HomeMy WebLinkAbout1 - Original Submission_ Exhibit A_CO6 Kitsap Lake_01032025Scope of Work 60 Washington Avenue, Suite 390 • Bremerton, WA 98337 | 360.377.0014 | Parametrix.com Exhibit A City of Bremerton Kitsap Lake Park Renovation Project Change Order 6 – Additional Engineering Services During Construction Introduction This document describes Parametrix’s proposed scope of work (SOW) for Change Order 6 under our existing contract. The purpose for Change Order 6 is to request budget for the following services: 1. Project Management and Meetings for extended 3 additional months of work. 2. Engineering services during construction beyond previous scope. A proposed schedule is included in this scope as Exhibit B and our proposed budget is attached as Exhibit C. Task 1 – Project Management and Meetings Objective Continue project management through the substantial completion of the project. Activities The following activities will be performed as part of this task:  Manage and direct the project technical team.  Provide routine project management and communications (scope, schedule, budget, and invoicing).  Prepare monthly progress reports and progress billings and submit to the City for approval and payment. Deliverables The following deliverables are associated with this task:  Routine correspondence and monthly invoices and progress reports  Meeting agendas and notes Assumptions The following assumptions apply to this task:  Project duration is expected to take an additional 3 months beyond the previous estimate because of the extended construction schedule. Docusign Envelope ID: DEC32142-FA8E-4B98-9B3A-B52F038A3682 Scope of Work City of Bremerton 233-1896-174 Kitsap Lake Park Renovation Project 2 January 2025 Change Order 6 – Additional Engineering Services Task 6 – Engineering Services During Construction Objective The following objectives apply to this task:  Receive compensation for engineering services during construction completed beyond previous scope.  Receive compensation for the redesign of paths between the parking lot and beach.  Provide additional engineering support during the construction phase of the project. Activities The following activities have been performed as part of this task:  Attended construction meetings as requested.  Responded to applicable Contractor’s Requests for Information (RFIs) and requests for change orders and make recommendations to the City.  Attended site walks at the request of the City.  Redesigned paths between parking lot and beach.  Revised design documents in response to changes encountered during the construction. The following activities will be performed as part of this task:  Attend construction meetings as requested.  Review Contractor’s submittals for compliance with the specifications.  Respond to applicable Contractor’s Requests for Information (RFIs) and requests for change orders and make recommendations to the City.  Attend site walks at the request of the City.  Revise design documents in response to changes encountered during the construction. Deliverables The following activities will be performed as part of this task:  Electronic copies of responses to material submittals, cut sheets, shop drawings review, RFI responses, and revised design documents. Assumptions The following assumptions apply to this task:  Parametrix provided the redesign of the paths between the parking and beach  Parametrix will review and respond to RFIs at an estimated 2 hours each. It is assumed that a total of no more than 3 additional RFIs will be reviewed (6 hours).  The Parametrix PM and/or one lead staff will attend up to 8 online meetings at 1 hour each and 2 site meetings at 2 hours each (12 hours).  Hours for support are 14 hours for the Parametrix PM, 4 hours for the project engineer for a total of 18 technical staff hours. Docusign Envelope ID: DEC32142-FA8E-4B98-9B3A-B52F038A3682 Scope of Work City of Bremerton 233-1896-174 Kitsap Lake Park Renovation Project 3 January 2025 Change Order 6 – Additional Engineering Services Exhibit B - Schedule Work Element Completed By Notice to Proceed February 3, 2025 Construction Complete February 28, 2025 Docusign Envelope ID: DEC32142-FA8E-4B98-9B3A-B52F038A3682 Exhibit C Client: City of Bremerton Project:Kitsap Lake Park Improvements Project No:233-1896-174 Shanon HarrisJason CeraldeYammie HoClara OlsonJeffrey L. CoopKyle HaleJean Johnson3.0 Project ControlsProject ManagerSenior EngineerEngineer IIIQuality Control (SD)Project AccountantSr. Contracts Specialist$143.67 $153.51 $241.92 $149.76 $243.36 $106.47 $187.17 Task Description Labor Dollars Labor Hours 01 Project Management and Meetings $3,047.37 21 7 10 0 0 0 3 1 Virtual Project Meetings (3)$460.53 3 3 Project Management (3 mo.) including scoping CO3 $2,586.84 18 7 7 3 1 06.A Schedule A Eng Services During Construction $2,751.93 18 0 15 0 3 0 0 0 Weekly Meetings (8 @ 1 hr)$1,228.08 8 8 Site Meeting (2 @ 2 hr)$614.04 4 4 RFI Responses (3 @ 2 hr)$909.81 6 3 3 06.B Schedule B Eng Services During Construction $6,845.10 43 0 34 2 6 1 0 0 Interceptor Drain Change $1,448.94 9 2 6 1 Regrade Paths between Parking and Beach $5,396.16 34 32 2 Labor Totals:82 7 59 2 9 1 3 1 Totals:$12,644.40 $1,005.69 $9,057.09 $483.84 $1,347.84 $243.36 $319.41 $187.17 Other Direct Expenses Mileage - $0.625/mile $0.00 Other Direct Expenses Total:$0.00 Project Total $12,644.40 Billing Rates: 1/3/2025 Cost Est_01032024.xlsx Docusign Envelope ID: DEC32142-FA8E-4B98-9B3A-B52F038A3682