1 - Original Submission_ Revised Project Schedule for CDBG 2023
1 2023 Subrecipient Agreement A. Project Description Sidewalk Replacement and Infill city wide. Project is to utilize CDBG grant funding to provide localized pedestrian improvements various locations throughout the City. The sidewalk areas scoped for repair will replace unpassable sidewalk segments, improve access adjacent to known ADA facilities, and link new pedestrian pathways. B. Project Scope / Tasks: 1 Sidewalk replacement and sidewalk Infill at various locations 2 Curb ramp replacement and installation at various locations 3 4 5 6 7 C. Project Milestone Schedule The time frame for completion of the outlined activities shall be: Milestone / Task Start Date End Date NTP / Project Construction January 2024 January 2025 EXHIBIT A – SCOPE OF SERVICES Docusign Envelope ID: BC1DC4C4-2C46-47A5-AE87-89BEE713B6AC ID Task NameDuration (days) Start Finish12023 City of Bremerton High Ave Curb Ramp Improvements 136 8/5/2024 12/18/2024 S M T W TFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSMTWTFReceive Executed Contract 0 1/30/2024 2/14/20242 Begin Construction 0 8/5/2024 8/5/20243 Construction Site #1 ‐ 5th Ave 16 8/5/2024 8/20/20244 Mobilization 1 8/5/2024 8/5/20245 Demo & Subgrade Prep 5 8/6/2024 8/10/20246 Pour Curb Ramps 6 8/11/2024 8/16/20247 Concrete Curing / HMA Patching 6 8/15/2024 8/20/20248 Construction Site #2 ‐ 7th Ave (East S19 8/21/2024 9/8/20249 Mobilization 1 8/21/2024 8/21/202410 Demo & Subgrade Prep 6 8/22/2024 8/27/202411 Pour Curb Ramps 7 8/28/2024 9/3/202412 Concrete Curing / HMA Patching 7 9/1/2024 9/8/202413 Construction Site #3 ‐ 8th Ave 35 9/9/2024 10/13/202414 Mobilization 2 9/9/2024 9/10/202415 Demo & Subgrade Prep 6 9/10/2024 9/15/202416 Pour Curb Ramp 2 9/16/2024 9/17/202417 Concrete Curing 3 9/18/2024 9/20/202418 Pour Curb Ramp 4 9/19/2024 9/22/202419 Concrete Curing / HMA Patching 5 9/21/2024 9/25/202420 Pour Curb Ramp 3 9/25/2024 9/27/202421 Concrete Curing 3 9/28/2024 9/30/202422 Pour Curb Ramp 3 9/30/2024 10/2/202423 Concrete Curing 4 10/3/2024 10/6/202424 Pour Curb Ramp 3 10/7/2024 10/9/202425 Concrete Curing / HMA Patching 4 10/10/2024 10/13/202426 Construction Site #4 ‐ 10th Ave 37 10/14/2024 11/19/202427 Mobilization 2 10/14/2024 10/15/202428 Demo & Subgrade Prep 6 10/15/2024 10/20/202429 Pour Curb Ramp 2 10/21/2024 10/22/202430 Concrete Curing 3 10/23/2024 10/25/202431 Pour Curb Ramp 4 10/24/2024 10/27/202432 Concrete Curing / HMA Patching 5 10/26/2024 10/30/202433 Pour Curb Ramp 3 10/30/2024 11/1/202434 Concrete Curing 4 11/2/2024 11/5/202435 Pour Curb Ramp 3 11/6/2024 11/8/202436 Concrete Curing 4 11/9/2024 11/12/202437 Pour Curb Ramp 3 11/13/2024 11/15/202438 Concrete Curing / HMA Patching 4 11/16/2024 11/19/202439 Construction Site #5 ‐ 12th Ave 29 11/20/2024 12/18/202440 Mobilization 1 11/20/2024 11/20/202441 Demo & Subgrade Prep 11 11/21/2024 12/1/202442 Tree Removal 5 12/2/2024 12/6/202443 Pour Curb Ramps 5 12/7/2024 12/11/202444 Concrete Curing / HMA Patching 7 12/12/2024 12/18/2024August September October November DecemberDocusign Envelope ID: BC1DC4C4-2C46-47A5-AE87-89BEE713B6AC