Loading...
HomeMy WebLinkAbout1 - Original Submission_ 140-063 Supplement 03 for 315023 Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 City of Bremerton Shea, Carr & Jewel, Inc. July 17, 2019 HSIP-000S(525) Additional work for Construction Management of the Kitsap Way (SR310) and Warren Ave (SR303) Traffic Signal and Multimodal Project per the attached Exhibit. No Change Additional $33,866.31 03 Federal Aid No. HSIP-000S(525) Shea, Carr & Jewel, Inc. 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 (360) 352-1465 315023 August 4, 2021 June 30, 2023 Kitsap Way (SR310) & Warren Ave (SR303) Traffic Safety & Multimodal $728,994.84 Retime signals, increase the visibility of traffic signal heads, and improve conditions for pedestrians at traffic signals. Upgrade signing and pavement markings and control access at driveways. On Kitsap Way (SR 310), improve lighting and rechannelize the roadway including with bike lanes and green bike facilities. Scott Sawyer, Principal Greg Wheeler, Mayor DocuSign Envelope ID: AA37E597-C3CB-4D17-8D46-8D1BB0205557 5/16/2023 Exhibit “A” Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost Overhead (Including Payroll Additives) Direct Non-Salary Costs Fixed Fee Total DOT Form 140-063 Revised 09/2005 DocuSign Envelope ID: AA37E597-C3CB-4D17-8D46-8D1BB0205557 MEMORANDUM 8730 Tallon Lane NE, Suite 200 ¨Lacey, WA 98516 ¨Office 360.352.1465 ¨Fax 360.352.1509 ¨scjalliance.com To: From: Date: Regarding: Project: Enclosure(s): cc: Cathy Bonsell City of Bremerton Daniel Clark, Senior Construction Manager May 3, 2023 Final Progress Billing per Supplement Agreement 03 Kitsap Way & Warren Ave Traffic Imp SCJ Project #00-070204 Invoice #72002 Gunnar.Fridriksson@ci.bremerton.wa.us; Cathy.bonsell@ci.bremerton.wa.us; EngineeringAP@ci.bremerton.wa.us The enclosed invoice represents work performed for the period ending September 20, 2022. Professional services performed include: Summary of Work Performed ¨This billing includes hours spent between 7/1/2022 and 9/20/2022, up to the billing amount agreed upon per written correspondences between SCJ Alliance and the City of Bremerton on 3/20/2023 and 4/25/2023, and reflected in Contract Amendment 03. Work performed is in accordance with authorized services. Please let me know if you have any questions regarding our billing statement. EXHIBIT A DocuSign Envelope ID: AA37E597-C3CB-4D17-8D46-8D1BB0205557 Cathy Bonsell Project Assistant City of Bremerton Community Development Department 345 6th Street, Suite 600 Bremerton, WA 98337 May 03, 2023 Project No:00-070204 Invoice No:72002 SCJ Alliance 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 Phone: (360) 352-1465 Project 00-070204 Kitsap Way & Warren Ave Traffic Imp Professional Services from April 02, 2023 to April 29, 2023 Phase 16 Construction Administration Classification Hours Rate Amount Senior Project Manager Clark, Daniel 1.50 76.44 114.66 Totals 1.50 114.66 Total Labor 114.66 Overhead on Direct Labor 151.97 % of 114.66 174.25 Fee on Direct Labor 30.00 % of 114.66 34.40 208.65 208.65 $323.31Total this Phase Phase 17 Construction Inspection Classification Hours Rate Amount CI4 Construction Inspector Wagner, Ed 229.00 52.00 11,908.00 Totals 229.00 11,908.00 Total Labor 11,908.00 Overhead on Direct Labor 151.97 % of 11,908.00 18,096.59 Fee on Direct Labor 30.00 % of 11,908.00 3,572.40 21,668.99 21,668.99 $33,576.99Total this Phase Billing Limits Current Prior To-Date Total Billings 33,900.30 695,128.53 729,028.83 Limit 728,994.84 Adjustment -33.99 $33,866.31Total this Invoice DocuSign Envelope ID: AA37E597-C3CB-4D17-8D46-8D1BB0205557 Project 7200200-070204 Kitsap Way & Warren Ave Traffic Imp Invoice Billings to Date Current Prior Total Labor 33,866.31 460,809.99 494,676.30 Consultant 0.00 232,957.29 232,957.29 Expense 0.00 1,027.76 1,027.76 Unit 0.00 333.49 333.49 Totals 33,866.31 695,128.53 728,994.84 For ACH Payments to Shea Carr & Jewell, Inc. Bank: Key Bank Routing: 125000574 Account: 479681295404 Authorized By: Date: Daniel Clark 5/3/2023 DocuSign Envelope ID: AA37E597-C3CB-4D17-8D46-8D1BB0205557