068-016-0007, 4624-068-002-0003, 4624-068-001-0202, 4624-068-001-0103, 4624-068-001-0301, 282401-4-040-2009, 282401-4-041-2008, 282401-4-044-2005, 282401-4-037-2004, 282401-4-038-2003, 282401-4-042-2007, & 282401-4-043-2006), located outside the City limits but within the West Bremerton Urban Growth Area. A vicinity map of the subject property is shown as Exhibit A. This service will be provided as annexation of the property located within the City’s urban growth area is not currently feasible. Service to this property is provided conditioned upon the owner of the property for which service is authorized execute an Outside Utility Agreement with the City which grants the City of Bremerton a limited power of attorney to include owner’s consent to annexation of the property as part of any notice of intent or petition for annexation presented to the City of Bremerton as Shown as Exhibit B. SECTION 3. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 4. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this _____ day of __________________, 20____. ERIC YOUNGER, Council President APPROVED AS TO FORM: ATTEST: KYLIE J. FINNELL, City Attorney ANGELA HOOVER, City Clerk R:\Legal\Legal\Forms\FORMS ON COBWEB\Resolution Rev. 01 2023.doc
Page 1 of 7
Outside Utilities Agreement
Rev. 09/2021
Return Address: City Clerk
City of Bremerton
345 Sixth Street, Suite 100
Bremerton, WA 98337
AUDITOR/RECORDER’S INDEXING FORM
Document Title(s): 1. Outside Utilities Agreement
Reference Number(s) of Documents assigned or released: N/A
Grantor(s): Thomas and Jean Weaver
Additional names on page 3 of document.
Grantee(s): 1. The City of Bremerton
Additional names on page 4 of document.
Legal Description:
(abbreviated)
A PTN OF GOVERNMENT LOTS 3 and 4, SEC 28, TWP 24 N, RNG 1E, W.M., IN
KITSAP COUNTY, WASHINGTON,
Additional legal is on page 5-6 of document.
Assessor’s Property Tax Parcel/Account Number: 282401-4-043-2006, 282401-4-042-2007, 282401-4-
044-2005, 282401-4-038-2003, 282401-4-037-2004,
282401-4-041-2008, 282401-4-040-2009, 4624-068-
001-0103, 4624-068-001-0202, 4624-068-002-0003,
4624-068-001-0301, 4624-068-016-0007, 4624-068-
004-0001
Project Name:
Sherman Heights Road Weaver Property Development
OUTSIDE UTILITIES AGREEMENT
WHEREAS the Bremerton Municipal Code requires property outside the city boundaries to
support annexation to the City of Bremerton as a condition for receiving City utilities (BMC
15.02.040 and 15.03.040); and
Page 2 of 7
Outside Utilities Agreement
Rev. 09/2021
WHEREAS the City of Bremerton has a primary obligation to its citizens to allocate limited
service resources for adequate growth and development within the City; and
WHEREAS the undersigned, as owner of a parcel outside the City of Bremerton, has made
application for city utilities;
NOW, THEREFORE, the undersigned owner (hereinafter "Owner") of real property located
in Bremerton, Kitsap County, Washington, (hereinafter "Property"), legally described as:
SEE ATTACHED EXHIBIT A
and the City of Bremerton (hereinafter "City"), in consideration of the mutual covenants set forth
herein including the furnishing of utility services by the City of Bremerton, do hereby promise and
agree as follows:
1. Services Provided. City of Bremerton shall provide utility services consistent with
service areas defined by the City comprehensive utility plans as amended, and terms and conditions
of a current Letter of Availability from the Bremerton Utilities Department.
2. Rates and Charges. Owner shall pay when due all connection charges, assessments,
and rates established for city utility services by City ordinance for the Owner's user class.
3. Street Standards. Development of the property described above shall comply with the
development standards of City of Bremerton’s adopted street standards.
4. Utility Improvements. Sewer
5. Annexation. Owner, by signing below, grants to the City of Bremerton a Limited
Power of Attorney to include this Agreement as Owner's consent to the annexation of the Property as
part of any Notice of Intent or Petition for Annexation presented to the City of Bremerton.
The annexation petition supported by this Power may include proportional assumption of the
City indebtedness by the area to be annexed. The petition shall require the concurrent adoption of
land uses designated in any urban fringe comprehensive plan approved for the annexation area
pursuant to RCW 35.13.177, or if none has been adopted, the land uses for annexed property as set
forth in the Bremerton Zoning Code as amended.
This Power of Attorney is nonrevocable.
Page 3 of 7
Outside Utilities Agreement
Rev. 09/2021
6. Enforcement. Violation of this Agreement may result in the immediate termination
of utility services to the above-described property as well as other remedies provided by law.
7. Covenants. The undersigned further agrees that this Agreement and the promise made
herein constitute a covenant running with the land and shall be binding upon the undersigned and his
heirs, successors, and assigns, and that this Agreement shall be filed for record in the office of the
Kitsap County Auditor.
OWNER(S):
DATED: BY:
Thomas Weaver, Owner
BY:
Jean Weaver, Owner
STATE OF WASHINGTON )
) ss
COUNTY OF KITSAP )
On this day, before me, the undersigned, a Notary Public in and for the State of Washington,
personally appeared ____________________________________________________, to me known
to be the individual(s) described in and who executed the within and foregoing instrument, and
acknowledged that he/she/they signed the same as his/her/their free and voluntary act and deed, for
the uses and purposes therein mentioned.
GIVEN under my hand and official seal this _____ day of _____________________,
20_____.
Notary Public in and for the State of Washington,
residing at:
My appointment expires:
Page 4 of 7
Outside Utilities Agreement
Rev. 09/2021
CITY OF BREMERTON
DATED: BY:
Greg Wheeler, Mayor
DEPARTMENTAL APPROVAL:
Thomas Knuckey
Director of Public Works and Utilities
APPROVED AS TO FORM:
Kylie J. Finnell, Bremerton City Attorney
Angela Hoover, City Clerk
R:\Legal\Legal\Forms\FORMS ON COBWEB\Outside Utilities Agreement Rev. 09 2021.docx
Page 5 of 7
Outside Utilities Agreement
Rev. 09/2021
EXHIBIT A
PARCEL NUMBER 282401-4-043-2006
RESULTANT LOT D OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF GOVERNMENT LOT 3, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
PARCEL NUMBER 282401-4-042-2007
RESULTANT LOT J OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCKS 68 AND 69, RE-PLAT OF PORT ORCHARD
CITY, ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 45, RECORDS OF KITSAP
COUNTY, WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST W.M., IN KITSAP COUNTY WASHINGTON.
PARCEL NUMBER 282401-4-044-2005
RESULTANT LOT E OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF GOVERNMENT LOT 3, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
PARCEL NUMBER 282401-4-038-2003
RESULTANT LOT 2 OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202310240087, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF GOVERNMENT
LOT 3, SECTION 28, TOWNSHIP 24 NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY,
WASHINGTON.
PARCEL NUMBER 282401-4-037-2004
RESULTANT LOT 1 OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202310240087, RECORDS OF KITSAP COUNTY, WASHINGTON, BEING A PORTION OF GOVERNMENT
LOT 3, SECTION 28, TOWNSHIP 24 NORTH, RANGE 1 EAST, W.M., IN KITSAP COUNTY,
WASHINGTON.
PARCEL NUMBER 282401-4-041-2008
RESULTANT LOT B OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF GOVERNMENT LOT 3, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
PARCEL NUMBER 282401-4-040-2009
RESULTANT LOT A OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF GOVERNMENT LOT 3, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST, W.M., KITSAP COUNTY, WASHINGTON.
Page 6 of 7
Outside Utilities Agreement
Rev. 09/2021
PARCEL NUMBER 4624-068-001-0103
RESULTANT LOT F OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCK 68, RE-PLAT OF PORT ORCHARD CITY,
ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 45, RECORDS OF KITSAP COUNTY,
WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24 NORTH, RANGE
1 EAST W.M., IN KITSAP COUNTY WASHINGTON.
PARCEL NUMBER 4624-068-001-0202
RESULTANT LOT G OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCK 68, RE-PLAT OF PORT ORCHARD CITY,
ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 45, RECORDS OF KITSAP COUNTY,
WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24 NORTH, RANGE
1 EAST W.M., IN KITSAP COUNTY WASHINGTON.
PARCEL NUMBER 4624-068-002-0003
RESULTANT LOT H OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCK 68, RE-PLAT OF PORT ORCHARD CITY,
ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 45, RECORDS OF KITSAP COUNTY,
WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24 NORTH, RANGE
1 EAST W.M., IN KITSAP COUNTY WASHINGTON.
PARCEL NUMBER 4624-068-001-0301
RESULTANT LOT K OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCKS 68 AND 69, RE-PLAT OF PORT ORCHARD
CITY, ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 45, RECORDS OF KITSAP
COUNTY, WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST W.M., IN KITSAP COUNTY WASHINGTON.
PARCEL NUMBER 4624-068-016-0007
RESULTANT LOT J OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCKS 68 AND 69, RE-PLAT OF PORT ORCHARD
CITY, ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLAT S, PAGE 45, RECORDS OF KITSAP
COUNTY, WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24
NORTH, RANGE 1 EAST W.M., IN KITSAP COUNTY WASHINGTON.
PARCEL NUMBER 4624-068-004-0001
RESULTANT LOT I OF BOUNDARY LINE ADJUSTMENT RECORDED UNDER AUDITOR'S FILE NO.
202311200160, BEING A RE-RECORDING OF AUDITOR'S FILE NO. 202310240086, RECORDS OF KITSAP
COUNTY, WASHINGTON, BEING A PORTION OF BLOCK 68, RE-PLAT OF PORT ORCHARD CITY,
ACCORDING TO PLAT RECORDED IN VOLUME 2 OF PLATS, PAGE 45, RECORDS OF KITSAP COUNTY,
Page 7 of 7
Outside Utilities Agreement
Rev. 09/2021
WASHINGTON, AND PORTION OF GOVERNMENT LOT 4, SECTION 28, TOWNSHIP 24 NORTH, RANGE 1
EAST W.M., IN KITSAP COUNTY WASHINGTON.
Subject Parcels
To: City Council From: Janelle Hitch, Civil Engineer, of Public Works, Utilities and Engineering Date: October 7, 2024 Re: Request for Utility Services Outside the City of Bremerton Limits: W. Sherman Heights Road Request: The Applicant, Thomas & Jean Weaver, have requested City wastewater utility services to potentially service the following 13 tax parcel numbers: City Council’s Decision: Will City Council allow wastewater services to be extended to an area in the West Bremerton Urban Growth Area without requiring annexation? Pursuant to Bremerton Municipal Code (BMC) 15.03.040, “It is the general policy of the City of Bremerton that properties located outside the City limits annex into the City before wastewater utility services are provided to those properties. For the purpose of this section, "service" means extensions of and/or service connections to City wastewater utilities to property located outside City limits.” The City Council may, in its sole and absolute discretion, provide wastewater utility services to properties outside of the City limits if certain conditions are met. The relevant exception for the Council to allow wastewater utility services without annexation falls under BMC 15.03.040 (b)(1) Annexation is not feasible.
DEPARTMENT OF PUBLIC WORKS, UTILITIES & ENGINEERING MEMORANDUM 282401-4-043-2006 282401-4-042-2007 282401-4-044-2005 282401-4-038-2003 282401-4-037-2004 282401-4-041-2008 282401-4-040-2009 4624-068-001-0103 4624-068-001-0202 4624-068-002-0003 4624-068-001-0301 4624-068-016-0007 4624-068-004-0001 282401-4-019-2006
Page 2 Department of Community Development (DCD) Analysis of Annexation: Pursuant to Bremerton Municipal Code (BMC) 15.03.040 when an owner of a property located outside the City limits request extension of utility service, the City Council may provide wastewater utility services to those properties if annexation is not feasible. To the left is an image illustrating the applicant properties (yellow), Outside Utility Agreements (green), and the Annexation Study Area (pink). Must be contiguous to the City. Per State Law and Kitsap Countywide Planning Policies, the City may annex property if it is contiguous to City of Bremerton limits. As the subject property is not contiguous to the City limits, the City could not annex just this property. To make annexation possible, more property would need to be included into the annexation area to make this area contiguous to the City of Bremerton limits. Must have properties in support of annexation. When reviewing a larger possible annexation area (as shown in the purple marks in the picture above), annexation analysis using the Petition Method of Annexation was performed. This commonly used annexation method requires the signatures of property owners representing 60% of the total assessed property value of the area to be in support of the proposed for annexation. This proposed annexation area does not have the required 60% of the total assessed property value as illustrated here: Therefore, as currently proposed, if the City received a Petition to Annex from the property owner, this request may not be successful as the City does not currently have the support of 60% of the total assessed property values. With the Study Area Total Area 201.5 acres Number of Parcels 359 Total Assessed Property Value $118,867,330 Applicant Property Total Area 6.48 acres Number of Parcels 14 Total Assessed Property Value $1,627,680 Outside Utility Agreements (OUAs) Total Area 56.4 acres Number of Parcels 83 Total Assessed Property Value $67,130,960
Page 3 requester petitioning the City to annex, the City would have 57.8% of the total assessed property values in the area proposed to be annexed. Public Work’s Recommendation. As demonstrated in the DCD’s Annexation Analysis, additional properties are needed to support annexation of this area. To require a property owner to gather the support of their neighboring properties of over $2.5 million is an onerous request. As such, City Staff finds that annexation at this time is not feasible and recommends that City Council allow an extension of wastewater utility services to the applicants’ property.
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Alternative Transportation Program Grant
Agreement with the WA State Transportation
Improvement Board for the Warren Avenue
Sidewalk Gap Project
COUNCIL MEETING Date: January 15, 2025
Department: PW & Utilities
Presenter: Chris Dimmitt
Phone: (360) 473-2307
SUMMARY: The City has been offered an Alternative Transportation Program Grant from the
Washington State Transportation Improvement Board (TIB) to partially fund sidewalk gap
improvements on Warren Avenue from Burwell Street to 4th Street. The project provides funding for
City crews to install approximately 200 linear feet of sidewalk. The project cost is estimated at
$57,000. The TIB grant award will pay for 76% of eligible project costs with a maximum grant of
$43,320. The City match amount is $13,680. Acceptance of the grant requires execution of the
Grant Agreement and completion of the Project Funding Status Form.
ATTACHMENTS: 1) Grant Agreement; 2) Project Funding Status Form; 3) Site Map;
FISCAL IMPACTS (Include Budgeted Amount): This project cost is included in the Capital
Improvement Program, budgeted in the Sidewalk Program.
STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Grant Agreement with the Washington State Transportation Improvement Board
for the Warren Avenue Sidewalk Gap Project and authorize the Mayor to finalize and execute the
agreement with substantially the same terms and conditions as presented.
.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
4H
City of Bremerton
P-W-152(P03)-1
Warren Ave Sidewalk
Burwell St to 4th St
STATE OF WASHINGTON
TRANSPORTATION IMPROVEMENT BOARD
AND
City of Bremerton
AGREEMENT
THIS GRANT AGREEMENT (hereinafter “Agreement”) for the Warren Ave Sidewalk, Burwell St
to 4th St (hereinafter “Project”) is entered into by the WASHINGTON STATE
TRANSPORTATION IMPROVEMENT BOARD (hereinafter “TIB”) and City of Bremerton, a
political subdivision of the State of Washington (hereinafter “RECIPIENT”).
1.0 PURPOSE
For the project specified above, TIB shall pay 76.0000 percent of approved eligible project costs
up to the amount of $43,320, pursuant to terms contained in the RECIPIENT’S Grant
Application, supporting documentation, chapter 47.26 RCW and/or chapter 47.04 RCW, title 479
WAC, and the terms and conditions listed below.
2.0 SCOPE AND BUDGET
The Project Scope and Budget are initially described in RECIPIENT’s Grant Application and
incorporated by reference into this Agreement. Scope and Budget will be further developed and
refined, but not substantially altered during the Design, Bid Authorization and Construction
Phases. Any material alterations to the original Project Scope or Budget as initially described in
the Grant Application must be authorized by TIB in advance by written amendment.
3.0 PROJECT DOCUMENTATION
TIB requires RECIPIENT to make reasonable progress and submit timely Project
documentation as applicable throughout the Project. Upon RECIPIENT’s submission of each
Project document to TIB, the terms contained in the document will be incorporated by reference
into the Agreement. Required documents include, but are not limited to the following:
a) Project Funding Status Form
b) Bid Authorization Form with plans and engineers estimate
c) Award Updated Cost Estimate
d) Bid Tabulations
e) Contract Completion Updated Cost Estimate with final summary of quantities
f) Project Accounting History
4.0 BILLING AND PAYMENT
The local agency shall submit progress billings as project costs are incurred to enable TIB to
maintain accurate budgeting and fund management. Payment requests may be submitted as
often as the RECIPIENT deems necessary, but shall be submitted at least quarterly if billable
amounts are greater than $50,000. If progress billings are not submitted, large payments may
be delayed or scheduled in a payment plan.
5.0 TERM OF AGREEMENT
This Agreement shall be effective upon execution by TIB and shall continue through closeout of
the grant or until terminated as provided herein, but shall not exceed 10 years unless amended
by the Parties.
6.0 AMENDMENTS
This Agreement may be amended by mutual agreement of the Parties. Such amendments shall
not be binding unless they are in writing and signed by persons authorized to bind each of the
Parties.
7.0 ASSIGNMENT
The RECIPIENT shall not assign or transfer its rights, benefits, or obligations under this
Agreement without the prior written consent of TIB. The RECIPIENT is deemed to consent to
assignment of this Agreement by TIB to a successor entity. Such consent shall not constitute a
waiver of the RECIPIENT’s other rights under this Agreement.
8.0 GOVERNANCE & VENUE
This Agreement shall be construed and interpreted in accordance with the laws of the state of
Washington and venue of any action brought hereunder shall be in the Superior Court for
Thurston County.
9.0 DEFAULT AND TERMINATION
9.1 NON-COMPLIANCE
a) In the event TIB determines, in its sole discretion, the RECIPIENT has failed to
comply with the terms and conditions of this Agreement, TIB shall notify the RECIPIENT,
in writing, of the non-compliance.
b) In response to the notice, RECIPIENT shall provide a written response within 10
business days of receipt of TIB’s notice of non-compliance, which should include either a
detailed plan to correct the non-compliance, a request to amend the Project, or a denial
accompanied by supporting details.
c) TIB will provide 30 days for RECIPIENT to make reasonable progress toward
compliance pursuant to its plan to correct or implement its amendment to the Project.
d) Should RECIPIENT dispute non-compliance, TIB will investigate the dispute and
may withhold further payments or prohibit the RECIPIENT from incurring additional
reimbursable costs during the investigation.
9.2 DEFAULT
RECIPIENT may be considered in default if TIB determines, in its sole discretion, that:
a) RECIPIENT is not making reasonable progress toward correction and
compliance.
b) TIB denies the RECIPIENT’s request to amend the Project.
c) After investigation TIB confirms RECIPIENT’S non-compliance.
TIB reserves the right to order RECIPIENT to immediately stop work on the Project and
TIB may stop Project payments until the requested corrections have been made or the
Agreement has been terminated.
9.3 TERMINATION
a) In the event of default by the RECIPIENT as determined pursuant to Section 9.2,
TIB shall serve RECIPIENT with a written notice of termination of this Agreement, which
shall be served in person, by email or by certified letter. Upon service of notice of
termination, the RECIPIENT shall immediately stop work and/or take such action as may
be directed by TIB.
b) In the event of default and/or termination by either PARTY, the RECIPIENT may
be liable for damages as authorized by law including, but not limited to, repayment of
grant funds.
c) The rights and remedies of TIB provided in the AGREEMENT are not exclusive
and are in addition to any other rights and remedies provided by law.
9.4 TERMINATION FOR NECESSITY
TIB may, with ten (10) days written notice, terminate this Agreement, in whole or in part,
because funds are no longer available for the purpose of meeting TIB’s obligations. If
this Agreement is so terminated, TIB shall be liable only for payment required under this
Agreement for performance rendered or costs incurred prior to the effective date of
termination.
10.0 USE OF TIB GRANT FUNDS
TIB grant funds come from Motor Vehicle Fuel Tax revenue and other revenue sources. Any
use of these funds for anything other than highway or roadway system improvements is
prohibited and shall subject the RECIPIENT to the terms, conditions and remedies set forth in
Section 9. If Right of Way is purchased using TIB funds, and some or all of the Right of Way is
subsequently sold, proceeds from the sale must be deposited into the RECIPIENT’s motor
vehicle fund and used for a motor vehicle purpose.
11.0 INCREASE OR DECREASE IN TIB GRANT FUNDS
At Bid Award and Contract Completion, RECIPIENT may request an increase in the maximum
payable TIB funds for the specific project. Requests must be made in writing and will be
considered by TIB and awarded at the sole discretion of TIB. All increase requests must be
made pursuant to WAC 479-05-202 and/or WAC 479-01-060 and/or WAC 479-10-575. If an
increase is denied, the recipient shall be liable for all costs incurred in excess of the maximum
amount payable by TIB. In the event that final costs related to the specific project are less than
the initial grant award, TIB funds will be decreased and/or refunded to TIB in a manner that
maintains the intended ratio between TIB funds and total project costs, as described in Section
1.0 of this Agreement.
12.0 INDEPENDENT CAPACITY
The RECIPIENT shall be deemed an independent contractor for all purposes and the
employees of the RECIPIENT or any of its contractors, subcontractors, and employees thereof
shall not in any manner be deemed employees of TIB.
13.0 INDEMNIFICATION AND HOLD HARMLESS
The PARTIES agree to the following:
Each of the PARTIES, shall protect, defend, indemnify, and save harmless the other PARTY, its
officers, officials, employees, and agents, while acting within the scope of their employment as
such, from any and all costs, claims, judgment, and/or awards of damages, arising out of, or in
any way resulting from, that PARTY’s own negligent acts or omissions which may arise in
connection with its performance under this Agreement. No PARTY will be required to
indemnify, defend, or save harmless the other PARTY if the claim, suit, or action for injuries,
death, or damages is caused by the sole negligence of the other PARTY. Where such claims,
suits, or actions result from the concurrent negligence of the PARTIES, the indemnity provisions
provided herein shall be valid and enforceable only to the extent of a PARTY’s own negligence.
Each of the PARTIES agrees that its obligations under this subparagraph extend to any claim,
demand and/or cause of action brought by, or on behalf of, any of its employees or agents. For
this purpose, each of the PARTIES, by mutual negotiation, hereby waives, with respect to the
other PARTY only, any immunity that would otherwise be available to it against such claims
under the Industrial Insurance provision of Title 51 RCW. In any action to enforce the provisions
of the Section, the prevailing PARTY shall be entitled to recover its reasonable attorney’s fees
and costs incurred from the other PARTY. The obligations of this Section shall survive
termination of this Agreement.
14.0 DISPUTE RESOLUTION
a) The PARTIES shall make good faith efforts to quickly and collaboratively resolve any
dispute arising under or in connection with this AGREEMENT. The dispute resolution
process outlined in this Section applies to disputes arising under or in connection with
the terms of this AGREEMENT.
b) Informal Resolution. The PARTIES shall use their best efforts to resolve disputes
promptly and at the lowest organizational level.
c) In the event that the PARTIES are unable to resolve the dispute, the PARTIES shall
submit the matter to non-binding mediation facilitated by a mutually agreed upon
mediator. The PARTIES shall share equally in the cost of the mediator.
d) Each PARTY agrees to compromise to the fullest extent possible in resolving the dispute
in order to avoid delays or additional incurred cost to the Project.
e) The PARTIES agree that they shall have no right to seek relief in a court of law until and
unless the Dispute Resolution process has been exhausted.
15.0 ENTIRE AGREEMENT
This Agreement, together with the RECIPIENT’S Grant Application, the provisions of chapter
47.26 Revised Code of Washington and/or 47.04 Revised Code of Washington, the provisions
of title 479 Washington Administrative Code, and TIB Policies, constitutes the entire agreement
between the PARTIES and supersedes all previous written or oral agreements between the
PARTIES.
16.0 RECORDS MAINTENANCE
The RECIPIENT shall maintain books, records, documents, data and other evidence relating to
this Agreement and performance of the services described herein, including but not limited to
accounting procedures and practices which sufficiently and properly reflect all direct and indirect
costs of any nature expended in the performance of this Agreement. RECIPIENT shall retain
such records for a period of six years following the date of final payment. At no additional cost,
these records, including materials generated under the Agreement shall be subject at all
reasonable times to inspection, review or audit by TIB personnel duly authorized by TIB, the
Office of the State Auditor, and federal and state officials so authorized by law, regulation or
agreement.
If any litigation, claim or audit is started before the expiration of the six (6) year period, the
records shall be retained until all litigation, claims, or audit findings involving the records have
been resolved.
Approved as to Form
Attorney General
By:
Signature on file
Guy Bowman
Assistant Attorney General
Lead Agency Transportation Improvement Board
Chief Executive Officer Date Executive Director Date
Print Name Print Name
Transportation Improvement Board
Project Funding Status Form
TIB Funding Status Report
Agency Name BREMERTON TIB Project Number: P-W-152(P03)-1
Project Name: Warren Ave Sidewalk
Burwell St to 4th St
Verify the information below and revise if necessary.
Email to: Your TIB Engineer
PROJECT SCHEDULE
Target Dates
Construction Approval Contract Bid Award Contract Completion
PROJECT FUNDING PARTNERS
List additional funding partners and amount.
Funding Partners Amount Revised Funding
BREMERTON 13,680
WSDOT 0
Federal Funds 0
TOTAL LOCAL FUNDS 13,680
Signatures are required from two different agency officials. Return the originally signed form to your TIB Engineer.
Mayor or Public Works Director
Signature Date
Printed or Typed Name Title
Financial Officer
Signature Date
Printed or Typed Name Title
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Public Works Agreement for Purchase of
Playground Equipment from Landscape
Structures, Inc. for Haddon Park
COUNCIL MEETING Date: January 15, 2025
Department: Parks & Recreation
Presenter: Tim Barker
Phone: (360) 473-5428
SUMMARY:
This project will install a new accessible playground at Haddon Park. The playground equipment was
selected through public feedback conducted at a Parks & Recreation Commission meeting, and the
Commission approved the final design on December 3rd.
The equipment pricing has been competitively solicited and publicly awarded through the Sourcewell
Cooperative Purchasing Agreement. The Total Project Cost: $136,080.45, installation, freight, and
sales tax included.
ATTACHMENTS: 1) Public Work Agreement; 2) Landscape Structures, Inc. Quote #2412-12453;
3) Playground Design Drawings; and 4) Presentation
FISCAL IMPACTS (Include Budgeted Amount): The playground equipment ($136,080.45) is
funded through a $132,000 CDBG grant, and the remaining balance will be funded through the
Recreation Conservation Office grant. Funding for this project was approved by the City Council on
7/3/24.
STUDY SESSION ACTION: ☐ Consent Agenda ☒ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve the Public Work Agreement for the purchase and installation of playground
equipment from Landscape Structures, Inc. in the amount of $136,080.45, sales tax included, and
authorize the Mayor to finalize and execute the agreement with substantially the same terms and
conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 11/09/2021
6A
Public Works Agreement (short form)
Rev. 04/2023
PUBLIC WORKS AGREEMENT
THIS AGREEMENT is entered into between the City of Bremerton, a Washington
Municipal Corporation (“City”), and Landscape Structures, Inc. (“Contractor”), whose mailing
address is 601-7th Street South, Delano, MN 55328-0198.
The parties agree as follows:
1. CONTRACTOR SERVICES. The Contractor shall perform the following
services for the City:
Playground equipment
Layout, mark and dig all holes required for installation of play equipment
Set main post in concrete per the manufacture’s specifications
Supervise play equipment installation and assembly during the Community Build Day
as identified in quotation #2412-12453, attached hereto as Attachment A, which is
incorporated herein.
2. TIME OF COMPLETION. Contractor shall complete the work within 90
calendar days from the date of issuance of the City’s Notice to Proceed.
3. COMPENSATION. The City shall pay the Contractor the total amount of
$136,080.45, which includes Washington State Sales Tax, for the work and services
contemplated in this agreement. The City shall pay the Contractor ninety percent (90%) of the
Contract amount upon completion and acceptance of the work by the City, and the remainder
upon fulfillment of the conditions listed below and throughout this agreement.
A. No Performance Bond. Because this contract including applicable sales
tax is $150,000 or less, and pursuant to Chapter 39.08 RCW, the
Contractor, in lieu of providing the City a performance bond, has elected
to have the City retain the final ten percent (10%) of the Contract amount
for a period of thirty (30) days after the date of final acceptance, or until
receipt of all necessary releases from the State Department of Revenue
and the State Department of Labor & Industries and until settlement of any
liens filed under Chapter 60.28 RCW, whichever is later.
B. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work.
Defective or unauthorized work includes, without limitation: work and
materials that do not conform to the requirements of this agreement; and
extra work and materials furnished without the City’s written approval. If
Contractor is unable, for any reason, to satisfactorily complete any portion
of the work, the City may complete the work by contract or otherwise, and
Contractor shall be liable to the City for any additional costs incurred by
Public Works Agreement (short form)
Rev. 04/2023
the City. “Additional costs” shall mean all reasonable costs, including
legal costs and attorney fees, incurred by the City beyond the maximum
Contract price specified above. The City further reserves its right to
deduct the cost to complete the Contract work, including any Additional
Costs, from any and all amounts due or to become due the Contractor.
C.. Final Payment: Waiver of Claims. THE MAKING OF FINAL
PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL
PRECLUDE ALL CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS
UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS
MADE.
4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times
acting as an independent contractor and not as an employee of the City. The Contractor shall
secure at its expense, and shall be responsible for all payments of income tax, social security,
state disability insurance compensation, unemployment compensation, and all other payroll
deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor
shall also secure all applicable business licenses, if required, in connection with the contract
services, including all required licenses for Contractor's officers, agents, employees and sub-
contractors.
5. TERMINATION. The City may terminate this agreement for good cause.
“Good cause” shall include, without limitation, any one or more of the following events:
A. The Contractor’s refusal or failure to supply a sufficient number of
properly skilled workers or proper materials for completion of the
Contract work.
B. The Contractor’s failure to complete the work within the time specified in
this agreement.
C. The Contractor’s failure to make full and prompt payment to sub-
contractors or for material or labor.
D. The Contractor’s persistent disregard of federal, state or local laws, rules
or regulations.
E. The Contractor’s filing for bankruptcy or becoming adjudged bankrupt.
If the City terminates this agreement for good cause, the Contractor shall not receive any
further monies due under this agreement until the Contract work is completed.
6. PREVAILING WAGES. Contractor shall file a “Statement of Intent to Pay
Prevailing Wages” with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter
Public Works Agreement (short form)
Rev. 04/2023
39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate
provisions. Contractor will be required to pay Federal, Davis-Bacon Wage Rates current on
the bid opening date. The Davis-Bacon wage rates are available at the US Department of Labor
website.
7. CHANGES. The City may issue a written work change directive for any change
in the Contract work during the performance of this agreement. If the Contractor determines, for
any reason, that a change order is necessary, Contractor must submit a written change order
request to the City’s project manager within two (2) business days of the date the Contractor
knew or should have known of the facts and events giving rise to the requested change. If the
City determines that the change increases or decreases the Contractor’s costs or time for
performance, the City will make an equitable adjustment. The City will attempt, in good faith, to
reach agreement with the Contractor on all equitable adjustments. However, if the parties are
unable to agree, the City will determine the equitable adjustment as it deems appropriate. The
Contractor shall proceed with the change order work upon receiving a written work change
directive or change order from the City. If the Contractor fails to require a change order within
the time allowed, the Contractor waives its right to make any claim or submit subsequent change
order requests for that portion of the contract work. If the Contractor disagrees with the
equitable adjustment the Contractor must complete the change order work; however, the
Contractor may elect to protest the adjustment as provided below:
A. Procedure and Protest by the Contractor. If the Contractor disagrees with
anything required by a work change directive or change order, including
any direction, instruction, interpretation, or determination by the City, the
Contractor shall:
1. Immediately give a signed written notice of protest to the City;
2. Supplement the written protest within fourteen (14) calendar days
with a written statement that provides the following information:
a. The date of the Contract’s protest.
b. The nature and circumstances that caused the protest.
c. The provisions in this agreement that support the protest.
d. The estimated dollar cost, if any, of the protested work and
how that estimate was determined.
e. An analysis of the progress schedule showing the schedule
change or disruption if the Contractor is asserting a
schedule change or disruption.
The Contractor shall keep complete records of extra costs and time
incurred as a result of the protested work. The City shall have
access to any of the Contractor’s records needed for evaluating the
protest.
Public Works Agreement (short form)
Rev. 04/2023
3. The City will evaluate all protests, provided the procedures in this
section are followed. If the City determines that a protest is valid,
the City will adjust payment for work or time by an equitable
adjustment. No adjustment will be made for an invalid protest.
B. Contractor’s Duty to Complete Protested Work. In spite of any protest,
the Contractor shall proceed promptly with the work as the City has
ordered.
C. Contractor’s Acceptance of Changes. The Contractor accepts all
requirements of a change order by: (1) endorsing it, (2) writing a separate
acceptance, or (3) not protesting in the way this section provides. A
change order that is accepted by Contractor as provided in this section
shall constitute full payment and final settlement of all claims for contract
time and for direct, indirect and consequential costs, including costs of
delays related to any work, either covered or affected by the change.
D. Failure to Protest Constitutes Waiver. By not protesting as this section
provides, the Contractor also waives any additional entitlement and
accepts from the City any written order (including directions, instructions,
interpretations, and determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the
procedures of this section, the Contractor completely waives any claims
for protested work and accepts form the City any written order (including
directions, instructions, interpretations, and determination).
F. Liens. In the event that there are any liens on file against the City of
Bremerton, the City of Bremerton shall be entitled to withhold final or
progress payments to the extent deemed necessary by the City of
Bremerton to properly protect the outstanding lien claimants until proper
releases have been filed with the City Clerk
8. CLAIMS. The Contractor shall give written notice to the City of all claims other
than change orders within fourteen (14) calendar days of the occurrence of the events giving rise
to the claims. Any claim for damages, additional payment for any reason, or extension of time,
whether under this agreement or otherwise, shall be conclusively deemed to have been waived
by the Contractor unless a timely written claim is made in strict accordance with the applicable
provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim
is set forth in detail in writing and received by the City within seven (7) calendar days from the
date Contractor knew, or should have known, of the facts giving rise to the claim. At a
minimum, a Contractor’s written claim must include the information set forth regarding protests
in Section 7.A.2.a.-e.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS
Public Works Agreement (short form)
Rev. 04/2023
ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM
OR CAUSED BY THAT DELAY.
Contractor must, in any event, file any claim or bring any suit arising from or connected
with this agreement within 120 calendar days from the date the contract work is complete.
9. WARRANTY. The Contractor shall correct all defects in workmanship and
materials within one year from the date of the City’s acceptance of the Contract work. When
defects are corrected, the warranty for that portion of the work shall extend for one year from the
date such correction is completed and accepted by the City. The Contractor shall begin to
correct any defects within seven (7) calendar days of its receipt of notice from the City of the
defect. If the Contractor does not accomplish the corrections within a reasonable time, the City
may complete the corrections and the Contractor shall pay all costs incurred by the City in order
to accomplish the correction.
10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officer, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits including all legal costs and attorney fees, arising out of or in connection
with the performance of this agreement, except for injuries and damages caused by the City’s
sole negligence.
The City’s inspection or acceptance of any of Contractor’s work when completed shall
not be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor and
the City, its officials, employees, agents and volunteers, the Contractor’s liabili ty hereunder shall
be only to the extent of the Contractor’s negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS
INDEMNIFICATION CONSTITUTES THE CONTRACTOR’S WAIVER OF IMMUNITY
UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF
THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE
MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this
agreement.
11. INSURANCE. The Contractor shall procure and maintain for the duration of this
agreement insurance of the types and in the amounts described below against claims for injuries
to persons or damage to property which may arise from or in connection with the performance of
the work by the Contractor, its agents, representative, employees, sub-consultants or sub-
contractors.
Public Works Agreement (short form)
Rev. 04/2023
Before beginning work on the project described in this agreement, the Contractor shall
provide a Certificate of Insurance evidencing:
A. Automobile Liability insurance with limits no less than $1,000,000
combined single limit per accident for bodily injury and property damage;
and
B. Commercial General Liability insurance written on an occurrence basis
with limits no less than $1,000,000 combined single limit per occurrence
and $2,000,000 general aggregate for personal injury, bodily injury and
property damage. Coverage shall include but not be limited to: blanket
contractual; products/completed operations/broad form property damage;
explosion, collapse and underground (XCU); and
C. Excess Liability insurance with limits not less than $1,000,000 per
occurrence and aggregate; and
B. Workers Compensation insurance as statutorily required by the Industrial
Insurance Act of the State of Washington, Title 51, Revised Code of
Washington and employer's liability with limits not less than $1,000,000.
Any payment of deductible or self-insured retention shall be the sole responsibility of
the Contractor.
The City, its officials, employees, agents and volunteers shall be named as an
additional insured on the insurance policy, as respects work performed by or on behalf of the
Contractor and a copy of the endorsement naming the City as additional insured shall be attached
to the Certificate of Insurance.
The Contractor’s insurance shall contain a clause stating that coverage shall apply
separately to each insured against whom claim is made or suit is brought, except with respects to
the limits of the insurer’s liability.
The Consultant's insurance shall be primary and non-contributory insurance as respects
the City and shall contain a waiver of subrogation against the City for claims arising out of any
operations, liabilities and obligations to which coverage applies. It shall be an affirmative
obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by
certified mail, return receipt requested to City of Bremerton, attn: Risk M anagement, 345 6th
Street, Suite 100, Bremerton, WA 98337 within two days of the cancellation, suspension or
substantive change of any insurance policy set out herein, and failure to do so shall be construed
to be a breach of this Agreement.
The City reserves the right to receive a certified copy of all the required insurance
policies. In the event that the Contractor employs other contractors (sub-contractors) as part of
the work covered by this Agreement, it shall be the Contractor’s responsibility to r equire and
confirm that each sub-contractor meets the minimum insurance requirements specified above.
Public Works Agreement (short form)
Rev. 04/2023
The Contractor shall, upon demand of the City, deliver to the City copies of such policy or
policies of insurance and the receipts for payment of premiums thereon.
12. MISCELLANEOUS.
A. Equal Employment Opportunity Statement. In the hiring of employees for
the performance of work under this Agreement, the Contractor, its subcontractors, or any person
acting on behalf of Contractor shall not discriminate in any employment practice on the basis of
age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital
status, military status, or the presence of any physical, mental or sensory disability.
B. ADA Statement. The City of Bremerton does not discriminate on the
basis of disability in programs and activities, which it operates pursuant to the requirements of
the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to
both employment and admission to participation in the programs, services and activities of the
City of Bremerton. Reasonable accommodation for employees or applicants for employment
will be provided.
C. Compliance with Laws. Contractor shall comply with all federal, state
and local laws, rules and regulations throughout every aspect in the performance of this
agreement.
D. Work Performed at Contractor’s Risk. Contractor shall take all
precautions necessary and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of this agreement. All work shall be done at Contractor’s own
risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other
articles used or held for use in connection with the work.
E. Nonwaiver of Breach. The failure of the City to insist upon strict
performance of any of the terms and rights contained herein, or to exercise any option herein
conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of
those terms and rights and they shall remain in full force and effect
F. Governing Law. This agreement shall be governed and construed in
accordance with the laws of the State of Washington. If any dispute arises between the City and
Contractor under any of the provisions of this agreement, resolution of that dispute shall be
available only through the jurisdiction, venue and rules of the Kitsap County Superior Court,
Kitsap County, Washington.
G. Attorney’s Fees. To the extent not inconsistent with RCW 39.04.240, in
any claim or lawsuit for damages arising from the parties’ performance of this agreement, each
party shall be responsible for payment of its own legal costs and attorney’s fees incurred in
defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the
City’s right to indemnification under Section 10 of this agreement.
H. Written Notice. All communications regarding this agreement shall be
sent to the parties at the addresses listed on the signature page of this agreement, unless
Public Works Agreement (short form)
Rev. 04/2023
otherwise notified. Any written notice shall become effective upon delivery, but in any event
three (3) calendar days after the date of mailing by registered or certified mail, and shall be
deemed sufficiently given if sent to the addressee at the address stated on this agreement.
I. Assignment. Any assignment of this agreement by the Contractor without
the written consent of the City shall be void.
J. Modification. No waiver, alteration, or modification of any of the
provisions of this agreement shall be binding unless in writing and signed by a duly authorized
representative of the City and Contractor.
K. Severability. If any one or more sections, sub-sections, or sentences of
this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity
of the remaining portion of this agreement and the remainder shall remain in full force and
effect.
L. Entire Agreement. The written provisions and terms of this agreement,
together with any attached Exhibits, supersede all prior verbal statements by any representative
of the City, and those statements shall not be construed as forming a part of or altering in any
manner this agreement. This agreement and any attached Exhibits contain the entire agreement
between the parties. Should any language in any Exhibit to this agreement conflict with any
language contained in this agreement, the terms of this agreement shall prevail.
M. Mutually Bound. Contractor and Subcontractor are mutually bound by
the terms of this agreement. Terms of this agreement will apply to the work of any subcontractor.
The Contractor shall assume toward the subcontractor all obligations and responsibilities the
Owner, under this agreement, assumes toward the Contractor, and the Subcontractor shall
assume toward the Contractor all obligations and responsibilities which the Contractor, under
this agreement, assumes towards the Owner.
N. Suspension & Debarment. For contracts involving Washington State and
Federal funding, Contractor hereby certifies, by signing this agreement, that neither it nor its
principals are presently debarred, suspended, proposed for debarment, declared ineligible, or
voluntarily excluded from participation in this transaction by any State or Federal department or
agency. Contractor shall provide immediate written notice to the City if at any time it learns that
it is or has become ineligible for certification. Should Contractor enter into a covered transaction
with another firm, Contractor agrees by signing this agreement that it will verify that the firm
with whom it intends to do business is not debarred, suspended, ineligible, excluded or
disqualified.
O. Solicitation of Minority Business. Per RCW 35.22.650, Contractor agrees
that the contractor shall actively solicit the employment of minority group members. Contractor
further agrees that the contractor shall actively solicit bids for the subcontracting of goods or
services from qualified minority businesses. Contractor shall furnish evidence of the contractor's
compliance with these requirements of minority employment and solicitation. Contractor further
agrees to consider the grant of subcontracts to said minority bidders on the basis of substantially
Public Works Agreement (short form)
Rev. 04/2023
equal proposals in the light most favorable to said minority businesses. The contractor shall be
required to submit evidence of compliance with this section as part of the bid.
IN WITNESS WHEREOF, the parties below have executed this agreement.
CONTRACTOR THE CITY OF BREMERTON
Print Name: Print Name:
Title: Title:
DATE DATE
Notices to be sent to: Notices to be sent to:
CONTRACTOR: CITY OF BREMERTON:
Attn: John Larson Attn: Tim Barker
Landscape Structures, Inc. City of Bremerton
2104 SW 152nd Street, Ste 1 345 6th Street, Suite 100
Burien, WA. 98166 Bremerton, WA 98337
(360)
(360) (facsimile)
APPROVED AS TO FORM:
Kylie J. Finnell
Bremerton City Attorney
ATTEST:
Angela Hoover, City Clerk
R:\Legal\Legal\Forms\FORMS ON COBWEB\Public Works Agreement (short form) Rev. 04 2023.doc
~ 8-12 weeks*see attached
1762711-01-03 $ 106,965.00
INSTALL $ 15,483.00
$ (8,557.20)
Sub Total $ 113,890.80
Freight $ 10,725.00
Tax 9.2%$ 11,464.65
Bond not included
Tax on Bond not included
Total $ 136,080.45
December 16, 2024
SITEWORK/DEMOLITION
Adam Basich 206.932.6366
DESIGN CONCEPT A - R.3 Custom PlayBooster Composite Play Structure, engineered
and manufactured in Delano, MN by Landscape Structures, 100% employee owned
American Made
PLAY EQUIPMENT
Borders for this design are by others, per drawing 1762711-01-03
Not Included in this Scope
Supervised Installation including Equipment delivery offload, all hole
marking and digging, setting of 26 posts, Community Install Direction and
Assistance
Supervised Community Installation Quoted @ Davis Bacon Wages
INSTALLATION
SAFETY SURFACING
Date Lead Time Terms
PlayCreation, Inc. attention: John
Larson 2104 SW 152nd Street,
ste 1 Burien, WA 98166
JohnL@PlayCreation.com
206.940.1108
Landscape Structures, Inc.
attention: Misty Link 601 - 7th
Street South Delano, MN
55328-0198
mistylink@playlsi.com
763.972.5591
Send for processing to:Issue Purchase Order To:
APPROVAL
_______________________________________________
signature
_______________________________________________
date PO#
Lulu D. Haddon Park
Quote / Worksheet #2412-12453
To:
Bremerton Parks and Recreation
680 Lebo Blvd Bremerton, WA 98310 Colette Berna
Park Preservation & Development Manager
Colette.Berna@ci.bremerton.wa.us 360.473.5429
Project Location: Lulu
D. Haddon Park 1525 N
Lafayette Ave.
Bremerton, WA 98312
Concept
A R.3
Sourcewell Contact #010521-LSI City
of Bremerton ID #20107
Quoted By
To Place Order : Sign Approval Line + Color Approval Sheet, then:
Future Surfacing Components must be Quoted @ DAVIS BACON wages per client request.
•50% Deposit Due Upon Order Entry
•Pricing valid for 90 day
•Quote based on current pricing
601 7th STREET SOUTH - P.O. BOX 198PH: 1-800-328-0035 FAX: 1-763-972-6091DELANO, MINNESOTA 55328LANDSCAPE STRUCTURES, INC.THIS PLAY AREA DOES CONFORM TOIT IS THE MANUFACTURERS OPINION THATTHE A.D.A. ACCESSIBILITY STANDARDS,ASSUMING AN ACCESSIBLE PROTECTIVESURFACING IS PROVIDED, AS INDICATED, ORWITHIN THE ENTIRE USE ZONE.CHOOSE A PROTECTIVE SURFACING MATERIAL THATHAS A CRITICAL HEIGHT VALUE TO MEET THEMAXIMUM FALL HEIGHT FOR THE EQUIPMENT (REF.ASTM F1487 STANDARD CONSUMER SAFETYPERFORMANCE SPECIFICATION FOR PLAYGROUNDEQUIPMENT FOR PUBLIC USE, SECTION 8 CURRENTREVISION). THE SUBSURFACE MUST BE WELLDRAINED. IF THE SOIL DOES NOT DRAIN NATURALLYIT MUST BE TILED OR SLOPED 1/8" TO 1/4" PERFOOT TO A STORM SEWER OR A "FRENCH DRAIN".THIS CONCEPTUAL PLAN WAS BASED ONINFORMATION AVAILABLE TO US. PRIOR TOCONSTRUCTION, DETAILED SITE INFORMATIONINCLUDING SITE DIMENSIONS, TOPOGRAPHY EXISTINGUTILITIES, SOIL CONDITIONS, AND DRAINAGESOLUTIONS SHOULD BE OBTAINED, EVALUATED, &UTILIZED IN THE FINAL DESIGN. PLEASE VERIFY ALLDIMENSIONS OF PLAY AREA, SIZE, ORIENTATION, ANDLOCATION OF ALL EXISTING UTILITIES, EQUIPMENT,AND SITE FURNISHINGS PRIOR TO ORDERING. SLIDES SHOULD NOT FACE THE HOT AFTERNOON SUN.Representing206.940.1108Project ManagerPlayCreation Landscape StructuresDesigned by:ADA Counts include Ireestanding play items.Representing Landscape Structures since Lulu D. Haddon ParkDesign A R.3Bremerton, WAPlayCreation,Inc.Landscape StructuresJohnL@PlayCreation.comPlayBooster1762711-01-03Scale In Feet0'1'5'10'20'years oldyears oldyears oldyears old
Lulu D. Haddon Park
Playground
Public Works Agreement for Purchase of Playground
Equipment from Landscape Structures, Inc.
This project was identified as a high priority in the 6-year Capital Facility
Plan (CFP), included in the 2020 Parks, Recreation & Open Space Plan.
The original playground equipment was installed in 1998 but had been in
storage for over a decade before being installed.
In 2021, the P&R Dept. applied for a 132k CDBG grant to replace the
outdated playground with an accessible one.
In August 2024, options were evaluated at the P & R Commission meeting.
The design was revised slightly and staff reviewed several color options and
selected one that complements the restroom/shelter colors.
In December 2024, the P&R Commission voted to proceed with the
contract.
The city has previously installed equipment from Landscape Structures at
Warren Ave. Park, Kiwanis Park, and Evergreen Rotary Park.
Haddon Park Playground Purchase –Background
Haddon Park Playground –Adjacent Area
Haddon Park Playground Location
Haddon Park Playground –Preferred Option Plan
Haddon Park Playground –Preferred Option*
Restroom Paint Swatches/Playground Colors
*4th slide substituted w/climber
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Supplemental Agreement No. 4 with HDR
Engineering, Inc. for the Naval Ave: 1st
Street to 15th Street Pedestrian and Bicycle
Enhancements Project
COUNCIL MEETING Date: January 15, 2025
Department: PW & Utilities
Presenter: Vicki Grover
Phone: (360) 473-2317
SUMMARY: In December of 2019, the City executed a contract (#6063) with HDR for the design of
the Naval Ave: 1st Street to 15th Street Pedestrian and Bicycle Enhancements Project in the amount
of $61 4,400 . Supplement No. 01 through No. 03 have been executed; extending the contract term to
December 31, 2026, and increasing the contract value to $853,324. This proposed Supplement No.
4 is for the Right Of Way Phase of the project; scope of work is for time and expenses related to Real
Estate Services. These work tasks include but are not limited to, services to support property
acquisition and documentation, extension of time for project management and design services to
incorporate changes from Right of Way acquisition. This Supplement will increase the contract
amount by $1,460,952 (Total $2,314,276) and extend the contract term to December 31, 2030. In
addition, the contract amount for this Supplement also includes escalation costs from 2020 to 2024
for HDR and 3 sub-consultants.
ATTACHMENTS: 1) Supplement No. 4 with HDR 2) Presentation
FISCAL IMPACTS (Include Budgeted Amount) No fiscal impacts. This project cost is included in
the Transportation Capital Projects (TransCap) budget.
STUDY SESSION ACTION: ☐ Consent Agenda ☒ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve Supplemental Agreement No. 4 with HDR Engineering, Inc. for the Naval Ave : 1st
Street – 15th Street Pedestrian and Bicycle Enhancements Project; and authorize the Mayor to
finalize and execute the agreement with substantially the same terms and conditions as presented.
Motion approved:
Move to refer the Naval Ave Right of Way Acquisition, Contract Modification 4, to the Public Works
Committee directing them to collaborate with Engineering Division and Administration to explore a
compromise and report back to the Council with recommendations at the study session meeting on
January 22nd.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
6B
AGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT: Study Session Date: January 8, 2025
Supplemental Agreement No. 4 with HDR
Engineering, Inc. for the Naval Ave: 1st
Street to 15th Street Pedestrian and Bicycle
Enhancements Project
COUNCIL MEETING Date: January 15, 2025
Department: PW & Utilities
Presenter: Vicki Grover
Phone: (360) 473-2317
SUMMARY: In December of 2019, the City executed a contract (#6063) with HDR for the design of
the Naval Ave: 1st Street to 15th Street Pedestrian and Bicycle Enhancements Project in the amount
of $614,400. Supplement No. 01 through No. 03 have been executed; extending the contract term to
December 31, 2026, and increasing the contract value to $853,324. This proposed Supplement No.
4 is for the Right Of Way Phase of the project; scope of work is for time and expenses related to Real
Estate Services. These work tasks include but are not limited to, services to support property
acquisition and documentation, extension of time for project management and design services to
incorporate changes from Right of Way acquisition. This Supplement will increase the contract
amount by $1,460,952 (Total $2,314,276) and extend the contract term to December 31, 2030. In
addition, the contract amount for this Supplement also includes escalation costs from 2020 to 2024
for HDR and 3 sub-consultants.
ATTACHMENTS: 1) Supplement No. 4 with HDR 2) Presentation
FISCAL IMPACTS (Include Budgeted Amount) No fiscal impacts. This project cost is included in
the Transportation Capital Projects (TransCap) budget.
STUDY SESSION ACTION: ☐ Consent Agenda ☒ General Business ☐ Public Hearing
RECOMMENDED MOTION:
Move to approve Supplemental Agreement No. 4 with HDR Engineering, Inc. for the Naval Ave: 1st
Street – 15th Street Pedestrian and Bicycle Enhancements Project; and authorize the Mayor to
finalize and execute the agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve Deny Table Continue No Action
Form Updated 01/02/2018
6B
Supplemental Agreement
Number
Organization and Address
Phone:
Original Agreement Number
Project Number Execution Date Completion Date
Project Title New Maximum Amount Payable
Description of Work
The Local Agency of
desires to supplement the agreement entered in to with
and executed on and identified as Agreement No.
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read:
III
Section V, PAYMENT, shall be amended as follows:
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: By:
Consultant Signature Approving Authority Signature
Date
DOT Form 140-063
Revised 09/2005
04 HDR Engineering, Inc.
929 108th Avenue NE, Suite 1300
Bellevue, WA 98004
(425)-450-6200
315028 (City Contract 6063)
HLP-PB19(006)February 13, 2020 December 31, 2030
Naval Avenue- 1st Street to 15th Street Pedestrian and Bicycle Enhancements 2,314,276.71
This scope of work includes time and expenses for Real Estate Services for the Right Of Way Phase. These
activities include but are not limited to services to support property acquisition and documentation, extension
of time for project management and design services to incorporate changes from Right of Way acquisition.
City of Bremerton
HDR Engineering Inc.
2/13/20 315028 (City Contract 6063)
See Exhibit A
12-31-30
See Exhibit B
Paul Ferrier, HDR Engineering Inc.Greg Wheeler, Mayor City of Bremerton
Naval Avenue: 1st St to 15th St Bicycle and
Pedestrian Enhancement Project
City Project No. 315028
Scope for Design and Right-of-Way Services
CONTRACT MODIFICATION #4
(Amendment #9)
September 2024
City of Bremerton
Prepared by:
HDR
929 108th Avenue NE, Suite 1300
Bellevue, WA 98004
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 2 of 15
CONTENTS
INTRODUCTION ............................................................................................................................................. 3
Scope of Work ..................................................................................................................................................3
Project Description ...........................................................................................................................................3
Major Milestone Schedule ................................................................................................................................3
TASK 1. PROJECT MANAGEMENT & ADMINISTRATION ............................................................................. 4
TASK 2. QUALITY ASSURANCE / QUALITY CONTROL ................................................................................. 4
TASK 3. PUBLIC INVOLVEMENT ................................................................................................................ 4
TASK 4. STAKEHOLDER COORDINATION ................................................................................................... 4
TASK 5. DATA COLLECTION / REVIEW OF EXISTING INFORMATION ........................................................... 5
TASK 6. SURVEY AND MAPPING ............................................................................................................... 5
TASK 7. GEOTECHNICAL ENGINEERING .................................................................................................... 5
TASK 8. TRAFFIC ANALYSIS ...................................................................................................................... 5
TASK 9. BASIS OF DESIGN ........................................................................................................................ 5
TASK 10. ENVIRONMENTAL DOCUMENTATION & PERMITTING ASSISTANCE .............................................. 6
TASK 11. 30% DESIGN ............................................................................................................................... 6
TASK 12. FINAL DESIGN - PS&E .................................................................................................................. 6
TASK 13. REAL ESTATE SERVICES ............................................................................................................... 6
TASK 14. DESIGN SERVICES DURING ROW PHASE .................................................................................... 15
TASK 15. MANAGEMENT RESERVE FUND ................................................................................................. 15
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 3 of 15
INTRODUCTION
During the term of this PROFESSIONAL SERVICES AGREEMENT (AGREEMENT), HDR Engineering, Inc.
(CONSULTANT) shall perform professional services for the City of Bremerton (CITY) in connection with the
following project: Naval Avenue: 1st St to 15th St Bicycle and Pedestrian Enhancement Project (PROJECT).
Contract Modification #4 keeps intact the overall terms of the original agreement and the previously
executed amendments.
Scope of Work
This Contract Modification #4 scope of work includes time and expenses for the Right-of-Way (ROW) phase of
the project. The additional scope of work includes project management efforts extending the project
timeline, services for support of ROW acquisition, design services to incorporate design changes from right of
way acquisition and grant support.
Project Description
The PROJECT rebalances the existing roadway section to remove barriers to non-motorized travel by adjusting
the number and width of vehicular lanes, adding bicycle facilities, and enhancing pedestrian facilities. The
PROJECT will provide ADA improvements to the maximum extent feasible throughout the project limits. As
part of this roadway reconfiguration project, the following will be included, pavement resurfacing, curb and
gutter, signing and striping to support continuous bike facilities, more robust pedestrian facilities, signal
modifications, street lighting, way finding signage, utility relocations, and stormwater improvements. This is a
multimodal improvement project identified in the City’s 2007 Non-motorized Transportation Plan.
Major Milestone Schedule
Contract Modification #3 modifies the schedule as follows:
Notice to Proceed……………………. Complete
Identify the Basis of Design ....... Complete
30% Design ................................. Complete
60% Design and ROW Plan ......... Complete
90% Design ................................. Complete
100% Design ............................... TBD
ROW …………………………………………2024 - 2027
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 4 of 15
Advertisement………………………… TBD (Depending on Funding)
Contract Modification #4 Project Tasks
The CONSULTANT shall manage the work as described within the following major Work Elements:
TASK 1. PROJECT MANAGEMENT &
ADMINISTRATION
Task 1 is modified to include additional time for project PM and Accountant to execute the amendment,
update project budget, billings, and invoicing throughout the life of the contract. Also, includes processing
amendments to subconsultants for additional work as part of this amendment.
Assumption(s):
· This scope assumes up to 30 monthly invoices.
· Includes up to 24 biweekly meetings, assuming periods of no activity.
· Attendance of ROW kickoff Meeting
Deliverable(s):
· Up to 30 additional invoices and progress reports.
· Meeting agendas and notes
TASK 2. QUALITY ASSURANCE / QUALITY CONTROL
No change to this task from original scope
TASK 3. PUBLIC INVOLVEMENT
No change to this task from original scope
TASK 4. STAKEHOLDER COORDINATION
No change to this task from original scope
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 5 of 15
TASK 5. DATA COLLECTION / REVIEW OF EXISTING
INFORMATION
No change to this task from original scope
TASK 6. SURVEY AND MAPPING
No change to this task from original scope
TASK 7. GEOTECHNICAL ENGINEERING
No change to this task from original scope
TASK 8. TRAFFIC ANALYSIS
Task 8 is modified to add scope to perform a traffic signal warrant analysis of the 15th Street signalized
intersection. Signal warrant analysis will follow latest guidance from updated MUTCD.
Assumption(s):
· Effort accounts for collecting new traffic turn movement counts at the 15th Street signal to meet the
latest MUTCD data collection needs for the 1-hour, 4-hour and 8-hour signal warrants. To be
collected and provide by count vendor.
· Analysis will include safety review of latest 5 years of crash data, review of sight distance
requirements for existing and planned intersection configuration.
Deliverable(s):
· Draft and final traffic signal warrant analysis memo with recommendation
TASK 9. BASIS OF DESIGN
No change to this task from original scope
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 6 of 15
TASK 10. ENVIRONMENTAL DOCUMENTATION
No change to this task from original scope
TASK 11. 30% DESIGN
No change to this task from original scope
TASK 12. FINAL DESIGN - PS&E
Task 12 is modified to cover additional cost for rate escalation from original scoping in 2020 to staff rates in
2024. In addition to added effort for out of ROW impacts and additional complexity of work for realignment
and redesign of the north segment of the project from 11th Street to 15th Street. The alternative that was
selected for the design impacts ROW on both sides of the street adding additional design for sidewalks,
drainage, and driveway reconstruction. For utility coordination this scope adds budget to generate utility
coordination exhibits and more support time to assist with franchise utility coordination and management of
design by utilities.
Assumption(s):
· Removal of trees and replacement of sidewalk and drainage along the west side of Naval Ave fronting
the cemetery property.
· Utility coordination exhibits to account for vertical structures and overhead utility and
communications.
Deliverable(s):
· Up to ten (10) utility coordination exhibits
· Updates for 100% design package per original scope
TASK 13. REAL ESTATE SERVICES
The objective of this task is to provide the necessary effort required by the CONSULTANT to complete the
Real Estate Services management, valuation, negotiation, and acquisition for the CITY for up to eighty-three
(83) parcels. It is anticipated that these services will be completed within a period of thirty (30) months.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 7 of 15
Assumption(s):
· These tasks are based upon the most current WSDOT approved Right-of-Way Plans and Right of Way
Funding Estimate, which identifies eighty-three (83) parcels for acquisition.
· The CONSULTANT shall perform right of way acquisition in accordance with the Federal Uniform
Relocation Assistance and Real Property Acquisitions Policies Act (URA), WSDOT LAG Manual
guidelines, applicable State and local laws, CITY ROW procedures, WSDOT Right of Way Manual, and
CITY administrative rules.
· CITY shall provide CONSULTANT with available project information such as, but not limited to, the
CITY’s WSDOT approved ROW procedures (approved within the last three years), approved
environmental documentation, and any pre-approved CITY ROW forms, including legal documents, if
available and as needed.
· CONSULTANT and CITY agree to maintain clear lines of communication, determine, and document the
appropriate decision-making process to achieve project goals, and to provide open access to available
data that is pertinent to the project.
· Real Estate Services will acquire up to eighty-three (83) parcels which will consist of permanent
easements (PE) and/or temporary construction easements (TCE) and fee acquisitions of a complete
parcel. Any additional parcels not included will be considered an increased level of effort and will be
renegotiated and adjusted accordingly.
· All deliverables will be produced in accordance with the approved quality control/quality assurance
(QC/QA) process established by the CITY and the CONSULTANT team.
· All deliverables prepared by CONSULTANT shall be provided to the CITY – one (1) electronic version
and one (1) hard copy.
PRE-ACQUISITION AND DATA MANAGEMENT
CONSULTANT shall order title reports and obtain any right of entry agreements needed for the project
described as follows:
· Order title reports and circulate title reports to the project team.
· Acquire right of entry agreements (ROE), with ROE requests being mailed out and a maximum of two
(2) additional contacts being made for each parcel.
CITY Responsibilities:
· Review and approve title reports and pay title report invoice.
· Review and approve ROE agreement and cover letter.
· Identify and authorize any parcels needing right of entry agreements.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 8 of 15
· CITY and CONSULTANT will reassess any ROE negotiations that are unsuccessful after three attempts
to determine if modifications to scope and budget are required.
Assumption(s):
· CONSULTANT shall order a maximum of eighty-three (83) title reports with one copy of each title
report and any supporting documentation (e.g., copies of covenants affecting legal description,
deeds, etc.) supplied to CONSULTANT.
· CONSULTANT shall prepare all necessary documents and make a maximum of three landowner
contacts for any right of entry agreement request.
· There will be a maximum of two (2) right of entry agreement requests.
Deliverables:
· Title Reports
· Right of Entry Documents and Signed Agreements
MANAGEMENT AND ADMINISTRATION OF THE REAL ESTATE SERVICES RIGHT- OF-WAY (ROW) PROCESS
CONSULTANT will provide management, administration, coordination, direction, and guidance for the
following ROW tasks:
· Prepare for and attend ROW kickoff meeting and monthly project update meetings with the CITY.
· Prepare and provide an updated landowner list, preliminary ROW cost estimate (RFE), and ROW
schedule.
· Prepare and provide monthly ROW project status report to include acquisition milestones upon
commencement of the valuation process.
· Manage CONSULTANT staff to provide the most expeditious schedule for the delivery of the ROW
portion of the project.
· Manage CONSULTANT’s ROW subconsultants, including complying with and entering payments to
DBEs into WSDOT’s DMCS system.
· Provide 5 days notice to CITY staff when DBE subconsultants are scheduled to perform work for the
purpose of performing CUF reviews.
· Provide QA/QC services.
CITY Responsibilities:
· Attend ROW kickoff meeting and monthly project update meetings with the CONSULTANT.
· Review and approve landowner contact list, RFE, and ROW schedule.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 9 of 15
· Review monthly status reports and provide comments as needed.
Assumption(s):
· Up to two (2) CONSULTANT RES staff will attend the ROW kickoff meeting. Staff commitment is
estimated at two (2) hours per staff for preparation and participation.
· Up to one (1) CONSULTANT staff will attend up to twelve (12) recurring monthly client meetings to be
held virtually. Staff time commitment is estimated at two (2) hours per staff, per meeting, for
preparation, participation in the meeting, and meeting notes.
· Up to two (2) CONSULTANT RES staff will attend up to twelve (12) recurring monthly internal
meetings. Staff time commitment is estimated at one (1) hour per staff and per meeting for
preparation, participation in the meeting, and notes.
· All meetings with the CITY are anticipated to be held online by virtual capacity. If any meetings are
held in person, the increased level of effort will be renegotiated and adjusted accordingly.
· Update to ROW cost estimate (RFE).
· Up to one (1) ROW schedule and up to one (1) update will be prepared.
Deliverables:
· One (1) Landowner Contact List
· One (1) RFE and up to one (1) update
· One (1) ROW Schedule and up to one (1) update
· Up to twelve (12) Monthly ROW Project Status Reports Up to twelve (12) Monthly ROW Project
Status Reports
VALUATION PROCESS (AOS, APPRAISAL AND APPRAISAL REVIEW, EXHIBITS AND LEGAL DESCRIPTIONS)
CONSULTANT will manage the valuation process for up to eighty-three (83) parcels. As part of the valuation
process, Administrative Offer Summary (AOS) reports, full appraisal reports, and review appraisal reports will
be prepared. CONSULTANT shall meet all requirements set forth in 49 CFR 24.103. CONSULTANT will perform
the following tasks:
· Prepare a schedule for delivery of AOS reports, appraisal, and review reports.
· Assemble all needed valuation data, exhibit and scope for each AOS assigned.
· Send out landowner contact letters to all affected parcels in advance of the valuation, if needed.
· Manage the delivery of up to seventy-eight (78) AOS reports.
· Manage the delivery of up to five (5) Appraisal report and five (5) Appraisal Review.
· Develop up to eighty-three (83) parcel exhibits and legal descriptions.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 10 of 15
CITY Responsibilities:
· Review and approve valuation (AOS) schedule.
· Review and approve by signature all AOS reports.
· Review and approve parcel exhibits and legal descriptions
Assumption(s):
· CITY shall provide all information to CONSULTANT that is required to complete the assigned
appraisals, typically information from City permitting department.
· It is anticipated there will be a total of up to seventy-eight (78) parcel AOS reports. Five (5) Appraisal
report and five (5) Appraisal Review report. Appraisal Review report.
· Valuations for AOS’s will be based on comparable properties of the same type, size, use and
configuration.
· If it is determined that the value of any parcel is more than $35,000, or the valuation is determined to
be complex in nature, or an appraisal is necessary, the cost for the appraisal, appraisal review and
level of effort for those parcels will be renegotiated and adjusted accordingly. This will result in
additional costs to the CITY.
· For the appraisals that are needed, the following applies:
o All valuation services will be performed by a certified independent appraiser.
o Appraisals will be before and after short form narrative appraisal reports.
o NTP for the appraiser will be the date of receipt of sufficient right of way plans or exhibits;
title information; and landowner contact information.
o The estimated delivery schedule for the appraisal reports and AOS documents is within ten
(10) weeks from the date of NTP.
o NTP for the review appraiser will be upon delivery of the appraisal report. Estimated delivery
time is 30 days from NTP.
Deliverables:
· Valuation schedule.
· Draft and Final Administrative Offer Summary Reports.
· Landowner contact letters, if applicable.
· Appraisal Reports.
· Appraisal Reviews.
· Up to eighty-three (83) parcel exhibits and legal descriptions
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 11 of 15
ACQUISITION AND NEGOTIATION SERVICES
CONSULTANT will prepare offer packages, present offers, and negotiate purchases, prepare administrative
settlement memos, prepare executed documents for CITY approval and processing for a maximum of eighty-
three (83) acquisition parcels. All files will be transmitted to the CITY with all original documents at the
completion of negotiations. Services include:
· Prepare and maintain electronic and hard copy parcel files.
· Review title reports (limited to the last deed of record for up to eighty-three (83) parcels).
· Review ROW plans, exhibits and legal descriptions for up to eighty-three (83) parcels.
· Prepare and provide all documents required for the assigned parcels including Offer Letters,
Easements, W-9s, Real Property Vouchers, Real Estate Tax Affidavits, Escrow Agreements (if
applicable), and Negotiator Diaries.
· Make corrections based on WSDOT spot check comments of AOS offer packets
· Act as the agent of the CITY in negotiations.
· Make a maximum of four (4) good faith contact attempts with each of the impacted landowners in an
effort to negotiate a fair settlement.
· Acquire fee acquisition, permanent easements and temporary easements, as approved by the CITY.
· Provide a justification memorandum for settlements above the approved offering price, for approval
by the CITY.
· Provide a condemnation cover memorandum and parcel file, as approved by the CITY.
· Process all landowner payments through the CITY.
· Transmit completed parcel files to the CITY.
CITY Responsibilities:
· Provide CONSULTANT with a copy of WSDOT approved Right-of-Way acquisition procedures dated
within the last 3 years (if available).
· Approve all real estate documents and forms that CONSULTANT will use consistent with CITY
acquisition practice.
· Approve a minimum of one (1) preliminary offer package prior to any offer being made.
· Provide written approval for all administrative settlements agreed to by the City.
· Approve all landowner payments.
· Make prompt payment to the owner or Escrow Company for all approved acquisitions.
· Review and approve all transmitted files prepared by the CONSULTANT.
· Record all necessary documents upon receipt of transmitted files.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 12 of 15
Assumption(s):
· CONSULTANT shall follow the Uniform Relocation Act, WSDOT Local Agency Guidelines (LAG) manual,
all applicable State and Local laws and CITY administrative rules for R/W acquisition for all real estate
services provided for this project. WSDOT ROW Manual procedures & guidelines.
· CITY will provide the CONSULTANT with available project information such as but not limited to the
CITY’s WSDOT approved R/W procedures, if available.
· The CONSULTANT’s title review responsibilities shall be to identify the correct vesting from the title
report, inputting that information into the appropriate acquisition documents.
· CONSULTANT shall make the initial offer to purchase in person if possible, or by certified mail.
· CONSULTANT shall provide a maximum of four (4) good- faith attempts at negotiations for up to
eighty-three (83) parcels assigned, with those attempts being defined as an in-person visit with
landowner (physical or virtual), a detailed phone conversation, a substantive correspondence or
email exchange.
· If negotiations cannot be concluded within 90 days of the offer date on any given parcel or if an
appraisal is requested by a landowner of any AOS parcel, then the hours to complete those parcels
will be re-negotiated and adjusted accordingly.
· CONSULTANT’S acquisition duties shall be deemed complete if any of the following occur:
o A negotiated settlement approved by the CITY is reached and the necessary closing
documents are executed.
o The offer to purchase is rescinded by the City and the parcel is no longer needed.
o A P&U is secured, and the acquisition file is transmitted to CITY.
o A negotiated settlement cannot be reached after the fourth good faith attempt.
o If an impasse is reached during negotiations, the entire parcel file shall be turned over to the
CITY for further action, including determination to eliminate acquisition of property.
· The CITY agrees to pay all title, closing, escrow or other fees (if applicable).
Deliverables:
o Up to eighty-three (83) Offer packages with executed acquisition documents for closing by
the CITY.
o Up to one (1) QA/QC review of offer packages, including ROW Plans, legal descriptions and
exhibits for up to eighty-three (83) parcels.
o Administrative settlement memorandum (if needed).
o Possession and Use Agreements (if needed).
o Files recommended for condemnation proceedings (if needed).
o Up to eighty-three (83) completed parcel files.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 13 of 15
RELOCATION SERVICES
CONSULTANT following the relocation plan, will prepare and present all relocation notices and benefit letters,
provide relocation services, prepare, and develop an appeals process, administer relocation reviews and
appeals, prepare executed documents for City approval, and process all relocation payments for up to one (1)
Landlord business and three (3) residential relocations and one (1) personal property only (PPO). At the end
of the project all relocation files will be transmitted to the CITY with all the original documents.
· Develop appeals process and provide one staff member for the relocation review panel.
· Prepare all relocation documents per Chapter 12 of the WSDOT ROW Manual.
· Act as the CITY’s relocation agent for all affected parcels.
· Administer relocation reviews and approvals.
· Process all relocation payments.
· Transmit completed files to CITY.
CITY Responsibilities:
· Review and approve the relocation appeals process and provide at least one CITY staff members
to sit on the relocation review panel.
· Approve the format of all documents used.
· Review and authorize all relocation payments in advance.
· Make prompt payment to displacees for all approved relocations.
· Review and approve all transmitted files.
· Provide check copies as proof of payments to displacees.
Assumptions:
· One updated version of the relocation plan and appeals process will be prepared.
· CITY will have sufficient funding to pay for the relocation of any parcel assigned.
· All relocation forms will be approved by the CITY prior to their use.
· There will be a maximum of one (1) Landlord business and three (3) residential relocations.
· There will be a maximum of one (1) Personal Property only (PPO)
· All relocation services will follow the Uniform Relocation Act and WSDOT LAG manual standards.
Deliverables:
· Updated Relocation plan
· Relocation appeals process.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 14 of 15
· Relocation Documents.
· Relocation Services.
· Administer appeals and provide one appeals board member if needed.
· Completed files.
PREPARE RIGHT OF WAY CERTIFICATION PACKAGE
CONSULTANT shall work with the CITY and WSDOT Local Agency Coordinator (LAC) to prepare all files for
certification to the standards of the WSDOT LAG manual and prepare a certification memo for CITY.
· Prepare acquisition files and documents for pre-acquisition review by WSDOT.
· Attend the WSDOT pre-acquisition review meeting.
· Prepare post-acquisition files for certification.
· Prepare Draft Certification Memo.
· Participate in WSDOT LPA certification review.
CITY Responsibilities
· CITY shall supply all WSDOT LAC ROW documentation needed for parcel files to CONSULTANT in
advance of all WSDOT reviews.
· If WSDOT LAC ROW documentation is unavailable, the CITY agrees to facilitate and attend a
coordination meeting with the WSDOT LAC upon completion of NEPA and prior to the start of
acquisition activities.
· Review files prior to pre- and post-acquisition certification WSDOT review.
· Review and approve draft certification memo.
· Transmit final certification memo(s) to WSDOT LAC.
· Participate in WSDOT LPA certification review.
Assumption(s)
· A maximum of eighty-three (83) acquisition files shall be prepared for certification.
· There will be a maximum of one draft certification memo prepared.
· There will be a maximum of one certification review meeting of a maximum of two (2) hours duration
each for pre-acquisition and post-acquisition file review.
Deliverables:
· Up to eighty-three (83) acquisition files prepared for certification.
Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR
Page 15 of 15
· Up to one (1) draft certification memo.
TASK 14. DESIGN SERVICES DURING ROW PHASE
This task will be utilized to provide known and unknown design tasks as they present themselves during ROW
phase negotiations. This work will include but not limited to structural design of retaining walls, modification
to property frontage and property access, landscaping associated with the cemetery frontage, modification to
sidewalk and ramp design if needed. The fee estimate accounts for assumed design, scope and fee will be
provided as task present themselves for approval prior to commencement of work.
CITY Responsibilities
· Provide CONSULTANT with directive approval to complete work under this task.
Assumption(s)
· CONSULTANT and CITY will mutually agree to timeline durations and budget for work completed
under this task order prior to work beginning.
· To streamline delivery additional work will be requested and approved in writing via email.
· The CONSULTANT to incorporate changes into the final design of the project.
Deliverables:
· To be determined as each project change is enacted.
TASK 15. MANAGEMENT RESERVE FUND
A Management Reserved Fund (MRF) $70,000, roughly 5%, is to be utilized only for unforeseen added work
that is not included in this AGREEMENT. This amendment adds additional funds to the MRF to account for
these unforeseen items.
The CONSULTANT shall obtain written authorization from the AGENCY prior to doing any work under MRF
through the city’s Management Reserve Authorization form. CONSULTANT compensation for work done
under MRF must be approved by the AGENCY prior to doing the work.
LABOR ESTIMATE, HDR ENGINEERING STAFFCity of Bremerton: Navel Ave Pedestrian and Bicycle EnhancementsAcevedo, Robert CBush, Jaelen AlexanderFrench, Cameron CParenteau, Trevor MichaelRoderick, Andy PPauly, Sarah CElder, Bailie DawnGould, Paul FPfiester, Benjamin AWillis, Lynn KNapiorkowski, Tomasz William (Tom)Barney, Hayley LynnKhinvasara, Saurabh SachinVo, John-Viet TFrankel, Isabelle GraceGurrad, Matthew CTotal Project RoleProject Manager/Traffic LeadEIT SanitaryRoadway / Water EngineerCAD Technician Real Estate ManagerROW Admin RES Agent 1 ROW Specialest ROW Tech RES Agent Sr Traffic Designer Project Accountant Structural EIT Structural Engineer Civil EIT Landscaping LeadLabor HoursTotal Labor DollarsBilling Rate286.40 128.58 187.05 114.87 233.96 134.78 112.95 193.99 121.16 159.05 164.16 120.69 130.36 254.38 130.79 207.281173000000000301080000311 67,506.52$ Project Setup64102,201.16$ Project Mgmt Plan / Quality Mgmt Plan / HASP 4481,628.36$ Coordination and Monitoring 606017,184.00$ Invoicing / Status Reporting / EV / WorkPlan 307210217,281.68$ Subconsultant Management 2420449,287.40$ Project Closeout48122,111.12$ Meetings and prep45307517,812.80$ 84000000000220000026 4,757.12$ 15th Street Signal Warrant Analysis 422264,757.12$ 12344022400000002200001800536 83,248.10$ Civil 12 20180 180 39258,825.20$ Stormwater 2 4022208412,128.50$ Utilities Coordination1232448,689.92$ Traffic 88163,604.48$ 2020-2024 Escalation0-$ 1300007351037 1070 286 1150 10400000005318 792,811.10$ 13.1.1 Project file setup10 110 20032039,755.40$ 13.1.2 Title Reports and Title Reviews5 15516022,060.70$ 13.1.3 Right of Entry documents10 10 10 10406,028.50$ 13.2.1 Relocation Plan Update416203,642.96$ 13.3.1 Project reports10 30406,383.00$ 13.3.2 Coordinating and monitoring80 4012024,108.00$ 13.3.3 Attend meeting40 84810,436.64$ 13.3.4 Project closeout and QC10 20021029,295.60$ 13.4.1 Manage delivery of AOS and appraisals10 10 406010,049.40$ 13.5.1 Acquisition and Negotiations - Document Prep10 250 5031045,734.10$ 13.5.2 Acquisition and Negotiations - negotiations500 700 800 7602760413,851.00$ 13.5.3 Acquisition and Negotiations - Agreement processing10 40 40 40 4017023,457.20$ 13.5.4 Agreement processing - File management and Transmittal100 6016020,255.00$ 13.6.1 Relocation Services - Support 160 300 20066099,196.40$ 13.6.2 Relocation Services - PPO60 208010,656.80$ 13.6.3 Relocation Services - File management and Transmittal40 408013,150.80$ 13.7.1 ROW Certification Package - Prepare files for certification by WSDOT40 408014,749.60$ 1480062000000220020080160100830133,605.14$ Ped Ramp design 21880 80 18026,236.46$ Driveway Ramp design 224120 80 22633,492.08$ Structural Wall Design 21216 200 80 31051,000.20$ Landscaping 284100 11422,876.40$ Task Total Hours 219.00 40.00 22.00 102.00 735.00 1037.00 1070.00 286.00 1150.00 1040.00 492.00 108.00 200.00 80.00 340.00 100.00 7021.00Task Total Fee 62,721.60$ 5,143.20$ 4,115.10$ 11,716.74$ 171,960.60$ 139,766.86$ 120,856.50$ 55,481.14$ 139,334.00$ 165,412.00$ 80,766.72$ 13,034.52$ 26,072.00$ 20,350.40$ 44,468.60$ 20,728.00$ 1,081,927.98$ Project Management & AdministrationTraffic AnalysisFinal Design - PS&EReal Estate ServicesDesign Services During ROW Phase c:\pwworking\west01\d3785060\Bremerton Naval Bike Ped Improv_Amendment 4_ESTIMATE.xlsmPrinted 9/24/20242:42 PM
EXPENSESCity of Bremerton: Navel Ave Pedestrian and Bicycle EnhancementsMileage/mile (IRS starting 7/1/22)Copies/Page 11x17 B&WCopies/Page 11x17 ColorCopies/Page 8.5x11 B&WCopies/Page 8.5x11 ColorExpress Mail MiscellaneousTravel Office Expenses Office Expenses Office Expenses Office Expenses Office Expenses MiscellaneousOTHER DIRECT COSTSEach Each Each Each Each Each EachUnit Cost$0.625 $0.090 $0.900 $0.050 $0.450 $25.000 $10.000 $3.70 0.00% 0.00%8Quantity 2200000000.00Task Total$137.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $137.50 $0.00$137.5012Quantity 2200000000.00Task Total$137.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $137.50 $0.00$137.5013Quantity 5000 1000 700 12000 2000 80 80 0.00Task Total$3,125.00 $90.00 $630.00 $600.00 $900.00 $2,000.00 $800.00$0.00 $0.00 $8,145.00 $0.00$8,145.0014Quantity0.00Task Total$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00 $0.00 $0.00$0.00Total ODC 3,400.00$ 90.00$ 630.00$ 600.00$ 900.00$ 2,000.00$ 800.00$ -$ -$ 8,420.00$ -$ 8,420.00$ Real Estate ServicesDesign Services During ROW Phase ContingencyTech FeesTotal ODCODC MarkupTotal ODC + MarkupFinal Design - PS&ETraffic Analysisc:\pwworking\west01\d3785060\Bremerton Naval Bike Ped Improv_Amendment 4_ESTIMATE.xlsm
SUBCONSULTANTSCity of Bremerton: Navel Ave Pedestrian and Bicycle EnhancementsLingeman Valuation Duncan Appraisal DR Surveying PH Consulting IdaxSUBCONSULTANTS0.00%1Task Total$0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.008Task Total$0.00 $0.00 $0.00 $0.00 $1,450.00$1,450.00 $0.00$1,450.0012Task Total$0.00 $0.00 $0.00 $21,982.70 $0.00$21,982.70 $0.00$21,982.7013Task Total$119,400.00 $7,500.00 $46,620.00 $0.00 $0.00$173,520.00 $0.00$173,520.0014Task Total$0.00 $0.00 $0.00 $0.00 $0.00$0.00 $0.00$0.00Total Subconsultants 119,400.00$ 7,500.00$ 46,620.00$ 21,982.70$ 1,450.00$ 196,952.70$ -$ 196,952.70$ Traffic AnalysisFinal Design - PS&EReal Estate ServicesDesign Services During ROW Phase Total SubconsultantsSub MarkupTotal Subconsultants + MarkupProject Management & Administrationc:\pwworking\west01\d3785060\Bremerton Naval Bike Ped Improv_Amendment 4_ESTIMATE.xlsm
FEE ESTIMATECity of Bremerton: Navel Ave Pedestrian and Bicycle EnhancementsTask # Task DescriptionTotal LaborTotal ExpensesTotal SubconsultantsTotal For ProposalTotal For Proposal1 Project Management & Administration$67,507 $0 $0$67,5078 Traffic Analysis$4,757 $138 $1,450$6,34512 Final Design - PS&E$83,248 $138 $21,983$105,36913 Real Estate Services$792,811 $8,145 $173,520$974,47614 Design Services During ROW Phase $133,605 $0 $0$133,605$1,081,928 $8,421 $196,953 $1,287,302 $070,000.00$ -$ 103,649.75$ -$ $1,460,952 -$ Management Reserve Fund2020-2024 Escalation - Task 12c:\pwworking\west01\d3785060\Bremerton Naval Bike Ped Improv_Amendment 4_ESTIMATE.xlsmPage 1
Naval Ave
Council Meeting
January 15, 2025
1st to 15th Bike& PedEnhancementProject
Vicki Grover, P.E. – PW&U Engineering Division – City Project Manager
PROJECT HISTORY
•WSDOT Bike Ped Grant 2018, Council Accepted $620K on August
7, 2019
•Start Design January2020
•1st Virtual Online Open House – 6-26-2020 – online survey open
and open house website (June 26th – July 10
th)
•SAG Meeting 1 – 10-5-2020
•SAG Meeting 2 – 11-5-2021
•2nd Online Open House and Webinar – 10-10-2022
•PSRC Grant Application for Phase 1 – July 2021
•PSRC Grant Application for Phase 2 –July 2023
•PSRC Grant for Phase 1 Awarded – March 2022
Council Accepted $1.6M Phase 1 on June 15, 2022
Council Accepted $700K Phase 2 on December 20, 2023
•SEPA Approval 12/15/2023
•NEPA Approval 03/25/2024
Design Dates
•30% Design June 2020
•60% Design Sept. 2021
•90% Design April 2024
Estimated Schedule
•ROW Acquisition 2025 - 2026
•Go out to Bid – 12/2026
•Construction – 2027 2028
Next Step –ROW Acquisition
This Contract Modification #4 covers time and expenses for the Right-of-Way (ROW) acquisition phase,
including project management, ROW acquisition support, design adjustments from ROW changes, and grant
support.
Tasks Include:
•Pre-Acquisition and Data Management: Title reports, ROE agreements, and initial data collection.
•Management and Administration of ROW Process: Coordination, reporting, and QA/QC of ROW tasks.
•Valuation Process: AOS, appraisals, and parcel documentation for up to 83 parcels.
•Acquisition and Negotiation Services: Offer preparation, negotiations, and parcel acquisitions.
•Relocation Services: Relocation planning, execution, and appeals for affected parties.
•Right-of-Way Certification: Certification file preparation and WSDOT compliance.
ROW Needs
Permanent Acquisition (FEE) –39 Parcels 224,709 S.F.
Temporary Construction Easement (TCE) –79 Parcels 26,333 S.F.
Total of 83 unique parcels
Contract Cost
$1,460,952
Project Risks & Constraints
•WSDOT requires continuous progress.
•Redesign will pause the ROW process and
further design scope is unfunded.
•Pause in the ROW phase puts current
funding at risk.
Questions / Discussion
Published for
January 8
Study Session
Item B6
Public Comments
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Tuesday, December 17, 2024 9:56 AM
To: cory.derenburger@gmail.com
Cc: Vicki Grover <Vicki.Grover@ci.bremerton.wa.us>; Ned Lever <Ned.Lever@ci.bremerton.wa.us>;
Shane Weber <Shane.Weber@ci.bremerton.wa.us>; Thomas Knuckey
<Thomas.Knuckey@ci.bremerton.wa.us>; Public Works & Utilities Customer Response
<bremerton1@ci.bremerton.wa.us>; Gunnar Fridriksson <Gunnar.Fridriksson@ci.bremerton.wa.us>;
City Council <City.Council@ci.bremerton.wa.us>
Subject: RE: Naval and 6th Street Projects Question
Cory,
Thank you for the thoughtful and detailed email. As you’re probably aware, use of bicycle signal
indications is highly dependent upon several factors including intersection configuration,
vehicle/bike volumes, peak hour turning volumes, and intersection operational requirements, and
studies which would warrant separating bicycle movement from vehicle movements. If you’re
interested, there is some new guidance related to bike signals in the Manual on Uniform Traffic
Control Devices, 11th Edition, Part 4 (https://mutcd.fhwa.dot.gov/pdfs/11th_Edition/part4.pdf).
To date for the 6th Street project, we have not excluded bike signalization from consideration on the
project, but further evaluation would be required based on identification on a preferred corridor
layout. Additionally, as previously communicated on the project, we are seeking to deliver a
balanced and cost-conscious project which is currently budget constrained. Some project
elements could potentially be evaluated, recommended, and phased-in at a later date under a
separate project. At a minimum we would be making signal timing and detection adjustments
which considers the new on-street bicycle facilities and will also be looking at opportunities to
improve safety for pedestrians.
I appreciate the reference to NACTO’s dedicated intersection especially given its implementation
requires less space than a fully protected intersection – I will ensure this is included along with
other comments and suggestions provided as we work towards a viable preferred project
alternative. If you are not aware, there will be some initial discussion this afternoon at the Public
Works Committee meeting (https://www.bremertonwa.gov/Calendar.aspx?EID=3298) related to
multimodal level of service policy. While not directly related to the 6th Street project, any potential
new or updated policies related to multimodal transportation could more clearly inform active
transportation project development including the magnitude and type(s) of improvement. Once
such example of this for bicyclist is defining a methodology for Bicycle Level of Traffic Stress (BLTS)
which could be granular enough to differentiate intersection configurations such as the dedicated
intersection presented by NACTO.
Vicki Grover, copied on this email, may follow-up with more specifics related to the Naval project
as well.
Sincerely,
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Cory Derenburger <cory.derenburger@gmail.com>
Sent: Friday, December 13, 2024 9:38 PM
To: City Council <City.Council@ci.bremerton.wa.us>; Thomas Knuckey
<Thomas.Knuckey@ci.bremerton.wa.us>; Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Naval and 6th Street Projects Question
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Good evening,
I had a question about if there are any plans for bike signals in these projects? The
overview on the Naval project seems to allude to this, but I don't see much in the FAQ
about signal improvements on the 6th street project. The 6th Street plan from what I see
only shows the bike signal at Washington (which I do like heading south into the
sharrow). If there are plans for bike signals and detectors, generally what kind?
I will continue to advocate for a protected intersection and 6th and Naval, but even if we
cannot have a protected intersection there due to space or other considerations, can we
employ at a minimum the elements outlined in NACTO
Dedicated Intersections https://nacto.org/publication/dont-give-up-at-the-
intersection/dedicated-intersections/
Protected elements are more limited in this intersection design than a protected bike
intersection. It includes elements such as phased bike signaling, set back stop bar for
vehicles, and speed humps.
"Signals: Using a combination of a leading bike signal phase or interval, and setting back
the stop bar for motor vehicles, people on bikes get a head start before cars start turning. A
Leading Bike + Pedestrian Interval (LBI) can be provided if a shared through/turn lane is
next to the bikeway. If a dedicated right or left turn lane is next to the bikeway, protected-
permissive bike signal phasing should be considered.25 Protected signal phases should be
considered if turn volumes from the adjacent lane exceed 120 to 150 vph. Protected signal
phases should also be considered if conflicting left turn volumes (on two-way streets)
across the bikeway exceed 60 to 90 vph, or if these turns cross multiple traffic lanes."
I do not like turn pockets, please keep cyclists separated on the side in our own lane. This
helps with predictability for both motor vehicles and cyclists, and would go a long way to
reducing friction between road users and unsafe mixing at turn pockets.
*as a bonus the curb also gives us a foot rest at intersections, and helps us get moving
faster
If not in the plan, please consider adding bike signals and detectors, in addition to vehicle
setbacks from Dedicated Intersections.
I don't know the vph, but bike signals along 6th and Naval could make things safer for
cyclists, and I think drivers would benefit by knowing what is expected at each
intersection. Let's not make drivers and cyclists on these busy streets guess what the
other will do negotiating a merge or crossing an intersection, let's have the infrastructure
manage these interactions for all users and keep everyone safer.
Thank you,
Cory Derenburger
Bremerton
From: Heather Diane Pugh <pughhd@gmail.com>
Sent: Sunday, January 5, 2025 9:35 AM
To: City Council <City.Council@ci.bremerton.wa.us>; Greg Wheeler
<Greg.Wheeler@ci.bremerton.wa.us>; Thomas Knuckey <Thomas.Knuckey@ci.bremerton.wa.us>
Subject: Naval Avenue Project
Hi all,
Bremerton residents, myself included, want safer streets for non-car travel. This desire
is growing and now is the time to shift our focus. As I have expressed before, moving
cars in and out of Bremerton at greater speeds certainly benefits shipyard traffic but it
ignores what residents actually want - a safer place for live and recreate.
For example, I walk the Manette bridge often and the current car traffic priority (the new
roundabout on the west side) means less safety for everyone else moving about the
city. Increased speeds/reduced visibility for drivers entering the roundabout means it
can be challenging to cross the street by foot. Not only that, bike safety has now been
compromised. We can do better! And the Naval Ave project is our opportunity.
Other cities are planning for the future with a focus on public transit, completely
protected bike lanes, narrower roads, more trees, reduced parking lots, and we’ll even
see tolls for inner city driving (NYC would be the first of its kind in the US).
This letter is to ask that we employ creative planning that increases safety and livability
for Bremerton residents. Not only that, but build/rebuild roads for future growth that
encourage (and even force) reduced car travel.
Thanks for the opportunity to share my thoughts.
Heather Pugh
From: dianne iverson <diverson1950@gmail.com>
Sent: Sunday, January 5, 2025 10:13 AM
To: City Council <City.Council@ci.bremerton.wa.us>; Jane Rebelowski
<Jane.Rebelowski@ci.bremerton.wa.us>; Jeff Coughlin <Jeff.L.Coughlin@gmail.com>; Eric Younger
<eric.younger@ci.bremerton.wa.us>; Jennifer Chamberlin <Jennifer.Chamberlin@ci.bremerton.wa.us>;
Michael Goodnow <Michael.Goodnow@ci.bremerton.wa.us>; Anna Mockler
<Anna.Mockler@ci.bremerton.wa.us>; Denise Frey <Denise.Frey@ci.bremerton.wa.us>
Subject: Naval Avenue: Safety for all users makes a more livable city
Photo taken by Dianne Iverson in Victoria, BC in February 2024. Two individuals using
wheelchairs on a protected bike lane in Victoria, British Columbia.
To: Council President Younger and members of the City Council,
Re: Naval Avenue multimodal improvements need to be safer:
In 2019 as a member of the Naval Avenue Stakeholders Committee I proposed protected
bike lanes for Naval Avenue. A couple of weeks ago, I forwarded to you my original concept
that was presented to staff back in 2019 as a member of the committee. At that time, staff
was against protection for cyclists. My proposal for Naval Avenue protected bike lanes was
dismissed by staff. The issue has re-sufaced because more Bremerton families with
children are advocating for safer streets. Protection means a safer street for walkers,
bikers, and individuals who use wheelchairs.
Livability has been a term that has been used to describe your vision for Bremerton. I have
heard the Mayor and the Council publicly state that you all support livability. But what
does it mean to you? What does it mean to those of us who choose to live here? What
does it mean for families, for the elderly, for the disabled?
As a 74 year old resident of Bremerton who walks with a cane, bikes on a recumbent trike,
and uses a wheelchair, I too, am a believer in making Bremerton more livable. We share
that vision. One of the most important infrastructure needs for the most vulnerable in our
population is transportation. How people get from one place to another is an essential part
of livability for many of us.
So what does this have to do with Naval Avenue? Everything. Our city, like all American
cities, has been focused for 70 years on how to move automobiles and freight. Now, it is
time to think about transportation in a different way. How do we move people as well as
cars and freight. We can do both. And it is important that we do both, if we are wanting to
improve livability for all of us who choose to live here. We can no longer just be a place
where we are a highway for commuters.
So what does Naval Avenue need that will improve safety? Build community. Build a more
livable city? Here's a short list that research shows is effective.
1. Protection between active transportation users and cars. Paint is not protection.
2. No right turn on red, which is becoming a standard in many cities already. Cars turning
right at intersections is a safety hazard for walkers, bikers, and people who use
wheelchairs.
3. No mixing zones when possible. Take a bike ride with me on Kitsap Way and you will
experience many mixing zones of cars and bikes. The most dangerous zone is at SR
3/Kitsap Way on-ramp to Silverdale. Mixing zones are dangerous, and I will not cycle Kitsap
Way after the sun goes down. It is just too dangerous.
4. Light signals that give pedestrians, cyclists, and individuals who use wheelchairs
preference to move through an intersection.
5. Narrower crosswalks to protect the most vulnerable. Wider crosswalks that
incorporate turn pockets are more dangerous for our most vulnerable users. That's why on
Kitsap Way a refuge island was built in front of Brother Don's.
Let's raise the standard for safety for all of us as we upgrade our streets
in Bremerton. Let's learn from other communities throughout Puget Sound and across the
nation. Good road design is an essential component to making a city more livable. Let's
learn from each other and start to have a meaningful discussion about how to make our
streets safer. The staff recommendation for Naval Avenue to council is not safe enough.
Let's do it right the first time.Bremerton residents deserve better.
Dianne Iverson
diverson1950@gmail.com
From: Reama Schuldt <reama.schuldt@gmail.com>
Sent: Wednesday, December 18, 2024 6:46 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Cc: Michael Goodnow <Michael.Goodnow@ci.bremerton.wa.us>; Anna Mockler
<Anna.Mockler@ci.bremerton.wa.us>; The Schuldts <theschuldtfamily@gmail.com>; Jane Rebelowski
<Jane.Rebelowski@ci.bremerton.wa.us>
Subject: Happy New Year!
Hi City Council!
I hope your year end comes smoothly and 2025 kicks off without a hitch. I truly
appreciate you giving so much of your time and energy to this city that I love!
I want to thank you for your care on the Naval Ave project. I have been very interested
in the project since the first online meeting to talk about it. I watched the study session
video from last week. Thank you to the council members that continue to get into the
details on this plan.
I am deeply concerned about the removal of street trees, both those on p rivate property
and the ones on public land, like the Naval Elem play field and by the cemetery.
I own a home at 7th and Naval. I consider my family the current stewards of a home
that has seen generations of babies grow and people move through the decad es of their
lives. Built in 1915, the home is iconic and MANY people have said they consider it the
cutest home in the neighborhood. Part of the charm is the 50+ year old cherry tree that
is iconic on that strip of street.
Regarding public land trees, the Naval Elementary play field trees provide sun shade,
habitat for local wildlife (I've seen the cutest raccoon babies up there!), and they mirror
the trees on the opposite side of the field. These trees must be preserved. The other
trees I am concerned about are the ones along the cemetery. Those trees shade the
sidewalk.
I looked through the plan and it is difficult to tell which trees will be altered. If it turns out
these trees will be unharmed, then great. If it is in the plan to "remove and replace"
these trees, as Public Works said at the study session, that is very alarming! There is
NO replacing the gorgeous growth along the cemetery and in the playfield. There is NO
replacing a 50+ year old ornamental cherry tree.
Removing decades-old trees and replacing them (if that actually would ever happen)
defeats the very purpose of the Naval Ave road redesign, which is to make a bicycle
and pedestrian arterial.
The last thing I want to note in this email is that after the 6th Street open house where
PubWorks had two long maps laid out with design and seemed open to feedback, I
hoped this was how things were going to move forward. I heard PubWorks say that the
60% plan has been on the city website since 2022. I've done my very best to stay on top
of this project and be informed on changes happening steps from my door. However, I
do not recall any public comment invited at the 60% stage. Can you please send me a
copy of the 60% plan that they referenced? It's no longer on the website, having
been replaced with the 90% plan.
Also, can you clarify what communication has gone out to residents along Naval
on land acquisition? I'm concerned for my neighbors at 11th and Naval that will be
displaced when their home is removed. I'm concerned for my neighbors at 15th and
Naval that will have their front yard used as a construction parking lot.
Thank you always for your work to serve the residents of Bremerton. It's seen,
appreciated, and so valuable!
Happy holidays!
Reama Schuldt
Home owner in Bremerton
Business owner in Bremerton
P.s. Santatizer? Nice one, Council Member Younger!!
From: Travis Merrigan <bikebremerton@gmail.com>
Sent: Wednesday, December 11, 2024 1:40 AM
To: City Council <City.Council@ci.bremerton.wa.us>
Cc: Jeff Coughlin <Jeff.Coughlin@ci.bremerton.wa.us>; Anna Mockler
<Anna.Mockler@ci.bremerton.wa.us>; Jane Rebelowski <janerebelowski@yahoo.com>; Jennifer
Chamberlin <Jennifer.Chamberlin@ci.bremerton.wa.us>; Denise Frey
<Denise.Frey@ci.bremerton.wa.us>; Michael Goodnow <Michael.Goodnow@ci.bremerton.wa.us>; Eric
Younger <eric.younger@ci.bremerton.wa.us>
Subject: Naval Ave Project - do not approve $1.46m right-of-way acquisitions
Dear City Council,
I write in regards to the “Naval Avenue 1st to 15th Bicycle and Pedestrian Enhancements
Project”. Despite some excellent components, the City’s recently released ‘90% Plan’ for Naval
Ave will make the street less safe and cost too much.
I urge Council to delay implementation of the plan - do not rubber stamp the Administration's
request to begin right-of-way acquisitions. Let's slow down, allow the the public and council to
review the plan and improve it.
The Good:
The Naval Project has a couple of excellent elements, including:
-- An end-to-end bike lane from 1st to 15th
-- Safe, narrowed intersections at the small street crossings: 10th, 8th, 5th and 4th
The Bad:
However, the Naval plan falls well short in several critical areas, including
-- Large intersections will be made less safe due to lengthened crosswalks and long turn radii
that increase car turning speeds
-- Bike lanes are unprotected and incorporate turn pockets, which make the bike lanes unsafe
for children and other humans
-- The plan is extraordinarily expensive, with 83 right-of-way acquisitions, wholesale
removal/replacement of all existing sidewalks and power poles and widening of Naval Ave.
-- Lack of transparency. The City held a single public meeting, online, on a week day, and over
2 years ago. Neither the public nor Council has had an opportunity to weigh in on this plan.
The Naval 90% Plan should not be accepted without in-depth deliberation from City Council. On
such an expensive project, it would be prudent to commission a review from an outside
contractor (not our regular HDR or Parametrix) to see where improvements can be made.
-----
I respectfully submit three types of improvement - three principals to consider - applicable to
Naval Ave:
First, focus on safety in intersections - Intersections are where soft humans and big
machines directly cross paths. Most car-on-car and most car-on-human collisions occur in
intersections. According to the US DOT, “roughly one–quarter of traffic fatalities and about one–
half of all traffic injuries in the United States are attributed to intersections.”
The 90% plan for Naval would create (maintain) dangerous intersections with high Level of
Traffic Stress (LTS) at the large intersections: Burwell/Naval, 6th/Naval and 11th/Naval.
Because these intersections incorporate large radius corners, the encourage cars to turn at high
speeds, and design lengthens the crosswalk from the current, not-particularly safe status quo.
And these intersections contain ‘turn pocket’ style bike lanes, which are not safe for school
children. NACTO has great info about safe intersections - https://nacto.org/publication/dont-
give-up-at-the-intersection/protected-intersections/
‘A protected intersection, NACTO publication: https://nacto.org/publication/dont-give-up-at-
the-intersection/protected-intersections/ ‘
Second, build safe, modern bike infrastructure. Proposed bike lanes will result in a high
LTS, due to lack of protection, high traffic counts, turn pockets, and unsafe intersections. A high
LTS virtually ensures that children won’t ride in the bike lane. Bremerton should never again
build a bike lane that children can’t ride in, especially not for Naval Ave, which passes through
school zones. ‘Paint-only bike lanes’ are not modern bike infrastructure, please don’t fund
unprotected bike lanes.
‘Unprotected bike lanes attract illegally parked cars.’
Third, be cost efficient. Bremerton has many streets in need of safety improvements,
repaving, new sidewalks, etc. We should be as efficiency as possible, spread the improvements
widely. WA State budgets will likely be tighter in the future, and who knows what’s coming out of
DC. No is a time for high efficiency.
The recent Manette Roundabout project cost $8.3m for a project 4-5 blocks long or $1.7-2.1m
per block. The costs were high because 100% of the street was ripped out and replaced. The
Naval 90% Plan is every bit as ambitious as the roundabout and it stretches for 15 blocks. The
plan envisions 37 right-of-way acquisitions (!!), it would tear out virtually every existing sidewalk
and require move dozens of power poles and stormwater drains.
There’s a more efficient way to move forward. Seattle has a program called ‘Even Better Bike
Lanes’ that simply place inexpensive concrete barriers between soft humans and metal
machines. This technique can be complete for tens (maybe hundreds) of thousands of dollars
per block, not millions of dollars.
‘Even Better Bike Lane installation in Seattle.’
The City is committed to improvements on 6th and Naval. Great, let’s get them done efficiently.
Then let’s complete projects in the outlying areas, in every council district. Spread the money
widely and wisely. The City’s proposed plans for Naval and 6th Street don’t accomplish those
goals. Let’s do better.
Thanks,
Travis Merrigan
Bremerton
From: Travis Merrigan <bikebremerton@gmail.com>
Sent: Saturday, January 4, 2025 10:07 AM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: Update BMC 11.12.070 Traffic Impact Mitigation
Happy new year.
I believe Bremerton Municipal Code - 11.12.070 TRAFFIC IMPACT MITIGATION may be
inhibiting the construction of safe streets and requiring the construction of high-throughput
streets. The work need to be done quickly, because Public Works is declaring that it’s already
too late to have any effect on the safety elements of the Naval Ave street project.
Specifically, 11.12.070 states
(a) The City Engineer shall impose conditions necessary to mitigate all impacts of traffic,
circulation and parking resulting from a project… For segments… where the present LOS is
below the standard … the mitigation measure shall be sufficient in the estimation of the City
Engineer to maintain or exceed the present LOS. (full text link here.
In the Dec 17th Public Works Committee discussed their requirements for Level of Service
Naval Ave and 6th Street multimodal projects. On multiple occasions, Public Works officials
including the Director of PW and City Engineer, Ned Lever, stated that municipal code requires
PW to build only for car capacity, they have no responsibility to build safe streets.
In particular, the City Manager stated that he was required to maintain Level of Service - which
only measures rush-hour car backups. Quoting the City Engineer from Dec 17th, in response to
a question about removing turn pockets and making protected bike lanes, “We don’t have a
Level of Traffic Stress Policy, we only have a Level of service policy.” later he said “I think
engineering needs policy and standards that Council adopts. And so when all of these questions
come in about, why aren't [saying] why aren't you doing what Seattle's doing? Like, Bremerton
doesn't have an adopted standard…”
He continued: “I'd really like clarity about what you like when we comes to naval Ave… we need
to justify turn pockets because we're trying to maximize intersection, right?…. You're saying
you'd like to see bike lanes always on the curb line, but that's not our guidance right now, so.”
Public Works lacks guidance. They believe their job is fast rush-hour cars, not safe streets the
other 23 hours per day. does not believe safe streets are in their remit. That needs to change.
Here’s one part of the code that is currently weighted very heavily towards rush hour traffic.
Bremerton Municipal Code - 11.12.070 TRAFFIC IMPACT MITIGATION.
(a) The City Engineer shall impose conditions necessary to mitigate all impacts of traffic,
circulation and parking resulting from a project. For segments, intersections or other portions of
the street system for which a level of service (LOS) standard has been adopted within the
current comprehensive plan of the city, mitigation measures shall be sufficient, in the estimation
of the City Engineer, to assure that such segments, intersections or other portions of the street
system continue to meet or exceed the adopted LOS standards after full project occupancy and
operation. For segments, intersections or other portions of the street system for where the
present LOS is below the standard that has been adopted in the current comprehensive plan,
the mitigation measure shall be sufficient in the estimation of the City Engineer to maintain or
exceed the present LOS. . Mitigation measures may include, but are not limited to,
channelization; intersection modifications; signal installation, modification, or replacement;
installation of acceleration/deceleration lanes; turn lanes and medians.
Arguably, the Bremerton Municipal Code 11.10 Complete Streets contradicts the ‘rush-hour
only’ vision of streets. But Public Works doesn’t think so. So the City Council needs to act to
prevent more VERY UNSAFE PROJECTS - such as the Manette Roundabout - from being built.
Some examples of better city code:
But 2023 HB 1181, a major overhaul of the state’s Growth Management Act, replaces mentions
of “level of service” with “multimodal level of service.” It updated and improved RCW
36.70A.020.
… if the development causes the level of service on a locally owned or locally or
regionally operated transportation facility to decline below the standards… unless
transportation improvements or strategies to accommodate the impacts of development
are made concurrent with the development. These strategies may include ((increased))
active transportation facility improvements, increased or enhanced public transportation
service, ride-sharing programs,
It continues:
Priority must be given to inclusion of transportation facilities and services providing the
greatest multimodal safety benefit
In other words, LOS must be maintained UNLESS the project improves multimodal level of
service via improved pedestrian, cycling or transit improvements.
City of Bellingham measures not ‘Level of Service’ but ‘Multimodal Level of Service’ in its
Chapter 13.70 MULTIMODAL TRANSPORTATION CONCURRENCY MANAGEMENT.
Instead of just measuring how cars flow during the busiest time of day, they look at the capacity
for ‘person trips’. B. The purpose of this chapter is to establish a multimodal transportation
concurrency management program to ensure that adequate multimodal transportation capacity
in the form of “person trips” is available prior to, or concurrent with, final approval of
development permits.
Thank you for working to improve City Code.
Travis Merrigan
Bremerton
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Wednesday, January 8, 2025 1:07 PM
To: City Council <City.Council@ci.bremerton.wa.us>; Greg Wheeler
<Greg.Wheeler@ci.bremerton.wa.us>
Cc: dianne iverson <diverson1950@gmail.com>; Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>; Thomas
Knuckey <Thomas.Knuckey@ci.bremerton.wa.us>
Subject: Level of Service, 6th St. and Naval Ave.
City Council and Mayor Wheeler,
You're scheduled to get updates on the 6th Street project shortly. Things I hope you
consider for this project and for Naval Avenue:
Level of Service:
You have the ability to choose safety over Level of Service (LOS) on transportation
projects. The Council can vote to ignore arbitrary LOS benchmarks on even a project-
specific basis. City staff was incorrect in telling you the Growth Management Act (GMA)
forces you to meet LOS benchmarks in the Mid-December study session, and should
publicly correct themselves on such an important point.
Councilmember Rebelowski was right to express doubt about this point in the study
session. Bremerton's own 6th Street and 11th Street Study recommends giving 11th Street
a road diet in addition to 6th, in spite of projections showing it would drop our LOS below
current goals. Nick Ataie, one of our city's representatives to the GMA-related Puget Sound
Regional Council, has also said you can vote to ignore LOS. Other cities around Puget
Sound routinely choose safety over LOS, evidenced by the multitude of LOS-constraining
safety projects moving forward in areas of Seattle and Tacoma with significantly heavier
traffic than Bremerton.
6th Street:
There appears to be ample room to fit in a "dedicated intersection" at 6th and Naval to
eliminate the need for kids from Naval Avenue Elementary to snake in between multiple
lanes of traffic in the "turn pockets" designed for both 6th Street and Naval. No-turn-on-red
signs and dedicated intersections can likely eliminate the need for them throughout the
rest of the two projects. In my email chain with planner Nick Ataie, below, I outline
arguments about why there's likely room for a "dedicated intersection" at 6th and Naval,
enabling protected bike lanes to serve both routes.
The new AASHTO Guide for the Development of Bicycle Facilities (Fifth Edition, 2024) also
says "mixing zones," a.k.a. turn pockets, are not a preferred design feature. AASHTO
standards for bike infrastructure are generally less progressive and safety-minded than
NACTO standards, so it's notable if we're not even meeting AASHTO recommendations,
especially for projects serving two elementary schools.
Naval Ave and Public Feedback:
At the Mid-December study session, Public Works argued forcefully that it was
unreasonable to send their design for Naval Avenue back for a redesign. Their design
directly serves Naval Avenue Elementary School and asks those kids to make multiple
correct merging decisions in "turn pockets," and lacks lane protection. They characterized
the community feedback on this as arriving late and coming out of nowhere, which is
blatantly false. Dianne Iverson (copied), the bike community's main representative on the
Complete Streets Committee, has been calling for protected bike lanes on this project
since very early stakeholder feedback opportunities in 2019. The responsible course of
action for Public Works, early in this planning process, would have been to correctly inform
you of your ability to direct them to consider ignoring LOS benchmarks, rather than moving
ahead with such an unsafe design.
Perhaps the upcoming designs for 6th Street and Naval Avenue prioritize safety slightly
better than past iterations, but please do not be squeamish about requiring designs to fully
meet modern standards and the example set by our peer cities on Puget Sound. Please do
not fund either the 6th Street or Naval Avenue projects if they continue to include turn
pockets and fail to include protection for bike lanes. Our peer cities are not paying millions
of dollars for brand new obsolete bike infrastructure - especially on projects serving
elementary schools. Public Works is incorrect in saying LOS benchmarks are tying our
hands and that they were unaware the public might want to protect bike lanes for kids.
Thanks for your consideration,
Erik Pedersen
Bremerton Planning Commission
District 3 Resident
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Friday, December 13, 2024 11:38:26 AM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Fw: 6th Street Presentation
Nick,
I did a little more follow-up work on an argument for a protected/dedicated intersection based
on NACTO designs at 6th and Naval (and other intersection with "turn pockets" in your design)
I'd like to share with you.
It appears that we might have room for a protected or dedicated intersection at 6th and
Naval. The intersection of Dexter and Thomas in Seattle is the local example of a protected
intersection I'm aware of. Is that the one you referenced yesterday? My Google Earth Pro
mapping program shows it as not significantly wider than the 6th and Naval intersection you
propose to create after the right-of-way acquisitions (based on my rough observations of your
post right-of-way acquisition maps). The version of the Dexter and Thomas intersection shown
in aerial imagery isn't the current protected intersection configuration, but the curb-to-curb
measurements diagonally across the intersection are less than 100' in both directions (I do
realize the curbs have likely moved back in the current configuration).
However, your proposed 6th and Naval (post right-of-way acquisition) appears slightly larger
than this, or at least within just a foot or two in size (more than 100'). Furthermore, the parcels
at all four corners of this intersection include landscaping and/or simple surface parking areas
where slightly larger right-of-way acquisitions would be unlikely to significantly harm the
businesses on those parcels (which should keep costs down per the appraisals you'll do for the
acquisitions). To my layman's eyes, it seems like space is not preventing us from installing a
protected or dedicated intersection for 6th and Naval. Is that mostly correct? And if the
intersection isn't significantly wider, it likely wouldn't cost significantly more than your current
proposal, right?
That might simply leave bus turn radii as a limiting factor. It sure seems like buses make some
awfully tight turns at times (i.e. snaking from the Manette bridge into Manette's business
district). Are these bus turn radii requirements truly requirements, or are they simply
requests/recommendations? And would size constraints put us far out of whack with
recommendations, or would we be pretty close anyway? And might slightly larger right-of-way
acquisitions allow us to meet Kitsap Transit's request for bus turn radii in any case?
Thanks for your consideration and, again, thanks a lot for your time yesterday. I'm trying hard
to educate myself and other cyclists, so our comments can be better informed and more
useful.
Erik
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Thursday, December 12, 2024 4:23 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Re: 6th Street Presentation
Nick,
Thank you so much for your time today.
I found the photos of Eldridge Ave in Bellingham I was hunting for (attached). It's nothing
amazing - just an example of folks fitting plastic bollards in wherever they could, on a street
like 6th with lots of driveways.
Also, in a scenario where we can fit in protected lanes on 6th and Naval Ave, (with or
without removing the center turn lanes), the intersection of 6th and Naval (and others with
turn pockets) could really use NACTO's "Dedicated Intersection." I'd prefer this project
(which serves an elementary school) not occur than move forward with turn pockets. It's a
nonstarter for an all ages route. I think the early BLTS systems WSDOT's was based on
automatically bump a route with turn pockets up to a 3 or 4. Dedicated intersections also
provide extra protection with corner wedges, while taking up less space than a full
"protected intersection."
https://nacto.org/publication/dont-give-up-at-the-intersection/dedicated-intersections/
This website begins describing the dedicated intersection by saying, "(p)eople on bikes can
be given a dedicated path through the intersection even where there is not enough space
for a full bike setback." It sounds like there might be room to fit something like this in at 6th
and Naval.
Thanks again for your time,
Erik
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Monday, December 9, 2024 2:24:34 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Re: 6th Street Presentation
Thanks.
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Monday, December 9, 2024 2:22:22 PM
To: Erik Pedersen <erikepedersen@hotmail.com>
Subject: RE: 6th Street Presentation
Sure – That works for me.
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Monday, December 9, 2024 2:20 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Re: 6th Street Presentation
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
My boss now wants to meet with me at noon on Thursday. Would 1:30 work?
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Monday, December 9, 2024 12:28:12 PM
To: Erik Pedersen <erikepedersen@hotmail.com>
Subject: RE: 6th Street Presentation
Sounds great – It’s on my calendar. Just call my cell # when you arrive and I’ll let you in from our
main door.
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Monday, December 9, 2024 12:26 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Re: 6th Street Presentation
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
I'd be happy to walk up on Thursday. Your maps and other info would undoubtedly be
helpful.
Noon?
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Monday, December 9, 2024 11:08:37 AM
To: Erik Pedersen <erikepedersen@hotmail.com>
Subject: RE: 6th Street Presentation
Erik,
That sounds wonderful! This Thursday would work for me around lunchtime. Otherwise I could be
available after lunch both this Wednesday and Thursday. Let me know what works for you. Happy
to make the journey downstairs or if you wanted to come by my office I could pull some information
up on my compute to share.
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Monday, December 9, 2024 9:23 AM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: Re: 6th Street Presentation
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Nick,
I'm really looking forward to that presentation. I would absolutely love and appreciate the
chance to meet up with you though. I'm clearly not a traffic engineer and have a lot to
learn.
I work on the fourth floor of the Norm Dicks Center, and there are always lunch tables
available on the fourth floor, so a brown bag lunch meeting would work for me most days.
(My office also has a whole conference room that's virtually never used.)
Might something like that work for you?
Many thanks,
Erik
360-961-4678
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Monday, December 9, 2024 8:55:42 AM
To: Erik Pedersen <erikepedersen@hotmail.com>
Subject: RE: 6th Street Presentation
Erik,
I wanted to let you know that staff will be discussing “Multimodal Level of Service” at the
December 17th Public Works Committee Meeting
(https://www.bremertonwa.gov/Calendar.aspx?EID=3298) and the meeting will be hybrid
allowing attendance in-person or virtually. While public comment is not allowed at these meetings,
the information to be discussed is very relevant to many of your questions regarding Bicycle Level
of Traffic Stress (BLTS).
The intent of this discussion is to determine what sort of policy the City could implement to provide
additional clarity on Complete Streets projects (including 6th Street) on how we appropriately
measure/define a “level of service” (or level of stress) for road users and how that “level of service”
translates to physical improvements. We used the WSDOT methodology as a starting point for
BLTS for the 6th Street project, but there are several other methodologies used by other agencies
and we are by no means tied to that.
Regarding your questions below, I’d be happy to discuss in more detail with you, but it would be a
lot of information to try and package in an email. Let me know if there is a way we could coordinate
a phone call or meet in person.
Thanks,
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Friday, November 15, 2024 2:13 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Cc: Jeff Coughlin <Jeff.Coughlin@ci.bremerton.wa.us>; Thomas Knuckey
<Thomas.Knuckey@ci.bremerton.wa.us>; City Council <City.Council@ci.bremerton.wa.us>; Greg
Wheeler <Greg.Wheeler@ci.bremerton.wa.us>; Jane Rebelowski
<Jane.Rebelowski@ci.bremerton.wa.us>; Denise Frey <Denise.Frey@ci.bremerton.wa.us>; Anna
Mockler <Anna.Mockler@ci.bremerton.wa.us>
Subject: Re: 6th Street Presentation
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Nick,
Thanks for the quick response. I hit you with a big email just now and we're headed into the
holiday season, so I can wait longer than that if you're willing to dig into BLTS
methodology. That'd be a significant service to the community that's worth waiting for.
Many thanks,
Erik
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Friday, November 15, 2024 2:07 PM
To: Erik Pedersen <erikepedersen@hotmail.com>
Cc: Jeff Coughlin <Jeff.Coughlin@ci.bremerton.wa.us>; Thomas Knuckey
<Thomas.Knuckey@ci.bremerton.wa.us>; City Council <City.Council@ci.bremerton.wa.us>; Greg
Wheeler <Greg.Wheeler@ci.bremerton.wa.us>; Jane Rebelowski
<Jane.Rebelowski@ci.bremerton.wa.us>; Denise Frey <Denise.Frey@ci.bremerton.wa.us>; Anna
Mockler <Anna.Mockler@ci.bremerton.wa.us>
Subject: RE: 6th Street Presentation
Erik,
Great seeing you Tuesday! Thank you for taking the time to dig into some of the previous studies,
the WSDOT level of traffic stress methodology, and pass forward some thoughtful
requests/questions.
If you could bear with me on responding (likely next week) it would be much appreciated.
I hope you have a wonderful weekend.
Nick
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Friday, November 15, 2024 12:36 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Cc: Jeff Coughlin <Jeff.Coughlin@ci.bremerton.wa.us>; Thomas Knuckey
<Thomas.Knuckey@ci.bremerton.wa.us>; City Council <City.Council@ci.bremerton.wa.us>; Greg
Wheeler <Greg.Wheeler@ci.bremerton.wa.us>; Jane Rebelowski
<Jane.Rebelowski@ci.bremerton.wa.us>; Denise Frey <Denise.Frey@ci.bremerton.wa.us>; Anna
Mockler <Anna.Mockler@ci.bremerton.wa.us>
Subject: 6th Street Presentation
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Nick,
Thanks for your presentation on the 6th Street project earlier this week. It seems like a step in
the right direction, especially with regard to your acknowledgement of WSDOT's Bicycle Level
of Traffic Stress (BLTS) evaluation system, which calls for protected or separated bike lanes in
many circumstances. Most of our peer cities on Puget Sound go beyond WSDOT's base goal of
BLTS 1 and 2 outcomes on their scale (only BLTS 1 is truly kid and novice-safe), but educating
the public about this concept is a big step forward.
The presentation brought up five main points in my mind:
1. I saw a BLTS chart shown in the center of the room on Tuesday, but none of the BLTS
evaluation outcomes shown along specific road sections. After digging into WSDOT's
BLTS guide, I wonder if this recent design consistently meets WSDOT's goal of BLTS 1
and 2 outcomes, since it's such a busy street. I looked at the City's 2020 6th Street and
11th Street Corridor Feasibility Study, and they use a different scale to measure traffic
volume than the Annual Average Daily Traffic (AADT) WSDOT's BLTS tables use. Can you
please make public the AADT figures for 6th Street and Public Works' own evaluation of
where their current design falls on WSDOT's BLTS tables?
2. WSDOT's explanation of how to use its BLTS tables also lists other considerations that
might degrade a road's ranking from, say, BLTS 2 to a BLTS 3 (which would then not
meet WSDOT standards), such as significant truck traffic or tons of intersecting roads
and driveways (which 6th Street has both of in abundance). I think WSDOT's BLTS tables
are more of a general guide than a comprehensive ruleset, and they also don't take
center turn lanes (as the recent design for 6th includes) into consideration. I'd argue the
center turn lane should bump 6th Street half-way down from the "1 thru lane per
direction" category to the "2 thru lanes per direction" category. In addition, the original
BLTS rating system, which WSDOT's guide is based on, judges that "turn pockets," which
sandwich cyclists between two lanes of car traffic and require them to make correct
merging decisions, automatically result in a BLTS grade of 3 or 4 and are unacceptable
on main bike network routes. No kid or novice cyclist should ever be asked to make
correct merging decisions or be sandwiched between lanes of cars and trucks. WSDOT
Design Manual M 22-01.23 shows an example of a "Protected Intersection" (p. 1310-45)
that avoids the need for turn pockets and would almost certainly save lives and increase
ridership when paired with protected lanes. Even if our new design for 6th technically
meets WSDOT's guidelines per their BLTS tables, it likely does not meet them in spirit
because of these other considerations.
3. Our evaluation of the 6th Street project should hinge on whether this is Bremerton's
main east-west all-ages-and-abilities route. The answer to this question effects every
other consideration. I argue that 6th Street should our all-ages route, and if we need to
do away with the center turn lane in narrow road sections to provide bike lanes with
ample space and ample protection, we must. The city has Burwell and 11th St. as our
big vehicle-movers, and there's two elementary schools on or near 6th Street (Naval
Ave. and Star of the Sea). Other peer cities of ours around Puget Sound have been
willing to cause a small increase in traffic, or remove a row of parking, on selected
streets in limited circumstances like this. A "neighborhood greenway" on, say,
8th Street could perhaps remove 6th Street's responsibility to serve all-ages-and-
abilities. However, until we see plans for a robust, continuous alternative, most of us
will argue that if the center turn lane on 6th needs to go, it needs to go. There would
still be space for a center turn lane along most of the route, so the extra traffic shouldn't
be bad in relation to the added safety benefits for all road users, including pedestrians
and those in vehicles.
4. For the next design presentation, can we please show the public the option of the mini
"jersey barriers" Seattle is installing nowadays? The public deserves to at least be made
aware of this option, whether we can afford to install them or not. The 2015 Federal
Highway Administration Separated Bike Lane Planning Design Guide shows that
concrete barriers do, in fact, increase protection from crashes (p. 85). That's also
intuitively true to us all.
5. Lastly, if there are any safety measures we're not including in our designs because of
cost alone, can we please make a list of them for future consideration? Budget
decisions are always difficult, but this type of transparency about our options and
decisions would be helpful for everyone engaged in this process.
Many thanks,
Erik Pedersen
Bremerton Planning Commission
District 3 Resident
360-961-4678
From: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Sent: Friday, November 8, 2024 8:00 AM
To: Erik Pedersen <erikepedersen@hotmail.com>
Subject: RE: 6th Street Details
Good morning Erik,
I’m glad you plan on attending the meeting next Tuesday!
I can provide some general information below for your questions, but I want to caveat these by
saying these questions are much better discussed in a conversation Tuesday and I don’t want to
create a situation where information could be taken out of context. I hope you and others can come
to the meeting with a collaborative mindset, ask questions, provide perspectives, and most
importantly provide feedback.
Protected Bike Lanes: We will be including design recommendations for protected bike lanes
(unspecified treatment type) at specific locations. We are using WSDOT methodology for Bicycle
Level of Traffic Stress (BLTS) as a basis for evaluating needs and also considering site-specific
factors. WSDOT refers to protected bike lanes as “separated” bike lanes. I can tell you that want
will be presented next week will not depict a fully protected bike lane corridor on 6th Street. The
rationale is likely more than I could get in an email so I would be happy to discuss in more depth at
the meeting. From a City maintenance standpoint, there has been quite the discussion on
considerations/needs for maintenance, but I wouldn’t say that is driving (no pun intended) the
decision-making process at this point.
Road Widening / Right Turn Pockets: One of the primary design goals of this project was to avoid
any roadway widening; I’m happy to say that we will, indeed, present a design concept which
includes no widening of the existing curbs. We will also have an option which shows curb widening
at only one intersection (Naval Ave). Both of these options will include some type of vehicle right-
turn treatment at that intersection to meet our current operations standards. The only other right-
turn lane needed to meet vehicle operation standards is in the WB direction at Warren Ave. Some
other existing right-turn lanes will be shown as removed as they were determined to not be
necessary for meeting operational requirements. Overall, much less potential anticipated bike
lane/turn lane conflict areas than what currently exists on Kitsap Way.
Thanks again for the email and providing some insight into priorities from the bike community; I’ll
see you Tuesday.
Nick
Nick Ataie, P.E., Project Manager - Transportation
City of Bremerton Engineering Division
Direct 360.473.2306 | Cell 564.222.0897
From: Erik Pedersen <erikepedersen@hotmail.com>
Sent: Thursday, November 7, 2024 6:14 PM
To: Nick Ataie <Nick.Ataie@ci.bremerton.wa.us>
Subject: 6th Street Details
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
Nick,
I'm very curious about the details on the 6th Street road diet project. I spent my whole
childhood growing up on 7th Street, so 6th was always the boogeyman between me and
the nearest park. I'll be there on Tuesday.
Do you know if the bike lanes will be protected?
Is there going to be any road widening at intersections? Will the bike lane have to merge
through any right turn lanes into "turn pockets"? Those are the things the bike community
will be looking for.
Thanks,
Erik Pedersen
District 3 Resident
RE: Naval Base Kitsap - Comment to Agenda Item B.6 on January 8, 2025 (Item 6.B on January
15, 2025)
From: Satter, Allison E CIV (USA)
Sent: Wednesday, January 8, 2025 4:13 PM
To: City Council; Jennifer Chamberlin; Denise Frey; Jeff Coughlin; Jane Rebelowski; Michael Goodnow;
Eric Younger
Cc: Hale, John W CAPT USN NAVB KITSAP SVD WA (USA); Baerg, Alexander T CAPT USN NAVB
KITSAP SVD WA (USA); Herbig, Jennifer D CIV USN NAVSHIPYDIMF PGS WA (USA); Thomas
Knuckey; Gunnar Fridriksson; Shane Weber; Ned Lever
Subject: RE: Naval Base Kitsap - Comment to Agenda Item B.6 and 6.B
Good Afternoon City of Bremerton’s City Council:
We would like to provide comment to the City’s proposal for the 6th Street and Naval Avenue road
projects for the Council’s consideration for the action on January 15) :
Naval Base Kitsap (NBK) commuters and/or visitors to NBK-Bremerton will continue to queue on
City Streets. Near the Naval Gate, it has been typical for queuing vehicles to back up on Naval
Avenue, and at times extend to 6th Street.
It is very typical to have minor issues at the Navy’s entry gate. Those small unavoidable issues
are a contributing factor to queuing. Those minor issues may close a entry gate lane for a few
minutes. At peak time, the Naval Gate may process ~12 cars a minute. A 5-minute delay at the
gate would delay the processing of ~60-cars; 60 cars queuing in one lane is ~1,200’. There is
~1,300’ from Naval Gate to 6th Street.
With the City proposals (6th and Naval Avenue) and the current NBK’s vehicle queuing, we
assume the current queuing distance will likely be increased. Part of our assumption includes that
the vehicles traveling to downtown/Ferry will also be within the NBK-vehicle queue instead of
having a lane open to avoid the line, thus adding to the backup.
The Navy has no funded plans to improve base access to NBK-Bremerton. We continue to have
an incentive program to support mass transportation, Worker/Driver program and van/car-pooling
commuting and we are conducting an analysis on NBK-Bremerton to try to improve traffic flow on
base. Though we are studying on-base traffic patterns, there are no funded plans to improve the
queuing at the NBK-Bremerton gates.
We also have no plans to reduce NBK-Bremerton’s operations currently. Currently, NBK-
Bremerton is studying projects to update the Shipyard, which includes analyzing if this work will
bring extra contractors to the shipyard (and how much). We should know more through the
Environmental Review to be released this year. Also, teleworking is implemented in some areas
on NBK-Bremerton but is always subject to Department of Defense and Federal policies which
are subject to change at any time. As such, we do not have plans to reduce NBK-Bremerton’s
workforce, but future actions may be increasing the population who comes to the base.
It is estimated NBK-Bremerton has approximately 18,000-25,000 people living and working on
base every day; majority of that workforce commutes to NBK-Bremerton. It has been identified
that at peak AM time, approximately 700 vehicles/hour enter at the Naval Avenue Gate.
Ensuring that the workforce can get to the installation to work is essential to maintain current
Navy operations. It is so important that Department of Defense provided funding to the City
($675,000 in 2020) to develop a plan to address the City’s transportation issues and ensure
Bremerton’s growth will not impede on NBK-Bremerton; that resulted in the City’s Joint
Compatibility Transportation Plan (JCTP).
We appreciate the City’s Staffs hard work to try to find solutions that accommodate all stakeholders into
the City’s proposed transportation projects. Navy understands the importance of safe and predictable
transportation routes for all modes of transportation.
I have also included Naval Base Kitsap’s Commanding Officer, Captain Hale, and Puget Sound Naval
Shipyard & Intermediate Facility’s Executive Director, Jennifer Herbig. We are available to help educate
on the Navy if the Council has any questions.
V/r,
Allison Satter
Community Planning & Liaison Officer (CPLO)
Naval Base Kitsap (NBK)
Cell: (360) 930-2934
Email: Allison.e.Satter.civ@us.navy.mil
Published for
January 15
Council Meeting
Item 6B
Public Comments
From: Jessica Mar�nez <jessicalouisemar�nez@gmail.com>
Sent: Monday, January 13, 2025 7:35 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: supplemental agreement no. 4
I see that supplemental agreement no. 4 is on the agenda for the council mee�ng tomorrow. Not sure if
you will be vo�ng at the same mee�ng or not but I sincerely hope that you will vote in favor of a plan
that will provide beter safety for pedestrians and cyclists vs. one that will move car traffic faster.
Both of my children had to navigate unsafe traffic when they atended naval avenue. We lived so close to
the school yet we never felt safe le�ng them walk to school without us.
My husband was struck by a city bus while cycling. His accident could have been prevented with good
bike infrastructure. He survived but as I’m sure you can imagine it was trauma�c. In addi�on to costly for
the jurisdic�on where this occurred.
No mater how you vote I know that you will have cons�tuents who will be unhappy and I don’t envy
your posi�on. Car traffic within the city limits doesn’t need to move any faster and I am happy to get
where I’m going later when it means my neighbors are safer. Happy to see my tax dollars being used for
real substan�al improvements.
I hope that you will seriously consider adding protected bike lanes and simplifying the car traffic near
naval avenue so that elementary school kids don’t have to navigate and try to understand complex car
traffic. Please vote in favor of residents safety over commuter speed and convenience.
Jessica Mar�nez
Sent from my iPhone
From: michelbike99@gmail.com <michelbike99@gmail.com>
Sent: Monday, January 13, 2025 8:49 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: Naval Avenue redesign
Dear Councilmembers.
Naval Avenue is a key North South corridor. We cycle it frequently and would dearly like to see
protected bike lanes, not just paint, on the upcoming redevelopment. The world has moved on and
now we know we need protection, not just paint, for active transportation. Let’s do it now rather
than waiting 10 years to realize our mistake and have to re-do it then!
We are much more likely to get grant money this way. Recent experience with Almira showed just
that; a mediocre proposal was turned down, but when it was done with the latest in active
transportation engineering, we got the grant. Safety is a priority, and the current preliminary design
does not offer that.
We would also like to see shorter pedestrian crossings. These have been shown to reduce car-
pedestrian accidents.
There’s a good case for making “no right turn on red” at some lights. This provides cyclists and
pedestrians with time to cross. We have had several close calls as both pedestrians and as cyclists
with a “right hook” with a car turning right on red.
Outreach- when will there be public hearings? Having said that, we saw from the sixth street event,
mumbled throughout the room was the phrase “protected bike lanes”. There was talk then of
having an ordinance passed that protected bike lanes would be the norm unless there were some
exceptional reasons NOT to have them. I look forward to such an ordinance.
Thank you for reading this, and we look forward to you defending a proper bike-friendly design.
Charlie & Carol Michel
(360) 710-0616 Cell
(360) 830-4984 Home
When it comes to addressing the climate crisis, none of us is off the hook… and we cannot solve a
crisis without treating it like a crisis.
From: David Schmitz <daviddschmitzz@gmail.com>
Sent: Tuesday, January 14, 2025 9:48 AM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: on the Naval Avenue road project
Councilmember Goodnow,
I grew up in Bremerton, attended Naval Avenue Elementary School for two years, and have lived within
District 5 for most of my life. Today I am writing about the Naval Avenue project. While a road diet and
bike lanes are necessary for Naval Avenue, there are a couple of details that I think could weigh down
the overall good of the project.
Firstly, having automobiles cross over a bike lane to reach a turn pocket seems unsafe for both cyclists
and motorists, and this is magnified if kids are to encounter this while biking to and from school.
Secondly, turn pockets would increase the distance of a crosswalk, resulting in pedestrians spending
more time exposed to car traffic -- again, this concern is magnified when kids walking to and from school
are part of the scenario. With this in mind, protected bike lanes would go a long way towards bicycle
mobility in that area and would make it safer for kids in addition to cyclists and motorists as a whole.
I would rather something formidable rather than incremental is implemented while we have the
opportunity, if only because something incremental might result in having to circle back and repeat the
process in a few years. To that end, I am reminded of KeyArena being basically outdated the day it
opened in 1995 after the remodel -- granted, we are not losing an NBA team here, nor do we necessarily
need to build the Climate Pledge Arena equivalent of street design and bike lanes, but we do need
something that will be sufficient for a while.
Thank you for your consideration.
David Schmitz
From:Barbara Hagedorn
To:City Council
Subject:Naval avenue
Date:Tuesday, January 14, 2025 4:21:37 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
I’m writing to voice my concerns re the Naval Ave improvements. I am especially concerned with getting protected
bike lanes. This road runs by an elementary school & I think the children’s safety, as well as that of pedestrians,
should be prioritized over getting folks who don’t even live in Bremerton, in & out of town quickly.
Please consider these thoughts as you make your decision.
Sincerely,
Barb Hagedorn
Sent from my iPhone
From:Jeff Iverson
To:City Council
Cc:Greg Wheeler
Subject:Naval Ave 90% plan
Date:Tuesday, January 14, 2025 11:39:48 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Dear Bremerton City Council Members
My name is Jeff Iverson, I live at 3701 6th St in Bremerton. Mr. Goodnow is my representative.
We do not support the Naval Avenue 90% plan. Please do not approve it! For too long Bremerton streets have been
designed and laid out for out-of-town commuters. We already have roads designed as thoroughfares (11th, Warren,
Kitsap, Burwell…), Naval Ave and 6th St do not need to be added to that list. Bremerton roads need to start being
managed for the people that live here, not just the people driving through.
Our streets and intersections need to be designed to protect the weakest of our residents, children, cyclists, and
handicapped. Roads in school zones should be made smaller with more obstructions to slow cars, isolated and
protected bike lanes are needed. Wider lanes and big corners at intersections only speed up traffic making it more
dangerous for our children navigating and crossing these streets.
When we moved back to Bremerton to start our family I had hoped that I could send my child to the same
elementary school I went, Crownhill Elementary (the one before the 1993 fire). We live just across Kitsap Way,
Crownhill and West Hills are both walking distance so there is no bus route for either. Our roads are so unsafe for a
child to navigate that they will never be able to walk to school, we’ve chosen to deliver them to a charter school
daily instead.
Please don’t support putting good money and intentions into bad plans.
Sincerely,
Jeff Iverson
Denise Portmann
Sebastian Iverson-Portmann
Sent from my iPad
From:Jessica Torrez-Riley
To:City Council
Subject:Naval Ave Project
Date:Tuesday, January 14, 2025 11:25:50 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
I’m very glad the city is taking on effort to make Naval Ave more safe for pedestrians and
bicyclists. As a resident of 5th street, I frequently walk this corridor and appreciate measures
to widen safe zones for people and slow down cars. It is my understanding that further review
and updates are needed, particularly for bicyclist safety. I encourage City Council to fine tune
existing plans to prioritize these elements as well as include more robust transit considerations
in planning for Naval and 6th Street road diets.
Thank you,
Jess
--
Jessica Torrez-Riley
C: 425-442-4712
linkedin.com/in/jessicatorrezriley
From:Zach Weaver
To:City Council
Subject:Naval avenue bike lanes
Date:Tuesday, January 14, 2025 4:57:47 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
I love that you are considering a "road diet" and bike lanes. I strongly advise against the "turn
pocket" that will force kids to bike into traffic. Cars do not pay attention to bikes. Putting this
next to an elementary school seems wildly irresponsible. Due to the proximity of the school
and the increased likelihood of a younger ridership, these bike lanes should be protected, not
jutting in between lanes.
I have two kids, and Naval should be the school that they walk to when they are old enough. I
want to feel like the city cares about their safety more than the throughput of cars. Please
prioritize the well being of folks that live here, not the convenience of rush hour.
Thank you,
Zach Weaver
From: B Anderson <anderson.b@wavecable.com>
Sent: Tuesday, January 14, 2025 7:14 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: Naval Avenue improvements
I support the efforts by the West Sound Cycle Club and Street Smart Bremerton to make the Naval
avenue design safer for cyclists and pedestrians. Naval Avenue has a park and elementary school. Many
families live on this street. My son, his partner, and young daughter live nearby. They walk to the park as
it is the nearest green space to their home. Their young daughter will soon be old enough to learn to
ride a bike. They walk their dogs through these neighborhoods. My son also walks to his job at Puget
Sound Naval Shipyard using Naval Avenue. They deserve a safe place to walk and their daughter
deserves a safe place to play. Please priori�ze the families that live in these neighborhoods in future
improvements to these roads.
Beth Anderson
360-620-0893
Sent from my iPad
From: Erin Larsen-Cooper <elarsencooper@gmail.com>
Sent: Tuesday, January 14, 2025 7:11 PM
To: City Council <City.Council@ci.bremerton.wa.us>; Greg Wheeler
<Greg.Wheeler@ci.bremerton.wa.us>
Subject: Naval Avenue Road Diet
Dear City Council,
Please vote against the current design for Naval Avenue. It's clearly not safe and we must do
better.
I'm a Bremerton resident with two small children. The risk of getting hurt or killed by a car is very
real to me. I have a lifelong disability from getting hit by a car while biking to work, which
might've been prevented by better bike infrastructure or a design that slows cars down. I'm
painfully reminded every day of the risks of unprotected bike lanes, turn pockets, and other
unsafe infrastructure. I want something better, and safer, for my kids.
I'm disheartened when I look at the unprotected bike lanes and the intersections where cyclists
are asked to merge between multiple rows of cars. I've biked a lot in other cities and towns, so
I've seen real-world examples of cities doing better. Protected bike lanes aren't new anymore.
Seattle and other cities are building "protected intersections". This infrastructure can save lives
or prevent others from getting hurt and disabled.
Naval Avenue is the home of Naval Avenue Elementary School. I'm appalled that we haven't
started from a place of designing this street with infrastructure that’s safe for kids.
I'm also a driver and I understand the need to get places in a car. But I would never trade getting
some place a few minutes faster, for potentially killing or injuring a pedestrian or cyclist. Let’s
design our streets like lives depend on it – because they do.
Thank you,
Erin Larsen-Cooper
Bremerton, WA
From: Kristen <smokeyspice@gmail.com>
Sent: Tuesday, January 14, 2025 7:28 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: Naval Ave project
Please do not approve the latest proposal for the area around Naval Ave that Public Works
is trying to push through without serious reconsideration of safety for bikers, walkers or our
disabled neighbors.
The goal of the plan should be prioritizing people’s safety who are not in cars. You want to
be a better city far into the future? Take into account that our current streets are not safe
for these activities and adopting the new plan put forth coupled with the projections of
population growth endangers your constituents.
Thank you for voting against this wholly unsafe proposal.
Sincerely,
Kristen Sluiter
1036 5th St.
"Laughter is the joyous, beautiful, universal evergreen of life."
~Abraham Lincoln
From: Robert Ford <bertford@gmail.com>
Sent: Wednesday, January 15, 2025 5:41 AM
To: City Council <City.Council@ci.bremerton.wa.us>; Greg Wheeler
<Greg.Wheeler@ci.bremerton.wa.us>
Subject: Concerns Regarding Proposed Redesign of 6th Avenue
Dear Members of the Bremerton City Council,
I am writing to express my serious concerns regarding the proposed redesign of 6th
Avenue, particularly the impacts on pedestrian safety around Navel Elementary. As a
former resident of Bremerton for the first 20 years of my life, I have a deep connection to
the community and the well-being of its residents, especially children.
This project will have a significant and long-lasting impact on the safety of 6th Avenue and
the surrounding neighborhood for decades to come. Therefore, it's crucial that the design
prioritize the safety and well-being of all users, especially the most vulnerable:
pedestrians, cyclists, and children.
The proposed widening of 6th Avenue raises several significant safety concerns:
• Increased Crossing Distances: Widening the street will inevitably increase the
distance pedestrians must cross, making it more difficult and dangerous, especially
for young children and elderly individuals.
• Wider Turning Radius: While intended to improve traffic flow, wider turning radii
can encourage higher speeds, making it more challenging for drivers to yield to
pedestrians in crosswalks.
• Potential for Increased Traffic Speeds: Wider lanes can inadvertently encourage
drivers to increase their speed, further endangering pedestrians.
I urge the City Council to carefully reconsider these aspects of the proposed redesign. I
believe the following modifications would significantly enhance pedestrian safety:
• Reduce Lane Widths: Narrower lanes can naturally slow traffic and improve driver
visibility of pedestrians.
• Implement Traffic Calming Measures: Consider incorporating traffic calming
measures such as speed bumps, raised crosswalks, or chicanes to further slow
traffic and improve pedestrian safety.
• Prioritize Pedestrian Safety: Re-evaluate the design to prioritize the safety of
pedestrians, particularly children, in the vicinity of the school.
I strongly believe that the safety of our children and all community members should be
paramount in any transportation project. I urge the City Council to carefully consider these
concerns and make necessary adjustments to the proposed 6th Avenue redesign to ensure
the safety and well-being of all who use this vital corridor for generations to come.
Sincerely,
Robert Ford
A protected bike lane: A Dad is escorting his son home from school on a
protected bike lane in a city of 124,000. Safety matters.
An open letter to the Bremerton City Council about Naval Avenue
safety improvements. city.council@ci.bremerton.wa.us
From: dianne iverson <diverson1950@gmail.com>
Sent: Wednesday, January 15, 2025 11:27 AM
To: City Council <City.Council@ci.bremerton.wa.us>
Subject: Naval Avenue Pause
What is the most important question concerning Naval Avenue active
transportation improvements?
For those of us who live in Bremerton, safety is our top priority. The current design of
Naval Avenue recommended by city staff does not meet the safety standards I want for
our city, for our children, and for those of us who are disabled. We can do better.
So what are the safety issues that need further discussion with the community
and the Navy?
1. No right turn on red for cars. People not in cars need time to cross at intersections
before the cars.
2. Length of the pedestrian crossing at intersections. Shorter crosswalks are safer. The
Mayor's design increases the length of the crosswalks which makes it less safe to cross
a street than what exists now before any improvements are even made. Cities across
Puget Sound are currently upgrading crosswalks so that they are shorter. Why?
Because shorter crosswalks are safer. Why is the city proposing lower safety standards
in this multi-million dollar project?
3. High-tech surface sensor for pedestrians, bikes and wheelchair users which gives
lead time for pedestrians, bikes, and people who use wheelchairs.
4. A higher level of protection than painted "bike lanes" (plastic barriers, concrete,
barriers, bollards) More people of all ages and abilities will use a higher level of
protection. Lack of safety is the number one reason for people choosing not to ride.
So what are the next steps in resolving the remaining safety issues for Bremerton
residents?
1.Take a pause. There is no construction money granted to this project right now. A
grant must be written using the design accepted by Council. To submit an unsafe
design for a grant is not a good investment of our taxes. Let's design a safer street for
active transportation users before writing a grant. A safer design increases the odds of
acquiring a grant. (Almira Drive did not receive funds with its first grant application
because the design was not safe enough for kids, for families and for those that use
wheelchairs. When the city improved its design on Almira, the grant was awarded.) If
Almira Drive, which connects a school to its neighborhood, can be upgraded to a safer
street design for all users, so can Naval. Naval Avenue deserves the same safety
standards as Almira Drive for its residents. It can be done.
2.Inform the neighborhood through in person discussions. More neighborhood
residents need to participate in the design process of our multi-modal upgrades on
Bremerton's streets. No one from the adjoining neighborhoods on Naval were asked to
serve on the Naval Avenue stakeholders committee. No one on the Naval Avenue
stakeholders committee lived near Naval Avenue. The City of Bremerton has a
responsibility to the local residents to do expanded outreach. An on-line survey is only
one tool for gathering information from residents. But an on-line tool doesn't serve to
bring people together and learn from each other to build common ground and
understanding.
Does the city have the resources to improve the Mayor's recommended design of
Naval Avenue? Yes. The city's engineering staff is capable of adjusting the current
design based on the community's needs. It does not have to go out for a contract if the
city chooses to use its own employees as the experts.
Bremerton can do better for its citizens. Former Mayor Lisa Helps of Victoria BC
dramatically improved her city for bikes, pedestrians, and people who use wheelchairs
over the last 7 years. When asked why she was able to complete the multi-faceted re-
design of her city's streets, she attributed it to extensive community outreach. See
photo below of two men in Victoria using the protected bike lane to move about the city.
Dianne Iverson
Member of the Naval Avenue stakeholders Committee
I've advocated for protected bike lanes on Naval since 2019.
From: Nish Chaudhary <nish_c@live.com>
Sent: Wednesday, January 15, 2025 12:18 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Cc: Greg Wheeler <Greg.Wheeler@ci.bremerton.wa.us>
Subject: Naval avenue bicycle and pedestrian improvements project
Dear City Council and Mayor,
I am writing to express my strong support for improvements to the Naval Avenue street design,
specifically to enhance safety for pedestrians, bicyclists, and other micro-mobility users.
As we face the urgent challenges of climate change, reducing greenhouse gas emissions from
transportation is critical. Transportation accounts for nearly 40% of emissions in Washington
state, and designing infrastructure that supports non-automobile travel is essential for a
sustainable future.
While I appreciate the city's efforts to improve the Naval Avenue corridor, the current proposed
design has several significant flaws that must be addressed for it to provide real options for
biking, walking, and rolling safely. These include:
1. Redesigning the "lateral design" sections between 5th & 6th Streets and 10th & 11th
Streets. The proposed "mixing zone" design creates conflicts between cyclists and
vehicles. Studies show that these are the least comfortable and safest options. Quoting
from (Monsere, C. 2019, section 5.10, Summary): “When considering the expected level
of comfort, protected intersections (bend-out) and bike signals were found to provide the
best expected rider comfort. Designs that move bicyclists and motorists into shared
space (mixing zones or lateral shifts) were viewed as least comfortable”. I urge the city
to adopt fully protected, bend-out designs as recommended by the FHWA’s separated
bike lane guidelines. See (FHWA-HEP-15-025, 2015)
2. Incorporating physical barriers for bike lanes. In a hilly, rainy area like ours, safety
requires more than paint and flex posts. Physical separation, such as metal bollards,
curbs, or planters, is essential to protect cyclists and encourage safe biking. This should
be standard across the entire corridor, with clear explanations when such treatments
aren’t feasible. Council should direct staff to ensure that the design explicitly
incorporates and lists these vertical elements before authorizing any further progress on
this project.
3. Reducing crossing distances on 11th Street. The sidewalk design should be modified to
shorten pedestrian crossings, in line with improvements on nearby streets, to reduce
the risk of vehicle-pedestrian collisions. The design accounts for this on 10th street and
15th street and needs to do the same on 11th street.
Additionally, it’s critical that the city shift from a "check-box" approach to safety design. The
community has repeatedly asked for infrastructure that truly protects cyclists and pedestrians,
including physical barriers and safe intersection designs. This feedback must be incorporated
into the design, rather than being dismissed.
The city has a responsibility to create a safe, accessible environment for all residents, in line
with its own municipal code (Ord. 5354 §2, 2018). It is disheartening to see repeated disregard
for the community’s input and the latest safety research.
We need a city leadership that is committed to shifting from car-centric infrastructure to a
multimodal transportation network.
In conclusion, I request that the City Council and Mayor direct staff to revise the design to
address these concerns before moving forward.
Thank you for your attention to this important matter.
Sincerely,
Nishchal Chaudhary
References:
1. Inventory, 2021 : https://ecology.wa.gov/air-climate/reducing-greenhouse-gas-
emissions/tracking-greenhouse-gases/ghg-inventories
2. Ord. 5354 §2 (part), 2018 : https://mrsc.org/getmedia/89cde056-8b0a-42ab-83d9-
830f7ad33275/b72o5354.pdf
3. Monsere, C et.al, 2019: Contextual Guidance at Intersections for Protected Bicycle
Lanes, Portland State University: https://ppms.trec.pdx.edu/media/project_files/NITC-
RR-987-Contextual_Guidance_at_Intersections_for_Protected_Bicycle_Lanes.pdf
4. FHWA-HEP-15-025, 205 : Separated Bike Lane Planning and Design Guide, Federal
Highway Administration.
https://www.fhwa.dot.gov/environment/bicycle_pedestrian/publications/separated_bi
kelane_pdg/separatedbikelane_pdg.pdf
Page 1 of 15
From: Jennifer Chamberlin Jennifer.Chamberlin@ci.bremerton.wa.us
Sent: Tuesday, January 14, 2025 6:01 PM
To: City Council City.Council@ci.bremerton.wa.us
Subject: FW: Re: Traffic Collision and Fatality Data in Bremerton (Travis Merrigan)
Sent with Sophos Secure Email
From: "Travis Merrigan" <bikebremerton@gmail.com>
Sent: January 14, 2025 08:01 AM
To: "Anna Mockler" <Anna.Mockler@ci.bremerton.wa.us>, "Jennifer Chamberlin"
<Jennifer.Chamberlin@ci.bremerton.wa.us>, "Jane Rebelowski" <janerebelowski@yahoo.com>, "Jeff
Coughlin" <Jeff.Coughlin@ci.bremerton.wa.us>, "Denise Frey" <Denise.Frey@ci.bremerton.wa.us>
Subject: FW: Re: Traffic Collision and Fatality Data in Bremerton (Travis Merrigan)
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Thanks for your interest, Anna. I'm including Jennifer because she asked for similar info, and members of the
PW Committee - thank you all for your work..
Here's a heatmap of car-on-pedestrian, injury collisions in Kitsap, 2014-24.
https://fortress.maptive.com/ver4/59305193b1ed56dc2e683104a06e1119/694118
Some screen grabs of the same - big hotspots on Warren/Wheaton, 6th St and Naval @ 6th and Naval at
Burwell.
Cheers,
Travis
2
3
On Mon, Jan 13, 2025 at 7:58 AM Anna Mockler <Anna.Mockler@ci.bremerton.wa.us> wrote:
Thank you, Travis, for your kind offer. I am trying to track down "heat maps" of vehicle collisions which were
produced on request by BPD through the end of 2023. In 2024, I was told that BPD's new software doesn't
permit the production of such maps.
I've been trying to get a response from BPD for a year now.
Anna
Anna Mockler
District Six Councilor
Government can't make things perfect: it can make them better.
4
From: Travis Merrigan <bikebremerton@gmail.com>
Sent: Friday, January 10, 2025 7:09 PM
To: Anna Mockler <Anna.Mockler@ci.bremerton.wa.us>
Subject: Re: Traffic Collision and Fatality Data in Bremerton (Travis Merrigan)
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
*internal
Anna,
I'd be happy to show you how to access the crash data. I've looked at it closely for months. We should sit
down at a laptop. I'll show you and teach you how to dig into the data yourself, if you're a data hound like me.
:)
On Fri, Jan 10, 2025 at 6:22 PM Anna Mockler <Anna.Mockler@ci.bremerton.wa.us> wrote:
Thank you so much for this, Travis. It would be great if Bremerton data were called out from this data set.
Councilor Chamberlin, you've told us in public as Council President that public safety data records has this
data for Bremerton, when I asked where it could be found, as I couldn't find it. Since Barbara Forbes of BPD
told me in early 2024 that BPD's new software no longer records such data, I really look forward to your
better knowledge of collected data.
Sincerely,
Anna
Anna Mockler
District Six Councilor
Government can't make things perfect: it can make them better.
From: City Council <City.Council@ci.bremerton.wa.us>
Sent: Friday, January 10, 2025 2:33 PM
To: Travis Merrigan; City Council
Cc: Greg Wheeler; Thomas Knuckey; Shane Weber; Ned Lever; Tom Wolfe
Subject: RE: Traffic Collision and Fatality Data in Bremerton (Travis Merrigan)
Mr. Merrigan,
Thank you for providing this information, which I have shared with the full Council.
It is appreciated that you took the time to submit this data.
Lori Smith
Legislative Office Manager
Bremerton City Council
(360) 473-5280
5
From: Travis Merrigan <bikebremerton@gmail.com>
Sent: Friday, January 10, 2025 2:26 PM
To: City Council <City.Council@ci.bremerton.wa.us>
Cc: Greg Wheeler <Greg.Wheeler@ci.bremerton.wa.us>; Thomas Knuckey
<Thomas.Knuckey@ci.bremerton.wa.us>; Shane Weber <Shane.Weber@ci.bremerton.wa.us>; Ned Lever
<Ned.Lever@ci.bremerton.wa.us>
Subject: Fwd: Traffic Collision and Fatality Data in Bremerton
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless
you recognize the sender and know the content is safe.
Greetings Councilors.
I had the pleasure of speaking with CM Chamberlin recently. She asked some really good questions about
how many deaths and serious injuries occur in WA and Bremerton, and how that number had greatly
increased since the pandemic (answer, it's really bad, and much worse since 2019.) I thought you might all
benefit from that information, including how to make your own maps of danger spots in your own district.
(see below)
I'm greatly appreciative to all the City employees and leaders who are working to make our streets safer from
traffic violence.
Best,
Travis Merrigan
From: Travis Merrigan <bikebremerton@gmail.com>
Date: Fri, Jan 10, 2025 at 8:00 AM
Subject: Traffic Collision and Fatality Data in Bremerton
To: Jennifer Chamberlin <Jennifer.Chamberlin@ci.bremerton.wa.us>
Jennifer,
At your request, I prepared some info about how WA's and Bremerton's streets are becoming much more
dangerous, and killing many more people compared to before the pandemic. The causes of the increased
deaths are widely debated, but likely culprits include: larger cars, cell phone distraction, speeding, police
stopped giving tickets and legal weed (more impaired drivers.)
The increase in traffic fatalities has been covered by local and national press, including the Kitsap Sun,
Seattle Times and New York Times. According to Harvard, the high traffic fatalities amount to a 'public health
crisis.'
Here are some great sources of local data on traffic collisions and fatalities.
6
The WA Traffic Safety Commission keeps the 'official' tally of motor vehicle deaths. Their 'Fatalities
Dashboard' shows the grim body count of all traffic fatalities. 2023 had the highest # of traffic fatalities ever
in Washington - 810 people killed, that 49% more than the year before the pandemic.
They also have data about 'Active Transportation' fatalities, covering people walking, riding bikes and using
wheel chairs. Again, the carnage is increasing horrendously. in 2023, WA had a record 177 Active
transportation users killed, up 54% from the 116 in 2019, the last year before the pandemic.
Over that same time period, WA state population increased by just 3.67%. Road deaths are up way more
than population has increased.
7
You can look at just Kitsap County, where traffic fatalities in each of the past two years were higher than any
year since at least 2014.
And if you look at just Bremerton, we had a record year in 2022 and tied the previous record in 2023.
What about WHERE the crashes are happening. Washington State Patrol has 'unofficial' but much more
detailed data about where the deaths are occuring. A/nd they look at not just deaths but 'serious injury
crashes.' You can find that detailed information here. Go to 'Query' and wade thru the many options (it's not
super intuitive) then 'Select Output Map' at the very bottom - and you can make your own map.
8
Here's 10-year citywide fatalty locations.
9
Here's a map of all the 'Serious Injury' accidents in the past 10 years.
10
Close-up of those for Central Bremerton - Warren and Kitsap Way remain horribly dangrous, with additional
hotspots on 6th Street and on Naval, the most dangerous zones are the big intersections, 6th and 11th.
11
Here's a closeup of District 1, those are 'Serious Injury Collisions'.
12
Here's all traffic accidents in 2024. Pine Rd is a hotspot for traffic accidents, it's only a matter of time before
that busy, no-sidewalk street kills someone.
In summation, we're in the midst of an epidemic of traffic deaths. Bremerton is spending millions on street
projects, but recently completed projects, including Kitsap Way and the Manette Roundabout, we far from
modern safety standards, and will do nothing to curb these tragic numbers.
I hope we can count on your support to stop the city from building more mediocre projects, and start turning
the corner on these street tragedies.
Thank you,
Travis
Published for
January 15
Council Meeting
Item 3 – Mayor’s Report
MAYOR’S REPORT
January 15, 2025
Winter Preparations
Winter preparations are under way and
the City is ready for inclement weather:
•An anti-icing agent is being
applied in preparation for
freezing temperatures this
week
•Sufficient salt and sand are
stockpiled and available for
emergency response
•All equipment is serviced and
ready to go including
snowplows, sanders, salt
brine machine, storage tanks
and applicators
•Plans are in place for 24-hr
operations as required
Information on the City’s Snow/Ice Response
program, including a map of priority routes is
available at:
www.BremertonWA.gov/1001/Inclement-Weather
Bremerton + Kitsap County Fan Zone -FIFA World Cup 2026!
Bremerton & Kitsap County are excited to announce our selection to be an official Fan Zone for FIFA World Cup 2026
–one of nine locations across the state –in addition to the Seattle Fan Celebration hosted at the Seattle Center!
The City of Bremerton has partnered with Kitsap County and Port Orchard on this great opportunity. We released our
joint statement yesterday in celebration of the announcement by Seattle FIFA World Cup 26:
"We are thrilled that Kitsap County and the City of Bremerton have been selected as an official Seattle FIFA World
Cup 2026 Fan Zone, welcoming fans from around the globe to our extraordinary region. Just a ferry ride away from
Seattle, our community offers visitors the chance to immerse themselves in our rich naval history, enjoy live
entertainment in Quincy Square, explore our breathtaking maritime landscapes, and experience the warmth and
hospitality of our vibrant and welcoming waterfront neighborhoods. This incredible opportunity not only allows us to
share the beauty and culture of Kitsap County with the world but also serves as a powerful driver for economic
development. From local businesses and restaurants to hotels and cultural attractions, our Fan Zone will provide a
significant boost to our local economy and create lasting benefits for our community. We look forward to welcoming
the world to Kitsap, where every visitor is a neighbor, and every match is a reason to celebrate!"
-Bremerton Mayor Greg Wheeler
-Kitsap County Commissioner Katie Walters,
-Port Orchard Mayor Rob Putaansuu
Watch for more exciting updates to come!
Thank you to our Bremerton Fire Department crew
for helping with the Los Angeles, CA wildfires!
BFD Crew: Lt. Jeremy Dixon, Special Operator Jerry Lane, Special Operator Carlo Celeste
and Firefighter Jeremy Carnahan
Published for
January 15
Council Meeting
Item 7 – Council Reports