HomeMy WebLinkAbout08/07/2024 4D AGENDA BILL CITY OF BREMERTON 4D CITY COUNCIL SUBJECT:Study SessionDate: July 24, 2024 Contract ModificationAgreement No. 1withCOUNCIL MEETING Date: August 7, 2024 Parametrix, Inc. for Francis Street Outfall Department: Public Works & Utilities ImprovementsProject Presenter: D. Dinkuhn Phone: (360) 473-5331 SUMMARY: The consultant had submitted the 90% PS&E package, and Operations staff were confirming field conditions, when a previously unknown 18-inch outfall was uncovered. The second outfall will provide sufficient capacity for the system and simplifies permitting for the project. However, use of this second outfall necessitates a significant redesign of the project, redoing a wetlands report, and additional survey. This modification will increase the project budget to include costs for the project redesign, wetlands report, additional survey, and contract time. This additional design cost is offset by an approximate $235,000 savings in construction costs from the original design. ATTACHMENTS: 1.Contract Modification Agreement #1 2.Scope of Work FISCAL IMPACTS(Include Budgeted Amount): The original contract amount was $101,532 and this contract modification will increase the contract amount by $85,190. The new contract total is $186,722. This increase in the contract amount is included in the current project budget. STUDY SESSION ACTION:Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to approve Contract Modification #1 with Parametrix, Inc, for the Francis Street Outfall Improvements Project, in the amount of $85,190; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 11/09/2021