Loading...
HomeMy WebLinkAbout3873 P00005 EFF 1.9.2004 pg 230-297EXCEPTION TO SF 30 30-105-04 STANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA FAR (48 CFR) 53.243 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(Ifapplicable) P00005 09 -Jan -2004 6. ISSUED BY CODE N44255 7. ADMINISTERED BY (If other than item 6) CODE NAVFAC EFA NORTHWEST POULSBO See Item 6199177THAVENE POULSBO WA 98370-7570 8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO. CITY OF BREMERTON 9B. DATED (SEE ITEM 11) 3027 OLYMPUS DR BREMERTON WA 98310-4799 X 1OA MOD. OF CONTRACT/ORDER NO. N44255 -96-M-2292 X IOB. DATED (SEE ITEM 13) 22 -Dec -1997CODE04DN7IFACILITYCODE 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS ElThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt ofOffer El is extended, El isnot extended. Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: a) By completing Items 8 and 15, and returning copies ofthe amendment, (b) By acknowledging receipt of this amendmenton each copy ofthe offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (Ifrequired) 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM IOA. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B). C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: X D. OTHER (Specify type of modification and authority) pursuant to the terms and conditions of the contract E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) This modification incorporates the City of Bremerton Ordinance No. 4881, effective January 9, 2004, attached hereto, implementing new water and sewer rates into the contract. The City is not required to sign this modification as the City Council signatures on City Ordinance 4881 will serve that purpose. Except as provided herein, all tenns and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) MARCIA L BOYD / CONTRACT SPECIALIST TEL: (360) 396-0247 EMAIL: Marcia.Boyd@navy.mil 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED Ik-'N . m a .,. ,. sā€ž "y BY ā€ž 29 -Jan -2004 Signature ofperson authorized to sign) Signature of Contracting Officer) EXCEPTION TO SF 30 30-105-04 STANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA FAR (48 CFR) 53.243 N44255 -96-M-2292 P00005 Page 2 of 2 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES End of Summary of Changes)