HomeMy WebLinkAbout Contract Modification 1 Pacific Forest ResourcesCONTRACT MODIFICATION AGREEMENT NO. ____
BETWEEN THE CITY OF BREMERTON AND Pacific Forest Resources
Inc. (Consultant)
PROJECT 5000 Road Improvements, 5000 Vessey Bridge and 5000 Railcar Bridge
Replacement Design
CONSULTANT Pacific Forest Resources Inc.
DATE 11/14/2022
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
PROFESSIONAL SERVICES AGREEMENT (the "Contract") entered into between the
City of Bremerton and Pacific Forest Resources on 10/8/2021
All provisions in the Contract shall remain in full force and effect except as expressly modified
by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the
Contract are as follows:
I.
Section I. Scope , is modified as follows:
See Amended Scope of Work attached as Exhibit A
Section II. Term , is modified as follows:
The Consultant shall complete the work described in this Contract Modification Agreement by
November 28, 2025.
Section III. Compensation , is modified as follows:
The original contract amount was $22,000.00. The City shall pay the Consultant for the additional
work described above, based on time and materials, an amount not to exceed $47,000.00 for a total
amended contract amount of $69,000 including this Contract Modification.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final
settlement of all of the Consultant’s claims for contract time and for all costs of any kind,
including without limitation, costs of delays related to any work either covered or affected
by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past
performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs
and other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
Page 1 of 2
Contract Modification
Rev. 09/2021
DocuSign Envelope ID: 0240F75C-50AF-4234-8CDD-4B237A927C93
6288
Page 2 of 2
Contract Modification
Rev. 09/2021
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date)
CONSULTANT THE CITY OF BREMERTON
By: By:
Print Name: Print Name:
Its: Its:
Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By:
KYLIE J. FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Steve Faulkner , PE Sean Walsh
President Forestry Division Manager
Pacific Forest Resources Inc. City of Bremerton
P.O. Box 395 29322 SE 374th St 100 Oyster Bay Ave N.
Enumclaw, WA 98022 Bremerton WA 98312
360-825-2921 360-473-5928
R:\Legal\Legal\Forms\FORMS ON COBWEB\Contract Modification Rev. 09 2021.docx
DocuSign Envelope ID: 0240F75C-50AF-4234-8CDD-4B237A927C93
12/1/2022
Steve Faulkner
12/1/2022
President
Greg Wheeler
12/1/2022
Mayor
Pacific Forest Resources, Inc.
Engineering and Forest Management
City of Bremerton, Public works & Utilities November 9, 2022
Attn: Sean Walsh
1600 Oyster bay Ave S
Bremerton, WA 98312
RE: Bremerton Watershed 2023-24 Engineering Assistance –
5000 Rd Improvement & Bridge Replacements
Project Approach Outline & Cost Estimate
The following is a brief description of the perceived engineering and/or design assistance
required for various services associated with the two bridges on the 5000 Road as well as the
5000 Road Improvement Project as requested by the City of Bremerton Watershed along with
an estimated cost of the proposed services.
5000 Road Improvement Project
Site Survey & Preliminary Site Review
Pacific Forest Resources (PFR) will provide the necessary site survey/maps needed for the road
design/improvement segments. It is anticipated that the City will provide at least one field
assistant to PFR for the site survey to be completed (no provision is included by PFR for the
field assistant).
Initial field visit(s) to the road site will be made with Watershed personnel to help determine
the extents of work needed and to decide if any additional studies and/or specialized input is
needed by a geologist. Should it be determined (per the City's approval) that such additional
information is needed, PFR shall sub-contract with a geologist (as approved by the City) to
provide such services as needed.
Road Improvement Design, Plans, FP/HPA Preparation & Cost Estimates
Utilizing best engineering practices, PFR will develop “permit-ready” plans and specifications
needed to obtain the FP/HPA for the road Improvements. PFR will also prepare a complete
Forest Practice Application package ready for the City's submittal to the WDNR. Following
development of the preliminary plans, PFR will provide the City with a cost estimate for the
completed project.
PFR will be available to attend any ID team meetings with the various regulatory agencies if
required in order to answer any potential questions.
Road Improvement Plans, Bid Specifications & construction Supervision
If so requested, PFR will assist the City in the preparation of plans and specifications suitable
for construction and inclusion into the City's construction bid package for the improvement
P.O. Box 395 Phone 360-825-2921
29322 SE 374th St pacificforestresources@msn.com Cell 253-569-8244
Enumclaw, WA 98022 www.pacificforestresources.com Fax 360-825-8666
Exhibit ADocuSign Envelope ID: 0240F75C-50AF-4234-8CDD-4B237A927C93
Bremerton Watershed 5000 Road & Bridges Engineering Proposal
11-9-2022 Page 2
work. PFR will offer whatever assistance is needed to the City the in preparation and
evaluation of the construction bid package/contractor selection.
If requested by the City, PFR shall render Construction Supervision for the improvement work
as needed.
5000 Railroad & 5000 Vessey Bridge Replacements
Site Surveys & Preliminary Site Reviews
Pacific Forest Resources (PFR) will sub-contract with a licensed surveyor to provide the
necessary topographic surveys for the design of the two bridge structures. Initial field visits to
each site will be made with the WDFW and WDNR to analyze potential options and concerns
as well as to jointly determine the bank-full-width of the two crossings. This meeting will also
serve as the "pre-FP/HPA" review.
Preliminary Plans, FP/HPA Preparation & Cost Estimates
Based on their relative similarities and locations, the two bridges will likely be designed in
tandem, which should afford some efficiencies and the ability to easily replicate the work.
Utilizing best engineering practices, PFR will develop “permit-ready” plans and specifications
needed to obtain the FP/HPA. PFR will also prepare a complete Forest Practice Application
package ready for the City's submittal to the WDNR. Following development of the
preliminary plans, PFR will provide the City with a cost estimate for the completed project.
Bridge Bid Specifications & Bid Packages
Pacific Forest Resources will provide all necessary bridge specifications needed to assist the
City in preparing the bid package for the purchase of the needed structures (including any
assistance in evaluating the bids).
Construction Plans & Bid Specifications
Once the bridge manufacture(s) have been selected, a “stand-alone” set of "construction-grade"
plans for the complete bridge project will be developed for each of the sites. These plans shall
be stamped by a licensed engineer and will be suitable for construction and inclusion into the
City's construction bid package. PFR will offer whatever assistance is needed to the City the in
preparation and evaluation of the construction bid package/contractor selection. PFR will be
available at the City's request to attend any Pre-Bid site meetings in order to answer any
potential contractor questions.
Construction Staking
It is recommended that the construction staking be completed for the road and bridge sites prior
to the construction bid site visit in order to reduce some of the potential contractor concerns.
This work should be fairly straight-forward and could easily be accomplished by the City's
forestry staff, however a separate item for that process is included under this proposal so that the “office design” can be verified in the field. A single site visit will be required to
accomplish this item and it is recommended that this site visit be combined with the
construction pre-bid site meeting so the PFR can answer any potential contractor questions.
DocuSign Envelope ID: 0240F75C-50AF-4234-8CDD-4B237A927C93
Bremerton Watershed 5000 Road & Bridges Engineering Proposal
11-9-2022 Page 3
Construction Supervision
It is expected that that much of the construction supervision will be done by the City's Forester,
however a provision is included for this item as there may be some specialized construction
issue that require closer inspection.
Although probably not needed, if requested by the City, PFR will develop a set of As-Built
plans for the projects that depict any significant deviations from the original construction plans.
Estimated Engineering Costs
Pacific Forest Resources (PFR) proposes to charge for professional services on a time and
material basis as with similar municipal contracts. The basic engineering rate will be One
Hundred Sixty Dollars ($160) per hour plus vehicle cost per the accepted IRS rate. Direct
expenses (sub-consultants) and/or materials will charged based on the actual cost incurred plus
12%. The cost estimate shown below should be somewhat conservative and also anticipates
that much of the construction supervision is to be supplied by the City's Forester.
5000 Road Improvement Project Cost Estimate
Item Estimated Time Estimated Cost
Road Survey & Preliminary Site Review 1± day w/travel $1,500±
Geologist if needed (Sub-contract) 2± days w/travel $4,000±
Road Design, FPA & Cost Estimate 2½± days $3,200±
Road Construction Plans & Bid Specs 1± day $1,500±
Construction Staking ½± day w/travel $ 800±
Construction Supervision ½± day w/travel $ 800±
Estimated Road Improvement Engineering Cost $11,800±
5000 Road Bridges Design Project Cost Estimate
Item Estimated Time Estimated Cost
Preliminary Site Reviews (2) 1± day w/travel $1,500±
Topographic Survey (2) $5600 each $11,200±
Prelim Design, FPA & Cost Estimate (2) 2 @ 4± days $10,200±
Bridge Specs & Bid Package 1± day $1,500±
Construction Plans & Bid Specs 3± days $3,800±
Construction Staking 1± day w/travel $1,500±
Construction Supervision 2½± days w/travel $4,000±
As-Built plans (if requested) 1± day $1,500±
Estimated Bridge Engineering Cost (2 Bridges) $35,200±
Total Estimated Engineering Cost $47,000±
DocuSign Envelope ID: 0240F75C-50AF-4234-8CDD-4B237A927C93
Bremerton Watershed 5000 Road & Bridges Engineering Proposal
11-9-2022 Page 4
As noted above, these costs are expected to be somewhat conservative, however all work is to
be invoiced on an “actual time” basis, therefore if the project is simpler than expected or if
more site work can be accomplished by the City, the final cost will obviously be reflective of
that. Throughout the design process, status reports for the project will be coordinated with the
City's contracting officer so that any decisions as to additions (or deletions) to the project scope
may be made in a timely manner.
Please feel free to contact me if you wish to discuss any of this in more detail.
Respectfully submitted –
Steve Faulkner, PE President
DocuSign Envelope ID: 0240F75C-50AF-4234-8CDD-4B237A927C93