Loading...
HomeMy WebLinkAbout07/10/2024 STUDY SESSION AGENDA PACKET______________________________________________________________ CITY COUNCIL 345 6th Street, Suite 100, Bremerton, WA 98337 Phone (360) 473-5280 WEDNESDAY, JULY 10, 2024 CITY COUNCIL HYBRID STUDY SESSION AGENDA Starting at 5:00 PM in Council Conference Room 603 Council Conference Room 603 will be open to the public to attend the Study Session in-person, but there will be no opportunities for input. However, public questions or comments may be submitted at any time to City.Council@ci.bremerton.wa.us. Please remember that the content of the Agenda Bill items is subject to change; and no action at the Study Session is anticipated. If approved by the Council, these items will be placed on the July 17, 2024 City Council Meeting Agenda, or as indicated…  Members of the public may click the link below to join the webinar: https://bremertonwa-gov.zoom.us/j/8738266756?pwd=ZWlMVnVYbFBHYjY5U1RJUmFreDFXUT09  Or One tap mobile: US: +12532050468,,87318266756#,,,,*857582# or +12532158782,,87318266756#,,,,*857582#  Or Telephone: Dial (for higher quality, dial a number based on your current location): US: +1 253 205 0468 or +1 253 215 8782 or +1 346 248 7799 or +1 669 444 9171 or +1 669 900 6833 Webinar ID: 873 1826 6756 Passcode: 857582 A. BRIEFINGS ON AGENDA BILL ITEMS 1. Public Works Agreement with Sourcewell for CXT Restroom for Haddon Park Renovation Project 2. Grant Agreement with WA State Department of Archaeology & Historic Preservation for Ivy Green Cemetery Fence Replacement 3. Tower License and Indemnification Agreement with Day Management Corp (dba Day Wireless Systems) to allow placement of wireless equipment at Cheryl Street 4. Resolution to repeal Resolution No. 3345 and to establish updated MRSC Small Public Works Roster processes for the City of Bremerton 5. Contract with Redside Construction LLC for Evergreen Rotary Park Boat Ramp Repair Project 6. Resolution to approve Utility Easement Relinquishment at the Sinclar Ridge Phase I Subdivision B. GENERAL COUNCIL BUSINESS – Items 1-2 are a maximum 10-minutes each, with Council Q&A 1. Discussion on Lodging Tax Advisory Committee ’25 Application Criteria – Chair Denise Frey 2. Contract with Peninsula Support Organization Bluebills – Council President Jennifer Chamberlin 3. Update on Action Steps on Council Goals & Priorities – Council President Jennifer Chamberlin 4. Regional and Other Committee/Board Briefings 5. Other General Council Business (As necessary, and as time allows…) C. EXECUTIVE SESSION 1. 15-Minutes to discuss Potential Litigation pursuant to RCW 42.30.110 (1) (i); No action anticipated D. ADJOURNMENT OF STUDY SESSION Americans with Disabilities Act accommodations provided upon request. Those requiring special accommodations should contact the City Clerk’s Office at (360) 473-5323 at least 24 hours prior to the meeting. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2024 Public Works Agreement with Sourcewell for CXT Restroom for Haddon Park Renovation Project COUNCIL MEETING Date: July 17, 2024 Department: Parks & Recreation Presenter: C. Berna/B. Hauschel Phone: (360) 473-5429 SUMMARY: The Parks & Recreation Department applied for and received funding from the Recreation and Conservation Office’s Youth Athletic Facilities grant in the amount of $350,000 for improvements to the Haddon Park Renovation Project. A major scope item was the replacement of the substandard, non-accessible restroom. The new accessible prefabricated restroom will feature two unisex restrooms, a maintenance room and will be prefabricated from high-strength precast concrete, making the building easier to maintain and better able to withstand the rigors of vandalism. Restroom pricing has been competitively solicited and publicly awarded through Sourcewell. Total Cost: $225,141 ATTACHMENTS: 1.) CXT Quote; 2.) Public Works Agreement; 3.) Restroom Comparison FISCAL IMPACTS (Include Budgeted Amount): Funding budgeted in the Parks Capital Construction Fund as part of the Haddon Park Renovation Project. STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the purchase of restroom from CXT through Sourcewell in the amount of $225,141 (includes Washington State Sales Tax) and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024 A1 Updated LULU D. HADDON PARK - RESTROOM COMPARISION Criteria Public Restroom Company Romtec CXT Elevation Floor Plan Building Type Pre-Cast Built on Site Pre-Cast Building Footprint 9'-4" x 24'-8" 11'-4" x 28'-8"10' x 26' Maintenance Room size 9'-4" x 10'-8" 11'-4" x 10'9'-4" x 9'-8" Ind. Restroom Size (2) 7'-0" x 9'-4" 9'4" x 11'-4"7'-6" x 9'-4" Partitions (Yes or No) No; Unisex Yes; Gender Specified No Roof Overhang (Front) 2'-4"2'3:12 pitch; 1' Roof Overhang (Side) 8"1'1' Cost Estimate 274k (Design & Supply) + 24k (Install) = 299k + WSST 130k-135k (Design & Supply) + Install (140k-145k)= 270k-280k + WSST 109k (Design, Supply & Install) + WSST Type of pad with water/sewer /elec. tie in 6" gravel Concrete 6" gravel Warranty 5 year component; 20-yr structural Awaiting Response 1 year bldg warranty; fixtures longer Closest Manufacturing Plant Aumsville, OR Roseburg, OR Nampa, ID Lead Time 240 days Awaiting Response 150-180 days Used in COB Parks? Lions Park Blueberry, Kiwanis, Manette, Warren N/A Longevity potentially 50 years Awaiting Response 45-70 years Anti-graffiti coating Optional Awaiting Response Optional Cost Comparison Summary ±326k ±300k ±178k AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2024 Grant Agreement with WA Department of Archeology & Historic Preservation for Ivy Green Cemetery Fence Replacement COUNCIL MEETING Date: July 17, 2024 Department: Parks & Recreation Presenter: B. Hauschel/ C. Berna Phone: (360) 473-5429 SUMMARY: The attached Department of Archeology & Historic Preservation (DAHP) Grant will provide $20,040 to replace fencing at Ivy Green Cemetery. ATTACHMENTS: 1) DAHP Grant Agreement; 2) Site Plan FISCAL IMPACTS (Include Budgeted Amount): This $20,040 grant requires no matching funds. STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve a grant agreement with Department of Archaeology and Historic Preservation for the Ivy Green Cemetery Fence Improvement project and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024 A2 State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 1 of 17 Grant Agreement Between Washington State Department of Archaeology and Historic Preservation And City of Bremerton Grant No. Grant Title: Effective Date: End Date: Grant Amount: FY24-90009-011 Ivy Green Cemetery December 1, 2023 June 30, 2025 $20,040 Grant Purpose Provide support for the rehabilitation of the Ivy Green Cemetery located in Bremerton, Kitsap County. This agreement is made between The Department of Archaeology and Historic Preservation hereinafter referred to as the DEPARTMENT, and City of Bremerton hereinafter referred to as the GRANTEE. Parties’ Contact Information DAHP Contact Person: Marivic Quintanilla | Contracts & Grants Manager phone: 360-870-6383 | email: marivic.quintanilla@dahp.wa.gov GRANTEE Contact Person: Colette Berna | Parks Preservation and Development Manager phone: 360-473-5429 | email: Colette.berna@ci.bremerton.wa.us State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 2 of 17 Section 1. Responsibilities of the Grantee A.The GRANTEE will perform or cause others to perform the work described in the “Scope of Work” (Attachment 2). Additional special conditions or specifics about the work required by this agreement, if any, are in attachments as enumerated and described in Section 2. The GRANTEE agrees to perform the work in accordance with any such special conditions or specifics. B.The GRANTEE understands that the work called for under this agreement must conform to state administrative requirements as they relate to the DEPARTMENT, and the GRANTEE agrees to comply with such requirements. C.The GRANTEE agrees to comply with the restrictions of lobbying with appropriated funds: No part of the money appropriated by any enactment of State Legislation shall, in the absence of express authorization by such, be used directly or indirectly to pay for any personal service, advertisement, telegram, telephone, letter, printed or written matter, or other device, intended or designed to influence in any manner an elected official, to favor or oppose, by vote or otherwise, any legislation or appropriation by legislation, whether before or after the introduction of any bill or resolution D.The GRANTEE agrees to maintain records in a manner which will provide an audit trail to all expenditures reported to the DEPARTMENT. The GRANTEE agrees to keep these records for at least six years following the ending date of the grant. In the event that an audit of the GRANTEE or of the DEPARTMENT should take exception to any expenditure by the GRANTEE, the GRANTEE agrees to refund to the DEPARTMENT on demand the amount determined by the audit as due. In the event that the DEPARTMENT is required to institute legal proceedings to enforce this repayment provision, the DEPARTMENT shall be entitled to its costs thereof, including reasonable attorney’s fees. When arranging for an audit, the DEPARTMENT should contact: Colette Berna Phone: 360-473-5429 680 Lebo Blvd Email: Colette.berna@ci.bremerton.wa.us Bremerton, WA 98310 E.The GRANTEE agrees to pay all the costs involved in carrying out the terms of this agreement prior to seeking reimbursement as provided for in Section 2. A. When seeking reimbursement, the GRANTEE will submit a completed reimbursement form in writing to the DEPARTMENT and provide such supporting documents as an affidavit of publication for newspaper advertising soliciting bids, contracts, photocopies of canceled checks and invoices, and other documents as may be requested by the DEPARTMENT. The DEPARTMENT will provide the GRANTEE with the reimbursement form and guidelines for financial reporting procedures. The GRANTEE agrees to submit its request for State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 3 of 17 reimbursement within thirty (30) days following completion of the work. F.The GRANTEE agrees to provide the DEPARTMENT with a completion/project report acceptable to the DEPARTMENT. The GRANTEE will submit this on or before the end date of this grant. The GRANTEE agrees that the DEPARTMENT shall have the right to withhold all or part of the funds under this grant pending receipt of an accepted completion/project report. Michelle Thompson, DEPARTMENT Architectural Historian shall have acceptance approval or denial of the completion/project report. G.The GRANTEE agrees that the “Budget” (Attachment 1) shall be a financial guide for the work called for by this agreement. The GRANTEE may exceed the budgeted amounts, but this shall in no way obligate the DEPARTMENT for a greater amount than the Grant Amount. If the GRANTEE should spend less than the budgeted amount on an object or element in the Budget, the DEPARTMENT may either reduce its obligation proportionately or it may terminate this agreement. The GRANTEE agrees to maintain records which will render an accurate accounting of each element or object in the Budget. The actual expenditures for the amounts reflected in the Budget may vary by 15 percent without requiring an amendment to this grant agreement. H.The GRANTEE agrees that the DEPARTMENT shall have the right to terminate this agreement if the GRANTEE shall fail to fulfill in a timely and proper manner its obligations under this agreement or if the GRANTEE shall violate any of the covenants, conditions, or stipulations of the agreement. In case of such termination by the DEPARTMENT, the GRANTEE agrees to return to the DEPARTMENT within thirty (30) days of the effective date of termination, any payments made by the DEPARTMENT to the GRANTEE under the terms of this agreement or any portion of such payments as may be directed by the DEPARTMENT. The GRANTEE agrees to submit evidence of completion of all work elements identified in the Scope of Work on or before the grant end date. GRANTEE acknowledges and understands that final work elements which do not conform to the terms and conditions of this agreement will not be reimbursed. I.The GRANTEE will maintain regular contact with the DEPARTMENT regarding the progress of the grant project. The GRANTEE agrees that the DEPARTMENT shall have the right to monitor the work called for by this agreement. J.The GRANTEE agrees that it, its agents, officers and employees, and any other person or entity performing any work under this agreement, are independent contractors and not employees of the State of Washington (“State”). State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 4 of 17 K.State funds are the basis for this agreement. The GRANTEE certifies that neither it nor its principals are presently debarred, declared ineligible, or voluntarily excluded from participation in transactions by any State department or agency. Should for any reason the State funds which are the basis for this agreement become withdrawn, reduced, or not appropriated by legislation the agreement may be terminated without penalty to the DEPARTMENT. L.To the fullest extent permitted by law, GRANTEE shall indemnify, defend and hold harmless the State, agencies of the State and all officials, agents and employees of State, from and against all claims for injuries or death arising out of or resulting from the performance of the agreement. GRANTEE’s obligation to indemnify, defend, and hold harmless includes any claim by GRANTEE’s agents, employees, representatives, or any subcontractor or its employees. GRANTEE expressly agrees to indemnify, defend, and hold harmless the State for any claim arising out of or incident to GRANTEE’s or any subcontractor’s performance or failure to perform the Agreement. GRANTEE’s obligation to indemnify, defend, and hold harmless the State shall not be eliminated or reduced by any actual or alleged concurrent negligence of State or its agents, agencies, employees and officials. The parties shall make every effort to resolve disputes arising out of, or relating to, this agreement through discussion and negotiation. Should discussion and negotiation fail to resolve a dispute arising under this agreement, the parties shall select a dispute resolution team to resolve the dispute. The team shall consist of a representative appointed by each party and a third party mutually agreed upon by the parties. The team shall attempt, by majority vote, to resolve the dispute. M.The GRANTEE agrees to provide or purchase industrial insurance coverage, as applicable, prior to performing work under this agreement. The DEPARTMENT will not be responsible for payment of industrial insurance premiums or for any other claim or benefit for this GRANTEE, or any sub-grantee or employee of the GRANTEE, which might arise under the industrial insurance laws during performance of work under this agreement. If the Department of Labor and Industries, upon audit, determines that industrial insurance payments are due and owing as a result to work performed under this agreement, those payments shall be made by the GRANTEE; the GRANTEE shall indemnify the DEPARTMENT and guarantee payment of such amounts. N.The GRANTEE agrees to include written acknowledgment of The Department of Archaeology and Historic Preservation support for all grant-related publications and public information materials including audio-visual and workshop materials. State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 5 of 17 O.The GRANTEE agrees to any additional conditions as may be identified in amendments under Section 3 and attached to this agreement. P.There shall be no discrimination against any person employed by the GRANTEE in connection with work covered by or related to this agreement, or against any applicant for such employment, because of race, creed, color, sex, age, marital status, national origin, the presence of any sensory, mental, or physical handicap, or any other condition as set forth Chapter 49.60 RCW. This provision shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or advertising; layoff or termination; rates of pay or other forms of compensation and selection for training. The GRANTEE shall insert a similar provision in all subcontracts for services covered by this agreement. During the performance of this agreement, the GRANTEE shall comply with all federal and state nondiscrimination laws, regulations and policies. Q.In accordance with legislative findings and policies set forth in Chapter 39.19 RCW the GRANTEE is encouraged in the participation and use of Minority and Women’s Business Enterprise firms certified by OMWBE. R.The GRANTEE agrees to a $0.00 match of funds. One hundred percent (100%) being the full amount of the let grant amount, zero percent (00%) being the match amount by the GRANTEE. Further, the GRANTEE agrees that any match specifically identified to this grant agreement by the GRANTEE the GRANTEE will not claim match directly earmarked or identified for this agreement as match for any other grant, agreement or contract. The DEPARTMENT has first and exclusive claim to match provided by the GRANTEE to this agreement as indirect eligible match to the National Park Service, Historic Preservation Fund awarded to the DEPARTMENT. DEPARTMENT: Grant Amount: $20,040.00 GRANTEE: Minimum Grant Match Amount: $0.00 Section 2. Responsibilities of the DEPARTMENT A.The DEPARTMENT agrees to reimburse the GRANTEE one hundred (100) percent of its actual authorized expenditures for the purpose of this agreement, provided: (1)The total paid by the DEPARTMENT shall not exceed the amount stipulated in the “Budget” (Attachment 1) as DEPARTMENT share. (2)All expenditures were incurred between the beginning and ending dates of the grant. State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 6 of 17 (3)No expenditures have been previously claimed in any other grant from any agency of the state or federal government. (4)The DEPARTMENT has authority to expend the funds required to meet the obligations contained herein. (5)The GRANTEE has met all requirements contained in this agreement. (6)The DEPARTMENT will accept as match expenditures presented by the GRANTEE on rehabilitation projects completed in accordance with the Secretary of Interior’s Standards for the Rehabilitation of Historic Properties that were completed on or after July 1 of the year 2023 and prior to the effective date of this contract. B.The DEPARTMENT agrees to consider requests from the GRANTEE for progress payments if, in the DEPARTMENT’S judgment, the public interest will be served by doing so and if such payments are administratively practical and provided appropriated funds are available for which to issue a progress payment. C.The DEPARTMENT may unilaterally terminate all or part of this contract, or may reduce its scope of work and budget, if there is a reduction in funds by the source of those funds, and if such funds are the basis for this contract. The following attachments are hereby incorporated into and made a part of this agreement. Attachment 1 “Budget”, consisting of one page. Attachment 2 “Scope of Work”, consisting of one page. Attachment 3 “State Form A19-1 Invoice Voucher” to be used as basis for billing, consisting of one page. Attachment 4 Attachment 5 “Historic Preservation Easement” consisting of four pages. (See easement document attachment.) “Heritage Cemetery Grant Special Terms and Conditions” consisting of one page. State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 7 of 17 Section 3. Amendments This grant agreement may only be amended if such amendment is in writing (with the exception of the 15% variance for actual expenditures identified in Section 1.G), agreed to and signed by all the parties, and attached hereto. DEPARTMENT: GRANTEE: Department of Archaeology City of Bremerton and Historic Preservation By: Allyson Brooks Ph.D. Its: Executive Director By: Greg Wheeler Its: Mayor Date Date State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 8 of 17 Attachment 1 BUDGET Construction Costs: STATE Dollars Hard Match Soft Match Total Protection & Security $20,040 $0 $0 $20,040 Totals $20,040 $0 $0 $20,040 State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 9 of 17 Attachment 2 SCOPE OF WORK The GRANTEE shall perform or shall cause to perform the following procedures as related to potential ground disturbance prior to project work beginning: Based on the work description, no permit from DAHP is required. However, an inadvertent discovery protocol shall be in place during the proposed work. A template can be found at: https://dahp.wa.gov/archaeology/human-remains/recommended-inadvertent-human-remains-discovery- language The GRANTEE shall perform or shall cause to perform the following project scope of work: 1.Protection and Security a.Remove and replace the chain link fencing and posts along 15th Street, using the same holes that the current posts are in to minimize ground disturbance. If new holes are required, please coordinate new ground disturbance locations with DAHP. The GRANTEE shall provide final architectural/construction drawings and/or designs for the work noted above to the Washington Trust for Historic Preservation to ensure compliance with the stated plans before work begins. For fencing projects, please provide specifications/details on the proposed products before purchase and installation. State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 10 of 17 Attachment 3 STATE FORM: A-19 INVOICE VOUCHER Attached on the next page. FORM A 19-1A (Rev. 5/91) STATE OF WASHINGTON INVOICE VOUCHER AGENCY USE ONLY AGENCY NO. LOCATION CODE P.R. OR AUTH. NO. 355 AGENCY NAME Department of Archaeology and Historic Preservation PO Box 48380 Olympia WA 98504-8343 INSTRUCTIONS TO VENDOR OR CLAIMANT: Submit this form to claim payment for materials, merchandise or services. Show complete detail for each item. VENDOR OR CLAIMANT (Warrant is to be payable to) Vendor’s Certificate: I hereby certify under penalty of perjury that the items and totals listed herein are proper charges for materials, merchandise or services furnished to the State of Washington, and that all goods furnished and/or services rendered have been provided without discrimination because of age, sex, marital status, race, creed, color, national origin, handicap, religion, or Vietnam era or disabled veterans status. BY (SIGN IN INK) (TITLE) (DATE) FEDERAL I.D. NO. OR SOCIAL SECURITY NO. (For reporting Personal Services Contract Payments to I.R.S. RECEIVED BY DATE RECEIVED DATE DESCRIPTION QUANTITY UNIT AMOUNT FOR AGENCY USE PREPARED BY TELEPHONE NUMBER DATE AGENCY APPROVAL DATE DOC. DATE PMT DUE DATE CURRENT DOC. NO. REF DOC. VENDOR NUMBER VENDOR MESSAGE UBI NUMBER REF DOC SUF TRANS CODE M O D FUND MASTER INDEX SUB OBJ SUB SUB OBJECT ORG INDEX WORKCLASS COUNTY CITY/TOWN PROJECT SUB PROJ PROJ PHAS AMOUNT INVOICE NUMBER APPN INDEX PROGRAM INDEX ALLOC BUDGET UNIT MOS ACCOUNTING APPROVAL FOR PAYMENT DATE WARRANT TOTAL WARRANT NUMBER State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 12 of 17 Attachment 4 CEMETERY GRANT EASEMENT This page intentionally left blank – see easement document. State of Washington • Department of Archaeology & Historic Preservation P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065 www.dahp.wa.gov Grant No. FY24-90009-011 Pa g e | 17 of 17 Attachment 5 HERITAGE CEMETERY GRANT SPECIAL TERMS AND CONDITIONS 1)Grantee agrees to record a Historic Preservation Easement in a form as specified by the Department. 2)Grantee agrees to proactively maintain the Heritage Cemetery for a minimum of ten (10) years, in accordance with the terms of this Grant Agreement. If within a period of ten (10) years, action is taken with respect to the Heritage Cemetery which causes it to be no longer eligible for listing in the Washington Heritage Register or the Washington State Heritage Cemetery Register, grant funds shall be repaid in full within one year. 3)If the Heritage Cemetery is not visible from a public right of way, Grantee agrees to provide public access to the exterior of the Heritage Cemetery under reasonable terms and conditions, as set forth in Laws of 2007, Chapter 333, codified as RCW 27.34. 4)All work must comply with the United States secretary of the interior’s standards as set forth in the Grant Agreement, provided, however, that exceptions may be made for retention or installation of metal roofs. Such exceptions shall be made on a case-by- case basis at the sole discretion of the Department. 5)The Heritage Cemetery Preservation Fund (“Fund”) shall be acknowledged on any materials produced and in publicity for the work performed under this Grant Agreement. Grantee agrees to post a sign acknowledging the Fund at the worksite for the duration of this Grant Agreement. IVY GREEN CEMETERY FENCING REPLACEMENT PROJECT BREMERTON PARKS & RECREATION DEPARTMENT 15TH STREET NAVAL AVE.Fencing replacement funded by 20k DAHP grant Fencing replacement funded by Naval Ave. Ped and Bike Improvement Project Entry improvements funded by previous 25k DAHP grant (2019) AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Tower License and Indemnification Agreement with Day Management Corp (dba Day W ireless Systems) to allow placement of wireless equipment at Cheryl Street Study Session Date: July 10, 2024 COUNCIL MEETING Date: July 17, 2024 Department: Public Works Presenter: Melinda Monroe Phone: (360) 473-5306 SUMMARY: The City of Bremerton and Day W ireless Corporation wish to enter into a License Agreement allowing DWS to place equipment at their expense on the Cheryl Street Tower and use space within the associated facilities building. The Tower is part of the public works water utility portfolio and managed by the Facilities division. This placement would add a minimum of $78,000 over a period of 10 years to the Facilities division budget. ATTACHMENTS: 1) License Agreement between the City of Bremerton and DWS FISCAL IMPACTS (Include Budgeted Amount: N/A STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve Telecommunications License Agreement between the City of Bremerton and Day Management Corporation, Wireless Corporation, and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A3 Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 1 TOWER LICENSE AND INDEMNIFICATION AGREEMENT BETWEEN THE CITY OF BREMERTON AND DAY MANAGEMENT CORPORATION DBA DAY WIRELESS SYSTEMS This AGREEMENT (“License”) is made and entered into as of the _____ day of __________, 2024, by and between the CITY OF BREMERTON, a Washington municipal corporation ("City"), and Day Management Corp. dba Day Wireless Systems, an Oregon Corporation ("Licensee"). WHEREAS, Licensee is an Oregon State corporation that maintains and operates radio repeater systems in Kitsap County, Washington; and WHEREAS, City is the owner of certain real property in the City of Bremerton, Kitsap County, Washington, commonly known as 1925 Cheryl Street , and legally described as set forth in Exhibit A, which is attached and incorporated herein by this reference (hereinafter "City Property"); and WHEREAS, Licensee desires to utilize the above-referenced portion of city property for purposes of placing Licensee’s owned telecommunications equipment; and NOW, THEREFORE, in consideration of the mutual benefits to be derived, it is agreed: 1. License and Conditions. City agrees to provide Licensee this non-exclusive license to utilize said portion of city property upon the following conditions: A. Use: This License is granted to Licensee for use a portion of City Property, described in Exhibit A, attached hereto and by this reference made a part hereof (“License Property”) for the purpose transmission and reception of telecommunication and signals using real property and facilities approved in Exhibit A and with the site configuration and equipment listing as outlined in Exhibit B. The use of the property, tower and access by Licensee must not interfere with the use and enjoyment of the property by the City or by other authorized licensees of the property. B. Term: This Agreement shall be effective as of the first of the month following the date of execution by both parties, unless terminated as provided in Section 4, below, and shall continue for an initial term of one (1) year, provided however, that this Agreement shall automatically be extended for ten (10) additional one (1) year terms if Lessee is not currently in default. C. Compensation: In consideration for the granting of this License, beginning on the first day of the month following the last date of signature by the parties, the Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 2 Licensee shall pay the City a total of six hundred fifty dollars and zero cents ($650.00)_per month, and at the beginning of each successive agreement anniversary thereafter the monthly rent shall automatically be adjusted based upon the CPI for all urban consumers, Seattle-Tacoma index (1982-84=100) as published by the Bureau of Labor and Statistics for the last month for which statistics are posted prior to the effective date above. However, rent shall not, in any case, decrease nor shall the annual rent increase by more than four percent (4%) per year above the annual rent for the preceding year. D. Purpose and Site Access. This License is given only for the above stated purpose. Any extension or modification of the scope of use shall only be in writing. Licensee shall be responsible for adherence to all federal, state and local regulations pertaining to the operation of a communications facility. 1. Licensee shall provide the City with a list of all authorized individuals who will have access to the premises. City shall provide Licensee with access to the premise at all times on a twenty-four hour per day, seven day per week basis, adequate to service the premise and telecommunications equipment. Employees visiting the premises shall be clearly identifiable as employees of the Licensee either by uniform badge or marked vehicle. Changes to this list of authorized employees should be provided to the City with at least 24-hours notice prior to accessing the site. Licensee contractor’s should be accompanied by Licensee site access authorized individual. E. Licensee responsibilities. Licensee shall reasonably carry out the uses allowed within the License Property so as not to interfere with the City’s use and operation of the License Property. 1. Access. Owner shall permit and manage access to the premises and will provide the necessary keys and or codes for Licensee. Access is allowed only to the areas and spaces as described in the Tower Lease Agreement. The Licensee shall be responsible to make sure the site is secure and that all building locks, gate locks and other site security measures are intact and fully secure after any and all entries by Licensee. Access is not allowed to any other area or property by the Licensee or its affiliates, that is not listed for the Licensee’s use. This site has Municipal Water Supply Reservoirs and Utility Property that has restricted access. Driveway, gate and access roadways will not be blocked for any reason, without prior approvals by the City. If there are any issues with site security, the radio tower, the radio tower building, or the property, the Licensee shall contact the City of Bremerton Facilities standby personnel at (360) 473-0681 (a 24/7 monitored phone) and place a report. Licensee should notify the City of Bremerton 24 hours prior to accessing the site providing duration of site access. 2. Planning and Management. Licensee shall be responsible for all systems installations, upgrades and ongoing site management. Designated representatives of Licensee will plan and coordinate all system installations and Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 3 subsequent upgrades. All approved work will be managed as discrete projects using an agreed-upon project management methodology. 3. Installation and site compliance. Licensee will provide, install, operate and maintain all related equipment, cables, antennas, power supplies and batteries in a manner consistent with industry best practices and in accordance with all applicable laws including, NEPA compliance per 47 CFR 1.13.07 and 47 CFR 1.13.08 Fire control standards NFPA 76, and 2001. Licensee will be responsible for all procurement of services and supplies necessary for said installation. Licensee will be responsible for compliance with all federal, state and local laws and registration requirements during and after site installation. All responsibility of compliance with federal state and local law and indemnification in Section 2 of this agreement, shall also apply respectively to all service contractors in agreement with Licensee. Changes to site plan and or footprint of site design require notification to the City of Bremerton and prior authorization. 4. Equipment Ownership. All equipment purchased by Licensee will be owned by Licensee and will be tagged and tracked accordingly. A full equipment list will be incorporated into Exhibit B of this Agreement. Equipment disposal will be the sole responsibility of Licensee. Equipment left on site after the expiration or termination of this agreement will become the property of the City of Bremerton. 5. Utilities. All required utilities will be the responsibility of the licensee to setup, maintain, and install. F. Property Condition. Licensee shall maintain the License Property in good condition, shall clean any debris and litter, and shall be responsible for any property damage resulting from its use of the License Property. Licensee shall be responsible for its own property located, maintained or stored on the License Property. G. Interference with Other Users. The Licensee acknowledges that the City may enter into leases with other tenants for their equipment and telecommunications facilities for the purposes of transmitting and receiving telecommunication signals from City property. The City, however is not in any way responsible for or liable for any interference with Licensee’s use of the City property which may be caused by new technology. In the event that any other tenant’s activities interfere with the Licensee’s use of the leased facilities, and such use or operation was not in existence of the date of this lease, and the Licensee cannot resolve this interference with the other tenants, the City will, upon written request by Licensee, cause such interfering use to cease. Licensee understands that if its use interferes with a prior tenant or the City use, and the interference problem cannot be cured, then Licensee will be required to power down the interfering equipment Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 4 or move the equipment until such interference can be resolved. The Licensee shall cooperate with all other tenants to identify the causes of and work towards the resolution of any electronic interference problem. In addition, the Licensee agrees to eliminate any radio or television interference caused to City-owned facilities or surrounding residences at Licensee’s own expense and without installation of extra filters on City owned equipment. Licensee further agrees to accept such interferences as may be received from city operated telecommunications or other City facilities located upon City property. The Licensee shall not locate or maintain its telecommunications facilities so as to unreasonably interfere with the use of the public ways by the City, by the general public or by other persons authorized to use or be present in or upon the public ways. All such facilities which interfere with public ways shall be moved by the Licensee, at the Licensee’s cost, temporarily or permanently as determined by the City Public Works and Utilities Director. H. This license is non-assignable and non-exclusive. This license agreement does not preclude the City from granting a similar agreement, right, lease, franchise etc. to other carriers, providers or other persons for telecommunications or other purpose. I. Permitting. All required permitting is the sole responsibility of Licensee. J. Site Configuration. Final site configuration and drawings will be provided and included into this license as Exhibit B. K. City confirms that the property and site are in compliance with all federal, state and local law as of the execution of this Agreement. Any FCC and FAA approval of the placement of equipment on the Tower and use thereof shall be responsibility of the Licensee. L. Removal of Improvement. All changes to site configuration, and all improvements attached to real property including landscaping, with exception of the telecommunications equipment owned by Licensee, will become the property of the City upon expiration or termination of the agreement. 2. Indemnification. Licensee, agents of Licensee, and contractors of Licensee shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Licensee's use of the License Property pursuant to this Agreement, except for that portion of the injuries and damages caused by the City's sole negligence. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 5 the Licensee and the City, its officers, officials, employees, agents and volunteers, the Licensee's liability hereunder shall be only to the extent of the Licensee's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE LICENSEE'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. 3. Insurance. Licensee shall procure and maintain for the duration of this license, insurance against claims for injuries to persons or damage to property that may arise from or in connection with the operation of this license by Licensee, its agents, representatives, employees, contractors or subcontractors. By the effective date of this License Agreement, Licensee shall provide a Certificate of Insurance evidencing: Commercial General Liability insurance written on an occurrence basis with limits no less than $2,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and employer’s liability. Automobile Liability insurance with limits no less than $2,000,000 combined single limit per accident for bodily injury and property damage; and Worker’s Compensation within statutory limits and employer’s liability insurance with limits of not less than $1,000,000.00; and Comprehensive premises-operations, explosions and collapse hazard, underground hazard and products completed hazard with limits of not less than $2,000,000.00. Any payment of deductible or self-insured retention shall be the sole responsibility of Licensee. The City shall be named as an additional insured on the insurance policy, with respect to the operation of this license by or on behalf of Licensee, and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 6 Licensee’s insurance shall contain a clause stating that coverage shall be primary and non-contributory and contain a waiver of subrogation. The City shall be provide such evidence within 30 days of contract execution and within thirty (30) days of City’s written request for proof of coverage. Proof of coverage shall be provided once per calendar year. Licensee shall provide thirty (30) days advance notice of cancellation of any coverages required in the Section 3. All coverage notices shall be sent to the City’s risk Manager by fax at: 360-473-5161 or by mail at:City of Bremerton, Attn: Risk Manager, 345 6th Street STE 100, Bremerton, WA 98337. 4. Termination. City may terminate this license at its sole discretion with 60 days prior written notice, for convenience or otherwise and for no consideration or damages. Licensee may terminate this agreement with 90 days prior written notice. Licensee shall, upon expiration of the Term or within ninety (90) days after any earlier termination of this Agreement, remove its antenna(s), equipment, conduits, fixtures, and all personal property and restore the Premises to its original condition, reasonable wear and tear and casualty damage excepted. 5. Modification. This license may not be modified, altered, or amended unless first approved in writing by the City. Licensee shall not allow the mounting, installation, wiring or relocation of any equipment not belonging to the City on the premises without written permission of the City. 6. Breach. In the event of any alleged breach or threatened breach of this License Agreement by either party, and if City and Licensee are unable to cure the breach or otherwise resolve their dispute, then final resolution of the dispute or claim shall occur solely under the jurisdiction and venue of the Kitsap County Superior Court, and each party shall be responsible for its own legal costs and attorney fees incurred in defending or bringing that claim or lawsuit. 7. Binding Effect. This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors. 8. Entire Agreement. This License Agreement document contains the entire agreement between the parties and, in executing it, City and Licensee do not rely upon any statement, promise, or representation, whether oral or written, not expressed herein. 9. Non-Waiver. Waiver of a breach of any provision hereof shall not be deemed to be a waiver of a breach of any other provision or a subsequent breach of the same provision. 10. Notices. Any notice desired or required to be given hereunder shall be in writing, and shall be deemed received three days after deposit with the U.S. Postal Service, postage fully prepaid, certified mail, return receipt requested, and addressed to the party to which it is intended at its last known address, or to such other person or address as either party shall designate to the other from time to time in writing forwarded in like manner: Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 7 City of Bremerton Day Management Corp dba Day Wireless Systems Finance Department PO Box 22169 345 6th St. STE 100 Milwaukie, OR 97268-2169 Bremerton, WA 98337 (503) 659-1240 360-473-0681 11. Severability. In the event that one or more provisions of this Agreement shall be determined to be invalid by any court of competent jurisdiction or agency having jurisdiction thereof, the remainder of the Agreement shall remain in full force and effect and the invalid provisions shall be deemed deleted. 12. Counterparts. This license may be executed in two or more counterparts, any of which shall be deemed an original but all of which together shall constitute one and the same instrument. IN WITNESS WHEREOF, this License Agreement is executed and shall become effective as of the last date signed below. CITY OF BREMERTON DAY MANAGEMENT CORP. D/B/A DAY WIRELESS SYSTEMS By: By: Print Name: Print Name: Its: Its: Date: Date: Approved as to form: __________________________ Kylie J. Finnell, City Attorney Attested: _______________________________ Angela Hoover, City Clerk Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 8 EXHIBIT A: Site Description Parcel #: 012401-1-067-2004 1925 Cheryl Street NE, Bremerton, WA 98310 NW1/4 SW1/4 NE1/4 ADDN'L BLDG VALUE CARRIED UNDER 012401-1-118-2003 9.22 (approx. 401,623 sq. ft.) Latitude, Longitude 47.60197462, -122.61718177 Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 9 EXHIBIT B: license property configuration drawing, equipment list, and application Configuration includes placement of equipment on the tower, use of the ice rack, and tower rack placed in the small room (b) of the equipment building. 1. Equipment listing: Antenna #1 Antenna #2 Antenna #3 Existing/New/Remove New New New Type of Antenna Omni Omni Dish Quantity 1 1 1 Manufacturer RFI RFI Mikrotik Model *Attach Cut Sheets TBD TBD mANT30 Desired Mounting Height 180 150 150 Length (feet) 19' 19' 2.3' Weight (lbs) 55 55 20lb Azimuth(s) NA NA ~95 Tower Leg TBD TBD E Feedline Count 1 1 1 Size of Feedline 7/8" 7/8" CAT5E (1/4") Radio Equipment Information Radio #1 Radio #2 Radio #3 Radio #4 Radio #5 Radio #6 Existing/New/Remove New New New New New New Class of Service Licensed Licensed Licensed Licensed Licensed Unlicensed FCC Call Sign TBD TBD TBD TBD TBD NA Manufacturer Motorola Motorola Motorola Motorola Motorola Mikrotik Model Number MTR3000 MTR3000 MTR3000 MTR3000 MTR3000 Basebox 5 TX Frequency 454.43125 461.5375 461.8 462.15 454.51875 5.1gHz RX Frequency 459.43125 466.5375 466.8 467.15 459.51875 5.1gHz Channel Width (Mhz) 0.0125 0.0125 0.0125 0.0125 0.0125 20 Channel Center TX Power 100 100 100 100 100 30dBm ERP 250 250 250 250 250 53dBm Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 10 Tower Locates: Day Wireless Cheryl Street Tower License Agreement 2024 License Agreement 11 Exhibit B: Configuration and Equipment listing Final configuration will be added after installation: AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2024 Resolution to repeal Resolution No. 3345 and to establish updated MRSC Small Public Works Roster processes for the City of Bremerton COUNCIL MEETING Date: July 17, 2024 Department: Public Works Presenter: Melinda Monroe Phone: (360) 473-5306 SUMMARY: The City would like to repeal Resolution No. 3345 aligning the Small Works Roster Resolution with the new changes included in SB 5268 and RCW 39.04.151-155. Resolution No. ______ allows City staff continued benefits of the MRSC Roster Services including the new option to use direct contracting when the expected project value is less than $150,000 and when there are six (6) or more Small Disadvantaged Business Enterprises listed in the appropriate roster work category. ATTACHMENTS: Resolution No. ________; Resolution No. 3345; Summary of Changes FISCAL IMPACTS (Include Budgeted Amount): N/A STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to adopt Resolution No. _____ repealing Resolution No. 3345 and updating the Small Works Roster process to align with statewide updates and limits as allowed per RCW 39.04.151-152 and award public works, consulting services, vendor supply, architectural, engineering and other professional services via the MRSC Roster process. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/09/2021 A4 Page 1 of 4 Resolution Rev. 10/2019 RESOLUTION NO. A RESOLUTION of the City Council of the City of Bremerton, Washington, on the subject of repealing Resolution No. 3345 and establishing a Small Public Works Roster process to award public works contracts and a consulting services roster for architectural, engineering and other professional services. WHEREAS, RCW 39.04.155 and other laws regarding contracting for public works by municipalities, will expire on July 1, 2024 and will be replaced by RCW 39.04.151 and RCW 39.04.152, and other laws which will allow certain contracts to be awarded by a Small Works Roster process; and WHEREAS, in order to be able to implement the Small Works Roster processes, the City is required to adopt a resolution establishing specific procedures; and WHEREAS, RCW 39.80.030 requires that an agency publish in advance that agency’s requirement for professional services and that one of the ways to accomplish that notification is to announce generally to the public its projected requirements for any category or type of professional services and request qualification statements to be kept on file with the agency; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. Resolution No. 3345 is hereby repealed and replaced with this Resolution. SECTION 2. MRSC Rosters. The City currently contracts with the Municipal Research and Services Center of Washington (MRSC) to adopt for City use of those statewide electronic databases for small public works roster, consulting services and supplier roster services developed and maintained by MRSC. In addition, paper and/or electronic rosters may be kept on file by appropriate City departments. The City hereby elects to use the statewide small works roster established under RCW 39.04.151(2) and administered by the MRSC. SECTION 3. Small Public Works Roster. The following Small Works Roster procedures are established for use by the City pursuant to RCW 39.04.151 and RCW 39.04.152: 1. Cost. The City need not comply with formal sealed bidding procedures for the construction, building, renovation, remodeling, alteration, repair, or improvement of real property where the estimated cost does not exceed the limits as set forth in RCW 39.04.152, as currently enacted and hereafter amended, which includes the costs of labor, material, equipment and sales and/or use taxes as applicable. Instead, the City may use the Small Public Works Roster procedures for public works projects as set forth in RCW 39.04.151-152. The breaking of any project Page 2 of 4 Resolution Rev. 10/2019 into units or accomplishing any projects by phases is prohibited if it is done for the purpose of avoiding the maximum dollar amount of a contract that may be let using the Small Works Roster process. 2. Publication. At least twice a year, on behalf of the City, MRSC shall publish in a newspaper of general circulation within the jurisdiction a notice of the existence of the roster or rosters and solicit the names of contractors for such roster. Responsible contractors shall be added to appropriate MRSC Roster(s) at any time that they submit a written request and necessary records. The City may require master contracts to be signed that become effective when a specific award is made using a Small Works Roster. 3. Telephone, Electronic or Written Quotations. The City shall obtain telephone, written or electronic quotations for public works contracts from contractors on the appropriate Small Works Roster to assure that a competitive price is established and to award contracts to a contractor who meets the mandatory bidder responsibility criteria in RCW 39.04.350(1) and may establish supplementary bidder criteria under RCW 39.04.350(2). a. A contract awarded from a Small Works Roster need not be advertised. Invitations for quotations shall include an estimate of the scope and nature of the work to be performed as well as materials and equipment to be furnished. However, detailed plans and specifications need not be included in the invitation. b. Quotations may be invited from all appropriate contractors and vendors on the appropriate Small Works Roster Category. All requirements to invite and notify vendors on the small works roster as set forth in RCW 39.04.152 as currently enacted and hereafter amended shall be followed. The City has the sole option of determining whether notification to the appropriate amount of remaining contractors is made by: i. Publishing notice in a legal newspaper in general circulation in the area where the work is to be done; ii. Mailing a written notice to these contractors; or iii. Sending a written notice to these contractors by electronic method, facsimile or email. c. City representatives shall not inform any contractor of the terms or amount of any other bids for the same project until the project has been officially awarded. d. A written record shall be made by the City representative of each contractor’s bid on the project and of any conditions imposed on the bid. Immediately after an award is made, the bid quotations obtained shall be recorded, open to public inspection, and available by telephone inquiry. Page 3 of 4 Resolution Rev. 10/2019 4. Award. All of the bids or quotations shall be collected by the Department Director or his designee. Awarding and modification of the public works contracts shall follow the limits and approval procedures set forth in BMC 2.76.100 and BMC 2.76.110. SECTION 3. Services and Supplier Rosters 1. Services. Consulting services are professional services that have a primarily intellectual output or product and include architectural and engineering services as defined in RCW 39.80.020. Architectural and Engineering, Consulting Services, Purchased and Personal Services may utilize Contract awards via the MRSC Roster and publication services in accordance with the processes outlined in BMC 2.76. 2. Goods and Supplier Roster. Goods and Supply vendors are included in the MRSC Roster services and may utilize Contract awards via the MRSC Roster and in accordance the processes as outlined in with BMC 2.76, RCW 39.04.190 and RCW 57.08.050. 3. Publication. At least twice a year, on behalf of the City, MRSC shall publish in a newspaper of general circulation within the jurisdiction a notice of the existence of the consulting services roster or rosters and solicit statements of qualifications from firms providing consulting services. Such advertisements will include information on how to find the address and telephone number of a representative of the City who can provide further details as to the City’s projected needs for consulting services. Firms or persons providing consulting services shall be added to appropriate MRSC roster or rosters at any time that they submit a written request and necessary records. The City may require master contracts to be signed that become effective when a specific award is made using a consulting services roster. Professional Architectural and Engineering Services. The MRSC Rosters will distinguish between professional architectural and engineering services as defined in RCW 39.80.020 and other consulting services and will announce generally to the public the City’s projected requirements for any category or type of professional or other consulting services. The City reserves the right to publish an announcement on each occasion when professional services or other consulting services are required by the agency and to use paper and/or other electronic rosters that may be kept on file by appropriate City departments. SECTION 4. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 5. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. Page 4 of 4 Resolution Rev. 10/2019 PASSED by the City Council of the City of Bremerton, Washington this day of , 2024. JENNIFER CHAMBERLIN, Council President APPROVED AS TO FORM: ATTEST: KYLIE FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk R:\Legal\Legal\Resolutions\Public Works\2021.04.27 Resolution - Small Works Roster.doc AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2024 Contract with Redside Construction LLC for Evergreen Rotary Park Boat Ramp Repair Project COUNCIL MEETING Date: July 17, 2024 Department: Public Works & Utilities Presenter: David Dinkuhn Phone: (360) 473-5331 SUMMARY: This Contract provides for the repair of the boat ramp at Evergreen Rotary Park. Work includes installation of City-provided Ultrablock for retaining walls, pressure grouting voids under the existing ramp, backfill, and beach debris removal. Bid solicitations were sent to six construction firms listed on the MRSC Small Works Roster. A single bid was received on June 27, 2024 from Redside Construction for $184,887.61 (including sales tax). ATTACHMENTS: 1) Contract 2) Photographs FISCAL IMPACTS (Include Budgeted Amount): Project is funded by REET and bid amount is available in project budget. STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the contract with Redside Construction, LLC in the amount of $184,887.61 (including sales tax) for the Evergreen Rotary Park Boat Ramp Repair project and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A5 Contract Documents For: Evergreen Rotary Park Boat Ramp Repair City of Bremerton Project No. 59169 Bids Accepted Until: 11:00 am PDT, June 27, 2024 Email or mail bids to Contact Person listed below: Contact Person: David Dinkuhn, PE Public Works & Utilities 345 Sixth Street, Suite 100 Bremerton, WA 98337-1873 Tel: (360) 473-5331 david.dinkuhn@ci.bremerton.wa.us CERTIFICATE OF ENGINEER The technical material and data contained in these Specifications for the Evergreen Rotary Park Boat Ramp Repair were prepared under the supervision and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below.   Prepared by: David Dinkuhn, PE Stormwater Project Manager TABLE OF CONTENTS PAGE PART I – BIDDING REQUIREMENTS AND CONTRACT FORMS NOTICE INVITING BIDS ............................................................................................................ I-1 BIDDER’S CHECKLIST .............................................................................................................. I-3 PROPOSAL BOND ..................................................................................................................... I-5 CONTRACTOR’S REGISTRATION ........................................................................................... I-6 CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES ............................. I-7 BID PROPOSAL ......................................................................................................................... I-8 PROPOSAL FORM .................................................................................................................... I-9 INFORMATION REQUIRED OF BIDDER ................................................................................ I-14 CONTRACT .............................................................................................................................. I-17 CONTRACT CERTIFICATE – CORPORATION ....................................................................... I-22 CONTRACT CERTIFICATE – LIMITED LIABILITY COMPANY ............................................... I-23 CONTRACT CERTIFICATE – PARTNERSHIP ........................................................................ I-24 CONTRACT CERTIFICATE – JOINT VENTURE ..................................................................... I-25 PERFORMANCE BOND ........................................................................................................... I-26 PAYMENT BOND ..................................................................................................................... I-28 PAGE PART II – SPECIAL PROVISIONS INTRODUCTION TO THE SPECIAL PROVISIONS .................................................................. II-1 DIVISION 1 – GENERAL REQUIREMENTS ............................................................................. II-2 DIVISION 2 – EARTHWORK ................................................................................................... II-27 DIVISION 6 – STRUCTURES .................................................................................................. II-29 DIVISION 8 – MISCELLANEOUS CONSTRUCTION .............................................................. II-31 APPENDICES A CONSTRUCTION PLANS – Under Separate Cover B CONSTRUCTION FORMS – Available Upon Request C PERMITS – Provided when Available PART I BIDDING REQUIREMENTS AND CONTRACT FORMS City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair I-1 Contract Documents NOTICE INVITING BIDS for Evergreen Rotary Park Boat Ramp Repair City of Bremerton, Washington NOTICE INVITING BIDS SMALL WORKS ROSTER BID SOLICITATION: In accordance with competitive bid requirements set forth under RCW 39.04.155, Small Works Contract Procedures, the City of Bremerton invites interested bidders to submit a bid for this solicitation. Contractors who bid on this project must be registered on the Small Works Roster by the time that bids are due. RECEIPT OF BIDS: Bids for the: Evergreen Rotary Park Boat Ramp Repair project will be accepted until June 27, 2024, at 11:00 am PDT. Transmit bids by email to david.dinkuhn @ci.bremerton.wa.us or by mail to David Dinkuhn, PE, 345 6th Street, Suite 100, Bremerton, WA 98337-1891. OPENING OF BIDS: The bids will be opened and read on June 27, 2024 at 11:00 a.m. PDT. COMPLETION OF WORK: The WORK must be completed within thirty (30) working days after the commencement date stated in the Notice to Proceed. DESCRIPTION OF WORK: This Contract provides for the repair of the boat ramp at Evergreen Rotary Park. Work includes installation of City-provided Ultrablock for retaining walls, pressure grouting voids under the existing ramp, backfill, and beach debris removal all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications. PRE-SELECTED GROUTING SUBCONTRACTOR: Bidders shall subcontract with Northwest Grouting LLC for grouting work. See Special Provision Section 8-34 High Strength Grout for contact information. CONDITIONED NOTICE TO PROCEED: Bidders shall be aware that Notice to Proceed for construction shall not be issued until all project permits are obtained by the City. ENGINEERS ESTIMATE: Engineer’s Estimate range for this project is $150,000 to $200,000. All work shall be performed in accordance with the Contract Plans, these Contract Provisions, and the latest edition of the WSDOT/APWA Standard Specifications. PROPOSALS: All bid proposals must be made on the blank forms furnished in the Contract Documents. Envelopes containing bids shall be entitled: Evergreen Rotary Park Boat Ramp Repair. PROPOSAL BOND: Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier’s check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. The failure to furnish a bid deposit of a minimum of five percent (5%) shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair I-2 Contract Documents CONTRACT BONDS: The successful bidder will also be required to provide a Performance Bond and a Payment Bond each for 100 percent of the Contract Price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bonds within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of seventy-five (75) calendar days from the date of bid opening. WAGE RATES: The attention of Bidders is directed to the requirements and conditions of employment to be observed and the minimum wage rates to be paid under the Contract. PROJECT ADMINISTRATION: All communications relative to this WORK prior to opening bids shall be directed to: Communication by phone/email: David Dinkuhn, PE Telephone: (360) 473-5331 david.dinkuhn@ci.bremerton.wa.us CITY’S RIGHTS RESERVED: The City of Bremerton reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. PUBLIC DISCLOSURE: All Proposals, including attachments and any documentation, submitted to and accepted by the City in response to this Notice Inviting Bids, become the property of the City and are subject to the disclosure provisions of the Washington Public Records Act. Submittals shall become property of the City and considered public documents under applicable Washington State laws. All documentation provided to the City may be subject to disclosure in accordance with Washington State public disclosure laws. EQUAL EMPLOYMENT OPPORTUNITY STATEMENT: It is the policy of the City of Bremerton to offer equal employment opportunity to all individuals. The City of Bremerton will administer all actions with respect to employment practices in compliance with federal, state, and local laws, and will not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental, or sensory disability. TITLE VI STATEMENT: The City of Bremerton, in accordance with the provisions of Title vi of the Civil Rights Act of 1964 (78 Stat. 252,42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded fill and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair I-3 Contract Documents ADA STATEMENT: The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services, and activities of the City of Bremerton. END OF Notice Inviting Bids City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp Repair I-4 Contract Documents BIDDER’S CHECKLIST This section lists the contract forms required for this project. The bidder’s attention is especially directed to the forms that must be executed in full as required and submitted with the bidder’s bid. These are indicated as follows in the section titled “Bid Documents.” BID DOCUMENTS These documents must be executed and submitted to the City with your bid, no later than the designated bid closing date and time. Bids that do not include all of the required forms, properly completed, may be declared unresponsive. 1. Proposal Bond 2. Contractor’s Registration 3. Certification of Compliance with Wage Rate Statutes 4. Bid Proposal 5. Proposal Form 6. Bid Certificate 7. Information Required of Bidder Documents to be Executed by the Successful Bidder The following forms are to be executed after the contract is awarded. These forms must be submitted within five (5) calendar days after the date of Notice of Award of Contract. 1. Contract 2. Contract Certificate 3. Performance Bond (Bond is for 100% of the Contract Amount) 4. Payment Bond (Bond is for 100% of the Contract Amount) 5. Insurance Certificates Documents to be Executed Prior to Work The following form is to be executed prior to first payment: 1. Statement of Intent to Pay Prevailing Wages, Department of Labor and Industries (obtain instructions and form at https://lni.wa.gov/licensing-permits/public-works- projects/contractors-employers/#required-documents-for-doing-the-work) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-5 Contract Documents SUBMIT THE ENCLOSED PROPOSAL BOND WITH YOUR PROPOSAL USE OF OTHER FORMS MAY SUBJECT YOUR BID TO REJECTION City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-10 Contract Documents PROPOSAL FORM EVERGREEN ROTARY PARK BOAT RAMP REPAIR Sales Tax – Sales tax shall be paid in accordance with Special Provisions Section 1-07.2(2) State Sales Tax Rule 170. Date: _______________, 202_ Item No. Spec Section Description of Item Est. Qty. Unit Unit Price Amount 1 1-04 Minor Change 1 Est. $15,000 $15,000 2 1-07 SPCC Plan 1 LS $ $ 3 SP 1-09 Mobilization 1 LS $ $ 4 SP 1-10 Project Temporary Traffic Control 1 LS $ $ 5 SP 2-02 Removal of Structures and Obstructions 1 L.S. $ $ 6 SP 2-02 Remove Beach Debris Incl. Haul 200 Ton $ $ 7 2-03 Unsuitable Foundation Excavation Incl. Haul 10 CY $ $ 8 SP 2-09 Shoring or Extra Excavation CL. A 1 L.S. $ $ 9 SP 8-01 Erosion/Water Pollution Control 1 L.S. $ $ 10 SP 8-33 Installation of Ultrablock for Retaining Wall (Ultrablock City supplied) 650 SF $ $ 11 SP 8-34 High Strength Grout 17 CY $ $ 12 SP 8-35 Sika Seal 1 LS $ $ Sales Tax (9.2%) $ TOTAL (BID ITEMS 1– 12 plus Sales Tax): $ END OF PROPOSAL FORM 37,500.00 500.00500.00 37,500.00 4,500.00 4,500.00 7,800.00 7,800.00 75.00 15,000.00 36.00 360.00 1.00 1.00 3,800.00 3,800.00 65.00 42,250.00 2,400.00 40,800.00 1,800.00 1,800.00 184,887.61 15,576.61 June 27 4 Company/Client Name Project Title Contract #Contract Value Description of Scopes of Work Type of Contract Estimated Completion Date Point of Contact (POC) POC Telephone # Company Performing Work JUB Enginereering and Simplot Legrow Pipeline Project EE $14,972,200 GC / CM for major Pipelin Project, incl construction of 3 ea 60" x 3000lf long Intake Pipes in Columbia River, Flexi Float Barges, Pile Driving from Barges, Pump Plant, and Existing Pipelines & Pump Plant Demolitions Private CURRENT, 2023 Gary Weatherly 509 783 2144 . C 509 737 7320 REDSIDE CONSTR. City of Bainbridge Island Winslow Water Tank Replacement $16,197,199.00 This project will demo the existing 1 MG reservoir and construct a new 2 MG elevated tank reservoir just north of the existing reservoir site. All site work, appurtenances, etc. Public Works CURRENT, 2025 Chris Munter 206-842-2016 REDSIDE CONSTR. City of Bremerton Pine Road Basin Stormwater Improvements Marine Impact Basin 870 $883,910.00 Replacement of the stormwater energy dissipator structure, beach restoration, and landscape and pavement restoration. Work includes installation and maintenance of erosion and sediment controls; flow bypassing; marine water management; excavation and temporary shoring; sawcutting, removal, repair, and installation of asphalt pavements; planting; and temporary traffic control Public Works CURRENT, 10/2024 David Dinkuhn 360-473-5331 REDSIDE CONSTR. Army Corps of Engineers LWSC Spillway Safety Barrier W912DW24P0016 $268,500.00 Replace the Spillway Safety Barrier at Lake Washington Ship Canal (LWSC)Federal CURRENT, 11/2024 Slava Govorushkin 206-764-6748 REDSIDE CONSTR. WSDOT Southworth Ferry Timber Deck & Roof Repair XE3522 $409,854.00 Improvement of the Southworth Ferry Terminal in Kitsap County, to remove timber decking that is covered in Asphalt or concrete and replace with steel pan decking and cast-in-place concrete. Additionally, the single ply roofing of the terminal building will be replaced with a new single-ply roof membrane and other work. Public Works CURRENT, 07/2024 Tom Castor 206-515-3727 REDSIDE CONSTR. City of Renton Gene Coulon Memorial Park North Water Walk CAG-22-014 $4,232,000.00 Removal of the existing concrete deck and replacing with light- penetrating grated decking supported on new steel girders, replacing picnic floats, replacing grated gangways and timber step runs with light-penetrating grated decking, replacing all treated timber components with recycled plastic lumber, wrapping piles for corrosion protection, minor repairs to existing pile caps, and related site work.. Public Works 8/7/2023 Betsy Severtsen 425-757-6657 REDSIDE CONSTR. University of Washington APL Floating Dock Restoration $2,697,000.00 Procurement of the float modules, steel access bridge, crane, new concrete abutment, Design and engineering Public Works 11/7/2023 Steve Robert 206-523-0024 ext 138 REDSIDE CONSTR. Port Gamble S'Kallam Tribe South Boat Ramp Replacement G&O 15614.01 $3,534,000.00 The project will consist of demolishing and wastehauling of the existing boat ramp and construction a pile supproted dual lane ramp with center floating dock Public Works 11/10/2022 Barry Baker 360-454-5490 REDSIDE CONSTR. Town of Friday Harbor Sewer Outfall Replacement Wilson engineering $3,131,563.00 Furnishing all labor, equipment and materials necessary for installing new 18-inch diameter HDPE pipe via directional drilling and placement on sea bed, connecting upland end to existing sewer outfall piping, and related work Public Works 3/17/2022 Michael Matthes 360-733-6100 Ext.1235 REDSIDE CONSTR. Port of Poulsbo Port of Poulsbo Boat Launch Replacement $595,821.25 Replacement of the Boat Launch Ramp, repair of the dock bulkhead, replacement of the boarding float and piling, cast in place abutment and stairs, and stormwater/upland improvements Public Works 7/30/2021 John Piccone 360-337-0029 REDSIDE CONSTR. Port of Tacoma WUT Fender System Replacement 71421 $1,711,100.00 Demolition of the existing fender systems including the precast concrete, fender piles, steel walers, chains, cables, and arch fenders. Installation of new fender systems that include cone fenders, UHMW- PE faced steel fender panels, chains, and anchorages. Repairing damaged concrete bullrail and water vault. Public Works 11/17/2021 Elly Bulega 253-428-8638 REDSIDE CONSTR. Metro Parks Tacoma Dickman Mill Expansion and Head Saw 202071J $1,611,124.00 The Dickman Mill Park Expansion and Head Saw Project consists of driving 52 steel piling, demo, new upland pile supported wood decking plazas;grated ramps to the upland plaza; additional guard railings; restoration ofthe historic mill pulley on placed wood decking; restoration of the historicmill head saw placed on a new base and supported on steel piles;restoration of the historic mill log carriage on existing in-water foundations and steel piles; a grated overwater walkway andoverwater view point with wood decking; etc. Public Works 7/1/2021 Kristi Evans 253-305-1054 REDSIDE CONSTR. CURRENT / PAST PROJECTS REFERENCE LIST Washington State Parks and Recreation Wave Attenuator Emergency Repairs SW-DA951 $130,115.37 Emergency Repairs to floating Wave Attenuator. Public Works 5/4/2021 Larry Mallo 360-725-9758 REDSIDE CONSTR. Army Corps of Engineers Alki Seawall / Coastal Erosion Control Project W912DW-19-C- 0033 $3,198,600.00 The work includes construction of a new soldier pile and precast concrete seawall waterward of the existing seawall, including work around an existing 54" outfall pipe owned by King County Federal 3/15/2021 Jenna Cunningham 253-363-0721 REDSIDE CONSTR. Chelan County PUD#1 Park Moorage Dock Replacement 20-04 $721,525.00 Replace Moorage docks at three parks on the columbia river. New docks and pile driving Public Works 2/28/2021 Court Hill 509-661-4143 REDSIDE CONSTR. PME / Department of the Navy BFHF7M Shoreline Remedy Repairs at BNC Bremerton Naval Complex 8004 $292,650.00 All Labor, Material and Equipment for a complete installation of shoreline remedy repairs. Includes all marine equipment and transportation; including but not limited to a crane barge, a deck barge and marine tug support as necessary for transport & installation of 300 tons small armor, filter & rat rock for shoreline rock Federal 1/1/2021 Seth Tinkham 360-598-9310 REDSIDE CONSTR. City of Bellevue Midlakes Pump Station Capacity Improvements 19022 $5,772,179.00 Demolition of existing pump station; Demolition on an existing building; Excavation and installation of new gravity sewer, deep manholes, and.force main under artesian conditions; Installation of new pump station, wet well, valve vault, meter vault,(under artesian aquifer conditions) control building, standby gene rator, RTU equipment, electrical and mechanical components; Groundwater Control during construction using dewatering. Public Works 1/1/2021 Vanaja Rajah 425-452-5286 REDSIDE CONSTR. Boat Street Marina Boat Street Marina Phase II $336,850.95 Demolition and disposal of existing approximately 3250 sq. ft. wharf including the removal of 41 piles. Construction of new 725 sq. ft. grated pier including the installation of 16 steel piles. Public Works 3/15/2021 Steven Agnew 206-634-2050 REDSIDE CONSTR. Port of Keyport Port of Keyport Boat Launch Reconstruction Project $536,346.49 The project generally consists of the removal and replacement of the existing concrete boat launch, pier renovations, and upland improvements. Upland improvements generally include but are not limited to new concrete slabs, demolition of the existing abandoned pump house, installation of a new low-pressure sanitary sewer service, and asphalt resurfacing. Public Works 3/27/2020 John Piccone 360-337-0029 REDSIDE CONSTR. Army Corps of Engineers LWSC ECS Crane Replacement W912DW-17-C- 0008 $5,225,820.00 Demolition and removal of the existing derrick crane, will require cutting the boom, mast, and stifflegs into easilyhandled sections for transport and disposal. These components are coated with paint that contains lead. The Contractor shall cut the crane components into sections utilizing a combination of flame cutting and mechanical cutting tools. The crane is centered 12 feet from the waterway. Conduct activities in a manner to preclude lead from escaping the control area and entering waterway. Federal 3/30/2020 Michael Bondor 206-764-3533 REDSIDE CONSTR. City of Seattle SCWQP- Ballard Early Work Package 2017-026 $7,540,809.00 This project consists of the following elements of work: Removal and replacement of existing Combined Sewer Overflow (CSO) Outfall; Removal and replacement of existing timber pier.; Remediation of contaminated site soils, including shoring, dewatering, soil excavation, transport, and disposal.; Installation of temporary electrical services for future project.; Relocation of existing water lines and other utilities to support outfall removal, temporary electrical service installation, and soil remediation. Public Works 1/17/2020 Cynthia Blazina 206-684-5080 REDSIDE CONSTR. City of Edmonds Five Comers Reservoir Recoating E5KA/c473 $2,822,374.00 The project entails complete recoating the 1.5 MG and 3.0 MG welded steel reservoirs and seismic upgrades to the 1.5 MG reservoir. Related work includes installation of overflow piping with air gap structure, roof vent hood assembly repl acement, ladder fall protection systems, manway retr ofits and cathodic protection (as an additive alternate) for both reservoirs; roof access hatch and landing for the 1.5 MG reservoir; and miscellaneous yard piping Public Works 5/1/2019 Henry Schoder 425-771-0220 REDSIDE CONSTR. City of Bainbridge Island Waterfront Park Bridge Repair $141,536.50 Construction of bridge improvements including, without limitation, demolition of the existing bridge decking, railings, and lighting, and replacement with new decking, railings, and lighting. Work includes: demolition, including debris containment and removal; installation of new decking, guardrails, and\ lighting; and associated work. Public Works 3/1/2019 Mark Epstein 206-780-3721 REDSIDE CONSTR. Kitsap County Public Works Wastewater Division Manchester Pump Stations and Beach Lines Rehabilitation KC-496-16 $5,268,656.39 construction include: Pump station rehabilitations including new; submersible wastewater pumps, wet wells, valve/meter vaults, and onsite piping at three existing pump station sites. New MCC and main control panels at all three pump stations. New standby generators at all three pump stations. Elevated concrete slabs, steps and handrails at all three pump stations. Associated site work and surface restoration at all three sites. Decommissioning and removal of three existing pump stations. Shoreline stabilization at two sites. Cured-in-place pipe (CIPP) beach line sewer rehabilitation and Coating.. Public Works 9/24/2018 Floyd Bayless 360-337-5631 REDSIDE CONSTR. Port of Seattle Terminal 5 Pile Removal & Disposal $2,679,000.00 Demolition of existing timber piers 23, 24, 25, and 26 and Shipway north of the Inner Harbor Line. This includes the demolition of creosote piles to the mud line, timber deck, miscellaneous abandoned utility lines, and miscellaneous steel items: saddles, tie straps, latter sect. Other work includes the demolition of existing steel sheet pile wall to the existing mud line. Regrade the site behind the demolished wall and installation of rip-rap along the slope. Public Works 2/15/2018 John H. Van Deursen 206-384-0613 REDSIDE CONSTR. City of Bainbridge Island City Dock Improvements $2,033,771.05 Construction of dock improvements including, without limitation, demolition of the existing city dock and pilings, and replacement with new pilings, floats, utilities, and amenities. Work includes demolition, including underwater debris removal; installation of new floats; water, fire, sewer, and electrical lines; concrete launch ramp extension; gate and fencing; dock appurtenances; and associated work. Public Works 3/31/2018 Mark Epstein 206-780-3721 REDSIDE CONSTR. Kitsap County Public Works Roads Division NE West Kingston Road Carpenter Creek Culver Replacement KC-461-16 $3,697,426.44 This contract provides for the improvement of NE West Kingston Road by constructing a Bridge over Carpenter Creek in the Kingston vicinity of northern Kitsap County. The work proposed consists of three schedules, Roadway Improvements, Sanitary Sewer and Water Main. Schedule A, Roadway Improvements consists of Preparation, Grading, Drainage, Storm Sewer, Surfacing, Cement Concrete Bridge Structure, Coating, HMA Pavement, Erosion \ Water Pollution Control, Traffic Safety and Control, Cement Concrete Traffic Curb and Gutter and Sidewalks, Gravity Block Wall and other work. Schedule B Sanitary Sewer consists of HDPE Sewer Pipe and Pipe Casing. Schedule C - Water Main consists of HDPE Pipe for Water Main. Public Works 4/30/2018 Floyd Bayless 360-337-5631 REDSIDE CONSTR. Bureau of Reclamation Cle Elum Radial Gate Modification R15PC00143 $2,343,818.00 Removal of corrosion prevention coating on portions of the radial gates; Handling and disposing of the removed coating; Removal of steel expanded metal and angle supports at top of radial gates 1through 5; Removal of the ports installed in radial gate 1; Surface preparation of portions of the gates, prior to welding; Furnishing and installing fabricated metal components on five radial gates; Furnishing and installing fabricated metal components to fill temporary ports in radial gate 1; Furnishing and installing aluminum skin plate on downstream side of five radial gates; Replacing rubber side seals on five radial gates; Spot repair coatings on five radial gates; Coating new metalwork on the radial gates; Overcoating existing metal handrails and hoist mounts. Federal 3/31/2017 Veniamin (Ben) Radchuk 208-378-5116 REDSIDE CONSTR. Chelan County PUD#1 Rocky Reach Dam Steel Floating Caission Rehabilitation 1463 $856,250.00 A very complex Project requiring removal of a 600 ton floating caisson from the water, demolition and disposal of all existing internal mechanical piping, installation of all new mechanical internal piping systems including large valves and valve stems for internal piping system, demo and replacement of major internal structural steel members, installation of a very large temp work platform structure including a fully contained shrink wrap system and environmental controls to facilitate lead & PCB abatement work, surface prep & re- coating of the caisson with high performance coatings including tenting the caisson & all necessary environmental controls, and then safely & efficiently re-launching of the caisson back into the Columbia River. Public Works 5/29/2015 Scott Tidd 509-661-4050 REDSIDE CONSTR. City of Bainbridge Island Eagle Harbor Waterfront Park $1,610,411.15 Construction of park improvements including, selective tree removal pruning, clearing and grubbing, grading, concrete paths and walls, rockeries, decomposed granite plaza, pavers, asphalt parking lot, sidewalks, stormwater systems and rain gardens, water and electrical services, lighting, planting, site furnishings, and other related ancillary items. Public Works 3/15/2017 Mark Epstein 206-780-3721 REDSIDE CONSTR. City of Tacoma Potlatch Transmission Lines North Bay Crossing Rebuild 4600009345 $1,934,000.00 Intertidal Replacement of Tacoma Power's Potlatch Transmission Lines North Bay Crossing with a new foundation, structure, conductors, and capping. Work included heavy pile driving from crane barge, technical marine demolition & disposal by barge of 6 marine foundations contaminated with lead paint in the middle of the bay, assembly and erection of a 165' tubular steel double circuit structure, forming and pouring major over water pile supported concrete cap usign barges / spud barges working around fluctating tides. Public Works 10/18/2014 James Blessing 253-502-8045 REDSIDE CONSTR. WA State Department of Natural Resources South Lake Shoreline Restoration DNR 13- E09 $2,397,400.00 Work included Marine capping & placement of 33,000 tons of shoreline restoration aggregates/sand under water along to create remediate a polluted shallow water habitat at Boeings Renton Plant. All work performed from multiple spud & deck barges using precision GPS Dredgepack Systems amd long reach excavators. Marine demolition including removal of PCB laden dredge spoils, dangerous waste / creosote, 2 derelict marine outfalls, removal of 1,00 feet of outer abandoned marine flume sheet pile walls, retoration 2.9 acres of wetland, removal of nonnative invasive plants from the 3 acre upland property, furnish and install 2 large marine outfalls, diving, tugboating, with fluctuating water levels. Public Works 9/1/2015 Monica Shoemaker 206-799-2949 REDSIDE CONSTR. Douglas County PUD Construct Carpenter Island Public Boat Launch 14-12-W $2,396,400.00 Site Demolition and Construction of Roadways, Parking Lots, Guardrails, Permanent Signage, Stormwater Detention Ponds, Restrooms, Boat Launch, New Boat Ramp, handling floats, concrete abutments, steel pile driving and navigation channel dredging Public Works 5/31/2016 Shane Phillips 425-778-5763 REDSIDE CONSTR. Hoffman Construction / City of Seattle Henderson CSO Underwater Pipeline Construction PW#212-010AC $778,000.00 Marine Dredging and Marine Outfall Installation from Spud Barge. Work included underwater placement of fish mix, pipe bedding, aggregrate underwater while workign from Spud Barges. Sedeminent Remediation, removal, & export of invasive species laden marine sediment was all performed via barges to facilitate upland landfill of disposal of sedimante / spoils. Work also included Diving and Survey. All of the aggregate material was purchase from Cal Portland Public Works 12/18/2015 Tony Kidd 206-793-5519 REDSIDE CONSTR. Chelan County PUD#1 Lincoln Rock & Daroga State Park Dock and Pile Replacement 1451 $1,099,144.00 Spud Barge & deck barge project. Removing and Disposing of existing docks and wood piles, furnishing and installing new docks, gangways, and new steel piles. Technical Marine logistically challenging project in non-navigable waters with fluctuating water levels Public Works 12/16/2014 Court Hill 509-661-4143 REDSIDE CONSTR. Army Corps of Engineers LWSC Tainter Gates & Trunnion Replacement W912DW-14-P- 0010 $637,000.00 Heavy Civil Spud barge / Crane Barge Project. Remove 6 ea existing 20 ton spillway tainter gates, trunnions, and anchor bolts using spud barge. Fabricate new trunnions, recoating, repair concrete over water with environmental controls, install 6 new gates and anchorages from spud barge in fluctuating water levels. Public Works 8/14/2014 Peter Krembs (425) 649-7242 REDSIDE CONSTR. Army Corps of Engineers LWSC Monolith Erosion & Scour Repair W912DW-12-C- 0002 $1,558,000.00 Work required barge import and in water placement of 26 million pounds of restoration aggregates under water in teh spillway using GPS / precision long reach excavators working from spud barges around fluctuating tides day and night. The project was to remediate excessive environmental scour below the spillway and the Ballard Locks monolith to protect against future environmental scour damage & seismic events. The work also included technical diving, furnishing and driving underwater sheet Piles by barge, underwater concrete placement, environmental controls, and multi-beam survey.Federal 3/16/2012 Peter Krembs 206.400.7408 REDSIDE CONSTR. Army Corps of Engineers LWSC Pintle Bearing Repair W912DW-12-C- 0001 $409,138.00 Major spud barge / crane barge project removing the 400ton upstream service gates at the Ballard Locks for ACOE. Prep Ballard Lock Gates for removal including diving, coating, transport to drydock for repair and re-install gates and pintles Federal 10/31/11- 12/22- 11 Peter Krembs 206.400.7408 REDSIDE CONSTR. Department of Ecology Northlake Shipyard Sandblast Grit Interim Removal C1400116 $1,519,571.00 MTCA cleanup action project dredging, disposing, and capping of 12,500 tons of extremely contaminated sediment and sand blast grit in Northlake Shipyard, Seattle. Arsenic, Heavy Metals, PCB, Heavy Environmental Pollution. Work site was 2.5 acres of undewater lake bottom at Northlake Shipyard. All sediment remediation work and marine cap material placement peformed using deck barges and spud barges, dredging machines using RTK positioning, multi-beam bathymetric survey controls, water quality monitoring with telemetry, Cat345CL long reach excavator and crane barge. Water levels fluctuated during construction.Public Works 5/14/2014 Libby Goldstein (425) 649-7242 REDSIDE CONSTR. City of Bainbridge Island Rockaway Beach Dam Termpary Service Gate Rehabilitation $1,056,432.00 Marine Shoreline Restoration Project to remediate a large slide into the intertidal area of Bainbridge Island. Construction, Installation 350 feet soldier pile wall in intertidal zone including Drilled Shafts & Soldier pile on beach, Work included beach nourishment and remediation mateiral placed in teh intertidal, intertidal Wet Excavation, Beach Nourishment Sand Installation, Dewatering, Intertidal CIP concrete placement, intertidal rock placement & geowall, precast concrete panels for marine seawall. Work occured 24hrs days and nights and Labor Day working around tides. Project successfully performed on extremely tight 5 week schedule to meet a fisheries closure. Public Works 6/12/2014 Chris Hammer 206-780-3740 REDSIDE CONSTR. Mukilteo Water & Wastewater District Big Gulch WWTF Outfall Replacement 8586 $615,393.00 Large Marine Outfall w/ Concrete Anchors Installation in Puget Sound. All work performed using multiple Spud & deck barges. Also included multi-beam hydrographic surveying support, technical diving, working around tides / fluctuating water levels.Public Works 8/1/2013 Harry Seller 206-284-0860 REDSIDE CONSTR. City of Lynnwood WWTF Outfall Diffuser Replacement 2040 $390,630.00 36" dia Marine Outfall w/ Concrete Anchors Installation in Puget Sound using Barges & Divers. Work required precision GPS locating from barges, contaminated materials removal and disposal of old marine piping (lead), intertidal material placement, hydrographic surveying Public Works 9/20/2011 Brian Delp 425-670-5224 REDSIDE CONSTR. University of Washington WAC Float Replacement 203205 $333,000.00 Spud barge / barge project. Demo and Disposal of existing timber floats, floatation; Furnishing and installing new timber floats and pile hoops Public Works 8/1/2013 Don Romain 206-221-4396 REDSIDE CONSTR. Hat Island Community Hat Island Marina Expansion $2,800,000.00 50,000cy's dredging & dewatering of a major boat basin using multiple pump, construction of new pile breakwaters at marina entrance channel with steel pipe & sheet piles, new rock jetties, new concrete boat ramp & bulkhead, maintenance and repair of rock breakwater and bulkhead, maintenance dredging of marina basin and entrance channel. Multiple crane barges and 5 excavators used for the work. Private 3/1/2013 Chuck Motson 360-444-6611 REDSIDE CONSTR. Western Washington University Lakewood Dock Replacement $366,351.00 a. Spud barge project in a freshwater lake. New Main Pier/Ramp/Dock - The removal of the existing Main pier, ramp and dock together with associated support piles and the replacement with new piles, pier, ramp, and dock. b. West Launch Pier/Ramp/Dock - The shortening of the existing West Launch pier together with the removal of four timber piles and the installation of new pier decking, ramp, dock and associated piles. c. East Launch Pier/Ramp/Dock - The repair of four existing East Launch ramp/dock timber piles (steel sleeve); and the repair of two existing east launch pier timber piles (fiberglass jacket). Public Works 3/31/2013 Mike DiSpigno 253-383-2740 REDSIDE CONSTR. Marine Floats Corporation Girl Scouts Camp Pile Removal and Pile Driving $52,175.00 Puget Sound Project working in fluctuating water levels, intertidal areas, included Pile Removal, Disposal, and Pile Driving Private 2/7/2013 Logan Brown 253-383-2740 REDSIDE CONSTR. Marine Floats Corporation Pleasant Harbor Marina Pile Removal and Pile Driving $77,600.00 Puget Sound Project working in fluctuating water levels, intertidal areas, included Pile Removal, Disposal, and Pile Driving Private 1/21/2013 Logan Brown 253-383-2740 REDSIDE CONSTR. City of Gig Harbor Maritime Pier, Ramp and Float $534,677.00 Demolition of existing creosote timber pier, and replace with a new fixed timber pier supported by steel pipe piles, A new timber float, anchored with steel pipe piles; Installation of a new aluminum gangway from the end of the fixed pier to a new timber float, HDPE utilities, and signage. Public Works 10/15/2012 Marcos McGraw 253-853-2647 REDSIDE CONSTR. Port of Port Angeles Tumwater Creek Bridge Replacement $828,696.00 Work included demolition and removal of mulitiple bridges in intertidal and replacement of a timber bridge at the mouth of Tumwater Creek where it meets Port Angeles Harbor. Work will include driving steel piles, replacing sheet pile wall with rip rap, and installation of a sheet pile wall behind an existing sheet pile wall that would then be removed. Public Works 5/16/2012 Chris 360/417-3446 REDSIDE CONSTR. Kitsap County Public Works NW Stavis Bay Bridge Replacement 3640 $721,048.00 Bridge replacement in Stavis Bay. Work Included Rivirine Excavation, In-water Excavation and fish mix placement on shoriline, dewatering, driving Steel Piling, installation of ELJ's in intertidal, Furnishing,Installing and Grouting Prestressed Concrete Voided Slabs, Surfacing, various Concretes Class 4000, various HMA Pavements, Erosion Control and Planting, Traffic Safety and Control and related work.Public Works 12/19/2011 Jacques Dean 360-337-4693 REDSIDE CONSTR. HDB Marine 25 Mile Creek Guard Station Dock & Boathouse $183,000.00 Spud barge project 25 miles up Lake Chelan. Technical Marine Logistics, included Pile Driving of 24"steel pile, Installation of Boathouses and Pier Subcontract 8/16/2010- 9/30/2010 Martin McDonald P)208-689-3248 F)208-689-3636 REDSIDE CONSTR. City of Wenatchee Wenatchee Day Use Moorage Facility Design / Build Project 804 $641,252.00 Spud Barge Project / technical marine project using barges in high current and fluctuating water level area of the Columbia River. Work inlcuded very technical in-river Marine Rock Drilling, Tugboat Support, Design / Engineer / Build Boarding Float System Complete, Install Elevated Steel Transition platform & 2 ea 6'x80' design / build / engineer gangways, electrical, landscaping, signage, irrigation & paving Public Works 7/09-12/09 Gary Owen(PM), Carl McNabb (PND Engineer) 509-888-3204 Gary, 206-624- 1387 Carl REDSIDE CONSTR. Department of Natural Resources (WSDNR) Marine Station and Squaxin Island Dock Removals 10-E39 $233,000.00 Removed and dispose of 2 ea major creosote treated piers, pilings, dolphins, and associated structures at two intertidal locations in Puget Sound. Work inlcuded removal and remediation of underwater pollution and marine sediments including diving.Public Works 2/7/11-3/14/11 Monica Shoemaker (206) 799-2949 monica.shoemake r@ dnr.wa.gov REDSIDE CONSTR. Max Kuney Construction WSDOT SR-285 George Sellar Bridge 7677 $42,000.00 Spud barge project. Barge, Tugboat, & Marine Installation of Main Steel Bridge Beams under Major Bridge Subcontract 10/10/19- 11/15/09 Michael Grimes/Kevin Carroll 509-535-0651 REDSIDE CONSTR. WSDOT Bremerton Ferry Terminal Slip 1 Seismic Retrofit 00-0844 $60,270.00 Spud barge project, included working around tides in intertidal zone to install a seismic retrofit & new fenderign of the Slip bridge seat at the Bremerton Ferry Terminal, and other work Public Works 5/11/2011 Mike Morrow 206-515-3944 REDSIDE CONSTR. South Puget Sound Salmon Enhancement Group (SPSSE)Squaxin Island Bulkhead Removal $81,869.00 Shoreline Remediation Project performed using spud barges and deck barges. Included shoreline excavation & in-water Excavation and new beach nourishment material placement in the intertidal using excavators and barges.Public Works 3/16/11-3/29/11 Brian Combs P)360-412-0808 ext 2 F)360-412- 0809 REDSIDE CONSTR. City of Portland Bureau of Purchases Riverplace Breakwater Dock Repair 110221 $377,242.00 Marine Project in Major River in Urban Area similar to Duwamish location. Marina Dock Float Renovation & Repairs, Electrical, & Marine HDPE Utilities Public Works 5/09- 10/09 Susan Watt 503-823-5593 REDSIDE CONSTR. Washington State Parks and Recreation Jones and Sucia Islands State Parks- ADA Moorage: In-water Improvements NW-C3805 $371,360.22 Spud barge project, intertidal project working in Puget Sound flucturating water levels, included major demolition and disposal of existing pier / creaosote structures, Pile Driving, Installation of Floats and Gangways, constructing new concrete abutments Public Works 9/11-1/11 Phillip Jensen P)360-755-5262 F)360-428-1094 REDSIDE CONSTR. Triton Logging Inc PSE Project Marine Mob/Demo Logistical Support Services $49,650.00 Technical Marine Mobilization/Demobilization of Spud Barge, and Marine Support Private Contract 11/10-12/10 Andrew Walker P)604-414-7888 REDSIDE CONSTR. Cape George Colony Club George Marina Pile Sleeving $28,394.00 Dredging, Sleeving & Grouting MarinaPiling in interdidal zone Private 2/1/11-2/11/11 Art Burke 360-385-1177 manager@ capegeorge. Org REDSIDE CONSTR. Razz Construction, Inc Anacortes/Guemes Island Pile Driving $35,390.00 Intertidal project working in Puget Sound flucturating water levels buiding a new ferry terminal, Pile Driving from spud barges.Subcontract 1/27/11-2/3/11 Dave Rasmussen P)360-319-5739 F)360-752-0099 REDSIDE CONSTR. Port of Orcas North Outfall Drainage Improvements $150,649.00 Interdidal project requiring relocation of an existing Marine Outfall, New pipe anchor system using driven steel piles on the beach in intertidal zone, 30" HDPE Outfall Repair and Demolition of Ex'g Concrete Anchoring System, New Metal Fabrications, Earthwork, Storm Drainage Utilities. Work included fish mix placement on beach in intertidal for shoreline rehabilitation.Public Works 1/1/2010 Bea von Tobel, Port manager David Williams, Engineer 360-376-5285 Bea 425-951-4876 David Williams REDSIDE CONSTR. Port of Bremerton Port Orchard Building Pile Repair $97,733.00 Spud barge project. Intertidal pier rehabilitation project working from barges in Puget Sound flucturating water levels.Public Works 8/09-10/09 Steve Slaton (Owner), David Pierce (PND Engineer) 360-674-2381 Steve, 206-624- 1387 David REDSIDE CONSTR. Riptide Condominium Riptide II Slope Stabilization Project $363,972.00 Intetidal Wall Project and sediment remediation to repair an environmental slope failure on to Puget Sound Beaches. Intertidal / marine Installation of Soldier Piling & Precast Concrete Panel Wall, Marine Drilled Concrete Shafts Install, Intertidal Excavation, Barge Transport & Marine Placement for Slope Stabilization, HDPE Utilities, Drainage Correction Private 2/09-4/09 Sharon Schrader 360-373-9608 REDSIDE CONSTR. Driftwood Key Club Marina Renovation & Waler Replacement Project $202,000.00 Marina Refurbishment Contract, Waler Replacement, Float Utilities, Float Misc Structural Steel, Marina Floats Refurbishment Private 1/09-4/09 Bill Buegel 360-638-2077 REDSIDE CONSTR. Port of Port Townsend Quilcene Marina Dredging Project $178,850.00 Sediment Dredging and barge Disposal of 3,500cy of Sediment using a 62' long reach excavator w/built-in GPSspud working from spud barge using deck barges for material export. Work included in-water placement of new marine sediment / rock to stabilize wing walls at marina entrance. Work included hydrograhic surveying.Small Works 7/15/2010- 8/7/2010 Jim Pivarnik 360-385-0656 REDSIDE CONSTR. City of Seattle Chester Morse Lake Outlet Channel Deepening O&M PW#2010-041R $235,607.00 Long reach excavator in-water dredging from a spud barge to remediate a blocked exit channel for SPU Utilities. Project required precision GPS dredging, bathymetric survey, spud barges, extremely high level environmental controls because Chester Morse watershed provided drinking water to 3million people in King County.Public Works 7/15/2010- 8/15/2010 John Summers 206-684-5074 REDSIDE CONSTR. City of Seattle Wheeler / Nob Hill Erosion Repair 2009-038 $132,087.00 Installation of Soldier Piling & Structural Precast Concrete Panel Wall, Drilled Concrete Shafts Install, CIP Concrete, Erosion Control Structures, Earthwork, CB's & Stormwater Utilities, curb and sidewalk, 8" HDPE pipe Outfall System Public Works 6/09-10/09 Joe Carter 206-684-5070 REDSIDE CONSTR. King County Marine Bulkhead Restoration- Bunker Trail Vashon Island C00358C09 $50,788.00 Intertidal Marine Construction using spud barges and excavators to perform interdidal shoreline restroatio. Mobilized Rock to Island for Bulkhead repair, TESC, Sewer Force Main on beach & Utilities protection & Environmental protection Public Works 8/1/09-8/15/09 Derren Chernick 206-263-9321 REDSIDE CONSTR. Port of Orcas Eastsound Outfall Emergency Repair Project Appx. $250,000 Intertidal project. Spud Barge Project. 1100ft 12" HDPE Outfall Pipe, Concrete Anchoring System Diffuser Outlets, Excavation and upland 12" Steel Stormwater Piping Public Works Roy Light 360-376-2720 REDSIDE CONSTR. Contract Value Period of Performance $880,000.00 2006/2007 $750,000.00 2003 $877,200.00 11/1/07- 2/14/08 $230,757.00 10/1/08-12/09 $42,000.00 7/5/2008- 9/20/08 $880,000.00 2002 $750,000,000.00 2000-2002 $13,000,000.00 2002 $6,300,000.00 6/24/05 - 3/31/06 $1,714,738.00 1998-2000 $705,176.00 2000 $400,000.00 1998-1999 Driftwood Key Club Driftwood Key Club Maintenance Dredging MEC Laboratory & outfall repair HDPE Seawater Intake and Outfall Southwest Suburban Sewer District Miller Creek Outfall 36" dia Marine HDPE pipe in place Connection to existing outfall *NOTE: THE FOLLOWING PROJECTS WERE PERFORMED UNDER OTHER CORPORATE ENTITY TITLES AND WERE MANAGED BY THE FAMILY TEAM OF SAM BERRY, PRESIDENT OF REDSIDE CONSTRUCTION, LLC AND FATHER DAVID BERRY * NOTE: NOT ALL PROJECTS ARE LISTED, ADDITIONAL PROJECTS LISTS AVAILABLE UPON REQUEST: SAM BERRY AND DAVID BERRY (FATHER & SON) HAVE PERFORMED OVER 550 PUBLIC WORKS CONSTRUCTION CONTRACTS AND HUNDREDS OF PRIVATE CONSTRUCTION PROJECTS UNDER VARIOUS COMPANY ENTITY'S SINCE 1984. Company / Client Name Project Title Description of Work Weston Solutions, Inc. HDPE Sewer force main in lake Bridgehaven Community Club Association Bridgehaven Dredging Intertidal Maintenance Dredging Hat Island Dredging Intertidal Maintenance Dredging Hat Island Community Association Install 12" Steel Piling, Intertidal Maintenance Dredging Sound Transit/PCL Construction Central Link Light Rail C755 24" X 200' Long Steel Piling Installation, Temporary Shoring, Rebar & Concrete Arrowhead Pt. Sewer Main North Shore Utility District Arrowhead Sewer Replacement Immunex-Amgen Immunex-Amgen Campus Project Construction of Campus for Immunex Corporation, Including Central Utility Plant, Utilidor, Bridge and Seven Multi-Story Campus Buildings Mukilteo School District Odyssey Elementary School Complete Construction of Elementary School and School Campus US Army Corps of Engineers Ballard Locks Renovation Marine Construction including Timber Pile Driving, Replacement of Treated Timber Pier Faces, Demolition US Army Corps of Engineers Snohomish Sheet Pile / Ebey Slough Installation of Sheet piling at Dike District #2 US Army Corps of Engineers Deep Water Slough Marine Construction including suspension bridge cabling and piling, design/build bridge, 15k tons rock transport across river $352,750.00 7/24/08- 10/23/08 $2million 9/1/07 - 10/1/08 $721,810.50 12/08-12/09 $185,000.00 7/1/2009- 10/1/09 $350,000.00 5/07-10/07 $580,000.00 6/25/07- 11/15/07 $200,000.00 3/1/07 - 4/15/07 $145,479.00 6/26/06- 12/15/06 $1,400,000.00 10/31/03 - 4/30/04 $535,000.00 11/1/04 - 2/15/05 $490,000.00 7/1/2006 $162,800.00 7/2006 - 9/2006 $950,000.00 2005 THRU 2006 $842,112.00 6/29/04 THRU 12/1/04 $45,000.00 2003 - 2004 $1,800,000.00 2002 $500,000.00 2002 THRU 2003 $450,000.00 10/23/03 - 2004 $700,000.00 1999-2001 $167,786.99 02-08-01 THRU $1,200,000.00 1997 $520,000.00 1997 $680,000.00 1996 $875,000.00 1996 $1,800,000.00 DATED * NOTE: NOT ALL PROJECTS ARE LISTED, ADDITIONAL PROJECTS LISTS AVAILABLE UPON REQUEST: City and Borough of Yakutat City and Borough of Yakutat HDPE Fuel Float Dock Furnish / Install Floating Fuel Dock Eagle Harbor Maintenance Facility USCG U.S. Coast Guard Dock Design/Build/Engineer 8'x8'x100' Concrete Float for USCG "Osprey" Moorage Replacement of USCG Concrete Float Dock Pacific Seafoods New Pen Anchor System Design / Build / Construct Project Design / Build Pile Supported Net Pen Anchoring System & Pile Driving in Columbia River Pile Stubbing, Marine Structural Retrofit, Pile Driving, Heavy Civil University of Washington Board of Regents Boat Street Marina Reconstruction 8" Dia Piling, Pier, Rock Bulkhead & Shoreline Restoration Department of Natural Resources Port Townsend Waterfront/Pile Demolition Demolish & Dispose Creosote Structures & Piling Marine Demolition, Install 12"-14" dia Steel Piling, Marina Floats, HDPE Utilities, Sitework Washington State Department of Transportation/ Mowat Construction Washington State Department of Transportation Eagle Harbor Seep Remediation Project Shoreline Excavation & Reconstruction, Hazmat Remediation of Beach Sediments NW Maritime Center Northwest Maritime Center Dock New 24" Piling, Construct New Pier & Floats City of Medina Medina Beach Park Shoreline Restoration Aqua Express Kingston Passenger Only Ferry Terminal 24"-36" Steel Piling and Passenger Terminal & Walkway Huffaker Management Group Port Orchard Marina Marina Demolition, 24" Pile Installation, New Floats & new HDPE Fire & Water Utilities Island Construction Port Townsend Plaza New Sea Wall Construction & Sheet Pile Driving City of Seattle Washington Park Arboretum Project 24" dia Auger Cast Concrete Piling, Bridge, Foundations, Park Improvements City of Seattle Luna Park Seawall Steel Piling, Elevated Pre-cast Concrete Pier Queen City Yacht Club Queen City Yacht Club New 12" Steel Piling City of Marysville Lagoon Partitions Partition Piling/ Pre-cast Concrete Panels City of Seattle Magnolia Park Slide Repair / Retaining Wall Soldier Pile Retaining Wall, Lagging, Drilled Shafts University of Washington Board of Regents Old Oceanography Dock Repair Remove & Replace Existing Dock Central Kitsap School District Central Kitsap High School Façade Renovation Drilled Shaft / Foundation Underpinning, Façade Renovation Port of Seattle T-91 Test Pile Installation Furnish / Install Steel Test Piling MOORING DOLPHINS Port of Kalama US Navy Caisson Mooring - Bangor Naval Base STEEL PILING, PIER FOR CAISSON TO TRIDENT SUBMARINE DRYDOCK City of Seattle Fire Station #5, Pier 51 DRILLED SHAFT STEEL PILING FOR FIRE BOAT Lay Berth Facility MOORING PILE / DOLPHINS FOR ASIAN FREIGHTERS …..and many more…. City of Seattle Fire Station #5, Pier 51 DRILLED SHAFT CONCRETE PILE UNDER PIER PSNS Inactive Submerging Mooring Facility City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-17 Contract Documents CONTRACT DOCUMENTS and CONTRACT BOND FORMS WILL BE PROVIDED TO THE SUCCESSFUL BIDDER ONLY City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-18 Contract Documents CONTRACT (Page 1 of 4) THIS AGREEMENT is dated the day of in the year 20___ by and between the City of Bremerton (hereinafter called CITY) and (hereinafter called CONTRACTOR). CITY and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK. CONTRACTOR shall complete the WORK as specified or indicated in the CITY’s Contract Documents entitled Evergreen Rotary Park Boat Ramp Repair. ARTICLE 2. CONTRACT TIMES. The WORK shall obtain Physical Completion within 30 working days after the commencement date stated in the Notice to Proceed. Time is of the essence as to each and every deadline set forth in this agreement. This provision has been specifically negotiated. ARTICLE 3. LIQUIDATED DAMAGES. CITY and the CONTRACTOR recognize that time is of the essence for this Agreement and that the CITY will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein, plus any extensions thereof allowed in accordance with Section 1-08.8 of the Standard Specifications which may be modified by the Special Provisions. They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by the CITY if the WORK is not completed on time. Accordingly, instead of requiring any such proof, the CONTRACTOR shall pay the CITY liquidated damages in accordance with Section 1-08.9 of the Special Provisions after the date of Physical Completion for each phase. ARTICLE 4. CONTRACT PRICE. CITY shall pay CONTRACTOR for completion of the WORK in accordance with the Contract Documents in the amount set forth in the Bid Proposal, which shall include sales tax as provided in Section 1-07.2 of the Special Provisions. ARTICLE 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Section 1-09.9 of the Standard Specifications which may be modified by the Special Provisions. Applications for Payment will be processed by ENGINEER as provided in the Special Provisions _____________ Contractor Initials City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-19 Contract Documents CONTRACT (Page 2 of 4) ARTICLE 6. CONTRACT DOCUMENTS. The Contract Documents which comprise the entire agreement between CITY and CONTRACTOR concerning the WORK consist of this Contract and the following attachments to this Contract:  Notice Inviting Bids,  Bidders Checklist,  Bid Proposal including the Proposal Forms, Information Required of Bidder, Bid Bond, and all required certificates and affidavits,  Performance Bond,  Payment Bond,  Standard Specifications,  Amendments to the Standard Specifications,  Special Provisions,  Appendices  Contract Plans,  Addenda numbers _____ to _____, inclusive.  Change Orders which may be delivered or issued after Effective Date of the Agreement and are not attached hereto. There are no Contract Documents other than those listed in this Article 6. The Contract Documents may only be amended by Change Order as provided in Section 1-04.4 of the Standard Specifications which may be modified by the Special Provisions. ARTICLE 7. INDEMNIFICATION. The CONTRACTOR and CITY acknowledge and agree that they have negotiated the following in accordance with the requirements of RCW 4.24.115 and the CONTRACTOR specifically waives his immunity under industrial insurance under Title 51 RCW. To the fullest extent permitted by Laws and Regulations, the CONTRACTOR shall indemnify, defend, and hold harmless the CITY, ENGINEER, their consultants, subconsultants, and the officers, directors, employees, and agents of each and any of them, against and from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, all claims and liability arising under, by reason of, related, or incidental to the Contract Documents or any performance of the WORK, but not from the sole negligence or willful misconduct of the CITY and/or the ENGINEER as further defined in the Contract Documents. The provisions of this section shall survive the termination of the contract. _____________ Contractor Initials City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-20 Contract Documents CONTRACT (Page 3 of 4) ARTICLE 8. ASSIGNMENT No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The CITY, in its sole discretion, may refuse to allow the CONTRACTOR to assign any or all of its duties, rights and/or responsibilities under the Agreement, except with regards to an assignment of funds for security purposes. In the case of an assignment for security purposes the CITY may condition its approval to the extent it deems necessary to assure that there will be adequate funds to complete the WORK and to pay a subcontractors and suppliers. ARTICLE 9. EQUAL EMPLOYMENT OPPORTUNITY STATEMENT In the hiring of employees for the performance of work under this Contract, the Contractor, its subcontractors, or any person acting on behalf of the Contractor shall not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental, or sensory disability. ARTICLE 10. ADA STATEMENT The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services, and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. CITY and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents. IN WITNESS WHEREOF, CITY and CONTRACTOR have caused this Agreement to be executed the day and year first above written. CITY : City of Bremerton CONTRACTOR By By [CORPORATE SEAL] Attest Attest City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-21 Contract Documents Address for giving notices Address for giving notices License No. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-22 Contract Documents CONTRACT (Page 4 of 4) Approved as to Form: Agent for service of process: (Signature) (Title) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-23 Contract Documents CONTRACT CERTIFICATE (if Corporation) STATE OF ) ) ss. COUNTY OF ) I HEREBY CERTIFY that a meeting of the Board of Directors of the ___________________ ____________________________________________________________________________ ____________________________________________________________________________ a corporation existing under the laws of the State of ____________________________, held on __________________, 20___, the following resolution was duly passed and adopted: “RESOLVED, that _________________________________________________, as ______________________ President of the Corporation, be and is hereby authorized to execute the Agreement dated _________________, 20___, by and between this Corporation and the City of Bremerton and that his/her execution thereof, attested by the Secretary of this Corporation, and with the Corporate Seal affixed, shall be the official act and deed of this Corporation.” I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the corporation this _____, day of ___________________, 20___. (Secretary) (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-24 Contract Documents CONTRACT CERTIFICATE (if Limited Liability Company) STATE OF ) ) ss. COUNTY OF ) I HEREBY CERTIFY that a meeting of the Members of the __________________________ ____________________________________________________________________________ ____________________________________________________________________________ a Limited Liability Company existing under the laws of the State of _______________________, held on __________________, 20___, the following resolution was duly passed and adopted: “RESOLVED, that ____________________________ and ___________________, as Members of this Limited Liability Company, be and are hereby authorized to execute the Agreement dated _________________, 20___, to the City of Bremerton by this Limited Liability Company and that their execution thereof shall be the official act and deed of this Limited Liability Company.” I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this ___, day of ____________, 20___. A Limited Liability Company By: Member By: Member (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-25 Contract Documents CONTRACT CERTIFICATE (if Partnership) STATE OF ) ) ss. COUNTY OF ) I HEREBY CERTIFY that a meeting of the Partners of the ___________________________ ____________________________________________________________________________ ____________________________________________________________________________ a partnership existing under the laws of the State of _______________________, held on __________________, 20___, the following resolution was duly passed and adopted: “RESOLVED, that ____________________________ , as ______________________ of the Partnership, be and is hereby authorized to execute the Agreement dated _________________, 20___, by and between this Partnership and the City of Bremerton and that his/her execution thereof attested by the _____________________ shall be the official act and deed of this Partnership.” I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this ___, day of ____________, 20___. Partner (SEAL) City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-26 Contract Documents CONTRACT CERTIFICATE (if Joint Venture) STATE OF ) ) ss. COUNTY OF ) I HEREBY CERTIFY that a meeting of the Principals of the _________________________ ____________________________________________________________________________ ____________________________________________________________________________ a joint venture existing under the laws of the State of _______________________, held on __________________, 20___, the following resolution was duly passed and adopted: “RESOLVED, that ____________________________ , as ______________________ of the Joint Venture, be and is hereby authorized to execute the Agreement dated _________________, 20___, by and between this joint venture and the City of Bremerton and that his/her execution thereof attested by the _____________________ shall be the official act and deed of this Joint Venture.” I further certify that said resolution is now in full force and effect. IN WITNESS WHEREOF, I have hereunto set my hand this ___, day of ____________, 20___. Managing Partner (SEAL) END OF AGREEMENT City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-27 Contract Documents PERFORMANCE BOND (Page 1 of 2) KNOW ALL MEN BY THESE PRESENTS, That as CONTRACTOR, and as Surety, are held and firmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of dollars, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been awarded and is about to enter into the annexed Agreement with said OWNER to perform the WORK as specified or indicated in the Contract Documents entitled “Pine Road Basin Stormwater Improvements Marine Impact Basin Project”; now, therefore, In the event CONTRACTOR fails to timely or properly perform any of the requirements of the Contract Documents at the times and in the manner contained therein, the Surety shall be liable under this bond up to the amount of the bond for the full amount of the OWNERS’s expenses to construct or repair all work as well as all loss, cost, expense or damage suffered by the OWNER in excess of the Contract amount due to the CONTRACTOR’S failure to comply with any contract or permit conditions or other applicable laws and regulations. The Surety agrees that within 30 calendar days of receiving notice that the OWNER has declared a CONTRACTOR default and formally terminated the CONTRACTOR’S right to complete the Contract pursuant to its terms and conditions and that the CONTRACTOR has defaulted on all or part of the terms guaranteed by this bond, the Surety shall either: 1. Notify the OWNER in writing of its intent to cure the default itself within a reasonable period of time acceptable to the OWNER. The OWNER agrees to pay the balance of the Contract price to the Surety in accordance with the terms of the Contract, or 2. Tender to the OWNER the demanded sum, up to the amount of the bond. However, if the amount necessary for the OWNER to cure the default is less than the amount tendered, the OWNER will return, without interest, any overpayment to the Surety. PROVIDED, that any alterations in the WORK to be done or the materials to be furnished, or changes in the time of completion, which may be made pursuant to the terms of said Contract Documents, shall not in any way release said CONTRACTOR or said Surety hereunder, nor shall any extensions of time granted under the provisions of said Contract Documents, release either said CONTRACTOR or said Surety, and notice of such alterations or extensions of the Agreement is hereby waived by said Surety. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-28 Contract Documents PERFORMANCE BOND (Page 2 of 2) The obligation of the Surety shall include reimbursing the City for all costs and expenses, (including, but not limited to fees and charges of engineers, architects, attorneys, and other professionals, and court costs if litigation is commenced) incurred by the OWNER in enforcing the provisions of this Bond. The CONTRACTOR hereby agrees that the CONTRACTOR’S obligation to perform the required work is not limited to the amount of funds held by the Surety. This bond is irrevocable and cannot be canceled by the Surety or the CONTRACTOR. This bond shall remain in full force and effect for a period of one (1) year following final acceptance of the project by the City, and until the bond is released in writing by the OWNER at the written request of the Surety or CONTRACTOR. IN WITNESS WHEREOF, we have hereunder set our hands and seals this_________day of_________________, 2024. (SEAL) (SEAL) (CONTRACTOR) (Surety) By: By: (Signature and SEAL) (Signature and SEAL) (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY) Address of Surety to which all notices shall be sent: _____________________________ _____________________________ _____________________________ Address of Surety for service of process: _____________________________ (must be a physical address) _____________________________ _____________________________ City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-29 Contract Documents Payment Bond (Page 1 of 2) KNOW ALL MEN BY THESE PRESENTS, That as CONTRACTOR, and as Surety, are held and firmly bound unto City of Bremerton hereinafter called "OWNER," in the sum of dollars, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH, that said CONTRACTOR has been awarded and is about to enter into the annexed CONTRACT with said OWNER to perform the WORK as specified or indicated in the Contract Documents entitled “Pine Road Basin Stormwater Improvements Marine Impact Basin Project”; now, therefore, If said CONTRACTOR, or subcontractor, fails to pay for any materials, equipment, or other supplies, or for rental of same, used in connection with the performance of work contracted to be done, or for amounts due under applicable State law for any work or labor thereon, said Surety will pay for the same in an amount not exceeding the sum specified above, and, in the event suit is brought upon this bond, reasonable attorney's fees to be fixed by the court. This bond shall inure to the benefit of any persons, companies, or corporations entitled to file claims under applicable State law so as to give a right of action to them or their assigns in any suit brought upon this bond. PROVIDED, that any alterations in the WORK to be done or the materials to be furnished, or changes in the time of completion, which may be made pursuant to the terms of said Contract Documents, shall not in any way release said CONTRACTOR or said Surety thereunder, nor shall any extensions of time granted under the provisions of said Contract Documents release either said CONTRACTOR or said Surety, and notice of such alterations or extensions of the CONTRACT is hereby waived by said Surety. The obligation of the Surety shall include reimbursing the City of all costs and expenses, (including, but not limited to fee and charges of engineers, architects, attorneys, and other professionals, and court costs if litigation is commenced) incurred by the OWNER in enforcing the provisions of this Bond. City of Bremerton June 2024 Evergreen Rotary Park Boat Ramp RepairPine Road Basin Stormwater Improvements Project I-30 Contract Documents PAYMENT BOND (Page 2 of 2) IN WITNESS WHEREOF, we have hereunder set our hands and seals this ________ day of______________________, 2024. (CONTRACTOR) (Surety) By: By: (Signature and SEAL) (Signature and SEAL) (SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY) Address of Surety to which all notices shall be sent: _____________________________ _____________________________ _____________________________ Address of Surety for service of process: _____________________________ (must be a physical address) _____________________________ _____________________________ END OF CONTRACT FORMS South Edge of CIP Slab Evergreen Boat Launch CIP Slab Precast Panels North Side of Boat Launch Photo 5 Full Size Ultrablocks Photo 6 Bench Blocks AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: July 10, 2024 Resolution to approve the Utility Easement Relinquishment at the Sinclair Ridge Phase I Subdivision COUNCIL MEETING Date: July 17, 2024 Department: Public Works Presenter: Janelle Hitch Phone: (360) 473-5285 SUMMARY: The owner has requested that the water easement recording number 200209190155, benefitting the City of Bremerton be relinquished. The use that it was originally acquired for is no longer needed. A water main extension has been completed for the Sinclair Ridge Phase 1 subdivision in an equivalent area; the water main has been dedicated to the City and is within a right-of-way that has been dedicated to the City. In accordance with the Revised Code of Washington (RCW) 35.94.040, the release request must be determined by a resolution of the legislative authority after a public hearing is held. The action before the Council is to approve a Resolution for the utility easement relinquishment. ATTACHMENTS: Resolution No. _____, and Staff Memorandum FISCAL IMPACTS (Include Budgeted Amount): There are no fiscal impacts associated with this request. STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to pass Resolution No. _____ and authorize the easement relinquishment of the water easement recorded under number 200209190155. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 04/19/2024 A6 RESOLUTION NO. ________ A RESOLUTION of the City Council of the City of Bremerton, Washington, declaring a certain public utility easement located at Sinclair Ridge Phase 1 surplus to the City’s needs in accordance with the provisions of RCW 35.94.040 and authorizing relinquishment of the easement. WHEREAS, the City has a water easement recorded under AFN 200209190155 from grantor Northwest Corporate Campus, LLC, granted in September, 2002; and WHEREAS, the property where the easement is located was subsequently sold to Century Communities who initiated the Sinclair Ridge Development; and WHEREAS, the Sinclair Ridge development has provided a revised location for water utilities and therefore the easement is no longer needed and will not be utilized by the City; and WHEREAS, the City Council has determined that the City water easement described in Exhibit A, Staff Memorandum, is surplus to the City’s needs and is not required for providing public utility services; and WHEREAS, pursuant to RCW 35.94.040, a public hearing was held on July 17 relating to the relinquishment of the easement; and WHEREAS, it is in the best interest of the City to relinquish the easement and no monetary consideration will be provided in order to allow Sinclair Ridge to continue with development; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The recitals set forth in this resolution are hereby incorporated as if fully set forth herein. SECTION 2. The City public utility easement recorded under AFN 200209190155 located at Sinclair Ridge Phase 1 is hereby declared surplus to the City’s needs and is not required for providing continued public utility service. SECTION 3. It is in the best interest of the City to relinquish this easement and therefore the easement is hereby relinquished and the City shall have no further interest in this property. SECTION 4. Severability. If any one or more sections, subsections, or sentences of this Resolution are held to be unconstitutional or invalid, such decision shall not affect the validity of the remaining portion of this Resolution and the same shall remain in full force and effect. SECTION 5. Effective Date. This Resolution shall take effect and be in force immediately upon its passage. PASSED by the City Council of the City of Bremerton, Washington this _____ day of __________________, 20____. JENNIFER CHAMBERLIN, Council President APPROVED AS TO FORM: ATTEST: KYLIE J. FINNELL, City Attorney ANGELA HOOVER, City Clerk R:\Legal\Legal\Forms\FORMS ON COBWEB\Resolution Rev. 03 2024.doc To: City Council From: Janelle Hitch, Managing Engineer – Development, of Public Works and Utilities Date: 6/27/2024 Re: Utility Easement Relinquishment – Sinclair Ridge Phase 1 Request: Relinquishment of the Water Easement recorded under AFN 200209190155 to the City of Bremerton from the grantor – Northwest Corporate Campus, LLC in September 2002. The property was subsequently sold to Century Communities who initiated the Sinclair Ridge Development. The Sinclair Ridge development provided a revised location for water utilities within the subdivision. The water main installed is in the Right -of-Way that has been dedicated to the City with the final subdivision. The easement was originally intended to provide a corridor for a water transmission main that was constructed on a different alignment in Anderson Hill Road. The easement recorded in 2002 is no longer needed and will not be utilized by the City (see Exhibit 1 Site Map). City Council’s Decision: in accordance with the Revised Code of Washington (RCW) 35.94.040 , the release request must be determined by a resolution of the legislative authority after a public hearing. Therefore, the relinquishment requires the approval and adoption of resolution by the City Council. DEPARTMENT OF PUBLIC WORKS, UTILITIES & ENGINEERING MEMORANDUM EXHIBIT 1: SITE MAP Published for July 10 Study Session Item A6 – Presentation 111-1Volunteers Needed For City of Bremerton's Lodging Tax Advisory Committee (L TAC) Are you part of an organization or busin ess that organizes an event, provides a venue, or does ma rketing for tourists from outside Bremerton? Do you work for a Hotel or op erate a Vacation Rental in Bremerton? Are you available for a 3-year term of service? 3-5 meetings/year with a schedule to be determined & option to attend in person or remotely by Zoom Please visit the City's Website for more information & to apply https://www.bremertonwa.gov/228/Boards-Commissions B1 Approved Funding to the following in Support of Tourism: •Puget Sound Navy Museum $5,000 •Bremerton Rotary (Blackberry Festival) $10,000 •Visit Kitsap Peninsula $55,000 •Downtown Bremerton Association $22,000 •Sunny Jack Events (Bremerton Bridge Blast) $40,000 •Collective Visions Gallery $5,000 •West Sound Pickleball Community $7,500 •Bremerton Historic Ships Association $45,000 •WA State Science & Engineering Fair $30,000 •Kitsap History Museum $20,000 •Roxy Bremerton Foundation $12,500 •Greater Kitsap Chamber $70,000 •WayzGoose Kitsap $7,500 •UNDA1SUN $15,000 •City of Bremerton – Consultant to Review Economic/Tourism Impact, Clarify Initiatives, Develop Recommendations $10,500 Sub Total Revenue Allocated $355,000 2024 LODGING TAX FUNDING 2024 LODGING TAX FUNDING Dedicated Funding through 2024: •Admiral Theatre $150,000 Funding through 2027 •Kitsap Conference Center $250,000 Funding through 2028 Subtotal of Revenue for Dedicated Funding $400,000 Total Revenue Allocated $755,000 2024 LODGING TAX FUNDING 2024 LODGING TAX FUNDING FY 2024 APPLICATION CRITERIA PROJECTS CONSIDERED BY LTAC • Funding for long-time community events or destination marketing • Funding to kick-start new events • Funding for municipal projects CRITERIA USED WHEN REVIEWING THE APPLICATIONS • Economic Impact • Events or Activities to draw tourists from 50 miles or more away • Events or Activities that reflect Bremerton’s diversity, including the BIPOC Community • New Events or Activities within Bremerton City Limits • Collaboration with Community Organizations for hosting events or marketing CONTINUE WITH THE SAME CRITERIA OR MAKE CHANGES FOR FY2025? Published for July 10 Study Session Item B2 – Bluebills 200 Moe Street  Poulsbo, Washington 98370 (360) 779-3901  fax (360) 779-5112 www.cityofpoulsbo.com City of Poulsbo Housing, Health and Human Services City of Poulsbo Social/Community Services Agreement Peninsula Support Organization Bluebills THIS AGREEMENT (“Agreement”) is entered into by and between the City of Poulsbo, Washington, a Washington municipal corporation (the “City”), and the Peninsula Support Organization Bluebills, a Washington not-for-profit organization (the “Agency”), each individually a “Party” and collectively referred to as the “Parties.” WHEREAS, the City has determined the need to have/provide certain social/community services performed for its citizens but does not have the manpower or expertise to perform such services; and WHEREAS, the City desires to have the Agency perform such services pursuant to certain terms and conditions; now, therefore, IN CONSIDERATION OF the mutual benefits and conditions hereinafter contained, the Parties hereto agree as follows: 1. Term. Upon approval and execution of the Parties, this Agreement shall be in full force and effect from January 1, 2024, through December 31, 2024 (the “Term”). 2. Scope of Services. The Agency will make home repairs and install wheelchair ramps and other safety equipment for low-income residents in the Poulsbo area. Eligibility for services will be determined by the Bluebills, with the understanding that the gifting of public funds is restricted, under the Washington State Constitution, to the “poor and infirmed” (section 7). These repairs will enable individuals to live safely in their homes and help to maintain safe and affordable housin g. 3. Compensation and Method of Payment. 3.1. The City shall pay the Agency an amount not to exceed fifteen thousand dollars ($15,000.00) for the 2024 calendar year, pursuant to the terms of this Agreement (“Compensation”). Compensation shall be paid by the City to pay for supplies purchased for home repair and safety equipment for low -income residents in the Poulsbo area. 3.2. Payment will be made by the City upon receipt of an invoice from the Agency describing specific repairs and improvements made and accompanying receipts. DocuSign Envelope ID: 0C3166D8-B1E3-4E48-8B3C-DFD8FFB31F3B 200 Moe Street  Poulsbo, Washington 98370 (360) 779-3901  fax (360) 779-5112 www.cityofpoulsbo.com 4. Project Administrator. The City's Director of Housing, Health and Human Services will serve as Project Administrator and shall ensure that work meets the requirements of this Agreement. The Agency shall report to and take any necessary direction from the Project Administrator. 5. Reporting. The Agency shall submit a quarterly program accomplishment report outlining the successes of the Agency Program and showing the benefit to the City of Poulsbo. 6. Termination. This Agreement may at any time be terminated by the City giving to the Agency thirty (30) days written notice of the City's intention to terminate the same. BLUEBIILS CITY OF POULSBO: By: Robert Keever By: Becky Erickson ______________________________ ______________________________ Mayor Title: Bluebills Vice Chairman Date Signed: Date Signed: DocuSign Envelope ID: 0C3166D8-B1E3-4E48-8B3C-DFD8FFB31F3B 1/15/20241/18/2024 1/18/2024 2024 – 2025 City Council Goals & Priorities As established by input at the Joint Planning Session on Feb. 24, 2024 and approved on Apr. 3, 2024 Community & Employee Engagement 1. Support development of Diversity, Equity, & Inclusion position 2.Increase public engagement i.Hold district meetings on Comprehensive Plan ii.Develop FAQs for Council website iii.Public outreach pre-budget season iv.Re-establish outreach program with Bremerton High School Economic Development 3.Continue work with the Greater Kitsap Chamber, Kitsap Economic Development Alliance, Downtown Bremerton Association, etc. to promote economic development initiatives 4.Promote economic development initiatives i.Bremerton Creative District ii.Main Street Certification iii.Historic preservation policy iv.Chronically vacant building policy development v.Incentives & funding for commercial areas a.Wheaton Way b.Charleston District Housing Equity 5.Ensure rental housing standards are met 6.Explore feasibility of using surplus city-owned parcels for affordable housing projects 7.Support creative humane housing solutions for wide variety of housing types i.Support community partners in development of low-barrier hybrid shelter and low-income housing ii.Continue to support creation of “missing middle” housing iii.Review income levels for 12- and 20-year Multi-Family Tax Exemption Parks and Environmental Stewardship 8.Develop policies that encourage environmental stewardship 9.Continue support of Kitsap Lake Water Quality Program 10.Support sustainable funding for Parks operations Public Safety and Support 11.Increase public safety funding 12.Monitor impact of current public safety policies and programs Transportation and Multimodal Support 13.Increase residential street maintenance funding 14.Establish ranking system for scoring transportation projects in collaboration with Public Works 15.Prioritize multimodal connectivity i.Trail network throughout Bremerton ii.Development of Jarstad Park to Kitsap Lake Trail iii.Warren Ave bridge iv.Prioritize data-based traffic-calming policy prioritizing pedestrians and cyclists B3