Loading...
HomeMy WebLinkAbout6111DocuSign Envelope ID: F274CAB9-0FC2-4C25-ADB4-47AC1CA61716 Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 DocuSign Envelope ID: F274CAB9-0FC2-4C25-ADB4-47AC1CA61716 August 19, 2020 Kitsap Lake Elementary Safe Routes to School 5 Parametrix, Inc. March 22, 2018 $465,160.15 City of Bremerton Greg Wheeler, Mayor Parametrix, Inc. 60 Washington Avenue, Suite 390 Bremerton, WA 98337 SRTS-6590(002) SRTS-6590(002) John Perlic, Senior Vice President Additional work to support Construction Management of the Kitsap Lake Elementary Safe Routes to Schools Project. No Change. Project involves construction of American with Disabilities Act (ADA) Compliant sidewalk and other improvements to encourage students to walk or bicycle to Kitsap Lake Elementary School. 360-377-0014 Additional $24,991.29. LA 9223 December 31, 2021 9/9/2020 City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 1 July 2020 Supplement 5 – Engineering Services During Construction EXHIBIT A – SCOPE OF WORK City of Bremerton Kitsap Lake Elementary Safe Routes to School Supplement 5 – Engineering Services During Construction INTRODUCTION This document presents a proposed scope of work (SOW) for providing additional civil engineering services during construction as requested by the City. A summary of the budget remaining as of Friday, July 10 is a s follows: Task 4 Subtask 3 - $539.38 labor and $109.55 fixed fee remaining. Management Reserve - $1,000 remaining Total budget remaining is $1,648.93. A proposed schedule is included with this scope and our proposed budget is attached. Main elements of the work are detailed below. TASK 04 – CONSTRUCTION SUPPORT Subtask 01 – Construction Support Objective Provide engineering support during bidding and construction phases of the project. Activities The following activities are associated with this task: • Attend construction meetings as requested. • Review Contractor’s submittals for compliance with the specifications. • Respond to applicable Contractor’s Requests for Information (RFIs) and requests for change orders and make recommendations to the City. • Assist with construction management at the request of the City. • Attend site walks at the request of the City. • Revise design documents in response to changes encountered during construction. • Provide an Engineer III for construction observation on a fill-in basis. DocuSign Envelope ID: F274CAB9-0FC2-4C25-ADB4-47AC1CA61716 SCOPE OF WORK (continued) City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 2 July 2020 Supplement 5 – Engineering Services During Construction • PH consulting will provide similar support services. Deliverables The following deliverables are associated with this task: • Hard copies and electronic copies of responses to material submittals, cut sheets, shop drawing review, and revised design documents Assumptions The following assumptions apply to this task: • Hours for support are: Project Manager - 24 hours, Engineer III – 110 hours. • PH consulting will provide up to 16 total hours of support. DocuSign Envelope ID: F274CAB9-0FC2-4C25-ADB4-47AC1CA61716 City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School July 2020 Supplement 5 – Engineering Services During Construction Exhibit B – Schedule Work Element Completed By Notice to Proceed August 19, 2020 Engineering Services During Bidding and Construction December 31, 2020 DocuSign Envelope ID: F274CAB9-0FC2-4C25-ADB4-47AC1CA61716 Project: Kitsap Lake Elementary Safe Routes to School SUPPLEMENT 5 Direct Salary Cost (DSC): Classification Hours =Rate =Cost Sr. Consultant (Project Manager)24 X $74.82 $1,795.68 Engineer III 110 X $44.22 $4,864.53 Sr. Project Coordinator 0 X $36.88 $0.00 Project Accountant 0 X $39.75 $0.00 Sr. Contracts Administrator 0 X $45.30 $0.00 Sr. Publications Specialist 0 X $35.56 $0.00 X $0.00 X $0.00 X $0.00 Total DSC =$6,660.21 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 1.7916 x $$6,660.21 $11,932.43 Fixed Fee (FF): FF Rate x DSC of 21.00% x $$6,660.21 $1,398.64 Reimbursables: Mileage 0 miles x $0.58 $0.00 Survey Equipment 0 days x $155.00 $0.00 Subconsultants: PH Consulting $2,378.20 Management Reserve: Management Reserve $5,000.00 SubTotal $24,991.29 Grand Total $24,991.29 Date: WSDOT Form 140-089 EF Exhibit D Page 1 of 1 Exhibit D Prime Consultant Cost Computations Agreement Number: DocuSign Envelope ID: F274CAB9-0FC2-4C25-ADB4-47AC1CA61716 ________________________________________________________________________________ Public Works & Utilities │ 100 Oyster Bay Ave. N., Bremerton, WA 98312 * Phone (360) 473-5920 * Fax (360) 473-2330 Working for and with our residents to establish Bremerton as Puget Sound’s most beautiful and livable waterfront city! Executive Correspondence Routing Memo Date: 05/11/2020 Description: Supplemental Agreement # 4 with Parametrix, Inc. for the Kitsap Lake Safe Routes to Schools (SRTS) Project. This supplement’s purpose is to add unanticipated design scope required to complete the construction contract, and engineering support during the advertisement and construction phases of the project. Supplement was approved by City Council on May 6, 2020. Fiscal Impact: Supplement increases contract value by $ 36,442.62 to a new Contract maximum of $ 440,198.86. The cost for this work is included in the 2020 budget allocated to the project; no additional funding is needed. Action Requested: Review and Signature Originator: Andrea Archer-Parsons, Project Manager Approval / Recommendation: Managing Engineer: Recommended Initials/date _______ City Engineer: Recommended Initials/date _______ Public Works Director: Recommended Initials/date _______ Contracts Administrator: LASERFICHE / DOCUSIGN City Attorney: LASERFICHE / DOCUSIGN Mayor: LASERFICHE / DOCUSIGN City Clerk: LASERFICHE / DOCUSIGN THANK YOU!! Shane Weber Digitally signed by Shane Weber DN: C=US, E=shane.weber@ci.bremerton.wa.us, O=City of Bremerton, OU=Bremerton Engineering, CN=Shane Weber Reason: I have reviewed this document Date: 2020.05.12 10:43:58-07'00' Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Date: 2020.05.12 13:22:11-07'00' DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 5/18/2020 5/19/2020 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 DOT Form 140-063 Revised 09/2005 Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II for completion of the work to read: III If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate By: By: Consultant Signature Approving Authority Signature Date Darby Watson, Vice President DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 5/19/2020 City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 1 March 2020 EXHIBIT A - SCOPE OF WORK City of Bremerton Kitsap Lake Elementary Safe Routes to School Supplement 4 – Additional Survey, Final Design, and Engineering Services During Construction INTRODUCTION This document presents a request for additional budget for survey and design services performed for the project. It also describes the proposed scope of work (SOW) for providing civil engineering services during bidding and construction. A proposed schedule is included with this scope and our proposed budget is attached. Main elements of the work consist of:  Complete Bid Set plans, specifications, and estimate (PS&E) documents for March 13, 2020 project bidding.  Provide ongoing project management through 2020.  Provide engineering services during bidding and construction as requested by the City. BUDGET SUMMARY AS OF 03/06/2020 Total budget expended to date is summarized on Table 1 below. Table 1. Budget Summary Task Subtask Subtask Name Original Budget Budget Expended as of 3/6/20 Balance Original 01 01 PM $9,953.24 $11,849.93 ($1,900.63) 02 Alts Analysis $8,503.52 $6,404.92 $2,094.80 04 Prelim Design $23,666.26 $24,836.37 ($1,175.89) 05 Final Design $93,045.08 $109,581.05 ($16,705.29) 06 Survey $33,291.33 $54,630.19 ($21,258.84) 07 Subconsultants $87,170.49 $81,131.34 $6,039.15 EXP Expenses $1,459.92 $2,496.62 ($1,036.66) FF PMX PMX Fixed Fee $12,293.73 $12,293.72 $0.00 02 PH Fixed Fee $8,915.20 $2,403.71 $6,511.49 03 SW Fixed Fee $1,563.80 $0.00 $1,563.80 04 CRC Fixed Fee $135.52 $0.00 $135.52 Supplement 1 01 05 Engineering Design $3,238.51 $3,627.52 ($94.12) 07 Subconsultants $10,680.60 $10,286.33 $394.27 FF PMX PMX Fixed Fee $236.34 $236.34 $0.00 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 SCOPE OF WORK (continued) City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 2 March 2020 Task Subtask Subtask Name Original Budget Budget Expended as of 3/6/20 Balance FF1 02 PH Fixed Fee $1,627.52 $1,779.68 ($152.16) Supplement 2 02 01 Universal Field Services $94,603.00 $91,931.73 $2,671.27 FF2 01 UFS Fixed Fee $13,362.00 $12,064.95 $1,297.05 Totals $403,746.06 $425,554.40 ($21,616.24) JUSTIFICATION FOR ADDITIONAL BUDGET REQUEST Additional budget in the amount of $21,616.24 is requested for providing additional design effort and right-of- way (ROW) exhibits as required by the project. As shown below, we provided additional roadway plans, intersection grading plans, driveway profiles, retaining wall plans, and ROW exhibits for a total of 18 additional plans sheets and 28 additional ROW exhibits. Summary of Parametrix Plans and ROW Exhibits Provided for the Project ITEM AS ORIGINALLY SCOPED DELIVERED PLAN SHEETS Cover/Sheet Index/Notes/Sheet Key/ Survey Control 5 5 Summary of Quantities 0 1 Typical Roadway Sections 1 3 Site Prep, Demolition 5 7 TESC Details 1 0 Roadway Plan and Profile 8 13 Roadway Details 3 2 Raised Crosswalk Details 1 1 Intersection Grading Plans 0 3 Driveway Profiles 1 7 Curb Ramp Grading Plans 7 4 Retaining Wall Plans 2 5 Retaining Wall Details 1 1 Temporary Traffic Control Plans 2 3 TOTAL PLAN SHEETS: 37 55 ADDITIONAL PLAN SHEETS: 55-37 = 18 ROW PLANS ROW Plans 6 5 ROW Removal Plans (fences, trees, etc.) 0 4 Permanent Easement Exhibits 4 13 Temporary Construction Easement (TCE) Exhibits 0 16 TOTAL ROW PLANS 10 38 ADDITIONAL ROW PLANS: 38-10 = 28 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 SCOPE OF WORK (continued) City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 3 March 2020 NEW WORK TASK 01 – ENGINEERING DESIGN Subtask 01 – Project Management and Meetings Objective Monitor and manage scope, schedule, and budget; and meet with the City of Bremerton (City) staff as needed to review project status. Activities The following activities will be performed:  Manage and direct the Parametrix project technical team.  Provide routine project management and communications (scope, schedule, budget, invoicing, etc.).  Prepare detailed monthly progress reports and progress billings, and submit to City for approval and payment. Deliverables The following deliverables are associated with this task:  Routine correspondence including monthly progress reports and invoices. Assumptions The following assumptions apply to this task:  Project duration will be 9 months (April 2020 through December 2020). Subtask 05 – Final Design (60%, 90%, and Bid Set PS&E) Objective Complete final Bid Set plans, specifications, and cost estimates (PS&E). Activities: The following activities will be performed:  Prepare final sealed PS&E. Deliverables: The following deliverables are associated with this task:  Sealed plans (55 sheets), contract documents, and estimate DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 SCOPE OF WORK (continued) City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 4 March 2020 Assumptions The following assumptions apply to this task:  Final PS&E was completed and advertised for bidding on March 13, 2020. Parametrix staff expended the following effort on this task the week of March 9, 2020: project manager - 4 hours; publications specialist - 4 hours. Subtask 07 – Subconsultants Objective PH Consulting will prepare final Bid Set PS&E for their portions of the work and provide miscellaneous support during bidding and construction. A budget for PH Consulting is attached. Activities: The following activities will be performed:  Prepare final sealed PS&E.  Provide miscellaneous support during construction. Deliverables: The following deliverables are associated with this task:  Sealed plans (16 sheets), contract documents, and estimate  Construction documentations as requested Assumptions: The following assumptions apply to this task:  Final PS&E was completed and advertised for bidding on March 13, 2020. TASK 03 – BIDDING AND CONSTRUCTION SUPPORT (NEW TASK) Subtask 01 – Bidding and Construction Support Objective Provide engineering support during the bidding and construction phase of the project. Activities The following activities are associated with this task:  Attend construction meetings as requested.  Review Contractor’s submittals for compliance with the specifications. DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 SCOPE OF WORK (continued) City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 5 March 2020  Respond to applicable Contractor’s Requests for Information (RFIs) and requests for change orders and make recommendations to the City.  Attend site walks at the request of the City.  Revise design documents in response to changes encountered during construction  Provide up to 40 hours construction observation on a fill in basis. Deliverables The following deliverables are associated with this task:  Hard copies and electronic copies of responses to material submittals, cut sheets, and shop drawing review, revised design documents. Assumptions The following assumptions apply to this task:  Hours for support are: Project Manager - 8 hours, Engineer III - 52 hours. DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 SCOPE OF WORK (continued) City of Bremerton 233-1896-148 Kitsap Lake Elementary Safe Routes to School 6 March 2020 Exhibit B - Schedule Work Element Completed By Notice to Proceed April 1, 2020 Engineering Services During Bidding and Construction December 31, 2020 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 Project: Kitsap Lake Elementary Safe Routes to School SUPPLEMENT 4 Direct Salary Cost (DSC): Classification Hours =Rate =Cost Sr. Consultant (Project Manager)12 X $74.82 $897.84 Engineer III 48 X $44.22 $2,122.70 Sr. Project Coordinator 5 X $36.88 $184.40 Project Accountant 5 X $39.75 $198.75 Sr. Contracts Administrator 1 X $45.30 $45.30 Sr. Publications Specialist 4 X $35.56 $142.24 X $0.00 X $0.00 X $0.00 Total DSC =$3,591.23 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 1.7952 x $$3,591.23 $6,446.98 Fixed Fee (FF): FF Rate x DSC of 21.00% x $$3,591.23 $754.16 Reimbursables: Mileage 0 miles x $0.54 $0.00 Survey Equipment 0 days x $140.00 $0.00 Subconsultants: PH Consulting $3,014.18 SubTotal $13,806.56 Additional Surveying and Final Design Services under existing contract $21,616.24 Grand Total $35,422.80 Date: WSDOT Form 140-089 EF Exhibit D Page 1 of 1 Exhibit D Prime Consultant Cost Computations Agreement Number: DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 PH Consulting LLC Project: Kitsap Lake Elementary Safe Routes to School Supplement 2 PE Direct Salary Cost (DSC): Classification Man Hours =Rate =Cost Senior Project Manager 2 X $71.40 $142.80 Project Manager 8 $60.00 $480.00 Construction Engineer 0 X $60.00 $0.00 CAD Designer II 0 X $37.50 $0.00 Office Admin 0 X $20.00 $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 Total DSC =$622.80 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 110% x $$622.80 $685.08 Fixed Fee (FF): FF Rate x DSC of 32% x $$622.80 $199.30 Reimbursables: Parking/Tolls $0.00 Reproduction Mileage $0.00 Subconsultants: Grand Total $1,507.18 Date: WSDOT Form 140-089 EF Exhibit E Page 1 of 1 Exhibit E Subconsultant Cost Computations Agreement Number: 3/16/20 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 Exhibit E Consultant Fee Determination Supplement #2 - Fee Summary Kitsap Lake SRTS PH Consulting Staff Category Hours Rate Cost Senior Project Manager 2 $ 71.40 $ 142.80 Project Manager 8 $ 60.00 $ 480.00 Construction Engineer 0 $ 60.00 $ - CAD Designer II 0 $ 37.50 $ - Office Administrator 0 $ 20.00 $ - Total Hours 10 $ 622.80 Direct Labor Cost $ 622.80 Overhead Rate @ 110% of Direct Labor $ 685.08 Fee @ 32% of Direct Labor $ 199.30 Direct Salary Cost $ 1,507.18 Direct Expenses Unit Cost Reproduction Costs Full Sized Copies (Bond)1 -$ Full Sized (PVC)1 -$ Reprographics 1 Parking/Tolls 1 -$ Mileage $0.575/Mi -$ Traffic Count Vendor $ - Sub-Total Direct Expenses $ - Subcontracts $ - Sub-Total Subcontracts $ - Total Fee $ 1,507.18 Consultant Fee Determination 1 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 Exhibit E Consultant Fee Determination - Supplement #2 Task Detail Kitsap Lake SRTS Task No. Task Description Senior Project Manager Project Manager Construction Engineer CAD Designer II Office Administrator PH Total Rates $ 71.40 $ 60.00 $ 60.00 $ 37.50 $ 20.00 $ 172.79 $ 145.20 $ 145.20 $ 90.75 $ 48.40 1 Project Management 1.1 Schedule Development 0 1.2 Scope & Budget Management 0 1.3 Schedule Management 0 1.4 Progress Reporting & Invoicing 0 0 0 1.5 Subconsultant Management 0 1.6 Project Team Meetings 0 Task 1 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 4 Contract Drawings (60%,90%,100%)0 4.1 General - Cover, Index, General Notes 0 4.2 Signing & Channelization Improvements 0 4.3 Crossing Beacon / School Zone Flasher / Street Lighting Improvements 0 4.4 Submittals (60%,90%, 100%)0 4.4.1 60% Submittal 0 4.4.2 90% Submittal 0 4.4.3 100% Submittal (Revisions) 1 0 1 Task 4 Total 1 0 0 0 0 1 $ 172.79 $ - $ - $ - $ - $ 172.79 5 Specifications 1 8 9 Task 5 Total 1 8 0 0 0 9 $ 172.79 $ 1,161.60 $ - $ - $ - $1,334.39 6 Cost Estimating 0 6.1 Quantities 0 6.2 Opinion of Cost 0 0 Task 6 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 7 Services During Bidding 0 0 0 Task 8 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 8 Construction Engineering Services 8.1 Services: Submittal/RFI Review,0 0 Field/Site Review Support,0 0 Construction Meetings,0 0 As-Built Drawings,0 0 Task 10 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 0 TOTALS 2 8 0 0 0 10 Consultant Fee Determination 1 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 Job Classifications Quality Manager 86.70$ 95.37$ 27.74$ 209.81$ Principal 76.50$ 84.15$ 24.48$ 185.13$ Sr Project Manager 71.40$ 78.54$ 22.85$ 172.79$ Project Manager 66.30$ 72.93$ 21.22$ 160.45$ Senior Traffic Engineer 61.20$ 67.32$ 19.58$ 148.10$ Project Engineer 51.00$ 56.10$ 16.32$ 123.42$ Associate Engineer 38.76$ 42.64$ 12.40$ 93.80$ Assistant Transportation Engineer 35.70$ 39.27$ 11.42$ 86.39$ Senior Construction Manager 59.16$ 65.08$ 18.93$ 143.17$ Construction Manager 45.90$ 50.49$ 14.69$ 111.08$ Construction Inspector 40.80$ 44.88$ 13.06$ 98.74$ Engineering Intern II 25.50$ 28.05$ 8.16$ 61.71$ Engineering Intern I 20.40$ 22.44$ 6.53$ 49.37$ CAD Designer III 45.90$ 50.49$ 14.69$ 111.08$ CAD Designer II 40.80$ 44.88$ 13.06$ 98.74$ CAD Designer I 30.60$ 33.66$ 9.79$ 74.05$ CAD Technician II 30.60$ 33.66$ 9.79$ 74.05$ CAD Technician I 20.40$ 22.44$ 6.53$ 49.37$ Marketing Lead 35.70$ 39.27$ 11.42$ 86.39$ Office Administrator 35.70$ 39.27$ 11.42$ 86.39$ Office Assistant 25.50$ 28.05$ 8.16$ 61.71$ Direct non-salary costs will be billed at actual costs. Direct Mileage will be billed at current approved IRS mileage rate. PH Consulting LLC Summary of Direct Labor Costs Effective Janury 1, 2020-December 31, 2020 Maximum Direct Labor Rate Safe Harbor Overhead 110% Fixed Fee 32% Maximum Billing Rate DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 PH Consulting LLC Project: Kitsap Lake Elementary Safe Routes to School Supplement 3 CM Direct Salary Cost (DSC): Classification Man Hours =Rate =Cost Senior Project Manager 0 X $71.40 $0.00 Project Manager 10 $60.00 $600.00 Construction Engineer 0 X $60.00 $0.00 CAD Designer II 0 X $37.50 $0.00 Office Admin 0 X $20.00 $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 X $0.00 Total DSC =$600.00 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 110% x $$600.00 $660.00 Fixed Fee (FF): FF Rate x DSC of 32% x $$600.00 $192.00 Reimbursables: Parking/Tolls $5.00 Reproduction Mileage $50.00 Subconsultants: Grand Total $1,507.00 Date: WSDOT Form 140-089 EF Exhibit E Page 1 of 1 Exhibit E Subconsultant Cost Computations Agreement Number: 3/16/20 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 Exhibit E Consultant Fee Determination Supplement #3 CM - Fee Summary Kitsap Lake SRTS PH Consulting Staff Category Hours Rate Cost Senior Project Manager 0 $ 71.40 $ - Project Manager 0 $ 60.00 $ - Construction Engineer 10 $ 60.00 $ 600.00 CAD Designer II 0 $ 37.50 $ - Office Administrator 0 $ 20.00 $ - Total Hours 10 $ 600.00 Direct Labor Cost $ 600.00 Overhead Rate @ 110% of Direct Labor $ 660.00 Fee @ 32% of Direct Labor $ 192.00 Direct Salary Cost $ 1,452.00 Direct Expenses Unit Cost Reproduction Costs Full Sized Copies (Bond)1 -$ Full Sized (PVC)1 -$ Reprographics 1 Parking/Tolls 1 5.00$ Mileage $0.575/Mi 50.00$ Traffic Count Vendor $ - Sub-Total Direct Expenses $ 55.00 Subcontracts $ - Sub-Total Subcontracts $ - Total Fee $ 1,507.00 Consultant Fee Determination 1 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8 Exhibit E Consultant Fee Determination - Supplement #3 CM Task Detail Kitsap Lake SRTS Task No. Task Description Senior Project Manager Project Manager Construction Engineer CAD Designer II Office Administrator PH Total Rates $ 71.40 $ 60.00 $ 60.00 $ 37.50 $ 20.00 $ 172.79 $ 145.20 $ 145.20 $ 90.75 $ 48.40 1 Project Management 1.1 Schedule Development 0 1.2 Scope & Budget Management 0 1.3 Schedule Management 0 1.4 Progress Reporting & Invoicing 0 0 0 1.5 Subconsultant Management 0 1.6 Project Team Meetings 0 Task 1 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 4 Contract Drawings (60%,90%,100%)0 4.1 General - Cover, Index, General Notes 0 4.2 Signing & Channelization Improvements 0 4.3 Crossing Beacon / School Zone Flasher / Street Lighting Improvements 0 4.4 Submittals (60%,90%, 100%)0 4.4.1 60% Submittal 0 4.4.2 90% Submittal 0 4.4.3 100% Submittal (Revisions) 0 0 0 Task 4 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 5 Specifications 0 0 0 Task 5 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 6 Cost Estimating 0 6.1 Quantities 0 6.2 Opinion of Cost 0 0 Task 6 Total 0 0 0 0 0 0 $ - $ - $ - $ - $ - $ - 7 Services During Bidding 0 2 2 Task 8 Total 0 0 2 0 0 2 $ - $ - $ 290.40 $ - $ - $ 290.40 8 Construction Engineering Services 8.1 Services: Submittal/RFI Review,8 8 Field/Site Review Support,0 0 Construction Meetings,0 0 As-Built Drawings,0 0 Task 10 Total 0 0 8 0 0 8 $ - $ - $ 1,161.60 $ - $ - $1,161.60 0 TOTALS 0 0 10 0 0 10 Consultant Fee Determination 1 DocuSign Envelope ID: EA33E025-251B-4691-BD9E-07B10A62B3D8