HomeMy WebLinkAbout6063 Supplement No. 03 Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063Revised 09/2005 Description of Work This scope of work includes time and expenses for re-design, survey, and public outreach of the project segment between 11th Street and 15th Street on Naval Avenue. These activities also include but are not limited to PS&E development, traffic engineering, and stormwater design updates. Right of way acquisitions and construction management, engineering services during construction, construction inspection and documentation management could be added as a supplement to this contract at a later date. City of Bremerton HDR Engineering, Inc. 02/13/20 315028 (City Contract 6063) See Exhibit A-1 attached. No change to term. See Exhibit B attached. 03 315028 (City Contract 6063) HDR Engineering, Inc. 929 108th Avenue NE, Suite 1300 Bellevue, WA 98004 (425) 450-6200 HLP-PB19(006)February 13, 2020 December 31, 2026 Naval Avenue- 1st Street to 15th Street Bicycle and Pedestrian Enhancements $ 853,324.71 Paul Ferrier, HDR Engineering Inc.Greg Wheeler, Mayor City of Bremerton DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Rob Berman _________ 11/2/2023 Naval Avenue: 1st St to 15th St Bicycle and Pedestrian Enhancements Project City Project No. 315028 Scope for Design and Right-of-Way Services CONTRACT MODIFICATION #3 (Amendment #7) August 2023 City of Bremerton Prepared by: HDR 929 108th Avenue NE, Suite 1300 Bellevue, WA 98004 Exhibit A-1 DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR Page 2 of 7 CONTENTS INTRODUCTION ............................................................................................................................................. 3 Scope of Work ..................................................................................................................................................3 Project Description ...........................................................................................................................................3 Major Milestone Schedule ................................................................................................................................3 TASK 1. PROJECT MANAGEMENT & ADMINISTRATION ............................................................................. 4 TASK 2. QUALITY ASSURANCE / QUALITY CONTROL ................................................................................. 4 TASK 3. PUBLIC INVOLVEMENT ................................................................................................................ 4 In person Public Open House ............................................................................................................................4 TASK 4. STAKEHOLDER COORDINATION ................................................................................................... 5 TASK 5. DATA COLLECTION / REVIEW OF EXISTING INFORMATION ........................................................... 5 TASK 6. SURVEY AND MAPPING ............................................................................................................... 5 TASK 7. GEOTECHNICAL ENGINEERING .................................................................................................... 5 TASK 8. TRAFFIC ANALYSIS ...................................................................................................................... 6 TASK 9. BASIS OF DESIGN ........................................................................................................................ 6 TASK 10. ENVIRONMENTAL DOCUMENTATION & PERMITTING ASSISTANCE .............................................. 6 TASK 11. 30% DESIGN ............................................................................................................................... 6 TASK 12. FINAL DESIGN - PS&E .................................................................................................................. 6 Extension of bike lanes north from 11th Street to 15th Street ...........................................................................6 TASK 17. MANAGEMENT RESERVE FUND ................................................................................................... 7 DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR Page 3 of 7 INTRODUCTION During the term of this PROFESSIONAL SERVICES AGREEMENT (AGREEMENT), HDR Engineering, Inc. (CONSULTANT) shall perform professional services for the City of Bremerton (CITY) in connection with the following project: Naval Avenue: 1st St to 15th St Bicycle and Pedestrian Enhancements Project (PROJECT). Contract Modification #3 keeps intact the overall terms of the original agreement and the previously executed amendments. Scope of Work This Contract Modification #3 scope of work includes time and expenses for redesigning the segment from 11th Street to 15th Street to extend bike lanes through the entirety of the corridor. The additional scope of work includes additional survey for locations requiring additional widening, Modification to existing project documentation to account for the change, quantities and estimate change to reflect new design. The Consultant will prepare and support the CITY for an in-person public open house. Project Description The PROJECT rebalances the existing roadway section to remove barriers to non-motorized travel by adjusting the number and width of vehicular lanes, adding bicycle facilities, and enhancing pedestrian facilities. The PROJECT will provide ADA improvements to the maximum extent feasible throughout the project limits. As part of this roadway reconfiguration project, the following will be included, pavement resurfacing, curb and gutter, signing and striping to support continuous bike facilities, more robust pedestrian facilities, signal modifications, street lighting, way finding signage, utility relocations, and stormwater improvements. This is a multimodal improvement project identified in the City’s 2007 Non-motorized Transportation Plan. Major Milestone Schedule Contract Modification #3 modifies the schedule as follows: Notice to Proceed……………………. Complete Identify the Basis of Design ....... Complete 30% Design ................................. Complete 60% Design and ROW Plan ......... Complete 90% Design ................................. 2023 100% Design ............................... 2024 Advertisement………………………… TBD (Depending on Funding) DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR Page 4 of 7 Contract Modification #3 Project Tasks The CONSULTANT shall manage the work as described within the following major Work Elements: TASK 1. PROJECT MANAGEMENT & ADMINISTRATION Task 1 is modified to include additional time for project PM and Accountant to execute the amendment, update project budget and billings. Also, includes processing amendments to subconsultants for additional work as part of this amendment. Assumption(s): · This scope does not assume any additional invoicing is needed and does not provide any additional hours for previous project management scope amended with MRF #5. Deliverable(s): · No new deliverables assumed, work will be tracked with progress reports and invoicing already included in the project. TASK 2. QUALITY ASSURANCE / QUALITY CONTROL Components of this work including QA/QC of additional design for roll plot submittal. Assumption(s): · QC of additional design will be built into overall QC process for future submittals. Deliverable(s): · No new deliverables TASK 3. PUBLIC INVOLVEMENT Task 3 is augmented as follows. This task is to assist the CITY with Public Outreach effort for this project, the CITY will lead the public involvement effort. In person Public Open House CONSULTANT will develop material for an in-person public open house. CONSULTANT will support the CITY during the in person public open house located along the corridor. DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR Page 5 of 7 Assumption(s): · In-person public open house to be attended by up to two (2) consultant team members for a total of four (4) hours. · CONSULTANT to create, print and mail out mailers notifying homeowners along the corridor of the in- person open house. · CONSULTANT to create content for and provide up to six (6) large presentation boards for display at the open house. · CONSULTANT to provide a large roll plot of the corridor for display during the open house. · CONSULTANT to compile and summarize input received during open house and add to overall project public outreach documentation. Deliverable(s): · Presentation Boards up to six (6) large color print boards. · Large scale roll plot of corridor with updated design · Update to final report of public outreach content in PDF format. TASK 4. STAKEHOLDER COORDINATION No change to this task from original scope TASK 5. DATA COLLECTION / REVIEW OF EXISTING INFORMATION No change to this task from original scope TASK 6. SURVEY AND MAPPING Scope of task 6 from the original contract is maintained, this amendment adds additional scope for new survey needed for areas outside of right-of-way that is required to assess the proposed impacts of the new design from 11th to 15th. The scope modification also includes additional hours for HDR staff to coordinate the request, process the new Basefile and update project CAD reference files. TASK 7. GEOTECHNICAL ENGINEERING No change to this task from original scope DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR Page 6 of 7 TASK 8. TRAFFIC ANALYSIS No change to this task from original scope TASK 9. BASIS OF DESIGN No change to this task from original scope TASK 10. ENVIRONMENTAL DOCUMENTATION & PERMITTING ASSISTANCE No change to this task from original scope TASK 11. 30% DESIGN No change to this task from original scope TASK 12. FINAL DESIGN - PS&E Task 12 is augmented as follows. Extension of bike lanes north from 11th Street to 15th Street The CONSULTANT shall redesign the north segment, stretching from 11th street to 15th street, with the primary objective of incorporating on-street bike lanes. This deviation from the design assumptions in the original grant request is driven by input from the community. The redesign will involve a concise alternatives analysis, aiming to develop up to three (3) different solutions for the implementation of bike lanes. These alternatives may include, but are not restricted to, bike lanes in both directions, bike lanes in one direction to support uphill traffic only, or a combination of both approaches. The goal is to create an optimal bike facility while minimizing adverse effects on adjacent properties and reducing the overall project cost. As part of this scope, the CONSULTANT will conduct one (1) working session with City staff to work through the design alternatives and decide on a preferred alternative to carry forward into the 90% design. Change in design affects Roadway design, sidewalk, and driveway design, signing and striping, traffic signals, drainage, and utilities. DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Naval Avenue B&P Improvements | Exhibit A-1 Scope of Work HDR Page 7 of 7 Assumption(s): · Scope assumes preferred alternative has no impacts to the cemetery property. · Alternative analysis assumes up to three (3) alternatives. · Working session to be in person and attended by up to three (3) Consultant Staff for a two (2) hour duration. CONSULTANT to develop and provide material for discussion. Including roll plot and presentation. · Change in design does not add any additional plan sheets to the set only modifies existing plans. · Scope of work does not include scope and budget for structural design of walls. Any wall design if determined needed will be designed during the ROW phase. · Scope includes signal redesign consistent of equipment relocation only, assuming changes will be required for the signal at 11th street, relocation of equipment for the RRFB at 13th street and minor modification to signal design at 15th Street. · There will be no additional preliminary submittals. Following the working session and selection of preferred alternative the design will be rolled into the 90% and 100% submittals. Deliverable(s): · One (1) roll plot for working session. · One (1) electronic presentation of discussion of alternatives. · Included in 90% and 100% design plan package (plans, Spec, estimate) TASK 17. MANAGEMENT RESERVE FUND No change to this task DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 FEE ESTIMATECity of Bremerton: Naval Ave Pedestrian and Bicycle EnhancementsTask # Task DescriptionTotal LaborTotalEscalationTotal ExpensesTotal SubconsultantsTotal From SpreadsheetTotal For Proposal1 Project Management & Administration1,256.18$ -$ -$ -$ 1,256.18$ 2Quality Assurance / Quality Control1,513.64$ -$ -$ -$ 1,513.64$ 3Public Involvement9,422.88$ -$ 1,205.00$ -$ 10,627.88$ 4Stakeholder Coordination-$ -$ -$ -$ -$ 5Data Collection / Review of Existing Information-$ -$ -$ -$ -$ 6Surveying and Mapping498.08$ -$ -$ 8,000.00$ 8,498.08$ 7Geotechnical Engineering-$ -$ -$ -$ -$ 8Traffic Analysis-$ -$ -$ -$ -$ 9Basis of Design-$ -$ -$ -$ -$ 10Environmental Documentation & Permitting Assistan-$ -$ -$ -$ -$ 1130% Design-$ -$ -$ -$ -$ 12Final Design - PS&E63,584.88$ -$ 212.00$ 4,638.60$ 68,435.48$ 13Ad-Ready Submittal -$ -$ -$ -$ -$ 14Funding Support-$ -$ -$ -$ -$ 15Bidding Phase Assistance-$ -$ -$ -$ -$ 16Real Estate Services-$ -$ -$ -$ -$ 17Management Reserve Fund-$ -$ -$ -$ -$ 18Direct Expenses-$ -$ -$ -$ -$ 90,331.26$ -$ c:\pwworking\west01\d2870078\230803_Bremerton Naval Bike Ped Improv_ESTIMATE.xlsmPage 1Exhibit BDocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 LABOR ESTIMATE, HDR ENGINEERING STAFF City of Bremerton: Naval Ave Pedestrian and Bicycle Enhancements Acevedo, Robert C French, Cameron C Parenteau, Trevor Michael Ahrens, Leah Marie Napiorkowski, Tomasz William (Tom) Bush, Jaelen Alexander Project Role PM/Traffic Lead Roadway / Water Engineer Structural CAD Project Accountant Traffic Designer Design EIT Total Labor HoursBilling Rate 258.74 158.66 98.58 147.74 150.46 111.12 HDR Job Title ETF.ETF300.Engi neer Traffic Sr ESA.ESA200.Engi neer Sanitary BIM.BIM210.BIM Specialist Civil 1 FIN.FIN210.Projec t Accountant 1 ECI.ECI050.Coord inator Civil ESA.ESA100.EIT Sanitary 1 2 0 0 5 0 0 7 Project Setup 2 2 Project Mgmt Plan / Quality Mgmt Plan / HASP 1 1 2 Coordination and Monitoring 0 Invoicing / Status Reporting / EV / WorkPlan 0 Subconsultant Management 1 2 3 Project Closeout 0 2 2 0 4 0 4 0 10 Roll Plot Submittal 2 4 4 10 90 0 100 0 3 14 0 10 0 32 0 56 In Person Open house 4 4 8 Material Prep 8 10 20 38 Mailers 2 8 10 4 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 6 0 0 2 0 2 0 4 Basefile Update 2 2 4 7 0 0 0 0 0 0 0 8 0 0 0 0 0 0 0 9 0 0 0 0 0 0 0 10 0 0 0 0 0 0 0 11 0 0 0 0 0 0 0 12 22 16 60 0 302 36 436 Bike Lane - Concept alternatives / Work Shop 16 20 40 76 Civil Design 4 20 250 274 Traffic Design 2 4 6 Drainage 16 20 8 36 80 13 0 0 0 0 0 0 0 14 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 16 0 0 0 0 0 0 0 17 0 0 0 0 0 0 0 Task Total Hours 40.00 16.00 76.00 5.00 340.00 36.00 513.00 Real Estate Services Management Reserve Fund Funding Support Bidding Phase Assistance Basis of Design Environmental Documentation & Permitting Assistance 30% Design Final Design - PS&E Ad-Ready Submittal Stakeholder Coordination Data Collection / Review of Existing Information Surveying and Mapping Geotechnical Engineering Traffic Analysis Hours Project Management & Administration Quality Assurance / Quality Control Public Involvement c:\pwworking\west01\d2870078\230803_Bremerton Naval Bike Ped Improv_ESTIMATE.xlsm Printed 8/4/20231:25 PM DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Cost + FF (DSC) Pricing Proposal City of Bremerton, Bicycle and Pedestrian Enhancements HDR 19-180 Bicycle and Pedestrian Enhancements HDR City of Bremerton TASK 1 SURVEY AND MAPPING Principal Surveyor Project Manager Project Surveyor Assist PM Tech 5 Tech 5 Tech 3 Assist PM Hours Labor Dollars Task DSC Rate $91.00 $64.00 $48.00 $46.50 $44.33 $44.33 $34.00 $46.50 1.1. Survey PM, Admin, QA/QC 2 4 6 2 2 16 $912 1.2. Survey Control 0.5 1 2 2 6 $266 1.3. Field Surveying and Mapping 0.5 2 30 30 63 $2,523 1.4. Utility Surveying Services 1 2 8 8 19 $846 1.5. Office Processing 1 2 30 33 $1,549 -$- -$- -$- 5 11 6 2 30 40 40 2 136 Total Dollars $455.00 $704.00 $288.00 $93.00 $1,329.90 $1,773.20 $1,360.00 $93.00 -$6,096 - Direct Salary Cost $6,096 Overhead Cost 157.22%$9,584 ODC BREAKDOWN Fee (*DSC)29%$1,768 NON-INVOICED INVOICED Total Labor $17,448 Mileage 690 0.655 $452 3D LS/iStar/Cyclone Materials repro $-Traffic Control *estimated computer $-UG Utility Locates ODC's (Other Direct Costs)other $-Ferry Non-Invoiced (mileage; repro; etc.)Mile/repro $451.95 SUB TOTAL $452 Other $- Invoiced (sub-c; rental; etc.)TBD $-SUB TOTAL $- Contract Total $17,900 Revised 2023/10/05 DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Supplement #2 Exhibit E Consultant Fee Determination - Task Budget Detail Bremerton HSIP Phase III PH Consulting Staff Category Hours Rate Cost Principal 4 $ 76.50 $ 306.00 Senior Traffic Engineer 8 $ 60.00 $ 480.00 Project Engineer 8 $ 51.00 $ 408.00 CAD Designer II 16 $ 40.00 $ 640.00 Office Administrator 2 $ 35.00 $ 70.00 Total Hours 38 $ 1,904.00 Direct Labor Cost $ 1,904.00 Overhead Rate @ 110% of Direct Labor $ 2,094.40 Fee @30% of Direct Labor $ 571.20 Direct Salary Cost $ 4,569.60 Direct Expenses Unit Cost Total Traffic Counts -$ Reproduction Costs Full Sized Copies (Bond) 0 100 -$ Full Sized (PVC)-$ Reprographics 0 200 -$ Parking/Tolls 1 42.8 42.80$ 2023 Mileage Rates 40 $0.655/Mi 26.20$ 0 0 Sub-Total Direct Expenses $ 69.00 PE Phase Fee (Tasks 1-3) $ 4,569.60 Total Fee $ 4,638.60 8/4/2023 1 Naval Ave 1st St to 15th St Bicycle and Pedestrian Enhancements Project DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Supplement #2 Exhibit E Consultant Fee Determination - Task Budget Detail Bremerton HSIP Phase III Task No. Task Description Principal Senior Traffic Engineer Project Engineer CAD Designer II Office Administrator PH Total ANTE Rates $ 76.50 $ 60.00 $ 51.00 $ 40.00 $ 35.00 Full Burden $ 183.60 $ 144.00 $ 122.40 $ 96.00 $ 84.00 1.0 PROJECT MONITORING AND COORDINATION 1.1 Project Coordination 0 1.2 Project Monitoring, Progress Reporting, & Invoicing 0 1.3 Project Team Meetings 0 1.4 City Coordination 0 0 Task 1.0 Total Hours 0 0 0 0 0 0 Subtotal Task 1.0 $ - $ - $ - $ - $ - $ - 2.0 PRELIMINARY DESIGN 2.1 30% Design Plans 0 2.2 Quanitities / Opinion of Cost 0 2.3 Preliminary Traffic Signal, Street Light & RRFB Improvements Design 0 0 0 0 2.4 30% Design Package Submittal 0 Task 2.0 Total Hours 0 0 0 0 0 0 Subtotal Task 2.0 $ - $ - $ - $ - $ - $ - 3.0 FINAL DESIGN - PSE 3.1 Traffic Signal & Street Light Improvement Plans (60%,90%,100%)4 8 12 16 2 42 3.2 Specifications (60%,90%,100%) 0 3.3 Quantities/ Opinion of Cost (60%,90%,100%)0 3.4 Submittals (60%,90%,100%) 0 0 Task 3.0 Total Hours 4 8 8 16 2 42 Subtotal Task 3.0 $ 734.40 $ 1,152.00 $ 979.20 $ 1,536.00 $ 168.00 $ 4,569.60 PH TOTAL HOURS 4 8 8 16 2 42 TOTAL ALL TASKS $ 734.40 $ 1,152.00 $ 979.20 $ 1,536.00 $ 168.00 $ 4,569.60 8/4/2023 2 Naval Ave 1st St to 15th St Bicycle and Pedestrian Enhancements Project DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Administravite Assistant 3 $33.00 Assist PM & Controller $54.00 Principal Surveyor $106.00 Tech 1, 2 & 3 $39.25 Tech 4 & 5 $48.00 Project Surveyor $55.00 Sr. Project Manager & Project Manager $74.00 Bellevue, WA 98005 Bremerton Naval Ave 2023 Rates 1 Alliance Geomatics_HDRE19-180 1261A 120th Ave NE Direct Labor Hourly Billing Rate NTE1AG Classifications DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Acceptance ICR Cognizant Review May 24, 2019 HDR Engineering 1917 S 67th Street Omaha, NE 68106 Subject: Acceptance FYE 2018 ICR – Cognizant Review Dear Mr. Cox: We have accepted your firms FYE 2018 Indirect Cost Rate (ICR) based on the “Cognizant Review” from the Nebraska Department of Transportation at: • 156.95% of direct labor for contracts in effect prior to June 24, 2014 (rate includes 0.55% Facilities Capital Cost of Money) • 155.99% of direct labor for contracts awarded on or after June 24, 2014 (rate includes 0.55% Facilities Capital Cost of Money). This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:ah DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 Acceptance ICR Audit Office Review July 16, 2019 1 Alliance Geomatics 1261A-120th Avenue NE Bellevue, WA 98005 Subject: Acceptance FYE 2018 ICR – Audit Office Review Dear Michael Paradis: Transmitted herewith is the WSDOT Audit Office’s memo of “Acceptance” of your firm’s FYE 2018 Indirect Cost Rate (ICR) of 157.22% of direct labor. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:ah DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5 City of North Bend Bendigo Blvd and Mt Si Blvd Roundabout Project ANTE Rate Schedule Safe Harbor Overhead Fixed Fee 110%30% Principal 100.00$ 110.00$ 30.00$ 240.00$ Senior Project Manager 95.00$ 104.50$ 28.50$ 228.00$ Project Manager 90.00$ 99.00$ 27.00$ 216.00$ Quality Manager 95.00$ 104.50$ 28.50$ 228.00$ Senior Traffic Engineer 85.00$ 93.50$ 25.50$ 204.00$ Project Engineer 75.00$ 82.50$ 22.50$ 180.00$ Associate Engineer 55.00$ 60.50$ 16.50$ 132.00$ Assistant Transportation Engineer 50.00$ 55.00$ 15.00$ 120.00$ Engineering Intern 40.00$ 44.00$ 12.00$ 96.00$ CAD Designer III 60.00$ 66.00$ 18.00$ 144.00$ CAD Designer II 50.00$ 55.00$ 15.00$ 120.00$ CAD Designer I 45.00$ 49.50$ 13.50$ 108.00$ Office Administrator 45.00$ 49.50$ 13.50$ 108.00$ Office Assistant 40.00$ 44.00$ 12.00$ 96.00$ Direct non-salary costs will be billed at actual costs. Direct Mileage will be billed at current approved IRS mileage rate. PH Consulting LLC Summary of Direct Labor Costs Effective January 1, 2023-December 31, 2023 Job Classifications Maximum Direct Labor Rate Maximum Billing Rate 1/4/2023 1 Naval Ave 1st St to 15th St Bicycle and Pedestrian Enhancement Project DocuSign Envelope ID: 90859927-13B2-4E24-9CD9-332B9F14ACB5