SUMMARY:
The city submitted a Defense Community Infrastructure Program (DCIP) Grant application on June
17, 2024, for$7,145,000 to fund construction of the CBFM. The City received notice of grant
approval on August 13, 2024. The grant application is currently being reviewed by the Office of Local
Defense Community Cooperation (OLDCC) Technical Review Committee (TRC). The city will receive
the results of their review on or about September 9, 2024. Once approved by OLDCC, the
application is sent to the US Congress for final approval. Once approved by Congress, the city will
receive a NOTICE OF AWARD substantially similar to Attachment A. The NOTICE OF AWARD
must be executed and returned to OLDCC before the federal fiscal year closes September 30, 2024.
ATTACHMENTS: 1. Example NOTICE OF AWARD; 2. Location Map
FISCAL IMPACTS (Include Budgeted Amount): The CBFM Replacement project is identified in
the 2025-2030 Capital Improvement Program for $8M. This Grant will fund $7.145M in construction
costs out of a total project cost estimate of$7.988M.
STUDY SESSION ACTION: 0 Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to approve the Defense Community Infrastructure Program Grant; and authorize the Mayor to
finalize and execute the OLDCC NOTICE OF AWARD, in the amount of$7.145M with substantially
the same terms and conditions as presented in Attachment 1.
COUNCIL ACTION: X Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action
Form Updated 01/02/2018
Docusign Envelope ID:9BOOBFD1-D88C-41ED-BC5A FEEE766E3C52
Office of Local Defense Community
Cooperation
Department of Defense
Notice Of Award
1.FEDERAL AWARDING AGENCY 2.INSTRUMENT TYPE:
U.S. DEPARTMENT OF DEFENSE Grant Agreement
OFFICE OF LOCAL DEFENSE COMMUNITY COOPERATION
2231 CRYSTAL DRIVE, SUITE 520 3.AWARD TYPE
ARLINGTON,VA 22202
Construction
4.TYPE OF ACTION: 5.FEDERAL AWARD DATE:
New Award 2024-09-19
6.AWARDED TO: 7.PRINCIPAL INVESTIGATOR
City of Bremerton David Powell
345 6th Street Suite 100 Engineering Project Manager
Bremerton WA 345 6th Street Suite 100
98337-1891 david.powell@ci.bremerton.wa.us
8.UNIQUE ENTITY IDENTIFIER: 9.OLDCC AWARD NUMBER:
HV84RG6NYNG4 CIP2166-24-01
10.FEDERAL AWARD IDENTIFICATION NUMBER: 11.PROGRAM TYPE:
HQ00052410043 Community Investment
12.AMENDMENT NUMBER: 13.REGULATORY AUTHORITY:
2 CFR 200
14.PERIOD OF PERFORMANCE: 15.STATUTORY AUTHORITY:
09/01/2024-05/31/2026 10 U.S.C.2391(d)and the Further Consolidated Appropriations Act for
Fiscal Year 2024 (Public Law 118-47)
16.ASSISTANCE LISTING NUMBER AND TITLE:
12.027 Defense Community Infrastructure Program
17.TITLE AND DESCRIPTION:
page 1 of 4
Docusign Envelope ID:9BOOBFD1-D88C-41ED-BC5A FEEE766E3C52
Central Bremerton Force Main Replacement
18.BUDGET SUMMARY
FEDERAL NON-FEDERAL TOTAL APPROVED BUDGET
PREVIOUSLY OBLIGATED $0 $0 $0
OBLIGATED BY THIS ACTION $7,145,000 $843,000 $7,988,000
INDIRECT COST RATE IS: 0 $0 $0 $0
TOTAL OBLIGATED ON AWARD $7,145,000 $843,000 $7,988,000
GRANT TOTAL $7,145,000 $843,000 $7,988,000
19.FEDERAL AGENCY POINTS-OF-CONTACT
GRANTS MANAGEMENT SPECIALIST: PROJECT MANAGER:
Stephanie Roach Tim Robert
stephanie.m.roach2.civ@mail.mil timothy.b.robert.civ@mail.mil
(703)697-2119 (703)509-6156
20.TERMS AND CONDITIONS
The following terms and conditions are incorporated herein by reference with the same force and effect as if they were given in full text.
Upon request the Federal awarding agency will make the full text available, or they can be found as described below.
The following documents may be found at
https://oldcc.gov/grant-terms-and-conditions.
National Policy Requirements
OLDCC Grants Management Manual
page 2 of 4
Docusign Envelope ID:9BOOBFD1-D88C-41ED-BC5A FEEE766E3C52
Special Conditions
1.This grant period is from September 1, 2024,through May 31, 2026. Eligible costs incurred between September 1, 2024,and the date of
this agreement are allowable and reimbursable.
2. Pre-award costs in the amount of$138,543, as identified in the application for funding, are accepted for this award.
3.The Grantee shall ensure requests for disbursements under this award are in proportion to the Federal and non-Federal portions of the
total approved budget for the project. For example,for every$1 in eligible costs on a project with a 50% Federal contribution, requests for
disbursements should ensure Federal funds do not exceed 50%of the expenditures for the project at any point over the term of the award.
4.The Grantee agrees to retain ownership of the new, expanded,or renovated facility, and to operate and maintain or replace the facilities
to the same standard and conditions as any other Grantee-owned property,to include scheduling and funding necessary maintenance and
replacement of the improved real property on the same basis as any other Grantee-owned property and facilities.
5. In the event the final project cost is less than the approved budget for this award,the Grantee and Grantor will recover those savings in
proportion to their share of the approved project.
6. In the event the final project cost exceeds the approved budget for this award,the Grantee is responsible to provide any additional
funding needed to complete the project.
7. Project Development Schedule:
Construction Start Date: July 1,2025
Construction End Date: February 28, 2026
Failure to meet this Project Development Schedule/Construction Schedule is considered a violation of the Grant Agreement and may
result in action by the Grantor to suspend and/or terminate the grant. The Project Development Schedule/Construction Schedule may only
be revised through prior approval by the Grantor.
8.The Grantee must seek written prior approval from the Grantor before the Grantee may reallocate funding from the Contingencies
budget category.
9.The Grantee must seek written prior approval from the Grantor before the Grantee may alter the source or amount of funding that
contributes toward completing the project.
10.The Grantee shall not proceed with construction or demolition nor undertake any other ground-disturbing planning or project activities
without the Grantor's prior written approval that the requirements of the National Environmental Policy Act and other Federal
environmental requirements have been met. This approval is contingent upon the Grantee's submission of environmental analyses
sufficient to sustain and document the Grantor's requirements under the National Environmental Policy Act,to include all applicable
conditions, avoidance measures, and mitigation measures when required. This restriction does not apply to project design, development of
environmental information or studies that include no ground disturbing work, administrative activities, securing permits,or other activities
that present no risk of irreparable injury to the environment.
11. Prior to the start of construction,the Grantee shall provide, for the Grantor's prior approval,written evidence of adequate access and
site control for a term of not less than the beneficial life of the improvements being made with Federal funds.
12.The Grantee shall not proceed with construction or demolition, nor undertake any other ground-disturbing project activities without the
Grantor's prior written approval of the Grantee's submission of a performance or surety bond sufficient for the completion of the activity
being undertaken with this award.
13.The Grantee is required to obtain all necessary easements and permits and provide written evidence of site control prior to breaking
ground on the project. If the Grantee is unable to secure these within 12 months of award, it agrees that it will voluntarily terminate the
grant award in accordance with 2 CFR part 200 upon written request from the Grantor.
page 3 of 4
Docusign Envelope ID:91300BFD1-D88C-41ED-BC5A-FEEE766E3C52
21.AWARD PERFORMANCE GOALS
P FREQUENCY _
Performance Report Quarterly 2024-12-31
Performance Report Quarterly 2025-03-31
Performance Report Quarterly 2025-06-30
Performance Report Quarterly 2025-09-30
Federal Financial Report 2025-09-30
Performance Report Quarterly 2025-12-31
Performance Report Quarterly 2026-03-31
Federal Financial Report 2026-09-30
Final Performance Report 2026-09-30
22.AFFIRMATION OF AWARD
By signing this agreement,the Authorized Representative assures that the recipient will carry out the projecUprogram described in its
application and will comply with the terms and conditions and other requirements of this award.
FOR THE RECIPIENT FOR THE UNITED STATES OF AMERICA
oocuslgnea ny! /
.,ns..a lti�ln�v2en
AF54n90149!10454.
Name: Greg Wheeler Date9AO Sig0n24d Patrick O'Brien Date Signed
Title: Mayor 77 Award Official 2024-09-19
page 4 of 4