HomeMy WebLinkAbout5037Contract Number: Vendor: Sub�ect: Department: File Class: Begin Date: End Date: Review Date: Vault Date: 5037 CONFLUENCE ENGINEERING GROUP, LLC Water System Plan and Support Public Works LEG 12-1 5/6/2011 7/1/2013 6/1/2013 Comments : PROFESSIONAL SERVICES AGREEMENT Confluence Engineering Group LLC The Crty of Bremerton ("Crty") and Confluence Engmeermg Group LLC ("Consultant"), referred to collectively as the "Parties," enter mto the followmg Agreement for professional services I. Scope: The Consultant agrees to perform the services more specifically described m the Scope of Work, dated May 6, 2011, includmg any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein The Scope of Work may be modified only pursuant to Section VII G of this Agreement If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express wntten request of the Crty Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices m effect at the time such services are performed II. Term: The City and the Consultant agree that work will begin on the tasks described m Exhibit A immediately upon execution of this Agreement The parties agree that the work described m Exhibit A is to be completed as provided for m the work schedule attached hereto as Exhibit B, provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $40,000 Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference The Consultant shall submit regular billing statements detailmg work performed and amount charged on each task or portion thereof The descriptions shall conform to and fall withm the categories set out in the Scope of Work and/or Fee Schedule Upon receipt of a conforming billmg statement, the City shall promptly process payment PROVIDED, HOWEVER, the Crty reserves the right to priorihze scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein The Consultant's labor rates and billing fees shall be as delineated in Exhibit C Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibrt C If a billmg statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance Such withholding does not relieve Consultant of its obligations under this Agreement Bremerton/Confluence Engineering Water Quality and Water System Plan Issues Page 1 of 13 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performmg independent functions and responsibilities withm its field of expertise Consultant and its personnel are independent Consultants and not employees of the City Consultant and its personnel have no authority to bmd the City or to control the City's employees and other Consultants None of the benefits provided by the City to its employees, mcludmg, but not limited to, compensation, msurance, and unemployment msurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants dunng the performance of this Agreement The City may, dunng the term of this Agreement, engage other independent Consultants to perform the same or similar work As an independent Consultant, Consultant is responsible for its own management The City's admimstration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel As an mdependent Consultant, Consultant is responsible for payment of all taxes and licensmg fees necessary to perform rts obligations under this Agreement These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensmg, and Crty busmess licensmg If any taxes or fees due the Crty have been declared delmquent, the City may withhold the delmquent amount, plus any additional charges arismg from the delmquency, from any payments due Consultant V. Indemnification: Consultant shall defend, mdemmfy and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, m�uries, damages, losses or suits, including all legal costs and attorney fees, arismg out of or m connection with the performance of this Agreement, except for that portion of the m�unes and damages caused by the City's sole negligence The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of mdemmfication , Should a court of competent �unsdiction determine that this Agreement is sub�ect to RCW 4 24 115, then, in the event of liability for damages arismg out of bodily inJury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER The provisions of this section shall survive the expiration or termmation of this Agreement Bremerton/Confluence Engmeering Water Quality and Water System Plan Issues Page 2 of 13 VI. Insurance: The Consultant shall procure and mamtam for the duration of the Agreement, insurance against claims for m�uries to persons or damage to property which may arise from or m connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants Before begimm�g work on the pro�ect described m this Agreement, the Consultant shall provide a Certificate of Insurance evidencing 1. Automobile Liabilitv msurance with limits no less than $1,000,000 combmed single limit per accident for bodily m�ury and property damage, and 2. Commercial General Liabilitv msurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal in�ury, bodily in�ury and property damage Coverage shall include but not be limited to blanket contractual, products/completed operations/broad form property damage, explosion, collapse and underground (XCU) if applicable, and employer's liabilrty, and 3. Professional Liabilitv insurance with limits no less than $1,000,000 limit per occurrence/claim Any payment of deductible or self msured retention shall be the sole responsibility of the Consultant All required policies shall be provided on an "occurrence" basis except professional liabilrty insurance (if required), which may be provided on a"claims-made" basis The Crty shall be named as an addrtional msured on the Commercial General Liabilrty msurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional msured shall be attached to the Certificate of Insurance The City reserves the right to receive a certified copy of all the required msurance policies and endorsements The City further reserves the right to re�ect any unacceptable policies and/or endorsements The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each msured agamst whom claim is made or suit is brought, except with respects to the limits of the insurer's liability The Consultant's msurance shall be primary insurance as respects the City and it shall be an affirmative obligation upon Consultant to advise the City's Risk Manager by fax at (360) 473- 5161, or by certified mail, return receipt requested to City of Bremerton, attn Risk Management, 345 6 Street, Suite 600, Bremerton, WA 98337 withm two days of the cancellation, suspension or substantive change of any insurance policy set out herem, and failure to do so shall be construed to be a breach of this Agreement The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the msurance policy with all endorsements as evidence of coverage Bremerton/Confluence Engineering Water Quality and Water System Plan Issues Page 3 of 13 VII. General Conditions: A Reports and Information When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement The reports and documents shall be furnished in the time and form requested Consultant shall mamtam accountmg records m accordance with Generally Accepted Accounting Prmciples (GAAP) to substantiate all billed amounts B Ownership and Use of Records and Documents Ongmal documents, drawings, designs and reports, mcluding those m electromc format, developed under this Agreement are the property of the City All written information submitted by the City to the Consultant m connection wrth the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like mformation relatmg to its own business If such mformation is publicly available or is already m Consultant's possession or known to it, or is nghtfully obtamed by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, madvertent or otherwise All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office m Seattle, Washmgton Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editmg, modifymg and updatmg as necessary until such time as the City is capable of storing such information m the City's offices Duplicate copies of this mformation shall be provided to the City upon its request, and at reasonable cost All documents, includmg all reports, drawmgs, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are mstruments of service with respect to the pro�ect and are the property of the City Any reuse by the City for other than the specific purpose mtended will be at Crty's sole risk C Work Performed at Consultant's Risk Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants m the performance of the work hereunder and shall utilize all protection necessary for that purpose All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to matenals, tools, or other articles used or held for use in connection with the work D Place of Work The Consultant shall perform the work authorized under this Agreement at its offices m Seattle, Washington Meetmgs with the City staff as descnbed in Exhibrt A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties E Entire A�reement This Agreement and rts Exhibrts constrtutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth m the text of this Agreement Bremerton/Confluence Engmeering Water Quality and Water System Plan Issues Page 4 of 13 F Severabilitv Should any part of this Agreement be found void, the balance of the Agreement shall remam m full force and effect G. Modification This Agreement may only be modified by written mstrument signed by both Parties H Written Notices All communications regardmg this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing CrtY Address Consultant Address Water Resources Division Confluence Engmeering Group, LLC 3027 Olympus Dnve 517 NE 92nd Street Bremerton, WA 98310 Seattle, WA 98115 I Waiver Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision Waiver of any nght or power arismg out of this Agreement shall not be deemed waiver of any other right or power J Non-Waiver of Breach The failure of the City to insist upon strict performance of any of the covenants and agreements contamed herein, or to exercise any option herem conferred in one or more mstances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain m full force and effect K Compliance with Laws Consultant shall comply with all applicable Federal, State, and local laws m performing its obligations under this Agreement L Choice of Law and Venue This Agreement shall be mterpreted according to the laws of the State of Washmgton Any�udicial action to resolve disputes arising out of this Agreement shall be brought m Krtsap County Superior Court , _, : � � �`` - „ > > _ M Attornevs' Fees In the event of lrtigation to enforce any of ��i� terms or provisions herein, each party shall pay all its own costs and attorney's fees _, , ,� > N Assi� ent Any assignment of this agreement by the Contractor without the written consent of the City shall be void VIII. Nondiscrimination: Consultant shall not discrimmate in employmerit or services to the public on the basis of race, color, nahonal origm, sex, religion, age, marrtal status, disabilrty, or sexual orientation except for employment actions based on bona fide occupational qualification IX. Termination: This Agreement shall remam m force until completion and acceptance of the services, termmated by written instrument upon mutual consent, or by the City of Bremerton for convenience This Agreement may be immediately termmated for cause by a Party if the Bremerton/Confluence Engmeenng Water Quality and Water System Plan Issues Page5of13 other Party substantially fails to perform through no fault of the termmatmg Party, and the non- performmg Party does not commence correction of the failure of performance wrthm thirty (30) days of the termmatmg Party's sendmg notice to the non-performmg Party Any Notice by Consultant shall include a report showmg the status of all items listed m the Scope of Work current through the termination date If the City receives reimbursement by any federal, state, or other source for work descnbed m Section I herein, and that fundmg is withdrawn, reduced or limited m any way, or the pro�ect is cancelled or substantially reduced after the execution date of this Agreement and pnor to the completion of the work, the City may summarily termmate this Agreement A Excusable Dela� The right of Consultant to proceed shall not be termmated nor shall Consultant be charged with liquidated damages for any delays m the completion of the work due to 1) any acts of the federal government m controllmg, restrictmg, or requisitiomng materials, equipment, tools, or labor by reason of war, national defense, or other national emergency, 2) any acts of the City, its consultants, or other public agencies causmg such delay, and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, mcluding, but not restncted to, acts of God, fires, floods, stnkes, or weather of unusual seventy PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days m writing of the cause of the delay If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, m writmg, extend the time for completing the work for a period of time commensurate with the penod of excusable delay B Ri h�pon Termination In the event of terminahon, the C�ty shall pay for all services performed by the Consultant to the effective date of termination, as described on a final mvoice submitted to the City After termmation, the City may take possession of all records and data withm the Consultant's possession pertaming to this pro�ect which may be used by the City without restriction Any such use not related to the pro�ect which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant CIT�.F;B MERT �SU NT ' `�� By Y�A� L+ErV T By ' ,r.� rts /� a � rts �r� Date 6—�'I'—� // Date s' �/ � Appro s to form � erton ity Attorney R\LEGAL\Contracts\FORMS\Professional Sernces Agreement Form (2003) doc . ��,i �l� /i� _ � Bremerton/Confluence Engmeenng Water Quality and Water System Plan Issues Page 6 of 13 PROFESSIONAL SERVICES AGREEMENT FOR WATER QUALITY SERVICES ATTACHMENT A- SCOPE OF WORK BACKGROUND There are four water quality and regulatory compliance topics for which the City of Bremerton would like consulting support These include 1 Disinfection Byproduct (DBP) Formation and Control Plan 2 Groundwater Rule (GWR) Compliance Assessment 3 Discolored Water Investigation 4 Water System Plan (WSP) Support Services 5. Other technical services only to be performed on written request by the City It is anticipated that services for items 1 and 2 will be provided in 2011, and services for items 3 and 4 will be provided in 2012 One overarching Pro�ect, entitled Water Quality Services, will be administered TASK 1- PROJECT MANAGEMENT Ob�ect�ves Organize and manage the pro�ect to fulfill the pro�ect ob�ectives described in this Scope of Work Confiuence Activities 1 Manage budget and schedule 2 Provide quality control reviews 3 Hold progress calls with City Pro�ect Manager as needed and at key milestones 4 Prepare monthly progress reports and invo�ces Gty Responsibilities 1 Participate in progress calls 2 Payment of submitted invoices within 30 days Deliverables 1 Minutes from progress calls summarizing key action items 2 Monthly progress report and invoice Assumpt�ons 1 Pro�ect wili begin in Q3 2011 and be completed by Q2 2013 2 2011 rate schedule wili be used for the pro�ect duration 7 Bremerton Water Quality Serv�ces Scope of Work TASK 2— DISINFECTION BYPRODUCT FORMATION AND CON7ROL PLAN Ob�ective Characterize DBP formation and causative factors within the City's distribution system and prepare a DBP Control and Response Plan This task will build upon the findings and recommendations from the Phase 1 DBP Evaluation completed in 2008 1.1 Data Request and Review 1 Prepare data and information request Data/information types expected to include a IDSE DBP Data and Stage 2 DBP Rule Monitonng Plan with sites shown on system map b Additional Stage 1 DBP Rule routine compliance monitoring results since January 2008, including associated Cl2, temperature, pH, and HPC data where available c Laboratory QC data d Additional data related to special studies, split samples, reservoir chlorine boostmg, etc e Chlorine, HPC, etc from coliform sample stations f Capacities and turndown for pump stations that feed the E490 zone g Reservoir 15/18 configuration (capacity, geometry, inlet/outlet configuration, etc ) and operations data Anticipated data to include SCADA data suitable to perform a temporal water balance in E490 zone (e g, inflow/outflow rates for zone, mflow/outflow rates for Res 15/18, Res 15/18 water levels), operational/contro) philosophy for Res 15/18 (e g, level setpoints, pump station control) 2 Organize and review data received 1.2 Assess DBP Formation Causative Factors 1 Conduct Reservoir 15/18 water age and mixing analysis a Using in-house spreadsheet models, calculate turnover and average water age under current typical winter and summertime demand and reservoir operating modes b Develop a monitoring plan (and associated laboratory analytical cost estimate), which will be implemented by the City during summer 2011 The monitoring plan will be used to identify spatial water quality conditions within the reservoir during fill/drain cycles, and to assess water quality changes (inc DBPs), mixing effectiveness, and stratification This reservoir monitoring plan will be integrated with a system monitoring plan Both plans will be implemented concurrently by the City, as described below under Item 2 c Discuss reservoir and system monitoring plan with City via conference call (less than one hour) d Evaluate reservoir monitoring data to assess mixing and water quality conditions within the reservoir e Develop recommendations for improving mixing and/or turnover/water age conditions within Res 15/18 to reduce DBP formation and disinfectant loss f Develop hydraulic modeling scenarios to be implemented by City, if needed, to assess feasibility of alternate operating conditions 2 Develop DBP and water quality profile across system 8 Bremerton Water qual�ty Servrces Scope of Work a Develop a monitoring plan (and associated laboratory cost estimate) to allow for an evaluation of DBP, disinfectant residual, temperature, UV absorbance, conductivity, etc from locations throughout the system These would include Reservo�r 4, the E490 zone entry-point, and other system locations as desired by the City and/or based on the initial data review City to implement this monitoring pian in summer 2010, concurrent with the reservoir monitoring plan noted above b Obtain water age and blend fraction hydraulic model output at the monitored locations under relevant demand/operating scenario from the City's hydraulic model to assist with interpretation of monitoring data City to perform extended-period hydraulic model simulation based on source operation and system demands consistent with the actual monitoring time period c Evaluate monitoring data and model output to interpret water quality trends and water movement/blending patterns 3 Conduct bench-scale DBP formation tests a Prepare a bench-scale testing protocol (and associated laboratory cost estimate) to conduct simulated distribution system (SDS) testing on Union River source water The tests would be used to evaluate DBP formation and related water quality trends (UV absorbance at 272 nm, disinfectant decay) under varying conditions Four treatment scenarios are anticipated as summarized below, with DBP and water quality analyses anticipated at two discrete times per scenario Thus, there would be 4 x 2= 8 paired �ar samples for testing 1 Current chlorine dose conditions i Current pH endpoint at the CCF (control sample) ii Alternate, lower pH 2 Lower initial chlorine dose with booster chlorination after a period of time i Current pH endpoint at the CCF ii Alternate (lower) pH) b Perform SDS testing, including chlorine dosing and pH ad�ustment, time-series pour-offs for DBPs, chlorine boosting, and water quality analyses Confluence to coordinate the shipping of DBP samples to the laboratory designated by City, with laboratory billing going directly to City 4 Compile Task 2 2 results for analysis in Task 2 3 1.3 Summarize Findings 1 Prepare draft Technical Memorandum (less than 10 pages) that summarizes the approaches used, data obtained, and key findings of Tasks 2 1 and 2 2 2 Prepare for and conduct conference call with the City (approx one hour) to discuss findings and obtain comments Findings will be used to develop DBP Control and Response Plan in Task 2 4 3 Finalize Technical Memorandum based on City comments E Bremerton Water Quality Services Scope of Work 1.4 Prepare DBP Control and Response Plan 1 Work with City to select up to three key DBP "trigger levels" for response, such as a Exceeds 60/45 Stage 1 DBP Rule reduced monitoring criteria, or Stage 2 Operational Evaluation criteria b Approaching MCL c >_ MCL 2 Use Findings from Task 2 3 plus Stage 1 and 2 DBP Rule requirements to develop a draft DBP Control and Response Action Plan The Plan will summarize trigger level-specific response actions the City should consider implementing, including monitoring, operations, maintenance, treatment ad�ustments, modified source operating strategies, other) 3 Prepare Final DBP Control and Response Action Plan based on City comments City Responsibilities 1 Compile and provide requested data in a timely manner, using electronic format where possible 2 Help interpret data as needed 3 Participate in conference cails as requested, e g, to discuss monitoring plans, draft technical memorandum, draft DBP control and response plan, etc 4 Rev�ew draft Monitoring Plans (Reservoir Monitoring and System Profile), provide unified set of comments, and provide input on system locations to be included in the latter 5 Implement Reservoir Monitoring Plan and System Profile Monitoring Plan 6 Conduct hydraulic modeling, if needed, to assess the feasibility of alternate reservoir operating conditions or alternate source operating strategies 7 Conduct extended-period hydraulic model simulation and provide data/graphs of water age and blend ratios for monitoring sites 8 Provide input on bench-test conditions, i e, initial and booster chlorine levels, target pH levels, time to booster chlorinate, etc 9 Collect and ship at least 4 gallons of Union River water to Confluence for SDS bench-testing 10 Review draft Technical Memorandum (Task 2 3) and provide unified set of comments 11 Assist with development of DBP Response Tr�gger Levels 12 Review draft DBP Control and Response Plan and provide unified set of comments 13 Contract directly with analytical lab, deliver samples, and pay external laboratory fees Deliverables 1 Data request 2 Reservoir hydraulic modeling scenarios 3 Reservoir and System Profile Monitoring Plans 4 SDS bench-test protocol 5 Draft and Final Technical Memorandum to summarize findings of Tasks 2 1 and 2 2 6 Draft and Final DBP Control and Response Plan ' 7 Conference call agenda and minutes summarizing key decisions and action items Assumptions 1 City will pay for all external laboratory fees (fees not included in Confluence fee table) 2 City will conduct all field sampling and analyses, with the exception of the SDS bench-tests 3 No on-site meetings to discuss results are needed 10 eremerton Water Qual�ty Serv�ces Scope of Work GROUNDWATER RULE COMPLIANCE ASSESSMENT Ob�ective Review and comment on the City's Compliance Monitoring Strategy for the Anderson Creek Wellfield Confluence Activities 1 Review the City's CT calculations, monitoring locations, and monitoring approaches for ensuring continuous 4-log virus inactivation at the Anderson Creek Wellfield 2 Provide one set of cohesive comments associated with review 3 Conduct conference call with City to discuss comments (approx one hour in duration) City Responsibilities 1 Prepare Compliance Monitoring Strategy for the Anderson Creek Wells for Confluence review 2 Review Confluence's comments 3 Participate in call to discuss comments 4 Incorporate comments and revise document Deliverables 1 One set of comments on City's Compliance Monitoring Strategy for Anderson Creek Welifield 2 Conference call to discuss Confluence comments Assumptions 1 No site visits will be needed to conduct review of City's analysis DISCOLORED WATER INVESTIGATION Objectrve To identify potential causes and associated remediation strategies associated with discolored water events Confluence Act�vities 1 Prepare data request and review available data (water quality, customer complaints, flow velocities, etc) 2 Develop monitoring plan for bulk water and sediment samples to be implemented by City Monitoring program wiil capture water quality conditions associated with a Routine operations b Pigging operations One day of field support will be provided to assist with collection of bulk water and sediment samples using hydrant net assemblies or other sample collection technique to assess mass of material released and general water quality characteristics (iron, manganese, color, pH, HPCs, other trace inorganics to be measured by external laboratory) 11 Bremerton Water Quality Services Scope of Work 3 Assess inorganics accumulation and release risk factors and identify potential mitigation strategies 4 Prepare brief draft Technical Memorandum (5-10 pages) summarizing findings 5 Prepare for and conduct conference call to discuss findings and obtain comments 6 Prepare Final Technical Memorandum City Responsibdities 1 Provide available requested data and information 2 Conduct monitoring according to monitoring plan 3 Conduct hydraulic modeling, if necessary, to determine flow velocities as a function of demand 4 Coordinate with external laboratory and pay laboratory fees 5 Provide one set of comments on draft Technical Memorandum 6 Participate in conference cail Deliverables 1 Data request 2 Monitoring plan 3 Phone meeting agenda and minutes 4 Draft and Final Technical Memoranda Assumptions 1 One day of field support provided 2 City to pay for all external laboratory fees Fees not included in Confluence budget WATER SYSTEM PLAN SUPPORT SERVICES Objective Provide as-needed assistance for updating the City's Water System Plan Confluence Actwities 1 Review and comment on Water Quality section 2 Conduct QC review of two additional draft Plan sections as requested City Responsibilities 1 Prepare updated chapters of Water System Plan for Confluence review Delwerables , 1 Provide written comments (using Track Changes) for selected chapters 12 Bremerton Water Quality Serv�ces Scope of Work EXHIBIT B — SCHEDULE This pro�ect will begin once the city signs the agreement after June 1, 2011 and the pro�ect will be completed by June 30, 2013 EXHIBIT C - BUDGET 13 Bremerton Water Qual�ty Services Scope of Work 'Includes tra�el costs use of Confluence eqwpment and reagenis etc Does not include e�emal laboratoryfees