Loading...
HomeMy WebLinkAbout1 - Original Submission_ 20210707_4555_Approved AB_PapeAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: June 23, 2021 Agreement with Pape & Sons Construction, COUNCIL MEETING Date: July 7, 2021 Inc. for Marine Drive Water Main Department: PW&U - Engineering Replacement Presenter: Robert Endsley Phone: (360) 473-2348 SUMMARY: This project will replace approximately 5,800 linear feet of water main along Marine Drive from 2155 Marine Drive to the northern limits, and at the intersection of Rocky Point Road and Marine Drive. The existing water main is cast iron installed in the 1940s and is undersized for meeting fire flow requirements. Fire hydrants, blow -offs, services, and other water system appurtenances will also be replaced with the project. Additionally, the existing roadway will be overlaid with asphalt. Three (3) bids were received. Bids were opened on June 10, 2021. Pape &Sons Construction, Inc. was the lowest responsible, responsive bidder in the amount of $2,018,002.35 (which includes sales tax). ATTACHMENTS: 1. Agreement 2. Location Map 3. Bid Tabulation 4. Fiscal Summary FISCAL IMPACTS (Include Budgeted Amount): The overall project cost (including design, construction management, construction and other project costs) is estimated at $2.45 million and is funded within the 2021 Water Capital budget. See the attached Fiscal Summary. STUDY SESSION AGENDA: x Limited Presentation Full Presentation STUDY SESSION ACTION: Consent Agenda x General Business Public Hearing RECOMMENDED MOTION: Move to award the construction contract for Marine Drive Water Main Replacement to Pape &Sons Construction, Inc in the amount of $2,018,002.35 (including sales tax) and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. Cdilil T[3i>T L 7 1 Approve Deny Table Continue No Action Form Updated 01/02/2018 DocuSign Envelope ID: B89BF1F5-26D2-43D1-9B65-F807B281C997