Loading...
HomeMy WebLinkAbout5977 (2)Page 1 of 2 Contract Modification #1 Bremerton/BERK Consulting, Inc. Eastside Employment Center CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND BERK CONSULTING, INC. PROJECT Eastside Employment Center Market Analysis, Redevelopment, & Subarea Plan, Planned Action EIS. CONSULTANT BERK Consulting, Inc. DATE THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the City of Bremerton and BERK Consulting, Inc. on May 2, 2019. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: See attached Scope Amendment dated July 27, 2020. Section II. Term , is modified as follows: The Consultant shall complete the work described in this Contract Modification Agreement by November 2020. . Section III. Compensation , is modified as follows: The original contract amount was Two-Hundred and Seventy Thousand Dollars ($ 270,000 .00). The City shall pay the Consultant for the additional work described above, based on time and materials, an amount not to exceed Fifteen Thousand Dollars ($15,000.00) for a total amended contract amount of Two-Hundred and Eighty-Five Thousand Dollars ($ 285,000.00), including this Contract Modification. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. DocuSign Envelope ID: B78550A9-95F0-453F-823C-A0B9C60FA95C Page 2 of 2 Contract Modification #1 Bremerton/BERK Consulting, Inc. Eastside Employment Center This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. CONSULTANT: BERK Consulting, Inc. THE CITY OF BREMERTON By: By: Print Name: Lisa Grueter Print Name: Greg Wheeler Its: Principal Its: Mayor Date: Date: APPROVED AS TO FORM: ATTEST: By: By: ROGER A. LUBOVICH, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Lisa, Grueter, AICP Andrea L. Spencer, AICP BERK Consulting, Inc. Director of Community Development 2200 Sixth Avenue – 10th Floor 345 6th Street, Suite 600 Seattle, WA 98121 City of Bremerton DCD lisa@berkconsulting.com Bremerton, WA 98337 206.493.2367 360-473-5283 DocuSign Envelope ID: B78550A9-95F0-453F-823C-A0B9C60FA95C 8/4/2020 8/4/2020 1 Bremerton Eastside Employment Center SCOPE AMENDMENT | JULY 27, 2020 The purpose of this amendment is to identify additional tasks needed to ensure a completion of the Subarea Plan and Environmental Impact Statement (EIS). Task 5.6 Planned Action Staff Workshops The purpose of this subtask is to conduct meetings with Community Development and Public Works Staff to develop the planned action mitigation including capital projects, cap ital costs, and mitigation fees. This includes attendance at up to four virtual meetings and refinements of proposals, costs, mitigation, and other documents. Task 9.4 Preferred Alternative Refinement Under this subtask, following the Planning Commission recommendations, responses to public comments, and integration of SR 303 preferred concepts, the Eastside Employment Center Preferred Alternative will be further refined. This includes revised land use estimates, transportation evaluation of trips, updated maps, and subarea naming. The refined Preferred Alternative will be integrated within the subarea plan, code, Final EIS and planned action. This includes growth estimates for added stories and commercial square feet, the differences in mixed use trips and the Draft EIS range of alternatives. COST ESTIMATE Based on the scope amendment, the time and materials not to exceed amount is presented below. DocuSign Envelope ID: B78550A9-95F0-453F-823C-A0B9C60FA95C