HomeMy WebLinkAbout1 - Original Submission_ 20220207_5827_Contract Modification No. 1 with MTC_NLPage 1 of 2 Contract Modification Rev. 09/2021
CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND MATERIALS TESTING AND CONSULTING
PROJECT: Oyster Bay Beach Sewer Upgrades
CONSULTANT: Materials Testing and Consulting
DATE: February 7, 2022
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Oyster Bay Beach Sewer Upgrades AGREEMENT (the "Contract") entered into between the City of Bremerton and Materials Testing and Consulting on June 7, 2021.
All provisions in the Contract shall remain in full force and effect except as expressly modified by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I.
Section I. Scope , is modified as follows: See additional scope attached as Exhibit A.
Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by September 1, 2022.
Section III. Compensation , is modified as follows: The original contract amount was $24,696. The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed $7,462 for a total amended contract amount of $32,158 including this Contract Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final
settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification.
DocuSign Envelope ID: 067C3686-7059-44F8-ACE2-F189A47E54AC
Page 2 of 2 Contract Modification Rev. 09/2021
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date)
CONSULTANT THE CITY OF BREMERTON
By: By:
Print Name:Raymond McNamara Print Name:Greg Wheeler_________
Its:President Its:Mayor______________________
Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By: KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Attn: Deane Ramsdell Attn: Angela Hoover Materials Testing and Consulting City of Bremerton
777 Chrysler Drive 345 6th Street, Suite 100 Burlington, WA 98233 Bremerton, WA 98337-1891
R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx
Ned Lever
Digitally signed by Ned Lever
DN: C=US,
E=ned.lever@ci.bremerton.wa.us,
O=City of Bremerton, OU=Engineering,
CN=Ned Lever
Date: 2022.02.09 10:08:56-08'00'
DocuSign Envelope ID: 067C3686-7059-44F8-ACE2-F189A47E54AC
3/16/2022 3/16/2022
Date: January 27, 2022
Contact:
Phone:
Fax:
Based on Plans Dated:Feb 01, 2021
Item Unit Quantity Rate Total
IPD-S - Site Subgrade & Rock Course Compaction- for Full Depth Asphalt Paving
and All Concrete Flatwork-includes compaction of gravel pathways Hour 20 72.00$ 1,440.00$
IPD-A - Asphalt Paving - includes overlays, drives and full depth 2350 tons Hour 20 72.00$ 1,440.00$
SAMPU - Sample Pickup if Required (Allowance)Hour 1 72.00$ 72.00$
2,952.00$
Item Unit Quantity Rate Total
EXT - Asphalt Extraction with Gradation Each 2 275.00$ 550.00$
RICE - Rice Density- each paving day even on Commercial if compaction is desired Each 2 95.00$ 190.00$
740.00$
Item Unit Quantity Rate Total
PM - Project Manager Hour 3 90.00$ 270.00$
270.00$
$ 3,962.00
Respectfully Submitted,
Deane Ramsdell
360.508.6336 24/7
• Invoices are due and payable upon receipt. Any invoice not paid within thirty (30) days of the date rendered may be assessed a finance charge of one-and-one-half
(1½%) percent per month, for each month beyond thirty (30) days past due. Invoices not paid within sixty (60) days of the date rendered may result in MTC stopping work
until such invoices are paid in full. Invoices not paid within ninety (90) days of the date rendered may be referred to an independent company for collection. Client will be
responsible for all expenses incurred by MTC for the collection of any unpaid invoice(s), including collection fees, actual attorneys’ fees, and costs for legal counsel as
stated in RCW 19.16.250.21. Furthermore, Client acknowledges that MTC may elect to withhold a Final Letter of Compliance for the project, and/or place a lien on any
real property until all outstanding invoices and/or fees have been paid in full.
Subtotal - Project Management & Consulting Services:
Budget Estimate for Services - Total:
Project Management & Consulting Services
Laboratory Testing
• Prices are subject to change if this agreement is not executed within 90 days from the date of the bid.
• All services will be provided on a time and materials basis. The total is an estimate and the actual construction cost will be based on the project schedule and
sequencing. The estimate is not a guaranteed price. A four hour minimum charge applies to all work performed, billing is also based on a portal to portal basis. A premium
rate of 1.5 times the regular rate will be charge for overtime and 2 times the regular charge for Sunday's and holidays.
• MTC will utilize the laboratory based closest to the project site. MTC offers additional services upon request which will be billed at our regular fee schedule.
Acceptance of this proposal will constitute agreement to MTC standard general terms and conditions.
Combined with our past experience with projects of similar size and scope, we estimate the total cost of our services for this project to be:
Subtotal - Special & Construction Inspection:
Architect: City of Bremerton
Client Name: City of Bremerton Department of Public Works and Utilities William Davis
(360) 473-2312
Email: william.davis@ci.bremerton.wa.us
Address: 3027 Olympus Drive, Bremerton, WA 98310
Project Name / Location: Oyster Bay Beach Sewer Upgrades- Kitsap Way(SR310) at Shorewood Drive, Weslon Place, Lower Oyster
Bay Drive and Madrona Point Drive- Budget Increase Request
Special & Construction Inspection
Materials Testing & Consulting, Inc. (MTC) thanks you for the opportunity, and respectfully submits the following proposal to provide materials testing
and special inspection services during construction of the above-referenced project.
Subtotal - Special & Construction Inspection:
• In closing, our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and vast experience on
projects of similar size and scope make MTC the clear team member of choice for this project. We look forward to working with you.
Printed Name & Title Date
Client Authorized Signature
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington ● Olympia ● Bellingham ● Silverdale ● Tukwila
p: 360.755.1990 ● f: 360.755.1980 ● www.mtc-inc.net
Page 1 of 1
EXHIBIT A - SCOPE OF WORK AND
FEES FOR MATERIALS TESTINGAND LABORATORY SERVICESEXHIBIT ADocuSign Envelope ID: 067C3686-7059-44F8-ACE2-F189A47E54AC
EXHIBIT B
Oyster Bay Beach Sewer Upgrade
Contract with Materials Testing and Consulting
CONTRACT MODIFICATION #1 SUMMARY SHEET – February 2022
Cost Item Amount
Budget for add’l MTC services $3,962
Management Reserve $3,500
TOTAL for Contract Modification #1 $7,462
Original Contract Amount $24,696
Contract Modification #1 $7,462
Revised Contract Amount $32,158
** Management Reserve to only be used upon written authorization of the City Project Manager