Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1 - Original Submission_ Complete Bid Docs Residential Elec Serv Conn Mods_AD Set Final_
!!! !"" #$%##& ’() %* &+"’,-." #$%##&/ ’() 0"12/34 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 "##$"%&#% 0%0%!"!!"!55!!!5%#6!% #%"#$’’"#$’(#%%"#%##$"#%)" *+,-.-/0 ’66!5&5%&67!55 %&55%8!"!! 6!""56!!&%!$5+"8 6!51%6%9*7":: (66751#%!’+;!! &+"’,!5 ." Chris Dimmitt Digitally signed by Chris Dimmitt Date: 2021.10.07 09:36:56 -07'00' Shane Weber Digitally signed by Shane Weber DN: C=US, E=Shane.Weber@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Shane Weber Reason: I am approving this document Date: 2021.10.07 11:35:32-07'00' DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !" #$ % ! "#$ •%&’#() • %*’#() •+%*,’#() •-.# .#%/0’#() •+%/’#( •+%*’#( •’.’’%/10’#() !""#$%%&’"(&) **’!*+*#’ *,’%’-*.+/ -$%%,0 $’)$ % *+#. "*+1#’.2 )) **3- 2&.’)’.*+/24$2("254 *#*#’.+6’-*$)’/+*’!+/*#’"(&6’-* % /’+7*#’’)$ %*+’/"(.’1.+1’.#$/!% /8$/!!’% 0’.,2 . 2+/03!4 #’ 5’#6 " "#! "/$00!!78*/7*0*/7 ’" !’/* $%%’-*. -$%’.0 -’+//’-* +/+! 7 -$* +/.+6’-*!’ "! #’ *,+7.’)’.*+/+77 -’"$.’-%+"’!*+*#’1(&% -$/! /1’."+/& !"(&) **$%"4 %%/+* &’ $--’1*’!2 " 98 ’ ’# ’ #2! ’"’/$00!!78*/7*0*/7" ""! 2 ’!2:!!"! #! 9:’’’ /;#" "##%(! ’## ’7#" "77 7’#"#’7 ’#’’’7 ##7# DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !" #$ % ’ ,, ’ ,’ (: ( ’ " : (’$( 1 *1=-,:,(: ’%:’2,,2 ,$%:"!: ,:*-:"2<4:/4/4:$( 1’,3>&/0*$-$( $2/>5?@5*$2-& ,$%,2,,2 ,$%:,(,(!& (!’’%:!’,(’:(( !&,,((,’ 2,,2 ,$%: ,"!:’ !’,(’& ;(A,,B54:4 44B0C:444& $%,’/4’%( & <="$% 2(&:::, ,2(& (",54 ,(& >,,,,,,: %:D%:!,*CE- ,,&,!,% ,!#(2(& 9 $($( "!($("$% F,,(&’ 2! " "!( $( 6, 1 & )2,# 6*+54-@<+?/+4<,&6;&&’&&(+@C5 : 344::$2>0++<& >;=!(# ’!(#( ’,& ,%!!G, ,(& ): ’,!H!(23>5@*<0 &/C/:@/I& &&/444/444 ? @-(:’! ,!:!(,’ ,,,!’( (::(’& DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !" #$ % >>), ,,,!&’ ’,,,,’:’: ’,,(*@4J-::::: (:G(:::, ,:& ) ,(!:’,,2’ 623>>4:26222&,, ,, ,(: !: ! & ,,,,’,!& *9<=.#09<:*# DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 &’ #$ % 1#234’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ocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 &’ #$ % 5+"5"!+"6!&+$&5%"5"!+"6!! !5+5+!+!6!5+%"5!(&% !5%C%"&!66!&5%!&!5%!"!55% 7&&!66!+"8%!& - #91 :"%"8676+"5 55!8""+7% !"6%55%6!%’<D75+%5 0%5!%5%!""+&665+!!%55$6! 5!%"5@:9<;(0:<=.:<*9:**<A+&5 % : #;7<76 ’ # = ;>1 0%""8!+$&5!%!!8!550%&+ &+58%723!"5!5!!%5 !(8!5! ! + 1 0+$&5+%&&"+55!5&6! 0 # DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 51#""3%’ $’1%<#"3?5 $’ 5"3 $?51)"?51# ")"#% DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ %* ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) %%.’’5#%’$$"#% DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ %) ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % * ) 2/3 (00( 00 :#:*!"%236 6"5+%!%!! "!’" !’/* $%%’-*. -$%’.0 -’+//’-* +/+! 7 -$* +/.+6’-*!&7!"& !56"$8,0%%236&%!7+6"5&5% +55!!%62!"3!8 %%"!!0%"%!"" "&5%""8!!!&1 •!!55!5"6%&+8 •!6 •>!6 •56%8,7"75 •!!& •*!6"! •!!55!5"6%&+!% •!86 •E!+&&5&! •!8%!5!& DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % + ) %"#%"%""$?($#’#%&<$& $"%"’$1$%#%5"# DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ( #$ % ) ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 %"$"5%" %"$"1% <#’’1(# ""3 55’1#%’? DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 1 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 PUBLIC WORKS AGREEMENT THIS AGREEMENT is entered into between the City of Bremerton, a Washington Municipal Corporation (“City”), and Henden Electric, Inc. (“Contractor”), whose mailing address is 26124 Calvary Lane NE Kingston, WA 98346. The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall perform the following services for the City: Residential Electrical Service Connection Modification Project 315018-874 2. TIME OF COMPLETION. Contractor shall complete the work within 20 WORKING days from the date of issuance of the City’s Notice to Proceed. 3. COMPENSATION. The City shall pay the Contractor the total amount of $ 52,401.75, plus any applicable Washington State Sales Tax, for the work and services contemplated in this agreement. The City shall pay the Contractor ninety percent (90%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this agreement. A. No Performance Bond. Because this contract including applicable sales tax is $150,000 or less, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a performance bond, has elected to have the City retain the final ten percent (10%) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. 4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state disability insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses, if required, in connection with the contract services, including all required licenses for Contractor's officers, agents, employees and sub- contractors. 5. TERMINATION. The City may terminate this agreement for good cause. “Good cause” shall include, without limitation, any one or more of the following events: DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 2 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 A. The Contractor’s refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor’s failure to complete the work within the time specified in this agreement. C. The Contractor’s failure to make full and prompt payment to sub- contractors or for material or labor. D. The Contractor’s persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor’s filing for bankruptcy or becoming adjudged bankrupt. If the City terminates this agreement for good cause, the Contractor shall not receive any further monies due under this agreement until the Contract work is completed. 6. PREVAILING WAGES. Contractor shall file a “Statement of Intent to Pay Prevailing Wages” with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7. CHANGES. The City may issue a written work change directive for any change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the City’s project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor’s costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving a written work change directive or change order from the City. If the Contractor fails to require a change order within the time allowed, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided below: A. Procedure and Protest by the Contractor. If the Contractor disagrees with anything required by a work change directive or change order, including any direction, instruction, interpretation, or determination by the City, the Contractor shall: DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 3 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 1. Immediately give a signed written notice of protest to the City; 2. Supplement the written protest within fourteen (14) calendar days with a written statement that provides the following information: a. The date of the Contract’s protest. b. The nature and circumstances that caused the protest. c. The provisions in this agreement that support the protest. d. The estimated dollar cost, if any, of the protested work and how that estimate was determined. e. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor’s records needed for evaluating the protest. 3. The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. B. Contractor’s Duty to Complete Protested Work. In spite of any protest, the Contractor shall proceed promptly with the work as the City has ordered. C. Contractor’s Acceptance of Changes. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts form the City any written order (including directions, instructions, interpretations, and determination). DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 4 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in detail in writing and received by the City within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor’s written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the City’s acceptance of the Contract work. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officer, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages caused by the City’s sole negligence. The City’s inspection or acceptance of any of Contractor’s work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officials, employees, agents and volunteers, the Contractor’s liability hereunder shall be only to the extent of the Contractor’s negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS INDEMNIFICATION CONSTITUTES THE CONTRACTOR’S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 5 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. 11. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement, insurance against claims for injuries to persons or damage to property that may arise from or in connection with the performance of the Contract work by the Contractor, its agents, representatives, employees or sub-contractors. Before beginning the work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: A. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and B. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad from property damage; explosion, collapse and underground (XCU) if applicable; and C. Workers Compensation insurance as statutorily required by the Industrial Insurance Act of the State of Washington, Title 51, Revised Code of Washington and employer's liability with limits not less than $1,000,000. . Any payment of deductible or self-insured retention shall be the sole responsibility of the Contractor. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor’s insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. The Consultant's insurance shall be primary and non-contributory insurance as respects the City and shall contain a waiver of subrogation against the City for claims arising out of any operations, liabilities and obligations to which coverage applies. It shall be an affirmative obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by certified mail, return receipt requested to City of Bremerton, attn: Risk Management, 345 6th Street, Suite 100, Bremerton, WA 98337 within two days of the cancellation, suspension or DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 6 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement. The City reserves the right to receive a certified copy of all the required insurance policies. PUBLIC WORKS CONTRACTS: 11. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement insurance of the types and in the amounts described below against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work by the Contractor, its agents, representative, employees, sub-consultants or sub-contractors. Before beginning work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: A. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and B. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU); and C. Excess Liability insurance with limits not less than $1,000,000 per occurrence and aggregate; and D. Workers Compensation insurance as statutorily required by the Industrial Insurance Act of the State of Washington, Title 51, Revised Code of Washington and employer's liability with limits not less than $1,000,000. Any payment of deductible or self-insured retention shall be the sole responsibility of the Contractor. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor’s insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 7 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 The Consultant's insurance shall be primary and non-contributory insurance as respects the City and shall contain a waiver of subrogation against the City for claims arising out of any operations, liabilities and obligations to which coverage applies. It shall be an affirmative obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by certified mail, return receipt requested to City of Bremerton, attn: Risk Management, 345 6th Street, Suite 100, Bremerton, WA 98337 within two days of the cancellation, suspension or substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement. The City reserves the right to receive a certified copy of all the required insurance policies. 12. MISCELLANEOUS. A. Equal Employment Opportunity Statement. In the hiring of employees for the performance of work under this Agreement, the Contractor, its subcontractors, or any person acting on behalf of Contractor shall not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental or sensory disability. B. ADA Statement. The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. C. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. D. Work Performed at Contractor’s Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor’s own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. E. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect F. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PUBLIC WORKS AGREEMENT – Page 8 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. G. Attorney’s Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties’ performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney’s fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City’s right to indemnification under Section 10 of this agreement. H. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. I. Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. J. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. K. Severability. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. L. Entire Agreement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. IN WITNESS WHEREOF, the parties below have executed this agreement. HENDEN ELECTRIC, INC THE CITY OF BREMERTON Print Name: Print Name: Title: Title: DATE DATE DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 12/8/2021 Scott Henden President Greg Wheeler Mayor 12/8/2021 PUBLIC WORKS AGREEMENT – Page 9 of 10 (between City of Bremerton and Henden Electric, Inc.) Rev. 09/2021 Notices to be sent to: Notices to be sent to: HENDEN ELECTRIC INC: CITY OF BREMERTON: Attention: Attention Chris Dimmitt 26124 Calvary Lane NE 345 6th Street, Suite 100 Kingston, WA 98346 Bremerton, WA 98337 (360) 297-4433 (360) 473-2307 APPROVED AS TO FORM: Kylie J. Finnell Bremerton City Attorney ATTEST: Angela Hoover, City Clerk R:\Legal\Legal\Forms\FORMS ON COBWEB\Public Works Agreement (short form) Rev. 09 2021.doc DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 #$ % ) 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ ! %$&!&!"#$% &’#&()*!#))*#)+ #$,’-’./’ ’!"*0 ’’ ,&!$0’#/)" 12,12 ,13*) !#$24!2 ,+/%5,#! #$25!!2 #),5!+67#),/ *0 ! ’ 8 *0 8* ’ 0! ! " 0 6’ ’69 6’ % *0/ 2 *0 ! ’ + ’*0/ "!’’" !’"!’ "/ 6’*0 !/8*! ’8*’’0’8*!/3:; ’()% *+*,-% ’*!% +."/,-+ ’% ",- ),&!"’; •&0/.1$(2 !" #$’’" •%$&!&#&(<)*#)! •,"’7&$,!! •12,12,13*) % •#$24!2 ,+/%5,#+ •#$25!!2 #),5!+67#), ,’!,=:/ !" % + DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ ,0’0’0 0 ! $ 2 *"’ 0"*!$!2$"*2/#!!$$ $ 0 ! $$!$$ !$ !’ !! $ " ’ " !$$*2’$#$4 >!4?>’$% ):)’#,*0’+ 12,12,13*) !#$2 4!2,+/%5,#!#$25! ! 2 #), 5! +67 #),/ ’ # ! ):)’#$’:$0 ’/ #$%$$$ &’(#% + &’()*%*#$$ &’$; &’()+*%*#$$ ’3& 4% *+*,- 7’ ’ ! ! ! @!’’5,#+//@!’% !/+ &’()($,%*% ’- &’$; >’7&!0’! ,’7)0’7’/ % )’’’!,+ ; % )* #*- 5!A: A 3!!" !/ ,*0 3!!" !/ 4$/$/A: A 3!"! @!/ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ ),*0"",’ !,’7,=:/ &’()./0 ’3& 4% *+*,"!- ’ ’ 0 $ $$ -)" 0 7% $B.0;+ )"07$:’7&! @!:$"’!! "$$"07 ’!’7/ &’()1 , ’3&% 5*+*,- % &’$;+ *3’"/> @!!’!’ ’!!/ ’’!!9:9!9 !9$!99 :$ ’9=!$!9= C&72<&72<D<#72’9 ’#$,= 5$1!97!41!’/7% ""$"’"/+ @!’!’*3/ ,$)$"0$$’ 0’!0$’,$)$"/ 0’*3! ’/ &’()2 #$, ’()% *+*,-% + !’$; 7’$; / ,$)$"6$!’9 / 1’9 / ,$)$"$9 / !’’$!$ ’0’:!!!9 / $!’=’’$’’/$!% ’!E!!$$!+ ’!"$!9 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $4 / $!’!"=’’$’ "/ >’,*0!!’! ,*0/ >’,*0 ’/ % 3$$4%*%+ &’5)2 6$%3 ’6#% )*+*,- 50; )"",$)$"$$):!’ , 7 !0 !’ ! 0 !#$4/!0’""’!% ,!’!",$)$"@!0+ $!"5,#//0! !/ %,*7!8 &’.)( $*%%99 ,%9 ,%*%9$$$$ ’.#% *+*,- % 50$;+ )""’0"’$’ /$/$00 0’; / ) / *3 / *0 / ,* / ’ / ,$)$"=*&’"% / #&(*’57$D!,!/+ :$,-7-% &’2) 3--$ ’"#% *+*,- !’$; % >’’’’’"$!$$!+ "/ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ #$&’4>! !0$"’’0’ #$>!’"F)’+ #>F)/ ,’’ "’0$’!/, !"!’!$ 0=!$"% "0!/2"!+ ’,! ’0’!=/ ,0"’’"’’"@!"’ ,=’"$!"!$ ’’!!/, ""’’!$’" ’"’’/@!" !!"$!/@!!"’% 2$!!0’,=’+ !0 @!"’,=’" !/ &’2)(4 &!$!6 "’$; &’2)(4% ’3& 5% *+*,-+ #$&’50!!! :/6 /!$6 /’"!/ ,!#$&’50!’ @!/,$)$"!"’ ,!:"/ ,!,6 :! !/>0 :!/% 6 /:/+ ,$)$""$,7’ 3F#)6’!*"’,’#$ &’50!’$6:0 5,#/%//,$)$""!’" ,"!,"#$&’ 50!!/)"! !’!/ % &’2)(/04;2+ #),%66 !"!$$0$ /"!!0’ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ "C!"’’0!’’/ !"!’ $"!’" $$"/3’!,! #$5:0!! !!$,"!’ @!!!!$/ % &’2)(/(04;2’+ #),%66 !"!$$’ :$!$!!!"/!! !’$"/"’ #$9!9 "$ "!!"’ $"9$! !0 !! ’$$"9 $$’"’% $""!"+ ’""0!’/ 3’!,’,$ )$":’!/,$)$" !":",/3 ,!:!" !!5! ’$:/ 2:;,$)$":’",% !!’"@!+ !!$/!:! !"!/ &’2)(/50% ,:’,$)$"" "’’0 ’#$ &’50!5!%/ % &’2)(.:7*!<+ !’$; 5$’2"0","’7 ’ ):)’#0",,0 ’ ) 1 * $/ ,!$$" ):)’#0 ’!$’"/% 5$’2"0!@!’)/+ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $5 %$: &’= )’$; &’=)’ <> D")*#)8*% + )’$; &’=)’/0%%*% ’"#% )*+*,- *,$$!’ ,2$!" 0/!’!’; / 0$!9% / $!$$0 !+ ’’"9 / 0!’$"’0 !/9 / $!’9 / 0’"’’9 / !!"/ ,!!’’$; / )’!!9% / )"!’$$!9+ / )’!’0’/ &’=)1 *, 6%/!’$; ""$"/ % &’=)? ,*!8+ 6%/!’$; ,"!’!’*! !/>0*!!, "’:!",$)$"! ’ " ,$ )$" ’ " ’/,0’!’% DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $) /!!! 0"’!/ >’!0 ’,0 !!’ " ! ! " ’:! ;% + ,’20,D’ ,$$’!!0"’ ,"’:!",$)$"0 !’/ &’@)2 >-A % 6+/ !’$;+ DE:G’/ >$< &’@)/50 $6$% ’6#% )*+*,- 50 7% + 30’,!!"$" "!’,$,$)$" $’,!$%"’’’ 6/’,",$)$"9’! $"!!’!$"!,! ’!",$)$"@!0 $!"5,#//0!!/ !$,=’!$! 0"!!’/>’!% !!" $ " " ! ’ + ,$,$)$"$’,’ ,$)$"!,,$ )$" 0 " " " " ,$ )$"0!$/ &’@)5 6+/"!$!/% + DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $8 = >%% =&(’9**%:<9:,<9 $%% =&(’)%,% + %6/!’$; />0’0 0/ =&(’)(/0,$3: %6/!’$;% + ""#$&$@!’/ =&(’)5% =&(’)5/0 %6/!’$; % ,00 0+ ):)’#"’"$0 *!$!2$"*2 "*2/ , &$ :$ $ ’0"2$/, 0’"’0 $ *2 ’ ’*$>@!’%6// >,’$@!;% + / *2@!):2 *220F 3 $63" 5 * * " 0/ , 0’" *2 ’ ! ’/ > , 0 1 2 ,12,13*) !#$ 2 4 ! 2 , +/% 5,#! #$ 2 5! ! 2 #), 5! +67 #),/ /, ’ *2 5 *3 >’ (" % ):&’$$’0+ *2’$! !$$ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ !" #!$% &’ &( )* + ! " #!$, ))- ). % ".$’ ,/.%"+$0( * 1+ ), - . ".$% ,/.(0’ ( 2)3/44444 4445* + 62)3/, 444444445 - 7 %. % !8,/."%$% %% )8 979%’ :%( %* %+ ".$%, 6 0%- ’. 9;1!<90’ ’ ’% 9;1!<:0’’ =’( ’* 9;1!<0’+ > "=’, )$’- (. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 ! "# $ *25*3>’(" )**21&>I2; *220F’$63"5 ** "0 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 *$>"4’7 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 0%!:!"">"!, DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3960-000-012-00081112 Perry AvenueCONSTRUCTION NOTES:1.INSTALL NEW SERVICE MAST WITH ROOF PENATRATION MEETING REQUIREMENTS OF PSE ELECTRICSERVICE HANDBOOK, NEC, RCW AND WAC. DEMOLISH OLD SERVICE MAST.2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTSOF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC.4.RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE IMPROVEMENTS TO MEETREQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING.5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK,NEC, RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT.7.DEMOLISH EXISTING SERVICE PANEL AND INSTALL NEW 200 AMP SERVICE INDOOR FLUSH MOUNT PANELMEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC.8. BOND AND GROUND TO REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC.NOTES 1, 2, 4NOTES 4, 5NOTES 4,7, 8NOTES 1, 2, 4GENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..BID ITEM NO. 3 - SERVICE CONNECTION MODIFICATION - 1112 PERRY9/20/21MG/JMDocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3960-000-014-00061118 Perry AvenueNOTES 4, 6NOTES 4, 6CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT ISMODIFIED TO MAKE SERVICE IMPROVEMENTS MEETREQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS,INTERIOR WALL BOARD, EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSEELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. INSTALLIMPROVEMENTS TO THE STRUCTURE AS REQUIRED TOACCOMMODATE LOADS OF NEW SERVICE CONNECTION.BID ITEM NO. 4 - SERVICE CONNECTION MODIFICATION - 1118 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTONADDITIONAL PHOTOS FOR REFERENCE ONLY3960-000-014-00061118 Perry AvenueBID ITEM NO. 4 - SERVICE CONNECTION MODIFICATION - 1118 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3950-000-007-00071124 & 1128 Perry AvenueNOTES 4, 6CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT ISMODIFIED TO MAKE SERVICE IMPROVEMENTS MEETREQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS,INTERIOR WALL BOARD, EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSEELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. INSTALLIMPROVEMENTS TO THE STRUCTURE AS REQUIRED TOACCOMMODATE LOADS OF NEW SERVICE CONNECTION.BID ITEM NO. 5 - SERVICE CONNECTION MODIFICATION - 1124 & 1128 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3918-001-010-00011133 Perry AvenueCONSTRUCTION NOTES:1.INSTALL NEW SERVICE MAST AND DOUBLE ROOF PENATRAION MEETING REQUIREMENTS OF PSE ELECTRICSERVICE HANDBOOK, NEC, RCW AND WAC. DEMOLISH OLD SERVICE MAST.2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTSOF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING.5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK,NEC, RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT.7.DEMOLISH EXISTING SERVICE PANEL AND INSTALL NEW 200 AMP SERVICE INDOOR FLUSH MOUNT PANELMEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC.8.BOND AND GROUND TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW ANDWAC.NOTES 1, 2, 4NOTES 4, 5NOTES 4,7, 8NOTES 1, 2, 4NOTES 4, 5CONSTRUCTION NOTES:9. EXISTING CONDUIT LEAVES BOTTOM OF METER AND LB’S INTO BASEMENT. CHIP CONCRETE AS NEEDEDTO INSTALL NEW CONDUIT10. CORE DRILL DRIVEWAY UNDER CARPORT TO INSTALL GROUND RODSNOTES 4, 9,10BID ITEM NO. 6 - SERVICE CONNECTION MODIFICATION - 1133 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3914-002-003-05071139 Perry AvenueNOTES 2, 4, 11CONSTRUCTION NOTES:2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTSOF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC.4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIORWALL BOARD, AND SIDING.11. RAISE SERVICE MAST TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW ANDWAC.BID ITEM NO. 7 - SERVICE CONNECTION MODIFICATION - 1139 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTONADDITIONAL PHOTOS FOR REFERENCE ONLY3914-002-003-05071139 Perry AvenueBID ITEM NO. 7 - SERVICE CONNECTION MODIFICATION - 1139 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3914-002-003-03091141 Perry AvenueNOTES 4,7, 8NOTES 1, 2, 3, 4,5, 12CONSTRUCTION NOTES:1. RELOCATE 200A SERVICE LOCATION TO FRONT THIRD OF HOUSE. INSTALL NEW SERVICE MAST MEETINGREQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. DEMOLISH OLD SERVICE MAST. 2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTS OFPSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 3.OFFSET MAST AROUND GUTTER TO RAISE SERVICE MAST TO MEETING REQUIREMENTS OF PSE ELECTRICSERVICE HANDBOOK, NEC, RCW AND WAC.4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING.5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC,RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT. 7.DEMOLISH EXISTING SERVICE PANEL AND INSTALL NEW 200 AMP SERVICE INDOOR FLUSH MOUNT PANELMEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 8.BOND AND GROUND TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 12.INSTALL PIPE AROUND STRUCTURE TO EXISTING PANEL LOCATION.BID ITEM NO. 8 - SERVICE CONNECTION MODIFICATION - 1141 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3914-002-003-03091141 Perry AvenueNOTES 2, 3, 4, 5BID ITEM NO. 8 - SERVICE CONNECTION MODIFICATION - 1141 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..CONSTRUCTION NOTES:1. RELOCATE 200A SERVICE LOCATION TO FRONT THIRD OF HOUSE. INSTALL NEW SERVICE MAST MEETINGREQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. DEMOLISH OLD SERVICE MAST. 2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTS OFPSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 3.OFFSET MAST AROUND GUTTER TO RAISE SERVICE MAST TO MEETING REQUIREMENTS OF PSE ELECTRICSERVICE HANDBOOK, NEC, RCW AND WAC.4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING.5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC,RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT. 7.DEMOLISH EXISTING SERVICE PANEL AND INSTALL NEW 200 AMP SERVICE FLUSH MOUNT PANEL MEETINGREQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 8.BOND AND GROUND TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 12.INSTALL PIPE AROUND STRUCTURE TO EXISTING PANEL LOCATION.DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3940-029-004-00021304 Perry AvenueNOTES 4, 6CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE IMPROVEMENTS TOMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIORWALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC,RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE AS REQUIRED TO ACCOMMODATE LOADSOF NEW SERVICE CONNECTION.BID ITEM NO. 9 - SERVICE CONNECTION MODIFICATION - 1304 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTONNOTES 4, 63914-002-001-00041309 Perry AvenueCONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCWAND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE AS REQUIRED TO ACCOMMODATE LOADS OF NEWSERVICE CONNECTION.BID ITEM NO. 10 - SERVICE CONNECTION MODIFICATION - 1309 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3914-002-001-00041309 Perry AvenueADDITIONAL PHOTOS FOR REFERENCE ONLYBID ITEM NO. 10 - SERVICE CONNECTION MODIFICATION - 1309 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3930-000-003-00061316 Perry AvenueNOTES 1, 4,5NOTES 4,5, 13NOTES 1, 4,5, 8, 12NOTES 2,4, 6NOTES 1, 4,CONSTRUCTION NOTES:1.RELOCATE 200A SERVICE LOCATION TO FRONT THIRD OF HOUSE. INSTALL NEW SERVICE MASTMEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. PROVIDEROOF PENETRATION. DEMOLISH OLD SERVICE STRIKE PLATE.2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PERREQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICEIMPROVEMENTS MEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALLBOARD, EXTERIOR WALL BOARD, AND SIDING.5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICEHANDBOOK, NEC, RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT. 6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC,RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE AS REQUIRED TO ACCOMMODATELOADS OF NEW SERVICE CONNECTION. DEMOLISH EXISTING STRIKE PLATE.CONSTRUCTION NOTES:8. BOND AND GROUND TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK,NEC, RCW AND WAC. 12. INSTALL PIPE AROUND STRUCTURE TO EXISTING PANEL LOCATION.13. EXISTING PANELS CAN BE LEFT IN PLACE AS THEY ARE IN GOOD CONDITION ANDNEWER INSTALLATIONS.BID ITEM NO. 11 - SERVICE CONNECTION MODIFICATION - 1316 PERRY9/20/21MG/JMDocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3930-000-003-00061316 Perry AvenueADDITIONAL PHOTOS FOR REFERENCE ONLYBID ITEM NO. 11 - SERVICE CONNECTION MODIFICATION - 1316 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3930-000-002-00071318 Perry AvenueNOTES 1,2, 4, 5, 13NOTES 1,2, 4, 5, 13CONSTRUCTION NOTES:1.INSTALL NEW SERVICE MAST MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCWAND WAC. DEMOLISH OLD SERVICE MAST. NOTE: IF ROOM INSUFFICIENT FOR ROOF PENETRATION OFFSET MAST AROUND GUTTER.2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTSOF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING.5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC,RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT. 7.DEMOLISH EXISTING SERVICE PANEL AND INSTALL NEW 200 AMP SERVICE INDOOR SURFACE MOUNT PANELMEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 8.BOND AND GROUND TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 13. BLANK EXISTING METER BASE AND RELOCATE NEW METER BASE NEXT TO EXISTING.NOTES 4, 7, 8BID ITEM NO. 12 - SERVICE CONNECTION MODIFICATION - 1318 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3930-000-001-00081420 & 1422 Perry AvenueCONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE IMPROVEMENTS TOMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD,EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK,NEC, RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE AS REQUIRED TO ACCOMMODATELOADS OF NEW SERVICE CONNECTION. NOTES 4, 6BID ITEM NO. 13 - SERVICE CONNECTION MODIFICATION - 1420 & 1422PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTONADDITIONAL PHOTOS FOR REFERENCE ONLY3930-000-001-00081420 & 1422 Perry AvenueBID ITEM NO. 13 - SERVICE CONNECTION MODIFICATION - 1420 & 1422 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TOPSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENTAND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FORADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES ASFOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENTWASHINGTON STATE ELECTRICAL LAWS UNDERELECTRICAL CHAPTER 19.28 (RCW) AND CURRENTWASHINGTON STATE ELECTRICAL RULES UNDERELECTRICAL WAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3929-000-001-01001503 Perry AvenueNOTES 4, 6CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKEIMPROVEMENTS TO MEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS,INTERIOR WALL BOARD, EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICEHANDBOOK, NEC, RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE ASREQUIRED TO ACCOMMODATE LOADS OF NEW SERVICE CONNECTION. BID ITEM NO. 14 - SERVICE CONNECTION MODIFICATION - 1503 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3912-0000-007-00041504 Perry AvenueNOTES 4, 6BID ITEM NO. 15 - SERVICE CONNECTION MODIFICATION - 1504 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKEIMPROVEMENTS TO MEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS,INTERIOR WALL BOARD, EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICEHANDBOOK, NEC, RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE ASREQUIRED TO ACCOMMODATE LOADS OF NEW SERVICE CONNECTION. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3914-001-001-07091517 Perry AvenueNOTES 4, 6BID ITEM NO. 16 - SERVICE CONNECTION MODIFICATION - 1517 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSEELECTRIC SERVICE HANDBOOK FOR SINGLE-FAMILYRESIDENTIAL PROJECTS PERMANENT AND TEMPORARYSERVICE.2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONALDETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES ASFOLLOWS: NATIONAL ELECTRICAL CODE (NEC), OR NFPA70, 2020 EDITION, AND THE CURRENT WASHINGTONSTATE ELECTRICAL LAWS UNDER ELECTRICAL CHAPTER19.28 (RCW) AND CURRENT WASHINGTON STATEELECTRICAL RULES UNDER ELECTRICAL WAC RULE296-46B (WAC)..CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKEIMPROVEMENTS TO MEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS,INTERIOR WALL BOARD, EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICEHANDBOOK, NEC, RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE ASREQUIRED TO ACCOMMODATE LOADS OF NEW SERVICE CONNECTION. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3970-000-002-00081609 Perry AvenueNOTES 2, 4, 11CONSTRUCTION NOTES:2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTSOF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE SERVICE IMPROVEMENTSMEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIORWALL BOARD, AND SIDING.11. RAISE SERVICE MAST TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW ANDWAC.BID ITEM NO. 17 - SERVICE CONNECTION MODIFICATION - 1609 PERRY9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3908-000-001-01052055 East 15th St.CONSTRUCTION NOTES:1.INSTALL NEW SERVICE MAST MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCWAND WAC. PROVIDE ROOF PENETRATION. EMOLISH OLD SERVICE MAST. 2.PROVIDE BRACING OR GUYING AS REQUIRED TO MEET CLEARANCE REQUIREMENTS PER REQUIREMENTSOF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 4.RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKE IMPROVEMENTS,INCLUDING BUT NOT LIMITED TO, ROOFING MATERIALS, RAFTERS, INTERIOR WALL BOARD, EXTERIOR WALLBOARD, AND SIDING. 5.INSTALL NEW METER BASE/SOCKET MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK,NEC, RCW AND WAC. DEMOLISH OLD SERVICE ENTRANCE EQUIPMENT. 7.DEMOLISH EXISTING SERVICE PANEL AND INSTALL NEW 200 AMP SERVICE INDOOR FLUSH MOUNT PANELMEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW AND WAC. 8.BOND AND GROUND TO MEET REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK, NEC, RCW ANDWAC.NOTES 1, 2,4, 5NOTES 4,7, 8NOTES 1, 2,4, 5BID ITEM NO. 18 - SERVICE CONNECTION MODIFICATION - 2055 E 15TH9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TO PSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTS PERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FOR ADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES AS FOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENT WASHINGTON STATE ELECTRICAL LAWS UNDER ELECTRICALCHAPTER 19.28 (RCW) AND CURRENT WASHINGTON STATE ELECTRICAL RULES UNDER ELECTRICALWAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Drawing TitleDateDrawing ReferenceDrawn/Ck'd ByScaleASI/RFI/CSK Number1601 5th Avenue, Suite 1600Seattle, WA 98101206.622.5822www.kpff.comProject TitleClientRESIDENTIAL ELECTRICALSERVICE CONNECTIONMODIFICATION PROJECTCITY OF BREMERTON3908-000-001-00062134 East 14th St.NOTES 4, 6CONSTRUCTION NOTES:4. RESTORE ANY BUILDING SURFACE OR STRUCTURE THAT IS MODIFIED TO MAKEIMPROVEMENTS TO MEET REQUIREMENTS INCLUDING ROOFING MATERIALS, RAFTERS, INTERIORWALL BOARD, EXTERIOR WALL BOARD, AND SIDING.6.INSTALL NEW STRIKE PLATE MEETING REQUIREMENTS OF PSE ELECTRIC SERVICE HANDBOOK,NEC, RCW AND WAC. INSTALL IMPROVEMENTS TO THE STRUCTURE AS REQUIRED TOACCOMMODATE LOADS OF NEW SERVICE CONNECTION. BID ITEM NO. 19 - SERVICE CONNECTION MODIFICATION - 2134 E 14TH9/20/21MG/JMGENERAL NOTES:1.“PSE ELECTRIC SERVICE HANDBOOK” REFERS TOPSE ELECTRIC SERVICE HANDBOOK FORSINGLE-FAMILY RESIDENTIAL PROJECTSPERMANENT AND TEMPORARY SERVICE. 2.REFER TO SPECIAL PROVISIONS 8-20 FORADDITIONAL DETAILS.3.“NEC,” “RCW,” AND “WAC” REFER TO FULL TITLES ASFOLLOWS: NATIONAL ELECTRICAL CODE (NEC), ORNFPA 70, 2020 EDITION, AND THE CURRENTWASHINGTON STATE ELECTRICAL LAWS UNDERELECTRICAL CHAPTER 19.28 (RCW) AND CURRENTWASHINGTON STATE ELECTRICAL RULES UNDERELECTRICAL WAC RULE 296-46B (WAC)..DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ "!# DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 NVicinity Map101131394 OVERHEAD CIRCUIT MAPSCALE: NONEARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.SCALE: NONEUNIVERSAL MAPNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"BREMERTON EAST 11TH & PERRY STPI RELOCATIONPSE CAPITAL PROJECTGENERAL SPECIFICATIONSScope of WorkRelocate poles along E. 11th St and Perry Ave in Bremerton, underground someportions, and reconductor.General-All work is to be completed per PSE Standards & Practices. Copies of all PSEStandards are available upon request.-Work sites shall be kept clear of debris and all construction materials; equipmentand packing shall be removed daily.-Return all unused and removed poles, transformers and hardware to PSE,storeroom. All copper shall be coiled and returned the day it is removed from thepoles. Remove all unused pins and insulators.-Return all streetlights, area lights and floodlights to Sumner yard.Preconstruction- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required bypermitting agency, in advance of starting work in Right-of-way involving a Permit.- All system switching shall be approved by System Operations (425-882-4652) aminimum of 48 hours in advance.- Notify customers of all outages 48 hours in advance.Work Drawings & Documents- Field design changes shall be approved by PSE Project Manager or Engineer.- Mark all field changes, equipment ID numbers and Underground cable information inred on Foreman's copy of worksketch.- Return one Foreman's copy of worksketch to Project Manager at completion of job.- When permits are required, a copy shall be available on work site at all times.Safety- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.- Refer to PSE standards 6275.9050 for personal protective grounding requirements.- Refer to PSE standards 6275.9150 for vehicle grounding and barricadingrequirements.- Proper line clearances shall be taken at the beginning, and released at the end, ofeach work day, or as otherwise instructed by the System Operator.- Provide signs, barricades, and traffic control in conformance with permit regulations.- Utilize flagging and other vehicle traffic control as necessary and in conformance withlocal traffic regulations.- Maintain traffic flow as required by permitting agency.Erosion & Sediment Control- Refer to PSE standards 0150.3200 for minimum requirements.- Comply with all requirements of permitting agency.- Installed erosion & sediment devices shall be maintained until vegetation has beenre-established or disturbed soil has been otherwise permanently stabilized.Joint Facilities- Coordinate with Communication Companies for transfers.OVERHEAD CONSTRUCTIONPoles & Structures- Poles are to be installed or relocated as staked. Unless otherwise noted, all polelocation measurements are from the center of the pole.- All new poles set shall be the class indicated on the sketch, or better. Do not set alower class pole than specified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly perstandard specification 6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return toPSE storeroom. Fill and crown pole holes and restore area similar to adjacentlandscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductorsand guys to new poles set, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and alltransformers. Install at all sites being worked within the scope of the project wherethey are currently missing.- Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600amp switch jumpers. Install tree wire conductor for jumpers on all poles that aredouble deadended with tree wire.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwiseshown on the drawing.- All neutral connections to be made with solid compression connectors. Connect allpole grounds to common neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead andunderground taps with fused protection above 40T.- Install Wildlife Protectors on all transformers.UNDERGROUND CONSTRUCTIONExcavation-Trenching outside of the Right-of-way shall be of sufficient depth to provide aminimum of 36” of cover for primary conductors and 24” of cover for secondaryconductors.-Road crossings and all trenches within the Right-of-way shall be of sufficient depthto provide a minimum of 36” of cover for all conductors or as required by thepermitting Agency.-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sandcover.-No rocks larger than 6” shall be included in backfill.-Backfill in road crossings and within the Right-of-way shall be compacted to 95%density or as required by the permitting Agency.-Restore all excavated areas to original condition.- If four or more six inch conduits are installed in a trench, fluidized thermal backfill(FTB) shall be installed around the conduits to a depth of six inches above and tothe sides of the conduit, and two inches underneath, per PSE Standard 6790.0140.Vaults & Handholes- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”- Vaults shall be placed level and 2” above final grade in landscaped areas and flushwith final grade when placed in hard surface areas.- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.- All conduit entrances shall be grouted.Conductors & Conduit- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.- Unless splices are called for, or otherwise noted or approved, conduit risers shall beplumbed directly to road crossing conduits.- Install insulating caps on all unused primary bushings.- All “spare” conduits shall be capped at each end.Owner / Developer Contact InfoofficeATTN:CITY OF BREMERTONN/ABREMERTON, WA 98310CHRIS DIMMITT360-473-2307PHONECABLE TV11627309 101131394N/A583064951N/AN/A108122793PROJECT PHASEPWRNOTIF# ORDER#SuperiorRemovalOH Expense593223352OH ExpenseE-Mail:Cell Phone:Project Manager Contact Information:Manager:ERROL BURGOS425.324.5341Errol.Burgos@pse.comUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED1 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)LEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONJOB SITEJOB SITEJOB SITEErrol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 BRE21SHE25T8572725TT8567965TT8567640TT8567725T40TT8568240TAX85684(N.O.)X85681100TA,B,CT8572525TA,BT8572615TX8567640TX8567840TN.O.101131394 OVERHEAD CIRCUIT MAP (BEFORE)SCALE: NONEUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED2 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AOVERHEAD CIRCUIT MAP (AFTER)SCALE: NONEErrol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 111811181114111011081106110411151114110411131109E 11TH STE 11TH STSCOTT AVESCOTT AVECOMM POLECOMM POLECOMM POLEROWROWSCOTT AVEREMOVE621329-156057RELOCATE621325-1560575-021, 25TEXISTING621326-15603237.5kVA 120/240v5-027, 40TEXISTING621336-15603237.5kVA 120/240vEXISTING621308-156052RELOCATE621326-15604250kVA 120/240vNEW621313-15605825kVA 120/240vSW# T85725, 25TNEW621314-15604650kVA 120/240v#2 ACSR#2 ACSR#2 ACSR#6 CU#4 ACSRSW# X85675, 25TABABCABREPLACE621346-1560581x10kVA1x25kVA 120/240vOpen-Wye/Open-DeltaNEW621346-1560581x10kVA1x25kVA 120/240vOpen-Wye/Open-DeltaSW# T85726, 15TSITE PLAN101131394 SCALE: 1" = 20'MATCHLINE SEE PAGE 4 AA UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED3 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVDID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 621326-156032 45 - 1987SLAF8524P02 621326-156042 45 - 2000SLAS1525P03 621325-156057 50 - 1968SLAF8526P04 621329-156057 45 - 1999P04A 621346-156058 45 2 1971WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP02 P03 SEC TPX 1 130P03 P05 SEC TPX 1 120P03 P04B #4ACSR 2 245Total Feet 245 (#4ACSR) ACTUAL________RemovedTotal Feet 250 (SEC TPX) ACTUAL________RemovedSERVICE RELOCATIONS AND CONVERSIONSNAME AND ADDRESSMeter Location Meter NumberOld Point ofDeliveryNew Point ofDeliveryService Notes2110P02 P02A2105P02 P02A2109-2117P02 P02A1107P03-P03B P03A-P03B1014P05-P03 P03A2207P05-P03 P03A2202-2206P05-P05B P05A-P05BNew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:P0250621314-156046P02AInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P03621329-15605725kVA6211250 POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASSYEARREMARKS / LOCATION REFP02A 621314-156046 50 2P03A 621307-120070 50 1P04B 621346-156058 45 3SITE NOTESAT P01EXISTING 45 FT CL UNK, 1987 POLE TO REMAINAT P02AINSTALL NEW 50FT CL2 POLE (AS STAKED) 6010.1000, PD502INSTALL 3Ø TANGENT PTP #2 ACSR 6033.1010, TAN312TRANSFER 50kVA TRANSFORMER FROM P02TRANSFER OH PRIMARY & SVCS FROM P02INSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P03AINSTALL NEW 50FT CL1 POLE (AS STAKED) 6010.1000, PD501INSTALL 3Ø SINGLE WINGARM #2 ACSR 6033.4010, TASW312INSTALL 2Ø OH TO UG TERM 6043.1000, TSU2C1FINSTALL SW# T85725, FUSE AT 25TINSTALL 25kVA TRANSFORMER 6025.1000, TRFNXFTRANSFER OH PRIMARY & SVCS FROM P03INSTALL (1) 4" RISER 6042.1000, RIS4CSSINSTALL GRID NUMBERSAT P04BINSTALL NEW 45FT CL 3 POLE (AS STAKED) 6010.1000, PD453INSTALL 3Ø DEADEND #2 ACSR 6033.1040, DE2315INSTALL 2Ø UG TO OH TERM 6043.1001, UTSU2C1INSTALL SW# T85726, FUSE AT 15TTRANSFER 10kVA TRANSFORMER FROM P04ATRANSFER 25kVA TRANSFORMER FROM P04AINSTALL (1) 4" RISER 6042.1000, RIS4CSSINSTALL SINGLE HELIX ANCHOR, L=10'S 6012.1000, ANDP24INSTALL (1) 3/8 PRIMARY DOWN GUY 6013.0100, GYD3SAINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100, GYD3SANPSE IS RESPONSIBLE FOR FINAL ROADRESTORATION PER CITY OF BREMERTONSTANDARDS FROM CITY PROJECT LIMIT TOPOLE P04BNOT TO SCALECROSS SECTION - E 11TH STLOOKING EAST (E 52+70)60' ROWNS36" MIN4" CONDUIT18" SD1.7'0.6'12" SDErrol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 101110092314-2316E 11TH STPERRY AVECOMM POLECOMM POLEROWROWROWCOMM POLEREMOVE621331-156078RELOCATE621324-15606925kVA 120/240vREMOVE621324-156084EXISTING621324-1560961x25kVA 120/240v1x15kVA 120/240vEXISTING621312-1560843x50kVA 120/208v#6 CU #2 ACSRNEW621313-15606925kVA 120/240vSW# T85676, 40TBRE21NEW621312-156076NEW621305-156083SW# T85677, 25T#6 CU#2 ACSRABCABCABCNEW621313-156085SW# X85678, 40TN.O.NEW #2 TWBRE21SITE PLAN101131394 SCALE: 1" = 20'MATCHLINE SEE PAGE 4 AA UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED4 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AMATCHLINESEE PAGE 5BB POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVDID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP05 621324-156069 40 1 2017SLAF8527P06 621324-156084 45 - 1957SLAS1499P08 621331-156078 45 - 1967WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP05 P08 SPAN GUY 1 100P06 P07 SPAN GUY 1 135P06 P06B#6 CU &NEUTRAL4 165P06 P08#6 CU &NEUTRAL4 85P08 P09#2 TW &NEUTRAL4 85Total Feet 85 (#2 TW) ACTUAL________RemovedTotal Feet 250 (#6 CU) ACTUAL________RemovedTotal Feet 235 (SPAN GUY) ACTUAL________Removed POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASSYEARREMARKS / LOCATION REFP05A 621307-120081 50 1P06A 621305-156083 50 1P07A 621313-156085 502WIRE STRINGING PRIMARY &SECONDARYLocationPri SecWire Size & Type QuantityLength(perconductor)TotalFrom ToP06A P06B XX #6 CU & NEUTRAL 4 100SITE NOTESAT P05AINSTALL NEW 50FT CL1 POLE (AS STAKED) 6010.1000, PD501INSTALL 3Ø DEADEND #2 ACSR 6033.1040, DE2315INSTALL 3Ø OH TO UG TERM 6043.1003, TSU3CTWINSTALL SW# T85676, FUSE AT 40TTRANSFER 25kVA TRANSFORMERTRANSFER OH PRIMARY & SVCS FROM P05INSTALL (1) 4" RISER 6042.1000, RIS4CSSINSTALL GRID NUMBERSAT P06AINSTALL NEW 50FT CL1 POLE (AS STAKED) 6010.1000, PD501INSTALL 3Ø DEADEND #6 CU 6033.1040, DE2310INSTALL 3Ø UG TO OH TERM 6043.1001, UTSU3L1INSTALL SW# T85677, FUSE AT 25TINSTALL (1) 4" RISER 6042.1000, RIS4CSSINSTALL 20" PLATE ANCHOR, L=8'N 6012.1000, ANDP20INSTALL (1) DOUBLE 3/8 PRIMARY DOWN GUYS 6013.0100, GYDD31AINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100, GYD3SANINSTALL GRID NUMBERSAT P07AINSTALL NEW 50FT CL2 POLE 6010.1000, PD502INSTALL 3Ø DOUBLE DEADEND #2ACSR 6033.1044, DDE2315INSTALL 3Ø LB SWITCH C/O'S 6022.1000, DLS315LINSTALL SW# X85678, FUSE @ 40TOPERATE AS NORMAL OPENAT P07INSTALL JUMPERS (9998076)INSTALL (3) STIRRUPS (2254000)INSTALL (3) H CONNECTORS (2137000)PSE IS RESPONSIBLE FOR FINAL ROADRESTORATION PER CITY OF BREMERTONSTANDARDS FROM CITY PROJECT LIMIT TOPOLE P06ANOT TO SCALECROSS SECTION - E 11TH STLOOKING EAST (E 55+17)60' ROWNS36" MIN4" CONDUITVault & Equipment TableSiteApproximateStation &Offset FromVlt CenterGridNumberVault Size& CoverType & SizeEquipmentIn VaultInstall Primary BushingsTransformerID Numbers(Company ID)ASBUILT INFORMATIONForeman-CompleteLBELB10JPer STD 6041.1000DCMID 7630600J01STA 54+72.429.35 RT6213121560764'8"X7'X5' Vaultw/ 2-3' Sq Anti-Skid doorsJBOX3AS PER STD 6055.1030J-Box below gradew/ (3) 4 pos busMatid: 762590010 2New pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:P0525kVA621313-156069P05A18" SD2.9'0.4'12" SDErrol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PERRY AVETRANSFER AMR #53620 FROM P135'x5' EASEMENTREQUIREDROWROWROWROWTRIM BUSHTREE TO BE REMOVEDSWING SVC TO P11ARELOCATE AMRUNIT TO P13ABRIDLE SVCREMOVE621327-156080REMOVE621353-15607937.5kVA 120/240vRELOCATECOMM OWNED POLE621334-156081REMOVE621369-156080AMR: 53620NEW621346-15608250kVA 120/240vNEW621327-1560811x25kVA 120/240v1x75kVA 120/240vSW# T85679, 65TNEW621346-156078#2 TW#2 TW#2 TW#2 TWNEW621328-156078BRE21RELOCATECOMM OWNED POLE621346-156081NEW621358-156082REPLACE621337-1560791x25kVA 120/240v1x75kVA 120/240v621334-156081NEW #2 TWNEW #2 TWNEW #2 TWSITE PLAN101131394 SCALE: 1" = 20'MATCHLINESEE PAGE 4BBUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED5 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVDID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP09 621337-156079 45 3 2011SLAF8377P09B 621327-156080 - - --P11 621353-156079 45 - 1978P13 621369-156080 45 - 2003SLAM3203WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP09 P09BSEC TPX 130P09 P11 #2 TW 3 125P11 P10 SEC TPX 1 70P11 P12 SEC TPX 165P11P13 #2 TW 3 150P13 P14 #2 TW 3 150Total Feet 425 (#2 TW) ACTUAL________RemovedTotal Feet 165 (SEC TPX) ACTUAL________RemovedSERVICE RELOCATIONS AND CONVERSIONSNAME AND ADDRESSMeter Location Meter NumberOld Point ofDeliveryNew Point ofDeliveryService Notes1100P09-P09B P09C1105P09 P09C-P09A1113P09 P09C-P09A1112P11-P10P09C-P09A-BRIDLE1114P11-P10P09C-P09AP10A1115P11-P10P09A-P09CP10A1118P11-P12 P12A1121P11 P12A-P11A1122P11-P12 P12A1124P11-P12 P12A-P13A1127P14-P13 P12A-P11A1133P14-P13 P15A-P13AMATCHLINESEE PAGE 6CC POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASS YEAR REMARKS / LOCATION REFP09A 621328-156078 35 3P09C 621327-156081 50 1P11A 621346-156078 35 3P10A 621334-156081 50 2LUMEN TO INSTALLP12A 621346-156082 50 2LUMEN TO INSTALLP13A 621358-156082 50 2LUMEN TO INSTALLSITE NOTESAT P09AINSTALL NEW 35FT CL3 POLE (AS STAKED) 6010.1100, PS353TRANSFER OH SVCS FROM P09INSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P09CINSTALL NEW 50FT CL1 POLE (AS STAKED) 6010.1000, PD501INSTALL 3Ø DEADEND #2 TW (N) 6033.1040, DE2315INSTALL 3Ø UG TO OH TERM 6043.1001,UTSU3L1INSTALL SW# T85679, FUSE AT 65T TRANSFER 25kVA TRANSFORMER FROM P09TRANSFER 75kVA TRANSFORMER FROM P09INSTALL (1) 4" RISER 6042.1000, RIS4CSSINSTALL OH TRIPLEX TO P09AINSTALL OH TRIPLEX TO P10ATRANSFER OH SVC TO 1100 INSTALL 24" PLATE ANCHOR, L=8'S 6012.1000, ANDP24INSTALL (1) DOUBLE 3/8 PRIMARY DOWN GUY 6013.0100, GYDD31AINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100. GYD3SANINSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P10ALUMEN TO INSTALL NEW 50FT CL2 POLEINSTALL 3Ø TANGENT PTP #2 TW 6033.1010, TAN312TRANSFER OH SVCS TO 1114 & 1115AT P11AINSTALL NEW 35FT CL3 POLE (AS STAKED) 6010.1100, PS353TRANSFER OH SVCSINSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P12ALUMEN TO INSTALL NEW 50FT CL2 POLEDEEP SET 1'INSTALL 3Ø TANGENT PTP #2 TW 6033.1010, TAN312INSTALL 50 kVA TRANSFORMER 6025.1000, TRFRXFINSTALL OH TRIPLEX TO P11ATRANSFER OH SVCS TO 1122 & 1118INSTALL 1/0 TPX BRIDLE SVCS TO 1112 6024.1000, BSTPXINSTALL GRID NUMBERSAT P13ALUMEN TO INSTALL NEW 50FT CL2 POLEINSTALL 3Ø TANGENT PTP #2 TW 6033.1010, TAN312TRANSFER AMR #53620 FROM P13TRANSFER OH SVC TO 1133WIRE STRINGING PRIMARY &SECONDARYLocationPriSecWire Size & Type QuantityLength(perconductor)TotalFrom ToP09A P09C XX 4/0 TRIPLEX 1 45P09C P10A XX 4/0 TRIPLEX 1 65P09C P12A XX#2 TW &NEUTRAL4 185P12A P11AXX 4/0 TRIPLEX140P12AP13AXX#2 TW &NEUTRAL4120P13AP15A XX#2 TW &NEUTRAL4 140New pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:25621328-156078Installed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P12A621346-15608250kVANew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:75621328-1560786211350P09CP09CP09P09Errol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 E 13TH STE 13TH STBRIDLE SVCCOMM POLE5'x5'EASEMENTREQUIREDROWROWROWTREETRIMMINGBRIDLE SVCRELOCATE621384-15608025kVA 120/240vRELOCATE621370-156082RELOCATE621390-156080REPLACE621403-15608125kVA 120/240vEXISTING621388-15609525kVA 120/240v2411, 65TNEW621372-15608337.5kVA 120/240vNEW621372-156079NEW621384-156083SW# X85680, 65TNEW621380-156084NEW621399-15608437.5kVA 120/240v#2 TW#2 TW#2 TW#2 TWBRE21NEW621394-156080NEW #2 TWNEW #2 TWNEW #2 TWNEW #2 TW NEW #2 TWSITE PLAN101131394 SCALE: 1" = 20'MATCHLINESEE PAGE 5CCUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED6 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP14621384-156080 45 3 2011P15 621370-156082 35 3 2018P16 621390-156080 50-1968SLAF8375P18 621403-156081 4522018WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP14 P15 SEC TPX 1 30P14P16 #2 TW 3 125P16 P17 #2 TW 3 155P16 P17 SEC TPX 1 155P16 P18#2 TW3 130P18 1304 METER SEC TPX 1 90P18 1306 METER SEC TPX 1 70P18 P19#2 TW3 110Total Feet 520 (#2 TW) ACTUAL________RemovedTotal Feet 345 (SEC TPX) ACTUAL________RemovedSERVICE RELOCATIONS AND CONVERSIONSNAME AND ADDRESSMeter Location Meter NumberOld Point ofDeliveryNew Pointof DeliveryService Notes1139P14P15A-NEWBRIDLE1141P14 P15A-P14A1147P14 P15A-P14A1136P14-P15 P15A1146P17-BRIDLEP17-NEWBRIDLE1151P18-P16 P15A-P16A1304P18 P18A-P18B1306P18 P18A1305P18 P18A-P18B1309P18 P18ASITE NOTESAT P14AINSTALL NEW 35FT CL3 POLE (AS STAKED) 6010.1100, PS353TRANSFER OH SVCS TO 1141 & 1147INSTALL GRID NUMBERSAT P15AINSTALL NEW 50FT CL2 POLE (AS STAKED) 6010.1000, PD502INSTALL 3Ø TANGENT PTP #2 TW 6033.1010, TAN312INSTALL NEW 37.5kVA TRANSFORMER 6025.1000, TRFPXFINSTALL TRIPLEX TO P14A & P16ATRANSFER OH SVC FROM P15INSTALL 1/0 TPX BRIDLE SVC TO 1139 6024.1000, BSTPXINSTALL GRID NUMBERSAT P16ALUMEN TO INSTALL NEW 50FT CL2 POLEINSTALL 3Ø TANGENT PTP #2 TW 6033.1010, TAN312INSTALL 3Ø SLACK SPAN BUCK #2 TW 6033.5010, SSDB312INSTALL 3Ø LI SWITCH C/O'S 6022.1000, DLS315FINSTALL SW# X85680, FUSE @ 65TTRANSFER OH SVC TO 1151INSTALL GRID NUMBERSAT P17AINSTALL NEW 50FT CL3 POLE (AS STAKED) 6010.1000, PD503INSTALL 3Ø DEADEND #2 TW (E) 6033.1040, DE2315INSTALL 3Ø SLACK SPAN BUCK #2 TW 6033.5010, SSDB312INSTALL 24" PLATE ANCHOR, L=8'W 6012.1000, ANDH1INSTALL (1) DOUBLE 3/8 PRIMARY DOWN GUY 6013.0100, GYDD31AINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100, GYD3SANINSTALL GRID NUMBERSAT P17EXISTING POLE TO REMAINREMOVE CUTOUT & SWITCH 2411, 65TINSTALL 1/0 TPX BRIDLE SVC TO 1146 6024.1000, BSTPXAT P18ALUMEN TO INSTALL NEW 50FT CL1 POLEINSTALL 3Ø TANGENT PTP #2 TW 6033.1010, TAN312INSTALL NEW 37.5kVA TRANSFORMER 6025.1000, TRFPXFINSTALL TRIPLEX TO P18B & P20ATRANSFER OH SVCS TO 1306 & 1309INSTALL GRID NUMBERSAT P18BINSTALL NEW 35FT CL3 POLE (AS STAKED) 6010.1100, PS353TRANSFER OH SVCS TO 1304 & 1305INSTALL GRID NUMBERSMATCHLINESEE PAGE 7DD POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASSYEARREMARKS / LOCATION REFP14A621372-156079 35 3P15A 621372-156083 502P17A621380-156084 50 3P18B 621394-156080 35 3P16A 621384-156083 502 LUMEN TO INSTALLP18A 621399-156084 501 LUMEN TO INSTALLInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P15A621372-156083 37.5Removed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP14 621384-156080 25Installed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P18A621399-156084 37.5WIRE STRINGING PRIMARY &SECONDARYLocationPriSecWire Size & Type QuantityLength(perconductor)TotalFrom ToP15A P13A XX 4/0 TRIPLEX 1 140P15A P14A XX 4/0 TRIPLEX 1 40P15A P16A XX#2 TW &NEUTRAL4 120P17 P17A XX 4/0 TRIPLEX 1 95P17A P17 XX#2 TW &NEUTRAL4 150P16AP17AXX#2 TW &NEUTRAL4 45P16A P18AXX#2 TW &NEUTRAL4150P18A P18 XX 4/0 TRIPLEX 1 55P18A P20A XX 4/0 TRIPLEX 1 65P18A P20A XX#2 TW &NEUTRAL4 6562113006211300Errol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 PERRY AVEPERRY AVEE 15TH STE 14TH STTRIM BRANCHESCOMM POLECOMM POLE10'X15' EASEMENT REQUIREDROWROWROWROWROWREMOVE621414-156081EXISTING621414-15607025kVA 120/240vRELOCATE621441-15608237.5kVA 120/240vEXISTING621441-156074RELOCATE621405-156082RELOCATE621427-156081RELOCATE621432-156084NEW621405-156085621431-15607115kVA 120/240vNEW621419-15608425kVA 120/240vNEW621433-156081NEW621435-15608537.5kVA 120/240vSW# X85681 , 100T#2 TW#2 TWBRE21#2 ACSR (AØ)NEW 336.4 TWN.O.NEW #2 TWNEW #2 TWNEW #2 TWSITE PLAN101131394 SCALE: 1" = 20'MATCHLINESEE PAGE 6DDUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED7 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP19 621414-156081 45-2003SLAM3202P20 621405-156082 3542017P21621427-156081 45 - 1982SLAF8373P22621441-156082 45 - 1989P23 621432-156084 - - -WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP19 P20 SEC TPX 1 30P19 P21 #2 TW 3 125P21 P22 #2 TW3 155P21 P22 SEC TPX 1 155P22 P23 SEC TPX 1 30P22 P24 #2 TW3 160P22 P24 SEC TPX 1 160Total Feet 440 (#2 TW) ACTUAL________RemovedTotal Feet 375 (SEC TPX) ACTUAL________RemovedSERVICE RELOCATIONS AND CONVERSIONSNAME AND ADDRESSMeter Location Meter NumberOld Point ofDeliveryNew Point ofDeliveryService Notes2134P18-P19 P18A-P20A1316P18-P19 P18A-P20A1318P18-P19 P18A-P20A1420P22-P21 P21A-BRIDAL2055P22-P21 P21B1503P22-P21 P21A1504P22-P23 P23A-P22A1510P22-P23 P23A-P22ASITE NOTESAT P20AINSTALL NEW 50FT CL3 POLE (AS STAKED) 6010.1000, PD503INSTALL 3Ø SINGLE WINGARM #2 TW 6033.4010, TASW312INSTALL 1Ø POLE TAP (NORMAL OPEN) 6031.5100, LATW112DO NOT INSTALL JUMPERSTRANSFER #2 ACSR OH PRIMARY & NEUTRAL FROM P19;SPLICE AND EXTEND ±40'TRANSFER OH SVCS FROM P19INSTALL 24" PLATE ANCHOR, L=5'E 6012.1000, ANDP24INSTALL (1) 7/16 PRIMARY DOWN GUY 6013.0100, GYD7SAINSTALL (1) 7/16 NEUTRAL DOWN GUY 6013.0100, GYD7SANINSTALL GRID NUMBERSAT P21ALUMEN TO INSTALL NEW 50FT CL1 POLEINSTALL 3Ø TANGENT PTP #2 TW6033.1010, TAN312INSTALL NEW 25kVA TRANSFORMER 6025.1000, TRFNXFINSTALL 1/0 TPX BRIDLE SVC TO 1420 6024.1000, BSTPXINSTALL GRID NUMBERSAT P21BEXISTING 40 FT CL UNK, YEAR UNK POLE TO REMAININSTALL 15kVA TRANSFORMER 6025.1000,TRFLXFTRANSFER OH SVC TO 2055AT P22AINSTALL NEW 35FT CL3 POLE (AS STAKED) 6010.1100, PS353TRANSFER OH SVCS TO 1504 & 1510TRANSFER OH SEC (W)INSTALL GRID NUMBERSAT P23AINSTALL NEW 50FT CLH2 POLE (AS STAKED) 6010.1000, PD50H2INSTALL 3Ø PRIMARY NEUTRAL DOUBLE DEADEND 336 TW 6033.3064, DDEP313INSTALL 3Ø L/I SWITCH C/O'SINSTALL SW# X85681, FUSE @100T 6022.1000, DLS315FTRANSFER 37.5kVA TRANSFORMER FROM P22INSTALL TRIPLEX TO P22AINSTALL 24" PLATE ANCHOR, L=20'S 6012.1000, ANDP24INSTALL (1) DOUBLE 7/16 PRIMARY DOWN GUYS 6013.0100, GYDD71AINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100, GYD3SANINSTALL GRID NUMBERSMATCHLINESEE PAGE 8EE POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASS YEAR REMARKS / LOCATION REFP20A 621405-156085 50 3P22A 621433-156081 35 3P23A 621435-156085 50 H2P21A 621419-156084 50 1LUMEN TO INSTALLNew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:P2237.5621435-156085P23AInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P21B621431-156071156211200WIRE STRINGING PRIMARY &SECONDARYLocationPri SecWire Size & Type QuantityLength(perconductor)TotalFrom ToP20A P19XX#2 ACSR &NEUTRAL245P20AP21A XX#2 TW &NEUTRAL4140P21C P21B XX 4/0 TRIPLEX 1 125P21A P23A XX#2 TW &NEUTRAL4 165P23A P22A XX 4/0 TRIPLEX 1 45P23AP24AXX336.4 TW4/0 NEUTRAL4 160Installed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P21A621419-156084 256211250Errol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 1618161416101620PERRY AVESCOTT PLE 16TH STE 16TH STCOMM POLEROWROWROWROWROWWALLWALLROWINSTALL 3Ø FLYING TAPEXISTING POLE621455-156082100TEXISTING621456-156072EXISTING621454-15609737.5kVA 120/240vEXISTING621450-156096621468-156083GANG OP, N.O.2401RELOCATECOMM OWNED POLE621470-156085EXISTING621482-156098EXISTING621456-15605925kVA 120/240v24-310, 25TNEW621463-15608637.5kVA 120/240v#2 TW336.4 TW336.4 TW336.4 TW2/0 ACSRSHE25BRE21BRE21NEW621451-156086SW# X85684, N.O.NEW 336.4 TWNEW 336.4 TWNEW 336.4 TWSITE PLAN101131394 SCALE: 1" = 20'MATCHLINESEE PAGE 7EEUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED8 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP28(COMM)621470-156085 40-1986WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP24 P27336.4 PRI /4/0 NEUT4 140P27 P29 2/0 ACSR 3 180Total Feet 140 (336.4 ACSR PRI) ACTUAL________RemovedTotal Feet 140 (4/0 ACSR NEUT) ACTUAL________RemovedTotal Feet 180 (2/0 ACSR) ACTUAL________RemovedSERVICE RELOCATIONS AND CONVERSIONSNAME AND ADDRESSMeter Location Meter NumberOld Point ofDeliveryNew Pointof DeliveryService Notes1517P22-P24P25A-P24CUT OVER SVC1607P29-P27 P28A-P27A CUT OVER SVC1609P29-P27 P28A-P27A CUT OVER SVC1616P29-P27-P28 P28A CUT OVER SVCSITE NOTESAT P24EXISTING 45 FT CL2, 2009 POLE TO REMAINREMOVE NORTH-SOUTH FRAMINGINSTALL 3Ø PRI NEUT SINGLE ARM 336 TW (EAST-WEST ONLY) 6033.1012, TAP313RAISE NEUTRAL TO PRIMARY POSITIONAT P24ALUMEN TO INSTALL NEW 50 FT CL1 POLEINSTALL 3Ø SINGLE WINGARM 336 TW 6033.4012, TASW313RAISE NEUTRAL TO PRIMARY POSITIONINSTALL GANG OP SWITCH; OPERATE AS NORMAL OPEN 6022.2000, DLSG15WAINSTALL SW# X85684INSTALL GRID NUMBERSAT P25EXISTING 45 FT CL2, 2010 POLE TO REMAINAT P25AEXISTING 45 FT C3, 2010 POLE TO REMAININSTALL OH TRIPLEX TO P24AT P26EXISTING 45 FT CL3, 2010 POLE TO REMAINRAISE NEUTRAL TO PRIMARY POSITIONAT P27EXISTING 45 FT CL1, 2010 POLE TO REMAINTOP POLE TO NEUTRALAT P28ALUMEN TO INSTALL NEW 50 FT CL1 POLEINSTALL 3Ø SINGLE WINGARM 336 TW 6033.4012, TASW313INSTALL NEW 25kVA TRANSFORMER 6025.1000, TRFNXFINSTALL TRIPLEX TO P27TRANSFER OH SVC TO 1616INSTALL GRID NUMBERSMATCHLINESEE PAGE 9FFWIRE STRINGING PRIMARY &SECONDARYLocationPri SecWire Size & Type QuantityLength(perconductor)TotalFrom ToP25A P24 XX 4/0 TRIPLEX 1 210P24 P28A XX336.4 TW4/0 NEUTRAL4 125P28AP27A XX 4/0 TRIPLEX 155P28A P29AXX336.4 TW4/0 NEUTRAL4175 POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASSYEARREMARKS / LOCATION REFP24A 621451-156086 50 1 LUMEN TO INSTALLP28A 621463-156086 50 1 LUMEN TO INSTALLErrol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 23092130213321292311DRIVEWAYPERRY AVEE 17TH STE 17TH STTRANSFER SPAN GUY TO THIS POLETRANSFER OH SVCTO THIS POLECOMM POLETRIMBUSHROWROWROWROWROWHIDDENDRIVEWAYCOMM POLESLACK SPANSET POLE IN PLANTER STRIPREPLACE621483-15608337.5kVA 120/240vEXISTINGEXISTING621523-15608415kVA 120/240v25kVA 120/240vREMOVE621501-156083UNK, 40TRELOCATECOMM OWNED POLE621499-156087EXISTING621509-15608415kVA 120/240vNEW621406-156090NEW621480-15608837.5kVA 120/240vNEW621505-15608815kVA 120/240vEXISTING621502-15606425kVA 120/240v2/0 ACSR2/0 ACSR#6 CU2/0 ACSRNEW621489-156076SW# T85683, 25TNEW621517-156088SHE25NEW621494-156088SW# T85682, 40TNEW 336.4 TWNEW 336.4 TWNEW 336.4 TWNEW 336.4 TWCOMM OWNED POLE621516-15610450kVA 120/240vSITE PLAN101131394 SCALE: 1" = 20'MATCHLINESEE PAGE 8FFUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED9 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERSSITE #POLE DATA POLETEL TV FIBER TRAN RMVDID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP29 621483-156083 45 - 1960P30 621501-156083 50 - 1957SLAF8371P30B(COMM)621499-156087 35- -WIRE REMOVAL TABLELocationWire Size & Type QuantityLength(Circuit FT)RemarksFrom ToP29 P30 2/0 ACSR 3 140P30 P31 2/0 ACSR 3 190P30 P31 SEC TPX1190P30 P30B SPAN GUY 1 45P30 P322/0 ACSR3 115P30 P32SEC TPX 1115P32 P34 2/0 ACSR 3 140Total Feet 440 (2/0 ACSR) ACTUAL________RemovedTotal Feet 305 (SEC TPX) ACTUAL________RemovedTotal Feet 45 (SPAN GUY) ACTUAL________RemovedSERVICE RELOCATIONS AND CONVERSIONSNAME AND ADDRESS Meter Location Meter NumberOld Point ofDeliveryNew Pointof DeliveryService Notes1613P29 P29A-P29B2139P29 P29A-P29B2138P32 P32A-P321725P32 P32A-P322305P33B P34-P33ASITE NOTESAT P29ALUMEN TO INSTALL NEW 50FT CL1 POLEINSTALL 3Ø SINGLE WINGARM 336 TW 6033.4012, TASW313TRANSFER 37.5kVA TRANSFORMER FROM P29TRANSFER SPAN GUY (W/E)INSTALL OH TPX TO P29BINSTALL GRID NUMBERSAT P29BINSTALL NEW 35FT CL3 POLE (AS STAKED) 6010.1100, PS353TRANSFER OH SVCS FROM P29INSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P30ALUMEN TO INSTALL NEW 50FT CLH2 POLEINSTALL 3Ø SINGLE WINGARM 336 TW 6033.4012, TASW313INSTALL 1Ø OH TO UG TERM (AØ) 6043.1000, TSU1L1INSTALL SW# T85682, FUSE AT 40TINSTALL (1) 2" RISER 6042.1000, RIS2CSSINSTALL GRID NUMBERSAT P31AINSTALL NEW 50FT CL3 POLE (AS STAKED) 6010.1000, PD503INSTALL 1Ø DEADEND #6 CU 6031.1040, DE0115INSTALL 1Ø UG TO OH TERM 6043.1001, UTSU1C1INSTALL SW# T85683, FUSE AT 25TINSTALL (1) 2" RISER 6042.1000, RIS2CSSINSTALL SINGLE HELIX ANCHOR, L=8' E 6012.1000, ANDH1INSTALL (1) 3/8 PRIMARY DOWN GUY 6013.0100, GYD3SAINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100. GYD3SANINSTALL GRID NUMBERSAT P32EXISTING 45 FT CL2, 2010 POLE TO REMAIN AS SEC POLETOP POLE ABOVE SECAT P32AINSTALL NEW 50FT CL1 POLE (AS STAKED) 6010.1000, PD501INSTALL 3Ø SINGLE WINGARM 336 TW 6033.4012, TASW313TRANSFER 15kVA FROM P32INSTALL OH TPX TO P32INSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P33AINSTALL NEW 45FT CL1 POLE (AS STAKED) 6010.1000, PD451INSTALL 3Ø DEADEND 336 TW (S) 6033.1042, DE3310INSTALL 3Ø SLACK SPAN DE 336 TW TO P34 6033.5010, SSF313TRANSFER OH SVCS FROM P33BINSTALL TRIPLE HELIX ANCHOR, L=20' N 6012.1000, ANDH3INSTALL (2) 7/16 PRIMARY DOWN GUYS 6013.0100, GYDD71AINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100. GYD3SANINSTALL GRID NUMBERSCOMMUNICATIONS TO TRANSFERAT P34EXISTING 45 FT CL1, 2010 POLE TO REMAINREPLACE FRAMING WITH 3Ø DEADEND 2/0 ACSR (N) 6033.1042, DE3310INSTALL SLACK SPAN DE 336 TW TO P33A 6033.5010, SSF313INSTALL OH TRIPLEX TO P33AINSTALL TRIPLE HELIX ANCHOR, L=20' S 6012.1000, ANDH3INSTALL (2) 7/16 PRIMARY DOWN GUYS 6013.0100, GYDD71AINSTALL (1) 3/8 NEUTRAL DOWN GUY 6013.0100. GYD3SAN POLE TABLE (NEW)SITEPOLE DATAGRID # HEIGHT CLASS YEAR REMARKS / LOCATION REFP29B 621406-156090 35 3P31A 621489-156076 50 3P32A 621505-156088 50 1P33A 621517-156088 45 1P30A 621494-156088 50 H2LUMEN TO INSTALLNew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:P3215621505-156088P32ANew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary VoltageTransferred From:P2937.5621480-156088P29AWIRE STRINGING PRIMARY &SECONDARYLocationPriSecWire Size & Type QuantityLength(perconductor)TotalFrom ToP29A P30A XX XX336.4 TW4/0 NEUTRAL4 125P29A P29B XX 4/0 TRIPLEX 1 60P30A P32A XX336.4 TW4/0 NEUTRAL4 115P32A P32 XX 4/0 TRIPLEX 1 55P32A P33AXX336.4 TW4/0 NEUTRAL4120P33A P34XX336.4 TW4/0 NEUTRAL465P31A P31 XX #6 CU & NEUT 2 125P34 P33A XX 1/0 TRIPLEX 1 55PSE IS RESPONSIBLE FOR FINAL ROADRESTORATION PER CITY OF BREMERTONSTANDARDS FROM CITY PROJECT LIMIT TOPOLE P31A & P33ANOT TO SCALECROSS SECTION - PERRY AVELOOKING NORTH (P 77+91)40' ROWW36" MIN2" CONDUITE10" SD0.3'Installed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P34621523-15608425Removed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP34621523-156084156211250Errol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 NEWEHZ837-AØEHZ838-BØEHZ839-CØNEWEHZ840-AØEHZ841-BØEHZ842-CØNEWEHZ843-AØEHZ844-BØEHZ845-CØNEWEHZ836-AØSCOTT AVENEWEHZ834-AØEHZ835-BØE 11TH STE 13TH STE 13TH STE 14TH STE 15TH STE 16TH STE 17TH STPERRY AVEPERRY AVEPERRY AVENEW(1) 4" CONDUITNEW(1) 4" CONDUITNEW(1) 4" CONDUITNEW(1) 2" CONDUITSCOTT AVENEW(1) 4" CONDUITE 11TH STE 13TH STE 13TH STE 14TH STE 15TH STE 16TH STE 17TH STPERRY AVEPERRY AVE101131394 UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPE. BURGOS 425.324.5341 .E. PASAYE 714.713.4570 8/30/21N/A N/A N/AE. PASAYE 714.713.4570 8/30/21N/A BREMERTONBREMERTON EAST 11TH & PERRYPOLE RELOCATION1100 PERRY AVE, BREMERTON, WA 98310N/A N/AN/A 101131394AS NOTED10 / 10KITSAP N/A N/A CSPKSEPIE13 T24N R01E N/A N/A2401E052,49 2401E052 2401E052,49 BRE-21, SHE-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITPRIMARY CABLEASBUILT INFORMATIONSIZEQtyLENGTHDesign(ft)BENDS PULL PULL Cable LENGTHDesign(ft)Cable Numbers Please RecordForeman - CompleteFROM TO(in)90° 45°22° 11°(lbs)Rev(lbs)SizeA B CManufacturerCompoundYearActual Amount Installed (Conduit & Cable)P03A P04B4 1245- 2 - -210 206 1/0 315 EHZ834 EHZ835-P05A J014 170- - 1 - 71286 1/0 115 EHZ843 EHZ844 EHZ845J01 P06A4 11452 - - -5471721/0 185 EHZ847 EHZ848 EHZ849J01P09C 4 12051 1 - -522 187 1/0 250 EHZ840 EHZ841 EHZ842P30A P31A2 1125- 1 - -67711/0 195 EHZ836- -TOTALSCONDUIT PRIMARY CABLESIZE LENGTHDesign(ft)BENDS Cable LENGTHDesign(ft)(in)90° 45° 22° 11° Size6 - - - - - 750 MCM -4 665 3 3 1-1/0 JKT - 3Ø550-1/0 JKT - 2Ø3153 - - - - - TPX -2 125 - 1 - -1/0 JKT - 1Ø195CABLE DIAGRAMNOT TO SCALECONDUIT DIAGRAMNOT TO SCALETHREE PHASE J-BOX W/ADJUSTABLE LID AND EXCAVATION DETAIL4'-0"1'-0"5'-8"8"7'-0"Tubes for 1"adjustable bolts ( 4)Cover2,490 lbsTop Section1,835 lbsBase4,760 lbs4'-8"(2) 3' SquarePlate DoorsNOTE: For Installations in pavement or sidewalks with adjustable coverSIDE VIEWTOP VIEW9'-0"11'-0"2"6'-0"6"CrushedRock3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards.4'-8" x 7' Handhole ( 575) w/adjustable CoverNOT TO SCALEEXCAVATION - 22 CUBIC YARDSMID # 7663206 OR 9996162CLEAR WORKING SPACE FOR VAULTSNOT TO SCALEFIELD SIDE (PREFERRED)ROAD SIDE (PREFERRED)6' MIN3'MIN3'MIN3' MIN2-4" Power ConduitsCommunications(When Present)Excavated Dirt PileFinal Grade24" Min6" Min Sand Cover Over Power Conduits12" MinSeparation36"MinCover48"MaxBackfill(No rocks over 6" diameter)NOTE: Install 12" shadingif the backfill contains rocksgreater than 10" dia.Separation12" MinGas3" Sand BeddingVEHICLEACCESSSIDE4"4"(Power, Gas, andCommunications)(When Present)NOT TO SCALETRENCH EXCAVATION DETAILAT J01Errol Burgos 9/3/21DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 !"!#$ $ ! ! DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Addendum Electric Service Handbook: Single-Family Residential Projects Permanent and Temporary Service (Form #1218, 06/19) Update to Underground Service Information Effective Date: 11/26/19 This addendum is to clarify and correct information updated in the latest edition of this document. Chapters 2 & 5: Page 19 Customer-installed service line conduit installation requirements section, Page 51 Underground section, and page 52 Figure 33 x Conduit in the main service trench shall be 3-inch gray Schedule 40 from the PSE facility (pole/vault/handhole/pedestal) to the service riser/work pit. x The knockout on the 200-amp meter base is 2-1/2 inches in diameter. x 200-amp services should be installed with a non-continuous conduit system using 3-inch conduit in the main service trench and a 2-1/2-inch conduit service riser to the meter base knockout because of the differing pipe sizes. Reference the Electric underground service installation requirements handout (Form 6080) for work pit requirements. NOTES 1. PSE encourages customers to install 320-amp panels if the service requires 350 MCM to be installed for any portion of the service. 2. An existing panel requiring an upgrade to larger than 200 amps, or an added motor load, may require excavation and the existing conduit be replaced with a 3-inch conduit or a new 3-inch conduit installed if no conduit existed previously. x 320-amp service with continuous or non-continuous conduit shall use a 3-inch conduit from end to end of the service. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook June 2021 Single-Family Residential Projects Permanent and Temporary Service DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects ©2021 by Puget Sound Energy All rights reserved. No part of this book may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or information storage and retrieval system, without permission from Puget Sound Energy (PSE). DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects Customer service—guaranteed PSE makes two service guarantees to you. First, we commit to keeping scheduled appointments, and second, we commit to restoring power outages as soon as we can. • If we don’t keep an appointment to install new service, reconnect existing service, or inspect natural gas equipment, you’ll receive a $50 credit on your PSE bill. • If your electric service is out for 120 consecutive hours or longer, you may be eligible to receive a $50 credit on your PSE bill. These service guarantees are in addition to nine service quality measures that track PSE’s performance, and are subject to certain conditions and may be suspended during unusual and exceptional circumstances. For more information, visit pse.com/guarantees. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects Table of contents Preface What this handbook contains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 1 PSE’s service availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 1 Codes, permits, and inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 Electrical service equipment inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Reconnecting existing electric service after repair or replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Scheduling/Timelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 2 Underground or overhead service? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 2 Which type of electrical system is available in your area? . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Underground service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 2 Overhead service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . 3 Questions or assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 3 Other electric service information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4 How to contact Puget Sound Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 PSE’s service providers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . 5 Overview: new permanent and temporary electric service hookup . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Chapter 1 Steps to a successful permanent electric service installation #DjMHSHNMR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . 7 Service installation responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 7 Puget Sound Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 7 Customer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 8 Starting the installation process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 8 Setting up an account or ordering a new service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Will your project need engineering? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Choosing the right service size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 9 Service voltages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 9 Service sizes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 9 Sizes less than 200 A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 10 Determining an approved meter location. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Customer-installed meter base/socket location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Know what’s below: Call 811 before you dig . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Coordinating utility trenching and construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Transformer locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 11 +HPTDjDCOQNO@MDS@MJRBKD@Q@MBDREQNLHFMHSHNMRNTQBD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects Table of contents Outbuildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . 16 Service line installation responsibilities for outbuildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Cost for service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 16 /NVDQPT@KHSXUNKS@FDkHBJDQ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 16 Chapter 2 Permanent underground service Steps to a successful underground service installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Selecting a meter base/socket location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Multiple metered services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 18 Service line trenches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 18 Trench routing/clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 18 3QDMBG@MCA@BJjKKQDPTHQDLDMSR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Customer-installed service line conduit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Customer-installed service line conduit installation requirements . . . . . . . . . . . . . . . . . . . . . 19 Continuous and discontinuous conduit systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 When to choose continuous conduit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 When to choose discontinuous conduit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Service entrance equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 22 Installation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 22 Service entrance conduit size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 /DQL@MDMSTMCDQFQNTMCRDQUHBDENQL@MTE@BSTQDCGNLDR . . . . . . . . . . . . . . . . . . . . . . . 25 Service equipment installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Meter base/socket requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 Remote metering (meter loop) for underground residential services . . . . . . . . . . . . . . . . . . . . . . . . 26 What is remote metering? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 26 Requirements for residential remote metering, 200 A or less . . . . . . . . . . . . . . . . . . . . . . . . 26 400 A and larger panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 28 Remote services greater than 800 A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Meter post and pedestal locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Chapter 3 Permanent overhead service Steps to a successful overhead service installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Selecting a meter base/socket location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Clearance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 30 Service line ground clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Maintenance of your service around trees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Attachment of service conductor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Minimum clearances from structures, building openings, and gas meters . . . . . . . . . . . . . . 31 Intermediate service pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 32 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Table of contents Electric Service Handbook 2021 — Single-Family Residential Projects Service mast . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . 32 Service mast requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 32 Height requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 32 Additional mast supports (guy or brace) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Screw-in service knobs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 35 Service entrance equipment installation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Manufactured homes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . 36 Meter base/socket installation requirements for manufactured homes . . . . . . . . . . . . . . . . . 36 Customer-owned meter pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 36 Meter pole requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 36 Installation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 36 Chapter 4 Primary line extensions Customer responsibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 38 Inspection/Coordination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 38 Site preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 38 Customer-provided trench . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . 39 Trench width . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 39 Trench excavating requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 3QDMBG@MCA@BJjKKQDPTHQDLDMSRENQOQHL@QXDKDBSQHBKHMDDWSDMRHNMSQDMBGDR (no PSE gas) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . 42 3QDMBG@MCA@BJjKKQDPTHQDLDMSRENQOQHL@QXDKDBSQHBKHMDDWSDMRHNMSQDMBGDR (with PSE gas) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 42 Vaults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . 42 Vault excavation procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 42 Vault location and access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 46 5@TKSA@BJjKKL@SDQH@K . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 46 Customer-supplied conduits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 47 Terminating conduit at transformer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 Excavating to expose existing buried primary voltage power lines . . . . . . . . . . . . . . . . . . . . . . . . . . 47 Chapter 5 Meter installation Service rating options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 48 Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 48 Puget Sound Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 48 Customer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 48 Customer equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 48 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Table of contents Electric Service Handbook 2021 — Single-Family Residential Projects Meter bases/sockets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 49 General requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 49 Meter base/socket location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Grounding requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 49 Disconnecting means and its sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Meter/panel combo units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49 Clearance requirements for meter installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 200 A services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 51 Single-family residential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 51 Underground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 51 Overhead . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 52 Outbuildings (overhead or underground service) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 400 A self-contained services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 53 Underground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 53 Overhead . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 54 Outbuildings (overhead or underground service) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 400 A current transformer (CT) services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Services over 400 A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . 55 Chapter 6 Customer generation Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 57 Puget Sound Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 57 Customer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 57 General requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 57 What to submit when applying for interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 Interconnection system diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 58 Meter location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . 58 Meter socket requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . 58 Labeling requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . 59 Disconnect switch requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 59 Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 60 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . 60 Chapter 7 Temporary services What this chapter contains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 61 #DjMHSHNM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . 61 Obtaining your temporary service from existing power facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . 62 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Table of contents Electric Service Handbook 2021 — Single-Family Residential Projects Customer charge for service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 62 Temporary meter base/socket requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 Temporary underground services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 62 Meter location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 62 Trenching and excavation requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 Underground temporary service installation process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64 Temporary overhead services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 66 Meter location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 66 Service line path requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 Clearance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 66 Overhead temporary service installation process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 Chapter 8 'LVFRQQHFWLRQDQGPRGLðFDWLRQRIVHUYLFH Disconnection of your meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 69 ,NCHjDCRDQUHBDR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 69 Glossary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71 List of Tables Table 1 Types of electric services. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Table 2 Standard voltages for residential customers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Table 3 Service sizes available from PSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Table 4 Color codes for locating utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Table 5 Clearances for padmount transformers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Table 6 Service line installation responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Table 7 Current transformer (CT) enclosure dimensions (minimum) . . . . . . . . . . . . . . . . . . . . . . . 55 3@AKD $W@LOKDNENUDQGD@C@MCTMCDQFQNTMCLNCHjDCRDQUHBD . . . . . . . . . . . . . . . . . . . . . . . . 70 List of Figures Figure 1 Underground facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 2 Figure 2 Overhead facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 3 Figure 3 Clearances for transformers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Figure 4 Clearances for transformers from structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 %HFTQD,HMHLTLBKD@Q@MBDREQNLNHKjKKDCDPTHOLDMSSN+/G@Y@QCNTRKHPTHCNQETDKS@MJR . . . 14 Figure 6 Clear working space for padmount transformers and aboveground J-box enclosures . . 14 Figure 7 Minimum clearances from LP storage tanks to sources of ignition . . . . . . . . . . . . . . . . . 15 Figure 8 Typical underground service from overhead power facilities . . . . . . . . . . . . . . . . . . . . . . 17 Figure 9 Example of continuous conduit in underground electric service . . . . . . . . . . . . . . . . . . . 20 Figure 10 Example of discontinuous conduit in underground electric service . . . . . . . . . . . . . . . . 21 Figure 11 Two types of meter bases/sockets for permanent underground service . . . . . . . . . . . . . 23 %HFTQD RDQUHBDDMSQ@MBDDPTHOLDMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Table of contents Electric Service Handbook 2021 — Single-Family Residential Projects %HFTQD/DQL@MDMSTMCDQFQNTMCRDQUHBDENQL@MTE@BSTQDCGNLDR . . . . . . . . . . . . . . . 26 Figure 14 Remote metering for underground residential services on meter post . . . . . . . . . . . . . . 27 Figure 15 Remote metering for underground residential services on meter pad . . . . . . . . . . . . . . . 27 Figure 16 Typical overhead service installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Figure 17 Minimum overhead service line vertical clearances from ground level . . . . . . . . . . . . . . . 31 Figure 18 Minimum clearances over other structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 Figure 19 Intermediate service pole location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Figure 20 Unguyed service masts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 33 Figure 21 Guyed service masts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . 34 Figure 22 Permanent overhead meter pole installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37 Figure 23 Conduit riser placement detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Figure 24 Typical joint utility trench with primary voltage cable on your private property . . . . . . . . . 40 Figure 25 Padmount transformer vault excavation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Figure 26 Aboveground junction box vault excavation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43 Figure 27 Minimum dimensions of excavation requirements for small secondary handholes . . . . . 44 Figure 28 Joint trench detail for vaults and pedestals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Figure 29 Location of customer conduit in PSE vaults . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Figure 30 Residential meter socket wiring diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Figure 31 Meter base/socket minimum clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 Figure 32 Recessed meter installation clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 Figure 33 Residential meter socket wiring diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 Figure 34 Typical arrangement of service conductors for underground class 320 meter base/socket . 53 Figure 35 Typical arrangement of service conductors for overhead class 320 meter base/socket . 54 Figure 36 Instrument-rated (CT) meter bases/sockets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Figure 37 Single-phase CT mounting base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 Figure 38 Trenching requirements for power stubout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 Figure 39 Temporary underground service installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Figure 40 Minimum clearance requirements upon installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67 Figure 41 Temporary overhead service installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects 1 Preface This handbook is your guide to Puget Sound Energy’s (PSE) requirements for new, @KSDQDCLNCHjDCNQSDLONQ@QXDKDBSQHBRDQUHBDENQODQL@MDMSRHMFKDE@LHKXQDRHCDMSH@K structures. We have also included additional requirements for electric service to outbuildings (barns, shops, pump houses, garages, etc.). What this handbook contains (MSGHRG@MCANNJXNTVHKKjMC@MRVDQRSNPTDRSHNMRRTBG@R • What are the installation requirements for permanent and temporary underground and overhead service? • How do I choose the right service size? • What are the trenching requirements? • How do I locate existing underground utilities before I dig? PSE’s service availability General boundaries for PSE’s gas and electric service area are available on pse.com/construction-services. A Customer Construction Services (CCS) Representative can help you to determine the closest available service line and can provide you with cost information for establishing new service. Codes, permits, and inspections This handbook should only be used as a guide. It does not cover all possible federal, state, or local code requirements. It is your responsibility to ensure that your project complies with the most recent issue of the National Electric Code (NEC) and any other federal, state, or local codes that may apply. 3GHRG@MCANNJRG@KKMNSADHMSDQOQDSDCSNBNMkHBSVHSGSGDQDFTK@SHNMRNESGDRS@SD of Washington or other regulatory bodies having jurisdiction. PSE’s metering requirements may be more stringent. Local codes and requirements related to the planned work should be addressed before any construction begins. Electrical service equipment inspection Once your service equipment is installed, the state of Washington, or the city with jurisdiction over your area, requires that your installation pass an electrical inspection before PSE can energize your system. NOTE: It is your responsibility to request an electrical inspection. Electrical inspections for most areas in the PSE service territory are done by the Washington State Department of Labor and Industries. However, electrical inspections are performed by city personnel in several jurisdictions. Please consult pse.com/construction-services/permits-and-inspections for a list of the cities and current contact information. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 2 Preface Electric Service Handbook 2021 — Single-Family Residential Projects Reconnecting existing electric service after repair or replacement All electrical equipment and wiring on the customer side of the meter (including meter base and service masts) are owned and maintained by the customer. Therefore, you are responsible for any repair or replacement of storm-damaged or failed metering equipment. If you must repair/replace equipment of this kind, your service may need to be de-energized or disconnected. %NQLNQDHMENQL@SHNMQDEDQSN"G@OSDQ#HRBNMMDBSHNM@MC,NCHjB@SHNMNE2DQUHBDNE this handbook or contact your CCS Representative at 1-888-321-7779. Scheduling/Timelines The time needed for engineering, scheduling, and construction of the work will vary depending upon the complexity of the job, possible right-of-way permits, easements, and the volume of work requested by PSE customers. Contact your CCS Representative at 1-888-321-7779 for current construction scheduling Underground or overhead service? Which type of electrical system is available in your area? The two types of permanent services are underground and overhead. You can determine if PSE’s system is underground or overhead by checking for our facilities along your road. If the power system is underground, you’ll see facilities like those in Figure 1. If the power system is overhead, a series of poles similar to Figure 2 will be visible. Use Table 1 to help you determine which type of electrical service can be provided. For help determining which type of system is in your area, call your CCS Representative at 1-888-321-7779. Underground service If your area is served underground, one or more underground facilities should be visible (see Figure 1). Please request a permanent underground service (Chapter 2). Figure 1 Underground facilities STUBOUT PEDESTAL HANDHOLE PADMOUNT TRANSFORMER DETAIL DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 3 Preface Electric Service Handbook 2021 — Single-Family Residential Projects Overhead service If the power system in your area is overhead, poles should be visible (see Figure 2). Please request a permanent overhead service (Chapter 3). Figure 2 Overhead facilities Questions or assistance If none of the items in Figures 1 or 2 exist in your area, or if you have questions, call 1-888-321-7779 and a CCS Representative will be glad to assist you. TRANSFORMER POLE DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 4 Preface Electric Service Handbook 2021 — Single-Family Residential Projects If available electrical system is . . . And if . . . Then your service line will be . . . Underground Your new meter location is less than 225 ft.* from our nearest padmount transformer (see Figure 1). NOTE: If your new meter location is more than 225 ft. from our nearest underground transformer, an additional transformer may be required. Underground Overhead The new meter location is less than 200 ft.* from our nearest power pole. The service originates from the pole. The pole has a transformer on it (see Figure 2). Underground Overhead The new meter location is less than 125 ft.* from our nearest power pole. The pole has a transformer on it (see Figure 2). Your service line does not cross anyone else’s property. Overhead or Underground Table 1 Types of electric services NOTE:(EXNTQRHST@SHNMCNDRMNSjSSGDBQHSDQH@OQDRDMSDCOKD@RDBNMS@BSXNTQ PSE project manager. !@RDCNMSGDSXOHB@KUNKS@FDkHBJDQB@KBTK@SHNMRNMTMCDQFQNTMCRXRSDL@MC sag calculations on overhead system. Contact a CCS representative regarding evaluation for type of service for your service request. Other electric service information If you need information on the installation of permanent or temporary multifamily @MCMNMQDRHCDMSH@KRDQUHBDRXNTVHKKjMCHSHMSGD/2$$KDBSQHB2DQUHBD'@MCANNJENQ Non-residential Projects. Puget Sound Energy’s guides and handbooks are available at the Construction Services Guides and Handbooks web page. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 5 Preface Electric Service Handbook 2021 — Single-Family Residential Projects How to contact Puget Sound Energy You can obtain further information by contacting us through the following: • Go to pse.com/construction-services • Or call PSE Customer Construction Services (CCS) at 1-888-321-7779 ,NMC@XSGQT%QHC@X@ L O L (EXNTG@UDPTDRSHNMR@ANTS$MDQFX$EjBHDMBX/QNFQ@LR • Go to pse.com/rebates • Or call PSE Energy Advisors at 1-800-562-1482 ,NMC@XSGQT%QHC@X@ L O L If you have general questions regarding your account, such as changing service or questions about your bill: • Go to pse.com/customer-service/help-center/my-account • Or call Customer Service at 1-888-225-5773; TTY 1-800-962-9498 Monday thru Friday, 7:30 a.m. - 6:30 p.m. If you have an emergency or a service delivery issue, please call: • Customer Service at 1-888-225-5773; TTY 1-800-962-9498 24 hours a day, 7 days a week. PSE’s service providers PSE contracts with two partner companies to provide construction services: Potelco, Inc. and InfraSource Construction LLC. The employees who install your service may work for these service providers on PSE’s behalf. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 6 Preface Electric Service Handbook 2021 — Single-Family Residential Projects Overview: new permanent and temporary electric service hookup This information applies only if PSE has existing power facilities in your area. If electric power is not readily available, please contact: Customer Construction Services 1-888-321-7779 or pse.com/construction-services Single-family residential customer responsibilities • Determine if you need overhead or underground service. • Call PSE to set up an account and submit an order. Allow adequate time for possible engineering, right-of-way permits, and easement review. • Obtain an electrical work permit. • If temporary service, install temporary service facility and meter base. • If permanent service, determine the service size amp rating you want (200, 320, or 400 A). • Determine an approved permanent meter location. • Ensure that existing underground utilities are located before you dig. Call 811 two business days prior to digging for a free service that will mark the location of underground lines. • Prepare job site by providing a clear path/trench for your service line for proper vault entrance requirements per PSE standards. • Provide site preparation and installation requirements (site plans) according to PSE installation standards in the Gas and Electric Underground Service Installation Requirements handout. • Obtain an approved electrical inspection. • After the electrical inspection has been completed and approved, request that PSE install and energize your system. PSE’s responsibilities • Connect temporary service. • Determine if engineering is required. • Install your overhead or underground permanent service line conductors. • Install your meter and energize your system Scheduling/ time frame • If engineering is not required, services are typically installed and energized 3 to 5 days after you have passed your inspection. Engineering, right-of-way permits, etc., can extend time frames by 8 weeks or more. Permanent and temporary service charge • Charges vary due to the type of service you request and the type of system we have in your area. Contact your Customer Construction Services Representative for current rate information. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects 7 Chapter 1 Steps to a successful permanent electric service installation 'HðQLWLRQV /2$CDjMDR@RHMFKDE@LHKXQDRHCDMBD@R@RSQTBSTQDSG@SHR • Located on a legal residential lot. • Approved for occupancy as a permanent single-family residence by the local governing agency or agencies. • A parcel where the lot line is extended to the public thoroughfare, even if the unit(s) shares a common wall(s) with other like living units, such as in zero-lot-line construction. A mobile or manufactured home will be considered a single-family residence if it meets the above requirements, and: • Is permanently located on a foundation. • Has had the axles and wheels removed. • Meets all other requirements for a mobile home permit as required by the local governing agency or agencies. NOTE: A mobile or manufactured home located in a mobile home park in which each home owner DOES NOT own the parcel that the home sits on does not qualify as a single-family residence. Service installation responsibilities Installing new electrical service to your single-family residence is a joint project between you and PSE. Puget Sound Energy PSE is responsible for: • Installing the service line conductors to a customer-installed and maintained service mast or underground meter service riser. • Installing the meter in a customer-installed and maintained meter base/socket. • Energizing your system. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 8 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Customer You are responsible for: • Determining if you need overhead or underground service. • Setting up an account and submitting an Application for Service. • Obtaining an electrical work permit. • Determining the service size amp rating you want. • Determining an approved meter location. • Providing site preparation and installation requirements according to PSE installation standards in the Gas and Electric Underground Service Installation Requirements handout. • Before any digging project, calling the 811 “Call Before You Dig” hotline a minimum of two business days before digging. • Installing the meter base/socket on the outside wall in an approved location. • Installing all the electrical wiring inside your residence. • Obtaining a city or state inspection and approval of your installation. • After your electrical inspection is complete, calling PSE to request that your service be installed and energized. • Keeping your meter base/socket accessible to PSE • Coordination with other utility companies being installed in a joint trench. Starting the installation process Setting up an account or ordering a new service You may establish your billing account when you are ready to initiate your temporary service order, order your permanent service, or after the state electrical inspection is complete and your trench is ready (if applicable). To establish an account with PSE, call CCS at 1-888-321-7779. The CCS Representative will ask for your billing information and the address for new service. (New addresses are obtained from the U.S. Postal Service or the County Addressing Department.) To order a new service, submit an Electric Service Application Single-Family Residential 100E to your CCS Representative. All forms can be downloaded from pse.com/construction-services. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 9 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Will your project need engineering? A CCS Representative will ask you the following questions to help determine how your project is handled: • What kind of residential building is this service for (home, barn, shop, etc.)? • What is the building’s square footage? • What kind of electrical or gas appliances will you have (furnace, heat pump, air conditioning, water heater, etc.)? • What size service panel will you be installing? • When will you be ready for service? • Do you need underground or overhead service? • Will any other utility be sharing the trench? • Is the PSE utility connection point adjacent to your property or across the street? NOTE: If a transformer or electrical service stubout is located on your property, your project probably will not require engineering. If no transformer or stubout is available, your project will require engineering and/or needs a municipality right-of-way permit, and our CCS Representative will ask you to complete and submit an Electric Service Application Single-Family Residential 100E. This form can be downloaded at pse.com/construction-services. Choosing the right service size Service voltages Table 2 PSE offers their customers the voltages shown in Table 2. Standard voltages for residential customers Service type Voltage Single-phase 120/240 V, 3-wire * Three-phase 120/208 V, 4-wire 277/480 V, 4-wire * Available for loads to a maximum demand of 100 kW. Larger loads may be served, if determined feasible by a PSE engineer. All motors must be rated 7-1/2 HP or less. Service sizes Table 3 PSE offers several service sizes for single-family residential structures and for outbuildings. The service size you need depends on both the size of your home and the power requirements of the equipment you will be installing in it. Table 3 explains the sizes that are available. Service sizes available from PSE Voltage Ampere rating Typical use 120/240 200 A 0-1500 Sq. Ft. or 1501-2500 Sq. ft. 320 or 400 A 2501-3500 Sq. ft. Over 400 A greater than 3500 Sq. ft. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 10 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Sizes less than 200 A You may install a service panel or meter base/socket that is sized less than 200 A, but the service line and meter that PSE installs will be sized as if you were installing a 200 A service. If you are installing an underground service that is less than 200 A, your meter base/ socket must meet the dimensional requirements for a 200 A underground meter base/socket (refer to Chapter 5, Meter Installation, located in this handbook). Determining an approved meter location NOTE:.MKX@TSGNQHYDC@MCPT@KHjDC/2$ODQRNMMDKRG@KKHMRS@KK@MCQDLNUDLDSDQR Customer- installed meter base/socket location You are required to install your meter base/socket in compliance with the requirements in Chapter 5. All locations are subject to approval by a PSE Representative. If you have questions regarding meter locations, call your CCS Representative at 1-888-321-7779. Meter base/sockets, including current transformer (CT) enclosures, must be located: • Outside. • On the front 1/3 of your home closest to normal drivable public access. • In an area that is not subject to being fenced-in (patios, decks, porches, breezeways and backyards are bad locations). • On a structure that is owned by you. These approved locations allow us to: • Read your meter in a cost-effective manner. • ,@HMS@HMXNTQLDSDQDEjBHDMSKX • #HRBNMMDBSXNTQRDQUHBDHESGDQDHR@jQD NOTE: Refer to the Gas and Electric Underground Service Installation Requirements handout for more information (Form 6080 and 3885). Know what’s below: Call 811 before you dig Before excavating, Washington law requires you to call 811 to locate underground utility KHMDR #NHMFRNVHKKDM@AKDXNTSN@UNHCONSDMSH@KHMITQXjMDRBNRSKXQDO@HQNE/2$TSHKHSXE@BHKHSHDR@MCDKDBSQHBNQM@STQ@KF@RRDQUHBDCHRQTOSHNMR "@KK@SKD@RSSVNSNjUDETKK business days prior to digging. (For example, call Wednesday to dig on Monday.) When you call, an operator will record information about your dig and notify affected utility companies, including PSE. PSE locates and marks its own lines for free, but privately owned utility lines must be located by a separate vendor, typically for a fee. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 11 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects The locate service uses the following color codes to identify underground utilities: Table 4 Color codes for locating utilities Color Utility White Proposed excavation area Pink Temporary survey markings Red Electric power lines, cables, conduit, and lighting cables Yellow Gas, oil, steam, petroleum, or gaseous materials Orange Communication, alarm or signal lines, cables, or conduit Blue Potable water Purple Reclaimed water, irrigation, and slurry lines Green Sewers and drain lines NOTE: Use white paint to mark the area within which you want utility locations. Once all utilities are located: • Do not dig with machinery within 3 feet of the locate marks. • Hand dig to expose all utilities to be crossed. Coordinating utility trenching and construction New construction typically involves the installation of telephone cables, cable television cables, and natural gas lines; as well as electric power cables. It is the responsibility of you and your builder to notify each utility about your intended electric service installation as well as all other utilities providing service to your new structure. If you need a PSE gas service, please call 1-888-321-7779 and complete an application for gas service at pse.com/construction-services. Transformer locations PSE will install padmount transformers using the clearances listed in Table 5 and shown in Figures 3 through 6. Clearances between padmount transformers and structures must be measured from the metal portion of the transformer closest to the building or structure (including any overhangs). A clear and level working space is necessary for the operation and maintenance of padmount transformers (Figure 6). The working space should be free from obstructions such as trees, shrubbery, poles, ATHKCHMFRQDS@HMHMFV@KKRRSQTBSTQDREDMBDRjQDGXCQ@MSRTSHKHSXODCDRS@KRCDBNQ@SHUD screens, ditches, streams, roadways, etc. Shrubs, hedges, plants, ground cover, or other vegetation with invasive root, vine, or branch systems that may grow underneath or into PSE equipment are prohibited. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 12 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Table 5 Clearances for padmount transformers Feature Clearance distance Combustible walls or roof (including stucco). 10 feet (3 feet from a combustible wall if using @QDCTBDCk@LL@AHKHSX transformer). See Figure 4. Noncombustible walls (including brick, concrete, steel, and stone), provided the side of the transformer facing the wall does not have doors. Materials that pass UBC Standard 2-1 or ASTM E136-79 are considered to be noncombustible. 3 feet. See Figure 4. %HQDROQHMJKDQU@KUDRRS@MCOHODR@MCjQDGXCQ@MSR 6 feet. See Figure 3 #NNQRVHMCNVRUDMSRjQDDRB@ODR@MCNSGDQ building openings. 10 feet. See Figure 3. The water’s edge of a swimming pool or any body of water. 15 feet. See Figure 3. Individual domestic and irrigation wells. 100 feet. See Figure 3. Facilities used to dispense or store LP or hazardous liquids or fuels. 20 feet. See Figure 5. 10 feet. See Figure 5. Gas service meter relief vents. 3 feet. See Figure 3. Figure 3 Clearances for transformers TRANSFORMER FIRE ESCAPE TRANSFORMER POOLS OR BODIES OF WATER GAS METER RELIEF VENT SPRINKLER VALVE, STANDPIPE, OR HYDRANT DOOR, WINDOW, VENT OR OTHER OPENING WELL HEAD FUEL TANK 100' 15' 10' 20' 3' 6' 10' DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 13 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 4 Clearances for transformers from structures TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACES TRANSFORMER CLEARANCES FROM NONCOMBUSTIBLE SURFACES TRANSFORMER CLEARANCES FROM NONCOMBUSTIBLE WALLS WITH COMBUSTIBLE ROOFING REDUCED FLAMMABILITY TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFNONCOMBUSTIBLE BUILDING WALLSNONCOMBUSTIBLE BUILDING WALLSCOMBUSTIBLE BUILDING WALLS AND ROOFAPPROVED TRANSFORMERAREA APPROVED TRANSFORMERAREA APPROVED TRANSFORMERAREA NONCOMBUSTIBLE ROOF AND SOFFIT COMBUSTIBLE ROOF AND SOFFIT APPROVEDTRANSFORMER AREA 10'3' 3'10' 10' 3' 3'3' 3' 10' 10' 10' DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 14 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 6 ,HMHLTLBKD@Q@MBDREQNLNHKjKKDCDPTHOLDMSSN+/G@Y@QCNTRKHPTHCNQETDKS@MJR Figure 5 Clear working space for padmount transformers and aboveground J-box enclosures 6' MIN 20' MIN 10' MIN LP TANK LP TANK OIL-FILLED ELECTRICAL EQUIPMENT (PAD OR POLE MOUNTED) OIL-FILLED ELECTRICAL EQUIPMENT (PAD OR POLE MOUNTED) DIKE OF ADEQUATE HEIGHT TO CONTAIN OIL AND NOT ALLOW IT TO FLOW TOWARDS THE LP TANK TOP VIEW 36" MIN 18" MIN 10' MIN 18" MIN VAULT LID COOLING FINS EQUIPMENT ACCESS DOOR EQUIPMENT ACCESS DOOR DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 15 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects PRIMARY VOLTAGE POWER LINE ELECTRIC METER BASE OR SWITCH SUBMERSIBLE TRANSFORMER, HANDHOLE, SWITCH, OR PEDESTAL GAUGE, VENT, OR FILL CONNECTIONS 6' MIN 10' MIN 5' MIN 5' MIN LP GAS /LTXHðHGSURSDQHWDQNVFOHDUDQFHVIURPLJQLWLRQVRXUFH (ESGDQD@QDKHPTDjDCOQNO@MD+/G@Y@QCNTRKHPTHCNQETDKS@MJRNMXNTQOQNODQSXSGD following minimum clearances apply from PSE’s padmounted transformer or the ignition source (see Figures 6 and 7). • All LP tanks must be at least 6 feet from a vertical plane extending down from an overhead primary voltage line. • Consumer storage LP tanks must be at least 5 feet from any source of ignition, such as electric meter bases, submersible transformers, secondary handholes or pedestals, or padmount switches. • 3GDjKKBNMMDBSHNMF@TFDBNMMDBSHNMNQUDMSNMSGD+/S@MJLTRSAD@SKD@RS 10 feet from any source of ignition. Figure 7 Minimum clearances from LP storage tanks to sources of ignition DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 16 Chapter 1 Electric Service Handbook 2021 — Single-Family Residential Projects Outbuildings An outbuilding is a stand-alone structure that is located on residential property and is not a living space. Typical outbuildings are barns, pump houses, garages, shops, and storage sheds. Service line installation responsibilities for outbuildings An underground service line to an outbuilding is installed by the customer or PSE, depending upon the intended use of the outbuilding (see Table 6). If you want PSE to install a separate service to your outbuilding, refer to the Service Installation Responsibilities section at the beginning of this chapter. Table 6 Service line installation responsibilities If the primary use of Outbuilding is for . . .Service line will be installed and maintained by . . . Commercial purposes or a pump house for a multifamily/community well serving more than 2 households. Customer General residential (garages, shops, small barns and well pump houses serving up to 2 households). Puget Sound Energy NOTE: Installation costs and billing rates are different for each type of primary use of outbuildings. Contact your CCS Representative at 1-888-321-7779 for more information. Cost for service Charges vary depending on the location of existing electrical facilities, the type of service you are requesting, and the distance to run service from our facilities to your home. Contact CCS at 1-888-321-7779 to determine the cost for service. 3RZHUTXDOLW\YROWDJHñLFNHU In your Application for Service, PSE requires the locked rotor starting currents (in amps) for the largest single-phase and three-phase motors that draw in-rush current. After we determine the size of transformer required to serve the new load of the facility, we will B@KBTK@SDSGDODQBDMSUNKS@FDkHBJDQEQNLSGDLNSNQRRS@QSHMFBTQQDMS@SSGDONHMSNE service and provide that number to you. If this voltage dip exceeds PSE’s limits based on facility type, the transformer size must be increased to compensate for this. You will be responsible for the difference in cost of the larger transformerNQXNTVHKKMDDCSNHMRS@KKRTEjBHDMSBNMSQNKRSNAQHMFkHBJDQ back within PSE’s limits. NOTE:6DVHKKRHYD/2$RE@BHKHSHDRSNOQNUHCD@KDUDKNEUNKS@FDkHBJDQSG@SHRMNQL@KKX acceptable to customers. If you need to be served with a higher quality of service, contact your CCS Representative. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects 17 Chapter 2 Permanent underground service Steps to a successful underground service installation The following list details the key steps in the installation of your underground service resulting in PSE’s installation of your underground service line and meter (see Figure 8). • "NMjQLVGDQDXNTQRDQUHBDKHMDVHKKNQHFHM@SDAXBNMS@BSHMF"TRSNLDQ"NMRSQTBSHNM Services (CCS) at 1-888-321-7779. • Call PSE to set up an account and submit an order. Allow a minimum 4-12 weeks for possible engineering, right-of-way permits, and easement review. • Obtain an electrical work permit. • Determine an acceptable location for your meter base/socket (see Chapter 5). • Coordinate with PSE project manager for any work in right-of-way. • Order underground utility locate service by contacting the 811 “Call Before You Dig” hotline a minimum of two business days before digging. • Dig a trench and provide proper conduit between your meter location and the service line origination (transformer, handhole, pole, or stubout). »Provide 4-foot-square work pits at poles, stubouts, handholes, and meter service entrance. »Provide conduit for electrical service lines and a minimum of 3/8-inch pull rope. • Install your meter base/socket service entrance equipment. • Obtain a city or state electrical inspection and approval of your installation. • Call CCS at 1-888-321-7779 to have your service installed and energized. Figure 8 Typical underground service from overhead power facilities SECONDARY HANDHOLE POLE METER RISER 24" MIN DEPTH OF COVER 48" MAX DEPTH OF TRENCH UNDERGROUND SERVICE LINE CHECK WITH LOCAL PERMITTING AGENCY FOR DEPTH OF COVER REQUIREMENTS FOR ANY PSE FACILITY INSTALLED IN PUBLIC RIGHT-OF-WAY. 36" COVER MAY BE REQUIRED OVER PSE FACILITIES. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 18 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects 18 Selecting a meter base/socket location When choosing your meter base/socket location, be sure to consider the types of terrain where your service line will be buried. Since PSE is responsible for repairing your service line if it fails, the path you select is subject to being dug up. Therefore, we recommend that the service line route be accessible for repairs and excavation. NOTE: Refer to the general requirements section in Chapter 5, Metering Installation, when selecting a location for your electric meter base and socket. Multiple metered services If a residential class customer installs a bus gutter or meter-pack enclosure to set two meters (one meter for the house, the other for the shop, barn, garage, etc.) on a single piece of property being billed to the same individual, PSE will run a single service line at the customer’s request. However, the single line must accommodate SGDJ6KN@C@MCKHLHSSGDUNKS@FDCQNO@MCUNKS@FDkHBJDQSNVHSGHM/2$RRS@MC@QCR NOTE: PSE will not run a single service line to a bus gutter or meter-pack that serves multiple residential class customers residing on differing properties with separate legal ownership. NOTE: Alternate Dwelling Units (ADUs) with different mailing address must be metered separately (One meter on each home). Service line trenches This section refers to the illustrations found in the Electric Underground Service Installation Requirements handout available at pse.com/construction-services. Trench routing/ clearances The routing of a customer-provided trench must maintain a minimum of 5 feet from RDOSHBS@MJR@MC@LHMHLTLNEEDDSEQNLCQ@HMjDKCR Trench and EDFNðOO requirements PSE will allow customer-owned facilities within the service line trench if the following minimum horizontal clearances from PSE facilities are maintained: • 18 inches minimum for customer-owned tight-line sewer (not tile), storm drain lines, roof drain lines, natural gas line, propane gas line, fuel oil line, and water mains up to 6 inches. • 12 inches minimum for water services, irrigation pipes, lighting, security and electric supply circuits, closed-system roof drains/storm drains (not French drains), and culverts. NOTE: The Electric Underground Service Installation Requirements handout illustrates the service trench requirements in detail. Customer- installed service line conduit If your service line will be crossing under any permanent structure (driveways, sidewalks, decks, patios, rockeries, retaining walls, or through your backyard), you are required to provide and install conduit under those obstructions. * You are required to provide an electrical service line conduit for services 100 feet long or less. However, PSE recommends the use of conduit for all services. * Any portion of the service conductor not in conduit may not be under a drive path or hard surface. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 19 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Customer- installed service line conduit installation requirements • The service line conduit shall be gray, schedule 40 PVC conduit with a minimum 3 inches in diameter for all runs. • White water pipe or green sewer pipe is not acceptable. • The service line conduit shall contain no more than a total of 180 degrees of bends of which no individual bend is less than a 24-inch radius. • Install a minimum of 3/8-inch pull rope, or 3/8-inch polyester pulling tape, in the conduit. Strength of the pulling rope or tape shall meet or exceed 1800-pound rated tensile strength. • Stop the conduit 4 feet from the pole in the work pit with the pole butt exposed. • Do not provide a conduit elbow at the base of PSE’s pole, and do not install conduit on a PSE pole. • When installing conduit at a transformer, stop 3 feet from the entrance at the bottom of the transformer minipad (Figures 9, 10 and 24). NOTE: Details of a service line trench with customer-installed conduit is shown in the Electric Underground Service Installation Requirements handout (Form 6080). Continuous and discontinuous conduit systems BNMSHMTNTRBNMCTHSRXRSDLHRCDjMDC@R@RDBSHNMNEBNMCTHSRODQL@MDMSKXFKTDC together and installed between the location of available power (e.g., PSE power pole, padmount transformer, pedestal, handhole, or stubout) and the meter base without any points of separation where it exists underground (e.g., conduit work pits). See Figure 9. CHRBNMSHMTNTRBNMCTHSRXRSDLHRCDjMDC@RLTKSHOKDRDBSHNMRNEBNMCTHSRHMRS@KKDC between the location of available power and the meter socket with points of separation between sections where they exist underground (see Figure 10). Choosing to install a continuous conduit system has its advantages and disadvantages: • An advantage of a continuous conduit system is that the PSE electrical crew does not require an excavated work pit to be open at the location of your meter socket on the day your new service is energized. Preferred method of PSE installation is a work pit at the meter base i.e. a discontinuous conduit system. • Disadvantages of a continuous conduit system: »The length should be enough to ensure PSE’s electrical cable can be pulled between the location of available power and the meter socket, and, »6@SDQB@MLHFQ@SD@MCkNVHMSNSGDGNLDHESGD@U@HK@AKDONVDQRNTQBDDWHRSR@S a higher elevation than the location of the meter base. NOTE: Contact CCS or your PSE project manager to initiate a cable pulling review. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 20 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 9 Example of continuous conduit in underground electric service When to choose continuous conduit Choose to install a continuous conduit system for your electrical service if: • At a distance where the cable pulling is easy without a pull rope. Contact CCS or your PSE project manager to initiate a cable pulling review. • The sum total of the degrees of bends in the conduit run (including the bend required at the bottom of the meter base riser) does not exceed 180° with minimum radius of bend is 24 inches. • The elevation at the location of available power is less than the elevation of your meter socket (i.e., your meter socket is uphill from the location of available power). NOTE: By choosing to install a continuous conduit system, the customer assumes QDRONMRHAHKHSXENQQDBNFMHYHMFONSDMSH@KRTQE@BD@MCRTAFQ@CDV@SDQkNVRSG@S may create an entry of water into the customer’s electrical equipment. PSE is not responsible for damage caused by water entering a customer’s meter base or equipment. PSE TRANSFORMER (OR PEDESTAL, HANDHOLE, POLE OR STUBOUT) PSE SERVICE CABLE 24" MINCOVER 24" EXCAVATED DIRT PILE AND SELECT FILL BEDDING/SHADING CONTINUOUS CONDUIT BETWEEN AVAILABLE SOURCE OF POWER AND SERVICE ENTRANCE (METER SOCKET) METER SOCKET(SURFACE OR FLUSH MOUNTED) 36" MIN 100' MAX FINAL GRADE 36" MIN TRENCH DEPTH DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 21 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 10 Example of discontinuous conduit in underground electric service When to choose discontinuous conduit Choose to install a discontinuous conduit system for your electrical service if: • The sum total of the degrees of bends in the conduit run (including the bend required at the bottom of the meter base riser) exceeds 180° requiring additional work pits for cable pulling. • The elevation at the location of available power is greater than the elevation of your meter socket (i.e., your meter socket is downhill from the location of available power). A table for selecting the required conduit size is provided in the Electric Underground Service Installation Requirements handout. Puget Sound Energy (PSE) does not prefer continuous conduit system. Contact CCS at 1-888-321-7779 if you have questions on whether to install continuous or discontinuous conduit for your underground electric service. PSE TRANSFORMER(OR PEDESTAL, HANDHOLE, POLE OR STUBOUT) PSE SERVICE CABLE EXCAVATED DIRT PILE AND SELECT FILL BEDDING/SHADING ONE OR MULTIPLE SECTIONS OF DISCONTINUOUS CONDUIT BETWEEN AVAILABLE SOURCE OF POWER AND SERVICE ENTRANCE. (METER SOCKET) METER SOCKET (SURFACE OR FLUSH MOUNTED) 36" MIN 24" MIN24" MINCOVER 24" FINAL GRADE 36" MIN TRENCH DEPTH DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 22 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Service entrance equipment Determine the meter base/socket location, the service line route, and the size of the service you want (for example, 200 A), before you begin installing your service entrance equipment. Installation requirements • 2DQUHBDDMSQ@MBDDPTHOLDMSB@MADHMRS@KKDCDHSGDQkTRGLNTMSDCNQRTQE@BD mounted (see Figure 11). • Install the meter base/socket so that the top of the meter will be between @MCEDDS@ANUDjMHRGDCFQ@CDVHSG@ENNSGDHFGSADHMFHCD@K • The service entrance conduit has a maximum of one 45° or 90° degree bend with a minimum 24-inch radius. • Do not install “LB” joints, conduits, or devices that allow access to the service conductor in the riser ahead of the meter. • A current transformer (CT) enclosure, if required, must be mounted on the outside of the structure it serves. NOTE:2DQUHBDDMSQ@MBDDPTHOLDMSENQ@ HMRS@KK@SHNMHRRGNVMHM%HFTQD Service entrance conduit size The Electric Underground Service Installation Requirements handout illustrates the service entrance conduit size requirements in detail. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 23 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Items owned and installed by customer 1 Meter base/socket 2 Insulating busing 3 Terminal adapter or lock washer 4 Conduit strap (2) 5 Rigid steel conduit, Sch 40 or Sch 80 PVC ** 6 $KANVNQ" min radius 7 Bell end 8 Lock washer 9 Ground electrode and wire in accordance with NEC/WAC Items owned and installed by PSE 10 Meter 11 Service line PSE owned but customer purchased and installed 12 Conduit (required in residential plats) 13 Bell end NOTE: Conductor slack shall be left at the base of the service entrance for ground settlement to relieve tension on meter connections. NOTE: Total distance of raceway within the building to the customer’s overcurrent protection shall not exceed 15 ft (WAC 296-46B-230.070). 1 1 10 10 2 28 8 3 3 5 5 4 4 9 9 7 71111 12 1213 134'4' 2' MIN 2'MIN 6' MAX4' MIN 6' MAX4' MIN CUSTOMERSERVICE PANEL CUSTOMERSERVICE PANEL CONDUCTOR SLACK FOR GROUND SETTLEMENT CONDUCTOR SLACK FOR GROUND SETTLEMENT6 6 9 9 METER BASE/SOCKET FLUSH-MOUNTED METER BASE/SOCKET SURFACE-MOUNTED ** Figure 11 Two types of meter bases/sockets for permanent underground service, home built on permanent foundation * Optional grounding electrode(s) for structures without permanent foundation. ** Schedule 40 PVC or rigid-steel conduit may not be allowed on ñXVKPRXQW installations. Check with local jurisdictional codes before installation. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 24 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 12 RDQUHBDDMSQ@MBDDPTHOLDMSGNLDATHKSNMODQL@MDMSENTMC@SHNM 1 4 2 3 5 9 8 12 7 1412 10 1 1615 4' 2' MIN 15" MIN NO CONDUIT IN THIS AREA 6' MAX 4' MIN 6 9 SINGLE-PHASE INSTALLATION * Items owned and installed by customer 4 Conduit (Sch 40 or Sch 80 PVC or steel or EMT), 1" single-phase, 1-1/4" three-phase 5 Insulating busing 6 Six terminal meter base/socket with test switch space 7 Rigid steel conduit, Sch 40 or Sch 80 PVC ** 8 Insulating bushing 9 Current transformer enclosure (outside or in electric room) 10 NQADMCQHFHCRSDDK2BGNQ2BG/5" 11 Line and load side connectors for service conductors (2-bolt lugs) 12 Ground electrode and wire in accordance with NEC/WAC * 13 Current transformer mounting bracket 14 Bell end Items owned and installed by PSE 1 Service conductors (residential only) 2 Meter 3 Current transformer with meter circuit wiring PSE owned but customer purchased and installed 15 Conduit (required in residential plats) 16 Bell end NOTE: Total distance of raceway within the building to the customer’s overcurrent protection shall not exceed 15 ft (WAC 296-46B-230.070). LINE LOAD * Optional grounding electrode(s) for structures without permanent foundation. 2BGDCTKD/5"NQQHFHCRSDDKBNMCTHSL@XMNSAD@KKNVDCNMkTRGLNTMS installations. Check with local jurisdictional codes before installation. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 25 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects 3HUPDQHQWXQGHUJURXQGVHUYLFHIRUPDQXIDFWXUHGKRPHVĚ$ Service equipment installation If you are installing an underground service to your manufactured home, your service equipment can be installed one of two ways: • On a customer-owned pedestal or meter post (see Figure 13). • On the manufactured home, if both of the following conditions are met: »The manufacturer installed the service equipment at the time your home was built. »The service equipment meets the meter base/socket requirements listed below. Meter base/ socket requirements Meter base/sockets installed on manufactured homes must: • Be located on an outside wall of your home. • Be located on the front one-third of your home closest to normal drivable public access. Refer to Meter Locations and Clearances on Page 2 of the Electric Underground Service Installation Requirements handout for more information. • !DADSVDDM@MCEDDS@ANUDjMHRGDCFQ@CD • Meet PSE’s service entrance conduit size requirements. • Not be in a walkway or breezeway. • Not be in an area that is subject to being fenced. NOTE: Meter bases/sockets not installed on the manufactured home must meet the requirements of NEC 550.32(B). DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 26 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Remote metering (meter loop) for underground residential services What is remote metering? Normally, a meter base/socket and associated devices (current transformers, etc.) @QD@SS@BGDCSN@ODQL@MDMSjWDCRSQTBSTQDSG@SBNMS@HMRSGDKN@CADHMFRDQUDC (such as a house). If the metering equipment is not attached to the permanent structure, it is called “remote metering.” In this case, the conductors that run from the meter to your house are installed, owned, and maintained by you. Requirements for residential remote metering, 200 A or less Remote metering shall be mounted on a structure or meter post. It is your responsibility to purchase, install, and maintain this equipment. The required metering cabinet and supporting structure are shown in Figure 14. Figure 13 /DQL@MDMSTMCDQFQNTMCRDQUHBDENQL@MTE@BSTQDCGNLDR 4' 4' 4' MIN CONDUIT TO BE RIGIDLY FASTENED TO SUPPORT CUSTOMER’S CONDUCTOR TO MOBILE HOME. INSTALL ACCORDING TO NEC. CUSTOMER’S CONDUCTOR TO MOBILE HOME. INSTALL ACCORDING TO NEC. WEATHERPROOFPANEL 24" MIN 24" MIN24" MIN 36" MIN LOAD LINE LINE LOAD 6' MAX4' MIN 1 11 2 3 4 5 6 7 10 12 14 13 11 8 4 9 5 3 67 101214 13 METER PEDESTAL (MANUFACTURED HOMES ONLY)METER POST Items owned and installed by customer 1 6" x 6" x 8' min fully pressure-treated post 2 Service entrance equipment 3 2DQUHBDBNMCTHS@RRODBHjDCHM3@AKD 4 Ground wire, in accordance with NEC/WAC 5 Ground rod(s), in accordance with NEC/WAC 6 Service conductor to building/residence 7 $KANVNQADMC" min radius 8 Factory-built metal meter pedestal (manufactured homes only) 9 36" x 36" x 3" min concrete stabilizer pad 10 Bell end Items owned and installed by PSE 11 Meter 12 PSE service line PSE owned but customer purchased and installed 13 Conduit (required in residential plats) 14 Bell end 6' MAX DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 27 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 14 Remote metering for underground residential services on meter post Figure 15 Remote metering for underground residential services on meter pad Items owned and installed by customer 1 6" x 6" x 8' min fully pressure-treated post, mason block, or concrete 2 Service entrance equipment 3 2DQUHBDBNMCTHS@RRODBHjDCHM3@AKD 4 Ground wire, in accordance with NEC/WAC 5 Ground rod(s), in accordance with NEC/WAC 6 Service conductor to building/residence 7 $KANVNQADMC" min radius 8 Bell end Items owned and installed by PSE 9 Meter 10 PSE service line PSE owned but customer provided and installed 11 Conduit (required in residential plats) 12 Bell end Items owned and installed by customer 1 Galvanized steel pipe 2 C-channel (unistrut) cross bracing 3 Service entrance equipment 4 2DQUHBDBNMCTHS@RRODBHjDCHM3@AKD 5 Ground wire, in accordance with NEC/WAC 6 Ground rod(s), in accordance with NEC/WAC 7 Service conductor to building/residence 8 36" x 36" x 3" min concrete stabilizer pad 9 $KANVNQADMC" min radius 10 Bell end Items owned and installed by PSE 11 Meter 12 PSE service line PSE owned but customer provided and installed 13 Conduit (required in residential plats) 14 Bell end 6' MAX4' MIN 1 9 2 3 4 8 7 6 5 10 12 11 24" MIN 24" MIN 36" MIN LOAD LINE 4' CONDUIT TO BE RIGIDLY FASTENED TO SUPPORT CUSTOMER’S CONDUCTOR TO HOME. INSTALL ACCORDING TO NEC. METER POST METER PAD 11 2 3 1 4 8 5 6 7 9 10 12 14 13 6' MAX 4' MIN 24" MIN 24" MIN LOAD LINE 4' CUSTOMER’S CONDUCTOR TO MOBILE HOME. INSTALL ACCORDING TO NEC. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 28 Chapter 2 Electric Service Handbook 2021 — Single-Family Residential Projects 400 A and larger panels Remote meter installations that require current transformers shall be mounted on permanent support structures that are made of galvanized steel pipe with unistrut cross-braces, concrete, or masonry blocks. Support structures made of wood (treated or not) are unacceptable. The customer shall provide a 3-foot x 3-foot x 3-inch-thick concrete pad surrounding SGDLDSDQNQGNKDREDDSCDDOSG@S@QDjKKDCVHSGBNMBQDSDSN@MBGNQSGDRSQTBSTQD Meter bases/sockets shall be permanently labeled to indicate the address they serve. PSE requires engraved phenolic nameplates or adhesive die-cut labels at least 1-inch high. Service will not be established until marking is complete. NOTE: Felt-tip pens and label maker tape are not considered permanent marking. .SGDQQDPTHQDLDMSRRODBHjDCHMSGHRG@MCANNJENQLDSDQA@RDRRNBJDSR@MCBTQQDMS transformer (CT) enclosures apply. Remote services greater than 800 A Remote services 800 A or greater require EUSERC outdoor switchgear. Ask your CCS Representative for more information. Meter post and pedestal locations Remote metering must be: • Accessible for reading and maintenance during normal business hours. • Not be in a walkway or breezeway. • Not be in an area that is subject to being fenced or enclosed. • Safe parking must be located within 50 feet of the meter. NOTE: When installed close to PSE’s transformer, all metering equipment must be a minimum of 3 feet from the transformer and not installed in front of the transformer. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 29Electric Service Handbook 2021 — Single-Family Residential Projects Chapter 3 Permanent overhead service Steps to a successful overhead service installation The following checklist will assist you in preparing for the installation of an overhead service (see Figure 16). After you have completed these items, PSE can install the overhead service line and meter. • Check for any local ordinances/covenants that prevent you from obtaining an overhead service. • Call PSE to set up an account and submit an order. Allow adequate time for possible engineering, right-of-way permits, and easement review. • Obtain an electrical work permit. • Complete Electric Service Application Single-Family Residential 100E. All forms can be downloaded at pse.com/construction-services. • 2TOOKXQDBDMSKX@OOQNUDCRHSDCQ@VHMFRHMBKTCHMFRDOSHBCQ@HMjDKCKNB@SHNMVDS and dry utility locations and load information to your PSE Customer Construction Services (CCS) Representative. • "@KK""2SNjMCNTSVGDQDXNTQRDQUHBDKHMDVHKKNQHFHM@SD • Determine an acceptable location for your meter base/socket. • Provide a path clear of obstructions between PSE’s service pole and your service mast. Remove any trees/tree branches, bushes and any vegetation within 3 feet around the service conductor path. • Provide the location of any domestic or community water well on your property included in the site plan as well. • Install the required service entrance equipment. • Install the service entrance conductors (leave a minimum of 18 inches exposed at the weatherhead). • Verify that the service mast height requirements have been met (see Figure 16). • Provide payment for any preconstruction costs determined by CCS. • Have the city or state inspect and approve your installation. • Call CCS at 1-888-321-7779 to have your service installed and energized. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 30 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Selecting a meter base/socket location After CCS determines which pole the service line will come from, you can determine the location of your meter base/socket. Your meter base/socket must be located outside and on the front one-third of your structure closest to normal drivable public access. Refer to Chapter 5 in this handbook for detailed meter location criteria. Consider the type of terrain the line will cross when choosing a meter base/socket location. PSE strongly suggests avoiding service line routes that cross a driveway. Service lines that cross driveways can be hit by vehicles, which can cause damage to the service equipment and even to your home. Figure 16 Typical overhead service installation Clearance requirements Service line ground clearance The National Electric Safety Code (NESC) establishes minimum clearance requirements to maintain safe height requirements for electrical conductors over various terrain (see Figure 17). The NESC requires the lowest point of a service conductor to be at least 12 feet above the ground. The bottom of the drip loop must be a minimum of 10 feet above the ground. Maintenance of your service around trees If the service line will pass through any trees, you are required to prune those trees to provide a clear path for the service line. You are also responsible for regular tree pruning, and if necessary, tree removal to keep the path clear. Attachment of service conductor It is not your responsibility to string the conductor, but you are required to provide a point of attachment at your service mast that will allow PSE to install the conductor and maintain the required clearances. If you need further details, please contact the state or local electrical inspector for your area. SERVICE LINE (UTILITY OWNED AND INSTALLED) WEATHERHEAD SERVICE MAST GUY SERVICE PANEL SERVICE MAST METER TRANSFORMER POWER POLE SERVICE ENTRANCECONDUCTOR DRILL LOOP DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 31 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 17 Minimum overhead service line vertical clearances from ground level Minimum clearances from structures, building openings, and gas meters • A minimum clearance of 3 feet is required between electric service lines and VHMCNVRCNNQRONQBGDRjQDDRB@ODRNQRHLHK@QNODMHMFR • A minimum radial clearance of 3 feet is required between electric service equipment and the natural gas meter pressure relief vent (see Figure 18). • Service lines passing over the roof of another structure (but not attached to that structure) must maintain the minimum clearances (see Figure 18). • Service lines passing over a deck must maintain a minimum clearance of 11 feet (see Figure 18). Figure 18 Minimum clearances over other structures SERVICE LINE (UTILITY OWNED) SERVICE MAST CONNECTION POINT 12' MIN 18" MIN 26' MIN 13' SERVICE LINE(UTILITY OWNED) 3'MIN 3-1/2' MIN 11' MIN 11' MIN ROOFS WITH PERMANENT ACCESS ROOFS WITHOUT PERMANENT ACCESS GAS METER DECK ELECTRICMETER 16' MIN STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS DRIVEWAYS, AND PARKING AREAS NON-TRAFFIC PROPERTY DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 32 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects 32 Service mast A service mast is a rigid steel conduit that runs vertically from the top of your meter base/socket up through your roof. It contains your service entrance conductors and typically supports one end of your service line. Service masts are necessary when installing an overhead service and are installed by you or your electrical contractor. Service mast requirements The service requirements for the installation of the service mast are located in the National Electric Code (NEC). Some of the more common methods are included in this section (see Figures 20 and 21). Height requirements The service bracket (the point of connection with PSE’s service wire at the top of XNTQRDQUHBDL@RSLTRSAD@SKD@RSEDDS@ANUDjM@KFQ@CDNQSDQQ@HMRNSG@SSGD minimum clearances over your property can be maintained. Additional height may be required depending on the location and type of structure or terrain that your service line passes over. The NEC also requires that your service mast maintain minimum clearances above your roof (see Figure 20). The clearance required depends on the slope of your roof, and whether or not your service line is attached to the structure. For other options and details refer to the NEC. Your CCS Representative can assist you with determining the proper mast height. Intermediate service pole When the length of an overhead service line exceeds 125 feet or the clearances shown in Figure 18 cannot be achieved, an intermediate service pole may be required to maintain safe ground clearance (see Figure 19) for the wire and to relieve excessive tension at the service mast. Contact your PSE project manager to initiate a review. This intermediate service pole is set and owned by PSE and the cost is in addition to the service line costs. Please contact CCS for installations that may require an intermediate service pole to determine additional costs. Figure 19 Intermediate service pole location WHEN YOUR SERVICE LINE EXCEEDS 125' SERVICE LINE (UTILITY OWNED) SERVICE MAST WATER WELL INTERMEDIATE SERVICE POLE (UTILITY SET & OWNED) MAY BE REQUIRED SECONDARY LINE (UTILITY OWNED) 50' MIN50' MIN POWER POLE DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 33 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 20 Unguyed service masts HEAVY-WALL STRUT-TYPE CHANNEL HEAVY-WALL STRUT-TYPE CHANNEL FLASHING SERVICE BRACKET WEATHERHEAD GALVANIZED LAG-BOLT INTO FRAMING MEMBER MINIMUM 2' x 6" BETWEEN RAFTERS WITH HOLE BORED FOR SNUG FIT RIGID STEEL CONDUIT 18" MIN 24" MAX * SERVICE DROP MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST FRONT VIEW FLASHING IN COURSES OF SHINGLES BLOCKING BETWEEN MAST AND BUILDING 5/16" U-BOLTS 2" x 6" BACKING SHIM METER BASE/SOCKET AND FASTEN WITH SCREWS GROUND RIGID STEEL SERVICE BRACKET FLASHING STRUCTURAL FRAMING AND FINISH MATERIALS FLASHING FLUSH METER SOCKET GROUND SERVICE BRACKET WEATHERHEAD 2" x 6" INSTALLED SOLIDLY BETWEEN RAFTERS AND AGAINST ROOF SHEATHING RIGID STEEL CONDUIT STRUCTURAL FRAMING AND FINISH MATERIALS STUD SERVICE DROP MINIMUM 2" x 6" INSTALLED SOLIDLY BETWEEN RAFTERS OR STUDS WITH HOLE BORED FOR SNUG FIT WEATHERHEAD 18" MIN 24" MAX * 18" MIN 24" MAX * DETAIL SERVICE DROP MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, U-BOLTS SECURE MAST * ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH MAST HEIGHT BELOW 26" METER FLUSH MOUNTED DRIP LOOP DRIP LOOP DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 34 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 21 Guyed service masts GUY WIRESņņAPART ņņ PULL PULL COLLARS, CYCLONE FENCE CLAMP OR EQUAL WITH 3/8" MIN BOLT SIZE GALVANIZED THIMBLE AND CABLE CLAMP FLASHING OR MASTIC GALVANIZED BOLT; EYE-BOLT OPTIONALATTACHMENT SEE DETAIL 1 SERVICE BRACKET FLASHING 5/16" U-BOLT 2" X 4" BACKING STRUCTURAL FRAMING AND FINISH MATERIALS SEE DETAIL 1 NO. 6 COPPERWELD, AIRCRAFT CABLE OR EQUIVALENT 3/4" RIGID GALVANIZED CONDUIT OR EQUIVALENT ENDS FLATTENED AND DRILLED SHARP BEND; NO RADIUS(SEE DETAIL 2) STRUCTURAL FRAMING AND FINISH MATERIALS 5/16" U-BOLT 2" X 4" BACKING 18" MIN ņ MIN SERVICE DROP WEATHERHEAD COLLARS, CYCLONE FENCE CLAMP OR EQUIVALENT WITH 3/8" MIN BOLT SIZE RIGID STEEL CONDUIT GROUND BLOCKING BETWEEN MAST AND BUILDING RIGID STEEL CONDUIT GROUND METHOD OF GUYING DETAIL 1 DETAIL 2 ņ MIN DRIP LOOP DRIP LOOP DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 35 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Additional mast supports (guy or brace) Additional mast supports, typically a guy or a brace, are required for any service line if: • The service line is over 100 feet long; or, • The point of attachment is more than 24 inches above your roof (see Figure 21). Guys and braces are installed to prevent the weight of the service line from pulling your service mast away from your home or damaging your roof. Further information regarding guying and bracing service masts is available in the NEC. Screw-in service knobs For new or altered overhead service lines, you must provide a substantial point of attachment that meets NEC requirements. Older type screw-in service knobs attached to the home’s wall are often inadequate to support modern triplexed service lines. PSE may prohibit use of service knobs if deemed inadequate. Service entrance equipment installation requirements After you have determined the meter base/socket location, the service route, the height of your service mast, and the size of your service (200 A, 400 A, etc.); you are ready to begin installing your service entrance equipment. Once you have installed your meter base/socket and mast you are ready to provide and install your service entrance conductor. The service entrance conductor is the wire that is connected to the top lugs in your meter base/socket and runs up through the service mast. The service entrance conductors must be sized according to the NEC and to the rating of your meter base/socket. When installing the wire, leave at least 18 inches of it exposed at the end of the weatherhead to allow PSE to connect your service line to it. When you install your meter base/socket, make sure the top of the meter will ADADSVDDM@MCEDDS@ANUDjMHRGDCFQNTMCKDUDK If you have any questions regarding the installation of your service equipment, we suggest that you refer to the NEC, call the inspecting agency for your area, or contact an electrical contractor. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 36 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Manufactured homes If you are installing an overhead service to a manufactured home, our service equipment can be installed one of two ways: 1. On a customer-owned meter pole, or 2. On the manufactured home, if both of these conditions are met: a. The manufacturer installed the service equipment at the time the home was built, and b. The service equipment meets the meter base/socket requirements listed below. Meter base/ socket installation requirements for manufactured homes Meter base/sockets installed on manufactured homes must be: • Located on an outside wall of your home and accessible for reading and testing. • Located on the front one-third of your home closest to normal public access. • !DSVDDM@MCEDDS@ANUDjMHRGDCFQ@CD NOTE: Do not locate the meter base/socket in an area that is subject to being fenced. Customer-owned meter pole Meter pole requirements If a meter pole is required for the project, it is your responsibility to purchase and install it. The meter pole must meet the following requirements: • Be sound, round, reasonably straight, and made of wood. • Fully pressure treated. • Class 6 or better with a minimum diameter of 5-1/2 inches at the top. • 35 feet long minimum. • Butt gain cut 12 feet from the bottom of the pole (2-inch by 1/2-inch cut into the face of the pole), or a manufacturer’s tag attached at 12 feet from the bottom of the pole. Installation requirements The installation requirements for a meter pole are: • Must be located on the parcel the meter will serve. • Must be buried a minimum of 10% of the pole’s length plus 2 feet. If soil BNMCHSHNMR@QDONNQBQTRGDCQNBJRGNTKCADTRDC@R@RTARSHSTSDENQA@BJjKKSN stabilize the pole. • Must be guyed if the service line crosses a public road or if the distance between the meter pole and PSE’s pole is greater than 70 feet. A push brace or pole key brace may be used if guy space is not available. A meter pole installation is shown in Figure 22. NOTE: Multiple meters serving separate properties are not allowed on a single-meter pole. If you have any questions, contact your CCS Representative for further assistance. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 37 Chapter 3 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 22 Permanent overhead meter pole installation 8 1 7 9 9 1 8 6 7 5 5 2 2 3 3 4 410% OF POLELENGTH, +2'10% OF POLELENGTH, +2' 6' MAX4' MIN 6' MAX4' MIN POINT OF DELIVERY UTILITY-OWNED AND INSTALLED UTILITY-OWNED AND INSTALLEDCUSTOMER-OWNED AND INSTALLED CUSTOMER-OWNED AND INSTALLED POINT OF DELIVERY POINT OF ATTACHMENT POINT OF ATTACHMENT OVERHEAD SERVICE LOAD IF APPLICABLE ANCHOR ROD * * ANCHORS SHOULD BE EITHER SCREW TYPE OR CROSS-PLATE TYPE. OVERHEAD TO UNDERGROUND OVERHEAD TO OVERHEAD ANCHOR ROD * 6 Items owned and installed by customer 1 Customer-owned meter pole 2 Meter socket 3 Ground wire, in accordance with NEC/WAC 4 Ground rod(s), in accordance with NEC/WAC 5 Down guy, 5/16" minimum diameter noncorrosive stranded steel wire required for services over 70 ft from PSE pole. Push brace or pole key brace may be substituted for down guy. 6 Service entrance conductors - 18" out of weatherhead 7 Insulated clevis Items owned and installed by PSE 8 Service line 9 Meter DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects 38 Chapter 4 Primary line extensions If your new residence is not located close to existing primary electrical facilities, a primary line extension is required to place a transformer close to your structure. Primary line extensions are typically underground facilities. Customer responsibility PSE’s Electric Tariff G, Schedule 85 requires customers to provide the trenching, DWB@U@SHNMENQU@TKSR@MCA@BJjKKHM@BBNQC@MBDVHSG/2$RS@MC@QCR@MCVNQJ sketch, or contract with PSE to provide this work at its estimated cost. If you require a primary line extension, submit Electric Service Application Single-Family Residential 100E. All forms can be downloaded at pse.com/construction-services. Inspection/Coordination PSE shall assign a Project Manager to oversee the trench location, equipment OK@BDLDMSHMRS@KK@SHNM@MCA@BJjKKHMF • Work shall be subject to the inspection and satisfaction of PSE. • -NVNQJRG@KKADA@BJjKKDCBNUDQDCNQBNMBD@KDCTMSHKHSG@RADDMHMRODBSDC and approved by the inspector. Site preparation The following site requirements must be met before the installation can begin. • The trench route shall be clear of spoils, construction materials, and any other obstacles. • 3GDRHSDRG@KKAD@SjM@KFQ@CDNQ@BBDOS@AKDRTAFQ@CDHMSGD@QD@NE construction. • The front property line shall be surveyed and staked. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 39 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects 39 Customer-provided trench Trench width The minimum trench width is 18 inches. The excavator may need to increase the trench width depending on the other conduits/lines being installed in the trench. When increasing the trench width, remember to allow adequate horizontal separation between PSE’s electrical conduits/cables, gas lines, and other utility-owned conduits and lines in the trench (see Figure 23). Customer-owned facilities may not be in the same trench with PSE-owned gas lines. PSE will allow customer-owned facilities within an electric power trench if the following minimum horizontal clearances from PSE electric facilities are maintained: • 18 inches minimum for customer-owned tight-line sewer (not tile), storm drain lines, roof drain lines, natural gas line, propane gas line, fuel oil line, and water mains up to 6 inches. • 12 inches minimum for water services, irrigation pipes, lighting, security and electric supply circuits, communication lines, closed-system roof drains/storm drains (not French drains), and culverts. NOTE: When constrained by obstructions or clearances from other buried utility lines/facilities, the horizontal clearance between PSE power and communications may be reduced to 4 inches with mutual agreement from the participating communications providers. It is your responsibility to obtain agreement from participating communications providers for a reduced clearance when needed. Figure 23 illustrates PSE’s width and depth requirements for primary voltage cable residential line extension trenches on private property with and without a gas line present. Figure 23 Conduit riser placement detail - top view (not to scale) 4'X4' WORK PIT (POLE BUTT MUST BE EXPOSED) STANDOFF BRACKET 15" MIN LENGTHCONDUIT CLAMP CONDUIT CLIMBING SPACE CLIMBING SPACE ROAD FACEQUADRANT DIRECTION OF VEHICULAR TRAFFIC FIELD FACEQUADRANT 5" MIN DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 40 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects 40 Figure 24 Typical joint utility trench with primary voltage cable on your private property (cross-section view) ROADSIDE ROADSIDE ROADSIDE PHONE & TV GAS NATURAL GAS COMMUNICATIONS PHONE & TV FINAL GRADE FINAL GRADE FINAL GRADE 36" MIN COVER 36" MIN COVER 36" 36" MIN COVER 12" MIN SEPARATION 24" MIN SEPARATION 12" MIN *SEPARATION 12" MIN SEPARATION 12" MIN SEPARATION 12" MIN SEPARATION48" MAX 48" MAX 48" MAX 48" MAX 18" TYPICAL 32" TYPICAL 18" TYPICAL24" MIN 24" MIN 24" MIN 24" MINTO EXCAVATED DIRT PILE POWER, GAS, AND COMMUNICATIONS TO EXCAVATED DIRT PILE PRIMARY POWER CABLE DIRECT BURIED OR DB120 CONDUIT INSTALLATION PRIMARY POWER CABLE SCHEDULE 40 CONDUIT INSTALLATION PRIMARY POWER, MAINLINE GAS, AND COMMUNICATIONS PRIMARY POWER AND MAINLINE GAS BACKFILL FOR DB120 CONDUIT/DIRECT BURIED CABLE (NO ROCKS OVER 10" DIAMETER)BACKFILL FOR SCHEDULE 40 CONDUIT (NO ROCKS OVER 10" DIAMETER) 6" OR 12" OF SAND, 5/8" MINUS, OR CLEAN BACKFILL SHADING 1 PRIMARY POWER CABLE DIRECTLY BURIED OR IN PSE-PROVIDED GRAY DB120 GRADE CONDUIT NOTE 1 SEE TRENCH AND BACKFILL REQUIREMENTS FOR PRIMARY ELECTRIC LINE EXTENSION TRENCHES (NO PSE GAS) ON PAGE 41. NOTE 2 SEE TRENCH AND BACKFILL REQUIREMENTS FOR PRIMARY ELECTRIC LINE EXTENSION TRENCHES (WITH PSE GAS) ON PAGE 42. * THE MINIMUM DISTANCE BETWEEN THE SURFACES OF TWO UTILITIES, NOT THE CENTERLINE DISTANCE. PRIMARY POWER CABLE IN CUSTOMER-PROVIDED DISCONTINUOUS GRAY SCHEDULE 40 CONDUIT 3" OF SAND, 5/8" MINUS, OR CLEAN BACKFILL BEDDING BACKFILL (NO ROCKS OVER 10" DIAMETER) BACKFILL (NO ROCKS OVER 10" DIAMETER) 6" OR 12" MIN SAND SHADING AFTER COMPACTION 2 6" OR 12" MIN SAND SHADING AFTER COMPACTION 2 4" SAND BEDDING 4" SAND BEDDING PRIMARY POWERCABLES OR CONDUIT PRIMARY POWER CABLES OR CONDUIT EXCAVATED DIRT PILE EXCAVATED DIRT PILE DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 41 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects Trench excavating requirements The following requirements for the trench must be met before power conduits/cables will be installed. • When trenching in right-of-way (ROW), the governing jurisdictions may require the entity performing the trenching to obtain a ROW permit. Additionally the entity performing the work will need to be licensed and bonded. • "NMS@BSSGDFNUDQMHMFITQHRCHBSHNMSNCDSDQLHMDRODBHjBODQLHSSHMFQDPTHQDLDMSR and the approximate turn around time from the permit application submittal date. • For trench work provided by you within a public ROW or a PSE easement, PSE requires that you use a Washington State licensed and bonded contractor and complete and sign a PSE trenching agreement form. • Trench work within a public right-of-way must meet the erosion and sediment control requirements of the local jurisdiction. NOTE: Acquiring permits for excavation-related activity can take more than a month or longer depending on the amount of material being excavated, location of the excavation, and the jurisdiction issuing the permit. To avoid schedule delays, contact your PSE Project Manager for an estimated time frame to acquiring your permits. • /QNUHCD@RHFMDC$WB@U@SHNM1DPTHQDLDMSR%HM@K&Q@CD"DQSHjB@SHNMCNBTLDMS supplied by your Project Manager or PSE Representative. • The trench shall be excavated according to the trench detail and PSE’s work sketch. • The trench shall be straight and the trench bottom shall be smooth, level, and free from obstructions, sharp objects, or rocks larger than 1/2 inch in diameter. • $WB@U@SDCNQKNNRDL@SDQH@KRG@KKADOK@BDC@SKD@RSEDDSEQNLSGDjDKCDCFDNE the trench. • Water shall be removed by pumping or draining following the erosion and sediment control requirements of the local jurisdiction. NOTE: Trenches or vault excavations that are 4-feet-deep or greater require special sloping. Contact your PSE Project Manager for these requirements. Restrictions: When PSE’s project scope requires the manipulation of an existing primary cable or circuit, customers or third party contractors shall not uncover and expose existing buried primary voltage power lines or ducts in an energized state. PSE shall coordinate with the customer and service provider for the lines to be CDDMDQFHYDC@MCFQNTMCDCNQ/2$RG@KKOQNUHCDPT@KHjDCVNQJDQRSNODQENQL exposure of energized buried lines. These restrictions apply to both direct-buried cables and cables in conduit. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 42 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects 42 Trench and EDFNðOO requirements for primary electric line extension trenches (no PSE gas) /2$VHKKMNSDMDQFHYDHSRE@BHKHSHDRTMSHKA@BJjKKHRBNLOKDSDC When PSE primary cables are directly buried, or installed in PSE-provided gray DB120 grade conduit, you are responsible for the following: • Providing a minimum 3-inch bedding layer of sand, 5/8-inch minus, or clean A@BJjKKVHSGQNBJRNQRNKHCL@SDQH@KMNK@QFDQSG@MHMBGHMCH@LDSDQ@MCMN sharp objects) placed below cables/conduits. • A 12-inch layer of the same shading material above the directly buried cables/ conduits. • (EM@SHUDA@BJjKKHRBNLOKDSDKXEQDDNEENQDHFMNAIDBSR@MCQNBJRHMDWBDRRNE HMBGDRHMCH@LDSDQRG@CHMFVHSGR@MCHMBGLHMTRNQBKD@MA@BJjKKB@MAD reduced to 6 inches. • 3GDQDL@HMHMFSQDMBGRG@KKADA@BJjKKDCVHSGRNHKSG@SHREQDDNEQNBJRK@QFDQSG@M 10 inches in diameter and foreign objects. When PSE primary cables are installed in gray Schedule 40 grade or better conduit, you are responsible for the following: • !@BJjKKHMFSGDSQDMBGVHSGRNHKSG@SHREQDDNEENQDHFMNAIDBSR@MCQNBJRK@QFDQSG@M 10 inches in diameter. Bedding and shading of the conduit with sand, clean A@BJjKKNQRDKDBSjKK@RHMBGLHMTRBQTRGDC@FFQDF@SDHRMNSQDPTHQDC Trench and EDFNðOO requirements for primary electric line extension trenches (with PSE gas) You must provide a 12-inch layer of sand above and a 4-inch layer of sand bedding ADKNVSGDTSHKHSHDRADENQDA@BJjKKHMFRDD%HFTQD (EM@SHUDA@BJjKKHRBNLOKDSDKXEQDDNE foreign objects and rocks in excess of 8 inches in diameter, sand shading over utilities can be reduced to 6 inches after compaction. You are responsible for the following: • "NLOKDSHMFA@BJjKK@RRNNM@ROQ@BSHB@K@ESDQE@BHKHSHDR@QDOK@BDC@MCHMRODBSDC • "@QDETKKXOK@BHMFA@BJjKKSNOQDUDMSC@L@FDNQLNUDLDMSNESGDB@AKDRNQBNMCTHS • "NRSNEC@L@FDRSN/2$E@BHKHSHDRB@TRDCAXHLOQNODQA@BJjKKNQBNLO@BSHNM • Relocation costs due to change in grade or alignment. CAUTION: Do not use a compactor directly over the power conduit(s) until at least HMBGDRNEA@BJjKKHRHMOK@BDRNSG@SSGDBNLO@BSNQVHKKMNSC@L@FDSGDB@AKDRNQ conduit. Do not penetrate the soil deeper than 3 inches during compaction with a backhoe compactor. Vaults PSE is responsible for furnishing and installing all primary vaults and secondary handholes required for your electric service. Vault excavation procedure 1. Locate the vault according to PSE’s work sketch drawing. 2. Determine a suitable place to put the spoils (at least 2 feet from the edge of the excavation). 3. Excavate so the vault is in correct alignment with the trench and so that conduits for primary voltage cables (if required) can be brought straight into the front half of the vault. 4. Dig a hole large enough to accommodate the transformer or junction box vault and allow for easy installation and compaction (see Figures 25 through 27). 5. Remove debris and level the bottom of the excavation. 6. Prepare the bottom of the excavation so that the vault will rest on solid undisturbed earth with a 6-inch base of crushed rock. This prevents vault settling. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 43 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 26 Aboveground junction box vault excavation Figure 25 Minimum dimensions and excavation requirements for a single-phase padmount transformer vault WIRE ACCESS POINTS 42" 4" 38" 6' - 0" 6' - 0" SIDE VIEW 3' - 10" 6" CRUSHED ROCK 48" PLAN VIEW 2" 2" PLAN VIEW SIDE VIEW PRIMARY CABLE TYPICALLY ENTERS EITHER THE FRONT, OR THE FRONT HALFON THE SIDE OF A VAULT SERVICE AND SECONDARY CABLES ENTER EITHER THE BACK, OR THE BACK HALF ON THE SIDE OF A VAULT 6' - 0" 6' - 0" 3' - 6" 3' - 2" 4' - 0" STRUT A 2" 6" CRUSHED ROCK 3' - 6" NO SECONDARY DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 44 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 27 Minimum dimensions of excavation requirements for small secondary handholes PSE 1324 POLYETHELYNE HANDHOLE PLAN VIEW SIDE VIEW PSE 1730 POLYETHELYNE HANDHOLE APPROX13" APPROX17" APPROX24" APPROX30" 4' - 0" 4' - 5" 5' - 0" 5' - 6" 17" 20" 4" X 4"KNOCKOUT(2 PLACES) 4" X 4" KNOCKOUT(2 PLACES) APPROX 23" APPROX 27" APPROX 32" ELECTRIC APPROX 40" CONDUITS ENTER FROM BENEATH AT ONE END OF HANDHOLE CONDUITS ENTER FROM BENEATH AT ONE END OF HANDHOLE 15” 18" PENTABOLT LOCK COVER PENTABOLT LOCK COVER 2" 2" PLAN VIEW SIDE VIEW ELECTRIC DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 45 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 28 Joint trench detail for vaults and pedestals FIELD SIDE TRANSFORMER FIELD SIDEROAD SIDE ROAD SIDE SEE TABLE 2 COMMUNICATIONS COMMUNICATIONS GAS GAS FEEDER PRIMARYPOWER PRIMARY POWER NATIVEMATERIAL SECONDARY POWER PEDESTAL SECONDARY POWER SECONDARYPOWER CONDUIT LOWER PEDESTAL 6" OF CRUSHED ROCK (BASE FOR VAULT) 48"MAX 48"MAX 38" 10" 21" 18" 12" 1' 1' 2" 2" 12" MIN 12" MIN 36" COVER 36" COVER PSE 10' FRONTAGE EASEMENT PSE 10' FRONTAGE EASEMENT DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 46 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 29 Location of customer conduit entrance requirements in PSE vaults Vault location and access Underground equipment must be readily accessible by workers and equipment during construction and for future operation and maintenance. Workers should not have to climb over or remove obstacles to gain access. Heavy construction equipment must be able to get close enough to the excavation to place the vault in the hole. Consider the underground equipment’s weight and the lifting angle and swinging radius of the boom truck when choosing the underground equipment’s KNB@SHNM 1DLDLADQSG@SCTLOSQTBJRL@XMDDC@BBDRRHERDKDBSjKKHRTRDCENQjKKNQ if excavated material will be hauled away. A clear and level working space is necessary for the operation and maintenance of underground equipment. The location must allow room to operate a switch handle, completely open a hinged steel door, or use a hotstick to install and operate equipment. In no case shall clearances be less than those required by code from combustible and MNMBNLATRSHAKDV@KKRANCHDRNEV@SDQjQDDRB@ODRDSB The working space should be free from obstructions such as trees, shrubbery, poles, ATHKCHMFRQDS@HMHMFV@KKRRSQTBSTQDREDMBDRjQDGXCQ@MSRCDBNQ@SHUDRBQDDMRCHSBGDR streams, roadways, etc. Consider possible future structures and equipment that could interfere with clearances and accessibility. 9DXOWEDFNðOO material !@BJjKK@QNTMCU@TKSRRGNTKCBNMRHRSNEFNNCBNLO@BS@AKDL@SDQH@KRTBG@RBKD@MD@QSGjKKBQTRGDCQNBJNQR@MC -NUNHCRRGNTKCQDL@HMADSVDDMSGDU@TKSV@KKR@MC the sides of the excavation. !@BJjKKADMD@SGSGDU@TKSRG@KKADBQTRGDCQNBJRHWHMBGDRCDDOSNRS@AHKHYDSGDU@TKS If the vault is located in a concrete drive or sidewalk, a felt joint is to be installed around its perimeter. VAULT WALL PSE PRIMARY CABLE IN CONDUIT KNOCKOUTS CUSTOMER’S SERVICE WIRE CONDUITS MAY ENTER THE VAULT THROUGH MOUSE HOLES OR KNOCKOUTS IN THE UNSHADED AREAS. DO NOT ENTER CONDUITS THROUGH STRUCTURAL CONCRETE SURFACES (VAULT WALL). DO NOT ENTER THE SAME QUADRANT AS PSE’S PRIMARY CABLE. Figure 30 Electrical vault access road cross-section COMPACT CRUSHEDSURFACING TOP COURSE COMPACT GRAVEL BASE 2" MIN 8" MIN 10" DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 47 Chapter 4 Electric Service Handbook 2021 — Single-Family Residential Projects Customer-supplied conduits You may supply and install primary conduit for construction convenience. If you supply the conduit for primary voltage cable, it will be owned and maintained by /2$@MCRG@KKLDDSSGDENKKNVHMFRODBHjB@SHNMR • PVC electrical grade, Schedule 40 (or Schedule 80 if required in poor soil conditions). • Gray in color. q NQHMBGCH@LDSDQR@RRODBHjDCNMSGDVNQJRJDSBG • Conduit bends shall be long radius bends, 36-inch minimum radius. • Meet requirements in ASTM F 512 and NEMA TC 2. Terminating conduit at transformer If the service line conduit is to extend into a minipad transformer, the customer shall install the service line conduit two inches into the mousehole on the face of the minipad that is closest to the residence and perpendicular to the face of the minipad. Refer to customer conduit entrance requirements (Figure 30). (ESGDRDQUHBDHRBNMMDBSDCSN@RTALDQRHAKDSQ@MRENQLDQHM@U@TKS@PT@KHjDC/2$ representative shall be present when the knockouts are broken out and while the service line conduit is placed two inches into the vault. Excavating to expose existing buried primary voltage power lines Routinely, PSE must uncover existing buried primary power cables in order to maintain, intercept and reroute, or cut new equipment into the circuit such as transformers or J-boxes. In these situations, the excavation taking place must be coordinated with the customer with respect to the hazards a buried energized line presents. Customers preparing trench up to a cable intercept point shall not uncover the cable ahead of the scheduled date for line work. Customers preparing a trench route to a cable intercept point must stop 3 feet from locate marks prior to the start of PSE line construction work. .MKXNMBDSGDB@AKDHRHRNK@SDCSDRSDC@MCFQNTMCDCAXPT@KHjDCDKDBSQHB@KVNQJDQR rendering the cable de-energized, may a customer proceed to expose PSE’s cable through normal safe work and digging practices. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 48Electric Service Handbook 2021 — Single-Family Residential Projects Chapter 5 Meter installation This chapter provides you with PSE’s requirements for the metering equipment that you must provide to hook up your new service. Please follow these requirements to avoid a delay in your service hookup. If you have any questions about this information, call your Customer Construction Services (CCS) Representative. Please see PSE Form 7517 for information on preapproved meter catalog numbers. It is located on PSE's Construction Services Guides and Handbooks web page. Service rating options PSE’s metering equipment requirements for single-family residential structures (not apartments or condominiums) are based upon the following single-phase service ratings: Voltage Ampere rating 120/240 200 A 120/240 400 A 120/240 over 400 A * * If you need a three-phase service, please contact your CCS Representative. Refer to the PSE Electric Service Handbook for Non-residential Projects, Permanent and Temporary Service for three-phase metering requirements. Responsibilities Puget Sound Energy PSE is responsible for installing the meter, service line, and current transformers (CTs). Customer You are responsible for providing and installing all service entrance equipment (including the meter base/socket and CT enclosure). Customer equipment The customer load monitoring equipment shall be installed only on the load side of PSE metering. No customer equipment shall be allowed inside a meter or current transformer enclosure. This includes customer load monitoring and control devices. NOTE: Meter base/socket and current transformer enclosures shall not be used as junction boxes DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 49 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects Meter bases/sockets General requirements The meter base/socket you purchase and install shall meet the following general requirements: • Be a ring-type socket that includes a screw-type, stainless steel, or aluminum meter ring (snap-type rings must be stainless steel). • Be Underwriters Laboratories (UL) approved. • Be rated for exterior use and be rain-tight according to NEMA-3R. • Have all unused openings tightly sealed from the inside of the socket. • Be plumb and securely fastened to the supporting structure. • Have a cover that is securely attached to the meter base/socket case. NOTE: Meter base/socket and current transformer enclosures shall not be used as a junction box. Meter base/ socket location For single-family residences and manufactured and mobile homes, you are required to install your meter base/socket in a place that is accessible to PSE. All locations are subject to approval by a PSE Representative. If you have questions regarding meter locations, call your CCS Representative. Meter bases/sockets and current transformer (CT) enclosures must be located: • Outside. • On the front one-third of your home closest to normal public access. • In an area that is not subject to being fenced or walled in (such as patios, decks, porches, breezeways, backyards, and carports). • On a structure that is owned by you. These locations allow PSE to: • Read your meter in a cost-effective manner. • ,@HMS@HMXNTQLDSDQDEjBHDMSKX • #HRBNMMDBSXNTQRDQUHBDHMB@RDNEjQD Meter location information is provided in the Electric Underground Service Installation Requirements handout. Grounding requirements All meter bases/sockets, enclosures, and conduit shall be bonded and grounded in accordance with the NEC. Disconnecting means and its sequence For those services where a disconnect switch is installed, the meter shall be ahead of the disconnect switch. The service/safety disconnect must be colocated within 5 feet of the meter. Each meter shall have a corresponding disconnect. Meter/panel combo units For overhead service, meter/panel combo units must meet the requirements in Chapter 3. For underground service, these units must meet the requirements in Chapter 2, unless the line side conductors terminate below the meter base. If line side conductors terminate below the meter base and are bussed up to the top jaws, the minimum dimension for width and height is no longer required. NOTE: If using this type of service equipment, please check with your local or municipal inspector to determine if it meets updated NEC 2020 codes for disconnects. PSE requires this type of equipment to be hot sequenced and does not allow a disconnect ahead of the meter socket. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 50 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects Clearance requirements for meter installations The following clearances are required around all meter installations. It is your responsibility to provide and maintain these clearances. • 3GDSNONESGDLDSDQRG@KKADADSVDDM@MCEDDS@ANUDjMHRGDCFQ@CDDWBDOS meter pedestals). • A working space of 36 inches wide by 36 inches deep (see Figure 31) is required around the meter. This working space is to be kept clear of any obstructions including landscaping. Six feet of worker headroom is required. • There shall be a minimum horizontal and vertical clearance of 18 inches between the center of the electric meter and any obstruction (see Figure 31). • If a recessed meter base/socket is installed, a 10-inch clearance is required from the meter to the closest portion of the wall (see Figure 32). • (E@kTRGNQQDBDRRDCLDSDQA@RDRNBJDSHRHMRS@KKDCSGDRHCHMFNQjMHRGDC surface of the structure shall not overlap the cover of the meter base/socket. • (E@kTRGNQQDBDRRDCLDSDQA@RDRNBJDSHRHMRS@KKDCRO@BDLTRSADKDES@QNTMC the locking tab for PSE to install a meter seal. • ,DSDQA@RDRNBJDSL@XADQDBDRRDC@L@WHLTLNEHMBGDRADGHMC@jMHRGDC exterior surface. Figure 31 Meter base/socket minimum clearances TOP VIEW 3' MIN 3' MIN 3' MIN 3' MIN 6" MIN 6' MAX 4' MIN 6' MAX 18" MIN 18" MIN WORKING SPACE 36" DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 51 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 32 Recessed meter installation clearances 200 A services Single-family residential The 120/240 V, 200 A service is the most common service installed by PSE. Typically, it is installed on homes with a living area of less than 2,500 square feet. However, depending upon what type of equipment you are installing, you may want a larger service. It is your responsibility to determine your electrical requirements and to notify PSE of the size of service you would like. Refer to Chapter 1, Table 3, for service size information. Underground In addition to the meter base/socket requirements earlier in this chapter, meter bases/ sockets for 200 A underground services shall: • Be rated for 120/240 V and 200 A. • Contain four meter jaws and one connection point for the neutral conductor. • Be at least 4-1/4 inches deep, 11 inches wide, and 14 inches high. • Accept 3 inch PVC conduit. • Have lugs (electrical connectors) that are marked to accept 4/0 aluminum conductors. NOTE: Use only the conduit knockouts on either side of the bottom of the meter base/ socket enclosure for PSE’s service cable. 10" MIN 4" MAX 10" MIN DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 52 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects Overhead In addition to the meter base/socket requirements earlier in this chapter, meter bases/ sockets for 200 A overhead services shall: • Be rated for 120/240 V and 200 A. • Contain four meter jaws and one connection point for the neutral conductor. Outbuildings (overhead or underground service) Meter bases/sockets for 200 A (or less) services to single-family residential use outbuildings (such as garages, shops, single-family wells, or noncommercial barns) must meet all the requirements listed in this chapter for either underground or overhead services. NOTE: If an outbuilding is used for a commercial operations, please refer to the PSE Electric Service Handbook for Non-residential Projects as you will have additional requirements including customer-provided service conductor and a manual bypass meter base/socket. Figure 33 Residential meter socket wiring diagrams UNDERGROUND 11" MIN 14" MIN METER SOCKET MUST BE GROUNDED ACCORDING TO NEC NEUTRAL LUG ALTERNATE NEUTRAL LUG POSITION 3" PVC CONDUIT, CUSTOMER PROVIDED 3" PVC CONDUIT METER SOCKET MUST BE GROUNDED ACCORDING TO NEC NEUTRAL LUG CUSTOMER WIRE CUSTOMER WIRE ALTERNATE NEUTRAL LUGPOSITION SERVICE LINE(PSE PROVIDED) SERVICE LINE TO WEATHERHEAD (CUSTOMER PROVIDED) OVERHEAD DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 53 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects 400 A self-contained services The meter base/socket required for a 120/240 V, 400 A service is called a Class 320 meter base/socket (see Figures 34 and 35). It is larger than the 200 A meter base/socket, but it is still a self-contained meter base/socket. It can be installed on residences where the continuous current rating is 320 A or less. NOTE: If your structure requires more than 320 A of continuous current, you are required to install a CT service (refer to the 400 A current transformer (CT) services section in this chapter). Underground In addition to the meter base/socket requirements listed earlier in this chapter, Class 320 meter bases/sockets for 400 A underground services shall: • Be rated for 120/240 V and 320 A continuous current. • Contain four meter jaws and one connection point for the neutral conductor. • Contain a Class 320 manual block bypass (see Figure 34). • Have lugs that will accept 350 MCM aluminum wire. • Accept 3-inch steel or Schedule 40 or 80 conduit through a knockout in the bottom left corner or center of the enclosure. • Have at least an 8-1/2-inch clearance between the bottom of the lugs and the bottom of the enclosure (see Figure 34). Figure 34 Typical arrangement of service conductors for underground class 320 meter base/ socket BYPASS STUDS BYPASS STUDS LINE LUG 8-1/2" MIN PSE’S 4/0 OR 350 CABLE LINE LUG NEUTRAL BLOCK CUSTOMER WIRES 3" RIGID STEEL OR PVC FOR 320 A RESIDENTIAL, CUSTOMER PROVIDED (MAY BE LOCATED IN THE BOTTOM CORNER OPPOSITE THE NEUTRAL BLOCK OR CENTER OF THE ENCLOSURE) METER BASE/SOCKET MUST BE GROUNDED PER NEC. LOAD LUGS DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 54 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects Overhead In addition to the meter base/socket requirements listed earlier in this chapter, Class 320 meter bases/sockets for 400 A overhead services shall: • Be rated for 120/240 V and 320 A continuous current. • Contain four meter jaws and one connection point for the neutral conductor (see Figure 35). • Contain a Class 320 manual block bypass. Figure 35 Typical arrangement of service conductors for overhead class 320 meter base/socket Outbuildings (overhead or underground service) The metering requirements for 400 A services to outbuildings are the same as the metering requirements for 400 A services to single-family residential structures. BYPASS STUDS BYPASS STUDS LINE LUG LOAD LUG LOAD LUG LINE LUG NEUTRAL BLOCK CUSTOMER WIRES SERVICE CONDUCTORS TO WEATHERHEAD, CUSTOMER PROVIDED NOTE: METER BASE/ SOCKET MUST BE GROUNDED PER NEC. NOTE: LINE LUGS SHALL %(7851('ņ72$//2: PROPER INSERTION OF WIRE AND TO KEEP FROM BLOCKING BYPASS AREA. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 55 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects 400 A current transformer (CT) services 120/240 V, 400 A CT services are available at an additional charge. This service requires a different meter base (see Figure 36). It also requires additional equipment CT enclosure, conduit, CT mounting bracket, etc.). The CT enclosure must be located on the outside of the structure that it serves. Contact your CCS Representative for more information. NOTE: The CT enclosure cannot be used as a junction box or bus gutter. Figure 36 Instrument-rated (CT) meter bases/sockets Services over 400 A All 120/240 V services over 400 A (320 A continuous current) require CT metering. Figure 37 shows a CT mounting base. Please contact your CCS Representative for more information. Table 7 describes minimum CT enclosure dimensions. Table 7 Current transformer (CT) enclosure dimensions (minimum) Phase Switch Ampacity No. of Transformers Width Height Depth 1 * 400-800 2 24"48"11" 3 * 201-800 3 36"48"11" 3 ** over 800 3 ** TO CT CAN 1 DIAGRAM A 120/240V SINGLE-PHASE METER BASE/SOCKET DIAGRAM B THREE-PHASE SINGLE METER BASE/SOCKET TO CT CAN 1 1" MIN CONDUIT DIAMETER DIAGRAM B: 120/208 V, 4-WIRE WYE 277/480 V, 4-WIRE WYEALL DIMENSIONS ARE MINIMUM 1-1/4" MINCONDUIT DIAMETER12"MIN 12" MIN TEST SWITCH SPACE TEST SWITCH SPACE 4" MIN 4-1/2" MIN 11"11" 9"9" 20"MIN 20"MIN NOTE 112025(7+$1)285ņ%(1'6 50 FEET MAX LENGTHNO CONDULETS IN THE RUN * When enclosure dimension is greater than 24" x 48", a single side-hinged door is required. 2DQUHBDRNUDQ QDPTHQD@RVHSBGAN@QCCDRHFMDCSN$42$1"RODBHjB@SHNMR 2DQUHBDREQNL L@XADRVHSBGAN@QCCDRHFMDCSN$42$1"RODBHjB@SHNMR DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 56 Chapter 5 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 37 Single-phase CT mounting base Notes: (MRTK@SDCRTOONQSRRG@KKADQ@SDCENQSGDRDQUHMFUNKS@FD@MCG@UDRTEjBHDMS mechanical strength for the application. 2. Mounting base accepts bar-type current transformers only. 3. Two 1/2-inch steel bolts shall be provided for each cable terminating position and each bolt shall be furnished with a spring washer and a nut. The spring washer L@XADDHSGDQ@BNMDSXODADKKDUHKKDNQ@ROKHSQHMFV@RGDQ@MC@k@SV@RGDQ !NKSR shall be secured in place and spaced as shown. All parts shall be plated to prevent corrosion. EUSERC 328A SHOWN 3/4" 3/4" 1/4" 3-1/2" 1-3/4" 1-3/8" 5" CT MOUNTING BOLTS TYPICAL 4 PLACES - SEE NOTE 3 BUS MARKING “CT” (TYPICAL 2 PLACES)CABLE TERM. BOLTS (TYPICAL 4 PLACES - SEE NOTE 3) 10-32 MACHINE SCREW & WASHER DRILLED AND TAPPED INTO BUS 1-3/4" N 2" MIN 2-1/2" MAX INSULATING BARRIER 1-3/8" 8-1/8" 7/8" 8" MIN INSULATING SUPPORT (SEE NOTE 1)1-1/2"1-1/2"DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 57Electric Service Handbook 2021 — Single-Family Residential Projects Chapter 6 Customer generation This chapter provides PSE’s requirements to interconnect and operate customer-owned and installed generation sources in parallel with PSE’s electric distribution system. Customer generation sources include fuel cell, hydroelectric, biomass, solar, or wind power generators. Customer generation does not include emergency power generators. Responsibilities Puget Sound Energy PSE will review all interconnection applications, and once approved, will issue Approval to Construct. PSE will provide and install net and production meters as requested. Customer The customer shall submit an application to interconnect ahead of construction. Failure to obtain approval ahead of construction may result in delays and unanticipated costs for any corrections necessary. All customer electrical equipment shall comply with the NEC and any state or local code requirements. General requirements Customer generation systems up to 100 kW may be connected to and operate in parallel to PSE’s facilities in accordance with Electric Tariff G, Schedule 150, Net Metering Service for Renewable Energy Systems and Schedule 152, Interconnection with Electric Generators. For systems larger than 100 kW and/or systems using a technology other than inverter-based renewable energy generators, please contact distributedrenewables@pse.com. 3GDCDRHFMNESGDRDRXRSDLRRG@KKLDDS/2$RRS@MC@QCRENQUNKS@FDkHBJDQ@MC harmonics and will be served by PSE at a standard service voltage (see Chapter 1, Table 2). What to submit with applying for interconnection Customers must submit a signed Interconnection Application (including system diagram) using PowerClerk, our online application portal at psenetmetering.powerclerk.com. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 58 Chapter 6 Electric Service Handbook 2021 — Single-Family Residential Projects Interconnection system diagrams For PSE to review the interconnection application, a one-line diagram must be included. The one-line diagram shall schematically represent the following equipment and electrical connectivity: • Battery bank (as applicable) • Disconnect switch (as applicable) • Generator • Inverter • Main electrical panel • Production meter (as applicable) • Service meter (net meter) • Sub panel (as applicable for battery backup) • Utility service point of connection A system diagram guide can be found at pse.com/netmetering. Meter location Net meters and production meters are subject to the meter location requirements CDjMDCHM"G@OSDQNESGHRG@MCANNJ Production meters are optional. When a production meter is requested, it must be shown on the system diagram and noted on the Interconnection Application. A single production meter must be able to accurately measure all and only energy produced by the generating system and must be located adjacent to the net meter. f CI@BDMStHRCDjMDC@RADSVDDMHMBGDRSNEDDSBDMSDQSNBDMSDQ@KNMFSGD same wall. Installers shall not round corners. /QNCTBSHNMLDSDQHMFENQ@MDWO@MRHNMNE@&DMDQ@SHMF%@BHKHSXCDjMDC@R@KK generation behind a single net meter) will be reviewed on a case-by-case basis. The priority is for “all or none” of a generating facility’s energy output to be measured. More information about why a customer may want production meters can be found at pse.com/netmetering. Meter socket requirements When an optional production meter is requested, the customer shall provide and install the meter socket. Customer-provided metering equipment shall meet the requirements stated in Chapter 5 of this handbook. Production meter sockets shall not be “jumpered” prior to PSE’s installation of the meter. Customers may not tap at or in a meter socket except for 320-amp service. For 320-amp service, customer may not create new lugs, modify existing lugs, or tap into bypass lugs. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 59 Chapter 6 Electric Service Handbook 2021 — Single-Family Residential Projects Labeling requirements The labeling requirements in Chapter 5 of this handbook apply to net and production metering enclosures. In addition to those requirements, meter enclosures shall be K@ADKDCVHSGODQL@MDMSKX@EjWDCRHFM@FD@SSGDOQNCTBSHNMLDSDQ@MCMDSLDSDQ enclosures to identify their function (i.e., net meter or production meter). Where metering is accomplished at different voltages, the signage must also identify the voltages at which the meters are energized. Labels shall conform to the requirements of NEC Article 690. All labeling should be capitalized. PSE requires engraved phenolic nameplates or adhesive die-cut labels at least 1 inch high, with raised or cut-out lettering that is a minimum of 3/8 inch high. Disconnect switch requirements PSE must have the ability to disconnect customer generation from PSE’s system for employee protection. A visible, lockable disconnect switch is recommended to be installed for all customer generation systems, and is required in some cases. A visible, lockable disconnect switch is required in any of the following scenarios: • Maximum generating capacity is greater than 25 kW ac. • Electric service is three-phase. • Electric service is CT-metered. A disconnect switch is optional if your system meets all of the following characteristics: • Maximum generating capacity is 25 kW ac or less. • Electric service is single-phase. • Electric service is self-contained. When a visible, lockable disconnect switch is required, it must be a single switch that isolates the entire generating system and is colocated with the electric service (net) meter. When the generation system includes optional production metering, the placement of the disconnect switch relative to the production meter shall be as follows: • For 240 V and 120/208 V self-contained and CT-rated production meters, the disconnect switch shall be connected to the Line side of the production meter (between the production meter and the inverter). • In the case of 480 V self-contained production meters, the disconnect switch shall be connected to the Load side of the production meter (between the production meter and electrical panel). DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 60 Chapter 6 Electric Service Handbook 2021 — Single-Family Residential Projects Commissioning The customer must leave the customer generation system OFF until PSE commissions and installs the net meter. Systems that include optional production metering shall be left on at the disconnect switch with the PSE production meter socket empty. The system is expected to turn on for testing when PSE installs the production meter. For systems without a production meter, the following applies: • Systems with a visible/accessible ac disconnect switch: The system must be left off at the ac disconnect switch after the electrical inspection. The system will be turned on by PSE when the net meter is installed. • Systems without an accessible ac disconnect switch: The system must be left off at the breaker after the electrical inspection. PSE will make an appointment with customer to coordinate installation of net meter commissioning. Resources Additional information about interconnection and net metering with PSE (including Rate Schedules 150 and 152, details about the state and federal incentives, and system diagram guides) can be found at pse.com/netmetering. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 61Electric Service Handbook 2021 — Single-Family Residential Projects Chapter 7 Temporary services What this chapter contains (MSGHRBG@OSDQXNTVHKKjMC@MRVDQRSNPTDRSHNMRRTBG@R • What are the installation requirements for underground and overhead service? • What are the trenching requirements? • How do I locate existing underground utilities before I dig? • How do I get my temporary service energized? 'HðQLWLRQ A temporary (temp) service is a means of supplying electricity to your site for less than one year. Typically, a temporary service provides power for the construction phase of your project, while provisions are being made for your permanent power system. Temp service is provided underground or overhead depending on available PSE facilities. Obtaining your temporary service from existing power facilities The following information applies to your temporary service installation: • Determine if you need overhead or underground service (see Preface, Figure 1 and Figure 2). • Obtain an electrical work permit. • Order underground utility locate service by contacting the 811 “Call Before You Dig” hotline a minimum of two business days before digging. • Prepare the job site and install your temp service equipment (service post, pedestal, and meter base per illustrations found in this chapter). • Obtain an electrical inspection approval of your temp service equipment (this is done by you or your contractor). • Call PSE to request that your temp service be connected and energized after your electrical inspection is complete. • Apply for permanent service. • At your request, we will check your site to determine if engineering is required. If you have any questions, please call Customer Construction Services (CCS) at 1-888-321-7779. For information on permanent services, please contact CCS. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 62 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Scheduling Most temp services are connected to existing power facilities and engineering is not required. In these cases temp services are typically energized 3 to 5 days after your installation has passed inspection. Depending on complexity and work volume, time frames will vary. Customer charge for service Charges vary due to the type of system we have in your area. Your CCS Representative will explain current temp service fees. Temporary meter base/socket requirements 8NT@QDQDPTHQDCSNOQNUHCD@LDSDQRNBJDSVHSGSGDENKKNVHMFRODBHjB@SHNMR • A ring-type socket that includes a screw-type, stainless steel, or aluminum meter ring (snap-type rings must be stainless steel). • Rated 120/240 V • Single-phase • Minimum rating of 100 A • Maximum rating of 200 A • Four jaws • Underwriters Laboratory (UL) approved Temporary underground services Temporary underground service is available in PSE’s service area where the existing power facilities are installed underground. The process and cost of obtaining your temporary underground service can vary, depending on the location of our existing facilities. If there is a power stubout, handhole, pedestal, or transformer located on your property adjacent to our existing facilities (see Preface, Figure 1), engineering may not be required. Simply install your temporary service facilities (see Figure 38 and Figure 39), obtain an electrical inspection, and call PSE to connect your temporary service. Meter location To properly locate your temporary meter pedestal, set the meter pedestal on your property no more than 5 feet from the transformer, stubout, handhole, or pedestal. Sometimes a distance greater than 5 feet is required such as when your home site is some distance from our existing facilities and you want your pedestal close to where your permanent service will be located. In this case, please contact a CCS Representative at 1-888-321-7779 for information on setting up a remote temporary underground service. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 63 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Trenching and excavation requirements It is the customer’s responsibility to provide the trenching needed to connect to a power stubout (shown in Figure 38). The cable you provide is to be sized according SNSGD-$"@MCG@UD@LHMHLTLHMBGDRNEA@BJjKKBNUDQ@FD NOTE: A 4-foot-square excavation is required at the stubout to provide working room for our personnel to splice your cable to ours. If the connection point to PSE facilities is a handhole, pedestal, or transformer; trench up to the nearest side and leave your wires exposed. If you discover any other conductors while digging your trench, please leave them covered. Remember to order underground utility locate service by contacting the 811 “Call Before You Dig” hotline a minimum of two business days before digging. NOTE: Any trenching within 24 inches of existing underground facilities must be done by hand. Figure 38 Trenching requirements for power stubout NOTE: 4' x 4' work pit is required to allow working room for the tools necessary to connect temporary service. CUSTOMER POST, METER BASE, AND PANEL PSE CONDUCTOR PSE STUBOUT STUBOUT CONDUIT COVERING THE TEMPORARY CONNECTION 6' MAX 4' MIN 4'4' 26" CUSTOMER OWNED TEMPORARY SERVICE CONDUCTORS DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 64 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Underground temporary service installation process The following items must be completed before PSE energizes your underground temporary service: 1. Contact a CCS Representative at 1-888-321-7779 and request your temporary underground service. 2. Obtain an electrical work permit from the inspecting agency. 3. Order underground utility locate service by contacting the 811 “Call Before You Dig” hotline two business days before digging. 4. Install your meter pedestal and meter base/socket in the appropriate location (see Figures 38 and 39). 5. Provide the appropriately sized conductor from your meter socket to PSE’s connection point. Please leave 5 feet of extra cable at the stubout or handhole, and 10 extra feet at a transformer. Consult the NEC for the appropriate cable sizes. 6. Obtain and pass an electrical inspection. 7. Trench up to and expose the PSE connection point at the stubout, handhole, or transformer. 8. If trenching is provided, cover your cable except in the work pit where our personnel will be splicing your cable to ours. 9. After the above items are complete, call CCS at 1-888-321-7779 and inform a CCS Representative that your installation has been inspected and that you are ready for your temporary service. Figure 39 shows the standard temporary underground service installation that we recommend. The dimensions shown are the minimum acceptable. Please do not deviate from our installation standards without approval from your CCS Representative. Doing so may extend the time frame for your service hookup. If service needs to be connected in right-of-way, a permit will be required. This can take several weeks. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 65 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 39 Temporary underground service installation TOP OF METER BASE SHALL NOT BE ABOVE TOP OF STRUCTURE 6' MAX 4' MIN 3' MIN 5' MAX 1 8 3 2 4 5 6 7 2' MIN COVER Items owned and installed by customer 1 4" x 4" x 10' continuous single structure 2 2" x 4" bracing (post should be braced from two directions) 3 Meter socket and distribution panel (up to 200 A, 120/240 V) 4 Ground wire, in accordance with NEC/WAC 5 Ground rod(s), in accordance with NEC/WAC 6 Service entrance conductors in accordance with NEC Items owned and installed by PSE 7 Transformer, handhole, pedestal, or stubout 8 Meter DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 66 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Temporary overhead services Temporary overhead service is available anywhere in PSE’s service area where the existing electrical system is installed overhead. The process and cost of obtaining your temp overhead service can vary depending on the location of our existing facilities. The least complicated and cheapest way a temp service can be installed is if a transformer is located on a pole alongside your property (see Preface, Figure 2). If this is the case, engineering may not be required. All you have to do is install your temp service equipment, have it inspected, and call Customer Construction Services (CCS) at 1-888-321-7779 to order your service. Once the above items are completed, your service will be connected within a few business days. Meter location Your temporary meter post should be located on your property and within 70 feet of the PSE pole that will serve you. This limitation ensures that your temporary service pole can withstand the weight of the conductor. If a distance greater than 70 feet is required, or if PSE’s pole is on the opposite side of the street, please call CCS for our review and approval prior to construction. A taller, stouter temporary service post with additional bracing could be required. Service line path requirements In addition to the meter post distance limitation mentioned above, the service line path requirements are: • The path that the service line will take should not cross property belonging to other individuals. • If the service line will pass through trees or brush, clear a path to allow our service personnel to run the line and to allow the lines to hang without contacting trees or limbs. Maintaining this clear path is the customer’s responsibility. • 3GDRDQUHBDKHMDO@SGRGNTKC@UNHC@QD@RVGDQDUDGHBTK@QSQ@EjBVHKKNBBTQTMKDRR your temporary service post height is increased to provide adequate clearance (see Figure 40). Clearance requirements The National Electric Code (NEC) and the National Electric Safety Code (NESC) have established minimum clearance requirements to maintain safe heights for electrical conductors over various terrains. Figure 40 shows the clearance requirements for the types of terrain most commonly encountered. The NEC and NESC require the lowest point of a service conductor to be at least 12 feet aboveground. The bottom of the drip loop must be a minimum of 10 feet above the ground. You are required to provide a point of attachment on your service pole that will allow PSE to install the conductor and maintain the required clearances. If you need further details, please consult the current issue of the NEC, or contact the state or local electrical inspector for your area. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 67 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 40 Minimum clearance requirements upon installation Overhead temporary service installation process The following items must be completed before we can energize your service: 1. Contact a CCS Representative and request your temporary overhead service. 2. Obtain an electrical work permit from the inspecting agency. 3. Install a meter pole and meter socket. Temporary service equipment on trees is not acceptable. 4. Obtain and pass an electrical inspection. 5. After these items are completed, call CCS and inform a CCS Representative at 1-888-321-7779 that your installation has been inspected and that you are ready for temporary service. Figure 41 shows a typical temporary overhead service installation. Consult with your CCS representative for non-typical installations. SERVICE LINE(UTILITY OWNED) TEMPORARY SERVICE 12' MIN 18' MIN 70' MAXIMUM 26' MIN 10' MIN 16' MIN STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS DRIVEWAYS, AND PARKING AREAS NON-TRAFFIC PROPERTY DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 68 Chapter 7 Electric Service Handbook 2021 — Single-Family Residential Projects Figure 41 Temporary overhead service installation TOP VIEW OF STUD AND BRACES ņ 8 12' MIN 24" MIN 8' MIN GROUND LINE 10' MINTO DRIP LOOP 6' MAX4' MIN 6 7 ALIGN SERVICE LINE BETWEEN BRACES. MAX 70' IN LENGTH WITHOUT PSE APPROVAL. 1 2 9 3 4 5 Items owned and installed by customer 1 4" x 4" x 16' or 2" x 10" x 16' minimum, continuous single structure. No timber 2 Meter socket and distribution panel (up to 200 A, 120/240 V) 3 Ground wire, in accordance with NEC/WAC 4 Ground rod(s), in accordance with NEC/WAC 5 2" x 4" brace (two required) 6 Service entrance conductors - 18" out of weatherhead minimum 7 Insulated clevis (point of attachment) Items owned and installed by PSE 8 Service line 9 Meter NOTE THAT THE SERVICE LINES (;7(1'$7$ņ$1*/()520 WITHIN THE BRACES. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 69Electric Service Handbook 2021 — Single-Family Residential Projects Chapter 8 'LVFRQQHFWLRQDQGPRGLðFDWLRQRIVHUYLFH 3GDQDL@XAD@SHLDVGDMXNTQDKDBSQHBRDQUHBDMDDCRSNADLNCHjDC 8NTL@X wish to have your service disconnected, reconnected, moved from its current location, relocated, or simply de-energized. This may involve lengthening, shortening, transferring, or rerouting the existing service. Disconnection of your meter If you need the power disconnected to work on your side of the meter, without actually removing the wire from the insulator, PSE will perform a simple disconnect/ reconnect service for you. /2$CDjMDR@fCHRBNMMDBSHNMt@RSGDCHRBNMMDBSHNMNQQDBNMMDBSHNMNERHMFKDOG@RD self-contained meters or service lines at the meter base or weatherhead for the convenience of the customer. If the wire has to be removed, relocated, or otherwise manipulated as this becomes @LNCHjDCRDQUHBDQDEDQSNSGD,NCHjDCRDQUHBDRRDBSHNMADKNV "GDBJVHSGXNTQ CCS Representative to verify any charges that you may incur. 0RGLðHGVHUYLFHV /2$BK@RRHjDRVNQJCNMDNM@RDQUHBD@R@fLNCHjDCRDQUHBDtVGDM@BTRSNLDQ requests a change in their secondary service that alters its current point of delivery or location to a new point of delivery without requiring the replacement of the entire service entrance conductor. LNCHjDCRDQUHBDRSHKKLTRSLDDS@KKSGDMDVRDQUHBDHMRS@KK@SHNMQDPTHQDLDMSR 8NT are responsible for equipment from the meter socket into your building. An electrical work permit must be present on your property for all work done on the customer side of the meter. You must apply for the permit before the work is started. After the work is completed, your local government agency must inspect the work before PSE can energize the service. We know at times the electrical inspection is not completed or feasible by the time VD@QQHUDSNQDBNMMDBSXNTQRDQUHBD %NQLNCHjDCRDQUHBDRHESGDODQLHSHROQDRDMS and the work is completed, but the inspection has not been done, the service may still be energized by PSE if the work looks safe, clean, and completed. The inspection can take place the following day. 3GDBTRSNLDQQDPTDRSHMF@LNCHjDCRDQUHBDRG@KKADQDPTHQDCSNO@X/2$SGDBNRSR of altering, transferring, or extending the existing electric service to the new point of delivery or location. ,NCHjDCRDQUHBDQDPTHQDLDMSRB@MU@QXCDODMCHMFNMSGDRBNODNESGDBG@MFDRDD Table 8) DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 70 Chapter 8 Electric Service Handbook 2021 — Single-Family Residential Projects Table 8 $W@LOKDNENUDQGD@C@MCTMCDQFQNTMCLNCHjDCRDQUHBD Customer request PSE and Customer responsibilities 2YHUKHDG0RGLðHG6HUYLFH Your electric meter base is being replaced with a new meter base, and will be located a few feet away from where old meter base was. You will also replace the existing mast and weatherhead. • Notify your CCS Representative if you are changing panel amperage rating or increasing the connected load within your building. • You or your electrician must arrange for PSE to remove the wire from the point of attachment and make permanent connection to the new weatherhead. You must give PSE adequate notice of your intentions, typically 5 to 10 working days prior to needing your service energized. • An electrical permit must be present and visible prior to PSE energizing your service. 8QGHUJURXQG0RGLðHG6HUYLFH Your mobile home is being relocated and you need to move your meter pedestal closer to the new location. Or, you are remodeling and have to change the electrical panel and/or meter location. • Notify your CCS Representative if you are increasing the load or capacity of your meter panel. • You are responsible for digging to the new pedestal location. • You must expose PSE’s wire or conduit at the old pedestal location. This is where your new trench will start. • A new pedestal installation permit must be present and visible on-site prior to calling PSE to perform the work. You must give PSE 5 to 10 working days' notice prior to calling PSE to perform the work. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 71Electric Service Handbook 2021 — Single-Family Residential Projects Glossary Approved – Acceptable to the authority having jurisdiction. %DFNðOO – Native soil or soil brought in from another area, free from sharp objects, rocks, scrap building material, and corrosive material. Clearance – A set distance between two objects. Conduit – A listed or approved wireway with a smooth interior surface to permit easy drawing-in of the electrical conductors. A conduit may be metallic or nonmetallic, depending on its usage, in accordance with codes and Puget Sound Energy Standards. Current Transformer (CT) Enclosurel RD@K@AKDB@AHMDSCDRHFMDCENQRTQE@BDNQkTRG mounting, and provided with a frame or trim in which doors or removable covers are hung. Customer Construction Services (CCS) Representative – The designated representative of Puget Sound Energy, responsible for design and/or coordination of new or revised services to PSE customers. The CCS Representative responds to inquiries on policies, standards, practices, rates, and energy utilization. Customer Generation – A generation facility installed by PSE customers that are interconnected and operated in parallel with PSE’s electric distribution system through the electric service meter (net meter). Demandl3GDL@WHLTL@UDQ@FDJHKNV@SSKN@CTRDCAXSGDBTRSNLDQENQ@RODBHjB period of time during the billing period. Direct Burial – The installation of electrical conductors in a trench, without the use of conduit. Disconnect Switch – A single blade-type, visible and lockable disconnect. Drip Loop – A loop formed in overhead secondary conductors at the weatherhead to prevent water from entering into the service entrance conduit and equipment. EUSERC – Electrical Utility Service Equipment Requirements Committee Ground Rod – A ground electrode made up of a rod not less than 8' in length and 5/8" in diameter, typically made of zinc or copper coated steel. More information on ground rods is available in the National Electric Code. Guy – Cable or brace used to relieve the strain of overhead conductors on masts and poles. Inverter – An electronic device used to change dc current into ac current. Locked Rotor Current – Locked rotor current is associated with the amount of current drawn from your electric service necessary to start an electric motor. Typically, a motor draws its maximum current to transition the rotor from being stationary, or stopped, to spinning. Once the rotor of a motor is spinning, the current needed to power the motor is typically reduced. Locked rotor current is sometimes referred to as Locked Rotor Amperes, In-Rush Current, or Starting Current. Not all motorized devices have a unique starting current. Manual Block Bypass (Circuit-Closing Block) – A provision for paralleling the meter circuit, allowing the meter to be removed without interrupting service to the customer. Meter Jaw – A spring-loaded receptacle installed inside a meter socket, interfacing the terminals of the meter to the source and load conductors of the service. Meter Loop – Any provision in which an electrical meter may be installed. Does not include the service disconnect device. Meter Pole – A pole which supports the metering equipment owned and maintained by the customer. DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 72 Glossary Electric Service Handbook 2021 — Single-Family Residential Projects Meter Base/Socket – The mounting device consisting of meter jaws, connectors, and enclosure for accommodating socket-type meters. The mounting device may be either a single socket or a trough to accommodate more than one mounting unit. Metering Equipment – Any equipment associated with measuring electric energy. Municipal or State Inspectorl3GDPT@KHjDCQDOQDRDMS@SHUDNE@BHSXNQSGD6@RGHMFSNM State Department of Labor and Industries, who has been authorized by governmental agencies to inspect electrical service installations on their behalf. NEC – National Electrical Code NESC – National Electrical Safety Code Net Meter – A PSE meter through which the customer generation is interconnected to the PSE electric distribution system. Net meters measure both energy delivered from PSE to the customer and energy returned to PSE from the customer. Neutral – The grounded conductor in a single-phase, three-wire or three-phase, four- wire system. The service conductor that is at zero potential to ground. Point of Attachment (Point of Service) – The point at which Puget Sound Energy’s service conductors are attached to the customer’s premises by an approved insulated clevis. Point of Delivery – The connection point of the meter base, on the customer’s premises, where Puget Sound Energy’s circuit and the customer’s system are interconnected. Primary Voltage – The higher voltage, before transformation, used to distribute electrical energy through neighborhoods and local areas. Normally in excess of 600 V. Production Meter – A PSE meter measuring energy production from customer generation sources. RCW – Revised Code of Washington Seal – The locking device used to secure meter and/or service entrance equipment to assure safety and security for the unit. Secondary Voltage – The lower voltage, after transformation, used to supply the customer with electrical energy. Normally less than 600 V. Self-Contained – In reference to meter sockets: a device designed and rated to continuously carry the entire capacity of the service entrance equipment through the meter. Service Entrance Conductors – Those conductors which extend between the customer’s load center and point of delivery. Service Entrance Equipment – Service conduit, conductors, weatherhead, meter base, enclosures, service disconnect, and load center. Service Mast – The conduit above the meter used to provide mechanical protection for the service conductors and to support the service drop from Puget Sound Energy’s system. Supply Side Tap – A connection that is made on the line or utility side of the main service disconnect breaker. Temporary Service – An electrical service installed by Puget Sound Energy to provide power to a customer on a temporary basis (12 months or less). UL – (Underwriters Laboratories) A nationally recognized test laboratory which lists materials it has tested and accepted. UULC – Utilities Underground Location Center WAC – Washington Administrative Code DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 Electric Service Handbook 2021 — Single-Family Residential Projects 73 Notes DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779 1218 06/21 DocuSign Envelope ID: 8D999496-79B7-49F0-B938-E3871EDA3779