Loading...
HomeMy WebLinkAbout07/03/2024 4O AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT:Study SessionDate: June26, 2024 Agreement with COUNCIL MEETING Date: July3, 2024 Parametrix for Central Bremerton Force Department: Public Works & Utilities Main Replacement Detailed Design Presenter: David Powell Phone: (360) 473-5268 SUMMARY:Failurepointsalongthe Central Bremerton ForceMain(CBFM) werediscovered in December 2023. This critical force mainconveys sewagefrom downtownBremerton andthe East half of the Puget Sound Naval Shipyard to the wastewater treatment plant. The Cityimmediately requested proposals from six qualified engineering firms for a preliminary engineering analysisof the CBFM. The Cityselected Parametrixto prepare the initial analysisandtoassist in determining the scope of work for detailed design to replace the failed section. The initial analysisiscomplete, the scope of construction hasbeen determined, andthe Cityhas now received a proposal from Parametrixfor the detailed design. Parametrix willdeliverbid-ready detailed design plansand specificationsfor construction of the project. The scope also includes field survey, permitting support, andsupport during the bidding process. There are provisionsin the scope for Defense CommunityInfrastructure(DCIP) Grant assistance and assistance with NEPA environmental approvals if authorized bythe City. ATTACHMENTS:1.;2. Location Map FISCAL IMPACTS(Include BudgetedAmount):Thisisan emergent project and was not programmed inthe 2024 budget; $800,000 is included in the 2024 mid-yearbudget adjustment. The initial contract with Parametrixwas$98,420.36 forpreliminarydesign, and this contract for detailed design isfor $610,030.98.The constructioncost isestimated to be $7,194,000, andthe total project costincluding consultant costs plus Citystaff time and construction management is estimated at $7,988,000. The City submitted a DCIP Grant on June 17, 2024 for $7,145,000 tofundthe construction. The City will receive noticeof grant awardin September 2024. STUDY SESSION AGENDA: XLimitedPresentationFull Presentation STUDY SESSION ACTION:Consent Agenda General BusinessPublic Hearing RECOMMENDED MOTION:Move to award the for Central Bremerton Force Main Replacement Detailed Design to Parametrix in the amount of $610,030.44, including sales taxand authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION:Approve Deny Table Continue No Action Form Updated 01/02/2018