HomeMy WebLinkAbout1 - Original Submission_ 210920_6th St. Sewer_CO No. 2_ (2)DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD CONTRACT CHANGE ORDER NO: 2 PROJECT NAME: 6th Street Sewer Replacement The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. CONTRACTOR Aoorov� � -----DATE: 7 fa /.z1 PROOECIMANAGER James Pape, President Recommended: DATE: DIRECTOR OF PUBLIC WORKS AND UTILITIES Recommended: DATE: MAYOR Approved: DATE: APPROVED AS TO FORM: ATTEST: KYLIE FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk R:\Legal\Legal\Forms\FORMS ON COBWEB\Change Order Rev. 10 2019.docx Page 2 of 2 Change Order Rev. 06/2018 9/20/21 Thomas Knuckey Digitally signed by Thomas Knuckey Date: 2021.09.21 08:52:02 -07'00' DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD 9/24/2021 9/8/2021 ** Unless noted otherwise, all amounts shown are without sales tax Total Contract Amount at Award 249,490.00$ Change Order #1 25,053.85$ Current Contract Amount 274,543.85$ Amount Paid to Date:263,636.71$ Invoice #1 210,391.99$ Invoice #2 26,436.04$ Invoice #3 26,808.68$ Amount Remaining in Contract prior to WCD #5 and WCD #6 10,907.14$ Amount for WCDs #5 and #6 16,185.85$ Amount Remaining in Contract (5,278.71)$ Change Order #2 5,278.71$ Calculated Sales Tax for Change Order #2 475.08$ Change Order #2, Total amount with tax 5,753.79$ Summary of Change Order #2 Calculation 6th Street Sewer Replacement DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD James Pape, President DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD Site map for work at 16th Street and Warren Avenue DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD Site map for work at Burwell St. and High Avenue DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD 6th Street Sewer Replacement wjd Reg Rate Hours Amt Foreman 79.52$ 12 954.24$ Laborer 58.26$ 12 699.12$ Laborer 58.26$ 12 699.12$ Operator 77.30$ 8 618.40$ Truck Driver 69.89$ 8 559.12$ TCS 49.38$ 12 592.56$ 4,122.56$ Backhoe 50.00$ 8 400.00$ Excavator 80.00$ 0 -$ Dump Truck 80.00$ 8 640.00$ Service Truck 40.00$ 12 480.00$ 1,520.00$ Unit Cost Units # of Units TOTAL Manhole 1,500.00$ Ea 1.00 1,500.00$ Backfill 40.00$ Ton 12.00 480.00$ Trench Boxes 2.00$ Ea 100.00 200.00$ Bypass System 100.00$ Ea 1.00 100.00$ Pipe Section 10.00$ LF 10.00 100.00$ 2,380.00$ Base Total Markup Markup Amt TOTAL LABOR 4,122.56$ 29%1,195.54$ 5,318.10$ EQUIPMENT 1,520.00$ 21%319.20$ 1,839.20$ MATERIALS 2,380.00$ 21%499.80$ 2,879.80$ SUBCONTRACTOR -$ 12%-$ -$ SUBTOTAL 1 (PRE-TAX)10,037.10$ SUBCONTRACTOR MARKUPS WCD #5, Replace lamphole with MH at 16th and Warren; replace 6" x 18" long steel pipe with 8" PVC PRELIMINARY COST ESTIMATE by City LABOR EQUIPMENT MATERIALS DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD James Pape, President DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD SITE PLAN FOR REMOVAL OF PROTRUDING LATERAL AT 6TH STREET AND PARK AVENUE (WCD #6) DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD 6th Street Sewer Replacement wjd Reg Rate Hours Amt Foreman 79.52$ 1 79.52$ Laborer 58.26$ -$ Laborer 58.26$ -$ Operator 77.30$ -$ Truck Driver 69.89$ -$ TCS 49.38$ 4 197.52$ 277.04$ Backhoe 50.00$ 0 -$ Excavator 80.00$ 0 -$ Dump Truck 80.00$ 0 -$ Service Truck 40.00$ 2 80.00$ 80.00$ Unit Cost Units # of Units TOTAL PVC pipe 20.00$ LF 10.00 200.00$ 200.00$ Vortex $450 Hr 4 1,800.00$ Base Total Markup Markup Amt TOTAL LABOR 277.04$ 29%80.34$ 357.38$ EQUIPMENT 80.00$ 21%16.80$ 96.80$ MATERIALS 200.00$ 21%42.00$ 242.00$ SUBCONTRACTOR 1,800.00$ 12%216.00$ 2,016.00$ SUBTOTAL 1 (PRE-TAX)2,712.18$ PRELIMINARY COST ESTIMATE by City WCD #6; remove protruding lateral approx. 91' east of 6th and Park LABOR EQUIPMENT MATERIALS SUBCONTRACTOR MARKUPS DocuSign Envelope ID: 2204862F-1485-4A45-9FA0-531A9FDBE6BD