HomeMy WebLinkAbout4777 Contract Number: 4777
Vendor: CAMP DRESSER & McKEE
Subject: Consultant - Biogas Vehicle Fuel Study
Department: WWTP
File Class: LEG 12-1
Begin Date: 12/08/2008
End Date: 06/30/2009
Review Date: 02/15/2011
Vault Date: Ol/01/2011
Comments: No dates in Agreement
PROFESSIONAL SERVICES AGREEMENT
Professional Engineering Services to Perform a Biogas Vehicle Fuel Study
The City of Bremerton ("City") and Camp Dresser & McKee Inc. (CDM)
("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for
professional services:
I. Scope: The Consultant agrees to perform the services more specifically described in the
Scope of Work, dated November 19, 2008, including any attachments thereto, attached hereto
as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified
only pursuant to Section VII.G. of this Agreement. If the Scope of Work provides for
unspecified additional services such services shall only be performed upon the express written
request of the City. Consultant further represents that the services furnished under this
Agreement will be performed in accordance with generally accepted professional practices in
effect at the time such services are performed.
II. Term: The City and the Consultant agree that work will begin on the tasks described in
Exhibit A immediately upon execution of this Agreement. The parties agree that the work
described in Exhibit A is to be completed as provided for in the work schedule attached hereto
as Exhibit B; provided however, that additional time shall be granted by the City for excusable
delays or extra work as provided for in section IX (A) of this agreement.
III. Compensation: In consideration of the services provided pursuant to this Agreement,
the City shall pay Consultant in an amount not to exceed $30,000.00. Consultant's charges and
bills shall conform to the fee schedule attached hereto as Exhibit B and incorporated herein by
this reference.
The Consultant shall submit regular billing statements detailing work performed and
amount charged on each task or portion thereof. The descriptions shall conform to and fall
within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a
conforming bill statement, the City shall promptly process payment. PROVIDED,
HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay
work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and
billing fees shall be as delineated in Exhibit B.
Consultant shall not perform work beyond the Scope of Work, nor shall be compensated
for such work, unless the Scope of Work or amount of compensation is modified pursuant to
this Agreement. Consultant shall only be compensated for additional services if requested
pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance
with Exhibit B.
If a billing statement does not conform to this Agreement, the City may withhold
payment until the statement is brought into compliance. Such withholding does not relieve
Consultant of its obligations under this Agreement.
Bremerton/CDM
Biogas Vehicle Fuel Study
Page 1 of6
IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed
in the Scope of Work and is performing independent functions and responsibilities within its
field of expertise. Consultant and its personnel are independent Consultants and not employees
of the City. Consultant and its personnel have no authority to bind the City or to control the
City's employees and other Consultants. None of the benefits provided by the City to its
employees, including, but not limited to, compensation, insurance, and unemployment insurance
are available from the City to the employees, agents, representatives, or sub-Consultants of the
Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of
Consultant's agents, employees, representatives and sub-Consultants during the performance of
this Agreement. The City may, during the term of this Agreement, engage other independent
Consultants to perform the same or similar work.
As an independent Consultant, Consultant is responsible for its own management. The
City's administration and enforcement of this Agreement shall not be deemed an exercise of
managerial control over Consultant or its personnel.
As an independent Consultant, Consultant is responsible for payment of all taxes and
licensing fees necessary to perform its obligations under this Agreement. These taxes and fees
include but are not limited to State industrial insurance, Business & Occupation, State
professional licensing, and City business licensing. If any taxes or fees due the City have been
declared delinquent, the City may withhold the delinquent amount, plus any additional charges
arising from the delinquency, from any payments due Consultant.
V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers,
officials, employees, agents and volunteers harmless from any and all claims, injuries; damages,
losses or suits, including all legal costs and attorney fees, arising out of or in connection with the
performance of this Agreement, except for that portion of the injuries and damages caused by the
City's sole negligence.
The City's review or acceptance of any of the work when completed shall not be grounds
to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to
RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S
WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY
FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER
ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER.
The provisions of this section shall survive the expiration or termination of this Agreement.
BremertonlCDM
Biogas Vehicle Fuel Study
Page 2 of6
VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Consultant, its agents,
representatives, employees, sub-consultants or sub-Consultants.
Before beginning work on the project described in this Agreement, the Consultant shall
provide a Certificate of Insurance evidencing:
1. Automobile Liability insurance with limits no less than $1,000,000 combined single
limit per accident for bodily injury and property damage; and
2. Commercial General Liability insurance written on an occurrence basis with limits no
less than $1,000,000 combined single limit per occurrence and general aggregate for
personal injury, bodily injury and property damage. Coverage shall include but not be
limited to: blanket contractual; products/completed operations/broad form property
damage; explosion, collapse and underground (XCV) if applicable; and employer's
liability; and
3. Excess Liability insurance with limits not less than 1,000,000 limit per occurrence and
aggregate.
4. Professional Liability insurance with limits no less than $1,000,000 limit per
oC9urrence/ claim.
Any payment of deductible or self insured retention shall be the sole responsibility of the
Consultant.
All required policies shall be provided on an "occurrence" basis except professional
liability insurance (if required), which may be provided on a "claims-made" basis.
The City shall be named as an additional insured on the Commercial General Liability
insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an
endorsement that is acceptable to the City, which names the City as an additional insured shall be
attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of
all the required insurance policies and endorsements. The City further reserves the right to reject
any unacceptable policies and/or endorsements.
The Consultant's Commercial General Liability insurance shall contain a clause stating
that coverage shall apply separately to each insured against whom claim is made or suit is
brought, except with respects to the limits of the insurer's liability.
The Consultant's insurance shall be primary insurance as respects the City and the City
shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of
any cancellation, suspension or material change in coverage.
The City also reserves its unqualified right to require at any time and for any reason,
proof of coverage in the form of a duplicate of the insurance policy with all endorsements as
evidence of coverage.
Bremerton/CDM
Biogas Vehicle Fuel Study
Page 3 of6
VII. General Conditions:
A. Reports and Information: When requested by the City, Consultant shall furnish
periodic reports and documents on matters covered by this Agreement. The reports and
documents shall be furnished in the time and form requested. Consultant shall maintain
accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to
substantiate all billed amounts.
B. Ownership and Use of Records and Documents: Original documents, drawings,
designs and reports, including those in electronic format, developed under this Agreement are the
property of the City. All written information submitted by the City to the Consultant in
connection with the services performed by the Consultant under this Agreement will be
safeguarded by the Consultant to at least the same extent as the Consultant safeguards like
information relating to its own business. If such information is publicly available or is already in
Consultant's possession or known to it, or is rightfully obtained by the Consultant from third
parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise.
All data, documents and files created by Consultant under this Agreement may be stored
at Consultant's office in Seattle, Washington. Consultant shall make such data, documents, and
files available to the City upon its request at all reasonable times for the purpose of editing,
modifying and updating as necessary until such time as the City is capable of storing such
information in the City's offices. Duplicate copies of this information shall be provided to the
City upon its request, and at reasonable cost.
All documents, including all reports, drawings, specifications, computer software or other
items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service
with respect to the project and are the property of the City. Any reuse by the City for other than
the specific purpose intended will be at City's sole risk.
C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary
and shall be responsible for the safety of its employees, agents, and sub-consultants in the
performance of the work hereunder and shall utilize all protection necessary for that purpose.
All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss
of or damage to materials, tools, or other articles used or held for use in connection with the
work.
D. Place of Work: The Consultant shall perform the work authorized under this
Agreement at its offices in Seattle, Washington. Meetings with the City staff as described in
Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed
upon by the parties.
E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement
between the Parties, and the Parties acknowledge that there are no other agreements, written or
oral, that have not been set forth in the text of this Agreement.
Bremerton/CDM
Biogas Vehicle Fuel Study
Page 4 of6
F. Severability: Should any part of this Agreement be found void, the balance of the
Agreement shall remain in full force and effect.
G. Modification: This Agreement may only be modified by written instrument signed by
both Parties.
H. Written Notices: All communications regarding this Agreement shall be sent to the
parties at the addresses listed below by registered or 1 st class mail, or by personal service, and
shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement
or such other address as may be hereafter specified in writing.
City Address:
Pat Coxon
WWTP Mgr
1600 Oyster Bay Ave S
Bremerton, W A 98312
Consultant Address:
Cale McPherson
CDM Project Engineer
1218 3rd Avenue, Suite 1100
Seattle, WA 98101
1. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a
waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be
deemed waiver of any other right or power.
J. N on- Waiver of Breach: The failure of the City to insist upon strict performance of any
of the covenants and agreements contained herein, or to exercise any option herein conferred in
one or more instances shall not be construed to be a waiver or relinquishment of said covenants,
agreements or options, and the same shall be and remain in full force and effect.
K. Compliance with Laws: Consultant shall comply with all applicable Federal, State,
and local laws in performing its obligations under this Agreement.
L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws
ofthe State of Washington. Any judicial action to resolve disputes arising out of this Agreement
shall be brought in Kitsap County Superior Court.
M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions
herein, each party shall pay all its own costs and attorney's fees.
N. Assignment: Any assignment of this agreement by the Contractor without the written
consent of the City shall be void.
VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the
public on the basis of race, color, national origin, sex, religion, age, marital status, disability, or
sexual orientation except for emplOYment actions based on bona fide occupational qualification.
IX. Termination: This Agreement shall remain in force until completion and acceptance of
the services, terminated by written instrument upon mutual consent, or by the City of Bremerton
for convenience. This Agreement may be immediately terminated for cause by a Party if the
Bremerton/CDM
Biogas Vehicle Fuel Study
Page 5 of6
other Party substantially fails to perform through no fault of the terminating Party, and the non-
performing Party does not commence correction of the failure of performance within thirty (30)
days of the terminating Party's sending notice to the non-performing Party. Any Notice by
Consultant shall include a report showing the status of all items listed in the Scope of Work
current through the termination date.
If the City receives reimbursement by any federal, state, or other source for work described in
Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is
cancelled or substantially reduced after the execution date of this Agreement and prior to the
completion of the work, the City may summarily terminate this Agreement.
A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall
Consultant be charged with liquidated damages for any delays in the completion of the work due
to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials,
equipment, tools, or labor by reason of war, national defense, or other national emergency; 2)
any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes
not reasonably foreseeable by the parties at the time of the execution of the Agreement that are
beyond the control and without the fault or negligence of the Consultant, including, but not
restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED,
HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in
writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement,
the delay is properly excusable, the City shall, in writing, extend the time for completing the
work for a period of time commensurate with the period of excusable delay.
B. Rights Upon Termination: In the event of termination, the City shall pay for all
services performed by the Consultant to the effective date of termination, as described on a final
invoice submitted to the City. After termination, the City may take possession of all records and
data within the Consultant's possession pertaining to this project which may be used by the City
without restriction. Any such use not related to the project which Consultant was contracted to
perform shall be without liability or legal exposure to the Consultant.
CONSULTANT
By: Q ~_ 7b::-
its: / V~ ~ -P~ jet, ""\ t-
Date:~ <::>11- 2... ;z.60~
,
Attest:
C/UA~~J~~/L'7'~
City Clerk
BremertonlCDM
Biogas Vehicle Fuel Study
Page 6 of6
CDIVI
1216 3'd Avenue, Suite 1100
Seattle, WA 96101
tel: 206 336-4900
fax: 206 223-2340
Professional Engineering Services to
Perform a Biogas Vehicle Fuel Study
Exhibit A
Scope of Work
Overview
The City of Bremerton operates two mesophilic anaerobic digesters as part of its biosolids
handling system at the Westside Wastewater Treatment Plant (Bremerton WWTP). The
anaerobic digestion process yields a steady flow of the high energy product, biogas. Under
current operating conditions, a portion of the biogas is captured and utilized as boiler fuel for
plant and digester heating. The remaining biogas is flared with no beneficial end use. The
City has recognized the value of its biogas as a renewable energy source and has initiated a
Vehicle Fuel Study to evaluate the potential for converting biogas to a vehicle fuel. To
generate fuel the City will require a system that can remove the non-methane portion of the
biogas and compress and dispense the product gas at 3,000-3,600 psi. The compressed
product gas is referred to as biomethane or renewable natural gas (RNG) and can be used
interchangeably with compressed natural gas (CNG). The purpose of this document is to
provide a scope of work for that study.
The Biogas Vehicle Fuel Study will consider current plant operating conditions including
existing infrastructure and equipment, biogas production, and vehicle fuel demands to
identify biogas vehicle fuel alternatives. One alternative will be developed to include the cost
for construction including the biogas treatment and fueling infrastructure. The findings of
this study will be conveyed to the City in a Technical Memorandum and a final Biogas
Vehicle Fuel report.
This Scope of Work is organized into the following tasks:
Task 1- Project Management
1.1 Kick-off Meeting
1.2 Work Plan Development
1.3 Monthly Status Reporting
ClIVI
Task 2 - Biogas System and Alternatives Identification
2.1 Data and Information Collection/ Analysis
2.2 Biogas System Description and Availability
2.3 Public Works Vehicle Fleet Description
2.4 Preliminary Vehicle Fuel Alternatives Identification
2.5 Draft Biogas System and Vehicle Fuel Alternatives Technical Memorandum
Task 3 - Biogas Vehicle Fuel Report
3.1 Planning Level Vehicle Fuel Alternative Development
3.2 Planning Level Cost Estimate
3.3 Draft Biogas Vehicle Fuel Report
3.4 Final Report Meeting
3.5 Final Biogas Vehicle Fuel Report
Task 1- Project Management
The CDM Project Manager (PM) will be the point of contact for communications between the
City, CDM Engineering specialists and CDM subcontractors. The PM will coordinate the
work of the team and provide progress reports.
Upon receipt of Notice-to-Proceed, CDM's PM will work with the City to plan a kick-off
meeting at the Bremerton WWTP. To minimize travel time and project costs, a plant site visit
will be scheduled to coincide with this meeting. If practical, some data collection may also
take place at this time.
Task 2 - Biogas System and Alternatives Identification
This task involves gathering and assimilating the existing biogas-related information from the
Bremerton WWTP to identify operational, structural, mechanical, and space limitations of the
biogas system. This information will include production and flaring rates, quality and
pressure of the gas, and pipe material and diameters. As part of this task, information
regarding the Public Works vehicle fleet will be collected including vehicle types, fuel
demand, fuel economy, and assigned location. Based on the biogas system and vehicle fleet
information CDM will identify biogas vehicle fuel alternatives for the Bremerton WWTP. The
plant operating conditions and biogas system, the vehicle fleet, and the identified vehicle fuel
alternatives will be summarized in a Draft Technical Memorandum.
2.1 Data Collection/Analysis - The following information will be collected from the City:
. Biogas System/Plant Information
o Process Flow Diagrams (P&IDs) and Record Drawings
· Biogas
· Natural Gas
2
CONI
o Plant Site Plan (in AutoCAD format if available) showing biogas and
natural gas piping systems
o Biogas Quality (heat value, composition)
o Equipment Information
· Boilers (capacity, hours, thermal efficiency, burner type,
configuration, heat demand)
· Biogas Treatment (type, operation, maintenance costs)
· Digesters (size, operation, % solids, SRT, VSR, loading rate, heat
demand)
. Vehicle Fleet Information
o Bremerton WWTP Vehicles and Public Works Vehicles
· Vehicles (make, model, year, assigned location)
· Fuel Demand (daily, monthly, yearly demand, fuel economy)
. Growth Projections (if revised since Comprehensive Plan)
o Current plant service population
o Estimates of future plant service population
. Financial Information
o Natural gas billing invoices for at least one calendar year
o Natural gas rate schedules
o Economic parameters
· Economic period
· Discount rate (gross, inflation, net)
· Labor rates (equipment maintenance)
As part of the kick-off meeting CDM will perform a plant site visit and a visual inspection of
the facility including operating conditions and physical space constraints.
2.2 Biogas System Description and Availability - The biogas system will be evaluated to
facilitate the identification of biogas vehicle fuel alternatives. Based on current
operations as well as the anticipated growth and demand, the biogas available for
vehicle fuel will be quantified. Current biogas production including average and
peak production will be estimated based on industry standard guidelines and
CDM experience. This information will be used to size the treatment and fueling
system and to identify the requisite characteristics of the vehicle fleet. Vehicle
production will be provided in gasoline gallon equivalents (GGE) per day.
2.3 Public Works Vehicle Fleet Description - To ensure that the biogas fueling system meets
the needs of the Bremerton WWTP and the City, information will be collected on
the existing vehicle fleets. Vehicles that can be modified to utilize RNG will be
identified with relative costs provided. Vehicle fleet information will also be used
to determine the need for and the size of gas storage facilities.
2.4 Preliminary Vehicle Fuel Alternatives Identification - Vehicle fuel alternatives will be
3
ClIVI
identified and qualitatively evaluated prior to developing a single alternative to
the planning level. Alternatives will investigate types of gas storage (upstream,
downstream of treatment, low pressure, high pressure), types of gas treatment
(pressure swing adsorption, molecular sieve, water column) and connection with
the natural gas utility. Three alternatives will be identified and described. The
alternatives will be qualitatively evaluated and a recommendation will be made
for development to the planning level.
2.5 Draft Biogas System and Vehicle Fuel Alternatives Technical Memorandum - The findings
of this task will be summarize in a Draft Technical Memorandum for the review
of the City prior to the development of a single alternative and the completion of
the final report.
Assumptions
Data and information regarding the plant operations is readily available from the City,
including recent and accurate biogas testing data.
CDM will post the information to the project eRoom setup under Task 1.
City Responsibilities
The City will maintain communication with CDM and provide available data and
information at the project kick-off meeting or shortly thereafter. The City will provide the
information in electronic format. A consolidated single set of City comments will be provided
to CDM on the draft technical memorandum, Biogas System and Vehicle Fuel Alternatives within
two weeks of receipt.
Deliverables
. Draft technical memorandum, Biogas System and Vehicle Fuel Alternatives (approximately 7
pages)
Task 3 - Biogas Vehicle Fuel Report
3.1 Planning Level Vehicle Fuel Alternative Development - The biogas vehicle fuel option
selected under Task 2 - Biogas System and Alternatives Identification will be
developed to the planning level under this task. As part of the development, a
process flow diagram and a site plan will be generated, vendor quotes will be
fielded for major process equipment, a materials list will be developed and a
brief operations narrative will be written.
4
ClIVI
3.2 Planning Level Cost Estimate- Based on the planning level design, a cost estimate of the
identified alternative will be developed by CDM's construction and cost
estimating division.
3.3 Draft Biogas Vehicle Fuel Report - A draft Biogas Vehicle Fuel Report will be written to
summarize the findings of this study. The report will consolidate the Biogas
System and Vehicle Fuel Alternatives memorandum and the planning level design of
the selected alternative into a single document with an executive summary and
conclusion. The document will be approximately 20 pages long.
3.4 Final Report Meeting - A meeting will be held with the City and CDM. CDM's Project
Manager and Project Engineer will be in attendance. During the meeting the
findings of the study and appropriate next steps will be discussed.
3.5 Final Biogas Vehicle Fuel Report - A final version of the Biogas Vehicle Fuel Report will be
developed to include the discussion of the Final Report Meeting and the City
comments.
Assumptions
The vehicle fuel alternative will not require the development of a tie-in or wheeling
agreement with the Natural Gas utility.
City Responsibilities
A consolidated single set of comments will be provided to CDM on the draft Biogas Vehicle
Fuel Report within two weeks of receipt.
Deliverables:
. Draft Version, Biogas Vehicle Fuel Report (approximately 20 pages).
. Final Report Meeting agenda one week prior to meeting. Meeting minutes one week after
the Final Report Meeting.
. Final Version, Biogas Vehicle Fuel Report. CDM will provide five (5) hard copies and three
(3) electronic copies of the Final Report on a CD in Adobe .pdf format to the City.
5
Exhibit B
to Agreement between Owner and Engineer
City of Bremerton Westside Wastewater Treatment Plant
Hours Estimate: Biogas Vehicle Fuel Report
CDM
Staff : Janelle Cale Michael Richard Mojgan Christi ne Dave Parry Total
Rogers McPherson Stevens Mugler Moini Merrill
Project Role: Principal In PM/Project Graphics CADD Contract Admin & QA/QC
Charg.!...,- Engineer Admin Coord.
Hourlv Rate: $ 67.32 -r- 30.15 $ 38.50 $ 27.50 $ 28.68 $ 18.75 $ 91.35
Task Number & Descriotion
Task 1 - Project Management
Kick-off Meeting 6 6 2 2 16
Work Plan & Project Schedule 3 4 7
Monthly Status Reports and Invoicing 2 2 6 10
I Total Hours 6 11 0 0 4 1.2 0 33
I labor Costs $ 404 $ 332 $ - $ - $ 115 $ 225 $ - $ 1,075
I I
Task 2 - Biogas System and Alternatives Description
Data and Information Collection/Analysis 10 10
Biogas System Description and Availability 8 8
Public Works Vehicle Fleet Description 12 12
Preliminary Vehicle Fuel Alternatives Identification 16 2 18
Draft Bioqas System and Vehicle Fuel Alternatives TM 16 3 I 2 2 23
I . Total Hours 0 62 . 3 0 01 2 4 :71
I labor Costs $ - $ 1,869 $ 116 $ - $ - 1$ 38 $ 365 $ 2,022
I I
Task 3 - Bioaas Vehicle Fuel ReDort
Planning Level Vehicle Fuel Alternative Development 2 24 6 2 34
Planning Level Cost Estimate 2 5 7
Draft Biogas Vehicle Fuel Report 2 24 3 3 2 34
Final Report Meeting 10 2 2 14
Final Biogas Vehicle Fuel Report 1 8 3 2 14
I . . . Total Hours . 7 71 . C" 5 6 0 :8 .6 .. '.103
I labor Costs $ 471 $ '2,141 $ 19j $ 165 '.$ - $ 150" $ 548 .$ .3119
Total Hours 1 131 1441 81 6 41 22 I 10 207
Total labor Costs 1$ 8751$ 4,342 1 $ 3081$ 165 $ 1151$ 413 I $ 914 $ 7,130
Total Direct Labor
178.4% overhead allowance of direct labor:
28% professional fee of direct labor:
ODC Travel:
Outside Professional (WBA - Ed Fernbach):
Outside Professional (CCI - Cost Estimating):
2.5% other direct cost of direc labor:
$7,130
$12,721
$1,997
$1,157
$6,235
$582
$178
$30,000
TOTAL
WBA
Ed
Fernbach
Project
Engineer
r-s215.00
6
6
$ 1,290
3
4
7
$ 1,505
4
1
3
6
2
16
$ 3,440
29
$ 6,235