Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1_-_Original_Submission__20220615_5867_Approved_Agenda_Bill
AGENDABILL CITYOFBREMERTON 6ACITYCOUNCIL SUBJECT:StudySessionDate: N/A ChangeOrderNo. 1toContractwithPape COUNCILMEETINGDate: June15, 2022 andSonsConstruction, IncforOysterBay Department: PW&U AvenueForceMainReplacementProject Presenter: BillDavis Phone: (360) 473-2312 SUMMARY:Theprojectisreplacementof2,200-ftoffailingcastironpressureseweralongOyster BayAvenuebetweenKitsapWayandArsenalWay.TheconstructionbeganinAprilandisnearly complete.Thecontractassumedtheroadwaywouldberestoredwithatrenchpatch; however,the existingpavementisfailingandsoafullroadwayrestorationismoreappropriate. Thischangeorder for $223,149.11willprovideforacombinationofgrindandoverlayandpavementreplacement beyondthetrenchareaforfullwidthsurfacerestorationofOysterBayAvenue. ATTACHMENTS:1) ChangeOrderNo. 1; 2) PhotographsofSite FISCALIMPACTS(IncludeBudgetedAmount): TheChangeOrderincreasesthecontracttotalby 223,149.11; theprojectisincludedintheWastewaterFund. Abudgetadjustmentisnotrequired. STUDYSESSIONAGENDA:LimitedPresentationFullPresentationN/A STUDYSESSIONACTION:ConsentAgenda GeneralBusinessPublicHearing RECOMMENDEDMOTION: MovetoapproveChangeOrderNo. 1withPapeandSonsConstruction, Inc.fortheOysterBay AvenueForceMainReplacementProject ;andauthorizetheMayortofinalizeandexecutethe agreementwithsubstantiallythesametermsandconditionsaspresented. COUNCILACTION:Approve Deny Table Continue NoAction FormUpdated11/09/2021 DocuSign Envelope ID: 8C485391-0F9B-4CF3-A925-79B873AA1C37