HomeMy WebLinkAbout3875 P0001 3002- 164N44255 -08-C-3002
P00001
Page 2 of 2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION I - CONTRACT CLAUSES
The following have been added by full text:
CLAUSE CHANGE
This modification changes FAR 52.241-6 (b)(1) to read as follows:
b) Meter Test
1) The Contractor, at its expense, shall periodically inspect and test Contractor installed meters larger than
3" diameter every two years, meters 1 '/z " to 2" diameter at intervals not exceeding 4 years. Meters 1"
diameter and smaller shall be inspected and tested at intervals not exceeding 5 years. The government has
the right to have representation during the inspection and test.
All other terms and conditions remain unchanged.
End of Summary of Changes)