Loading...
HomeMy WebLinkAbout1 - Original Submission_ Exec Correspondence Routing Memo_MDWM________________________________________________________________________________ Public Works & Utilities │ 345 6th Street, Suite 100, Bremerton, WA 98337 * Phone (360) 473-5270 * Fax (360) 473-5398 Working for and with our residents to establish Bremerton as Puget Sound’s most beautiful and livable waterfront city! Executive Correspondence Routing Memo (For electronic routing only) Date: June 11, 2021 Description: Execute Contract Agreement with Pape & Sons Construction, Inc. in the amount of $2,018,002.35 for the Marine Drive Water Main Replacement project. This project will replace approximately 5,800 linear feet of water main along Marine Drive from 2155 Marine Drive to the northern limits, and at the intersection of Rocky Point Road and Marine Drive. Fiscal Impact: This project is included in the 2021 Water Capital Budget. Action Requested: Review and signature and e-mail back to Noreen Bolo. This contract is being routed electronically only. Originator: Robert Endsley, Project Manager Approval / Recommendation: Managing Engineer: Recommended Initials/date _______________ City Engineer: Recommended Initials/date _______________ Public Works Director: Recommended Initials/date _______________ Municode: 6/14/2021 Study Session: 6/23/2021, City Council: 7/7/2021 Contract Administrator: LASERFICHE Finance: LASERFICHE City Attorney: LASERFICHE/DOCUSIGN Pape & Sons Construction, Inc. LASERFICHE/DOCUSIGN Mayor: LASERFICHE/DOCUSIGN City Clerk: LASERFICHE/DOCUSIGN Please advise Noreen Bolo/Robert Endsley when executed. Thank you! 6/14/21 Ned Lever Digitally signed by Ned LeverDN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned LeverDate: 2021.06.14 12:36:13-07'00' DocuSign Envelope ID: B89BF1F5-26D2-43D1-9B65-F807B281C997