Loading...
HomeMy WebLinkAbout1 - Original Submission_ Supplement_01_140-063_wattach Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 City of Bremerton Parametrix, Inc. 4/21/2022 315403 See Exhibit B attached No Changes Additional $ 63,833.00. 01 315043 Parametrix, Inc. 1019 39th Avenue SE Suite 100, Puyallup, WA 98374 253-604-6747 STPUL-6566(014)4/21/2022 12/31/2025 6th Street Pavement Preservation Phase III - Naval Avenue to Warren Avenue $490,070.00 Provide preliminary engineering plans, specifications, and opinion of cost for construction bid documents; right-of-way acquisition services; and assistance during bidding and construction for pavement preservation from Naval Avenue to Warren Avenue; replacement of traffic signal at the 6th Street and Veneta Avenue intersection; upgrade of water main between Veneta Avenue and Warren Avenue; and replacement of portions of existing stormwater infrastructure. Cynthia M. Clark, Regional Division Manager Greg Wheeler, Mayor DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE 2/23/2024 Exhibit “A” Summary of Payments Basic Agreement Supplement #1 Total Direct Salary Cost Overhead (Including Payroll Additives) Direct Non-Salary Costs Fixed Fee Total DOT Form 140-063 Revised 09/2005 $124,690 $185,475 $79,912 $36,160 $426,237 $21,240 $36,434 $0 $6,159 $63,833 $145,930 $221,909 $79,912 $42,319 $490,070 DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE City of Bremerton 214-1896-186 Project No. 315043 6th Street Pavement Preservation Phase III Naval Avenue to Warren Avenue 1 January 2024 "Exhibit B" SUPPLEMENTAL SCOPE OF WORK City of Bremerton Project No. 315043 6th Street Pavement Preservation Phase III Naval Avenue to Warren Avenue INTRODUCTION This document describes work added to the original Scope of Work. TASK 01 – PROJECT MANAGEMENT Subtask 0102 – Project Administration Added Work ·Tracking costs for storm drain and sanitary system upgrades. Construction cost breakouts for 60% estimate Engineering cost breakouts for 60% estimate Cost breakouts for 90% and beyond Coordinating with City and team to implement in project bid documents ·Added detail in project budget reporting. Extra efforts are required to provide additional detail in monthly project invoices and earned value reporting as requested by City staff. TASK 03 – UTILITY COORDINATION Subtask 0301 – Utility Coordination Added Work ·Additional potholing Fifteen (15) holes were assumed in the original scope of work. Ended up requiring a total of forty-two (42) potholes, including twenty-five (25) that were paid for by Lumen and PSE. This required additional Parametrix staff time to coordinate with the applicable utilities and to review findings for potential conflicts. ·Additional utility coordination meetings. Two (2) in original scope of work. Anticipate up to eight (8) will be required. DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE SCOPE OF WORK (continued) City of Bremerton 214-1896-186 Project No. 315043 6th Street Pavement Preservation Phase III Naval Avenue to Warren Avenue 2 January 2024 TASK 07 – PLANS, SPECIFICATIONS, AND ESTIMATES Subtask 0701 – 60% Bid Documents Added Work – Storm Drain · Design of approx. 300 linear feet of new storm drain trunk line on the south side of the street west of Chester Street. This was needed to avoid ADA and driveway impacts that would have been required if the existing undersized pipe was replaced in place on the north side of the street. Added Work – Sanitary Sewer · Design of storm drain system extension to eliminate existing storm drainage cross-connection from Midtown Market site that currently discharges to the sanitary sewer. This was not included in original project scope. Subtask 0701W – 60% Bid Documents (Water) Added Work · Replacement of water main on High Ave. This was not included in original project scope. Subtask 0702 – 90% Bid Documents Added Work – Storm Drain · Revisions of storm drain system to avoid conflicts with exiting utilities based on results of potholing. · Revise Site Preparation, Roadway, and Storm Drain plans to show removal and replacement of pavement surfaces required by storm drainage upgrades to be shown only on storm drain plans. · Create separate bid schedule, bid items, quantities and estimate for storm drain upgrades. Remove this work from corresponding bid items, quantities and estimate in previous Roadway schedule. Added Work – Sanitary Sewer · 90% Design for storm drain system extension to eliminate the Midtown Market cross-connection to the sanitary sewer. · Revise Site Preparation, Roadway, and Storm Drain plans to show removal and replacement of pavement surfaces required by storm drainage upgrades to be shown only on storm drain plans. · Create separate bid schedule, bid items, quantities and estimate for storm drain upgrades. Remove this work from corresponding bid items, quantities and estimate in previous Roadway schedule. Subtask 0702W – 90% Bid Documents (Water) Added Work · 90% Design for replacement of water main on High Ave. DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE SCOPE OF WORK (continued) City of Bremerton 214-1896-186 Project No. 315043 6th Street Pavement Preservation Phase III Naval Avenue to Warren Avenue 3 January 2024 Subtask 0703 – 100% Bid Documents Added Work - General · Prepare Soil Mitigation Plan  Required per City’s Hazardous Materials Analysis Memorandum to identify:  A Mitigation plan that details the steps and coordination to be taken if Hazardous soil or materials are encountered as mentioned in the Project Hazardous Materials Memorandum.  Suspected locations unsuitable soils encountered that will require export.  Handling procedures and methodology to address soil management and disposal if necessary.  Will be included in appendix of Contract Documents  Payment by force account in Standard Specifications.  Anticipated that work will stop; materials be investigated by qualified individual(s); and the materials be disposed of properly based on investigative findings. · Additional design services related to traffic control.  Additional traffic control plans have become necessary beyond the original scope. The base assumption of using lump sum payment for traffic work is no longer permitted and additional work is also needed to identify, detail and estimate required traffic control work to reduce risk of overrunning quantities of unit price bid items during construction, including the following:  Meetings with City staff to collaboratively develop strategies for managing construction cost overruns related to traffic control.  Soliciting input from Parametrix construction management team, including development of construction sequencing to be described in the bid documents and development of a simple construction schedule to assist in developing estimates for traffic control quantities.  Additional traffic control plans, specifications, and estimates (see sections below).  Pedestrian accommodation/detour plans.  Pedestrian accommodation will need to be noted on traffic control plans which impact pedestrian access routes.  Pedestrian detours, if required, will be indicated on detour plans.  The original scope of work assumed a total of four (4) traffic control sheets would be required. It is now anticipated that a total of eight (8) traffic control plans will be required for the roadway work to address the traffic control scenarios itemized below. This represents a net increase of four (4) sheets compared to the original scope of work for the roadway work. Note that four (4) other traffic control sheets are additionally required for utility-specific work as addressed in the other Added Work sections that follow.  Typical traffic control plans will be provided for the following typical traffic control conditions for roadway construction:  Single outside lane closures for sidewalk, curb ramp, etc. (i.e. non-utility work). DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE SCOPE OF WORK (continued) City of Bremerton 214-1896-186 Project No. 315043 6th Street Pavement Preservation Phase III Naval Avenue to Warren Avenue 4 January 2024  Inside lane closures for pavement repair work.  Side street closure with pedestrian routings through closure.  Vehicle detour plans will be provided for:  Full 6th Steet closure - Assumes pedestrians will be accommodated on closed roadway.  Detours for typical segmented full closure of 6th Street - assumes pedestrians will be accommodated on closed segments of roadway.  Pedestrian detour plans will be provided for:  Typical side street closure.  Typical 6th Street sidewalk closure – between signal/HAWK crossing locations. Added Work – Storm Drain · Additional traffic control – Storm Drain Utility  The original scope of work did not anticipate any traffic control plans to specifically address storm drainage work. A total of two (2) additional traffic control plan sheets are anticipated to address the following traffic control scenarios:  Additional plan depicting double lane closure required for construction of 300 linear feet of storm drain trunk line on south side of 6th Street, west of Chester Street. Additional related specifications, quantities, and cost estimates.  Additional plan for the single southbound lane closure on Warrant Ave. for the construction of the additional catch basin and connection to existing storm drain in the SW corner of 6th Street and Warren Ave. Added Work – Sanitary Sewer · Additional traffic control – Sanitary Sewer Utility  The original scope of work did not anticipate any traffic control plans to specifically address sanitary sewer CSO removal work. A total of one (1) additional traffic control plan sheet is anticipated to address the following traffic control scenario:  Additional plan depicting double lane closure required for construction of storm drain system extension to eliminate the Midtown Market cross-connection to the sanitary sewer. Additional related specifications, quantities, and cost estimates. Added Work – Water · Additional traffic control – Water Utility  The original scope of work did not anticipate any traffic control plans to specifically address water utility work. A total of one (1) additional traffic control plan sheet is anticipated to address the following traffic control scenario:  Additional plan depicting double lane closures for construction of High Ave. water main. Additional related specifications, quantities, and cost estimates. DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE SCOPE OF WORK (continued) City of Bremerton 214-1896-186 Project No. 315043 6th Street Pavement Preservation Phase III Naval Avenue to Warren Avenue 5 January 2024 · Additional water line profiles for:  High Ave. water main upgrade  Veneta Ave. and Chester Ave. water main upgrade connections. Original scope assumed direct connections to existing side street mains like on Phase II, where no side street profiles were required. Comments from the 60% review are requiring profiles for these connections. DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE ROADWAYTOTALSChuck SchottMarc KendallJack WrightKatie JensenLauren JonesJessica LavarisBecky TaylorSTORM DRAINTOTALSChuck SchottMarc KendallMarcus VasseyJack WrightLauren JonesJessica LavarisBecky TaylorSANITARY SEWER TOTALSChuck SchottMarc KendallMarcus VasseyJack WrightKatie JensenLauren JonesJessica LavarisBecky TaylorWATERTOTALSChuck SchottMarc KendallMarcus VasseyJack WrightSUPPLEMENTTOTALSChuck SchottMarc KendallMarcus VasseyJack WrightKatie JensenLauren JonesJessica LavarisBecky TaylorAll Parametrix StaffSr EngineerSr EngineerSenior ConsultantPlanner IIISr Project Control SpecialistSr Project AccountantPublications SupervisorAll Parametrix StaffSr EngineerSr EngineerEnineer IVSenior ConsultantSr Project Control SpecialistSr Project AccountantPublications SupervisorAll ParametrixSr EngineerSr EngineerEnineer IVSenior ConsultantPlanner IIISr Project Control SpecialistSr Project AccountantPublications SupervisorAll Parametrix StaffSr EngineerSr EngineerEnineer IVSenior ConsultantAll Parametrix StaffSr EngineerSr EngineerEnineer IVSenior ConsultantPlanner IIISr Project Control SpecialistSr Project AccountantPublications SupervisorCost Rates:$87.68 $73.26 $89.60 $48.99 $40.87 $40.18 $34.36 $87.68 $73.26 $53.52 $89.60 $40.87 $40.18 $34.36 $87.68 $73.26 $53.52 $89.60 $48.99 $40.87 $40.18 $34.36 $87.68 $73.26 $53.52 $89.60 $87.68 $73.26 $53.52 $89.60 $48.99 $40.87 $40.18 $34.36 Multiplier:3.0054 Burdened Rates:$263.51 $220.18 $269.28 $147.23 $122.83 $120.76 $103.27 $263.51 $220.18 $160.85 $269.28 $122.83 $120.76 $103.27 $263.51 $220.18 $160.85 $269.28 $147.23 $122.83 $120.76 $103.27 $263.51 $220.18 $160.85 $269.28 $263.51 $220.18 $160.85 $269.28 $147.23 $122.83 $120.76 $103.27 Task SubTask Description Labor Dollars Labor Hours $9,996 ROADWAY $27,735 STORM DRAIN $14,652 SANITARY SEWER $11,451 WATER $63,833 TOTALS 01 Project Management $7,623 36 $1,014 2 2 2 $4,953 12 3 4 2 2 $1,655 4 2 1 $7,623 18 5 5 4 4 02 Project Administration $7,623 36 2 2 2 12 3 4 2 2 4 2 1 18 5 5 4 4 Tracking Costs for SD and Sanitary Sewer Upgrades $5,554 26 8 3 4 2 2 4 2 1 12 5 5 2 2 Additional detail in project budget reporting $2,068 10 2 2 2 4 6 2 2 03 Utility Coordination $5,211 24 $1,758 5 2 $2,341 4 8 $1,112 3 2 $5,211 12 2 10 01 Utility Coordination $5,211 24 5 2 4 8 3 2 12 2 10 Additional Coordination and Analysis of Potholes (27 add'l)$2,019 10 1 2 4 1 2 4 6 Additional Cooridination Meetings (up to 6 extra)$3,192 14 4 2 2 4 2 8 2 4 07 PS&E $51,000 255 $7,224 12 16 2 $20,441 22 38 34 3 $12,997 9 12 36 3 8 2 $10,339 3 10 44 1 $51,000 46 76 114 9 8 2 01 60% PS&E $6,499 36 1 4 1 2 2 16 1 8 1 2 3 28 3 300 LF Additional Storm Drain Trunk Line $1,133 6 1 4 1 1 4 1 Storm Drain Extension to Eliminate SD Discharge to SS $3,810 21 2 2 16 1 2 2 16 1 Water Main on High Avenue $1,556 9 8 1 8 1 02 90% PS&E $18,152 96 12 12 28 4 4 18 2 16 16 18 62 Resolution of Conflicts with Lumen $3,101 18 2 16 2 16 Design storm drain separation from sanitary sewer outfall $4,508 24 4 4 16 4 4 16 Revise Site Prep, Roadway and SD/SS Plans to Show Rest.on SD/SS Plans $4,790 23 6 8 8 1 6 8 9 Create Separate Bid Schedules, Bid Items, Quants, and Est. for SD and SS $2,739 13 4 4 4 1 4 4 5 90% Design of Water Main on High Ave.$3,014 18 2 16 2 16 03 100% PS&E $26,349 123 12 16 2 10 25 2 2 3 6 2 2 8 2 3 8 20 28 55 24 6 8 2 Soil Mitigation Plan $1,923 12 2 8 2 2 8 2 Traffic Control Meetings and Const. Management Input to Staging $8,854 37 8 4 2 8 1 2 2 2 2 2 2 2 20 7 6 4 Typical Traffic Control Plans (3 sheets, included in original assumptions) Vehicle Detour Plan - Full Length (1 sheet, inluded in original assumptions) Vehicle Detour Plans - (2 add'l. sheets)$3,169 14 2 6 6 2 12 Pedestrian Detour Plans (2 add'l. sheets) $3,169 14 2 6 6 2 12 Double Lane Closure for Storm Drain (1 add'l sheet)$1,585 7 1 6 1 6 Warren Ave SB Curb Lane Closure for Storm Drain (1 add'l sheet)$1,585 7 1 6 1 6 Double Lane Closure for Elimination of Discharge to Sanitary Sewer (1 add'l sheet)$1,585 7 1 6 1 6 Double Lane Closures for High Ave Water Main Upgrade (1 add'l sheet)$1,585 7 1 6 1 6 Additional Water Main Profiles High Ave Water Main Upgrade $965 6 6 6 Side Street Connections at Veneta and Chester $1,930 12 12 12 Labor Totals:$63,833 315 $9,996 19 18 2 2 2 $27,735 38 41 46 3 2 2 $14,652 13 14 37 3 2 $11,451 6 10 46 1 $63,833 76 83 129 9 8 4 4 2 Totals:$63,833 $9,996 $5,007 $3,963 $539 $246 $242 $27,735 $10,014 $9,027 $7,399 $808 $246 $242 $14,652 $3,426 $3,082 $5,951 $808 $207 $11,451 $1,581 $2,202 $7,399 $269 $63,833 $20,027 $18,275 $20,750 $2,424 $1,178 $491 $483 $207 Supplement No. 1 Budget Estimate 6th Street Pavement Preservation - Phase III 1/19/2024 "Exhibit C" DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE Project: 6th Street Pavement Preservation Phase III - Navel To Warren Direct Salary Cost (DSC): Classification Man Hours =Rate =Cost Senior Engineer 76 $87.68 $6,664 Senior Engineer 83 $73.26 $6,081 Engineer IV 129 $53.52 $6,904 Senior Consultant 9 $89.60 $806 Planner III 8 $48.99 $392 Sr. Project Controls Specialist 4 $40.87 $163 Sr. Project Accountant 4 $40.18 $161 Publications Supervisor 2 $34.36 $69 X $0 X $0 Total DSC =$21,240 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 171.54 % x $$21,240 $36,434 Fixed Fee (FF): FF Rate x DSC of 29 % x $$21,240 $6,159 Reimbursables: None $0 Other Direct Expenses Total:$0 Subconsultants: (See Exhibit E) None $0 Subconsultants Total: $0 Management Reserve: $0 Grand Total $63,833 Chuck Schott, P.E.Date:1/23/2024 WSDOT Form 140-089 EF Exhibit D Page 1 of 1 Supplement No. 1 – Exhibit D Prime Consultant Cost Computations Agreement Number: DocuSign Envelope ID: A90DB2C4-0EE7-4D0C-A6A3-258DC30233FE