CONTRACT MODIFICATION AGREEMENT NO. 1
To City Contract #6327
BETWEEN THE CITY OF BREMERTON AND PARAMETRIX, INC.
PROJECT: Kitsap Lake Stormwater Retrofit
CONSULTANT: Parametrix, Inc.
DATE: August 31, 2021
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Kitsap Lake Stormwater Retrofit AGREEMENT (the "Contract") entered into between
the City of Bremerton and Parametrix, Inc. on December 30, 2021.
All provisions in the Contract shall remain in full force and effect except as expressly modified
by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the
Contract are as follows:
I.
Section I. Scope , is modified as follows:
The scope of the contract is not changed.
Section II. Term , is modified as follows:
The contract end date is extended to July 31, 2023 and retroactive to August 30, 2022.
Section III. Compensation , is modified as follows:
No change to the contract compensation.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final
settlement of all of the Consultant’s claims for contract time and for all costs of any kind,
including without limitation, costs of delays related to any work either covered or affected
by this Contract Modification, claims related to on-site or home office overhead, or lost
profits. This Contract Modification does not limit the City’s right to bring a claim for past
performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs
and other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
DocuSign Envelope ID: FA948A94-A098-43E8-A9DF-752037E19F63
Page 2 of 2
Contract Modification
Rev. 09/2021
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date)
CONSULTANT THE CITY OF BREMERTON
By: By:
Print Name: Print Name:
Its: Its:
Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By:
KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
David Dinkuhn Gunnar Fridriksson, Project Manager
Project Manager City of Bremerton
Parametrix, Inc. PW&U Engineering Dept.
60 Washington Ave., Suite 390 345 6th Street, Suite 100
Bremerton, WA 98337 Bremerton, WA 98337
R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx
Ned Lever
Digitally signed by Ned LeverDN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned LeverReason: I have reviewed this documentDate: 2022.09.07 15:57:19-07'00'
DocuSign Envelope ID: FA948A94-A098-43E8-A9DF-752037E19F63
9/13/2022
Jenifer Young
EP&C Division Manager
Greg Wheeler
Mayor
9/13/2022