Loading...
HomeMy WebLinkAbout1 - Original Submission_ Quincy Square RFM Amendment 5Page 1 of 2 Contract Modification Rev. 09/2021 CONTRACT MODIFICATION AGREEMENT NO. 5 BETWEEN THE CITY OF BREMERTON AND RICE FERGUS MILLER, Inc. PROJECT Quincy Square; Project # 315012 CONSULTANT Rice Fergus Miller, Inc. DATE 2/1/2024 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the City of Bremerton and Rice Fergus Miller, Inc. on September 28, 2018 and as amended on August 11, 2020, on January 17, 2022, on October 4, 2022, and on September 18, 2023. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: See Amended Scope of Work attached as Exhibit A. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by December 31, 2024. Section III. Compensation , is modified as follows: The original contract amount was four hundred ninety-five thousand dollars ($495,000.00). The current contract amount, including all previous amendments is six hundred sixty-four thousand one hundred fifty-two dollars and thirty-six ($664,152.36) The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed forty-one thousand nine hundred eighty-seven dollars and ninety cents ($41,987.90) for a total amended contract amount of seven hundred six thousand one hundred forty dollars and twenty-six cents ($706,140.26), including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439 Page 2 of 2 Contract Modification Rev. 09/2021 including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. Public Works Director approved to process _________________________ (Initials and Date) CONSULTANT THE CITY OF BREMERTON By: By: Print Name: Print Name: Its: Its: Date: Date: APPROVED AS TO FORM: ATTEST: By: By: KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: City Clerk City of Bremerton. 345 6th Street STE 100 Bremerton, WA 98337 R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439 2/13/2024 2/13/2024 Principal Dean Kelly Mayor Greg Wheeler 3/1/2024 275 Fifth Street, Suite 100 Bremerton, WA 98337 Phone: (360) 377-8773 rfmarch.com Supplemental Services Agreement Project: Quincy Square on 4th Street Owner: City of Bremerton – #315012 Date of Original Agreement: September 28, 2018 SSA No.: Project No.: 06 January 31, 2024 2017087.01 In accordance with the Agreement referenced above, authorization is hereby given to: proceed with Additional Services proceed with revised scope of Basic Services incur Reimbursable Expenses As follows: Add budget for Parametrix to perform additional engineering services during final design, including a second draft final bid set as required by the City of Bremerton. Scope and fee to enable Parametrix to meet bid date of March 2024. Compensation shall be adjusted as follows: Parametrix Proposal : $73,030.90 Reallocation of remaining contracted fee to this supplemental service request: <31,043.00>*** Total SSA 06 Request: $41,987.90 *** Note: Reallocated fee contains scope and fee for Construction Administration Services. This scope and fee will need to be addressed in a future supplemental service request. Time for performance shall be adjusted as follows: To be determined. Upon execution, this Supplemental Services Agreement shall become a part of the original Agreement referenced above, and supplemental services described above shall commence. Submitted by: By: Authorized by Owner: By: Printed Name: Dean Kelly Printed Name: Title: Principal Title: Date: January 31, 2024 Date: END OF SUPPLEMENTAL SERVICES AGREEMENT DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439 Rice Fergus Miller 233-1896-161 Quincy Square 1 January 2024 EXHIBIT A – SCOPE OF WORK Rice Fergus Miller Quincy Square Modification 05 Request INTRODUCTION This document describes Parametrix’ proposed scope of work (SOW) for Modification 05 under our existing contract for the Quincy Square project. The purpose of Modification 05 is to add budget for Parametrix to perform additional engineering services during final design, including a Second Draft Final Bid Set, as requested by the City of Bremerton in comments on the Draft Final Bid Set submittal received on December 28, 2023A proposed budget is attached as Exhibit B. The following tasks are associated with this SOW: Task 5 – Final Design Objective Complete one plans, specifications and estimate (PS&E) submittal including the Second Draft Bid Set by responding to City comments to the Draft Bid Set submitted in October of 2023. Review comments were received on December 28, 2023. Activities The following activities are associated with this task: · Respond to City comments dated 12/28/2023 and prepare a Second Draft Bid Set submittal for City review which includes: • Address comments on the Plans, engineer’s opinion of probable cost, special provisions, and contract documents from the Draft Bid Set Submittal. • Revise plan sheets to incorporate additional tasks from City provided comments including but not limited to;  Coordination with the City staff for electrical revisions, additional requirements, existing as-built drawings and PSE revenue meter records.  Coordination with equipment suppliers in support of revised electrical design.  Revise Electrical plans, specifications, and construction cost estimate per City comments.  Prepare design documentation figure in accordance with PSE requirements to support the effort to prepare the PSE non-residential electrical service application.  Coordination with City staff on developing a sequence of construction. Preparing traffic control plans in response to city direction in 01/23/2024 review meeting. DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439 SCOPE OF WORK (continued) Rice Fergus Miller 233-2519-010 Quincy Square 2 January 2024  Design of two new curb ramps and redesign of two curb ramps at the 4th & Washington intersection to meet 2023 PROWAG requirements for accessible parallel on-street parking. • Coordination with the Client and City of Bremerton. • Complete a quality control review of the Second Draft Bid Set Submittal. Deliverables The following deliverables are associated with this task: · Second Draft Bid set PS&E including revised plans, engineer’s opinion of probable cost, special provisions, and contract documents. Assumptions The following assumptions apply to this task: · Upon approval of modification 05, Parametrix will have sufficient budget to prepare a Second Draft Bid Set PS&E and final signed bid set. Should there be additional submittals required, an additional contract modification would be required. DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439 Quincy Square Modification 05 Budget Request and Reallocation Task/Subtask Description Balance Remaining as of 1/27/2024 Budget Shift Budget Remaining After Budget Shift Modification 05 Budget Needs Additional Budget Requested with Modification 05 Less Remaining Budget Remaining after Budget Shift Plus Modification 05 Task 1 Quincy Square Subtask 01 Project Management and Meetings $3,642.13 ($2,500.00)$1,142.13 $1,142.13 Subtask 02 Conceptual Design (10%) $0.00 $0.00 $0.00 Subtask 03 Environmental Documentation ($572.25) ($572.25)($572.25) Subtask 04 Preliminary Design $0.91 ($0.91)$0.00 $0.00 Subtask 05 Final Design ($3,379.44)$14,233.07 $10,853.63 $89,884.53 $79,030.90 $89,884.53 Subtask 06 Survey $0.16 ($0.16)$0.00 $0.00 Subtask 07 Engineering Services During Construction $11,185.00 ($11,185.00)$0.00 $0.00 ESC Salary Escalation $547.00 ($547.00)$0.00 $0.00 Totals $11,423.51 $0.00 $11,423.51 $89,884.53 $79,030.90 $90,454.41 Modification 05 authorizes a budget shift from Subtasks 01.01 and 01.07 to 01.05 plus an additional budget request to Subtask 01.05 as follows: SSA 06 Fee Request (Parametrix request #05) DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439 PARAMETRIX EXHIBIT C - BUDGET 1/31/2024 RFM TOTAL TOTAL TASK SUBTASK 3.00 Burdened Labor Rate $249.87 $161.31 $242.61 $257.88 $158.13 $263.04 $136.05 HOURS COST 1 5 Final Design - Second Draft Bid Set Second Draft Bid Set Effort Civil Plan Revisions 4 40 44 $7,451.88 Electrical Plan revisions 8 96 24 80 208 $43,420.56 Electrical Specification revisions 8 2 10 $2,456.64 Traffic control plan revisions/Sequence of Construction 8 24 4 36 $6,922.56 Four curb ramps + Sight distance analysis 40 40 $6,452.40 Utility coordination drawing for PSE application 8 8 16 $3,205.92 Contract Document Revisions 20 8 8 8 44 $9,480.60 Update the opinion of probable cost 8 4 12 $2,260.92 Coordination with Client and City 3 3 3 9 $1,961.37 QC 8 16 24 $6,271.68 Subtotal 35 131 119 34 88 28 8 443 $89,884.53 TOTAL 35 131 119 34 88 28 8 443 $89,884.53 Mallory Wilde, PE Reviewed By: (Project Manager) Project: STAFFPMX # Quincy Square - FINAL DESIGN (Modification 05) BILLING MULT.: PM M. Wilde Client: Eng IV J. Johnson Pub Supr A. Lucas Sr. Engr. C. Schott Prepared By: 233-2519-010 Elec. Designer III D. Peterson Sr Elec. Eng. C. Wittman Sr. Elec. Eng. R. Rohler Page 1 DocuSign Envelope ID: B04D750E-8DD7-46B8-B32A-0F809AD54439