Loading...
HomeMy WebLinkAbout96M2292_P00028_CloseAiportH20_signed AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER (Type or print) 30-105-04EXCEPTION TO SF 30 APPROVED BY OIRM 11-84 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 Prepared by: bensoncd This modification is to close an account for water service at Bremerton Airport as shown on the following pages. 1. CONTRACT ID CODE PAGE OF PAGES J 12 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 16C. DATE SIGNED BY 21-Aug-2020 16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR (Signature of Contracting Officer)(Signature of person authorized to sign) 8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) 9B. DATED (SEE ITEM 11) X N44255-96-M-2292 10B. DATED (SEE ITEM 13) X 9A. AMENDMENT OF SOLICITATION NO. 22-Dec-1997 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended,is not extended. Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. X IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAr 52.243-1 Changes D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) 10A. MOD. OF CONTRACT/ORDER NO. P00028 2. AMENDMENT/MODIFICATION NO.5. PROJECT NO.(If applicable) 6. ISSUED BY 3. EFFECTIVE DATE 06-Aug-2020 CODE NAVFAC NORTHWEST 1101 TAUTOG CIRCLE SILVERDALE WA 98315-1101 N44255 7. ADMINISTERED BY (If other than item 6) 4. REQUISITION/PURCHASE REQ. NO. CODE See Item 6 CITY OF BREMERTON DEPARTMENT PUB WORKS UTILITIES CATHERINE JOHNSON 100 OYSTER BAY AVE N BREMERTON WA 98312-3455 FACILITY CODE04DN7CODE chuck.benson@navy.milEMAIL:360-315-8317TEL: CHARLES D. BENSON / CONTRACTING OFFICER Modification Control Number:bensoncd20808 AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER (Type or print) 30-105-04EXCEPTION TO SF 30 APPROVED BY OIRM 11-84 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 Prepared by: bensoncd This modification is to close an account for water service at Bremerton Airport as shown on the following pages. 1. CONTRACT ID CODE PAGE OF PAGES J 12 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) 16C. DATE SIGNED BY 16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR (Signature of Contracting Officer)(Signature of person authorized to sign) 8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) 9B. DATED (SEE ITEM 11) X N44255-96-M-2292 10B. DATED (SEE ITEM 13) X 9A. AMENDMENT OF SOLICITATION NO. 22-Dec-1997 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended,is not extended. Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. X IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAr 52.243-1 Changes D. OTHER (Specify type of modification and authority) E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) 10A. MOD. OF CONTRACT/ORDER NO. 2. AMENDMENT/MODIFICATION NO.5. PROJECT NO.(If applicable) 6. ISSUED BY 3. EFFECTIVE DATE 06-Aug-2020 CODE NAVFAC NORTHWEST 1101 TAUTOG CIRCLE SILVERDALE WA 98315-1101 N44255 7. ADMINISTERED BY (If other than item 6) 4. REQUISITION/PURCHASE REQ. NO. CODE See Item 6 CITY OF BREMERTON DEPARTMENT PUB WORKS UTILITIES CATHERINE JOHNSON 100 OYSTER BAY AVE N BREMERTON WA 98312-3455 FACILITY CODE04DN7CODE EMAIL:TEL: Modification Control Number:bensoncd20808 DocuSign Envelope ID: BF088813-6EE1-4242-A8DE-416E1309E2DE 8/18/2020 Mayor N44255-96-M-2292 P00028 Page 2 of 2 SECTION SF 30 BLOCK 14 CONTINUATION PAGE The following items are applicable to this modification: SUMMARY OR CHANGES SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES SECTION C - DESCRIPTIONS AND SPECIFICATIONS The following have been added by full text: CLOSE BREM AIRPORT H20 ACCOUNT The purpose of this modification is to close out the water account at Bremerton Airport effective immediately. The following account information is provided. City Acocunt number – 43-2690-0 Government Account Number - NW_43_FW_NM_CA_001 Service Address - Bremerton Airport 8850 SW State Hwy 3 Bremerton, WA 98312 This modification also retroactively incorporates the City’s 2020 rates as an attachment to this modification effective 1 January 2020 All other terms and conditions remain unchanged. (End of Summary of Changes) ORDINANCE NO. 5383 AN ORDINANCE of the City Council of the City of Bremerton, Washington, amending and reestablishing the assessments, rates, fees and charges established in Ordinance No. 5358 regarding rates and fees relating to the Department of Public Works and Utilities for water, wastewater, stormwater and other related services. WHEREAS,the City Council desires to amend and reestablish the assessments, rates, fees, and charges ("Rates and Fees") relating to the Department of Public Works and Utilities for general facility charges and water, wastewater, stormwater, and other related services established in Exhibit A of Ordinance No. 5358;NOW THEREFORE THE CITY COUNCIL OF THE CITY OF BREMERTON, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Rate Tables established. Rates and fees for services relating to the Department of Public Works and Utilities for general facilities charges and water, wastewater, stormwater, and other related services, as established in Exhibit A of Ordinance No. 5358, are hereby amended and reestablished in their entirety as set forth in the attached Exhibit A of this ordinance, said exhibit is incorporated herein by this reference. SECTION 2. Rate Tables—Effective Date. The amendment and reestablishment of rate tables as set forth in Section 1 above shall be effective January 1, 2020. SECTION 3. Corrections. The City Clerk and codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to,the correction of scrivener, clerical,typographical, and spelling errors, references, ordinance numbering, section/subsection numbers and any references thereto. SECTION 4. Severability. If any one or more sections, subsections, or sentences of this ordinance are held to be unconstitutional or invalid, such decision shall not affect the validity ofthe remaining portion of this ordinance and the same shall remain in full force and effect. SECTIONS. Effective Date. This ordinance shall take effect and be in force ten 10) days from and after its passage, approval, and publication as provided by law. PASSED by the City Council theaday of November, 2019. 01010. Lib i7o vA5 o r C Y R, Council Presiders 1 2020 Utilities Rates and Fees Approved this 21 ICI' day of November, 2019. GREG EELER, Mayor ATTEST: APPROVED AS TO FORM: 0 ANGE I DOVER, City Cler RO ER A. LUBOVICH, City Attorn- • PUBLISHED theg(l?\day of p o,-erlLY 2019. EFFECTIVE the leday of ,Ge rriber- 2019. ORDINANCE NO.. R:\Legal\Legal\Ordinances\Public Works&Utilities\2020 Utility Rates&Fees Ordinance.doc 2 2020 Utilities Rates and Fees Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 Inside&Outside City Limits GENERAL FACILITY CHARGES Water based on meter size average normal flow 5/8"x 3/4" 6,071.00 $ 6,291.00 1" 6,074.00 $ 6,291.00 1"Commercial 8,322.00 $ 8,619.00 1 1/2" Commercial S 48,5-92.00 $50,327.00 2"Commercial 48,592.00 $50,327.00 3"Commercial 1-2;4•,181.00 $ 125,818.00 4"Commercial 242,962.00 $ 251,636.00 Greater than 4" Case by Case basis Wastewater based on meter size average normal floc 5/8"x 3/4" 7,089.00 $ 7,342.00 1" 7,089.00 $ 7,342.00 1"Commercial 87-79.1.00 $ 9,105.00 1 1/2" Commercial 49,626.00 $51,398.00 2" Commercial 49,626.00 $51,398.00 3"Commercial 1227,6 -100 $ 132,167.00 4"Commercial 255,221.00 $ 264,332.00 Greater than 4" Case by Case basis Stormwater(per IHSU)3,261.00 $ 3,377.00 CONNECTION FEES Water Connection Fees Inside Outside 5/8"x 3/4" S 34-7,00 $ 3,376.00 $ 4,871.00 $ 5,064.00 1" 3,431.00 $ 3,562.00 $ 5,151.00 $ 5,343.00 1 1/2" 8,365.00 $ 8,558.00 $ 12,518.00 $ 12,837.00 2" 5 87829.00 $ 9,022.00 5-1-3724404 $ 13,533.00 3" 4"x 1" Service to property line 5-1-576-1-8,0430 NA $ 23,127.00 NA 3" 1"x 6" Service to property line 15,616.00 NA $ 23,169.00 NA 3" 4"x 8" Service to property line 1-558. NA $r-23,4—,4 NA 3" 1"x 10" Service to property line 15,735.00 NA $ 23,603.00 NA 3" 1"x 12" Service to property line 15,716.00 NA $ 23,57T00 NA 3" NA $ 16,169.00 NA $ 24,254.00 1" 1"x 4" Service to property line 4-77694,0o NA $ 26,511.00 NA 41" 1"x 6" Service to property lino S-1-77723,04 NA $ 26,585.00 NA 4" 1"x 8" Service to property lino 17,734.00 NA $ 26,601.00 NA 1" 1"x 10" Service to property line 17,812.00 NA $ 26,718.00 NA 4" 1"x 12" Service to property line 17,792.00 NA 5,---2-6,648,40 NA 4" NA $ 18,246.00 NA $ 27,369.00 6" 6"x 6" Service to property line 22,913.00 NA $ 34,115.00 NA 6" 6"x 8" Service to property line 22499.04 NA $ 34,319.00 NA 6" 6"x 10" Service to property line 22,991.00 NA $ 34,487.00 NA 1 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 Water Connection Fees(continued) Inside Outside 6" 6"x 12" Service to property line S-2279-75414 NA $ 31,163.00 NA 6" NA $ 23,426.00 NA $ 35,139.00 S" 8"x 8" Service to property line 29,127.00 NA $43691 NA S" 8"x 10" Service to property line S---2941-0:42144 NA $ 13,515.00 NA 28,858.00 NA $ 43,287.00 NA 8" NA $ 29,444.00 NA $ 44,166.00 10" 10"x 10" Service to property line 36,713.00 NA $ 55,115.00 NA 10" 10"x 12" Service to property line S----3-73-1-8-744 NA S-5-57-78-1-44 NA 10" NA $ 37,621.00 NA $ 56,432.00 12"and greater Actual time&material+equipment Wet Tapping (Water Main Only,excluding excavation& backfill)* Inside Outside 1"x 1" excluding excavation&backfill 27747410 NA $ 4,196.00 NA 1"x 6" excluding excavation&backfill 2,826.00 NA $ 1,239.00 NA 1"x 8" excluding excavation&backfill 2,837.00 NA $ 4,256.00 NA 2,911.00 NA $ 4,371.00 NA 1"x 12" excluding excavation&backfill $ 2,895.00 NA $ 1,343.00 NA 4" NA $ 2,995.00 NA $ 4,493.00 6"x 6" excluding excavation&backfill 37124.00 NA S---4484,40 NA 6"x 8" excluding excavation&backfill 3,079.00 NA $ 1,619.00 NA 6"x 10" excluding excavation&backfill $ 3,172.00 NA $ 1,758.00 NA 3,107.00 NA $ 4,661.00 NA 6" NA $ 3,252.00 NA $ 4,878.00 1,181.00 NA $ 6,272.00 NA 1,061.00 NA $ 6,096.00 NA 8"x 12" excluding excavation&backfill $ 3,815.00 NA $ 5,768.00 NA 8" NA $ 4,145.00 NA $ 6,218.00 10"x 10" excluding excavation&backfill $ 5,101.00 NA $ 8,106.00 NA 10"x 12" excluding excavation&backfill S. 57182.00 NA $--8T9-7-3,04 NA 10" NA $ 6,728.00 NA $ 10,092.00 6,350.00 NA S---975-2-5410 NA 12"and greater Actual time&material+equipment Wet Tapping (Water Main to Property Line)* Inside Outside 2"-service 1,632.00 $ 4,825.00 $ 6,918.00 $ 7,238.00 1"x 1" service 10,535.00 NA $ 15,803.00 NA 1"x 6" service 10,563.00 NA $-157845.00 NA 4"x 8" service 10,571.00 NA $ 15,861.00 NA 1"x 10" service 10,652.00 NA $ 15,978.00 NA 1"x 12" service 10,632.00 NA $ 15,918.00 NA 4" NA $ 11,067.00 NA $ 16,601.00 6"x 6" service 10,875.00 NA $ 16,313.00 NA 6"x 8" scrviec; 10,831.00 NA $ 16,217.00 NA 6"x 10" service 1-079.2-3445 NA $ 16,385.00 NA 6"x 12" service NA S----1-67-3-62,04 NA 6" NA $ 11,342.00 NA $ 17,013.00 8"x 8" service 12,717.00 NA $ 19,076.00 NA 2 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 Water Connection Fees(continued) Inside Outside 8"x 10" service 12,600.00 NA $ 18,900.00 NA 8"x 12" service 12,118.00 NA $ 18,672.00 NA 8" NA $ 13,035.00 NA $ 19,553.00 10"x 10" service 11,911.00 NA $ 22,370 NA 10"x 12" service 1--573-5S-414 NA $ 23,037.00 NA 10" NA $ 15,792.00 NA $ 23,688.00 12"x 12" service 15,400.00 NA $ 23,100.00 NA 12"and greater Actual time&material+equipment Fire Hydrant Installation* Inside Outside 6"x 8"and smaller-service to property line $ 13,878.00 $ 14,312.00 $r--20,Q 10 $ 21,468.00 6"x 10"-service to property line 13,971.00 $ 14,405.00 $--2079-5-77Q4 $ 21,608.00 6"x 12"-service to property line 13,955.00 $ 14,389.00 $ 20,933.00 $ 21,584.00 PLAN CHECK/INSPECTION FEES Engineering Services** Inside Outside Plan Check Fees Main Extensions: per foot 0.55 $ 0.57 $ 0.83 $ 0.86 BUT not less than 383.00 $ 383.00 $ 5-75.00 $ 575.00 Includes hydrants and appurtenances and connection to water system) Pump Stations 3,066.00 $ 3,200.00 $ X600.00 $ 4,800.00 Fireline Extension 133.00 $ 160.00 $ 230.00 $ 240.00 Irrigation Systems 153.00 $ 160.00 $--230,04 $ 240.00 Miscellaneous(per hour)plus equipment 77.00 $80.00 $ 115.00 $ 120.00 Storm Drainage Plan Review Fees*** Preliminary Drainage Plans Residential Development 6-l-300 $ 640.00 N/A N/A Non-Residential Development 383.00 $ 400.00 N/A N/A Plus per IHSU 1-00 $20.00 Final Detailed Drainage Plans Residential Development(per lot) 0-20 Lots 65.00 $68.00 N/A N/A 21 -50 Lots 58.00 $60.00 N/A N/A 51 - 100 Lots 46-00 $48.00 N/A N/A 100+Lots 38.04 $40.00 N/A N/A Minimum Charge 460.00 $ 480.00 N/A N/A Non-Residential Development per IHSU 25.00 $40.00 N/A N/A Minimum Charge 377.00 $ 480.00 N/A N/A Resubmittal Fees First Resubmittal No Charge No Charge N/A N/A Subsequent Resubmittal 160.00 $ 480.00 N/A N/A 3 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 Field Inspection Fees Water main extensions(per foot) 1.53 $ 1.60 $ 2.30 $ 2.40 but not less than: 536.62 $ 560.00 $ 801.93 $ 840.00 Pump Station 3,066:40 $ 3,200.00 $ 1,600.00 $ 4,800.00 Miscellaneous(per hour) 76.66 $80.00 $ 115.00 $ 120.00 Wastewater Connection Fees Lateral Connection at P/L 153.00 $ 160.00 $ 230.00 $ 240.00 Lateral Connection at Main 383.00 $ 400.00 $ 5-7544 $ 600.00 Conveyance Facility Ext.(Per Foot) 3.00 $ 3.20 $ 5.94 $ 5.00 but not less than: 767,44 $ 800.00 $ 1,150.00 $ 1,200.00 Pump Station 3,066.00 $ 3,200.00 $- -X600.00 $ 4,800.00 Miscellaneous(per hour) 77.00 $80.00 $ 115.04 $ 120.00 Storm Drainage Inspection Fees*** Inside Outside Residential Development(per lot) 77.00 $80.00 N/A N/A Non-Residential Development(per IHSU) 38.00 $40.00 N/A N/A Minimum Charge 307.00 $ 320.00 N/A N/A Conveyance Facility Extensions(per foot) 00 $ 2.00 N/A N/A Minimum Charge 464:94 $ 480.00 N/A N/A Unscheduled Inspections****(per site visit) $ 77.00 $80.00 N/A N/A MISCELLANEOUS FEES AND CHARGES Office Services New Account(includes water turn-on) 2204 $23.00 N/A N/A Account Maintenance 5.00 $ 5.00 N/A N/A Past Due Notice 3:04 $ 3.00 N/A N/A ACH Credit N/A N/A Lien Recovery Charge 108.04 Cost N/A N/A Close Account/Meter Read/Water Service Turn- off 22.00 $23.00 N/A N/A Utility/Lien Search Fee(Manual)per parcel 33.00 $34.00 N/A N/A Park Reservation Fee(non-refundable)125.00 $ 125.00 N/A N/A Park Reservation Refundable Deposit 1-40.40 $ 100.00 N/A N/A Field Services Pavement Restoration Charge refundable,if assessed and not required) Asphalt Patch 1,536.00 $ 1,585.00 $ 2,301.00 $ 2,378.00 Concrete Patch 1,730.00 $ 1,785.00 $ 2,115.00 $ 2,678.00 Asphalt Trench S 37448.00 $ 3,558.00 $ 5,172.00 $ 5,337.00 Concrete Trench 3,133.00 $ 3,543.00 $ 5,150.00 $ 5,315.00 County Road PermitN/A N/A Cost Cost Water Meter Installation 3/4"& 1" 236.00 $ 161.00 $ 236.04 $ 242.00 1-1/2"&2"5 243.40 $ 256.00 $ 213.00 $ 384.00 3"and greater Actual Time,Materials&Equipment 4 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 Field Services(continued)Inside Outside Water Meter Reactivation 53.00 $66.00 $ 53.00 $ 99.00 Water Meter Reinstallation 161.00 $149.00 $ 242.00 Water Meter Deactivation 66.00 $149.00 $ 99.00 Water Meter Tampering Tampering Fee 4 :04 $ 458.00 $ 426.00 $ 687.00 Tampering Repair Actual Time,Materials&Equipment Fire Service-Detector,Meter&MXU 602.00 $ 613.00 $ 602.00 $ 920.00 Storz Adapter 290.00 $ 323.00 $ 290.00 $ 485.00 Water Service Turn-off/Turn-on Customer Request) Regular Hours 53.00 $66.00 $ 53-00 $ 99.00 After Hours 61.00 $ 285.00 $ 261.00 $ 428.00 Delinquency Notice 22.00 $23.00 N/A N/A Water Service Turn-off/Turn-on Delinquent Accounts) Regular Hours 106.00 $ 114.00 N/A N/A After Hours 261.00 $ 285.00 $ 261.00 $ 428.00 Flow and Pressure Test(Uncertified) 3/4"& 1"meters only 1-0680 $ 114.00 S---1-06,04 $ 171.00 1-1/2"&2"meters only 193.00 $ 209.00 $--193410 $ 314.00 Larger than 2" Actual Time,Materials&Equipment Meter Test Fee(based on meter size) 3/4"& 1"236.00 $ 256.00 $ 236.00 $ 384.00 1-1/2"&2" 323.00 $ 351.00 $ 323.00 $ 527.00 3"or greater Actual Time,Materials&Equipment Utility Plant Locates Regular Hours N/C N/C N/C N/C After Hours 260:00 $ 285.00 $ 260..00 $ 428.00 Emergency N/C N/C N/C N/C Utility Compliance Specialist Inspection 106.00 $ 114.00 $106.00 $ 171.00 Administration Fee 13.00 $47.00 $ 43,08 $ 71.00 Utility Labor Rate Hourly(Eqp not included) $ 87.00 $95.00 P700. $ 143.00 5of9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 RETAIL WATER SERVICE RATES General Service-Monthly Service Charge Inside Outside Meter Size 5/8 x 3/4 inches 11.30 14.73 $ 21.11 $22.08 1 inch 16.31 16.83 $21.52 $ 25.26 1 1/2 inch 23.23 23.93 $ 31.85 $ 35.90 2 inch 31.21 32.15 $ 46.81 $ 48.21 3 inch 59.22 61.00 $ 88.82 $ 91.48 4 inch 110.01 113.34 $ 165.05 $ 170.00 6 inch 391.21 402.98 $ 586.86 $ 604.47 8 inch 1,129.13 1,472.00 $ 2,113.71 $ 2,208.02 10 inch 5,097.10 5,250.01 $ 7,615.63 $ 7,875.00 12 inch 19,161.62 19,736.47 $ 28,712.12 $ 29,604.69 Residential Commodity Charge(per HCF) Per HCF/Month 2.17 2.54 $ 3.70 3.81 Non-Residential Commodity Charge(per HCF) $ 2.23 2.30 $ 3.31 3.44 Fire Protection-Monthly Service Charge Service Size 1 inch 29.67 30.56 $ 11.19 45.82 1 1/2 inch 11.65 45.99 $ 66.97 68.98 2 inch 58.05 59.79 $ 87.07 89.68 3 inch 63.95 65.87 $ 95.95 98.83 4 inch 69.72 71.81 $ 101.57 107.71 6 inch 87.02 89.63 $ 130.52 134.44 8 inch 115.85 119.33 $ 173.78 178.99 10 inch 162.12 166.98 $ 243.19 250.49 12 inch 2-34,60 238.55 $ 317.11 357.83 Commodity Charge(per HCF) 4.17 4.60 $ 6.70 6.90 For Usage Other Than Firefighting Low-Income(1)Senior and Low-Income(')Disabled Citizen-Monthly Service Charge Base Charge(per account)5/8"x 3/4" 11.30 14.73 $ 21.11 22.08 Base Charge(per account) 1" 16.34 16.83 $ 21.52 25.26 Commodity Charge 0-5 HCF/Month No Charge No Charge Over 5 HCF/Month 2.17 2.54 $ 3.70 3.81 Temporary/Construction Meter 1"Meter Deposit 100.00 500.00 $ 100.00 $ 750.00 Base Fee(per month) 16.31 16.83 $ 16.31 25.26 Set Up Fee&Removal Fee 312.00 342.00 $ 312.00 $ 513.00 6 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 RETAIL WATER SERVICE RATES(CONTINUED)Inside Outside Temporary/Construction Meter(continued) Hydrant meter(3"Meter) Deposit 2,856.00 3,000.00 S-2456414 $ 4,500.00 Base Fee(per month) 59.22 61.00 $ 59.22 $ 91.50 Set Up Fee 342.00 342.00 $ 312.00 $ 513.00 Equipment Loss/Damage Actual Time,Materials&Equipment Commodity Charge(per HCF) 2.23 2.30 $ 3.34 3.44 City Parks and Recreation Dept.-Irrigation Commodity Charge(per HCF) 1.12 1.15 Gold Mountain Golf Course Complex-Irrigation Commodity Charge(per HCF) 1.51 1.56 RETAIL WASTEWATER SERVICE RATES Inside Outside Monthly Service Charge Single Family Base Charge(per account) 36.15 37.23 $54.22 55.85 Commodity Charge(per HCF) 4.85 5.00 $ 7.27 7.49 Duplex on 1 Meter or 2 Bldgs.on 1 Meter Base Charge(per unit) 28.62 29.48 $42.91 44.23 Commodity Charge(per HCF) 4.85 5.00 $ 7.27 7.49 Multi-Family Base Charge(per unit) 28.62 29.48 $42.94 44.23 Commodity Charge(per HCF) 4.85 5.00 $ 7.27 7.49 Low-Income(t)Senior and Low-Income(')Disabled Citizen Base Charge(per account) 22.42 23.09 $31.06 35.08 Commodity Charge(per HCF) 0- 10 HCF/Month No Charge No Charge Over 10 HCF/Month 4.85 5.00 $ 7.27 7.49 Commercial I Base Charge(per account) 53.44 55.04 $80.16 82.56 Commodity Charge(per HCF) 5.00 5.15 $ 7.49 7.71 Commercial II Base Charge(per account) 53.83 55.44 $80.74 83.16 Commodity Charge(per HCF) 6.10 6.59 $ 9.60 9.89 Commercial III Base Charge(per account) 54.36 55.99 $ 81.55 84.00 Commodity Charge(per HCF) 7.82 8.05 $ 11.72 12.07 7 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 RETAIL WASTEWATER SERVICE RATES(CONTINUED) Monthly Service Charge Inside Outside Commercial IV Base Charge(per account) 54.89 56.54 $ 82.34 84.81 Commodity Charge(per HCF) 9.23 9.51 $ 13.81 14.26 Commercial V Base Charge(per account) 60.38 62.19 $ 90.59 93.31 Commodity Charge(per HCF) 11.54 1,1.89 $ 17.31 17.83 Commercial VI Base Charge(per account) 66.11 68.40 $ 99.63 102.62 Commodity Charge(per HCF) 11.12 14.85 $ 21.63 22.28 Commercial VII Base Charge(per account) 73.06 75.25 $ 109.59 112.88 Commodity Charge(per HCF) 16.84 17.35 $25.27 26.03 Commercial Special Base Charge(per account) 80.36 82.77 $ 120.59 124.16 Commodity Charge(per HCF) 22.51 23.22 $ 33.78 34.79 Beverage Production Base Charge(per account) 54.36 55.99 $ 81.55 84.00 Commodity Charge(per HCF) 5.08 5.23 $ 7.61 7.84 Commercial Fountains-Separately Metered Base Charge(per account) 53.41 55.04 $ 80.16 82.56 Commodity Charge(per HCF) 1.65 1.70 $ 2.47 2.54 Septage Disposal(per gallon of tank capacity) $ 0.27 0.28 $ 0.10 0.41 Leachate Per Gallon of Tank Capacity Individual Residential Grinder Pumps Grinder Pump Surcharge 11.65 12.00 $ 17.48 18.00 Low-Income(l)Senior and Low-Income(l)Disabled Citizen Grinder Pump Surcharge 8.71 9.00 $ 13.11 13.50 RETAIL STORMWATER RATES Monthly Service Charge Inside Outside Residential I(Single Family/Duplex) Base Charge(per account) 16.17 17.54 N/A N/A Exception:Duplex with 2 Meters(per account) 8.13 8.77 N/A N/A 8 of 9 Exhibit A ASSESSMENTS,RATES,FEES,AND CHARGES EFFECTIVE January 1,2020 2019 2020 RETAIL STORMWATER RATES(CONTINUED) Monthly Service Charge Inside Outside Residential II-SW Impact Fee (per IHSU) 50%of the Res I Base Charge 8.08 8.77 N/A N/A Residential III-SW Impact Fee (per IHSU) 100%of the Res I Base Charge 16.17 17.54 N/A N/A Commercial I Base Charge(per IHSU) 16.17 17.54 N/A N/A Commercial II-SW Impact Fee(per IHSU) 50%of the Comm I Base Charge 8.08 8.77 N/A N/A Commercial III-SW Impact Fee (per IHSU) 100%of the Comm I Base Charge 16.17 17.54 N/A N/A Public School Districts(per account) 16.17 17.54 N/A N/A Low-Income(1)Senior and Low-Income(')Disabled Citizen Base Charge(per account) 9.81 10.68 N/A N/A Multi-Family&Commercial Rate Adjustment Water Quality(per IHSU) S 1.79 1.94 N/A N/A Water Quantity(per IHSU) 5.10 5.86 N/A N/A Stormwater Penalty New Multi-Family&Commercial development without on-site detention Charge(per IHSU) 3.58 3.88 N/A N/A 1)Low-Income defined as Gross Earned Income of$40,000 or less Pavement Restoration Charge May Also Be Assessed Fees include original review and one resubmittal review. Additional reviews will be charged at miscellaneous hourly rate(above). Does not apply to single family residence or duplex construction on an existing established lot. Unscheduled inspections shall be tracked through the course ofa project and billed after the final site inspection. Fees for unscheduled inspections shall be paid prior to final 9 of 9