Loading...
HomeMy WebLinkAbout5614 � �e-��t�c;� �� �: 7 AGENDA BILL 6 G CITY OF BREMERl'ON CITY COUNCIL SUBJECT: Local Agency Contract with Study Session Date: August 10, 2016 � Puget Paving & Construction, Inc. for Austin COUNCIL MEETING Date: August 17, 2016 Drive Pavement Preservation Project Department: PW&U Presenter: Tom Knuckey Phone: (360)473-2376 SUMMARY: The City received a $692,000 grant through KRCC for the Austin Drive Pavement Preservation project which will provide an asphalt overlay of Austin Drive from Kitsap Way to Erlands Point Rd and will also overlay Higbee Rd. from Austin Drive to the Navy Hospital Gate. Bids were opened on August 9th, 2016 and 3 bids were received. Puget Paving 8� Construction, Inc. was the lowest responsive, responsible bidder at$713,038.00 including sales tax. ATTACHMENTS: 1)Site Plan; 2) Contract; 3) Bid Tab FISCAL IMPACTS (Include Budgeted Amount): The project is included in the 2016 budget at $755,000. STUDY SESSION AGENDA: ❑X No Presentation ❑ Full Presentation STUDY SESSION ACTION: o Consent Agenda ❑ General Business ❑ Public Hearing RECOMNiENDED MOTION: Move to approve the Local Agency Contract with Puget Paving 8 Construction, Inc. in the amount of $713,038.00 for the Austin Drive Pavement Preservation Project; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: [.7�Approve ❑ Deny ❑ Table ❑ Continue ❑ No Action Form Updated 01/07/15 i . - i � ]'� �j; �I . � — �; -- i; �� ly � ei �a �� �� . �I '+ I +_ �� �I ��� I� .► �, �� � , � �j ! � . , �I � ' " • i �! _...I• _� - — Contract Documents For Austin Drive Pavement Preservation Project City of Bremerton Project No. 42102 Federal Aid Project No. STPUS-6639(001) Bid Openin_q: TBD. City Clerk's Office, City Hall � 345 Sixth Street, Suite 600 Bremerton, WA 98337=1873 Contact Person: . Gus Brandon Garcia Public Works & Utilities Engineering Division 3027 Olympus Drive Bremerton, WA 98310 Tel: (360)473-2317 FAX: (360)473-5398 :i , , �� ;�''� `` .':'` GJ `��.`r ';1 C`..�! -� d�� . , r�� ;�: �.; ;. , �� �`j t��' ' .. This Page Intentionally Left Blank PROJECT ENGINEER CERTIFICATION For construction of: Austin Drive Pavement Preservation Project Federal Aid Project#STPUS-6639(001) The technical material and data contained in these Specifications for the Austin Drive Pavement Preservation Project were prepared under the supervision and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below. ,1 J `�, — !�, c oF Wasy i: � �� itic .r � � �+'. Z r, h .�, 48273 '+bF,\�l9TER�'� � � �S�ONAL� Prep . by: Shane Weber, PE anaging Engineer Date: � �'� �� ��E`�♦� O� O� WASy G� �� RE ��c �; � • o�.4 �/1 2 � 3074� � RfClSTERF'0 \ �10NpL� Ap ved by: Tom Knuckey, PE City Engineer Date: �7 I��!�� TABLE OF CONTENTS I. CONTRACT DOCUMENTS • ADVERTISEMENT FOR BIDS........................................................................CD-3 • BIDDERS CHECKLIST.................................................................................CD-4 • PROPOSAL FORM......................................................................................CD-5 • PROPOSAL BOND FORM............................................................................CD-9 • STATEMENT OF BIDDERS QUALIFICATIONS................................................CD-10 • NON-COLLUSION DECALRATION...............................................................CD-12 • CERTIFICATION OF FEDERAL AID CONTRACTS...........................................CD-13 • DBE UTILIZATION CERTIFICATION..............................................................CD-14 • DBE UTILIZATION WRITTEN CONFIRMATION...............................................CD-16 • CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION.............CD-17 • LOCAL AGENCY SIGNATURE PAGE............................................................CD-18 • LOCAL AGENCY PROPOSAL SIGNATURE PAGE..........................................CD-19 • PERFORMANCE BOND...............................................................................CD-20 • PAYMENT BOND.......................................................................................CD-21 • LOCAL AGENCY CONTRACT......................................................................CD-22 II. AMENDMENTS TO THE STANDARD SPECIFICATIONS III. SPECIAL PROVISIONS IV. CONTRACT PLANS (BOUND SEPARATELY) APPENDICES A-FEDERAL AID PROVISIONS FHWA-1273 B-WASHINGTON STATE PREVAILING WAGES C-FEDERAL DAVIS-BACON WAGE DETERflAINATION CONTRACT DOCUMENTS Austin Dnve Pavemenf Preservation STPUS-6639(001) CD-1 This Page Intentionally Left Blank Austin Drive Pavement Preservation STPUS-6639(001) CD-2 NOTICE INVITING BIDS City of Bremerton � Austin Drive Pavement Preservation Project RECEIPT OF BIDS: Sealed Bids will be received at the office of the City Clerk of the City of Bremerton, located at 345 6�h Street, Bremerton, Washington 98337 until 10:00 AM PST as shown on-the wall clock inside the City Clerk's office on August 9, 2016, for the project Austin Drive Pavement Preservation Project. Bids received after the specified time and date will not be considered. OPENING OF BIDS: The bids will be publicly opened and read after 10:00 AM on August 9, 2016, in the office of the City Clerk at 345 6th Street, Bremerton, Washington 98337. COMPLETION OF WORK: The WORK must be completed within twenty-five (25) working days after the commencement date stated in the Notice to Proceed. DESCRIPTION OF WORK: The WORK to be completed under this Contract generally consists but is not limited to the installation of an HMA overlay on Austin Drive and Higbee Road as shown on the Plans. The Work will include temporary traffic control, saw-cutting, HMA patch repair, planning bituminous pavement, adjusting manholes, catch basins, and water valves, replacing catch basin frames and grates, constructing cement concrete curb ramps, paving, channelization and permanent signing, and all other work all in accordance with the Contract Plans, Provisions, and WSDOT Standard Specifications for Road, Bridge, and Municipal Construction. The Engineers Opinion of Probable Cost of Construction is approximately $675,000 to $700,000 Bidders on this project are encouraged to conduct site visits to familiarize themselves with the Work area. PREVIEWING CONTRACT DOCUMENTS: Contract Documents may be previewed on printer ARC (formerly known as Reprographics Northwest) website (www.e-arc.com). Go to http://www.e-arc.com/locations/219, click on the `Public Planroom' tab and scroll down to find the project. PURCHASING CONTRACT DOCUMENTS: The Contract Documents may be ordered from ARC. Payment is typically cost of reproduction (non-refundable). Contact Bid Services at ARC in Tacoma, WA: 1(800)337-8103; FAX (253)272-4064; E-mail: tacoma.bidservices(a�e-arc.com. PROPOSALS: All bid proposals must be made on the blank forms furnished in the Contract Documents. Sealed envelopes containing bids shall be entitled: Austin Drive Pavement Preservation Project—Overlay. Austin Drive Pavement Preservation STPUS-6639(001) CD-3 BID SECURITY: Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. The failure to furnish a bid deposit of a minimum of 5 percent shall make the bid nonresponsive and shall cause the bid to be rejected by the Contracting Agency. PERFORMANCE BOND: The successful bidder will also be required to provide a Performance Bond for 100 percent of the Contract Price. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Bremerton. PROJECT COMMUNICATION: All communications related to the project shall be directed to the City of Bremerton prior to opening of Bids: Communication by phone/email: Gus Brandon Garcia � Project Manager Telephone: (360)473-2317 Email: Gus.Garcia@ci.bremerton.wa.us CITY'S RIGHTS RESERVED: The City of Bremerton reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. The following is applicable to federal aid projects: The City of Bremerton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, sexual orientation or national origin in consideration for an award. - END OF NOTICE INVITING BIDS - Austin Drive Pavement Preservation STPUS-6639(001) CD-4 BIDDER'S CHECKLIST Bidder must execute and return with submittal: 1. PROPOSAL FORM - The unit prices bid must be shown in the space provided. The proposal shall be filled in and signed by the bidder. All addenda must be acknowledged. 2. BID PROPOSAL BOND 3. STATEMENT OF BIDDERS QUALIFICATIONS 4. NON-COLLUSION DECLARATION 5. LOCAL AGENCY CERTIFICATION FOR FEDERAL AID CONTRACTS 6. DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION CERTIFICATION AND INSTRUCTIONS 7. DISADVANTAGED BUSINESS ENTERPRISE UTILIZATION WRITTEN CONFIRMATION 8. CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION 9. LOCAL AGENCY SIGNATURE PAGE 10. LOCAL AGENCY PROPOSAL SIGNATURE PAGE After the Contract is awarded, execute: 1. LOCAL AGENCY— PUBLIC WORKS CONTRACT 2. PERFORMANCE BOND 3. PAYMENT BOND Austin Drive Pavement Preservation STPUS-6639(001) CD-5 PROPOSALFORM BIDDER: ADDRESS: DATE: TO: CITY OF BREMERTON ADDRESS: 345 6�h, Street, Suite 600 Bremerton, WA 98337 PROJECT: Austin Drive Pavement Preservation Project- Overlay The undersigned hereby certify(s) that they have personally examined the location and construction details of work as outlined on the plans and specifications for Austin Drive Pavement Preservation Project and have read and thoroughly understand the plans and specifications and confract governing the work embraced in this improvement and the method by which payment will be made for said work and hereby propose to undertake and complete the work embraced in this improvement in accordance with said plans, specifications, and contract at the attached schedule of rates and unit prices. Unit prices for all items, all extension and total amount of bid must be shown in ink or tvped• ADDENDA Receipt of Addenda numbers through is hereby acknowledged. Austin Drive Pavement Preservation STPUS-6639(001) CD-24 g2�°L PROPOSALFORM BIDDER; /u��f' ��hita�2�,c� �t.e. ADDRESS: -�D8�7� a�'K fr� .J� ��Cu�caoc� UYo9 9�5��� DATE: '_�7_.,".�'��I�o TO: CITY OF BREMERTON ADDRESS: 345 6'�', Street, Suite 600 Bremerton, WA 98337 PROJECT: Austin Drive Pavement Presenration Projecf- Overfay The undersigned hereby certify(s) that they have personaNy examined fhe location and consfruction defails of work as outlined on the p/ans and specifications forAustin Drive Pavement Preservation Project and have read and thoroughly understand fhe p/ans and specifications and contract goveming the work em6raced in fhis improvement and the method by which paymenf will be made for said work and hereby propose to undertake and comp/efe the work embraced in this improvemenf in accordance wifh said plans, specificafions, and contract at the aftached schedule of rates and unit prices. Unit arices for all items al/extension and fofa/amount of bid must be shown in ink or typed AD�EIV�A Receipt of Addenda numbers / through �- is hereby acknow/edged. Austin Odve Pavement Prese�vaUon STPUS�639(001 J � CO-24 PROPOSAL FORM(Continued) NOTE: Unit prices for all items, atl extensions and total amount of bid must be shown.Show unit prices in both words and figures and where conflict occurs the written or typed words shall prevail. Include sales tax on all appropriate bid items.DOR Rule 171 applies. Item Ref Est No. to Spec Description of Item Quantity Unit Unit Price Amount 1 1-09.7 Mobilization � �S $ ����v�o $ �10�p�e 2 2-02.3(3) Removal of Concrete 60 SY . Sidewalk $��b,° " $f S voo,O° i 3 8-22.3(6) Remove Pavement Marking 6000 LF $ SP 0. �s $ ��0.`�' 4 5-04.5 SP HMA for Pavement Repair 1405 SY Incl. Haul $ �S °o $`�J��Z5 5 7-05 SP Replace Catch Basin Frame 15 Eq and Grate $ � 70d.`�' ��S�oi�°' 6 5-04S.3�(14) 21aDnepg Bituminous Pavement 5741 SY $ � aa $ �7 ZZ3 n � � 7 5-04.3(14} Planing Bituminous Pavement 4723 SY $ � oa $�� �(� SP 4" Depth o° 8 5-04 HMA CL. '/:" PG 64-22 3190 TON $ •70.oo �,��7.� 3� 9 5-02.3(2)C Fog Seal 15 TON $ 7QG.°r' $ j0,5o�w' 10 8-01.3(9) Silt Fence 120 LF $ /D,"`' $ ���.�� 11 8-02 Erosion and Pollution Control 1 LS $ �000,� $ ,zov� ^� 12 8-22 24" Plastic Line 200 LF $ �p, °O $�vao,h' 13 8-22 Raised Pavement Marker 5 HUND $ (�00,`"' $ �oav,"G 14 8-23 SP Temp Pavement Marking 5700 LF $ Q ,�5 � �cja5.�� 15 8-21 Permanent Signing 1 LS $ /004,`'" $�ODD��° 16 8-20 SP Illumination System Complete 1 LS $33 o aa��° g 3� ��� p� 17 1-10 Project Temp Traffic Control 1 LS $�p �,�;••� $ �p�p�o0 18 1-10.3 Flaggers and Spotters 500 HR $ ���vO $����Qo,� 19 SP 8-22 Paint Line 1800 LF $ �. °� $ /go0,°D Austin Drive Pavement Pieservation STPUS-6639(001) CD-24 Item Ref Est No. to Spec Description of Item Quantity Unit Unit Price Amount 20 SP 8-52 Re-Establish Survey 5 Eq Monument $ �(�GIO.°' $,�'D�O.�D 21 SP 8-14 Cement Conc. Curb Ramp 4 E,q $ Type Parallel A J��`" $�pa�� c� � 22 SP 8-14 Cement Conc. Curb Ramp 4 Eq $ Type Parallel B �oOD"" $� o,x���' � 23 SP 8-26 HMA Speed Table Complete 1 LS $ 7,2�0`'" �y�50�'° 24 1-09.6 Minor Change 1 EST. $50,000 $50,000 25 SPCC Plan 1 LS 5D0 �5�f� Bid Proposal Total $ � / � a 3 � ,�d Ausfin Orive Pavement Presenration STPUS-6639(001) CD-24 PROPOSAL FORM (Continued) IF SOLE PROPRIETOR OR PARTNERSHIP IN WITNESS hereto, the undersigned has set his(its)hand This day of 2016. Signature of Bidder Title 1F CORPORATION IN WITNESS WHEREOF, the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this�ay of 2016. �a-�f �aVi�a � L'o�s'/nc.�h'�� -�,-�. Nam�of Corporati l��-�- " By Secretary Title f� �d� Sworn to before me this �� day of LGo 2016. ' ,,,�{�►yM���N,��yG p �l �i ,,*�i .� .�d'�uri.��t� `yr:. No a Publi in and for � ••'����'� � rY the State of Washington residing at ;. ,, �rA�.� �_ � ? "'r e ��''� �; p .�:.� � ., _�: , : NOTE: =��'`'�u. BL�Gr:� �. ; •.,,�����A�,:, .�;. 1. If the Bidder is a co-partnership, so state,giving the name under which busiri t ��,�``� �;'� ��"'-- 2. If the Bidder is a corporation,this proposal must be executed by the duly authoriL�d�of�as���and notarized. . Austin Orive Pavement Preservation STPUS-6639(001) CD-24 �'� ,\1. . ..a Proposal Bond KNOV4'ALL MEN BY THESE PRESENTS,That wc, puget Paving&Consiruction,Inc. of Lakewood,Washington as principal,and thc The Ohio Casualty Insurance Company a corporalion duly orbanized undcr thc taws af thc statc of New Hampshire ,and authorized to i10 busincss in thc Statc oFl�'as6ington,as surcty,arc hcid and firmiy bound unto thc Statc of Washington in the full and pcnal sum of fivc(5)perccnt of thc total emount of the bid proposal of said principal far thc work hcrcinaftcr dcscribcd,far thc paymcnt of which,wcll and truly to bc�nadc,�vc bind oun c�irs,cxccutors,administrators and assigns,and succcssors and assigns,firn�ly by thesc prescnts. Thc condition of this bond is such,that whcrcas thc principal hcrcin is hcrcu�ith submitting his or � its sealcd proposal for the"following higfiivay coiistriicfion�to wit: � Austin Drive Pavement Preservation Project said bid and proposal,by rcfcrcncc thcrcto,bcing madc a paK hcrcof. NOW,THEREFORE,If thc said proposal bid by said principal bc acccptcd,and thc contract 6� awardcd to said principal,and if said principal shall duly makc and cntcr into and cxecutc said contrdct and shall furnish bond as rcquircd by thc Dcpartmcnt of Transportation within a period of twcnty{20} da}+�from and aftcr said award,cxclusivc of thc day of such award,thcn this obligation shall bc null and void,otherwisc it sh;�ll rcmuin and bc in full forcc a��d cffcct. IN TESTiMOIYY WHEREOF,Thc principal a�id surcty havc causcd thcsc prescnts to bc signcd and scalcd this 9th day of Au t , 2016 Puget Paving&Conshuction,Inc. rincipal) The Olrio Casualty Insurance Company � � (Sur�ty) (Attom -i cc)Christopher Kinyon . . . �.. , . ' 00T fartn272-0Ot EF Rl�UeO t?�97 � �'F � Aus6n Orive Pavement Preservetlon = ;!.� , • STPUS-6639(001) � • CD-24 TfiIS POWER OF A7TORNEY IS NOT VALID UNLESS IT 15 PRINTHD ON REO BACKGROUND. , Thls Porrer oi ABomey Amits fhe acb oi those named hereln,and they have no authoriiy to bind the Company except in the manner and to the extent herein stated. Certificate No.r,�er,t�o American Fire and Casualty Company Liberry Mutual Insurance Company The Ohio Casuafty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: ThatAmerican Fire&Casualty Company and The Ohio Casualty Insurance Campany are corporations duly organized under the laws of lhe State of New Hampshire,fhal Uberty Mutuai Insurance Company is a corporation duly organ¢ed under the laws of the State of MassachuseHs,and West American Insurance Company Is a corporation duly organ¢ed under the laws of the State of Indiana(herein coilecdvely cailed the'Companies�,pursuant to and by authority herein set torth,does hereby neme,oonstitute and appant, Aliceon A.Keltner•Annelies M.fiichie•Barbara A.Johnson•Brandon K.Bush•Brent E.Heilesen•Carle Es iritu•Christo her Kin on• Cynthia L.Jay Diane M.Hardinq•Eric A.Zimmerman•James B Binder Jamie Diemer•Jon J Oia•Julie R Truitt�Karen C Swanson Kristine A Lawrence Kyle J Howat Mitchell R Smee,Peter J.Comfort all of Ihe city ot Teooma ,state c( WA each individually if there be more than one named,its We and lawful attomey-in•fact to make,execute,seal,acknowledge and deliver,tor and on its behalf as surety and as its act and deed,any and all underlakings,bonds,recogn¢ances and other surety obligations,in pursuance of these presents and shall be as binding upon the Companies as'rf they have been duly signed by the president and attested by the seaetary oi the Companies in their oum proper persons. IN WITNESS WHEREOF,this Power of Attomey has been subscribed by an authorized officer or offiaal of the Companies and the corporale seals o(the Companies have been affixed thereto this s�h day of June , 2016 ��pN��ASG9( P`nY I�NS�q9 JP��NS�qqy `'N�µSUqqH American Fire and Casualry Company � J z s �e� �Zm �3��' �^ ��,Q��°"�`�1rFo�^ The Ohio Casualty Insurance Company Ul � 19�6 3 = �9�9 0 > i9�z 3 � �gg� ; LibeRy Mutuallnsurance Company y � D s a West erican Insurance Company E �`fl'�It' a � �r .�`2 �m � aD � 2 y �Ly ��" �,�a 9y1 H�µ �ta �) lt�onh�l� ; h'oud� < � t •y t * * , /� 3 gy; G. .0 � STATE OF PENNSYLVANIA ss David M.Care ,Assistant Seaetary C =� COUNTY OF MONTGOMERY ep C L � On this s�h day of .1une . 2016,pefore me personally appeared David M.Carey,who acknowledged himself lo be the Assistant Secretary of American Fire and � � � d Casualty Company,Liberty Mutual Insurance Company,The Ohio Casualty Insurance Campany,and West American insurance Company,and U�at he,as such,being authorized so lo do, �,N p� execute the foregoing instrument for the purposes therein contained by signing on behalt of the oorpora6ons by himself as a duly authorized officer. d W �� IN WITNESS WHEREOF,I have hereunto subscribed m name and affixed my notanal seal at Plymouth Mee6ng,Pennsylvania,on lhe day and year first above written. p p, W � 5p PAsr COMMONWEALTH OF PENNSYLVANIA /► �•y'D Q'� M°"w F� Notarial Saal ��w"y`� /q'.�2�.�-.cn-dv Q M ti��°� �i y Teresa Pastella,Notary Publlc gy O� d OF O � Plymoutn Twp.,Montgomery County Teresa Pastella,Notary Public � 4� � My Commission Exqres March 28,2017 3 C C1 0 '�SYW*_,�, l0 O � �q��� Momber,pennsylvane Auodatlon ol Nolaries 0 � e� This Power of Attomey is made and executed pursuant to an by authority of Ihe following By-laws and Authorizations of American Fire and Casualty Company,The Ohio Casualty Insurance tn p' d.,, Company,Liberty Mutual Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as folbws: �o �m ARTICLEN-OFFICERS-Secbonl2.PowerofAttome .An officeroroiheroffiaalottheCo orationauthorized(orthal u � y y �P p rpose in wriGng by the Chairman or the President,and subject O � C;; to such limilation as the Chairman or the President may prescribe,shall appoint such attomeys-io-fact,as may be necessary to aal in behalf of the Corporation to make,execute,seal, �� O c acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attomeys-in-facl,subject to Ihe limitabons set forth in their respective �p� E y powers of attomey,sha�have full power to bind the Corporation by their signature and execufion of any such insUuments and to a@ach thereto Ihe seal of the Corporation. When so � d p p exeaited,such instruments shall be as binding as'rf signed by the President and attested to by Ihe Secretary.My powrer or authority granted lo any representa6ve or attomey-in-fact under >� � � the provisions of this article may be revoked at any time by ihe Board,the Chairman,the President or by the officer or officers granGng such power or authority. d� � c ARTICLE XIII-Execution of Contracts-SECTION 5.Surery Bands and Undertakings.My ot�cer of the Company authorized for that purpose in wriGng by the rhairman or the president, ~� M � and subjed to such limitations as the chairtnan or fhe p2sident may presaibe,shall appoint surh attameys-in-fact,as may be necessary to ad in behalf of the Company to make,execute, �M O � seal,acknowledge and deliver as surely any and all undertakings,bonds,recognizances and other surety obligations. Such attomeys-in-fact subject to the limitafions set torfh in their C ao Z v respective powers of attomey,shall have full power ta bind fhe Com p an y b y their signa ture an d execu t ion o f any such insVuments and to attach thereto ihe seal of the Company. When so v o executed such insUuments shall be as binding as if signed by the president and ariested by the seaetary. Certifieate of Designation-The President of the Campany,acling pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attomeys•in- ~� fad as may be necessary to act on behatf of the Company to make,execute,seal,acknowledge and deliver as surely any and all undedakings,bonds,recognizances and other surety oMigations Authorizaflon-By unanimous consent of the Compan�s Baard of Qirectors,fhe Company consents that facsimile or mechaniqlly reproduced signeture of any assislant se�xetary of the Company,wherever appearing upon a certified copy of any power of atlomey issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with the same force and eftect as though manually affixed. I,Gregory W.Davenport,the underslgned,As�stant Secretary,of Artrerican Fire and Casualty Company,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,and West American Insurance Company do hereby certify Ihat the original power of attomey of which the foregoing is a full,We and correcl copy oi the Power otAriomey executed by said Companies,is in full(orce and ef(ed and has not been revoked IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this�day of ✓ f G � ,20�. ��PND CASGq( JP�,SV INSV'�9 J���NSUqqry `Pa I.NSUq,� �i L Q�yf` J�� O[�i^ �Q?yW ",.b('A' g 1906 $ o �979 o F 1912 ; � 1991 °s r� i x By: . . by� •N�r�aD �,y 4q��� m'�,,rsA��,'� .� �'N� <= Gregory W.Davenport,Assistant Secretary �r f ,� * • • L�12873 122013 700 of 800 STATEMENT OF I3IDDER'S QUALIFICATIOIV5 Name cf Contractar �c!o-�� Pa v�rtg g' �,�,r�� � � v �-�--T-�C• adar�ss_ /0 �/ 7 ,a/� � f►✓e f /�P�� n�,� ��`�� Tefephone and Contact Person for this Bid_(0253) �f7cf -5'�/� ,f�P�'an ��n,� Number of years the c4rrtrac�ot has been engaged in the construction business under the preserit flrm name indicated: _ 5 i r � � Gross dollar amount of vwork under contrad: $_ `�,yt�//,�� Gross doflar arnaunl of con(rads not completed: $ � �yr��ljp� Type ef work generalty performed by Contractor: �,r� ` � �i?l���',�1� �-c�p��/Igl .��i�/.�l/�jdA/(Il��/! 1)�cl'. -,. . /z, �� List of flve proJects oi a similar size and nature that have been oompleted by the oontraGor wlthin th� last ten years induding the proJect name, year of construction, contracting agency, contract phone number and the gross daflar amount of each proJect: � Project Name Construction /�qency Name Contaci Name DollarAmount ��� . -. . . . Year and Numbe� � �►l�a;►��ei1_:..C�� . 'j'o�ua_ a h1 ar�k.- :" ,�,.- - � ���1� �"_` . -- pz���:, 1�--- �._.,... -- �r�7e�yv�iv o0 e�P�l` ,_. --- ..�� �Tr/_/i?Coo.y! �i�S 'U....._; • E��,,� � _-- - -� _�3"�a.73 --�1.DOQ90;�:�./ ocFsOnke�__ . ' ;_._....:_. . ,v �aE'r�' ��� ---��l6��- -UN;d��, p��,�� -��.r�; s �. � —,�:;��1�-- ��� _��95 0 0_ ,, w,�� s�- o-.�s`" D,..v, .._ �_� ao�,� ���wtf r � •e ,� � i�c ��w • /�eti�a� az��� /��/�P �OUn ,�3n �eb 26 ���OdO, V' O�eir e �'«.�„ Tr.,.y �ed n �s2.�e t r /a.�,��,�f �;,� �I3 oZo�� �r� o� Tac�.�.: � ,Pf/3aa ov�� � a- aiz � , �- ' _�0(,-�-.--. C'— ° T °I� �e �o�:_ _ � �� � "�9ve-S;Ovu=f --�ea- ac= -.T___-___�--/ v ��'_;- DO;oCb`=' �h� � R� � �3- � � 9� , � U10 List of flve major pfeces of equipment whlch are arrticipated to be used on this prcject by the ���0'n�� contracter and note which itema are owned by the contractor and which are to be leased or rented ��, �� irom others: �e � �� b 6�� o� � �a P �ot,Un� � C� � � f � 38 av�r���, /�o� I`e 70� ' lir �� %� 6v�n� Austln Drive Pavement Preseivation STPUS-6639(001J CD-24 STATEAf ENT OF BI DUER'S QUALIFICA170NS(corUinued} Bank References: _ P�{ Geur�S �r�/he �P P,�� g��?sj) 07�'`� /g�(p How many general superintendents or other respansible employees in a superviso you have at this time and how long have they been with this cantraclor?� , �t,vorry���t5 u�arS Have you changed bonding companies within the lest three years?_ �/D If so,why?(optional) Have you er�er been sued by the client on any public worics contract for a speaal dist�ct, municipality,county, or state govemment? ND For what reason? � Disposition of case,if settled: Washington State: Department of Labor and Industries Workmen's Compensation Account No,:�q0 ��'OG Department of L,fcenses Contractor's Registration No.: �r��F T,�e�92 �s Employmerrt Security Department Number: _ �9y S�/ � 3 Excise Tax Registration Number. �a�^ y/��-- �� lRS Employer fVum�er: �}/— /�y Z/ �� Percentage of work to be perfo�rned by General Contracior. 8:5% � d'��✓�M ?° [rdn S' ��•—�C BID�R By(Sign ) �i'�l%��i��" TITLE Austin Drive Pavement Preservation STPUS�639(001 J CO-24 Failure to return this Declaration as part af the bid proposal package will make the bid nonresponsive and ineligibte for awa�d. NON-COlLUSION DECLARATION 1, by signing the proposal,here6y declare, under penalty of perjury under the laws af the United States that the following statements are true and correct: 1. Thaf the undersigned person(s), firm,association or corpo�ation has (hava)not,either directly ar indirectly,entered into any agreement, participated in any collusion,or othenuise taken any action in restraint of free compeGtive bidding in connection with the project for rM�ich this proposal is submitted. 2. That by signing the signature page oi this proposal, i am decmed to have signed and ta have agreed to the p�ovisions of this declaration. NOTICE TO ALL BIDDFQS To repart rigging acUvities cafl: 1-800-424-9071 The U.S. Department of Transportation(USDOT)operates the above loll-free "hotline"Monday through Friday,8:00 a.m.ta 5:00 p.m.,eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent aciivities shouid use the°hotline°to report such aciivities. The"hotline°is part of USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direciion of ihe USOOT tnspector General. AII information will be treated confidentlally and caller anonymity will be respected. &R DOT Form 272-0381 EF OTPIGtt Austin Drive Pavement Preservation STPUS-6639(001) CD-24 Local Agency Certification for Federal-Aid Contracts The prospective participant certifles by signing and submitting this bid or proposal� to the best of his ar her knowledge and belief,that: (1) No Federai appropriated funds have been paid or will be paid,by or on behalf of the undersigned,to any person for intiuencing ar attempGng to influence an afficer o�employee of any Federal agency,a Member oi Congress, an officer or employee of Congress,or an employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any Federal grant,the making of any Federal loan,the entering into of any cooperative agreement,and the exlension,continuation, renewal,amendment, � or modification ot any Federal contract,grant,loan or cbbperatiVe-agreement. (2) If any tunds other than Federal appropriated tunds have been paid or will be paid to any person for influencing or attempting to influence an ofTicer or employee of any Federal agency,a Member of Congress,an officer or employee of Congress,or an employee of a Member of Congress in connection with this Federal contract,grant,loan,vr cooperative agreement,the undersigned shail complete and submit Standard Fornn-LLL,"Disclosure Form to Report Lobbying,"in accordance with its instructions. Thls certificatian is material representation of the fact upon which reliance was placed when this transaction was made or entered into. Submission of thi � � ' imposed by Section 1352,Title 31,U.S. Code. Any person who fails to file the required certificaGon shali be subject to a civil penalry of not less than$10,000 and not more than$100,OD0 for each failure. The orosnpriive�a � i�ant also agrees by s�bmitting his or her bid or oroR�l that_he or she shall rea�ire that the lang�age of this cPrtification be fnat�ded in all lower tier subcon ra which exceed$100,000 and that all such subrecipients sha�l certity and disclose accordingly. SR DOT Fam zn-0aon eF o�r�oi� Austin Drive Pavement PreservaGon STPUS-6639(001) CD-24 Local Agency Disadvantaged Business Enterprlse Utilization Certification To be digible for eward of this conhact Ihe b;dder must fil out and submit,as part oi Ils bid proposal,the lollow;ng Disadvanlaged Business Enterprise Utilizatfon CerGfication relating lo DlsadvanLaged gusiness Enlerprise(DB�requirements.The Conbacffng Agancy ehall consider es non-responsive and shaq rejecl anyr bld proposel that does not conla;n a pgE Cert;{�c,a�O�Wh;�h properly demonstrates Ihat the bldder will meet the OBE partic)patlon requtr�nents in one of the manners provided�Or in the pmpay���a� The Biddet must submit good/eith eHort dotumert[atiwi ee/v fn the evant the bidder's effurts to solicil suffxient DBE partitipetlon hes been unsucceasiul.The suaeasfal bidder's Disedvanta9e 8usiness F�prfse Ulilization Certification shap be deemed a paA of the resu�liny conlract Informatlon on ceAllled frrtns is ave�abte irom OA�lWBE onpne at httpJlomwbe.wagovldirectory-of-ceAifled•firmsl ` °� , 9` C.O�tS7i2c�h�d.� /mA,i'„ certifiee lhat thQ Oisadvantaged Buslness Enterprisa�DBE) IH II MsmedBtyeer Firms Gsted below have een eontacted reparding partidpetbn on thls groject,I�fhis bWder is suecessful on this project and is ewarded lhe Confrad.it shall essvre tl�et suDeontracb or supply agreements are executed wilh those flrms where an`Amount to be Appfled Towards Goal"is�sted.(It necessery,use edd+tinnal sheet) Cotumn 1 Cotumn 2 • Cdumn 3 Cdumn 4 rr ProJect Role Name of DBE (P�tm0.Joint Venturo, Amount to Certlflcata Number $��^�«. Descrlption of Work 6e Applled Manutadurer,Repukr Towards Goal Dea�s� t. J'u(ro�l�ac{� G�eGI���� ��c�o:�.�� 2.�f qR- ru�o.� CY�,�af �,�. �/�,�,� �33 ��.L� 3. ,f'' �— �LL�C6 �tdltt�0 �GK�� +��Z�700 a, s. 8, 7. 8, 9. 10. dlsadvantaged Busv�vsy Entarprtso Subcentra�ting Goal: I� �o DBE Totol$ g�p p�� _t� «' Box 2 � Box 3 � Ragular Dealer slalus must be epDroved prlor to CYd submitlaf by 1he Office oi Equal ppport�rdiy.Wash.S4�te pppt.pf Transporlation,on each eontrxt "• See qte eestio+�"Cre6l6ng OBE pmticipatian Towa�d Meeting fhe OaaP In tha Contract Oocumertl. •"F Tha Contrdctueg Ager�,ry wNl utlllze ods artrount to daterrtdns wMe1h¢r o�rro1 B�e bidder hes met lhe poef.In 9�e event of an�i8rrtetic Erfferenoe batwroen Ws roml a1W Iha svm ol tho Individual amourtte I�tod ahow,0»n ihe sum of tho amounFs Ilsted ahall preva(I and tlw toLM�nlll be rovised aeao�d;npy, Parttc;patron in excess ot the goel amount w�be conaidered volu+riary a rece�neutral parpcJpation. SR 00T Fam 272-0SdA EF 7l2M5 Austin Drive Pavement Preservation STPUS-6639(001J CD-24 Biddec, The Weshington Stete Depariment of Transportetion has made sign�icant changes to Ihe process for submitting Disadvaataged 8usiness Enterprise(DBEj Cortditior�of Award(COA}Goal documentation.Review the(DBE) specificaUons In the conVect you are bidding for changes in the requirerrterrts.A partlal6st of changes is Irtcluded in ihis letter.Failure to submit DBE dxumenta6on as required by the sp�cations w0!result in your bi�being considered nanresponsive and will be rejected. YOU MUST INCLUDE IN YOUR BID: 1.A Disadvantaged Business Enterprise Utilization Certi'fication(WSDOT Form#272-05fiA EF Revised 07J2b11) whfch demonstrates how you will meet ffie pBE COA Goal.Be sure to revlew the instruc�ons for fipfig out the torm.To asstst you in selecting DBE firms,WSDOT and OMWBE have created a Directory of Certified D6E Firms,avaiFabte at:h�t n:lhvww.omwbe wa qov/certificadon/index shtml.This directory provides a°WSDOT COA Work Descriptlon'for each OBE 6mt fo�purposes oi filC�g out the form.The'Description of Work"on the 0(sadvantaged Business Enterprise UtllzaGon Certification must be consisterit with the°WSDOT COA Work Description'In the Directury of CertH'red DBE Firms or yaur bid will be rejected,however da nat copy the work _, descriptlon verbatim 1t it includes items ot wu�9c in its title that.d►at are_nat work items.of the.cantract.__Qply li�t .. ._ those items of work in the Description of VVork descrfptor that the D8E Subcontractor Is gang to perform on tl�e Contract For exempfe,'rf the Conhact has work�6�stallat(on and removal of pavemerrt marfcings along with striping and you Found a cettified OBE Subcontraotor that has a'WSDOT COA Work Description'oi a descxiptor such as.PAVEMENT MARKINGS INSTALLATION AND REMOVAL;INCLUDING STRIPING,GUlDEPOSTS, GLARE SHIELDS,BOLLARDS,RUMBLE S7`RfPS. If the Contract does r�ot have work items for guideposts, glere shields,bollaMs and rumble strips then shorten ihe descriptor to only those wwk ftems in the descriptor that the OBE Subcontracto�will be doing such as,PAVEMENT PAARKINGS INSTALLATION AND REMOVAL; INCLUDING STRIPlPIG. 2.You must submit a Disad+rantaged Buslness Enterprise(DBE)WriKen Confirmation Document(datad 07/2011) for each OBE listed on your Disadvantaged Business Enterprise Utilization CerUfication.WSDOT has created Form#422-031A EF for this purpose.Keep in mind lhat bldders end bBEs may have a supply of the old forms, Do not use them.Requlred informaHon has been added to thls torm Iherefore use ot an eariier verslon of the form may result in bid rejection.The�Descxiption of Work"artd'Amount to be Applied Towards Goai'iisted the Disadvantaged Business Enterprise(DBE)Written Confirtnation Document must metch the"Description ot Worfc" end"Amount!o be Apptied Towards Goal'listed on your Disadvantaged Businese Enterprise Utilfzstlon Ce�cation or your bid anll be reJected.See Special Provisian Delivery Of Proposal when lhis documertt needs to be submitted. 3.You must submit Good Faith Eifort(GFE)Documentation in addition to the Disadvantaged Business Enterprise Uti!)zaqon Cerlificati�on ONLY IPV THE EVENT ypur ef(orts to soticit suffiaent DBE participation have been uneuxess/ul and ycu are relyir�g upon your Good Faith EBo�t DocumentaNm in whole or pert to meet the goal. See Spedal Provision Dellvery of proposal when this document needs to be submltted. WSDOT has posted a eopy of our tralning materials on our website whlch ie available aG htto:/lwww,wsdot.wa qQy�jz/constructioN see"Constructian News.' The DireClory of CeRified DBE Flrms is evallable al:htto�lhtiu:��.omv"�.�wa g�/cerii�c-tiort�ndex a►+►r*+i WSDOT Forms are aveilable et hito�Nwwwwsdot wa govltorms/ Noie the form#to easlly locate the form. O��ice of Equa1 Opportunity: Co�tract Ad d,Award: htta:IMrww.wsdot wa qovlea pportunitv httoJMhnv wsdoGwa aovlbl�Monteal � Revlsed 06/2013 Austin Orive Pavement Preservation STPUS-6639(001) CD-24 � Loca6 Agency Disadvantaged Business Enterprise ��18�) Writte� Confirmation Docurnent � As an authodzed representativve of the Dfsadvantaged Business Fn�rprise(QBEj,I oor�m that we have been contacted by the referenc�d bidder w�th regard tv the referenc�d project and if the Dictder is awarded the oontract we wiq enter into an agreement uvith the bidde�to partidpate in the pra)ec� conslstent with�the inturmaGon provided�the bidde�s disadvantaae�,Bs�siness Ent�mrice Utl�zation Cet�icanon. � com,act 17�e: �S/��► ��',�p �,p�r� ',.v f'mJ PP�' � �tdde�'s Bus�nees Na�ta; 7 UA�� .`+Zt//Aof 9` [Ah�r�r�.�n��.)rt„��, " . p6E's Bva�nes�Name: J// e � d�G t . DB�Slgnaba�e: DBE'�Titls: _�S�l�nna_/t-1 L� G o�: ��/�o/(„ The entries must be consistent valth wheE is shown on tl�e bidder's Dlsadverrteged Buslnesa ' EMerpt�e Ut�lzatbn Certiticatlon. Failure to ctc eo ariq result�3�rejedian. See Corrtract provls�on; Dlseventaged Br►s6�ess EMerluise Cond�'!on orqward pardclpa6bn. best��onoiWwk: !/N,IH ' . Amount to be Applted Towards Goa1: �OZ 2 ,7 0 U .�` sa � . ' ocT��ann�� CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSIOfd � ausarrr a�r�+e Pevartrenr Presarvaaa►, � . STPUS�639(P01J CD-24 Local Agency Disadvantaged Business Enterprise �DBE) Written Confirmation Document As an authorized representative of the Disadvantaged Business E�terprfse(DBE), I confi�m that we have been contacted by the referenced bidder wrth regard ta the referenced project and if the bidder is awarded the contract we w+ll enter into an agreement with the bidder to participate in the project consistent with the informaGon provided in the bidder's Disadvantaged B�sinecc Fnter�rise Uti(ization Certifi tion ContractTltle: �S�/1 ��✓P Yo�VP�lP�1T � P�Yo? A �/;� /�PP� U Bldder's Buslness Name: �up�� �0���` � /Y � ' l h .�n � ��� . OBE's Buslness Name: � � � �� DBE Slgnature: � DBE's Tltle: �/�f%pQ� Date: _ 8/ / /�/(� The entries must be consistent with what is shown on the bldder's Disadvantaged Business Enterprise UWizatlon Certffication. Failure to do so will result in bid rejection. See contract provision; Disavantaged Business Enlerprise Condit�on ol Award PartiC/pation. DescriptionoiWork: �„�Lo�� ��n �/�L 1��� / x...� Amount to be Applied Towards Goal: `� �� �b� , d" SR DOT Fam q�z.p;itq EF o7f1011 CERTIFICATION OF FEDERAL NON-DEBARMENT AND SUSPENSION Austin Drive Pavement Preservation STPUS-6639(001) CD-24 Loc�l Agency Disadvantaged Business Enterprise (DBE� Written Conffr�matian Document As An�uthorized represenletive af�hq p�aedvanleped 8uyinegs����rprise(b8E), i�anr,rm that we have beer►contacted by th�reterenced b�dder w�h�gard to Ine referenced prc�and�11he bidde► is awarded fhe contract we wtll enter mlo an egreement wifh tha bidder to pdniapete�n the project consislent with Ihe mtamal�on provided�n Ihe bidder'e �laU1�8�BlisineBg Ent 1lf�pOr1 G���hr�L ------._.��IIB� Cont►sct 1'IMr � < 7 P �\ ��:.rY�'��� : .,_.._.. _ . - --- - _ ..... � 91dd�r�Busln�sa NAme; - - ..._._ K9;�.�._�a✓�„ 1�_�vrc.&�?_'��y� 1�C. - . . . . �` �.. oet�.��.a,...n,m.� ..�_� : .. � - �.-�---� , .. ._ _.:. oee sio��►.: � _ _ q�.� DBE�.T�.: �r e � ��- o.�.: � � Gl 1 1 � ThQ erllnes rnust be Cons�slenl Mnlh whpi��shpwn o��he b���s D�s�d�anteped Bu�ness �nte►prise UliqiAUon CeAlf�celron, FeUure to do so wUl resuN m bid re�ectbn S�conirad provlswn, Di9evenfagod 6usirress Enferprise Cond�tion o�Awerd Perr�c,pelpn, Descr�ptqh ol Wak. � �LPG'�� , �V Amount lo be Apphed Tpwerd�Goal. � �,�"�')�� �--- —.—... 3a �� 1�^�11C)fAkl ;q•7Q'i CERTIFICATION OF FEDERAL�ION-bEBAitlAENT AND SUBp N810N auaLn onve Pa�r liesarv�pon S li+l/S�8J9(pplJ Cb•N . � INSTRUCTIONS TO BIDDERS• THIS FORM SHALL BE EXECUTED BY THE CONTRACTOR AND SUBMITTED WITH THE BID. THE CONTRACTOR SHALL MAKE COPIES AND DIS7RIBUTE THIS FORM TO ALL SUBCONTRACTORS.SUBCONTRACTORS MUST SUBMIT THIS FORM TO THE CITY PRIOR TO PERFORMtNG ANY WORK ON THIS PROJECT. As a prospective contractor for the City of Bremerton and as a requirement of your submittal, you are required to provide debarment/suspension certification indicating that you are in compliance with the below Federal Executive Order. Deba= Federal Executive Order(E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving individual awards or using federal..funds� and all,sub-recipients. _ . _ - - ------.._.._,..--�----------�--- --.___ __........--�---.... certi that the organization and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government or from receiving Federally- assisted contracts. Your signature certifies that neither you nor your principal is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. If, at any time during the term of the contract, such condition occurs the Contractor will notify the City without delay. CERTIFICATION: I,the undersigned,certify that the information above is true and complete to the best of my knowledge and belief. ' G{ al��, °� �a,�4 'a '1 Compan Name �t o�/I n� Name and Title of Signer(please e or prin clearly) � 0 Signature Dat Austin Drive Pavement P�eservation STPUS-6639(001) CD-24 Local Agency Signature Page T'he undersigned hereby agrees to pay labor not less than the prevailing rates of wages in accordance with the reyuiremcnts ofthe spccial provisions for this projec� Receipt is hereby acknowledged of addendum(s}No.(s)_� , oZ _�__ Slgnature of Autho�ized pfficial(s) Proposal Must be Signed Firm Name - - ,�j ' y -C . � Address �Og / 7' ��_�y� f' _,,a�,�,����,, �Lf� p��9� State oF Washington Contractor's License No. OU�►�-7-��...�9.�L� Federal ID No. 9� —��c�a�7 � Note: (I) This proposal form is not transferabie Wnd any aEteruti��i of the firm's name entered h�reon �vithout prior permissian from the wi(l be cause Tor considering the praposal irregtilar and subsequent reject.ipn of the bid. (2) Ple�se refer to section I-02.6 of the standard specifications,re:"i'reparation of Proposal,"or "Articic 4"afthe lnstruction to t3idders for building construction jobs. (3) Should it be necessary to modify this propo�)either iu writing or by electronic means,please make reference to the followin6 proposal n�unber on in your communication (4) RCW�7.28.03�(2)applies: No bid deposit or pertorman�e bond shall be required but it sl�all be specif ed in lhe bidding proposnl that each month the contractor may be required to submit paid invoices showing that disbursemeats ha�e been made to laborers,materialmen,mechanics, and subcoiilractors due such persons from the previous progress pavment. If,uch disbursements have not been made,the monthly progress payme�t shall be a•ithheld pending receipt of the paid invoices. pOr F�nn vz-o3w� amot t Austin Drive Pavement Preservation STPUS-6639(001) • CD-24 Local Agency Proposal - Signature Page Tlie bidder is hereby advised ihat by signature of this proposut he/sl�e i�deemed to have acknowledged all rcquircments and signcd all ccrtificates contained licrein. A proposal guara�iry u�a��amount of fivc perccnt(5%)of thc total bid,based upon the approsimatc estimate afquantilies at the above prices aud in the form as indicated belncv is attached hereto: Cash ❑ In the Amourrt of Cashier's Check ❑ QOIIatS Cenified Check ❑ ($ ) Payable to the aqency Proposal Bond � fn the Amount of 5°�ot the Bid � �, Rcceipt is hercby ackno��ledged of addcndum{s)No.(s)_� v� & Signature oF Autharized Official(s) Proposel Must be Slgned Firm Name ' q� e Address /O$/7 oZ/o J9i/r .1 �..�o,..l ����9 1`���� . - —�--- State ot Washington Contractor's License No. �U(��"7'�(�' � 9 'G,� Federal ID No. 9'� —��c�L��7� Note: (I) This proposa]form is not transferablc and any al�eration of the fiml's namc cntcred hcreon wit6out prior permission from the _will be cause for considering thc pru�osal imegular and subsequent rejeci-ion nf the bid. (2) Please refer to sectiun 1-02.6 of thr�tandnrd specifieatiuns,re:"Preparatiun of Proposal;'or "Article 4"of the Instruction to Bidders for building construction jobs. SR OOT Form?T2�p78KEf 0772011 Austin Drive Pavement Preservation STPUS�639(001) CD-24 � : :% ' � Local Agency Performance Bond PERFORMANCE BOND to(City of Bremerton or County],WA Bond No. 023036775 Thn tr.itv nt Bremerton o� CauntyJ,washington((City or County�)has awarded to Puget Pawng 8 Consvuction,lnc(PrinCip81),a contract for the construction oi ihe project designated as A„sun o��e Pa�emem• ,PrOjeCt No 42102 in[location],Washington(Contract),and said Principal is required to tumish a bond tor perfortnance of all obtiga ons un @f 9 CO►ItfBC�. 'PreservaUon The Ohio Casualty Insurence Compan The Principal,and (�Surety),a corParation,organ¢ed under the laws of the State of New Hampshire and licensed to do business in the State of Washington as surety and named in the current list of•Surety Companies Acceptable in Federal Bonds'as published in ihe Federal Registar by the Audit Staff Bureau of Accounts,U.S.Treasury Dept.,are lointly and severally held and firmly baund to the[City or CounlyJ,111�h9 SUrtI Of Seven Hundred Thirteen Thousand Thirty-Eight Dollars and 00/100 U$ Oouars($ 713,038.00 )Totat Contract Amount,subjact to the provisions herein. This StatuMry performance bond shall beoome null and void,if and when the PrinCipal,its heirs,executors,administrators, successors,or assigns shall well and faithfully perform all oi the P�nCipal's obligations under the Contract and fulfill all tertns and conditions oi all duly authorized rnodficatlons,addidons,and changes to said Contract that may hereatter be made,at fhe dme and in Me manner therein specified;and'rf such pertormance obl�gations have not b9en futfilled,this bond shall remain in force and effect. The Surety for value received agrees that rto chartge,eutension of 6me,alteration or addidon to the terms of the Contract,the specifiptions accompanying the Contract,or to the work to be pertormed under the Contract shall in any way aftect its obligation on this bond,end waives noHce of any Change,extBnsion of time,atteration or addition to the tertns of the Cantract or the work perfortnad.The Surety agrees that modificat�ons and changes to the terma and conditions of the Contract that increase the total amount to be paid the Principal shall autamatically increasa the obligation af the Surety on this bond and notice to Surety is not ►equired tor such increased obligatian. This bond may be executed in two(2)original counterparts,and sha11 be signed by the parties'dury authorized officers.This bond will only be ac�pted'rf it is accompanied by a fully exeated and ariginal power of attomey for the office execuling on behaM of the surety. PRINCIPAL Puget Paving&Construction,Inc. SURE T e Ohio Casualty Insurance Company � � �� �7 ` Au ust 19,2016 Principal Signature ate Surety Signature Date `rT�'T c�i1 V•c /),u Q�Z?��6 Christopher Kinyon August 19,2016 � Printed Name Date Printed Name Date , P�f'��eM Attorney-in-Fact • TAte Title Name,address,and telephane of Iocal oncelagent of Surety Campany is Propel Insurance PO Box 2940 Tacoma,WA 98401 (253)759-2200 Appro�ed as to fortn: G� Pc�� R�� - 1 l� [City ar County] or ,[City o or County] �ate pOT Fom+272-0D EF oerzo�a Austin Drive Pavement Preservation STPUS-6639(001) CD-24 , � .i ' Local Agency Payment Bond PUBLIC WORKS PAYMENT BOND to[Clty of Bremerton or County],WA Bond No. 023036775 T�����y� Bremerton or Caunty],Washington([Citv or Countyl)has ewarded to Puget Paving&Construction,inc. {Prtncipal},a contract for 1he construcGon of the project designated as,ausi�n o���e Pavemenc• ,Project No.42102 in[location].Washingtan(Contract),and said Principal is required under the terms of that Contracl lo(umish e payment�ond in acwnl with TiUe 39.08 Revised Code of Washington(RCW}and(wher�e epplicable)60.28 RCW. •P�eseNanon The Princi al,8t1d he Ohio Casualty Insurance Compan p �Surety),a corparaGon orgenized under the laws of the State of New Hampshire and licensed to do business in the State oI Washington as eurety and named in the current list ot'Surely Companies Acceptable in Federal Bonds"as published in lhe Federal Register by the Audit Staff Bureau ot Accounts,U.S.Treasurv Deat.,ere ioln�v and severally held and firtnlv 6ound to the[Clty o►County],UI Ihe SUR10f Seven Hundred Thirteen Thousand Thirtv-Eight Dollars and 00/100 US Dollars($ 713.038.00 )Totel Contract Amount,subJect to the provisions herein. Thls statutory payment bond shall become null end void,if end when the Principal,its heirs,executors,administrators,suocessors,or essigns shall pay aIl persons in accordance with RCW 39.08.39.12,end 60.28 inctuding all workers,laborers,mechanics. subconUactors,and materialmen,and all person who shall supply such contrector or subconVactor with provisions end supplies for the carrying on a(such work,and all texes Incurred on said ConUact under Tltles 50 and 51 RCW end all taxes imposed on the Pnncipal under Tltle 82 RCW;and if such payment obligations have not been fultdled,this bond shall�emain in(ull force and eflect. The Surety tor value received agrees that rto change,e�ension of time,alteretion or addiGon to the terms o(the Contrect,the specifications acc�mpanying Ihe Cantract,or to the wark to be performed under the Contract shall in any way eftecl ils obligaGon on tAis bond,and waives notice of any changes,excenslon of time,alleration or addition to the terms of the Contracl or the work perfortned.The Surety agrees that modifications and changes to the tertns and condiGons of Ihe Contract thet increase the totel amourtl to be pald the Principal shall aulamalically increase the obligation of the Surety on this band and notice to Surety is not required for such increased obliga6on. Thls bond may be executed in lwo(2)original counterparts,and shall be signed by the parties'duty aulhorized o�cers,This bond will only be accepted if il is accompanied by a futly executed and original power of eKomey for Ihe oRce executing on behatt of the surely. PRINCIPAL Puget Paving&Construction,Inc. SUR TY T Ohio Casualty Insurance Company c� z � ��' _T/6 ` a� St o s Principal Signature 4 Date Surety Signature Date • �f�P�'?� (aC`7��vl 8/Z��6 Christooher Kinvon August 19,2016 ' Printed Name Oate Printed Name Oate r"/Yf��e� Attornev-in-Fact T11e Title Name,eddress,artd telephone of local officelagent of Surety Company is: Propel Insurance PO Box 2940 Tacoma,WA 98401 (253)759-2200 Ap e s to form: ` �i �1-1 �e � [ or CounryJ o y,[Ciry ot or County] Date DOT Farm 272-003A 0872012 Austin Drive Pavement Preservation STPUS-6639(001) CD-24 � TH!'S�POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. . � This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. �44tssi American Fire and Casualty Company LibeRy Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: ThatAmerican Fire&Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of lhe State of Massachusetts,and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Aliceon A.Keltner�Annelies M.Richie�Barbara A.Johnson;Brandon K.Bush;Brent E.Heilesen;Carley Espiritu;Christopher Kinyon; Cynthia L.Jay;Diane M.Hardinq;Eric A.Zimmerman;Heather L.Allen;James B.Binder;Jamie Diemer;Jon J.Oja;Juiie R.Truitt;Karen C.Swanson; Kristine A.Lawrence;Kyle J.Howat;Mary S.Norrell;Mitchell R.Smee;Peter J.Comfort all of the city of Tacoma ,state of WA each individually if there be more than one named,its true and lawful attomey-in-fact to make,execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this ach day of August , 2016 ' ANo caSG P�,�V�NSUq P�,INSUqq P�,uNSUqq American Fire and Casualty Company a ��,`���avor�rfcq�� e�,��ar.•�,fGy2� jJ�y;U`O4q�oV�F �Q����,�o���� The Ohio Casualty Insurance Company N a 1906 0 0 1919 � � i9i 2 ° � 1991 � Liberty Mutual Insurance Company � 3 r West merican Insurance Company � S 2 � 6 b s aD • d`�G�`w�, e+p�4'aD �j�Wh. .pa-02 y'9/1�'J c^ 2 i < N N (�b, .iMl'% *[� h, A!.'.1'� � ) S,1CilU�` r �Y�IPtI� � � f ! f T * * By. r� = STATE OF PENNSYLVANIA ss Dawd M.Care ,Assistant Secretary � _� COUNTY OF MONTGOMERY C dp� On this ath day of August , 2ot6, before me personally appeared David M. Carey,who acknowledged himself to be the Assistant Secretary of American Fire and v F � � Casualty Company,LibeRy Mutual Insurance Company,The Ohio Casualty Insurance Company,and West American Insurance Company,and that he,as such,being authorized so to do, �W p� execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. ` � d � IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seai at Plymouth Meeting,Pennsylvania,on the day and year first above written. O �+l4 P pqs COMMONWEALTH OF PENNSYLVANIA � �'O �� Q��a�o"W�rFf Notarial Seal � Ya,.M C'N ti��,° �i y Teresa Pastella,Notary Public gy; �l�'^.""�" a.�� �'C O i oF Plymouth Twp,Montgomery County Teresa Pastella,Notary Public y C � ` �\P My Commission Expires March 28,2017 3 � O� �p�,�����' Member,Pennsylvania Association of Notanes a � c c� This Power ofAttomey is made and executed pursuant to an by authonty of the following By-laws andAuthorizations ofAmerican Fire and Casualty Company,The Ohio Casualty Insurance rn p ��, Company,Liberty Mutual Insurance Company,and West American Insurance Company which resolutions are now in full force and effecl reading as follows: �� � �L ARTICLE IV—OFFICERS—Section 12.Power ofAttorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject O C �;; to such lim�tation as the Chairman or the President may prescribe,shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, �y O� acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surery obligations. Such attorneys-in-fact,sub�ect to the limitations set forth in their respective �� � y^ powers of attomey,shall have fuil power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation When so '� d p` executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representahve or attorney-in-fact under >� ,� � the provisions of this article may be revoked at any lime by the Board,the Chairman,the Presidenl or by the officer or officers granting such power or authority. L� �� �� � ARTICLE Xlil—Execution of Contracts—SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writmg by the chairman or the president, � , > � and sub)ect to such limitations as the chairman or the president may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute, L-M O 3 seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attomeys-in-fact subject to the limitations set forth in their �o? Z v respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so v� executed such instruments shall be as binding as if signed by the president and attested by the secretary. �� Certificate of Designation—The President of the Company,acGng pursuant to the Bylaws of ihe Company,authorizes David M.Carey,Assistant Secretary to appoint such attomeys-in- fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Authorization—By unanimous consent of the Company's Board of Directors,the Company consents ihat facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a ceRified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with the same force and effect as though manually affixed. I,Gregory W.Davenport,the undersigned,Assistant Secretary,of American Fire and Casualty Company,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,and West American Insurance Company do hereby certify lhat the onginal power of attomey of which the foregoing is a full,true and correct copy of the Power of Attomey executed by said Companies,is in full force and effect and has not been revoked. �,� IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this�day of ,20�. PND CAS� P��(V INS(/9 P�,�NSUir�S PNINSI�Rq �<„`�;,;�o�r 9 J o�u'°M�9 J „arurtq�,'� �� oePonar�� 4 � �'��. e� 0 2�, J�' G�F W�' .�- Q, �, �� a 1906 o a �9�y ^ > 1912 ° `� 1991 � By' � � y ° x ae y a° Gregory W Davenport,Assistant Secretary Y�'!; '��4 i�a d�'H, esrP�� 9''`s ^'2 �i ,ro:;ia�» � b arnr•� `� y m+. �s J �c�iast' ! t � * � t • 110 of 800 LMS 12873 122013 Local Agency Contract �� T�IIS AGR�EM�N?,n�ade and entered into diis l� day af ��ij,�,� ,�C/� bct�vccn thc `J Cicy of Bremerton undcr and by virtuc of Titic�7 RCW,as amcndcd and Puget Paving&Construction,Inc. hcrcinaficr callec�thc Contractor. WITN�SSETII: That in cunsidcr�atian of thc tcm�s and cnnditions containrd hcrcin and atiachcd and rtiadc a part af tiiiti�gree:ment,the parties hereto covenant and agre�as follaws: 1. The Gontractor shall do all work and fiirnish all t�Qls,materials,and equipntent for: STPUS-6639(001)Austin Drive Pavement Preservation Project. in accordance with and as described in tlle attachcd plans and specifications,and the st�nc{ard specifications o.f the which are by tl�is ref�rence i.ncarporated herein and niade part hereof and,shall p�rfurm any changcs in thc work in aGcord with thc Contract Documcnts. Tt�c Contractor shali providc anci bcar thc cxpcnsr of all cquipmcnt,�vork and labar,of any sort��liatsaever that may he required for the transFer of materials an.d for constructin�and comnletinb the work peor��ided for in these Contract Documents except those items n.�entioned d�crcin to bc furnishcd bv. Ii. ��tY hcrcby promiscs and a��r�es with tli::Contractor tu�mploy,and docs cmpioy thc Contractor to prnvide the materials and to do and cause to 6e done the above described evark and to com�let�and tinish the same in Accord witt�the attached�lan.5 and specifications and the terms ai�d � conditiuny hcrrin ro�itaincd and hcrcby contracts t�pay fur thc samc acconiing to thc attachcd specilicaticros and►he schedule nfunit or it�mized prices at the time and in tlie manner and upon the conditions provided for in this contract. SR DaT Fom+z7z•ooe.a�F o7r�o�s Austin Drive Pavement Preservation STPUS-6639(001) CD- 23 III. Thc Contrnctor i'or himsclt�hcrscif,and for hisi'hcn c�irs,cxccuturs,administrators, , successors,and assigns,does hereby agree to fuU performance of all convenants required of the Conteactor in the co�itract. IV. It is furtl�er prv�ided that no lia�ility sl�all �ttach to tlie 8tute by reasoii of entering i��to this contract,cxccpt as p�nvidcd hcrein. IN t�tITNESS��'I�tEREU�,tl�e Contractor ha.s executed tl�is instrument,on khe day and year first bclow w�rittcn and has causcd this iastrumcnt to bc cxccuteci by and in thc namc of tlic day and year first above writtc;n. Executed by the Contractor ._�4 �v � , �, �r�e � /'��:C -e. �°�Y�/� �"�n..�/�ZC�J� �c . (car.re , Local Agency: ��{v �� I��ev�.4��v�n Title: �:�v La��� �O:vor By: � p��<<: � � - z-��G , S� oq7 F�irz•acsn e� D7,701 t Austin Drive Pavement Preservation STPUS-6639(001) CD- 24 AMENDMENTS Austin Drive Pavement Preservation STPUS-6639(001) A-1 INTRO.AP1 INTRODUCTION The following Amendments and Special Provisions shall be used in conjunction with the 2016 Standard Specifications for Road, Bridge, and Municipal Construction. AMENDMENTS TO THE STANDARD SPECIFICATIONS The following Amendments to the Standard Specifications are made a part of this contract and supersede any conflicting provisions of the Standard Specifications. For informational purposes, the date following each Amendment title indicates the implementation date of the Amendment or the latest date of revision. Each Amendment contains all current revisions to the applicable section of the Standard Specifications and may include references which do not apply to this particular project. 1-02.AP1 Section 1-02, Bid Procedures and Conditions April 4, 2016 1-02.4(1) General The first sentence of the last paragraph is revised to read: Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, shall request the explanation or interpretation in writing by close of business on the Thursday preceding the bid opening to allow a written reply to reach all prospective Bidders before the submission of their Bids. 1-02.9 Delivery of Proposal The last sentence of the third paragraph is revised to read: The Contracting Agency will not open or consider any Proposal when the Proposal or Bid deposit is received after the time specified for receipt of Proposals or received in a location other than that specified for receipt of Proposals unless an emergency or unanticipated event interrupts normal work processes of the Contracting Agency so that Proposals cannot be received. The following new paragraph is inserted before the last paragraph: If an emergency or unanticipated event interrupts normal work processes of the Contracting Agency so that Proposals cannot be received at the office designated for receipt of bids as specified in Section 1-02.12 the time specified for receipt of the Proposal will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which the normal work processes of the Contracting Agency resume. 1-02.12 Public Opening of Proposa6s This section is supplemented with the following new paragraph: If an emergency or unanticipated event interrupts normal work processes of the Contracting Agency so that Proposals cannot be opened at the time indicated in the call for Bids the time Austin Drive Pavement Preservation STPUS-6639(001) A-2 specified for opening of Proposals will be�deemed to be extended to the same time of day on the first work day on which the normal work processes of the Contracting Agency resume. 1-06.AP1 ' � � Section 1-06, Control of Material January 4, 2016 This section is supplemented with the following new section and subsections: 1-06.6 Recycled Materials The Contractor shall make their best effort to utilize recycled materials in the construction of the project; the use of recycled concrete aggregate as specified in Section 1-06.6(1)A is a requirement of the Contract. The Contractor shall submit a Recycled Material Utilization Plan as a Type 1 Working Drawing within 30 calendar days after the Contract is executed. The plan shall provide the Contractor's anticipated usage of recycled materials for meeting the requirements of these Specifications. The quantity of recycled materials will be provided in tons and as a percentage of the Plan quantity for each material listed in Section 9-03.21(1)E Table on Maximum Allowable Percent (By Weight) of Recycled Material. When a Contract does not include Work that requires the use of a material that is included in the requirements for using materials the Contractor may state in their plan that no recycled materials are proposed for use. Prior to Physical Completion the Contractor shall report the quantity of recycled materials that were utilized in the construction of the project for each of the items listed in Section 9-03.21. The report shall include hot mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag and other recycled materials (e.g. utilization of on-site material and aggregates from concrete returned to the supplier). The Contractor's report shall be provided on DOT Form 350- 075 Recycled Materials Reporting. 1-06.6(1) Recycling of Aggregate and Concrete Materials 1-06.6(1)A General The minimum quantity of recycled concrete aggregate shall be 25 percent of the total quantity of aggregate that is incorporated into the Contract for those items listed in Section 9-03.21(1)E Table on Maximum Allowable Percent (By Weight) of Recycled Material that allow the use of recycled concrete aggregate. The percentage of recycled material incorporated into the project for meeting the required percentage will be calculated in tons based on the quantity of recycled concrete used on the entire Contract and not as individual items. If the Contractor's total cost for Work with recycled concrete aggregate is greater than without the Contractor may choose to not use recycled concrete aggregate. When the Contractor does not meet the minimum requirement of 25 percent recycled concrete aggregate for the Contract due to costs or any other reason the following shall be submitted: 1. A cost estimate for each material listed in Section 9-03.21(1)E that is utilized on the Contract. The cost estimate shall include the following: a. The estimated costs for the Work for each material with 25 percent recycled concrete aggregate. The cost estimate shall include for each material a copy of the price quote from the supplier with the lowest total cost for the Work. Austin Drive Pavement Preservation STPUS-6639(001) A-3 b. The estimated costs for the Work for each material without recycled concrete aggregate. The Contractor's cost estimates shall be submitted as an attachment to the Recycled Materials Reporting form. 1-07.AP1 Section 1-07, Legal Relations and Responsibilities to the Public April 4, 2016 1-07.1 Laws to be Observed In the second to last sentence of the third paragraph, "WSDOT" is revised to read "Contracting Agency". 1-07.2(2) State Sales Tax: WAC 458-20-170 — Retail Sales Tax The last three sentences of the first paragraph are deleted and replaced with the following new sentence: The Contractor(Prime or Subcontractor) shall include sales or use tax on the purchase or rental of tools, machinery, equipment, or consumable supplies not integrated into the project, in the unit bid prices. 1-07.9(2) Posting Notices Items 1 and 2 are revised to read: 1. EEOC - P/E-1 (revised 11/09, supplemented 09/15)— Equal Employment Opportunity IS THE LAW published by US Department of Labor. Post for projects with federal-aid funding. � 2. FHWA 1022 (revised 05/15)— NOTICE Federal-Aid Project published by Federal Highway Administration (FHWA). Post for projects with federal-aid funding. Items 5, 6 and 7 are revised to read: 5. WHD 1420 (revised 02/13)— Employee Rights and Responsibilities Under The Family And Medical Leave Act published by US Department of Labor. Post on all projects. 6. WHD 1462 (revised 01/16)— Employee Polygraph Protection Act published by US Department of Labor. Post on all projects. 7. F416-081-909 (revised 09/15)—Job Safety and Health Law published by Washington State Department of Labor and Industries. Post on all projects. Items 9 and 10 are revised to read: 9. F700-074-909 (revised 06/13)—Your Rights as a Worker in Washington State by Washington State Department of Labor and Industries (L&I). Post on all projects. 10. EMS 9874 (revised 10/15)— Unemployment Benefits published by Washington State Employment Security Department. Post on all projects. Austin Drive Pavement Preservation STPUS-6639(001) A-4 1-08.AP1 Section 1-08, Prosecution and Progress . . January 4, 2016 1-08.1(1) Prompt Payment, Subcontract Completion and Return of Retainage Withheld In item number 5 of the first paragraph, "WSDOT" is revised to read "Contracting Agency". 1-09.AP1 Section 1-09, Measurement and Payment April 4, 2016 1-09.6 Force Account The second sentence of item number 4 is revised to read: A "specialized service" is a work operation that is not typically done by worker classifications as defined by the Washington State Department of Labor and Industries and by the Davis Bacon Act, and therefore bills by invoice for work in road, bridge and municipal construction. 5-02.AP5 Section 5-02, Bituminous Surface Treatment April 4, 2016 5-02.3(2) Preparation of Roadway Surface This section is supplemented with the following new subsection: 5-02.3(2)E Crack Sealing Where shown in the Plans, seal cracks.and joints in the pavement in accordance with Section 5- 04.3(4)A1 and the following: � � 1. Cracks '/4 inch to 1 inch in width -fill with hot poured sealant. 2. Cracks greater than 1 inch in width —fill with sand slurry. 5-04.AP5 Section 5-04, Hot Mix Asphalt April 4, 2016 This section (and all subsections) is revised to read: This Section 5-04 is written in a style which, unless otherwise indicated, shall be interpreted as direction to the Contractor. 5-04.1 Description This Work consists of providing and placing one or more layers of plant-mixed hot mix asphalt (HMA) on a prepared foundation or base, in accordance with these Specifications and the lines, grades, thicknesses, and typical cross-sections shown in the Plans. The manufacture of HMA may include warm mix asphalt (WMA) processes in accordance with these Specifications. Austin Drive Pavement Preservation STPUS-6639(001) A-5 HMA shall be composed of asphalt binder and mineral materials as required, and may include reclaimed asphalt pavement (RAP) or reclaimed asphalt shingles (RAS), mixed in the proportions specified to provide a homogeneous, stable, and workable mix. 5-04.2 Materials Provide materials as specified in these sections: Asphalt Binder 9-02.1(4) Cationic Emulsified Asphalt 9-02.1(6) Anti-Stripping Additive 9-02.4 Warm Mix Asphalt Additive 9-02.5 Aggregates 9-03.8 Reclaimed Asphalt Pavement (RAP) 9-03.8(3)B Reclaimed Asphalt Shingles (RAS) 9-03.8(3)B Mineral Filler 9-03.8(5) Recycled Material 9-03.21 � Hot Poured Sealant 9-04.2(1)A Sand Slurry 9-04.2(1)B 5-04.2(1) How to Get an HMA Mix Design on the QPL Comply with each of the following: • Develop the mix design in accordance with WSDOT SOP 732. • Develop a mix design that complies with Sections 9-03.8(2) and 9-03.8(6). • Develop a mix design no more than 6 months prior to submitting it for QPL evaluation. • Submit mix designs to the WSDOT State Materials Laboratory in Tumwater, including WSDOT Form 350-042. • Include representative samples of the materials that are to be used in the HMA production as part of the mix design submittal. See Section 5-04.2(1)A to determine when to include samples of RAP or RAS. • Identify the brand, type, and percentage of anti-stripping additive in the mix design submittal. • Include with the mix design submittal a certification from the asphalt binder supplier that the anti-stripping additive is compatible with the crude source and the formulation of asphalt binder proposed for use in the mix design. • Do not include warm mix asphalt (WMA) additives when developing a mix design or submitting a mix design for QPL evaluation. The use of warm mix asphalt (WMA) additives is not part of the process for obtaining approval for listing a mix design on the QPL. Refer to Section 5-04.2(2)B. The Contracting Agency's basis for approving, testing, and evaluating HMA mix designs for approval on the QPL is dependent on the contractual basis for acceptance of the HMA mixture, as shown in Table 1. � Austin Drive Pavement Preservation STPUS-6639(001) A-6 Table 1 Basis for Contracting Agency Evaluation of HMA Mix Designs for Approval on the QPL Contractual Basis Basis for Contracting Contracting Agency for Acceptance of Agency Approval of Materials Testing for HMA Mixture (see Mix Design for Evaluation of the Mix Section 5-04.3 9 Placement on QPL Desi n The Contracting Agency Statistical Evaluation, will test the mix design or Nonstatistical WSDOT Standard materials for compliance Evaluation Practice QC-8 With Sections 9-03.8(2) and 9-03.8 6 . The Contracting Agency Review of Form 350-042 may elect to test the mix for compliance with design materials, or Visual Evaluation Sections 9-03.8(2) and evaluate in accordance 9-03.8(6) with WSDOT Standard Practice QC-8, at its sole discretion. If the Contracting Agency approves the mix design, it will be listed on the QPL for 12 consecutive months. The Contracting Agency may extend the 12 month listing provided the Contractor submits a certification letter to the Qualified Products Engineer verifying that the aggregate source and job mix formula (JMF) gradation, and asphalt binder crude source and formulation have not changed. The Contractor may submit the certification no sooner than one month prior to expiration of the initial 12 month mix design approval. Within 7 calendar days of receipt of the Contractor's certification, the Contracting Agency will update the QPL. The maximum duration for approval of a mix design and listing on the QPL will be 24 months from the date of initial approval or as approved by the Engineer. 5-04.2(1)A Mix Designs Containing RAP and/or RAS Mix designs are classified by the RAP and/or RAS content as shown in Table 2. Table 2 Mix Design Classification Based on RAP/RAS Content RAP/RAS Classification RAP/RAS Content' Low RAP/No RAS 0% <_ RAP% <_ 20% and RAS% _ 0% High RAP/Any RAS 20% < RAP% <_ Maximum Allowable RAPz and/or 0% < RAS% <_ Maximum Allowable RASz 'Percentages in this table are by total weight of HMA zSee Table 4 to determine the limits on the maximum amount RAP and/or RAS. 5-04.2(1)A1 Low RAP/No RAS — Mix Design Submittals for Placement on QPL For Low RAP/No RAS mix designs, comply with the following additional requirements: Austin Drive Pavement Preservation STPUS-6639(001) A-7 1. Develop the mix design without the inclusion of RAP. 2. The asphalt binder grade shall be the grade indicated in the Bid item name or as otherwise required by the Contract. 3. Do not submit samples of RAP with these mix designs. 4. Testing RAP or RAS stockpiles is not required for obtaining approval for placing these mix designs on the QPL. 5-04.2(1)A2 High RAP/Any RAS - Mix Design Submittals for Placement on QPL For High RAP/Any RAS mix designs, comply with the following additional . requirements: 1. For mix designs with any RAS, test the RAS stockpile (and RAP stockpile if any RAP is in the mix design) in accordance with Table 3. 2. For High RAP mix designs with no RAS, test the RAP stockpile in accordance with Table 3. ` 3. For mix designs with High RAP/Any RAS, construct a single stockpile for RAP and a single stockpile for RAS and isolate (sequester) these stockpiles from further stockpiling before beginning development of the mix design. Test the RAP and RAS during stockpile construction as required by item 1 and 2 above. Use the test data in developing the mix design, and report the test data to the Contracting Agency on WSDOT Form 350-042 as part of the mix design submittal for approval on the QPL. Account for the reduction in asphalt binder contributed from RAS in accordance with AASHTO PP 78. Do not add to these stockpiles after � starting the mix design process. Table 3 Test Frequency of RAP/RAS During RAP/RAS Stockpile • Construction For Approving a High RAP/Any RAS Mix Desi n for Placement on the QPL Test Fre uenc ' Test for Test Method • 1/1000 tons of RAP (minimum Asphalt Binder FOP for AASHTO T of 10 per mix Content and Sieve 308 design) and Analysis of Fine and • 1/100 tons of and Coarse FOP for WAQTC T RAS (minimum Aggregate 27/T 11 of 10 per mix - desi n '"tons", in this table, refers to tons of the reclaimed material before being incorporated into HMA. 4. Limit the amount of RAP and/or RAS used in a High RAP/Any RAS mix design by the amount of binder contributed by the RAP and/or RAS, in accordance with Table 4. Austin Drive Pavement Preservation STPUS-6639(001) A-8 Table 4 Maximum�Amount of RAP and/or RAS in HMA Mixture Maximum Amount of Binder Contributed from: RAP RAS 40%' minus contribution of 200�02 binder from RAS 'Calculated as the weight of asphalt binder contributed from the RAP as a percentage of the total weight of asphalt binder in the mixture. 2 Calculated as the weight of asphalt binder contributed from the RAS as a percentage of the total weight of asphalt binder in the mixture. 5. Develop the mix design including RAP, RAS, recycling agent, and new binder. 6. Extract, recover, and test the asphalt residue from the RAP and RAS stockpiles to determine the percent of recycling agent and/or grade of new . asphalt binder needed to meet but not exceed the performance grade (PG) of asphalt binder required by the Contract. a. Perform the asphalt extraction in accordance with AASHTO T 164 or ASTM D 2172 using reagent grade trichloroethylene. b. Perform the asphalt recovery in accordance with AASHTO R 59 or ASTM D 1856. c. Test the recovered asphalt residue in accordance with AASHTO R 29 to determine the asphalt binder grade in accordance with Section 9- 02.1(4): - ' � d. After determining the recovered asphalt binder grade, determine the percent of recycling agent and/or grade of new asphalt binder in accordance with ASTM D 4887. e. Test the flnal blend of recycling agent, binder recovered from the RAP and RAS, and new asphalt binder in accordance with AASHTO R 29. The final blended binder shall meet but not exceed the performance grade of asphalt binder required by the Contract and comply with the requirements of Section 9-02.1(4). 7. Include the following test data with the mix design submittal: a. All test data from RAP and RAS stockpile construction. b. All data from testing the recovered and blended asphalt binder. 8. Include representative samples of the following with the mix design submittal: a. RAP and RAS. Austin Drive Pavement Preservation STPUS-6639(001) A-9 b. 100 grams of recovered asphalt residue from the RAP and RAS that are to be used in the HMA production. 5-04.2(1)B Commercial HMA - Mix Design Submittal for Placement on QPL For HMA used in the Bid item Commercial HMA, in addition to the requirements of 5- 04.2(1) identify the following in the submittal: 1. Commercial HMA 2. Class of HMA 3. Performance grade of binder 4. Equivalent Single Axle Load (ESAL) The Contracting Agency may elect to approve Commercial HMA mix designs without evaluation. 5-04.2(1)C Mix Design Resubmittal for QPL Approval Develop a new mix design and resubmit for approval on the QPL when any of the following changes occur. When these occur, discontinue using the mix design until after it is reapproved on the QPL. 1. Change in the source of crude petroleum used in the asphalt binder. 2. Changes in the asphalt binder refining process. 3. Changes in additives or modifiers in the asphalt binder. 4. Changes in the anti-strip additive, brand, type or quantity. 5. Changes to the source of material for aggregate. 6. Changes to the job mix formula that exceed the amounts as described in item 2 of Section 9-03.8(7), unless otherwise approved by the Engineer. 7. Changes in the percentage of material from a stockpile, when such changes exceed 5% of the total aggregate weight. a. Changes to the percentage of material from a stockpile will be calculated based on the total aggregate weight (not including the weight of RAP)for Low RAP/No RAS mix designs. b. For High RAP/Any RAS mix designs, changes in the percentage of material from a stockpile will be based on total aggregate weight including the weight of RAP (and/or RAS when included in the mixture). Prior to making any change in the amount of RAS in an approved mix design, notify the Engineer for determination of whether a new mix design is required, and obtain the Engineer's approval prior to implementing such changes. Austin Drive Pavement Preservation STPUS-6639(001) A-10 5-04.2(2) Mix Design—Obtaining P�oject Approval Use only mix designs listed on the Qualified Products List (QPL). Submit WSDOT Form 350- 041 to the Engineer to request approval to use a mix design from the QPL. Changes to the job mix formula (JMF)that have been approved on other contracts may be included. The Engineer may reject a request to use a mix design if production of HMA using that mix design on any contract is not in compliance with Section 5-04.3(11)D, E, F, and G for mixture or compaction. 5-04.2(2)A Changes to the Job Mix Formula The approved mix design obtained from the QPL will be considered the starting job mix formula (JMF) and shall be used as the initial basis for acceptance of HMA mixture, as detailed in Section 5-04.3(9). During production the Contractor may request to adjust the JMF. Any adjustments to the JMF will require approval of the Engineer and shall be made in accordance with item 2 of Section 9-03.8(7). After approval by the Engineer, such adjusted JMF's shall constitute the basis for acceptance of the HMA mixture. 5-04.2(2)B Using Warm Mix Asphalt Processes The Contractor may, at the Contractor's discretion, elect to use warm mix asphalt (WMA) processes for producing HMA. WMA processes include organic additives, chemical additives, and foaming. The use of WMA is subject to the following: • Do not use WMA processes in the production of High RAP/Any RAS mixtures. • Before using WMA processes, obtain the Engineer's approval using WSDOT Form 350-076 to describe the proposed WMA process. 5-04.3 Construction Requirements 5-04.3(1) Weather Limitations Do not place HMA for wearing course on any Traveled Way beginning October 1 St through March 31 St of the following year, without written concurrence from the Engineer. Do not place HMA on any wet surface, or when the average surface temperatures are less than those specified in Table 5, or when weather conditions otherwise prevent the proper handling or finishing of the HMA. Table 5 Minimum Surface Temperature for Paving Compacted Wearing Course Other Courses Thickness Feet Less than 0.10 55°F 45°F 0.10 to 0.20 45°F 35°F More than 0.20 35°F 35°F 5-04.3(2) Paving Under Traffic These requirements apply when the Roadway being paved is open to traffic. In hot weather, the Engineer may require the application of water to the pavement to - accelerate the finish rolling of the pavement and to shorten the time required before reopening to traffic. Austin Drive Pavement Preservation S TPUS-6639(001) A-11 During paving operations, maintain temporary pavement markings throughout the project. Install temporary pavement markings on the Roadway prior to opening to traffic. Temporary pavement markings shall comply with Section 8-23. 5-04.3(3) Equipment 5-04.3(3)A Mixing Plant Equip mixing plants as follows. 1. Use tanks for storage and preparation of asphalt binder which: • Heat the contents by means that do not allow flame to contact the contents or the tank, such as by steam or electricity. • Heat and hold contents at the required temperatures. • Continuously circulate contents to provide uniform temperature and consistency during the operating period. • Provide an asphalt binder sampling valve, in either the storage tank or the supply line to the mixer. 2. Provide thermometric equipment: • In the asphalt binder feed line near the charging valve at the mixer unit, capable of detecting temperature ranges expected in the HMA and in a location convenient and safe for access by Inspectors. • At the discharge chute of the drier to automatically register or indicate the temperature of the heated aggregates, and situated in full view of the plant operator. 3. When heating asphalt binder: • Do not exceed the maximum temperature of the asphalt binder recommended by the asphalt binder supplier. • Avoid local variations in heating. • Provide a continuous supply of asphalt binder to the mixer at a uniform average temperature with no individual variations exceeding 25°F. 4. Provide a mechanical sampler for sampling mineral materials that: • Meets the crushing or screening requirements of Section 1-05.6. 5. Provide HMA sampling equipment that complies with WSDOT SOP T-168. • Use a mechanical sampling device installed between the discharge of the silo and the truck transport, approved by the Engineer, or • Platforms or devices to enable sampling from the truck transport without entering the truck transport for sampling HMA. Austin Drive Pavement Preservahon STPUS-6639(001) A-12 6. Provide for setup and operation of the Contracting Agency's field testing: • As required in Section 3-01.2(2). 7. Provide screens or a lump breaker: • When using any RAP or any RAS, to eliminate oversize RAP or RAS particles from entering the pug mill or drum mixer. 5-04.3(3)B Hauling Equipment Provide HMA hauling equipment with tight, clean, smooth metal beds and a cover of canvas or other suitable material of sufficient size to protect the HMA from adverse weather. Securely attach the cover to protect the HMA whenever the weather conditions _ during the work shift include, or are.forecast to include, precipitation or an air temperature less than 45°F. Prevent HMA from adhering to the hauling equipment. Spray metal beds with an environmentally benign release agent. Drain excess release agent prior to filling hauling equipment with HMA. Do not use petroleum derivatives or other coating material that contaminate or alter the characteristics of the HMA. For hopper trucks, operate the conveyer during the process of applying the release agent. 5-04.3(3)C Pavers Use self-contained, power-propelled pavers provided with an internally heated vibratory screed that is capable of spreading and finishing courses of HMA in lane widths required by the paving section shown in the Plans. When requested by the Engineer, provide written certification that the paver is equipped with the most current equipment available from the manufacturer for the prevention of segregation of the coarse aggregate particles. The certification shall list the make, model, and year of the paver and any equipment that has been retrofitted to the paver. Operate the screed in accordance with the manufacturer's recommendations and in a manner to produce a finished surface of the required evenness and texture without tearing, shoving, segregating, or gouging the mixture. Provide a copy of the manufacturer's recommendations upon request by the Contracting Agency. Extensions to the screed will be allowed provided they produce the same results, including ride, density, and surface texture as obtained by the primary screed. In the Travelled Way do not use extensions without both augers and an internally heated vibratory screed. Equip the paver with automatic screed controls and sensors for either or both sides of the paver. The controls shall be capable of sensing grade from an outside reference line, sensing the transverse slope of the screed, and providing automatic signals that operate the screed to maintain the desired grade and transverse slope. Construct the sensor so it will operate from a reference line or a mat referencing device. The transverse slope controller shall be capable of maintaining the screed at the desired slope within plus or minus 0.1 percent. Equip the paver with automatic feeder controls, properly adjusted to maintain a uniform depth of material ahead of the screed. Austin Drive Pavement Preservation STPUS-6639(001) . A-13 � Manual operation of the screed is permitted in the construction of irregularly shaped and minor areas. These areas include, but are not limited to, gore areas, road approaches, tapers and left-turn channelizations. When specified in the Contract, provide reference lines for vertical control. Place reference lines on both outer edges of the Traveled Way of each Roadway. Horizontal control utilizing the reference line is permitted. Automatically control the grade and slope of intermediate lanes by means of reference lines or a mat referencing device and a slope control device. When the finish of the grade prepared for paving is superior to the established tolerances and when, in the opinion of the Engineer, further improvement to the line, grade, cross-section, and smoothness can best be achieved without the use of the reference line, a mat referencing device may be substituted for the reference line. Substitution of the device will be subject to the continued approval of the Engineer. A joint matcher may be used subject to the approval of the Engineer. The reference line may be removed after completion of the first course of HMA when approved by the Engineer. Whenever the Engineer determines that any of these methods are failing to provide the necessary vertical control, the reference lines will be reinstalled by the Contractor. Furnish and install all pins, brackets, tensioning devices, wire, and accessories necessary for satisfactory operation of the automatic control equipment. If the paving machine in use is not providing the required finish, the Engineer may suspend Work as allowed by Section 1-08.6. 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle Use a material transfer device (MTD) or material transfer vehicle (MTV) to deliver the HMA from the hauling equipment to the paving machine for any lift in (or partially in) the top 0.30 feet of the pavement section used in traffic lanes. However, an MTDN is not required for HMA placed in irregularly shaped and minor areas such as tapers and turn lanes, or for HMA mixture that is accepted by Visual Evaluation. At the Contractor's request the Engineer may approve paving without an MTDN; the Engineer will determine if an equitable adjustment in cost or time is due. If a windrow elevator is used, the Engineer may limit the length of the windrow in urban areas or through intersections. To be approved for use, an MTV: 1. Shall be a self-propelled vehicle, separate from the hauling vehicle or paver. 2. Shall not connected to the hauling vehicle or paver. 3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 4. Shall mix the HMA after delivery by the hauling equipment and prior to placement into the paving machine. 5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the mixture. Austin Drive Pavement Preservation STPUS-6639(001) A-14 To be approved for use, an MTD:�`�'- 1. Shall be positively connected to the paver. 2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 3. Shall mix the HMA after delivery by the hauling equipment and prior to placement into the paving machine. 4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the mixture. 5-04.3(3)E Rollers Operate rollers in accordance with the manufacturer's recommendations. When � requested by the Engineer, provide a Type 1 Working Drawing of the manufacturer's recommendation for the use of any roller planned for use on the project. Do not use rollers that crush aggregate, produce pickup or washboard, unevenly compact the surface, displace the mix, or produce other undesirable results. 5-04.3(4) Preparation of Existing Paved Surfaces Before constructing HMA on an existing paved surface, the entire surface of the pavement shall be clean. Entirely remove all fatty asphalt patches, grease drippings, and other deleterious substances from the existing pavement to the satisfaction of the Engineer. Thoroughly clean all pavements or bituminous surfaces of dust, soil, pavement grindings, and other foreign matter. Thoroughly remove any cleaning or solvent type liquids used to clean equipment spilled on the pavement before paving proceeds. Fill all holes and small depressions with an appropriate class of HMA. Level and thoroughly compact the surface of the patched area. Apply a uniform coat of asphalt (tack coat) to all paved surfaces on which any course of HMA is to be placed or abutted. Apply tack coat to cover the cleaned existing pavement with a thin film of residual asphalt free of streaks and bare spots. Apply a heavy application of tack coat to all joints. For Roadways open to traffic, limit the application of tack coat to surfaces that will be paved during the same working shift. Equip the spreading equipment with a thermometer to indicate the temperature of the tack coat material. Do not operate equipment on tacked surfaces until the tack has broken and cured. Repair tack coat damaged by the Contractor's operation, prior to placement of the HMA. Unless otherwise approved by the Engineer, use CSS-1, CSS-1 h, or Performance Graded (PG) asphalt for tack coat. The CSS-1 and CSS-1 h emulsified asphalt may be diluted with water at a rate not to exceed one part water to one part emulsified asphalt. Do not allow the tack coat material to exceed the maximum temperature recommended by the asphalt supplier. When shown in the Plans, prelevel uneven or broken surfaces over which HMA is to be placed by using an asphalt paver, a motor patrol grader, or by hand raking, as approved by the Engineer. Austin Drive Pavement Preservation ' STPUS-6639(001) A-15 5-04.3(4)A Crack Sealing 5-04.3(4)A1 General When the Proposal includes a pay item for crack sealing, seal all cracks '/4 inch in width and greater. Cleaning: Ensure that cracks are thoroughly clean, dry and free of all loose and foreign material when filling with crack sealant material. Use a hot compressed air lance to dry and warm the pavement surfaces within the crack immediately prior to filling a crack with the sealant material. Do not overheat pavement. Do not use � direct flame dryers. Routing cracks is not required. Sand Slurry: For cracks that are to be filled with sand slurry, thoroughly mix the components and pour the mixture into the cracks until full. Add additional CSS-1 emulsified asphalt to the sand slurry as needed for workability to ensure the mixture will completely fill the crack. Strike off the sand slurry flush with the existing pavement surface and allow the mixture to cure. Top off cracks that were not completely filled with additional sand slurry. Do not place the HMA overlay until the slurry has fully cured. Hot Poured Sealant: For cracks that are to be filled with hot poured sealant, apply the material in accordance with these requirements and the manufacturer's recommendations. Furnish a Type 1 Working Drawing of the manufacturer's recommendations to the Engineer prior to the start of work, including the manufacturer's recommended heating time and temperatures, allowable storage time and temperatures after initial heating, allowable reheating criteria, and application temperature range. Confine hot poured sealant material within the crack. Clean any overflow of sealant from the pavement surface. If, in the opinion of the Engineer, the Contractor's method of sealing the cracks with hot poured sealant results in an excessive amount of material on the pavement surface, stop and correct the operation to eliminate the excess material. 5-04.3(4)A2 Crack Sealing Areas Prior to Paving In areas where HMA will be placed, use sand slurry to fill the cracks. 5-04.3(4)A3 Crack Sealing Areas Not to be Paved In areas where HMA will not be placed, fill the cracks as follows: 1. Cracks '/4 inch to 1 inch in width -fill with hot poured sealant. 2. Cracks greater than 1 inch in width —fill with sand slurry. 5-04.3(4)B Soil Residual Herbicide Where shown in the Plans, apply one application of an approved soil residual herbicide. Comply with Section 8-02.3(3)B. Complete paving within 48 hours of applying the herbicide. Use herbicide registered with the Washington State Department of Agriculture for use under pavement. Before use, obtain the Engineer's approval of the herbicide and the proposed rate of application. Include the following information in the request for approval of the material: 1. Brand Name of the Material, Austin Drive Pavement Preservation STPUS-6639(001) A-16 ... • ; ,,,,.. 2. Manufacturer, 3. Environmental P�otection Agency (EPA) Registration Number, 4. Material Safety Data Sheet, and 5. Proposed Rate of Application. 5-04.3(4)C Pavement Repair Excavate pavement repair areas and backfill these with HMA in accordance with the details shown in the Plans and as staked. Conduct the excavation operations in a manner that will protect the pavement that is to remain. Repair pavement not designated to be removed that is damaged as a result of the Contractor's operations to the satisfaction of the Engineer at no cost to the Contracting Agency. Excavate only within.one lane at a time unless approved otherwise by the Engineer. Do not excavate more area than can be completely backfilled and compacted during the same shift. Unless otherwise shown in the Plans or determined by the Engineer, excavate to a depth of 1.0 feet. The Engineer will make the final determination of the excavation depth required. The minimum width of any pavement repair area shall be 40 inches unless shown otherwise in the Plans. Before any excavation, sawcut the perimeter of the pavement area to be removed unless the pavement in the pavement repair area is to be removed by a pavement grinder. Excavated materials shall be the property of the Contractor and shall be disposed of in a Contractor-provided site off the Right of Way or used in accordance with Sections 2- 02.3(3) or 9-03.21. Apply a heavy application�of tack coat to all surfaces of existing pavement in the pavement repair area, in accordance with Section 5-04.3(4). Place the HMA backfill in lifts not to exceed 0.35-foot compacted depth. Thoroughly compact each lift by a mechanical tamper or a roller. 5-04.3(5) Producing/Stockpiling Aggregates, RAP, 8 RAS Produce aggregate in compliance with Section 3-01. Comply with Section 3-02 for preparing stockpile sites, stockpiling, and removing from stockpile each of the following: aggregates, RAP, and RAS. Provide sufficient storage space for each size of aggregate, RAP and RAS. Fine aggregate or RAP may be uniformly blended with the RAS as a method of preventing the agglomeration of RAS particles. Remove the aggregates, RAP and RAS from stockpile(s) in a manner that ensures minimal segregation when being moved to the HMA plant for processing into the final mixture. Keep different aggregate sizes separated until they have been delivered to the HMA plant. 5-04.3(5)A Stockpiling RAP or RAS for High RAP/Any RAS Mixes Do not place any RAP or RAS into a stockpile which has been sequestered for a High RAP/Any RAS mix design. Do not incorporate any RAP or RAS into a High Austin Drive Pavement Preservation STPUS-6639(001) A-17 RAP/Any RAS mixture from any source other than the stockpile which was sequestered for approval of that particular High RAP/Any RAS mix design. RAP that is used in a Low RAP/No RAS mix is not required to come from a sequestered stockpile. 5-04.3(6) Mixing The asphalt supplier shall introduce anti-stripping additive, in the amount designated on the QPL for the mix design, into the asphalt binder prior to shipment to the asphalt mixing plant. � Anti-strip is not required for temporary work that will be removed prior to Physical Completion. Use asphalt binder of the grade, and from the supplier, in the approved mix design. Prior to introducing reclaimed materials into the asphalt plant, remove wire, nails, and other foreign material. Discontinue use of the reclaimed material if the Engineer, in their sole discretion, determines the wire, nails, or other foreign material to be excessive. Size RAP and RAS prior to entering the mixer to provide uniform and thoroughly mixed HMA. If there is evidence of the RAP or RAS not breaking down during the heating and mixing of the HMA, immediately suspend the use of the RAP or RAS until changes have been approved by the Engineer. After the required amount of mineral materials, RAP, RAS, new asphalt binder and recycling agent have been introduced into the mixer, mix the HMA until complete and uniform coating of the particles and thorough distribution of the asphalt binder throughout the mineral materials, RAP and RAS is ensured. Upon discharge from the mixer, ensure that the temperature of the HMA does not exceed the optimum mixing temperature shown on the approved Mix Design Report by more than 25°F, or as approved by the Engineer. When a WMA additive is included in the manufacture of HMA, do not heat the WMA additive (at any stage of production including in binder storage tanks) to a temperature higher than the maximum recommended by the manufacturer of the WMA additive. A maximum water content of 2 percent in the mix, at discharge, will be allowed providing the water causes no problems with handling, stripping, or flushing. If the water in the HMA causes any of these problems, reduce the moisture content. During the daily operation, HMA may be temporarily held in approved storage facilities. Do not incorporate HMA into the Work that has been held for more than 24 hours after mixing. Provide an easily readable, low bin-level indicator on the storage facility that indicates the amount of material in storage. Waste the HMA in storage when the top level of HMA drops below the top of the cone of the storage facility, except as the storage facility is being emptied at the end of the working shift. Dispose of rejected or waste HMA at no expense to the Contracting Agency. 5-04.3(7) Spreading and Finishing Do not exceed the maximum nominal compacted depth of any layer in any course, as shown in Table 6, unless approved by the Engineer: Ausfin Drive Pavement Preservation STPUS-6639(001) A-18 Table 6 Maximum Nominal Compacted Depth of Any Layer HMA Class Wearing Course Other than Wearing Course 1 inch 0.35 feet 0.35 feet 3/4 and '/z inch 0.30 feet 0.35 feet 3/8 inch 0.15 feet 0.15 feet Use HMA pavers complying with Section 5-04.3(3)to distribute the mix. On areas where irregularities or unavoidable obstacles make the use of inechanical spreading and finishing equipment impractical, the paving may be done with other equipment or by hand. When more than one JMF is being utilized to produce HMA, place the material produced for each JMF with separate spreading and compacting equipment. Do not intermingle HMA produced from more than one JMF. Each strip of HMA placed during a work shift shall conform to a single JMF established for the class of HMA specified unless there is a need to make an adjustment in the JMF. 5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA Sample aggregate for meeting the requirements of Section 3-04 prior to being incorporated into HMA. (The acceptance data generated for the Section 3-04 acceptance analysis will not be commingled with the acceptance data generated for the Section 5-04.3(9) acceptance analysis.) Aggregate acceptance samples shall be taken as described in Section 3-04. Aggregate acceptance testing will be performed by the Contracting Agency. Aggregate contributed from RAP and/or RAS will not be evaluated under Section 3-04. For aggregate that will be used in HMA mixture which will be accepted by either Statistical or Nonstatistical Evaluation, the Contracting Agency's acceptance of the aggregate will be based on: 1. Samples taken prior to mixing with asphalt binder, RAP, or RAS; 2. Testing for the materials properties of fracture, uncompacted void content, and sand equivalent; 3. Evaluation by the Contracting Agency in accordance with Section 3-04, including price adjustments as described therein. For aggregate that will be used in HMA which will be accepted by Visual Evaluation, evaluation in accordance with items 1, 2, and 3 above is at the discretion of the Engineer. 5-04.3(9) HMA Mixture Acceptance The Contracting Agency will evaluate HMA mixture for acceptance by one of three methods as determined from the criteria in Table 7. Table 7 Basis of Acceptance for HMA Mixture Austin Drive Pavement Preservation STPUS-6639(001) A-19 Visual Evaluation Nonstatistical Statistical Evaluation Evaluation • Commercial HMA • All HMA • All HMA placed at any mixture of mixture other location the same than that • Any HMA placed in: class and accepted by o sidewalks PG binder Visual or o road approaches grade with a Nonstatistical Criteria o ditches Proposal Evaluation for o slopes quantity Selecting o paths less than the o trails 4,000 tons. Evaluation o gores (Exclude Method o prelevel the tonnage o temporary of HMA pavement' mixture o pavement repair accepted by • Other nonstructural Visual applications of HMA Evaluation.) as approved by the En ineer 'Temporary pavement is HMA that will be removed before Physical Completion of the Contract. 5-04.3(9)A Mixture Acceptance—Test Section This Section applies to HMA mixture accepted by Statistical Evaluation and mixture accepted by Nonstatistical Evaluation. A test section is not allowed for HMA accepted by Visual Evaluation. The purpose of a test section is to determine, at the beginning of paving, whether or not the Contractor's mix design and production processes will produce HMA meeting the Contract requirements related to mixture. Use Table 8 to determine when a test section is required, optional, or not allowed, and to determine when test sections may end for an individual mix design. Each mix design will be evaluated independently for the test section requirements. Construct HMA mixture test sections at the beginning of paving, using at least 600 tons and a maximum of 1,000 tons or as approved by the Engineer. Each test section shall be constructed in one continuous operation. Each test section shall be considered a lot. The mixture in each test section will be evaluated based on the criteria in Table 9 to determine if test sections for that mix design may stop. If more than one test section is required, each test section shall be separately by the criteria in table 8 and 9. Table 8 Criteria for Conducting and Evaluating HMA Mix Texture Sections (For HMA Mixture Accepted by Statistical or Nonstatistical Evaluation) ; High RAP/Any RAS Low RAPINo RAS Austin Drive Pavement Preservation STPUS-6639(001) A-20 .. • . � , . . .• .'<i Is Mixture Test Section �' Mandatory' At Contrac3or's O tional or Mandato ? O tion Waiting period after paving 4 calendar daysz 4 calendar daysz the test section. Meet "Results Provide samples Required to Stop and respond to What Must Happen to Stop Performing Test WSDOT test Performing Test Sections? Sections" in Table 9 results required by for High RAP/Any Table 9 for Low RAS. RAP/No RAS. 'If a mix design has produced an acceptable test section on a previous contract (paved in the same calendar year, from the same plant, using the same JMF) the test section may be waived if approved by the Engineer. ZThis is to provide time needed by the Contracting Agency to complete testing and the Contractor to adjust the mixture in response to those test results. Paving may resume when this is done. 3For HMA with Low RAP/No RAS, which is accepted by Nonstatistical Evaluation, a test section is not allowed. Table 9 Results Required to Stop Performing HMA Mixture Test Sections' (For HMA Mixture Accepted by Statistical or Nonstatistical Evaluation) Test Property T e of HMA Hi h RAP/An RAS Low RAP/No RAS Minimum PF, of 0.95 Gradation based on the criteria None4 in Section 5- 04.3 9 64z Minimum PF, of 0.95 Asphalt Binder based on the criteria None4 in Section 5- 04.3 9 B4z Minimum PF, of 0.95 �a based on the criteria None4 in Section 5- 04.3 9 B42 Hamburg Wheel Track Meet requirements of These tests will not Indirect Tensile Strength Section 9-03.8(2).3 be done as part of Test Section. Sand Equivalent Meet requirements of 3 Uncompacted Void Content Section 9-03.8(2).3 None Fracture Austin Drive Pavement Preservation STPUS-6639(001) A-21 'In addition to the requirements of this table, acceptance of the HMA mixture used in each test section is subject to the acceptance criteria and price adjustments for Statistical Evaluation or Non-statistical Evaluation (see Table 7). 2Divide the test section lot into three sublots, approximately equal in size. Take one sample from each sublot, and test each sample for all of the properties in the first column. 3Take one sample for each test section lot. Test the sample for all of the properties in the first column. 4Divide the test section lot into three sublots, approximately equal in size. Take one sample from each sublot, and test each sample for all of the properties in the first column. There are no criteria for discontinuing test sections for these mixes; however, the contractor must comply with Section 5-04.3(11)F before resuming paving. 5-04.3(9)B Mixture Acceptance—Statistical Evaluation 5-04.3(9)B1 Mixture Statistical Evaluation — Lots and Sublots HMA mixture which is accepted by Statistical Evaluation will be evaluated by the Contracting Agency dividing that HMA tonnage into mixture lots, and each mixture lot will be evaluated using stratified random sampling by the Contracting Agency sub-dividing each mixture lot into mixture sublots. All mixture in a mixture Iot shall be of the same mix design. The mixture sublots will be numbered in the order in which the mixture (of a particular mix design) is paved. Each mixture lot comprises a maximum of 15 mixture sublots, except: • The final mixture lot of each mix design on the Contract will comprise a maximum of 25 sublots. • A mixture lot for a test section, which will consist of the three sublots and corresponding test results used in evaluating the test section for gradation, asphalt binder, and Va. Each mixture sublot shall be approximately uniform in size with the maximum mixture sublot size as specified in Table 10. The quantity of material represented by the final mixture sublot of the project, for each mix design on the project, may be increased to a maximum of two times the mixture sublot quantity calculated. Should a lot accepted by statistical evaluation contain fewer than three sublots, the HMA will be accepted in accordance with nonstatistical evaluation. Table 10 Maximum HMA Mixture Sublot Size For HMA Acce ted b Statistical Evaluation HMA Original Plan Quantity Maximum Sublot Size (tons)2 tons ' < 20,000 1,000 20,000 to 30,000 1,500 >30,000 2,000 ' "Plan quantity" means the plan quantity of all HMA of the ' same class and binder grade which is accepted by Statistical Evaluation. Austin Drive Pavement Preservation STPUS-6639(001) A-22 z The maximum sublot size for each combination of HMA class and binder grade shall be calculated separately. • For a mixture lot in progress with a mixture CPF less than 0.75, a new mixture lot will begin at the Contractor's request after the Engineer is satisfied that material conforming to the Specifications can be produced. See also Section 5-04.3(11)F. • If, before completing a mixture lot, the Contractor requests a change to the JMF which is approved by the Engineer, the mixture produced in that lot after the approved change will be evaluated on the basis of the changed JMF, and the mixture produced in that lot before the approved change will be evaluated on the basis of the unchanged JMF; however, the mixture before and after the change will be evaluated in the same lot. Acceptance of subsequent mixture lots will be evaluated on the basis of the changed JMF. 5-04.3(9)62 Mixture Statistical Evaluation —Sampling Complywith Section 1-06.2(1). Samples of HMA mixture which is accepted by Statistical Evaluation will be randomly selected from within each sublot, with one sample per sublot. The Engineer will determine the random sample location using WSDOT Test Method T 716. The Contractor shall obtain the sample when ordered by the Engineer. The Contractor shall sample the HMA mixture in the presence of the Engineer and in accordance with FOP for WAQTC T 168. 5-04.3(9)B3 Mixture Statistical Evaluation —Acceptance Testing Comply with Section 1-06.2(1). The Contracting Agency will test the mixture sample from each sublot (including sublots in a test section)for the properties shown in Table 11. Table 11 Testing Required for each HMA Mixture Sublot Test Procedure Performed b Va WSDOT SOP Engineer 731 Asphalt Binder Content FOP for Engineer AASHTO T 308 Gradation: Percent Passing FOP for Engineer 1'/z, 1„ 3/d', '/�', 3/a', No. 4, WAQTC No. 8, No. 200 T 27/T 11 The mixture samples and tests taken for the purpose of determining acceptance of the test section (as described in Section 5-04.3(9)A) shall also be used as the test results for acceptance of the mixture described in 5- 04.3(9)B3, 5-04.3(9)64, 5-04.3(9)B5, and 5-04.3(9)66. 5-04.3(9)B4 Mixture Statistical Evaluation —Pay Factors Comply with Section 1-06.2(2). Austin Drive Pavement Preservation STPUS-6639(001) A-23 The Contracting Agency will determine a pay factor (PF,)for each of the properties in Table 11, for each mixture lot, using the quality level analysis in Section 1-06.2(2)D. For Gradation, a pay factor will be calculated for each of the sieve sizes listed in Table 11 which is equal to or smaller than the maximum allowable aggregate size (100 percent passing sieve) of the HMA mixture. The USL and LSL shall be calculated using the Job Mix Formula Tolerances (for Statistical Evaluation) in Section 9-03.8(7). If a constituent is not measured in accordance with these Specifications, its individual pay factor will be considered 1.00 in calculating the Composite Pay Factor(CPF). 5-04.3(9)65 Mixture Statistical Evaluation —Composite Pay Factors (CPF) Comply with Section 1-06.2(2). In accordance with Section 1-06.2(2)D4, the Contracting Agency will determine a Composite Pay Factor (CPF) for each mixture lot from the pay factors calculated in Section 5-04.3(9)64, using the price adjustment factors in Table 12. Unless otherwise specified, the maximum CPF for HMA mixture shall be 1.05. Table 12 HMA Mixture Price Adjustment Factors Constituent Factor "f" All aggregate passing: 1'/z', 1", 3/4', '/z", 3/8' and No.4 sieves 2 All a re ate assin No. 8 sieve 15 All a re ate assin No. 200 sieve 20 As halt binder 40 Alr VOlds Va 20 5-04.3(9)B6 Mixture Statistical Evaluation — Price Adjustments For each HMA mixture lot, a Job Mix Compliance Price Adjustment will be determined and applied, as follows: JMCPA = [0.60x (CPF- 1.00)] xQxUP Where JMCPA = Job Mix Compliance Price Adjustment for a given lot of mixture ��) CPF = Composite Pay factor for a given lot of mixture (maximum is 1.05) Q = Quantity in a given lot of mixture (tons) UP = Unit price of the HMA in a given lot of mixture ($/ton) 5-04.3(9)B7 Mixture Statistical Evaluation — Retests The Contractor may request that a mixture sublot be retested. To request a retest, submit a written request to the Contracting Agency within 7 calendar days after the specific test results have been posted to the website or emailed to the Contractor, whichever occurs first. The Contracting Agency will send a Austin Drive Pavement Preservation STPUS-6639(001) A-24 •..�,,;�, split of the original acceptance sample for testing by the Contracting Agency to either the Region Materials Laboratory or the State Materials Laboratory as determined by;the.Engineer. The Contracting Agency will not test the split of the sample with the same equipment or by the same tester that ran the original acceptance test. The sample will be tested for a complete gradation analysis, asphalt binder content, and Va, and the results of the retest will be used for the acceptance of the HMA mixture in place of the original mixture sublot sample test results. The cost of testing will be deducted from any monies due or that may come due the Contractor under the Contract at the rate of$250 per sample. 5-04.3(9)C Mixture Acceptance— Nonstatistical Evaluation 5-04.3(9)C1 Mixture Nonstatistical Evaluation — Lots, Sublots, Sampling, Test Section, Testing, Retests For HMA mixture accepted by Nonstatistical Evaluation, comply with the requirements in Table 13: Table 13 Nonstatistical Evaluation Lots, Sublots, Sam lin , Test Section, Testin , Retests Comply with the Comply with the Specifications Below Requirements of the Section for: Test Section Section 5-04.3(9)A Nonstatistical Evaluation Lots and Sublots Section 5-04.3 9 B1 Statistical Evaluation Sam lin Section 5-04.3 9 B2 Statistical Evaluation Acce tance Tests Section 5-04.3 9 B3 Statistical Evaluation Retests Section 5-04.3 9 67 Statistical Evaluation 5-04.3(9)C2 Mixture Nonstatistical Evaluation -Acceptance , Each mixture lot of HMA produced under Nonstatistical Evaluation, for which all sublot acceptance test results (required by Table 13)fall within the Job Mix Formula Tolerances for Nonstatistical Evaluation in Section 9-03.8(7), will be accepted at the unit Contract price with no further evaluation. 5-04.3(9)C3 Mixture Nonstatistical Evaluation —Out of Tolerance Procedures Each mixture lot of HMA produced under Nonstatistical Evaluation, for which any sublot acceptance test result (required by Table 13) falls outside of the Job Mix Formula Tolerances for Nonstatistical Evaluation in Section 9-03.8(7), shall be evaluated in accordance with Section 1-06.2 and Table 14 to determine a Job Mix Compliance Price Adjustment. Table 14 Nonstatistical Evaluation —Out of Tolerance Procedures Com I with the Followin ' Pa Factorsz Section 5-04.3 9 64 Com osite Pa Factors3 Section 5-04.3 9 B5 Price Ad'ustments Section 5-04.3 9 B6 'When less than three mixture sublots exist, backup samples of Austin Drive Pavement Preservation STPUS-6639(001) A-25 the existing mixture sublots shall be tested to provide a minimum of three sets of results for evaluation. If enough backup samples are not available, the Contracting Agency will select core sample locations from the Roadway in accordance with WSDOT Test Method T 716, take cores from the roadway in accordance with WSDOT SOP 734, and test the cores in accordance with WSDOT SOP 737. zThe Nonstatistical Evaluation tolerance limits in Section 9-03.8(7) will be used in the calculation of the PF,. 3The maximum CPF shall be 1.00. 5-04.3(9)D Mixture Acceptance—Visual Evaluation Visual Evaluation of HMA mixture will be by visual inspection by the Engineer or, in the sole discretion of the Engineer, the Engineer may sample and test the mixture. 5-04.3(9)D1 Mixture Visual Evaluation — Lots, Sampling, Testing, Price Adjustments HMA mixture accepted by Visual Evaluation will not be broken into lots unless the Engineer determines that testing is required. When that occurs, the Engineer will identify the limits of the questionable HMA mixture, and that questionable HMA mixture shall constitute a lot. Then, the Contractor will take samples from the truck, or the Engineer will take core samples from the roadway at a minimum of three random locations from within the lot, selected in accordance with WSDOT Test Method T 716, taken from the roadway in accordance with WSDOT SOP 734, and tested in accordance with WSDOT SOP 737. The Engineer will test one of the samples for all constituents in Section 5-04.3(9)63. If all constituents from that test fall within the Job Mix Formula Tolerances (for Visual Evaluation) in Section 9-03.8(7), the lot will be accepted at the unit Contract price with no further evaluation. When one or more constituents fall outside those tolerance limits, the other samples will be tested for all constituents in Section 5-04.3(9)63, and a Job Mix Compliance Price Adjustment will be calculated in accordance with Table 15. Table 15 Visual Evaluation —Out of Tolerance Procedures Com I with the Followin Pa Factors' Section 5-04.3 9 64 Com osite Pa Factorsz Section 5-04.3 9 B5 Price Ad'ustments Section 5-04.3 9 B6 �The Visual Evaluation tolerance limits in Section 9-03.8(7) will be used in the calculation of the PF,. zThe maximum CPF shall be 1.00. 5-04.3(9)E Mixture Acceptance— Notification of Acceptance Test Results The results of all mixture acceptance testing and the Composite Pay Factor (CPF) of the lot after three sublots have been tested will be available to the Contractor through The Contracting Agency's website. The Contracting Agency will endeavor to provide written notification (via email to the Contractor's designee) of acceptance test results through its web-based Austin Drive Pavement Preservation STPUS-6639(001) A-26 materials testing system Statistical Analysis of Materials (SAM)within 24 hours of the sample being made available to the Contracting Agency. However, the Contractor agrees: . : �•.� .. . . 1. Quality control, defined as the system used by the Contractor to monitor, assess, and adjust its production processes to ensure that the final HMA mixture will meet the specified level of quality, is the sole responsibility of the Contractor. 2. The Contractor has no right to rely on any testing performed by the Contracting Agency, nor does the Contractor have any right to rely on timely notification by the Contracting Agency of the Contracting Agency's test results (or statistical analysis thereof), for any part of quality control and/or for making changes or correction to any aspect of the HMA mixture. 3. The Contractor shall make no claim for untimely notification by the Contracting Agency of the Contracting Agency's test results or statistical analysis. 5-04.3(10) HMA Compaction Acceptance For all HMA, the Contractor shall comply with the General Compaction Requirements in Section 5-04.3(10)A. The Contracting Agency will evaluate all HMA for compaction compliance with one of the following - Statistical Evaluation, Visual Evaluation, or Test Point Evaluation - determined by the criteria in Table 16: Table 16 Criteria for Determining Method of Evaluation for HMA Compaction� Statistical Evaluation Visual Evaluation of Test Point Evaluation of HMA Compaction is HMA Compaction is of HMA Compaction Re uired For: � Re uired For: is Re uired For: • Any HMA for which • "HMA for • Any HMA not the specified course Preleveling..." meeting the criteria thickness is greater . "HMA for Pavement for Statistical than 0.10 feet, and Repair..." Evaluation or the HMA is in: Visual Evaluation o traffic lanes, including but not limited to: • ramp lanes • truck climbing lanes • weaving lanes • speed change lanes 'This table applies to all HMA, and shall be the sole basis for determining the acceptance method for compaction. The Contracting Agency may, at its sole discretion, evaluate any HMA for compliance with the Cyclic Density requirements of Section 5-04.3(10)B. Austin Drive Pavement Preservation STPUS-6639(001) A-27 5-04.3(10)A HMA Compaction —General Compaction Requirements Immediately after the HMA has been spread and struck off, and after surface irregularities have been adjusted, thoroughly and uniformly compact the mix. The completed course shall be free from ridges, ruts, humps, depressions, objectionable marks, and irregularities and shall conform to the line, grade, and cross-section shown in the Plans. If necessary, alter the JMF in accordance with Section 9-03.8(7)to achieve desired results. Compact the mix when it is in the proper condition so that no undue displacement, � cracking, or shoving occurs. Compact areas inaccessible to large compaction equipment by mechanical or hand tampers. Remove HMA that becomes loose, broken, contaminated, shows an excess or deficiency of asphalt, or is in any way defective. Replace the removed material with new HMA, and compact it immediately to conform to the surrounding area. The type of rollers to be used and their relative position in the compaction sequence shall generally be the Contractor's option, provided the specified densities are attained. An exception shall be that pneumatic tired rollers shall be used for compaction of the wearing course beginning October 1St of any year through March 31St of the following year. Coverage with a steel wheel roller may precede pneumatic tired rolling. Unless otherwise approved by the Engineer, operate rollers in the static mode when the internal temperature of the mix is less than 175°F. Regardless of mix temperature, do not operate a roller in a mode that results in checking or cracking of the mat. On bridge decks and on the five feet of roadway approach immediately adjacent to the end of bridge/back of pavement seat, operate rollers in static mode only. 5-04.3(10)B HMA Compaction — Cyclic Density Low cyclic density areas are defined as spots or streaks in the pavement that are less than 90 percent of the theoretical maximum density. At the Engineer's discretion, the Engineer may evaluate the HMA pavement for low cyclic density, and when doing so will follow WSDOT SOP 733. A $500 Cyclic Density Price Adjustment will be assessed for any 500-foot section with two or more density readings below 90 percent of the theoretical maximum density. 5-04.3(10)C HMA Compaction Acceptance—Statistical Evaluation HMA compaction which is accepted by Statistical Evaluation will be based on acceptance testing perFormed by the Contracting Agency, and statistical analysis of those acceptance tests results. This will result in a Compaction Price Adjustment. 5-04.3(10)C1 HIVIA Compaction Statistical Evaluation — Lots and Sublots HMA compaction which is accepted by Statistical Evaluation will be evaluated by the Contracting Agency dividing the project into compaction lots, and each compaction lot will be evaluated using stratified random sampling by the Contracting Agency sub-dividing each compaction lot into compaction sublots. All mixture in any individual compaction lot shall be of the same mix design. The compaction sublots will be numbered in the order in which the mixture (of a particular mix design) is paved. Aust�n Drive Pavement Preservation STPUS-6639(001) A-28 . °' ' , :. .. , ;�.�:>:. Each compaction lot comprises a maximum of 15 compaction sublots, except for the final compaction lot of each mix design on the Contract, which comprises a maximum of 25 sublots. Each compaction sublot shall be uniform in size as shown in Table 17, except that the last compaction sublot of each day may be increased to a maximum of two times the compaction sublot quantity calculated. Minor variations in the size of any sublot shall not be cause to invalidate the associated test result. Table 17 HMA Compaction Sublot Size HMA Original Plan Quantity Compaction Sublot Size tons ' tons <20,000 100 20,000 to 30,000 150 >30,000 200 ' In determining the plan quantity tonnage, do not include any tons accepted by test point evaluation. The following will cause one compaction lot to end prematurely and a new compaction lot to begin: • For a compaction lot in progress with a compaction CPF less than 0.75, a new compaction lot will begin at the Contractor's request after the Engineer is satisfied that material conforming to the Specifications can be produced. See also Section 5-04.3(11)F. 5-04.3(10)C2 HMA Compaction Statistical Evaluation —Acceptance Testing . Comply with Section 1-06.2(1). The location of HMA compaction acceptance tests will be randomly selected by the Contracting Agency from within each sublot, with one test per sublot. . The Contracting Agency will determine the random sample location using WSDOT Test Method T 716. Use Table 18 to determine compaction acceptance test procedures and to allocate compaction acceptance sampling and testing responsibilities between the Contractor and the Contracting Agency. Roadway cores shall be taken or nuclear density testing shall occur after completion of the finish rolling, prior to opening to traffic, and on the same day that the mix is placed. Table 18 HMA Compaction Acceptance Testing Procedures and Responsibilities When Contract When Contract Does Not Includes Bid Include Bid Item "Roadway Item "Roadway Cores" Cores" Basis for Test: Roadway Cores Roadway Nuclear Cores Densit Austin Drive Pavement Preservation STPUS-6639(001) A-29 Gau e3 Contractor shall Contracting take cores' Agency will take , using WSDOT cores' using SOP 7342 WSDOT SOP Contracting In-Place 734 Contracting Agency, using Density Contracting Determined by: Agency will Agency will FOP for determine core determine core WAQTC TM 8 density using density using FOP for FOP for AASHTO T 166 �SHTO T 166 Theoretical Maximum Contracting Agency, using FOP for AASHTO T 209 Density Determined b : Rolling Average of Theoretical Contracting Agency, using WSDOT SOP 729 Maximum Densities Determined b : Percent Contracting Contracting Contracting Compaction in Agency, using Agency, using Agency, using Each Sublot WSDOT SOP WSDOT SOP FOP for Determined b : 736 736 WAQTC TM 8 'The core diameter shall be 4-inches unless otherwise approved by the Engineer. 2The Contractor shall take the core samples in the presence of the Engineer, at locations designated by the Engineer, and deliver the core samples to the Contracting Agency. 3The Contracting Agency will determine, in its sole discretion, whether it will take cores or use the nuclear density gauge to determine in- place density. Exclusive reliance on cores for density acceptance is generally intended for small paving projects and is not intended as a replacement for nuclear gauge density testing on typical projects. When using the nuclear density gauge for acceptance testing of pavement density, the Engineer will follow WSDOT SOP 730 for correlating the nuclear gauge with HMA cores. When cores are required for the correlation, coring and testing will be by the Contracting Agency. When a core is taken for gauge correlation at the location of a sublot, the relative density of the core will be used for the sublot test result and is exempt from retesting. 5-04.3(10)C3 HMA Statistical Compaction — Price Adjustments For each HMA compaction lot (that is accepted by Statistical Evaluation)which has less than three compaction sublots, for which all compaction sublots attain a minimum of 91;percent compaction determined in accordance with FOP for WAQTC TM 8 (or WSDOT SOP 736 when provided by the Contract), the HMA will be accepted at the unit Contract price with no further evaluation. � Austin Drive Pavement Preservation STPUS-6639(001) A-30 .t*^�,;,,�, For each HMA compaction lot (that is accepted by Statistical Evaluation)which does not meet the criteria in the preceding paragraph, the compaction lot shall be evaluated in accordance with Section 1-06.2(2) to determine the appropriate Compaction Price Adjustment (CPA). All of the test results obtained from the acceptance samples from a given compaction lot shall be evaluated collectively. Additional testing by either a nuclear density gauge or cores will be completed as required to provide a minimum of three tests for evaluation. For the statistical analysis in Section 1-06.2, use the following values: x = Percent compaction of each sublot USL = 100 LSL= 91 Each CPA will be determined as follows: CPA = [0.40x (CPF - 1.00)] xQxUP Where CPA = Compaction Price Adjustment for the compaction lot ($) CPF = Composite Pay Factor for the compaction lot (maximum is 1.05) Q = Quantity in the compaction lot (tons) UP = Unit price of the HMA in the compaction lot ($/ton) 5-04.3(10)C4 HMA Statistical Compaction — Requests for Retesting For a compaction sublot that has been tested with a nuclear density gauge that did not meet the minimum of 91 percent of the theoretical maximum density in a compaction lot with a CPF below 1.00 and thus subject to a price reduction or rejection, the Contractor may request that a core, taken at the same location as the nuclear density test, be used for determination of the relative density of the compaction sublot. The relative density of the core will replace the relative density determined by the nuclear density gauge for the compaction sublot and will be used for calculation of the CPF and acceptance of HMA compaction lot. When cores are taken by the Contracting Agency at the request of the Contractor, they shall be requested by noon of the next workday after the test results for the compaction sublot have been provided or made available to the Contractor. Traffic control shall be provided by the Contractor as requested by the Engineer. Failure by the Contractor to provide the requested traffic control will result in forfeiture of the request for retesting. When the CPF for the compaction lot based on the results of the cores is less than 1.00, the Contracting Agency will deduct the cost for the coring from any monies due or that may become due the Contractor under the Contract at the rate of$200 per core and the Contractor shall pay for the cost of the traffic control. 5-04.3(10)D HMA Compaction —Visual Evaluation Visual Evaluation will be the basis of acceptance for compaction of the Bid items "HMA for Pavement Repair CI. _ PG _"and "HMA for Prelevelling Class_ PG ". This HMA shall be thoroughly compacted to the satisfaction of the Engineer. HMA that is used to prelevel wheel ruts shall be compacted with a pneumatic tire roller. Austin Drive Pavement Preservation STPUS-6639(001) A-31 5-04.3(10)E HMA C�ompaction —Test Point Evaluation When compaction acceptance is by Test Point Evaluation, compact HMA based on a test point evaluation of the compaction train. Perform the test point evaluation in accordance with instructions from the Engineer. The number of passes with an approved compaction train, required to attain the maximum test point density, shall be used on all subsequent paving. 5-04.3(10)F HMA Compaction Acceptance— Notification of Acceptance Test Results � The obligations and responsibilities for notifying the Contractor of compaction acceptance test results are the same as for mixture acceptance test results. See Section 5-04.3(9)E. 5-04.3(11) Reject Work This Section applies to HMA and all requirements related to HMA (except aggregates prior to being incorporated into HMA). For rejection of aggregate prior to its incorporation into HMA refer to Section 3-04. 5-04.3(11)A Reject Work—General Work that is defective or does not conform to Contract requirements shall be rejected. 5-04.3(11)B Rejection by Contractor The Contractor may, prior to acceptance sampling and testing, elect to remove any defective material and replace it with new material. Any such new material will be sampled, tested, and evaluated for acceptance. 5-04.3(11)C Rejection Without Testing (Mixture or Compaction) The Engineer may, without sampling, reject any batch, load, or section of Roadway that appears defective. Material rejected before placement shall not be incorporated into the pavement. No payment will be made for the rejected materials or the removal of the materials unless the Contractor requests the rejected material to be tested. If the Contractor requests testing, acceptance will be by Statistical Evaluation, and a minimum of three samples will be obtained and tested. When uncompacted material is required for testing but not available, the Engineer will determine random sample locations on the roadway in accordance with WSDOT Test Method T 716, take cores in accordance with WSDOT SOP 734, and test the cores in accordance with WSDOT SOP 737. If the CPF for the rejected material is less than 0.75, no payment will be made for the rejected material; in addition, the cost of sampling and testing shall be borne by the Contractor. If the CPF is greater than or equal to 0.75, the cost of sampling and testing will be borne by the Contracting Agency. If the material is rejected before placement and the CPF is greater than or equal to 0.75, compensation for the rejected material will be at a CPF of 0.75. If rejection occurs after placement and the CPF is greater than or equal to 0.75, compensation for the rejected material will be at the calculated CPF with an addition of 25 percent of the unit Contract price added for the cost of removal and disposal. Austin Drive Pavement Preservation STPUS-6639(001) A-32 • .;k.. ... , . �:�,. 5-04.3(11)D Rejection —A�Partial Sublot (Mixture or Compaction) In addition to the random acceptance sampling and testing, the Engineer may also isolate from a mixture or compaction sublot any material that is suspected of being defective in relative density, gradation or asphalt binder content. Such isolated material will not include an original sample location. The Contracting Agency will obtain a minimum of three random samples of the suspect material and perform the testing. When uncompacted material is required for testing but is not available, the Engineer will select random sample locations on the roadway in accordance with WSDOT Test Method T 716, take cores samples in accordance with WSDOT SOP 734, and test the material in accordance with WSDOT SOP 737. The material will then be statistically evaluated as an independent lot in accordance with Section 1- 06.2(2). 5-04.3(11)E Rejection —An Entire Sublot (Mixture or Compaction) An entire mixture or compaction sublot that is suspected of being defective may be rejected. When this occurs, a minimum of two additional random samples from this sublot will be obtained. When uncompacted material is required for the additional samples but the material has been compacted, the Contracting Agency will take and test cores from the roadway as described in Section 5-04.3(11)D. The additional samples and the original sublot will be evaluated as an independent lot in accordance with Section 1-06.2(2). 5-04.3(11)F Rejection - A Lot in Progress (Mixture or Compaction) The Contractor shall shut down operations and shall not resume HMA placement until such time as the Engineer is satisfied that material conforming to the Specifications can be produced when: 1. the Composite Pay Factor (CPF) of a mixture or compaction lot in progress drops below 1.00 and the Contractor is taking no corrective action, or 2. the Pay Factor (PF,)for any constituent of a mixture or compaction lot in progress drops below 0.95 and the Contractor is taking no corrective action, or 3. either the PF, for any constituent (or the CPF) of a mixture or compaction lot in progress is less than 0.75. 5-04.3(11)G Rejection —An Entire Lot (Mixture or Compaction) An entire lot with a CPF of less than 0.75 will be rejected. 5-04.3(12) Joints 5-04.3(12)A Transverse Joints Conduct operations such that placement of the top or wearing course is a continuous operation or as close to continuous as possible. Unscheduled transverse joints will be allowed, but the roller may pass over the unprotected end of the freshly laid HMA only when the placement of the course is discontinued for such a length of time that the HMA will cool below compaction temperature. When the Work is resumed, cut back the previously compacted HMA to produce a slightly beveled edge for the full thickness of the course. Austin Drive Pavement Preservation STPUS-6639(001) A-33 Construct a temporary wedge of HMA on a 50H:1 V where a transverse joint as a result of paving or planing is open to traffic. Separate the HMA in the temporary wedge from the permanent HMA upon which it is placed by strips of heavy wrapping paper or other methods approved by the Engineer. Remove the wrapping paper and trim the joint to a slightly beveled edge for the full thickness of the course prior to resumption of paving. Waste the material that is cut away and place new HMA against the cut. Use rollers or tamping irons to seal the joint. 5-04.3(12)B Longitudinal Joints Offset the longitudinal joint in any one course from the course immediately below by not more than 6 inches nor less than 2 inches. Locate all longitudinal joints constructed in the wearing course at a lane line or an edge line of the Traveled Way. Construct a notched wedge joint along all longitudinal joints in the wearing surface of new HMA unless otherwise approved by the Engineer. The notched wedge joint shall have a vertical edge of not less than the maximum aggregate size nor more than '/z of the compacted lift thickness, and then taper down on a slope not steeper than 4H:1 V. Uniformly compact the sloped portion of the HMA notched wedge joint. On one-lane ramps a longitudinal joint may be constructed at the center of the traffic lane, subject to approval by the Engineer, if: 1. The ramp must remain open to traffic, or 2. The ramp is closed to traffic and a hot-lap joint is constructed. a. Two paving machines shall be used to construct the hot-lap joint. b. The pavement within 6 inches of the hot-lap joint will not be excluded from random location selection for compaction testing. c. Construction equipment other than rollers shall not operate on any uncompacted HMA. When HMA is placed adjacent to cement concrete pavement, construct longitudinal joints between the HMA and the cement concrete pavement. Saw the joint to the dimensions shown on Standard Plan A-40.10 and fill with joint sealant meeting the requirements of Section 9-04.2. 5-04.3(13) Surface Smoothness The completed surface of all courses shall be of uniform texture, smooth, uniform as to crown and grade, and free from defects of all kinds. The completed surface of the wearing course shall not vary more than '/8 inch from the lower edge of a 10-foot straightedge placed on the surface parallel to the centerline. The transverse slope of the completed surface of the wearing course shall vary not more than '/4 inch in 10 feet from the rate of transverse slope shown in the Plans. When deviations in excess of the above tolerances are found that result from a high place in the HMA, correct the pavement surface by one of the following methods: Austin Drive Pavement Preservation STPUS-6639(001) A-34 1. Remove material from high places by grinding with an approved grinding machine, or 2. Remove and replace the wearing�course of HMA, or 3. By other method approved by the Engineer. Correct defects until there are no deviations anywhere greater than the allowable tolerances. Deviations in excess of the above tolerances that result from a low place in the HMA and deviations resulting from a high place where corrective action, in the opinion of the Engineer, will not produce satisfactory results will be accepted with a price adjustment. The Engineer shall deduct from monies due or that may become due to the Contractor the sum of$500.00 for each and every section of single traffic lane 100 feet in length in which any excessive deviations described above are found. When portland cement concrete pavement is to be placed on HMA, the surface tolerance of the HMA shall be such that no surface elevation lies above the Plan grade minus the specified Plan depth of portland cement concrete pavement. Prior to placing the portland cement concrete pavement, bring any such irregularities to the required tolerance by grinding or other means approved by the Engineer. When utility appurtenances such as manhole covers and valve boxes are located in the Traveled Way, pave the Roadway before the utility appurtenances are adjusted to the finished grade. 5-04.3(14) Planing Bituminous Pavement Plane in such a manner that the underlying pavement is not torn, broken, or otherwise damaged by the planing operation. Delamination or raveling of the underlying pavement will not be construed as damage due to the Contractor's operations. Pavement outside the limits shown in the Plans or designated by the Engineer that is damaged by the ' Contractor's operations shall be repaired to the satisfaction of the Engineer at no additional cost to the Contracting Agency. For mainline planing operations, use equipment with automatic controls and with sensors for either or both sides of the equipment. The controls shall be capable of sensing the grade from an outside reference line, or a mat-referencing device. The automatic controls shall have a transverse slope controller capable of maintaining the mandrel at the desired transverse slope (expressed as a percentage)within plus or minus 0.1 percent. Remove all loose debris from the planed surface before opening the planed surface to traffic. The planings and other debris resulting from the planing operation shall become the property of the Contractor and be disposed of in accordance with Section 2- 03.3(7)C, or as otherwise allowed by the Contract. 5-04.3(15) Sealing Pavement Surfaces Apply a fog seal where shown in the Plans. Construct the fog seal in accordance with Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to opening to traffic. Austin Drive Pavement Prese�vation STPUS-6639(001) A-35 5-04.3(16) HINA Road Approaches Construct HMA approaches at the locations shown in the Plans or where staked by the Engineer, in accordance with Section 5-04. 5-04.4 Measurement HMA CI. _ PG , HMA for CI. PG , and Commercial HMA will be measured by the ton in accordance with Section 1-09.2, with no deduction being made for the weight of asphalt binder, mineral filler, or any other component ofthe HMA. If the Contractor elects to remove and replace HMA as allowed by Section 5-04.3(11), the material removed will not be measured. Roadway cores will be measured per each for the number of cores taken. Crack Sealing-LF will be measured by the linear foot along the line of the crack. Soil residual herbicide will be measured by the mile for the stated width to the nearest 0.01 mile or by the square yard, whichever is designated in the Proposal. Pavement repair excavation will be measured by the square yard of surface marked prior to excavation. Asphalt for fog seal will be measured by the ton, as provided in Section 5-02.4. Longitudinal joint seals between the HMA and cement concrete pavement will be measured by the linear foot along the line and slope of the completed joint seal. Planing bituminous pavement will be measured by the square yard. Temporary pavement marking will be measured by the linear foot as provided in Section 8-23.4. Water will be measured by the M gallon as provided in Section 2-07.4. 5-04.5 Payment Payment will be made for each of the following Bid items that are included in the Proposal: "HMA CI. _ PG _", per ton. "HMA for Approach CI. PG _", per ton. "HMA for Preleveling CI. _ PG _", per ton. "HMA for Pavement Repair CI. _ PG_", per ton. "Commercial HMA", per ton. The unit Contract price per ton for"HMA CI. PG ", "HMA for Approach CI. PG ", "HMA for Preleveling CI. _ PG _", "HMA for Pavement Repair CI. _ PG " and "Commercial HMA" shall be full compensation for all costs, including anti-stripping additive, incurred to carry out the requirements of Section 5-04 except for those costs included in other items which are included in this Subsection and which are included in the Proposal. "Crack Sealing-FA", by force account. "Crack Sealing-FA" will be paid for by force account as specified in Section 1-09.6. For the purpose of providing a common Proposal for all Bidders, the Contracting Agency has entered an amount in the Proposal to become a part of the total Bid by the Contractor. Austin Drive Pavement Preservation STPUS-6639(001) A-36 "Crack Sealing-LF", per linear foot. �� � •� The unit Contract price per linear foot for "Crack Sealing-LF" shall be full payment for all costs incurred to perform the Work described in Section 5-04.3(4)A. "Soil Residual Herbicide ft. Wide", per mile, or "Soil Residual Herbicide", per square yard. The unit Contract price per mile or per square yard for"Soil Residual Herbicide" shall be full payment for all costs incurred to obtain, provide and install herbicide in accordance with Section 5-04.3(4)B. "Pavement Repair Excavation Incl. Haul", per square yard. The unit Contract price per square yard for"Pavement Repair Excavation Incl. Haul" shall be full payment for all costs incurred to perform the Work described in Section 5-04.3(4)C with the exception, however, that all costs involved in the placement of HMA shall be included in the unit Contract price per ton for"HMA for Pavement Repair CI. _ PG_", per ton. "Asphalt for Fog Seal", per ton. Payment for"Asphalt for Fog Seal" is described in Section 5-02.5. "Longitudinal Joint Seal", per linear foot. The unit Contract price per linear foot for"Longitudinal Joint Seal" shall be full payment for all costs incurred to construct the longitudinal joint between HMA and cement concrete pavement, as described in Section 5-04.3(12)B. "Planing Bituminous Pavement", per square yard. � The unit Contract price per square yard for"Planing Bituminous Pavement" shall be full payment for all costs incurred to perform the Work described in Section 5-04.3(14). "Temporary Pavement Marking", per linear foot. Payment for"Temporary Pavement Marking" is described in Section 8-23.5. "Water", per M gallon. Payment for"Water" is described in Section 2-07.5. "Job Mix Compliance Price Adjustment", by calculation. "Job Mix Compliance Price Adjustment"will be calculated and paid for as described in Section 5-04.3(9)B6, 5-04.3(9)C3, and 5-04.3(9)D1. "Compaction Price Adjustment", by calculation. "Compaction Price Adjustment" will be calculated and paid for as described in Section 5- 04.3(10)C3. "Roadway Core", per each. The Contractor's costs for all other Work associated with the coring (e.g., traffic control) shall be incidental and included within the unit Bid price per each and no additional payments will be made. "Cyclic Density Price Adjustment", by calculation. . "Cyclic Density Price AdjustmenY'will be calculated and paid for as described in Section 5- 04.3(10)B. Austin Dnve Pavemenf Preservation STPUS-6639(001) A-37 6-02.AP6 Section 6-02, Concrete Structures April 4, 2016 6-02.3(2)A Contractor Mix Design The following new sentence is inserted after the first sentence of the third paragraph: The mix design submittal shall also include test results no older than one year showing that the Aggregates do not contain Deleterious Substances in accordance with Section 9-03. 6-02.3(2)A1 Contractor Mix Design for Concrete Class 4000� The following new sentence is inserted after the second sentence of the last paragraph: Mix designs using shrinkage reducing admixture shall state the specific quantity required. � The following new sentence is inserted before the last sentence of the last paragraph: Testing samples of mixes using shrinkage reducing admixture shall use the admixture amount specified in the mix design submittal. 6-02.3(2)B Commercial Concrete. The last sentence of the first paragraph is revised to read: Commercial concrete does not require mix design or source approvals for cement, aggregate, and other admixtures. 6-02.3(26)D2 Test Block Dimensions The first sentence is revised to read: The dimensions of the test block perpendicular to the tendon in each direction shall be the smaller of twice the minimum edge distance or the minimum spacing specified by the special anchorage device manufacturer, with the stipulation that the concrete cover over any confining reinforcing steel or supplementary skin reinforcement shall be appropriate for the project-specific application and circumstances. 6-02.3(27)A Use of Self-Consolidating Concrete for Precast Units Item number 2 of the first paragraph is revised to read: 2. Precast reinforced concrete three-sided structures, box culverts and split box culverts in accordance with Section 7-02.3(6). 6-09.AP6 Section 6-09, Modified Concrete Overlays April 4, 2016 6-09.3(8)A Quality Assurance for Microsilica Modified and Fly Ash Modified Concrete Overlays The first sentence of the first paragraph is revised to read the following two new sentences: Austin Drive Pavement Preservation STPUS-6639(001) A-38 The Engineer will perform slump, temperature, and entrained air tests for acceptance in accordance with Section 6-02.3(5)D and as specified in this Section after the Contractor has turned over the concrete for acceptance testing. Concrete samples for testing shall be supplied to the Engineer in accordance with Section 6-02.3(5)E. The last paragraph is deleted. 6-09.3(8)B Quality Assurance for Latex Modified Concrete Overlays The first two paragraphs are deleted and replaced with the following: The Engineer will perform slump, temperature, and entrained air tests for acceptance in accordance with Section 6-02.3(5)D and as specified in this Section after the Contractor has turned over the concrete for acceptance testing. The Engineer will perform testing as the concrete is being placed. Samples shall be taken on the first charge through each mobile mixer and every other charge thereafter. The sample shall be taken after the first 2 minutes of continuous mixer operation. Concrete samples for testing shall be supplied to the Engineer in accordance with Section 6-02.3(5)E. The second to last sentence of the last paragraph is revised to read: Recommendations made by the technical representative on or off the jobsite shall be adhered to by the Contractor. 6-14.AP6 Section 6-14, Geosynthetic Retaining Walls January 4, 2016 6-14.5 Payment The bid item "Concrete Fascia Panel", per square foot, and the paragraph following this bid item are revised to read: • "Concrete Fascia Panel For Geosynthetic Wall", per square foot. All costs in connection with constructing the concrete fascia panels as specified shall be included in the unit Contract price per square foot for"Concrete Fascia Panel For Geosynthetic Wall", including all steel reinforcing bars, premolded joint filler, polyethylene bond breaker strip, joint sealant, PVC pipe for weep holes, exterior surface finish, and pigmented sealer (when specified), constructing and placing the concrete footing, edge beam, anchor beam, anchor rod assembly, and backfill. 6-19.AP6 Section 6-19, Shafts January 4, 2016 6-19.4 Measurement The first paragraph is revised to read: Soil excavation for shaft, including haul, will be measured by the cubic yards of shaft excavated. The cubic yards will be computed using the shaft diameter, top of shaft elevation and bottom of shaft elevation shown in the Plans, less all rock excavation measured as specified for rock Austin Drive Pavement Preservation STPUS-6639(001) A-39 excavation. Excavation between the existing ground line and the top of shaft elevation is considered incidental to soil excavation for shaft and will not be measured. The second paragraph is deleted. 6-19.5 Payment The paragraph following the bid item "Soil Excavation For Shaft Including Haul", per cubic yard is revised to read: The unit Contract price per cubic yard for"Soil Excavation For Shaft Including Haul" shall be full pay for performing the work as specified, including all costs in connection with furnishing, mixing, placing, maintaining, containing, collecting, and disposing of all mineral, synthetic, and water slurry, and disposing of groundwater collected by the shaft excavation, and the incidental excavation of soils between the top of shaft elevation shown in the Plans and the existing ground line. 8-01.AP8 Section 8-01, Erosion Control and Water Pollution Control April 4, 2016 8-01.2 Materials This section is supplemented with the following new paragraph: Recycled concrete, in any form, shall not be used for any Work defined in Section 8-01. 8-01.3(8) Street Cleaning This section is revised to read: Self-propelled street sweepers shall be used to remove and collect sediment and other debris from the Roadway, whenever required by the Engineer. The street sweeper shall effectively collect these materials and prevent them from being washed or blown off the Roadway or into waters of the State. Street sweepers shall not generate fugitive dust and shall be designed and operated in compliance with applicable air quality standards. Material collected by the street sweeper shall be disposed of in accordance with Section 2- 03.3(7)C. Street washing with water will require the concurrence of the Engineer. 8-10.AP8 Section 8-10, Guide Posts January 4, 2016 8-10.3 Construction Requirements The last sentence of the second paragraph is deleted. Austin Drive Pavement Preservation STPUS-6639(001) A-40 8-20.AP8 � Section 8-20, Illumination, Traffic Signal Systems, Intelligent Transportation Systems, and Electrical April 4, 2016 8-20.3(5)A General The last paragraph is revised to read: Immediately after the sizing mandrel has been pulled through, install an equipment grounding conductor if applicable (see Section 8-20.3(9)) and any new or existing wire or cable as specified in the Plans. Where conduit is installed for future use, install a 200-pound minimum tensile strength pull string with the equipment grounding conductor. The pull string shall be attached to duct plugs or caps at both ends of the conduit. 8-20.3(5)A1 Fiber Optic Conduit The last paragraph is deleted. 8-20.3(5)D Conduit Placement Item number 2 is revised to read: 2. 24-inches below the top of the untreated surfacing on a Roadbed. 8-20.3(9) Bonding, Grounding The following two new paragraphs are inserted after the first paragraph: Install an equipment grounding conductor in all new conduit, whether or not the equipment grounding conductor is called for in the wire schedule. For each new conduit with innerduct install an equipment grounding conductor in only one of the innerducts unless otherwise required by the NEC or the Plans. The fourth paragraph (after the preceding Amendments are applied) is revised to read: Bonding jumpers and equipment grounding conductors meeting the requirements of Section 9- 29.3(2)A3 shall be minimum #8 AWG, installed in accordance with the NEC. Where existing conduits are used for the installation of new circuits, an equipment grounding conductor shall be installed unless an existing equipment ground conductor, which is appropriate for the largest circuit, is already present in the existing raceway. The equipment ground conductor between the isolation switch and the sign lighter fixtures shall be minimum #14 AWG stranded copper conductor. Where parallel circuits are enclosed in a common conduit, the equipment-grounding conductor shall be sized by the largest overcurrent device serving any circuit contained within the conduit. The second sentence of the fifth paragraph (after the preceding Amendments are applied) is revised to read: A non-insulated stranded copper conductor, minimum #8 AWG with a full circle crimp on connector (crimped with a manufacturer recommended crimper) shall be connected to the junction box frame or frame bonding stud, the other end shall be crimped to the equipment bonding conductor, using a "C"type crimp connector. Austin Dnve Pavement Preservation STPUS-6639(001) A-41 The last two sentences of the sixth paragraph (after the preceding Amendments are applied) are revised to read: For light standards, signal standards, cantilever and sign bridge Structures the supplemental grounding conductor shall be#4 AWG non-insulated stranded copper conductor. For steel sign posts which support signs with sign lighting or flashing beacons the supplemental grounding conductor shall be#6 AWG non insulated stranded copper conductor. The fourth to last paragraph is revised to read: Install a finro grounding electrode system at each service entrance point, at each electrical service installation and at each separately derived power source. The service entrance grounding electrode system shall conform to the "Service Ground" detail in the Standard Plans. If soil conditions make vertical grounding electrode installation impossible an alternate installation procedure as described in the NEC may be used. Maintain a minimum of 6 feet of separation between any two grounding electrodes within the grounding system. Grounding electrodes shall be bonded copper, ferrous core materials and shall be solid rods not less than 10 feet in length if they are '/z inch in diameter or not less than 8 feet in length if they are 5/e inch or larger in diameter. 8-22.AP8 Section 8-22, Pavement Marking January 4, 2016 8-22.4 Measurement The first two sentences of the fourth paragraph are revised to read: The measurement for"Painted Wide Lane Line", "Plastic Wide Lane Line", "Profiled Plastic Wide Lane Line", "Painted Barrier Center Line", "Plastic Barrier Center Line", "Painted Stop Line", "Plastic Stop Line", "Painted Wide Dotted Entry Line", or"Plastic Wide Dotted Entry Line"will be based on the total length of each painted, plastic or profiled plastic line installed. No deduction will be made for the unmarked area when the marking includes a broken line such as, wide broken lane line, drop lane line, wide dotted lane line or wide dotted entry line. 8-22.5 Payment The following two new Bid items are inserted after the Bid item "Plastic Crosshatch Marking", per linear foot: "Painted Wide Dotted Entry Line", per linear foot. "Plastic Wide Dotted Entry Line", per linear foot. 9-03.AP9 Section 9-03, Aggregates April 4, 2016 9-03.1(1) General Requirements This first paragraph is supplemented with the following: Austin Drive Pavement Preservation STPUS-6639(001) A-42 Reclaimed aggregate may be used if it complies with the specifications for Portland Cement Concrete. Reclaimed aggregate is aggregate that has been recovered from plastic concrete by washing away the cementitious materials. 9-03.1(2) Fine Aggregate for Portland Cement Concrete This section is revised to read: Fine aggregate shall consist of natural sand or manufactured sand, or combinations thereof, accepted by the Engineer, having hard, strong, durable particles free from adherent coating. Fine aggregate shall be washed thoroughly to meet the specifications. 9-03.1(2)A Deleterious Substances This section is revised to read: The amount of deleterious substances in the washed aggregate shall be tested in accordance with AASHTO M 6 and not exceed the following values: Material finer than No. 200 Sieve 2.5 percent by weight Clay lumps and friable particles 3.0 percent by weight Coal and lignite 0.25 percent by weight Particles of specific gravity less than 2.00 1.0 percent by weight. Organic impurities shall be tested in accordance with AASHTO T 21 by the glass color standard procedure and results darker than organic plate no. 3 shall be rejected. A darker color results from AASHTO T 21 may be used provided that when tested for the effect of organic impurities on strength of mortar, the relative strength at 7 days, calculated in accordance with AASHTO T 71, is not less than 95 percent. 9-03.1(4) Coarse Aggregate for Portland Cement Concrete This section is revised to read: Coarse aggregate for concrete shall consist of gravel, crushed gravel, crushed stone, or combinations thereof having hard, strong, durable pieces free from adherent coatings. Coarse aggregate shall be washed to meet the specifications. 9-03.1(4)A Deleterious This section, including title, is revised to read: 9-03.1(4)A Deleterious Substances The amount of deleterious substances in the washed aggregate shall be tested in accordance with AASHTO M 80 and not exceed the following values: Material finer than No. 200 1.0' percent by weight Clay lumps and Friable Particles 2.0 percent by weight Shale 2.0 percent by weight Wood waste 0.05 percent by weight Coal and Lignite 0.5 percent by weight Sum of Clay Lumps, Friable Particles, and Chert (Less Than 2.40 specific gravity SSD) 3.0 percent by weight 'If the material finer than the No. 200 sieve is free of clay and shale, this percentage may be increased to 1.5. Austin Dnve Pavement Preservation STPUS-6639(001) A-43 9-03.1(4)C Grading The following new sentence is inserted at the beginning of the last pargraph: Where coarse aggregate size 467 is used, the aggregate may be furnished in at least two separate sizes. 9-03.1(5) Combined Aggregate Gradation for Portland Cement Concrete This section is revised to read: As an alternative to using the fine aggregate sieve grading requirements in Section 9-03.1(2)B, and coarse aggregate sieve grading requirements in Section 9-03.1(4)C, a combined aggregate gradation conforming to the requirements of Section 9-03.1(5)A may be used. 9-03.1(5)A Deleterious Substances This section is revised to read: The amount of deleterious substances in the washed aggregates 3/e inch or larger shall not exceed the values specified in Section 9-03.1(4)A and for aggregates smaller than 3/8 inch they shall not exceed the values specified in Section 9-03.1(2)A. 9-03.1(5)B Grading The first paragraph is deleted. 9-03.8(7) HMA Tolerances and Adjustments In the table in item 1, the last column titled "Commercial Evaluation" is revised to read "Visual Evaluation". 9-03.21(1)B Concrete Rubble � This section, including title, is revised to read: 9-03.21(1)B Recycled Concrete Aggregate Recycled concrete aggregates are coarse aggregates manufactured from hardened concrete mixtures. Recycled concrete aggregate may be used as coarse aggregate or blended with coarse aggregate for Commercial Concrete. Recycled concrete aggregate shall meet all of the requirements for coarse aggregate contained in Section 9-03.1(4)or 9-03.1(5). In addition to the requirements of Section 9-03.1(4) or 9-03.1(5), recycled concrete shall: 1. Contain an aggregated weight of less than 1 percent of adherent fines, vegetable matter, plastics, plaster, paper, gypsum board, metals, fabrics, wood, tile, glass, asphalt (bituminous) materials, brick, porcelain or other deleterious substance(s) not otherwise noted; 2. Be free of harmful components such as chlorides and reactive materials unless mitigation measures are taken to prevent recurrence in the new concrete; 3. Have an absorption of less than 10 percent when tested in accordance with AASHTO T 85. Recycled concrete aggregate shall be in a saturated condition prior to mixing. Recycled concrete aggregate shall not be placed below the ordinary high water mark of any water of the State. Austin Drive Pavement Preservation STPUS-6639(001) A-44 9-03.21(1)D Recycled Steel Furnace Slag This section title is revised to read: Steel Furnace Slag 9-03.21(1)E Table on Maximum Allowable Percent (By Weight) of Recycled Material The following new row is inserted after the second row: Coarse A re ate for Commercial Concrete 9-03.1 4 0 100 0 0 9-04.AP9 Section 9-04, Joint and Crack Sealing Materials January 4, 2016 9-04.2(1) Hot Poured Joint Sealants This section's content is deleted and replaced with the following new subsections: 9-04.2(1)A Hot Poured Sealant Hot poured sealant shall be sampled in accordance with ASTM D5167 and tested in accordance with ASTM D5329. Hot poured sealant shall have a minimum Cleveland Open Cup Flash Point of 205°C in accordance with AASHTO T 48. 9-04.2(1)A1 Hot Poured Sealant for Cement Concrete Pavement Hot poured sealant for cement concrete pavement shall meet the requirements of ASTM D6690 Type IV, except for the following: 1. The Cone Penetration at 25°C shall be 130 maximum. 2. The extension for the Bond, non-immersed, shall be 100 percent. 9-04.2(1)A2 Hot Poured Sealant for Bituminous Pavement Hot poured sealant for bituminous pavement shall meet the requirements of ASTM D6690 Type II. 9-04.2(1)B Sand Slurry for Bituminous Pavement Sand slurry is mixture consisting of the following components measured by total weight: 1. Twenty percent CSS-1 emulsified asphalt, 2. Two percent portland cement, and 3. Seventy-eight percent fine aggregate meeting the requirements of 9-03.1(2)B Class 2. Fine aggregate may be damp (no free water). Austin Drive Pavement Preservation STPUS-6639(001J A-45 9-07.AP9 Section 9-07, Reinforcing Steel January 4, 2016 9-07.1(1)A Acceptance of Materials The first sentence of the first paragraph is revised to read: Reinforcing steel rebar manufacturers shall comply with the National Transportation Product Evaluation Program (NTPEP)Work Plan for Reinforcing Steel (rebar) Manufacturers. The first sentence of the second paragraph is revised to read: Steel reinforcing bar manufacturers use either English or a Metric size designation while stamping rebar. Aushn Drive Pavement Preservation STPUS-6639(001) A-46 SPECIAL PROVISIONS Austin Drive Pavement Preservation STPUS-6639(001) SP-1 This Page Intentionally Left Blank Austin Drive Pavement Preservation STPUS-6639(001) SP-2 DIVISION 1 GENERAL REQUIREMENTS 1-01 DEFINITIONS AND TERMS 1-01.3 Definitions (January 4, 2016 APWA GSP) Delete the heading Completion Dates and the three paragraphs that follow it, and replace them with the following: Dates Bid Opening Date The date on which the Contracting Agency publicly opens and reads the Bids. Award Date The date of the formal decision of the Contracting Agency to accept the lowest responsible and responsive Bidder for the Work. Contract Execution Date The date the Contracting Agency officially binds the Agency to the Contract. Nofice to Proceed Date The date stated in the Notice to Proceed on which the Contract time begins. Substantial Completion Date The day the Engineer determines the Contracting Agency has full and unrestricted use and benefit of the facilities, both from the operational and safety standpoint, any remaining traffic disruptions will be rare and brief, and only minor incidental work, replacement of temporary substitute facilities, plant establishment periods, or correction or repair remains for the Physical Completion of the total Contract. Physical Completion Date The day all of the Work is physically completed on the project. All documentation required by the Contract and required by law does not necessarily need to be furnished by the Contractor by this date. Completion Date The day all the Work specified in the Contract is completed and all the obligations of the Contractor under the contract are fulfilled by the Contractor. All documentation required by the Contract and required by law must be furnished by the Contractor before establishment of this date. Austin Drive Pavement Preservation STPUS-6639(001) SP-3 Final Acceptance Date The date on which the Contracting Agency accepts the Work as complete. Supplement this section with the following: .All references in the Standard Specifications, Amendments, or WSDOT General Special Provisions, to the terms "State", "Department of Transportation", "Washington State Transportation Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall be revised to read "Contracting Agency". All references to "State Materials Laboratory" shall be revised to read, "Contracting Agency designated location". All references to "final contract voucher certification" shall be interpreted to mean the final payment form established by the Contracting Agency. The venue of all causes of action arising from the advertisement, award, execution, and performance of the contract shall be in the Superior Court of the County where the Contracting Agency's headquarters are located. Additive A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. Alternate One of two or more units of work or groups of bid items, identified separately in the Bid Proposal, from which the Contracting Agency may make a choice between different methods or material of construction for performing the same work. Business Day A business day is any day from Monday through Friday except holidays as listed in Section 1-08.5. Contract Bond The definition in the Standard Specifications for "Contract Bond" applies to whatever bond form(s) are required by the Contract Documents, which may be a combination of a Payment Bond and a Performance Bond. Contract Documents ' See definition for"ContracY'. Contract Time The period of time established by the terms and conditions of the Contract within which the Work must be physically completed. Notice of Award The written notice from the Contracting Agency to the successful Bidder signifying the Contracting Agency's acceptance of the Bid Proposal. Austin Dnve Pavement Preservation STPUS-6639(001) SP-4 Notice to Proceed The written notice from the Contracting Agency or Engineer to the Contractor authorizing and directing the Contractor to proceed with the Work and establishing the date on which the Contract time begins. Traffic Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders (January 24, 2011 APWA GSP) Delete Section 1-02.1 and replace it with the following: 1-02.1 Qualifications of Bidder Before award of a public works contract, a bidder must meet at least the minimum qualifications of RCW 39.04.350(1)to be considered a responsible bidder and qualified to be awarded a public works project. 1-02.2 Plans and Specifications (June 27, 2011 APWA GSP) Delete this section and replace it with the following: Information as to where Bid Documents can be obtained or reviewed can be found in the Call for Bids (Advertisement for Bids)for the work. After award.of the contract, plans and specifications will be issued to the Contractor at no cost as detailed below: To Prime Contractor No. of Sets Basis of Distribution Reduced plans (11" x 17") 3 Furnished automatically u on award. Contract Provisions 3 Furnished automatically upon award. Large plans (e.g., 22" x 3 Furnished only upon 34") request. Additional plans and Contract Provisions may be obtained by the Contractor from the source stated in the Call for Bids, at the Contractor's own expense. Austin Drive Pavement Preservation STPUS-6639(001) SP-5 1-02.4(2) Subsurface Information (March 8, 2013 APWA GSP) The second sentence in the first paragraph is revised to read: The Summary of Geotechnical Conditions and the boring logs, if and when included as an appendix to the Special Provisions, shall be considered as part of the Contract. 1-02.5 Proposal Forms (June 27, 2011 APWA GSP) Delete this section and replace it with the following: The Proposal Form will identify the project and its location and describe the work. It will also list estimated quantities, units of ineasurement, the items of work, and the materials to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal form that call for, but are not limited to, unit prices; extensions; summations; the total bid amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment of addenda; the bidder's name, address, telephone number, and signature; the bidder's D/M/WBE commitment, if applicable; a State of Washington Contractor's Registration Number; and a Business License Number, if applicable. Bids shall be completed by typing or shall be printed in ink by hand, preferably in black ink. The required certifications are included as part of the Proposal Form. The Contracting Agency reserves the right to arrange the proposal forms with alternates and additives, if such be to the advantage of the Contracting Agency. The bidder shall bid on all alternates and additives set forth in the Proposal Form unless otherwise specified. 1-02.6 Preparation of Proposal (June 27, 2011 APWA GSP) Supplement the second paragraph with the following: 4. If a minimum bid amount has been established for any item, the unit or lump sum price must equal or exceed the minimum amount stated. 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be initialed by the signer of the bid. Delete the last paragraph, and replace it with the following: The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. A bid by a corporation shall be executed in the corporate name, by the president or a vice president (or other corporate officer accompanied by evidence of authority to sign). A bid by a partnership shall be executed in the partnership name, and signed by a partner. A copy of the partnership agreement shall be submitted with the Bid Form if any D/M/WBE requirements are to be satisfied through such an agreement. Austin Drive Pavement Preservation STPUS-6639(001) SP-6 A bid by a joint venture shall be executed in the joint venture name and signed by a member of the joint venture. A copy of the joint venture agreement shall be submitted with the Bid Form if any D/W/MBE requirements are to be satisfied through such an agreement. 1-02.7 Bid Deposit (March 8, 2013 APWA GSP) Supplement this section with the following: Bid bonds shall contain the following: 1. Contracting Agency-assigned number for the project; 2. Name of the project; 3. The Contracting Agency named as obligee; 4. The amount of the bid bond stated either as a dollar figure or as a percentage which represents five percent of the maximum bid amount that could be awarded; 5. Signature of the bidder's officer empowered to sign official statements. The signature of the person authorized to submit the bid should agree with the signature on the bond, and the title of the person must accompany the said signature; 6. The signature of the surety's officer empowered to sign the bond and the power of attorney. If so stated in the Contract Provisions, bidder must use the bond form included in the Contract Provisions. If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. 1-02.9 Delivery of Proposal (August 15, 2012 APWA GSP, Option 8) Delete this section and replace it with the following: Each proposal shall be submitted in a sealed envelope, with the Project Name and Project Number as stated in the Call for Bids clearly marked on the outside of the envelope, or as otherwise required in the Bid Documents, to ensure proper handling and delivery. To be considered responsive, the Bidder shall submit Written Confirmation Documentation from each DBE firm listed on the Bidder's completed DBE Utilization Certification, form 272- 056A EF, as required by Section 1-02.6. DBE Written Confirmation Documents and/or Good Faith Effort Documentation shall be submitted either with the Bid Proposal or up to 2 hours after the Bid Proposal is due. If submitted after the Bid Proposal is due, the information must be submitted in a sealed envelope labeled the same as for the Proposal, with "DBE Supplemental Information" added. All other information required to be submitted with the Bid Proposal must be submitted with the Bid Proposal itself, at the time stated in the Call for Bids. The Contracting Agency will not open or consider any Bid Proposal that is received after the time specified in the Call for Bids for receipt of Bid Proposals, or received in a location other than that specified in the Call for Bids. The Contracting Agency will not open or consider Austin Drive Pavement Preservation STPUS-6639(001) SP-7 any DBE confirmations or GFE documentation Proposal that is received after the time specified above, or received in a location other than that specified in the Call for Bids. 1-02.12 Public Opening of Proposals (May 4, 2012 APWA GSP) Delete this section and replace it with the following: Proposals will be opened and publicly read at the time indicated in the Call for Bids, after the deadline(s)for submitting all elements of the Bid Proposal including DBE Written Confirmation Documents and/or Good Faith Effort Documentation, unless the Bid opening has been delayed or canceled. Bidders, their authorized agents, and other interested parties are invited to be present. 1-02.13 Irregular Proposals (January 4, 2016 APWA GSP) Delete this section and replace it with the following: 1. A proposal will be considered irregular and will be rejected if: a. The Bidder is not prequalified when so required; b. The authorized proposal form furnished by the Contracting Agency is not used or is altered; c. The completed proposal form contains any unauthorized additions, deletions, alternate Bids, or conditions; d. The Bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract; e. A price per unit cannot be determined from the Bid Proposal; f. The Proposal form is not properly executed; g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as required in Section 1-02.6; h. The Bidder fails to submit or properly complete a Disadvantaged Business Enterprise Certification, if applicable, as required in Section 1-02.6; i. The Bidder fails to submit written confirmation from each DBE firm listed on the Bidder's completed DBE Utilization Certification that they are in agreement with the bidders DBE participation commitment, if applicable, as required in Section 1- 02.6, or if the written confirmation that is submitted fails to meet the requirements of the Special Provisions; j The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, as required in Section 1-02.6, or if the documentation that is submitted fails to demonstrate that a Good Faith Effort to meet the Condition of Award was made; k. The Bid Proposal does not constitute a definite and unqualified offer to meet the material terms of the Bid invitation; or I. More than one proposal is submitted for the same project from a Bidder under the same or different names. 2. A Proposal may be considered irregular and may be rejected if: a. The Proposal does not include a unit price for every Bid item; b. Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential detriment of the Contracting Agency; Ausfin Drive Pavement Preservation STPUS-6639(001) SP-8 c. Receipt of Addenda is not acknowledged; - d. A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in such an instance, both Bids may be rejected); or e. If Proposal form entries are not made in ink. 1-02.14 Disqualification of Bidders (March 8, 2013 APWA GSP, Option A) Delete this section and replace it with the following: A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder responsibility criteria in RCW 39.04.350(1), as amended. As evidence that the Bidder meets the mandatory bidder responsibility criteria, the apparent two lowest Bidders must submit to the Contracting Agency within 24 hours of the bid submittal deadline, documentation (sufficient in the sole judgment of the Contracting Agency) demonstrating compliance with all responsibility criteria. The Contracting Agency reserves the right to request such documentation from other Bidders as well, and to request further documentation as needed to assess bidder responsibility. The Contracting Agency also reserves the right to obtain information from third parties concerning a Bidder's compliance with the mandatory bidder responsibility criteria. If the Contracting Agency determines the Bidder does not meet the mandatory bidder responsibility criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the Contracting Agency shall notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees with this determination, it may appeal the determination within two (2) business days of the Contracting Agency's determination by presenting its appeal and any additional information to the Contracting Agency. The Contracting Agency will consider the appeal and any additional information before issuing its final determination. If the final determination affirms that the Bidder is not responsible, the Contracting Agency will not execute a contract with any other Bidder until at least two business days after the Bidder determined to be not responsible has received the Contracting Agency's final determination. 1-02.15 Pre Award Information (August 14, 2013 APWA GSP) Revise this section to read: Before awarding any contract, the Contracting Agency may require one or more of these items or actions of the apparent lowest responsible bidder: 1. A complete statement of the origin, composition, and manufacture of any or all materials to be used, 2. Samples of these materials for quality and fitness tests, 3. A progress schedule (in a form the Contracting Agency requires) showing the order of and time required for the various phases of the work, 4. A breakdown of costs assigned to any bid item, 5. Attendance at a conference with the Engineer or representatives of the Engineer, Austin Drive Pavement Preservation STPUS-6639(001) SP-9 6. Obtain, and furnish a copy of, a business license to do business in the city or countv where the work is located. 7. Any other information or action taken that is deemed necessary to ensure that the bidder is the lowest responsible bidder. 03 AWARD AND EXECUTION OF CONTRACT 1-03.1 Consideration of Bids (January 23, 2006 APWA GSP) � Revise the first paragraph to read: After opening and reading proposals, the Contracting Agency will check them for correctness of extensions of the prices per unit and the total price. If a discrepancy exists between the price per unit and the extended amount of any bid item, the price per unit will control. If a minimum bid amount has been established for any item and the bidder's unit or lump sum price is less than the minimum specified amount, the Contracting Agencv will unilaterally revise the unit or lump sum price, to the minimum specified amount and recalculate the extension. The total of extensions, corrected where necessary, includinq sales taxes where applicable and such additives and/or alternates as selected bv the Contracting Agency, will be used by the Contracting Agency for award purposes and to fix the Awarded Contract Price amount and the amount of the contract bond. 1-03.3 Execution of Contract (October 1, 2005 APWA GSP) Revise this section to read: Copies of the Contract Provisions, includina the unsigned Form of Contract, will be available for signature bv the successful bidder on the first business day following award. The number of copies to be executed b�the Contractor will be determined by the ContractinQ Aqencv. Within 10 calendar days after the award date, the successful bidder shall return the signed Contracting Agency-prepared contract, an insurance certification as required by Section 1- 07.18, and a satisfactory bond as required by law and Section 1-03.4. Before execution of the contract by the Contracting Agency, the successful bidder shall provide any pre-award information the Contracting Agency may require under Section 1-02.15. Until the Contracting Agency executes a contract, no proposal shall bind the Contracting Agency nor shall any work begin within the project limits or within Contracting Agency- furnished sites. The Contractor shall bear all risks for any work begun outside such areas and for any materials ordered before the contract is executed by the Contracting Agency. If the bidder experiences circumstances beyond their control that prevents return of the contract documents within the 10 calendar days after the award date stated above, the Contracting Agency may grant up to a maximum of 10 additional calendar days for return of the documents, provided the Contracting Agency deems the circumstances warrant it. Austin Drive Pavement Preservation STPUS-6639(001) SP-10 1-03.4 Contract Bond (July 23, 2015 APWA GSP) Delete the first paragraph and replace it with the following: The successful bidder shall provide executed payment and performance bond(s)for the full contract amount. The bond may be a combined payment and performance bond; or be separate payment and performance bonds. In the case of separate payment and - - � -- performance bonds, each shall be for the full contract amount..The bond(s) shall: 1. Be on Contracting Agency-furnished form(s); 2. Be signed by an approved surety (or sureties) that: a. Is registered with the Washington State Insurance Commissioner, and b. Appears on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner, 3. Guarantee that the Contractor will perform and comply with all obligations, duties, and conditions under the Contract, including but not limited to the duty and obligation to indemnify, defend, and protect the Contracting Agency against all losses and claims related directly or indirectly from any failure: a. Of the Contractor (or any of the employees, subcontractors, or lower tier subcontractors of the Contractor) to faithfully perform and comply with all contract obligations, conditions, and duties, or b. Of the Contractor (or the subcontractors or lower tier subcontractors of the Contractor)to pay all laborers, mechanics, subcontractors, lower tier subcontractors, material person, or any other person who provides supplies or provisions for carrying out the work; 4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the project under titles 50, 51, and 82 RCW; and 5. Be accompanied by a power of attorney for the Surety's officer empowered to sign the bond; and 6. Be signed by an officer of the Contractor empowered to sign official statements (sole proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed by the president or vice president, unless accompanied by written proof of the authority of the individual signing the bond(s) to bind the corporation (i.e., corporate resolution, power of attorney, or a letter to such effect signed by the president or vice president). 1-04 SCOPE OF WORK 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda (March 13, 2012 APWA GSP) Revise the second paragraph to read: Any inconsistency in the parts of the contract shall be resolved by following this order of precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): Austin Drive Pavement Preservation STPUS-6639(001) SP-11 1. Addenda, 2. Proposal Form, 3. Special Provisions, 4. Contract Plans, 5. Amendments to the Standard Specifications, 6. Standard Specifications, 7. Contracting Agency's Standard Plans or Details (if any), and 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 1-05 CONTROL OF WORK 1-05.7 Removal of Defective and Unauthorized Work (October 1, 2005 APWA GSP) Supplement this section with the following: If the Contractor fails to remedy defective or unauthorized work within the time specified in a written notice from the Engineer, or fails to perform any part of the work required by the Contract Documents, the Engineer may correct and remedy such work as may be identified in the written notice, with Contracting Agency forces or by such other means as the Contracting Agency may deem necessary. If the Contractor fails to comply with a written order to remedy what the Engineer determines to be an emergency situation, the Engineer may have the defective and unauthorized work corrected immediately, have the rejected work removed and replaced, or have work the Contractor refuses to perform completed by using Contracting Agency or other forces. An emergency situation is any situation when, in the opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or damage to the public. Direct or indirect costs incurred by the Contracting Agency attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from monies due, or to become due, the Contractor. Such direct and indirect costs shall include in particular, but without limitation, compensation for additional professional services required, and costs for repair and replacement�of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. Austin Drive Pavement Preservation STPUS-6639(001 J SP-12 No adjustment in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the Contracting Agency's rights provided by this Section. The rights exercised under the provisions of this section shall not diminish the Contracting Agency's right to pursue any other avenue for additional remedy or damages with respect to the Contractor's failure to perform the work as required. 1-05.11 Finallnspection (October 1, 2005 APWA GSP) Delete this section and replace it with the following: - 1-05.11 Final Inspections and Operational Testing 1-05.11(1) Substantial Completion Date When the Contractor considers the work to be substantially complete, the Contractor shall so notify the Engineer and request the Engineer establish the Substantial Completion Date. The Contractor's request shall list the specific items of work that remain to be completed in order to reach physical completion. The Engineer will schedule an inspection of the work with the Contractor to determine the status of completion. The Engineer may also establish the Substantial Completion Date unilaterally. If, after this inspection, the Engineer concurs with the Contractor that the work is substantially complete and ready for its intended use, the Engineer, by written notice to the Contractor, will set the Substantial Completion Date. If, after this inspection the Engineer does not consider the work substantially complete and ready for its intended use, the Engineer will, by written notice, so notify the Contractor giving the reasons therefore. Upon receipt of written notice concurring in or denying substantial completion, whichever is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized interruption, the work necessary to reach Substantial and Physical Completion. The Contractor shall provide the Engineer with a revised schedule indicating when the Contractor expects to reach substantial and physical completion of the work. The above process shall be repeated until the Engineer establishes the Substantial Completion Date and the Contractor considers the work physically complete and ready for final inspection. 1-05.11(2) Final Inspection and Physical Completion Date When the Contractor considers the work physically complete and ready for final inspection, the Contractor by written notice, shall request the Engineer to schedule a final inspection. The Engineer will set a date for final inspection. The Engineer and the Contractor will then make � a final inspection and the Engineer will notify the Contractor in writing of all particulars in which the final inspection reveals the work incomplete or unacceptable. The Contractor shall immediately take such corrective measures as are necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption until physical completion of the listed deficiencies. This process will continue until the Engineer is satisfied the listed deficiencies have been corrected. Austin Drive Pavement Preseivation STPUS-6639(001) SP-13 If action to correct the listed deficiencies is not initiated within 7 days after receipt of the written notice listing the deficiencies, the Engineer may, upon written notice to the Contractor, take whatever steps are necessary to correct those deficiencies pursuant to Section 1-05.7. The Contractor will not be allowed an extension of contract time because of a delay in the performance of the work attributable to the exercise of the Engineer's right hereunder. Upon correction of all deficiencies, the Engineer will notify the Contractor and the Contracting Agency, in writing, of the date upon which the work was considered physically complete. That date shall constitute the Physical Completion Date of the contract, but shall not imply acceptance of the work or that all the obligations of the Contractor under the contract have been fulfilled. 1-05.11(3) Operational Testing It is the intent of the Contracting Agency to have at the Physical Completion Date a complete and operable system. Therefore when the work involves the installation of machinery or other mechanical equipment; street lighting, electrical distribution or signal systems; irrigation systems; buildings; or other similar work it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the physical completion date. Whenever items of work are listed in the Contract Provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment which prove faulty, or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing, shall be included in the unit contract prices related to the system being tested, unless specifically set forth otherwise in the proposal. Operational and test periods, when required by the Engineer, shall not affect a manufacturer's guaranties or warranties furnished under the terms of the contract. 1-05.13 SUPERINTENDENTS, LABOR AND EQUIPMENT OF CONTRACTOR (August 14, 2013 APWA GSP) Delete the sixth and seventh paragraphs of this section. (October 1, 2005 APWA GSP) Add the following new section: Austin Drive Pavement Preservation STPUS-6639(001) SP-14 1-05.16 Water and Power New Section The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the contract includes power and water as a pay item. -05.�8 Record Drawings -s��<ion d�i<«d p��a,ddend���„tt 2 (Ma h 8, 2013 APWA GSP) The ntractor shall maintain one set of full size plans for Record Drawings, updated with clear a accurate red-lined field revisions on a daily basis, and within 2 business days after receipt of'�formation that a change in Work has occurred. The Contractor shall not conceal - any work un�i\e required information is recorded. _. This Record Dra�ing set shall be used for this purpose alone, shall be kept separate from other Plan sheets, and shall be clearly marked as Record Drawings. These Record Drawings shall be ke on site at the Contractor's field office, and shall be available for review by the Contracti Agency at all times. The Contractor shall bring the Record Drawings to each progress meeting for review. \ The preparation and upkeep of the Record Drawings is to be the assigned responsibility of a single, experienced, and qualified �ividual. The quality of the Record Drawings, in terms of accuracy, clarity, and completeness, is to be adequate to allow the Contracting Agency to modify the computer-aided drafting (CA�) Contract Drawings to produce a complete set of Record Drawings for the Contracting Agency without further investigative effort by the Contracting Agency. The Record Drawing markups shall document all c anges in the Work, both concealed and visible. Items that must be shown on the markups in ude but are not limited to: � • Actual dimensions, arrangement, and materials used hen different than shown in the Plans. • Changes made by Change Order or Field Order. � • Changes made by the Contractor. \ • Accurate locations of storm sewer, sanitary sewer, water main'� and other water appurtenances, structures, conduits, light standards, vaults, wid�l�of roadways, sidewalks, landscaping areas, building footprints, channelization and pavement markings, etc. Include pipe invert elevations, top of castings (manholes\nlets, etc.). � If the Contract calls for the Contracting Agency to do all surveying and staking,the Cor��acting Agency will provide the elevations at the tolerances the Contracting Agency requires f�(the Record Drawings. � \ Aust�n Drive Pavement Preservation STPUS-6639(001) SP-15 When the Contract calis for the Contractor to do the surveying/staking, the applicabl� tolerance limits include, but are not limited to the following: / � Vertical Horizontal / As-built sanitary 8�storm invert and grate ± 0.01 foot ± 0.01 foo elevations As-built monumentation ± 0.001 foot ± 0.0 foot As-built waterlines, inverts, valves, ± 0.10 foot ± 0 0 foot hydrants As-built ponds/swales/water features ± 0.10 foot � 0.10 foot As-built buildings (fin. Floor elev.) ± 0.01 foot ± 0.10 foot As-built gas lines, power, N, Tel, Com ± 0.10 foot , ± 0.10 foot As-built signs, signals, etc. N/A � ± 0.10 foot Making Entries on the Record Drawings: • Use erasable colored pencil (not ink)for all marlSitigs on the Record Drawings, conforming to the following color code: / • Additions - Red � • Deletions - Green • Comments - Blue • Dimensions- Graphite • Provide the applicable reference for a(I entries, such as the change order number, the request for information (RFI) numb,�r, or the approved shop drawing number. • Date all entries. � • Clearly identify all items in the ntry with notes similar to those in the Contract Drawings (such as pipe sym ols, centerline elevations, materials, pipe joint abbreviations, etc.). / The Contractor shall certify o�the Record Drawings that said drawings are an accurate depiction of built conditions iand in conformance with the requirements detailed above. The Contractor shall submit fir�al Record Drawings to the Contracting Agency. Contracting Agency acceptance of t�ie Record Drawings is one of the requirements for achieving Physical Completion j � Payment will be made for the following bid item: Rec�rd Drawings Lump Sum (�imum Bid $5000) Pay nt for this item will be made on a prorated monthly basis for work completed in accf�'rdance with this section up to 75% of the lump sum bid. The final 25% of the lump sum itefn will be paid upon submittal and approval of the completed Record Drawings set �repared in conformance with these Special Provisions. Austin Drive Pavement Preservation STPUS-6639(001) SP-16 n 6.7.d ..� L. L, a ..� ab, o � p Tl.., r�....+. ..+.. fLTfQ3—DGG1lT•1-fLrirTilTZTI-"LfIG�IGIT� . -�nus�bid--a�-leas�-t�tat�„�=��- 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.1 Laws to be Observed (October 1, 2005 APWA GSP) Supplement this section with the following: In cases of conflict between different safety regulations, the more stringent regulation shall apply. - The Washington State Department of Labor and Industries shall be the sole and paramount administrative agency responsible for the administration of the provisions of the Washington Industrial Safety and Health Act of 1973 (WISHA). The Contractor shall maintain at the project site office, or other well-known place at the project site, all articles necessary for providing first aid to the injured. The Contractor shall establish, publish, and make known to all employees, procedures for ensuring immediate removal to a hospital, or doctor's care, persons, including employees, who may have been injured on the project site. Employees should not be permitted to work on the project site before the Contractor has established and made known procedures for removal of injured persons to a hospital or a doctor's care. The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the Contractor's plant, appliances, and methods, and for any damage or injury resulting from their failure, or improper maintenance, use, or operation. The Contractor shall be solely and completely responsible for the conditions of the project site, including safety for all persons and property in the pertormance of the work. This requirement shall apply continuously, and not be limited to normal working hours.The required or implied duty of the Engineer to conduct construction review of the Contractor's performance does not, and shall not, be intended to include review and adequacy of the Contractor's safety measures in, on, or near the project site. 1-07.11 Requirements for Nondiscrimination (December 8, 2014 APWA GSP, Option B) Supplement this section with the following: Disadvantaged Business Enterprise Condition of Award Participation The Disadvantaged Business Enterprise (DBE) requirements of 49 CFR Part 26 apply to this Contract. Demonstrating compliance with these specifications is a Condition of Award (COA) of this Contract. Failure to comply with the requirements of this specification may result in your bid being found to be nonresponsive and may be rejected. DBE COA Goal The Contracting Agency has established a COA Contract goal in the amount of: 12% Austin Drive Pavement Preservation STPUS-6639(001) SP-17 DBE Eligibility/Selection of DBEs A Directory of Certified DBE Firms denoting the Description of Work the DBE Contractors are certified to perform is available at: www.omwbe.wa.qov/certification/index.shtml. � The directory provides plain language on the Description of Work that the listed DBE's have been certified by the Office of Minority and Women's Business Enterprises (OMWBE) to perform. The Bidder shall use the Directory of Certified DBE Firms to confirm if a DBE is certified for the "Description of Work"the Bidder lists on the DBE Utilization Certification form #272-056 EF (see form instructions) and therefore qualifies for credit towards the COA goal. Crediting DBE Participation Joint Venture When a DBE performs as a participant in a joint venture, only that portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work that the DBE performs with its own forces shall be credited. DBE Prime Contractor A DBE Prime Contractor may only take credit for that portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work that the DBE Prime performs with its own forces. DBE Subcontractor When a DBE firm participates as a Subcontractor only that portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work that the DBE performs with its own forces shall be credited. • Include the cost of supplies and materials obtained by the DBE for the Work in the Contract including supplies purchased or equipment leased by the DBE. • However, you may not take credit for supplies, materials, and equipment the DBE Subcontractor purchases or leases from the Prime Contractor or its affiliate. In addition, Work performed by a DBE, utilizing resources of the Prime Contractor or its affiliates shall not be credited. � • In very rare situations, a DBE firm may utilize equipment and/or personnel from a non-DBE firm other than the Prime Contractor or its affiliates. Should this situation arise the arrangement must be short-term and have prior written approval from the Office of Equal Opportunity (OEO). • Count the entire value of fees or commissions charged by a DBE firm for providing a bona fide service, such as professional, technical, consultant, managerial services, or for providing bonds or insurance. • When a DBE subcontracts to another firm, the value of the subcontracted Work may be counted as participation only if the DBE's lower tier Austin Drive Pavement Preservation STPUS-6639(001) SP-18 • . . . ' � .. .. . �.'i' �v Subcontractor is also a DBE. Work that a DBE subcontracts to a non-DBE firm shall not be credited. • When non-DBE Subcontractor further subcontracts to a lower-tier Subcontractor or supplier who is a certified DBE, then that portion of the Work further subcontracted may be credited as DBE participation, provided it is a distinct clearly defined portion of the Work that the DBE is certified to perform and the DBE Subcontractor pertorms the Work with its own forces. • If a firm is not certified as a DBE at the time of the execution of the contract, their participation cannot be counted toward any DBE goals. Trucking Use the following factors in determining DBE credit and whether a DBE trucking company is performing a commercially useful function: 1. The DBE must be responsible for the management and supervision of the entire trucking operation for which credit is being claimed. 2. The DBE must itself own and, with its own workforce, operate at least one fully licensed, insured, and operational truck used on the Contract. 3. The DBE receives credit only for the value of the transportation services � it provides on the Contract using trucks it owns or leases, licenses, insures, and operates with drivers it employs. For purposes of this requirement a lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others provided it is with the consent of the DBE and the lease provides the DBE first priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE. 4. The DBE may lease trucks from another DBE firm including an owner- operator provided they are certified as a DBE for trucking. The DBE who leases trucks from another DBE may claim participation for the total value of the transportation services the lessee DBE provides on the Contract. 5. The DBE may also lease trucks from a non-DBE firm and may enter into an agreement with an owner-operator who is a non-DBE. The DBE shall only receive credit for the number of additional non-DBE trucks equal or less than the number of DBE trucks the firms owns or has leased/subcontracted through another DBE trucking company. The DBE must control the work of the non-DBE trucks. If the non-DBE is performing the work without supervision of that work by the DBE, the DBE is not performing a Commercially Useful Function (CUF). 6. In any lease or owner-operator situation, as described in requirement#4 and #5 above, the following rules shall apply: Austin Drive Pavement Preservation STPUS-6639(001) SP-19 a. A written lease/rental agreement is required for all trucks leased or rented; documenting the ownership and the terms of the agreement. The agreements must be submitted and approved by the Contracting Agency prior to the beginning of the Work. The agreement must show the leaser's name, truck description and agreed upon amount and method of payment (hour, ton, or per load). All lease agreements shall be for a long-term relationship, rather than for the individual project. (This requirement does not apply to owner-operator arrangements.) b. Only the vehicle, (not the operator) may be leased or rented. (This requirement does not apply to owner-operator • arrangements). 7. Credit may only be claimed for DBE trucking firms operating under a subcontract or a written agreement approved by the Contracting Agency prior to performing Work. Expenditures paid to other DBEs Expenditures paid to other DBEs for materials or supplies may be counted toward DBE goals as provided in the following: Manufacturer You may claim DBE credit for 100 percent of value of the materials or supplies obtained from a DBE manufacturer. A manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the contract. A manufacturer shall include firms that produce finished goods or products from raw or unfinished material or that purchases and substantially alters goods and materials to make them suitable for construction use before reselling them. In order to receive credit as a DBE Manufacturer, the firm must be certified by OMWBE as a manufacturer in a NAICS code that falls within the 31XXXX to 33XXXX classification. Regular Dealer You may claim credit for 60 percent of the value of the materials or supplies purchased from a DBE regular dealer. Rules applicable to regular dealer status are contained in 49 CFR Part 26.55.e.2. To be considered a regular dealer you must meet the following criteria: • WSDOT considers and recognizes a regular dealer, as a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the materials or supplies required for the performance of the Contract and described by the specifications of the Contract are bought, kept in stock and regularly sold or leased to the public in the usual course of business. Austin Drive Pavement Preservation � STPUS-6639(001) SP-20 • Sixty percent (60%) of the cost of materials or supplies purchased from an approved regular dealer may be credited as DBE participation. Regular dealer status is granted on a contract-by-contract basis. A firm wishing to be approved as a regular dealer for WSDOT contracted projects or Highways & Local Program administered projects must submit a request in writing to OEO for approval, no later than seven days prior to bid opening. Once the OEO has received the request, an onsite review will be set up with the firm and a review conducted to determine the firm's qualifications. If it is determined that the firm qualifies as a regular dealer the OEO will list the firm on an Approved Regular Dealers List. The list may be accessed through the OEO Home website is at: www.wsdot.wa. oq v/equalopportunity. Note: Requests to be listed as a regular dealer will only be processed if the requesting firm is certified by the Office of Minority and Women's Business Enterprises in a NAICS code that fall within the 42XXXX NAICS Wholesale code section. Materials or Supplies Purchased from a DBE With regard to materials or supplies purchased from a DBE who is neither a manufacturer nor a regular dealer you may claim credit for the following: 1. Fees or commissions charged for assistance in the procurement of the materials and supplies. 2. Fees or transportation charges for the delivery of materials or supplies. In either case you may not take credit for any part of the cost of the materials and supplies. Commercially Useful Function (CUF) The Prime Contractor has a responsibility and must treat the working relationship with the DBE such that the DBE is performing a commercially useful function. The Prime Contractor may only take credit for Work performed by a DBE that is determined to be performing a commercially useful function. • A DBE performs a commercially useful function when it is responsible for execution of a distinct element of Work and is carrying out its responsibilities by performing, managing and supervising the Work involved. The DBE must also be responsible with respect to materials and supplies used on the Contract. For example; negotiating price, determining quality, determining quantities, ordering, installing (if applicable) and paying for the material itself. • A DBE does not perForm a commercially useful function if its role is limited to that of an extra participant in a transaction, Contract, or project through which funds are passed. Austin Drive Pavement Preservation STPUS-6639(001) SP-21 Joint Checking Allowance Prime Contractors and DBEs must receive pre-approval by the OEO before using a joint check. Joint check requests shall be submitted by the Prime Contractor to the Contracting Agency for approval. When requesting approval for use of a joint checking allowance, the Contractor must distribute a written joint check agreement among the parties (including the suppliers involved) providing full and prompt disclosure of the expected use of the joint checks. The agreement shall contain all the information concerning the parties' obligations and consequences or remedies if the agreement is not fulfilled or a breach occurs. The joint check request shall be submitted to the Contracting Agency for approval prior to signing the contract agreement. The following are some general conditions that must be met by all parties regarding joint check use:. a. It is understood that the Prime Contractor acts solely as the guarantor of a joint check. b. The DBE's own funds are used to pay supplier of materials. The Prime Contractor does not make direct payment to supplier. In order to be performing a Commercially Useful Function (CUF), the DBE must release the check to the supplier (paying for the materials it-self and not be an extra participant in a transaction). c. If the Prime Contractor makes joint checks available to one DBE Subcontractor, the service must be made available to all Subcontractors (DBE and non-DBE). d. The relationship between the DBE and its suppliers should be established independently of and without interference by the Prime Contractor. The DBE has final decision-making responsibility concerning the procurement of materials and supplies, including which supplier to use. e. The Prime Contractor and DBE shall be able to provide receipts, invoices, cancelled checks and/or certification statements of payment if requested by the Contracting Agency. f. The DBE remains responsible for all other elements of 49 CFR 26.55(c)(1). Failure by the Prime Contractor to request and receive prior approval of a joint check arrangement will result in the joint check amount not counting towards the Prime Contractor's DBE goal. Disadvantaged Business Enterprise Utilization Certification FORM # 272-056 EF To be eligible for award of the Contract, the Bidder shall properly complete and submit a Disadvantaged Business Enterprise Utilization Certification with the , Austin Drive Pavement Preservation STPUS-6639(001) SP-22 Bidder's sealed Bid Proposal, as specified Section 1-02.9 Delivery of Proposal. The Bidder's Disadvantaged Business Enterprise Utilization Certification must clearly demonstrate how the Bidder intends to meet the DBE COA goal. A Disadvantaged Business Enterprise Utilization Certification (form #272-056 EF) is included in your Proposal package for this purpose as well as instructions on how to properly fill out the form. In the event of arithmetic errors in completing the Disadvantaged Business Enterprise Utilization Certification the amount listed to be applied towards the goal for each DBE shall govern and the DBE total amount shall be adjusted accordingly. Note: The Contracting Agency shall consider as non-responsive and shall reject any Bid Proposal submitted that does not contain a Disadvantaged Business Enterprise Utilization Certification that accurately demonstrates how the Bidder intends to meet the COA goal. Disadvantaged Business Enterprise (DBE)Written Confirmation Document(s) FORM #422-031 EF The Bidder shall submit a complete and accurate Disadvantaged Business Enterprise (DBE) Written Confirmation Document for each DBE firm listed in the Bidder's completed Disadvantaged Business Enterprise Utilization Certification as submitted with the bid. Failure to do so will result in the associated participation being disallowed, which may result in bid rejection. A Disadvantaged Business Enterprise (DBE)Written Confirmation Document (form No. 422-031 EF) is included in your Proposal package for this purpose. The form(s) shall be received as specified in the special provisions for Section 1- 02.9 Delivery of Proposal. It is prohibited for the Bidder to require a DBE to submit a Written Confirmation Document with any part of the form left blank. Should the Contracting Agency determine that a Written Confirmation Document was signed by a DBE that was not complete; the validity of the document comes into question and the associated DBE Participation may not receive credit. Selection of Successful Bidder/Good Faith Efforts (GFE) The successful Bidder shall be selected on the basis of having submitted the lowest responsive Bid, which demonstrates a good faith effort to achieve the DBE COA goal. Achieving the goal may be accomplished in one of two ways, as follows: 1. Bv meetinq the goal The best indication of good faith efforts is to document, through submission of the Disadvantaged Business Enterprise Utilization Certification and supporting Disadvantaged Business Enterprise (DBE) Written Confirmation Document(s) that the Bidder has obtained enough DBE participation to meet or exceed the assigned DBE COA contract goal. That being the case no additional GFE documentation is required. Or; Austm Drive Pavement Preservation STPUS-6639(001) SP-23 2. � documentation that it made adequate GFE to meet the qoal The Bidder may demonstrate a GFE in whole or part through GFE documentation ONLY IN THE EVENT a Bidder's efforts to solicit sufficient DBE participation have been unsuccessful. In this case, the Bidder must supply GFE documentation in addition to the Disadvantaged Business Enterprise Utilization Certification, and supporting Disadvantaged Business Enterprise (DBE)Written Confirmation document(s). Note: In the case where the Bidder was awarded the contract based on demonstrating adequate GFE the advertised DBE goal will not be reduced to the Bidder's partial commitment. The Bidder shall demonstrate a GFE during the life of the Contract to attain the DBE Condition of Award (COA) Goal as assigned to the project. Good Faith Efforts (GFE) Documentation GFE documentation shall be received, as specified in the special provisions for Section 1-02.9 Delivery of Proposal. Based upon all the relevant documentation submitted in Bid or as supplement to Bid, the Contracting Agency shall determine whether the Bidder has demonstrated a sufficient GFE to achieve DBE participation. The Contracting Agency will make � a fair and reasonable judgment of whether a Bidder that did not meet the goal through participation, made adequate good faith efforts as demonstrated by the GFE documentation. The following is a list of types of actions, which would be considered as part of the Bidder's GFE to achieve DBE participation. It is not intended to be a mandatory checklist, nor is it intended to be exclusive or exhaustive. Other factors or types of efforts may be relevant in appropriate cases: 1. Attendance by the Bidder at any pre-solicitation or pre-Bid meetings that were scheduled by the Contracting Agency to inform DBEs of contracting and subcontracting or material supply opportunities available on the project; 2. Contacting local Tribes, Tribal Employment Rights Offices (TERO) concerning the subcontracting or supply opportunities in sufficient time to allow the enterprises to participate effectively; 3. Selection by the Bidder of specific economically feasible units of the project to be performed by DBEs in order to increase the likelihood of participation by DBEs even if the Bidder preferred to perform these Work items as the Prime Contractor; 4. Advertising by the Bidder in general circulation, trade association minority and trade oriented, women focus publications, concerning the subcontracting or supply opportunities; 5. Providing written notice from the Bidder to a reasonable number of specific DBEs, identified from the OMWBE Directory of Certified DBE Austin Drive Pavement Preservation STPUS-6639(001) SP-24 t�-.� �..r.. . .'Y�.�•�'•.. . ' . Firms for the selected subcontracting or material supply Work, in sufficient time to allow the enterprises to participate effectively; 6. Follow-up by the Bidder of initial solicitations of interest by contacting the DBEs to determine with certainty whether they were interested. Documentation of this kind of action shall include the information outlined below: a. The names, addresses, telephone numbers of DBEs who were contacted, the dates of initial contact, and whether initial solicitations of interest were followed-up by contacting the DBEs to determine with certainty whether the DBEs were interested; b. A description of the information provided to the DBEs regarding the plans, specifications, and estimated quantities for portions of the Work to be performed; c. Documentation of each DBE contacted but rejected and the reason(s)for that rejection; 7. Providing, to interested DBEs, adequate information about the plans, specifications, and requirements for the selected subcontracting or material supply Work; 8. Negotiating in good faith with the DBE firms, and not, without justifiable reason, rejecting as unsatisfactory, Bids that are prepared by any DBE. The DBE's standing within its industry, membership in specific groups, organizations, or associations and political or social affiliations - union vs. non-union employee status - are not legitimate causes for the rejection or non-solicitation of bids in the Prime Contractor's efforts to meet the project goal; 9. Advertising and making efforts to obtain DBE participation that were reasonably expected to produce a level of participation sufficient to meet the goal or requirements of the Contracting Agency; 10. Making any other efforts to obtain DBE participation that were reasonably expected to produce a level of participation sufficient to meet the goal or requirements of the Contracting Agency; 11. Using the services of minority community organizations, minority contractor groups, local, State, and federal minority business assistance offices and other organizations identified by WSDOT and advocates for disadvantaged, minority, and women businesses that provide assistance in the recruitment and placement of disadvantaged, minority, and women business enterprises; and 12. Using the WSDOT OEO DBE Supportive Services to assist you. For more information please contact the OEO by calling toll free at (888) 259-9143 or emailing dbess@wsdot.wa.gov. Austin Drive Pavement Preservation STPUS-6639(001) SP-25 Administrative Reconsideration of GFE Documentation Any Bidder has the right to reconsideration but only for the purpose of reassessing their GFE documentation.that was determined to be inadequate. • The Bidder must request and schedule a reconsideration hearing within seven calendar days of notification of being nonresponsive or forfeit the right to reconsideration. • The reconsideration decision on the adequacy of the Bidder's GFE documentation shall be made by an official who did not take part in the original determination. • The Bidder shall have the opportunity to meet in person with the official for the purpose of setting forth the Bidder's position as to why the GFE documentation demonstrates a sufficient effort. • The reconsideration official shall provide the Bidder with a written decision on reconsideration within five business days of the hearing explaining the basis for their finding. Procedures between Award and Execution After Award and prior to Execution the Bidder shall provide the additional information described below. Failure to comply shall result in the forfeiture of the Bidder's Proposal bond or deposit. 1. Additional information for all successful DBE's as shown on the Disadvantaged Business Enterprise Utilization Certification: a. Correct business name, federal employee identification number (if available), and mailing address. b. List of all Bid items assigned to each successful DBE firm, including unit prices and extensions. c. Description of partial items (if any) to be sublet to each successful DBE firm specifying the distinct elements of Work under each item to be performed by the DBE and including the dollar value of the DBE portion.. Total amounts shown for each DBE shall not be less than the amount shown on the Disadvantaged Business Enterprise Utilization Certification. A breakdown that does not conform to the Disadvantaged Business Enterprise Utilization Certification or that demonstrates a lesser amount of DBE participation than that included in the Disadvantaged Business Enterprise Utilization Certification will be returned for correction. 2. A list of all firms who submitted a Bid or quote in an attempt to participate in this project whether they were successful or not. Include the business name and a mailing address. Austin Drive Pavement Preservation STPUS-6639(001) SP-26 Note: The firms identified by the Prime Contractor may be contacted by the Contracting Agency to solicit general information as follows: age of the firm and average of its gross annual receipts over the past three-years. Procedures after Execution Crediting DBE Participation toward Meeting the Goal Reporting All DBE work whether COA or race neutral participation is reported. The Prime Contractor shall submit a Quarterly Report of Amounts Credited as DBE Participation form (422-102 EF) on a quarterly basis for any calendar quarter in which DBE has accomplished Work or upon � completion of the project, as appropriate. The dollars are to be reported as specified herein. In the event that the payments to a DBE have been made by an entity other than the Prime Contractor, as in the case of a lower-tier Subcontractor or supplier, then the Prime Contractor shall obtain the quarterly report, including the signed affidavit, from the paying entity and submit the report to the Contracting Agency. Changes in DBE COA participation Owner initiated Change Orders The Prime Contractor shall demonstrate a GFE to substitute COA DBE participation when the Contracting Agency deletes Work items by change order that impact a COA DBE's Work. When the Contract allows alternate Work methods which serve to delete or create under-runs in COA DBE Work then the Prime Contractor must provide documentation of negotiating the change with the DBE that was to perform the reduced Work and demonstrate a GFE to substitute other DBE COA participation. Original Quantity Under runs In the event that Work committed to a DBE firm as part of the COA under runs the original planned quantities the Prime Contractor shall demonstrate a GFE to substitute other DBE COA participation. Contractor-Initiated Proposals—General The Contractor cannot reduce the amount of work committed to a DBE firm at contract award without good cause and only with written concurrence from the OEO. Reducing a COA DBE's Work is viewed as a partial DBE termination, subject to the procedures below. DBE Termination A COA�DBE Subcontractor may only be terminated in whole or part with the approval of the Contracting Agency (in coordination with OEO). Approval will be granted provided the Prime Contractor demonstrates that the termination is based on good cause. Austin Drive Pavement Preservation STPUS-6639(001) SP-27 Good cause typically includes situations where the DBE Subcontractor is unable or has failed to perform the work of its subcontract in accordance with normal industry standards. While not all inclusive, some examples of good cause include the following circumstances: Good cause may exist if: • The listed DBE Subcontractor fails or refuses to execute a written contract. • The listed DBE Subcontractor fails or refuses to perForm the work of its subcontract in a way consistent with normal industry standards. • The listed DBE Subcontractor fails or refuses to meet the Prime Contractor's reasonable, nondiscriminatory bond requirements. • The listed DBE Subcontractor becomes bankrupt, insolvent, or exhibits credit unworthiness. • The listed DBE Subcontractor is ineligible to work on public works projects because of suspension and debarment proceedings pursuant 2 CFR Parts 180, 215 and 1,200 or applicable state law. • The listed DBE Subcontractor voluntarily withdraws from the project and provides to you written notice of its withdrawal. • The listed DBE is ineligible to receive DBE credit for the type of work required. • A DBE owner dies or becomes disabled with the result that the listed DBE is unable to complete its work on the contract. Good cause does not exist if: • The Prime Contractor seeks to terminate a COA DBE so that the Prime can self-perform the Work. • The Prime Contractor seeks to terminate a COA DBE so the Prime Contractor can substitute another DBE or non-DBE after contract award. • The failure or refusal of the DBE Subcontractor to perform its work on the subcontract results from the bad faith or discriminatory action of the Prime Contractor (e.g., the failure of the Prime Contractor to make timely payments or the unnecessary placing of obstacles in the path of the DBE's Work). Austin Drive Pavement Preservation STPUS-6639(001) SP-28 Prior to requesting termination, the Prime Contractor must give notice in writing to the DBE Subcontractor with a copy to the Contracting Agency of its intent to request to terminate DBE work and the reasons for doing so. The DBE Subcontractor shall have five (5) days to respond to the prime Contractor's notice. The DBE's response shall either support the termination or advise the Contracting Agency and the Prime Contractor of the reasons it objects to the termination of its subcontract. When a COA DBE firm is "terminated" from a Contract (or fails to complete its Subcontract for any reason), the Prime Contractor shall make every good faith effort to substitute another DBE Firm (ref.to 49 CFR 26.53(g)). Graduation When a DBE firm "graduates" from the DBE program (during the course of an executed subcontract), the DBE participation of that firm "may" continue to count towards the contract DBE goal. Decertification When a COA DBE firm who has a signed subcontract in place with a Prime, later becomes "decertified" (during the course of that subcontract)—the DBE participation of that firm "may" continue to count towards the Contract DBE goal. Counting payments Payments to a DBE firm will count toward DBE goals only if the participation is in accordance with these specifications. Prompt Payment Prompt payment to all Subcontractors shall be in accordance with Section 1- 08.1(1) of these Contract special provisions. Payment Compensation for all costs involved with complying with the conditions of this specification and any other associated DBE requirements is included in payment for the associated Contract items of Work. Damages for Noncompliance The Prime Contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The Prime Contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of Contracts, which contain funding assistance from the United States Department of Transportation. Failure by the Prime Contractor to carry out these requirements is a material breach of this Contract, which may result in the Termination of this Contract or such other remedy as the Contracting Agency deems appropriate. If the Prime Contractor does not comply with any part of its Contract as required under 49 CFR part 26, and/or any other applicable law or regulation regarding DBE, the Contracting Agency may withhold payment, suspend the ability of the Prime Contractor to participate in future Contracting Agency contracts, impose sanctions or Terminate the Contract, and subject the Prime Austin Drive Pavement Preservation STPUS-6639(001) SP-29 Contractor to civil penalties of up to ten percent of the amount of the Contract for each violation. In the case of WSDOT Contracts, prequalification may be suspended pursuant to WAC 468-16-180, and continuous violations (exceeding a single violation) may also disqualify the Prime Contractor from further participation in WSDOT Contracts for a period of up to three years. An apparent low Bidder must be in compliance with these Contract Provisions as a condition precedent to the granting of a notice of award by the Contracting Agency. The Prime Contractor is entitled to request an adjudicative proceeding with respect to the Contracting Agency's determination of Contract violation and assessed penalties by filing a written application within thirty days of receipt of notification. The adjudicative proceeding, if requested, will be conducted by an administrative law judge pursuant to the procedures set forth in RCW 34.05 and Chapter 10.08 of the Washington Administrative Code. 1-07.15 Temporary Water Pollution/Erosion Control 1-07.15(1) Spill Prevention, Control and Countermeasures Plan This section is supplemented with the following: The Contractor shall address the following items in the SPCC Plan in addition to the requirements of Section 1-07.15(1): Mixing, Transfers, and Storage 1. All oil, fuel or chemical storage tanks or containers shall be diked and located on impervious surfaces so as to prevent spill from escaping. 2. All liquid products shall be stored and mixed on impervious surfaces in a secure water tight environment and provide containment to handle the maximum volume of liquid products on-site at any given time. 3. Proper security shall be maintained to prevent vandalism. 4. Drip pans or other protective devices shall be required for all transfer operations. Spills Paint and solvent spills shall be treated as oil spills and shall be prevented from reaching storm drains or other discharges. No cleaning solvents or chemicals used for tool or equipment cleaning may be discharged to the ground or water. Maintenance of Equipment � Fuel hoses, oil drums, oil or fuel transfer valves and fittings, etc., shall be checked regularly for drips or leaks and shall be maintained and stored properly to prevent spills into State waters. � Disposal Aust�n Drive Pavement Preservation STPUS-6639(001) SP-30 Spilled waste, chemicals or petroleum products shall be transported off-site for disposal at a facility approved by the Department of Ecology. The materials shall not be discharged to any sanitary sewer without approval of the local sewer authority. Reporting and Cleanup The Contractor's designated person for managing and implementing the SPCC Plan shall report hazardous material spills as follows: Spills into State water (including ponds, ditches, seasonally dry streams, and wetlands)— Immediately call all of the following: National Response Center 1-800-424-8802 WA State Div. of Emergency Management (24 hr) 1-800-258-5990 Ecology Northwest Regional Office (425) 649-7000 Spill to Soil (Including encounters of pre-existing contamination): Ecology Northwest Regional Office (425) 649-7000 Report immediately if threatening to health or environment (i.e., explosive, flammable, toxic vapors, shallow groundwater, nearby creek), otherwise within 90 days. Underground Storage Tank (confirmed release of material): Ecology Northwest Regional Office (425) 649-7000 Report within 24 hours 1-07.18 Public Liability and Property Damage Insurance Delete this section in its entirety, and replace it with the following: 1-07.18 Insurance (January 4, 2016 APWA GSP) 1-07.18(1) General Requirements A. The Contractor shall procure and maintain the insurance described in all subsections of section 1-07.18 of these Special Provisions, from insurers with a current A. M. Best rating of not less than A-: VII and licensed to do business in the State of Washington. The Contracting Agency reserves the right to approve or reject the insurance provided, based on the insurer's financial condition. B. The Contractor shall keep this insurance in force without interruption from the commencement of the Contractor's Work through the term of the Contract and for thirty (30) days after the Physical Completion date, unless otherwise indicated below. C. If any insurance policy is written on a claims made form, its retroactive date, and that of all subsequent renewals, shall be no later than the effective date of this Contract. The policy shall state that coverage is claims made, and state the retroactive date. Claims-made form coverage shall be maintained by the Contractor for a minimum of 36 months following the Completion Date or earlier termination of this Contract, and the Contractor shall annually provide the Contracting Agency with proof of renewal. If renewal of the claims made form of coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase Austin Drive Pavement Preservation STPUS-6639(001) SP-31 an extended reporting period ("tail") or execute another form of guarantee acceptable to the Contracting Agency to assure financial responsibility for liability for services performed. D. The Contractor's Automobile Liability, Commercial General Liability and Excess or Umbrella Liability insurance policies shall be primary and non-contributory insurance as respects the Contracting Agency's insurance, self-insurance, or self-insured pool coverage. Any insurance, self-insurance, or self-insured pool coverage maintained by the Contracting Agency shall be excess of the Contractor's insurance and shall not contribute with it. E. The Contractor shall provide the Contracting Agency and all additional insureds with written notice of any policy cancellation, within two business days of their receipt of such notice. G. The Contractor shall not begin work under the Contract until the required insurance has been obtained and approved by the Contracting Agency H. Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the Contracting Agency may, after giving five business days' notice to the Contractor to correct the breach, immediately terminate the Contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the Contracting Agency on demand, or at the sole discretion of the Contracting Agency, offset against funds due the Contractor from the Contracting Agency. I. All costs for insurance shall be incidental to and included in the unit or lump sum prices of the Contract and no additional payment will be made. 1-07.18(2) Additional Insured All insurance policies, with the exception of Workers Compensation, and of Professional Liability � and Builder's Risk (if required by this Contract) shall name the following listed entities as additional insured(s) using the forms or endorsements required herein: ■ the Contracting Agency and its officers, elected officials, employees, agents, and volunteers The above-listed entities shall be additional insured(s)for the full available limits of liability maintained by the Contractor, irrespective of whether such limits maintained by the Contractor are greater than those required by this Contract, and irrespective of whether the Certificate of Insurance provided by the Contractor pursuant to 1-07.18(4) describes limits lower than those maintained by the Contractor. For Commercial General Liability insurance coverage, the required additional insured endorsements shall be at least as broad as ISO forms CG 20 10 10 01 for ongoing operations and CG 20 37 10 01 for completed operations. 1-07.18(3) Subcontractors , Austin Drive Pavement Preservation STPUS-6639(001) SP-32 .. . •'t. . • ... � . - ., • The Contractor shall cause each Subcontractor of every tier to provide insurance coverage that complies with all applicable requirements of the Contractor-provided insurance as set forth herein, except the Contractor shall have sole responsibility for determining the limits of coverage required to be obtained by Subcontractors. The Contractor shall ensure that all Subcontractors of every tier add all entities listed in 1-07.18(2) as additional insureds, and provide proof of such on the policies as required by that section as detailed in 1-07.18(2) using an endorsement as least as broad as ISO CG 20 10 10 01 for ongoing operations and CG 20 37 10 01 for completed operations. Upon request by the Contracting Agency, the Contractor shall forward to the Contracting Agency evidence of insurance and copies of the additional insured endorsements of each Subcontractor of every tier as required in 1-07.18(4)Verification of Coverage. 1-07.18(4) Verification of Coverage The Contractor shall deliver to the Contracting Agency a Certificate(s) of Insurance and endorsements for each policy of insurance meeting the requirements set forth herein when the Contractor delivers the signed Contract for the work. Failure of Contracting Agency to demand such verification of coverage with these insurance requirements or failure of Contracting Agency to identify a deficiency from the insurance documentation provided shall not be construed as a waiver of Contractor's obligation to maintain such insurance. Verification of coverage shall include: 1. An ACORD certificate or a form determined by the Contracting Agency to be equivalent. 2. Copies of all endorsements naming Contracting Agency and all other entities listed in 1-07.18(2) as additional insured(s), showing the policy number. The Contractor may submit a copy of any blanket additional insured clause from its policies instead of a separate endorsement. 3. Any other amendatory endorsements to show the coverage required herein. 4. A notation of coverage enhancements on the Certificate of Insurance shall not satisfy these requirements—actual endorsements must be submitted. Upon request by the Contracting Agency, the Contractor shall forward to the Contracting Agency a full and certified copy of the insurance policy(s). If Builders Risk insurance is required on this Project, a full and certified copy of that policy is required when the Contractor delivers the signed Contract for the work. 1-07.18(5) Coverages and Limits The insurance shall provide the minimum coverages and limits set forth below. Contractor's maintenance of insurance, its scope of coverage, and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the Contracting Agency's recourse to any remedy available at law or in equity.. All deductibles and self-insured retentions must be disclosed and are subject to approval by the Contracting Agency. The cost of any claim payments falling within the deductible or self-insured retention shall be the responsibility of the Contractor. In the event an additional insured incurs a liability subject to any policy's deductibles or self-insured retention, said deductibles or self- insured retention shall be the responsibility of the Contractor. Austin Drive Pavement Preservation STPUS-6639(001) SP-33 1-07.18(5) A Commercial General Liability Commercial General Liability insurance shall be written on coverage forms at least as broad as ISO occurrence form CG 00 01, including but not limited to liability arising from premises, operations, stop gap liability, independent contractors, products-completed operations, personal and advertising injury, and liability assumed under an insured contract. There shall be no exclusion for liability arising from explosion, collapse or underground property damage. The Commercial General Liability insurance shall be endorsed to provide a per project general aggregate limit, using ISO form CG 25 03 05 09 or an equivalent endorsement. Contractor shall maintain Commercial General Liability Insurance arising out of the Contractor's completed operations for at least three years following Substantial Completion of the Work. Such policy must provide the following minimum limits: $1,000,000 Each Occurrence $2,000,000 General Aggregafe $2,000,000 Products 8 Completed Operations Aggregate $1,000,000 Personal 8 Advertising Injury each offence $1,000,000 Stop Gap / Employers' Liability each accident 1-07.18(5) B Automobile Liability Automobile Liability shall cover owned, non-owned, hired, and leased vehicles; and shall be written on a coverage form at least as broad as ISO form CA 00 01. If the work involves the transport of pollutants, the automobile liability policy shall include MCS 90 and CA 99 48 endorsements. Such policy must provide the following minimum limit: $1,000,000 Combined single limit each accident 1-07.18(5)C Workers' Compensation � The Contractor shall comply with Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 1-07.23 Public Convenience and Safety 1-07.23(1) Construction Under Traffic (January 2, 2012 WSDOT GSP, Option 2) Section 1-07.23(1) is supplemented with the following: Work Zone Clear Zone The Work Zone Clear Zone(WZCZ)applies during working and nonworking hours.The WZCZ applies only to temporary roadside objects introduced by the Contractor's operations and does not apply to preexisting conditions or permanent Work. Those work operations that are actively in progress shall be in accordance with adopted and approved Traffic Control Plans, and other contract requirements. Austin Drive Pavement Preservation STPUS-6639(001) SP-34 . .. . . . � , ':'.r-: During nonworking hours equipment or materials shall not be within the WZCZ unless they are protected by permanent guardrail or temporary concrete barrier. The use of temporary concrete barrier shall be permitted only if the Engineer approves the installation and location. During actual hours of work, unless protected as described above, only materials absolutely necessary to construction shall be within the WZCZ and only construction vehicles absolutely necessary to construction shall be allowed within the WZCZ or allowed to stop or park on the shoulder of the roadway. The Contractor's nonessential vehicles and employees private vehicles shall not be permitted to park within the WZCZ at any time unless protected as described above. Deviation from the above requirements.shall not occur unless the Contractor has requested the deviation in writing and the Engineer has provided written approval. Minimum WZCZ distances are measured from the edge of traveled way and will be determined as follows: Minimum Work Zone Clear Zone Distance Re ulato Posted S eed Distance From Traveled Wa Feet 35 m h or less 10* 40 m h 15 45 to 55 m h 20 60 m h or reater 30 * or 2-feet beyond the outside edge of sidewalk 1-08 PROSECUTION AND PROGRESS (May 25, 2006 APWA GSP) Add the following new section: 1-08.0 Preliminary Matters 1-08.0(1) Pre-construction Conference (October 10, 2008 APWA GSP) Prior to the Contractor beginning the work, a preconstruction conference will be held between the Contractor, the Engineer and such other interested parties as may be invited. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule; 2. To establish a working understanding among the various parties associated or affected by the work; 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc.; 4. To establish normal working hours for the work; 5. To review safety standards and traffic control; and 6. To discuss such other related items as may be pertinent to the work. The Contractor shall prepare and submit at the preconstruction conference the following: Austin Drive Pavement Preservation STPUS-6639(001) SP-35 1. A breakdown of all lump sum items; 2. A preliminary schedule of working drawing submittals; and 3. A list of material sources for approval if applicable. 1-08.0(2) Hours of Work (December 8, 2014 APWA GSP) Except in the case of emergency or unless otherwise approved by the Engineer, the normal working hours for the Contract shall be any consecutive 8-hour period between 7:00 a.m. and 6:00 p.m. Monday through Friday, exclusive of a lunch break. If the Contractor desires different than the normal working hours stated above, the request must be submitted in writing prior to the preconstruction conference, subject to the provisions below. The working hours for the Contract shall be established at or prior to the preconstruction conference. All working hours and days are also subject to local permit and ordinance conditions (such as noise ordinances). If the Contractor wishes to deviate from the established working hours, the Contractor shall submit a written request to the Engineer for consideration. This request shall state what hours are being requested, and why. Requests shall be submitted for review no later than 5 days prior to the day(s)the Contractor is requesting to change the hours. If the Contracting Agency approves such a deviation, such approval may be subject to certain other conditions, which will be detailed in writing. For example: 1. On non-Federal aid projects, requiring the Contractor to reimburse the Contracting Agency for the costs in excess of straight-time costs for Contracting Agency representatives who worked during such times. (The Engineer may require designated representatives to be present during the work. Representatives who may be deemed necessary by the Engineer include, but are not limited to: survey crews; personnel from the Contracting Agency's material testing lab; inspectors; and other Contracting Agency employees or third party consultants when, in the opinion of the Engineer, such work necessitates their presence.) 2. Considering the work performed on Saturdays, Sundays, and holidays as working days with regard to the contract time. 3. Considering multiple work shifts as multiple working days with respect to contract time even though the multiple shifts occur in a single 24-hour period. 4. If a 4-10 work schedule is requested and approved the non-working day for the week will be charged as a working day. 5. If Davis Bacon wage rates apply to this Contract, all requirements must be met and recorded properly on certified payroll Austin Drive Pavement Preservation STPUS-6639(001) SP-36 1-08.1 Subcontracting (July 23, 2015 APWA GSP) Delete the eighth paragraph and replace it with the following: On all projects funded with federal assistance the Contractor shall submit "Quarterly Report of Amounts Credited as DBE Participation" (form 422-102 EF) on a quarterly basis, in which DBE Work is accomplished, for every quarter in which the Contract is active or upon completion of the project, as appropriate. The quarterly reports are due on the 20th of April, July, October, and January for the four respective quarters. 1-08.3(2)A Type A Progress Schedule (March 13, 2012 APWA GSP) Revise this section to read: The Contractor shall submit 3 copies of a Type A Progress Schedule no later than at the preconstruction conference, or some other mutually agreed upon submittal time. The schedule may be a critical path method (CPM)schedule, bar chart, or other standard schedule format. Regardless of which format used, the schedule shall identify the critical path. The Engineer will evaluate the Type A Progress Schedule and approve or return the schedule for corrections within 15 calendar days of receiving the submittal. 1-08.4 Prosecution of Work Delete this section and replace it with the following: 1-08.4 Notice to Proceed and Prosecution of Work (July 23, 2015 APWA GSP) Notice to Proceed will be given after the contract has been executed and the contract bond and evidence of insurance have been approved and filed by the Contracting Agency. The Contractor shall not commence with the work until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the project site within ten days of the Notice to Proceed Date, unless otherwise approved in writing. The Contractor shall diligently pursue the work to the physical completion date within the time specified in the contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) specified in the contract. When shown in the Plans, the first order of work shall be the installation of high visibility fencing to delineate all areas for protection or restoration, as described in the Contract. Installation of high visibility fencing adjacent to the roadway shall occur after the placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). Upon construction of the fencing, the Contractor shall request the Engineer to inspect the fence. Austin Drive Pavement Preservation STPUS-6639(001) SP-37 No other work shall be performed on the site until the Contracting Agency has accepted the installation of high visibility fencing, as described in the Contract. 1-08.5 Time for Completion (March 13, 1995 WSDOT GSP, Option 7) Section 1-08.5 is supplemented with the following: This project shall be physically completed within 25 working days. 1-08.9 Liquidated Damages (August 14, 2013 APWA GSP) Revise the fourth paragraph to read: When the Contract Work has progressed to Substantial Completion as defined in the Contract, the Engineer may determine that the work is Substantially Complete. The Engineer will notify the Contractor in writing of the Substantial Completion Date. For overruns in Contract time occurring after the date so established, the formula for liquidated damages shown above will not apply. For overruns in Contract time occurring after the Substantial Completion Date, liquidated damages shall be assessed on the basis of direct engineering and related costs assignable to the project until the actual Physical Completion Date of all the Contract Work. The Contractor shall complete the remaining Work as promptly as possible. Upon request by the Project Engineer, the Contractor shall furnish a written schedule for completing the physical Work on the Contract. 1-09 MEASUREMENT AND PAYMENT 1-09.6 Force Account (October 10, 2008 APWA GSP) Supplement this section with the following: The Contracting Agency has estimated and included in the Proposal, dollar amounts for all items to be paid per force account, only to provide a common proposal for Bidders. All such dollar amounts are to become a part of Contractor's total bid. However, the Contracting Agency does not warrant expressly or by implication that the actual amount of work will correspond with those estimates. Payment will be made on the basis of the amount of work actually authorized by Engineer. 1-09.9 Payments (March 13, 2012 APWA GSP) Delete the first four paragraphs and replace them with the following: The basis of payment will be the actual quantities of Work performed according to the Contract and as specified for payment. Austin Drive Pavemenf Preservation STPUS-6639(001) SP-38 The Contractor shall submit a breakdown of the cost of lump sum bid items at the Preconstruction Conference, to enable the Project Engineer to determine the Work performed on a monthly basis. A breakdown is not required for lump sum items that include a basis for incremental payments as part of the respective Specification. Absent a lump sum breakdown, the Project Engineer will make a determination based on information available. The Project Engineer's determination of the cost of work shall be final. Progress payments for completed work and material on hand will be based upon progress estimates prepared by the Engineer. A progress estimate cutoff date will be established at the preconstruction conference. . - . The-initial progress estimate will be made not later than 30 days after the Contractor commences the work, and successive progress estimates will be made every month thereafter until the Completion Date. Progress estimates made during progress of the work are tentative, and made only for the purpose of determining progress payments. The progress estimates are subject to change at any time prior to the calculation of the final payment. The value of the progress estimate will be the sum of the following: 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of work completed multiplied by the unit price. 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum breakdown for that item, or absent such a breakdown, based on the Engineer's determination. 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or other storage area approved by the Engineer. 4. Change Orders—entitlement for approved extra cost or completed extra work as determined by the Engineer. Progress payments will be made in accordance with the progress estimate less: 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; 2. The amount of progress payments previously made; and 3. Funds withheld by the Contracting Agency for disbursement in accordance with the Contract Documents. Progress payments for work performed shall not be evidence of acceptable performance or an admission by the Contracting Agency that any work has been satisfactorily completed. The determination of payments under the contract will be final in accordance with Section 1-05.1. 1-10 TEMPORARY TRAFFIC CONTROL 1-10.2 Traffic Control Management 1-10.2(1) General (December 1, 2008 WSDOT GSP) Section 1-10.2(1) is supplemented with the following: Austin Drive Pavement Preservation STPUS-6639(001 J SP-39 Only training with WSDOT TCS card and WSDOT training curriculum is recognized in the State of Washington. The Traffic Control Supervisor shall be certified by one of the following: The Northwest Laborers-Employers Training Trust 27055 Ohio Ave. Kingston, WA 98346 (360) 297-3035 Evergreen Safety Council 401 Pontius Ave. N. Seattle, WA 98109 1-800-521-0778 or (206) 382-4090 The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, Virginia 22406-1022 Training Dept. Toll Free (877) 642-4637 Phone: (540) 368-1701 1-10.2(2) Traffic Control Plans Supplement this section with the following: Development of Temporary Traffic Control Plan Development of a Temporary Traffic Control Plan shall be the responsibility of the Contractor. Costs for the Temporary Traffic Control Plan shall be included in the lump sum costs for "Project Temporary Traffic Control". Applicable WSDOT Standard Plans are acceptable for the Contractors use in developing this Plan. The Contractor shall submit his Temporary Traffic Control Plan for the Engineer's review five working days prior to the Preconstruction Meeting. The Engineer shall review the Plan and at the Preconstruction Meeting give written approval or discuss the revisions required. Subsequent reviews or revisions, if required, shall be accomplished by the Engineer within 5 working days after submittal. No work shall be undertaken until the Contractor has written approval of the Temporary Traffic Control Plan. 1-10.4 Measurement 1-10.4(1) Lump Sum Bid for Project (No Unit Items) (August 2, 2004 WSDOT GSP) Supplement this section with the following: The proposal contains the item"Project Temporary Traffic Control," lump sum. The provisions of Section 1-10.4(1) shall apply. • END OF DIVISION 1 Austin Drive Pavement Preservation STPUS-6639(001) SP-40 ' This Page Intentionally Left Blank Austin Drive Pavement Preservation STPUS-6639(001) SP-41 DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS 5-04 HOT MIX ASPHALT 5-04.4 Measurement This section is supplemented with the following: "HMA for Pavement Repair CI 22 PG 64-22", Per Square Yard 5-04.5 Payment This section is supplemented with the following: "HMA for Pavement Repair CI 22 PG 64-22", Per Square Yard The unit contract price for "HMA for Pavement Repair CL 22 PG 64-22" shall be considered full payment for all labor, equipment and materials required to repair the areas shown on the plans and shall include the removal and excavation of existing asphalt concrete and associated subgrade material. No separate measurement will be made for saw cutting, grinding, excavation of material, haul, disposal, placing and compacting crushed surfacing and shall be considered incidental to the bid item "HMA for Pavement Repair CL 22 PG 64-22" DIVISION 7 DRAINAGE STRUCTURES, STORN� SEWERS, SANITARY SEWERS, WATER MAINS, AIVD CONDUITS 7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS 7-05.4 Measurement � This section is supplemented with the following: Austin Drive Pavement Preservation STPUS-6639(001) SP-42 Replace Catch Basin Frame and Grate will be measured per each. 7-05.5 Payment This section is supplemented with the following: "Replace Catch Basin Frame and Grate", per each. Payment for "Replace Catch Basin Frame and Grate" shall include all costs for sawcutting, excavation, haul, and pavement repair. 7-12 VALVES FOR WATER MAINS 7-12.1 Description This section is supplemented with the following: The Work shall include providing new cast iron valve boxes and lids and adjusting valve boxes to final grade in accordance with the Plans. Adjustment shall be accomplished per the requirements of 7-05.3(1)Adjusting Manholes and Catch Basins to Grade. 7-12.4 Measurement This section is supplemented with the following: Adjust Valve will be measured per each. 7-12.5 Payment This section is supplemented with the following: "Adjust Valve", per each. Payment for"Adjust Valve"will include all costs for the valve boxes and lids and adjustment. END OF DIVISION 7 Austin Drive Pavement Preservation STPUS-6639(001) SP-43 This Page Intentionally Left Blank � Austin Drive Pavement Preservation STPUS-6639(001) SP-44 DIVISION 8 MISCELLANEOUS CONSTRUCTION DIVISION 8 MISCELLANEOUS CONSTRUCTION 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL 8-01.1 Description Supplement this section with the following: This work shall include preparing and implementing a Temporary Erosion and Sediment Control (TESC) Plan by the Contractor for this contract and providing a certified Erosion and Sediment Control (ESC) Lead to implement the TESC Plan. 8-01.3 Construction Requirements 8-01.3(1) General 8-01.3(1)A Submittals Section 8-01.3(1)A is supplemented with the following: The Contractor shall prepare and submit for approval a TESC Plan that complies with the requirements for a "modified" TESC Plan as described in Section 8-01.3(1)A of the Standard Specifications. The TESC Plan shall be submitted to the Engineer 10 working days prior to the start of clearing and grubbing. 8-01.4 Measurement Section 8-01.4 is supplemented with the following: No unit of ineasurement shall apply to the lump sum price for Temporary Erosion and Sediment Control. 8-01.5 Payment Section 8-01.5 is supplemented with the following: "Temporary Erosion and Sediment Control", lump sum. The lump sum contract price for "Temporary Erosion and Sediment Control" shall be full pay for all labor, equipment, material, and overhead costs associated with implementing the TESC plan, including preparation of the TESC Plan, installing, maintaining, inspecting and repairing Best Management Practices (BMPs), and providing the ESC Lead. BMPs include, but are not limited to, silt fences, compost filter socks, interceptor swales, straw bale barrier/dam, temporary seeding and mulching, plastic covering, and inlet protection. Austin Drive Pavement Preservation STPUS-6639(001) SP-45 8-02 Roadside Restoration 8-02.1 Description Supplement this section with the following: This work shall include restoration of all disturbed areas affected by project equal to the pre- construction condition. 8-02.4 Measurement This section is supplemented with the following: No specific unit of ineasurement will be made for the Bid Item "Roadside Restoration" Lump Sum. 8-02.5 Payment This section is supplemented with the following: "Roadside Restoration", Lump Sum The unit contract price for "Roadside Restoration", Lump Sum shall be full pay for all labor, equipment and materials necessary for the restoration of the disturbed areas to the pre- construction condition. No additional payment will be made for mulch, sod, bark mulch, top soil, plant or tree replacement and irrigation line repair and shall be considered incidental to the bid item. 8-13.5 Payment This section is supplemented with the following: "Adjust MonumenY', per each. The unit contract price per each for "Adjust MonumenY', shall be full pay for locating, uncovering, and adjusting monument case and cover to final grade. 8-14 CEMENT CONCRETE SIDEWALKS 8-14.1 Description This section is supplemented with the following: This Work shall include installation of 4 inches minimum of Crushed Surfacing beneath cement concrete curbs and curb ramps. 8-14.4 Measurement The second and third paragraphs of this section are deleted in their entirety and replaced with the following: � Austin Drive Pavement Preservation STPUS-6639(001) SP-46 Cement concrete curb ramp type will be measured per EACH of the curb ramp type installed. No separate measurement will be made for detectable warning surface and shall be considered incidental to the bid item Cement concrete curb ramp type_. 8-14.5 Payment This section is supplemented with the following: "Cement Concrete Curb Ramp Type_", per EACH The unit contract price per each for "Cement Conc. Curb Ramp Type _", no matter which type of curb ramp, shall be full pay for all labor, equipment, and materials required for constructing the curb ramp including all costs for saw cutting, excavation, removing asphalt pavement, removing existing cement concrete sidewalk, haul, disposal and placing and compacting 4 inches of crushed surfacing. 8-20 Illumination, Traffic Signal Systems, Intelligent Transportation Systems and Electrical 8-20.2 Materials This section is supplemented with the following: Illumination system luminaires shall consist of the following: Maximum 15'foot pole with aluminum bases, single arms, and fixture(s) Long Beach Blue in color. 8-22 PAVEMENT MARKING 8-22.1 Description This section is supplemented with the following: The Work shall include removing existing pavement markings and installing new markings in accordance with the Plans. 8-22.4 Measurement This section is supplemented with the following: Pavement Marking will be measured per�mp-surz�:-- lin��tl li�ol. (���'•'�dd�nd���t�TM�� 8-22.5 Payment This section is supplemented with the following: "Pavement Marking", per It�tp sa� �incal li�ot.(Pcr i�ddcndwn�>> Austin Drive Pavement Preservation STPUS-6639(001) SP-47 The lump sum contract price for "Pavement Markings" shall include all costs for removal of existing pavement markings and installation of raised pavement markers (RPMs), plastic lines, plastic arrows, and paint lines, complete. 8-26 HOT MIX ASPHALT SPEED TABLE (NEW SECTION) 8-26.1 Description This work shall include the installation of a speed table constructed of hot mix asphalt to the dimensions provided and in the location shown in the project plans. � 8-26.2 Materials Material shall meet the requirements of the following sections Materials shall meet the requirements of the following sections: Asphalt Binder 9-02.1(4) Cationic Emulsified Asphalt 9-02.1(6) Anti-Stripping Additive 9-02.4 Warm Mix Asphalt Additive 9-02.5 Aggregates 9-03.8 Recycled Asphalt Pavement 9-03.8(3) B Mineral Filler 9-03.8(5) Recycled Material 9-03.21 8-26.3 Construction Requirements , HMA PG 64-22 used in the construction of the speed table shall be installed in accordance with section 5-04 of the Standard Specifications. 8-22.4 Measurement HMA speed table will be measured per lump sum. 8-22.5 Payment "HMA Speed Table Complete", lump sum. The lump sum contract price for "HMA Speed Table Compfete" shall include all costs for removal of existing pavement, pavement markings, installation of design pavement markings and signage shown in the plans and installation of the HMA Speed table in the location shown on the plans. . END OF DIVISION 8 Austin Drive Pavement Preservation STPUS-6639(001) SP-48 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS FHWA-1273 -- Revised May 1, 2012 I. General II. Nondiscrimination III. Nonsegregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act Provisions VI. Subletting.or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water Pollution Control Act X. Compliance with Governmenfinride Suspension and Debarment Requirements XI. Certification Regarding Use of Contract Funds for Lobbying ATTACHMENTS A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only) I. GENERAL 1. Form FHWA-1273 must be physically incorporated in each construction contract funded under Title 23 (excluding emergency contracts solely intended for debris removal). The contractor(or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. Contracting agencies may reference Form FHWA-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with 1 the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withhotding of progress payments, withholding of final payment, termination of the contract, suspension /debarment or any other action determined to be appropriate by the contracting agency and FHWA. 4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors. II. NONDISCRIMINATION The provisions of this section related to 23 CFR Part 230 are applicable to all Federal-aid construction contracts and to all related construction subcontracts of$10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts. In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR 60, 29 CFR 1625-1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633. The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3. Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633. The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements. 1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35, 29 CFR 1630, 29 CFR 1625-1627, 41 CFR 60 and 49 CFR 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this 2 contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO: a. The contractor will work with the contracting agency and the Federai Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. b. The contractor will accept as its operating policy the following statement: "It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the Job training." 2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so. 3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum: a. Periodic meetings of supervisory and personnel o�ce employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer. b. All new supervisory or personnel office employees wil� be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women. d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees. e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of ineetings, employee handbooks, or other appropriate means. 4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived. 3 a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees, and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration. b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions. c. The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees. 5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability. The following procedures shall be followed: a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel. b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices. c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons. d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal. 6. Training and Promotion: a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved. 4 b. Consistent with the contractor's work force requirements and as permissible under Federa! and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a). c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each. d. The contractor will periodically review the training and promotion potential of employees . who are minorities and women and will encourage eligible employees to apply for such training and promotion. 7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below: a. The contractor will use good faith efforts to develop, in cooperation with the unions,joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment. b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability. c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information. d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency. 8. Reasonable Accommodation for Applicants I Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship. 5 9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. � b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obfigations. 10. Assurance Required by 49 CFR 26.'�3(b): a. The requirements of 49 CFR Part 26 and the State DOT's U.S. DOT-approved DBE program are incorporated by reference. b. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agency deems appropriate. 11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA. a. The records kept by the contractor shall document the following: (1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project; (2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and (3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women; b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project, indicating the number of minority, women, and non- minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July. s �r:.;••r�.. III. NONSEGREGATED FACILITIES This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of$10,000 or more. The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure fhat its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, resfrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes. IV. DAVIS-BACON AND RELATED ACT PROVISIONS This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects. The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 "Contract provisions and related matters"with minor revisions to conform to the FHWA-1273 format and FHWA program requirements. 1. Minimum wages a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and � mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis-Bacon poster(WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. b. (1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: � (i)The work to be performed by the classification requested is not performed by a classification in the wage determination; and (ii)The classification is utilized in the area by the construction industry; and (iii)The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (2) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (3) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for determination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (4) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs 1.b.(2)or 1.b.(3)of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. a c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2. Withholding The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held • by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3. Payrolls and basic records a. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. 9 b. (1)The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee ( e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shafl maintain the full social security number and current address of each covered worker, and shafl provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency.. (2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (i)That the payroll for the payroll period contains the information reguired to be provided under§5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under§5.5 (a)(3)(i)of Regulations, 29 CFR part 5, and that such information is correct and complete; (ii)That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3; (iii)That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (3)The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph 3.b.(2) of this section. (4)The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code. c. The contractor or subcontractor shall make the records required under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, 10 after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4. Apprentices and trainees a. Apprentices (programs of the USDOL). Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate)to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work perFormed until an acceptable program is approved. b. Trainees (programs of the USDOL). Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and �� individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee perForming work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. c. Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30. d. Apprentices and Trainees (programs of the U.S. DOT). Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal- aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program. 5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract. 6. Subcontracts. The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5. 7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 12 ... �x-. , ..- . ...� .•Lv,' 8. Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract. 9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. 10. Certification of eligibility. a. By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a)of the Davis-Bacon Act or 29 CFR 5.12(a)(1). b. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a)of the Davis-Bacon Act or 29 CFR 5.12(a)(1). c. The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. V. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT The following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. 1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1.) of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1.) of this section, in the sum of$10 for each calendar day on which such individual 13 was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1.) of this section. 3. Withholding for unpaid wages and liquidated damages. The FHWA or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2.) of this section. 4. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1.) through (4.) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or fower tier subcontractor with the clauses set forth in paragraphs (1.)through (4.) of this section. VI. SUBLETTING OR ASSIGNING THE CONTRACT This provision is applicable to all Federal-aid construction contracts on the National Highway System. 1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be perFormed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116). a. The term "perform work with its own organization" refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions: (1)the prime contractor maintains control over the supervision of the day-to-day activities of the leased employees; (2)the prime contractor remains responsible for the quality of the work of the leased employees; (3)the prime contractor retains all power to accept or exclude individual employees from work on the project; and 14 � . , �-, r. ... .. !iY,.'.. (4)the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements. b. "Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract. 2. The contract amount upon which the requirements set forth in paragraph (1)of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions. 3. The contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract. 4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the contracting agency has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. 5. The 30% self-performance requirement of paragraph (1) is not applicable to design-build contracts; however, contracting agencies may establish their own self-performance requirements. VII. SAFETY: ACCIDENT PREVENTION This provision is applicable to all Federal-aid construction contracts and to all related subcontracts. 1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR 1926) promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). 15 3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C.3704). VIII. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS This provision is applicable to all Federal-aid construction contracts and to all related subcontracts. In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, Form FHWA-1022 shall be posted on each Federal-aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project: 18 U.S.C. 1020 reads as follows: "Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended and supplemented; Shall be fined under this title or imprisoned not more than 5 years or both." IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WA�ER POLLUTION CONTROL ACT This provision is applicable to all Federal-aid construction contracts and to all related subcontracts. �s By submission of this bid/proposal or the execution of this contract, or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows: 1. That any person who is or will be utilized in the performance of this contract is not prohibited from receiving an award due to a violation of Section 508 of the Clean Water Act or Section 306 of the Clean Air Act. 2. That the contractor agrees to include or cause to be included the requirements of paragraph (1) of this Section X in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements. X. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost$25,000 or more— as defined in 2 CFR Parts 180 and 1200. 1. Instructions for Certification —First Tier Participants: a. By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below. b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default. d. The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. e. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. "First Tier Covered Transactions" refers to any covered transaction befinreen a grantee or subgrantee of Federal funds and a participant (such as the prime or 17 general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier ParticipanY' refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration. i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j. Except for transactions authorized under paragraph (f)of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. * * * * * 2. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion —First Tier Participants: a. The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals: (1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or votuntarily excluded from participating in covered transactions by any Federal department or agency; �a (2) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local)transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (3) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local)with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and (4) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local)terminated for cause or default. b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 2. Instructions for Certification - Lower Tier Participants: (Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost$25,000 or more - 2 CFR Parts 180 and 1200) a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below. b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. d. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. "First Tier Covered Transactions" refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or �s voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.Qov/), which is compiled by the General Services Administration. h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. * * * * * . Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-- Lower Tier Participants: 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. * * * * * 20 XI. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20). 1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, - the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. 2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 3. The prospective participant also agrees by submitting its bid or proposal that the participant shall require that fhe language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such recipients shall certify and disclose accordingly. 21 ATTACHMENT A - EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS This provision is applicable to all Federal-aid projects funded under the Appalachian Regional Development Act of 1965. 1. During the perFormance of this contract, the contractor undertaking to do work which is, or reasonably may be, done as on-site work, shall give preference to qualified persons who regularly reside in the labor area as designated by the DOL wherein the contract work is situated, or the subregion, or the Appalachian counties of the State wherein the contract work is situated, except: a. To the extent that qualified persons regularly residing in the area are not available. b. For the reasonable needs of the contractor to employ supervisory or specially experienced personnel necessary to assure an efficient execution of the contract work. c. For the obligation of the contractor to offer employment to present or former employees as the result of a lawful collective bargaining contract, provided that the number of nonresident persons employed under this subparagraph (1 c)shall not exceed 20 percent of the total number of employees employed by the contractor on the contract work, except as provided in subparagraph (4) below. 2. The contractor shall place a job order with the State Employment Service indicating (a)the classifications of the laborers, mechanics and other employees required to perform the contract work, (b)the number of employees required in each classification, (c) the date on which the participant estimates such employees will be required, and (d) any other pertinent information required by the State Employment Service to complete the job order form. The job order may be placed with the State Employment Service in writing or by telephone. If during the course of the contract work, the information submitted by the contractor in the original job order is substantially modified, the participant shall promptly notify the State Employment Service. 3. The contractor shall give full consideration to all qualified job applicants referred to him by the State Employment Service. The contractor is not required to grant employment to any job applicants who, in his opinion, are not qualified to perform the classification of work required. 4. If, within one week following the placing of a job order by the contractor with the State Employment Service, the State Employment Service is unable to refer any qualified job applicants to the contractor, or less than the number requested, the State Employment Service will forward a certificate to the contractor indicating the unavailability of applicants. Such certificate shall be made a part of the contractor's permanent project records. Upon receipt of this certificate, the contractor may employ persons who do not normally reside in the labor area to fill positions covered by the certificate, notwithstanding the provisions of subparagraph (1c) above. 5.The provisions of 23 CFR 633.207(e) allow the contracting agency to provide a contractual preference for the use of mineral resource materials native to the Appalachian region. 6. The contractor shall include the provisions of Sections 1 through 4 of this Attachment A in every subcontract for work which is, or reasonably may be, done as on-site work. 22 AMENDMENT REQUIRED CONTRACT PROVISIONS (Exclusive of Appalachian Contracts) FEDERAL-AID CONSTRUCTION CONTRACTS The Federal—Aid provisions are supplemented with the following: XII. Cargo Preference Act 1. U.S. Department of Transportation Federal Highway Administration memorandum dated December 11, 2015 requires that all federal-aid highway programs awarded after February 15, 2016 must comply with the Cargo Preference Act and its regulation of 46 CFR 381.7 (a)-(b). Amendment to Form FHWA 1273 Revised January 25, 2016 M25/2016 about:blank State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 4/25/2016 Countv Trade Job Classification Wa e Holiday Overtime Note Kitsap Cement Masons Journey Level $53.95 7A � 1M Kitsap 'Electricians - Inside Journey Level $51.26 1 Kitsap Electronic Technicians Journey Level $44.76 7E 1 D � – Kitsap Fence Erectors Fence Erector $13.80 1 Kitsap Fence Erectors Fence Laborer $11.60 1 Kitsap Fla�ers Journey Level $37.26 7A 31 Kitsap Laborers Air, Gas Or Electric Vibrating Screed $43.95 7A 31 Kitsap Laborers Airtrac Drill Operator $45.32 7A 31 Kitsap Laborers � Ballast Regular Machine $43.95 7A 31 Kitsap �Laborers Batch Weighman $37.26 7A ' 31 Kitsap Laborers � Brick Pavers $43.95 7A 31 Kitsap :Laborers ` Brush Cutter $43.95 7A � 31 Kitsap Laborers Brush Hog Feeder $43.95 7A 31 ��- — ------ Kitsap �Laborers Burner $43.95 7A 31 Kitsap 'Laborers Caisson Worker $45.32 7A 31 Kitsap Laborers __ � ' Carpenter Tender $43.95 7A�— 31 Kitsap j Laborers Caulker $43.95 7A 31 Kitsap Laborers Cement Dumper-paving � I $44.76j 7A 31 I I � about:blank 1!9 4/25/2016 about:blank --.__._�._------------------._._--�------- '-----------�-�------------_..�__.._---..�--- ----- - - - �--- --�----•---� ----�--...--�--- ----.�._..--------------- --' -- �Kitsap ;Laborers Cement Finisher Tender $43.95 7A 31 i � -�---------....--�----....._..-----_...—.�...------- ---_._- --.._..-----�--------- -----_---�-�----_- -- ___.�_..--�-- Kitsap Laborers Change House Or Dry Shack $43.95� ^ 7A '` 31`� ; � -� �._......"'-...� ' _ ��___'_'-__"_-'_'__.'�" '_._. __"_'__ - �. - ' 'I___'_�.'_..'__'_3 ------'--------------'---------- ---------- �-----�--+------------; . �Kitsap :Laborers �Chipping Gun (under 30 Lbs.) M_ __ _� __ .$43^95� 7A �_ 31__�_____ � ....-----�-------- ._._..�.._._..__.._—...---�---------.._._-----�-- .._.._ ._._.___.—__.— - --�------------ ; Kitsap �Laborers �Chipping Gun(30 Lbs. And Over) � $44.76; 7A E 31 � � ----�--._._-----•---,...._----------------..-------___--------___..----._._..� �_.._--- -------��---------------�-----$43.95�----_—_-�---�--�-----------,---...-------_. Kitsap ;Laborers �Choker Setter 7A � __ 31 __j _ __ � �.------•--- -...------.._......_..----�----�-------- ----._._...----�----..E_..�-->--._..._...-------------- -- ---------- - �---.._.,..--------- -------- �Kitsap 1 Laborers �Chuck Tender $43.95� 7A � 31 � � : � �.._...-----�---....�._.._.....:._-�------------------------__—___--�----------�-----------._.—._---------....�---__.__......._...-- �------------ -----_-----_� �Kitsap �Laborers Clary Power Spreader � $44.76' 7A ; _31 ___�_�__ _.__� --------��---------------�-�-----__--------------�------�--�------___..._.__--------___------------------��--------...__.�.--�.-�--._.._..----�-- r , � Kitsap ;Laborers �Clean-up Laborer � $43.95 i 7A ' 31 �_ _ __� -""-,_.....___"..-._._�._.._.__.___�_'.'_�__-...'____.._..'_"" _'....""_- _-�_-.._'�_'__"_-"-__'_._�__"_'.._...'._'.__'.""_"'_'._"'�S-'�'___-�'_�._�"_-_-�"_'_'-_"__'_.... f Kitsap �Laborers Concrete Dumper/chute Operator � $44.763 7A � 31 � ---- ---�---'----�-------�--�--------..__._......_._._._...------- ___..._.__ _._.._._._._.�----.___ �_�.___---------�-----�--------.._....._.._._.____.._. ..._..�----�-----�----—.....,_..� , Kitsap jLaborers Concrete Form Stripper $43.95 7A ; 31 ` ° ----------- _----------� --.�_...—__.�..----..._._..---- ----- ------L_....----------....G .w--•---- Kitsafi ._.__._.__.____�..----------�-------�-----------_.—_. ---- _ � p :Laborers Concrete Placement Crew --��--- .----$44.76�--�--_7A------.. �._.___._31__..__._ .....--_--._--.� ------._...�._��-----------...___-----------___..�-----�..------�--- __..-----------------�----___.._._..._�___ Kitsap ;Laborers ;Concrete Saw Operator/core Driller $44.76� 7A 31 ; ----.....----�-�----�-----...---------�----------.__.�------- �-----._.—_.�..___._..__.....-------------..__._�------------.._�.._--- _____...-----_.._-------- —..__��.._�-� Kitsap �Laborers Crusher Feeder $37.26 7A i_ 31 � � �..-�-------�---�----------�----�---------......---�----------- -----------------�-------------------�-� ------`. ._.__...._..� , Kitsap ;Laborers Curing Laborer $43.95 7A 31 � � ° Kitsap �Laborers Demolition: Wrecking �t Moving (incl. $43.95 7A � 31 � Charred Material) � ---�-------- -- -- ---------_-- ----- -----------.__----------- --- ----------- ----------._-----__. --�—�---- Kitsap I Laborersi ____ _ Ditch Digger $43.95 7A 31 _ � - --._..____.._......._,�---� � ---.__._...—.__-- ---_ --------__.----------- ---- ----- -- ----- —� .- Kitsap Laborers Diver $45.32 7A 31 � ' -�------- -- _..----�---__.._ _��..----�-� --- —._..._._.�...__. ..-------�--------�-�-----------6---- Kitsap_` �Laborers ____.____, _V_` __ _�__ Drill Operator (hydraulic,diamond) __ __ _ $44.76 _7A _ _�__31 _ __ _� -- — -= — -- -- ._ _ ,. Kitsap �Laborers Dry Stack Walls $43.95 7A � 31 �' ___--_----------------_---�------------...J�_----__._..__.._._..--------------___.�---_._�. --------------- ---__�----------- ----------...__. ,. Kitsap ; aborers �Dump Person $43.95 7A � 31 , � -------- �----------------__—_..----�-------------------------�------------ ---.._.._----. _ ..__..,--- — --� -----------�-----�----= Kitsap �Laborers Epoxy Technician_ `YV _ _��__�` _ $43.95 7A � 31 � --....--------- --_.---�---_�..__---...,�------------------ ---- — -----------�------�-�--._...._ --_�....._____ Kitsap Laborers ;Erosion Control Worker $43.95 7A � 31 —...---- -- - ------�-------...------------ .._...---�--�---- ,_.__.---�----_-----;---�---�--- -----------�- --------�--------------- �--------.._._. Kitsa ,Laborers Faller tt Bucker Chain Saw $44.76� 7A 31 P . _-- -��---- � _....--�-----�---- __..�----�---..___...---.�..-�-------_.------------------.._.....-----..._._..� _..—.___�.�.----�---�-�--------__------------�- -----�- -----�------�-- �Kitsap �Laborers Fine Graders $43.95 7A 31 � r ---�-------�- ---�--_____.___._.�.,_...---..._.._.._—.-----------._. �..._._..__.......---__.....--------�------.....,---------.___..._._..------------ --�---_._------ ----�----�--._._.....--�-�-------� ,Kitsap :Laborers Firewatch , $37.26� 7A _31 _�_ _ ^ �----�---------�+---�_._...-----�-------------------------....-----�----- ---�------------------- ------ ----------- � Kitsap !Laborers Form Setter �' �$43.95� 7A � 31 � Y.� _ � _. .. . . .. - - . . .. . . { � �._'�___..��._...�_ ..���._��_.�.'_��..�.�.._.�_.�._..��.��.._.�.������...�__'_�� �_'�._.���.�_..���..__'���.�_.���_�...�.�.-..��_'�_�����-�. � �� �_�. Kitsap �Laborers Gabian Basket Builders $43.95� 7A � 31 � � ------ _._..__ ..—.__.____. ....-- --- ----��--- ---- �- _..--------- � - . -------- -------- -------�..__. _._...---- _—_.___._._....._..____--�--------------�---------._ .-------------�---�---._.—__._..._..--------- Kitsap Laborers General Laborer i $43.95; 7A 4 31 , ---------------------�- ------- -------- ------..__...-----..__.._..__---- -----------; -----------. �.�_..-------�------�-----------�_._...---._._...---__...--�--------- ��$45.32 7A i 31 � Kitsap y�Laborers _ Grade Checker £t Transit Person 3� � _� __—.._.........--------.----._-.----.— _ __._.___._._..._______.�.------.-.------__.__.__._.__...----_..._�___ �___.__._�_ ----.__..__ Kitsap Laborers Grinders � $43.95 7A 31 � � ----..---------�----._._..�_..--------____._—_.----..._...__..------ ---------------._.____---_.--------------�._ __. ��._.._-- -------------�--�..--------------:; Kitsap ;Laborers Grout Machine Tender � $43.95 7A � 31 a , �---------.__- --------� � � ---------._._ -____.._________._.___ ------_------.,_..-------__. --------�---.__.____ -------------�--------__.---�-------__---------� �--- ; � about:blank y9 M25f2016 abart:blank �Kitsap �Laborers Groutmen (pressure)including Post Tension � $44.76� 7A 31 � � � Beams �-------------w------------------------------._.....__...-------- -------..��_�.--�---- ----- _.----------------�..__... ----- --------�---------.._._..._: h Kitsap �Laborers Guardrail Erector $43.95� 7A ' 31 � � -----;----.._.._...-----------------....._..�---------------- ---�--�-----------------�--------�------� ..-------- - _ . .. _ ;Kitsap i Laborers 'Hazardous Waste Worker (level A) $45.32 7A 31 � y . - -�- - ----.....-�- -- -�----�--- -- �--------------�-�---------_..__.-------_------------------�----.-�.____.._-------___._._..-�-- -------�-----------------.--------�--- �--_------_--------_��--- .-� . _ -------- . Kitsap !Laborers �azardous Waste_Worker (level B) __ $44.76� 7A ; 31 � 76 --......�.._._.... -�-----...-----------._.-_._.._.____-�--------- ------ --------._.� �---------_;g �_.,_�__...-.-- ' .K�tsap _ _;Laborers �Hazardous Waste Worker (level C) $43.95! 7A 31 � ---- -_----�---- ! -----�---....__.....__..._......__....____-----.._....__....__._-, _---------------- ------------�-----._ ...�..- -�----- , . .--_.�.------ ---------�--- �... -�--..__...__.._..---�--. ' Kitsap Laborers �_High Scaler $45.32� 7A � 31 � •--___........�.__._----------�-----------------�----------�---�------�---- -. ---��--------�---------------.._..----.__.-..-._?------- ----- -------------- � ,_-�-�---------�--�--------_-� Kitsap �Laborers jJackhammer $44.76� 7A 31 ' --------.__--�---__------------------------------��-------------------...-- -- ------._----------��------------�_ -----�----------��--._.._.._........__.._.._4 Kitsap �Laborers �Laserbeam Operator $44.76 7A � 31 � "'_'_'_"_'.._.."_'_'�""'_"_-_.�._'_.__'__"-'_'_"_"_"_""'_'-�._�__'_.'_'...._..""_"_.__'_'_'_'_.._"' _-'- __.�.___'___'_ _...'_'_.�._..._ _ F'___ ... -'__�_- Kitsap �Laborers 'Maintenance Person $43.95 7A � 31 -------------1---------------..._-_.------�--------._...----�--�----�- --- --- �...----------..._._..._--- -----.__- ----_-.._....---� ------�3-------�---- �._._Kitsap ;Laborers ,Manhole Builder-mudman $44.76 7A � 31 -------�_------___---__.-------___------__..__.._...�---_� - _ . _ - ,.�.,._-_�.-- , � �_---------------------__-________.__.-____.-�_.____._�... ---.._..__-------------�-�-- , Kitsap Laborers ;Matenal Yard Person $43.95 7A 31 � € -I---______.----..__._._..._.__ __..----------__.---�----------------_..---.-----�------�---.---- - �- - - --� -------__. ---------. - - �Kitsap �Laborers 'Motorman-dinky Locomotive , $44.76 E 7A � 31 � -------------1--------------------------�--...---------__-. _ -- ------_.__�.-....._._._._.,.-----------�--- -------� -�-----..�.__ �-�--=-- �Kitsap I Laborers �Noaleman (concrete Pump, Green Cutter $44.76' 7A � 31 � When Using Combination Of High Pressure � � ! � I �Air £t Water On Concrete £t Rock, Sandblast, E � � � ' � �Gunite, Shotcrete, Water Bla � � � �__._ ___. -�----____.____.__.__.____.._----------�- _.-�---- --�-------�-.------ --�-- ------�------� �Kitsap I Laborers �Pavement Breaker $44.76 7A i 31 � > -----------.a.---------------------�---------�..�-�- ---�--------------------�----_------�-- �-' _----.s.----�---�-�--�----- � �Kitsap_ �Laborers �Pilot Car � $37.26� 7A j 31 i � ----------------------.._.._---�--------��----._------, -----------� -------------�--------, - - I -- �Kitsap Laborers (Pipe Layer Lead � $45.32' _ 7A 31 � ___ __ _..�J---------------------�--- - -�-- - - - --- -� ----�- ----�------ -- ---- _- -__ _ _-_._---- Kitsap ILaborers iPipe Layer/tailor $44.76i 7A � 31 � ' ------ -----._.___----�---------------_.---._-- �- ------ - -----------._..�___._._.--�----�--..._! -----------�--._---------- -----#---- Kitsap rLaborers Pipe Pot Tender � $44.76i 7A 31 � � -----....----,------ ------___.-------.._.__�_...------�---- -�------------------.�.�-------�--- ----�---------- , - �-----------�---_-- � Kitsap 'Laborers ,Pipe Reliner $44.76; 7A � 31 '_�._���_�.._.�..�...��.�._.__��__'_'�_`._�_�___�'��.__�_____�.��._��_F__��'�_�__��_��______.��_�__�'��'_���."__�_ � � � 0 r . ��___'�� L_._.._'._.._'�.�.__.-'_�.'.�..___�_.-'_`��k �Kitsap !Laborers �Pipe Wrapper $44.76 7A � 31 ' � �--�---�- -�--.-..--------------�------.._�_.-__................__._..._._....--------�- ---�--+....___..._._._...._-- -�-----------�--�--- ---��_. _._ __._.-...___ .� ?Kitsap ;Laborers i Pot Tender � $43.95I 7A ? 31 j ' -�--__----.._.._._..�--...-------... �.�.----.._...._..--;-�--------------------�---------__�_____ -{�----_...------�-----._------_______.---------�---__- ---�---...._._-.�_---------' �Kitsap ;Laborers �Powderman � $45.32� 7A 31 i �--------�-- ---- -----�-�---- __..___..____.._._----- ---------------- -�----.---- ---- �- ---_ _----------�------------� �Kitsap _ 'Laborers �Powderman's Helper � $43.95' 7A = 31 � r �._...__--------------------------------�-------�-���-�-------___.__...---------�------�--------------------�-�--------A..._. _.._.._-..__._---�----__..._----_ _.....--------�a� �9 �Kitsap ;Laborers Power Jacks ; $44.76 7A � 31 � ` _ � .�._.----`-----'-'----"----._............_.--"---__"---�3'--------'-'--. . ...- '---"'-a ' . ----'-'-------'�- -'----'.._..__......-"-----'-'._"---'-�-----'-'--'-"------ -'__.�- --'-'-'--�..-,--"--- '--..__... , �Kitsap 'Laborers Railroad Spike Puller - Power ' $44.76' 7A F 31 ! � d�------�--�.------------.___._------.._.._.---...____. ..----.._----------__. -------_.._.___....-------------�----�------.._,.--�---�-----------�-�-----_-._._.-t------..---�----------... Kitsap �Laborers �Raker - Asphalt $45.32 7A 31 � . _ .... .. .- -�- --�---------- �----....---- ------.:..�_�.-------�-�-----.._..._� .__...__._.___. _;._____.--------------�-�-------- -----._._._.. . ---- -----------._.... .__..._.---- ----____- .Kitsap �Laborers Re-timberman � $45.32 7A � 31 �_ _ � __�-------------� Kitsa�-- _____._.�__._.._.�._..--�- -----�-- --�----___.�._.._.._...----------------�-------------�--------�--___ ----- -- ------�--��.�..__ i p �Laborers �Remote Equipment Operator � $44.76; 7A 31 � , . a ---�--------��_�___._..._._..-----------------�-----.._..------------__l..-----_..------�----�------�..------___--�-- � -___ ._...._._-----�------�-�--------.-�..------- Kitsa �Laborers Rigger/si�nal Person $44.76 7A 31 � � p . _ _ . �-----__.�_..�—-- - --s-------._.._._s ..--- -.__._...._._.__.....--....._�...------------------...--------�------� ---�-------------------�-------�--=-�-------------- � , ------ , � about:blank 3/9 4J25/2016 about:blank Kitsap Laborers Rip Rap Person $43.95 7A 31 Kitsap 'Laborers Rivet Buster $44.76 7A 31 Kitsap � Laborers Rodder $44.76 7A 31 Kitsap Laborers Scaffold Erector $43.95 7A 31 Kitsap Laborers Scale Person $43.95 7A 31 Kitsap` Laborers Sloper (over 20") $44.76 7A 31 Kitsap Laborers Sloper Sprayer $43.95 7A 31 Kitsap Laborers ^� ^ Spreader (concrete) $44.76 7A 31 Kitsap Laborers Stake Hopper $43.95 7A 31 Kitsap -- Laborers.----------------`-- -- Stock Piler -�---' ----�--- -.- $43.95 7A - -- 31 --------- Kitsap Laborers •Tamper �t Similar Electric, Air £t Gas $44.76 7A 31 Operated Tools Kitsap Laborers Tamper (multiple £t Self-propelled) $44.76 7A 31 Kitsap Laborers �Timber Person - Sewer (lagger, Shorer £t $44.76 7A 31 Cribber) , � Kitsap Laborers � Toolroom Person (at Jobsite) $43.95 7A 31 J � Kitsap Laborers ,Topper $43.95 7A 31 � Kitsap Laborers � Track Laborer !T � � $43.95�A 7A 31 Y � Kitsap I Laborers , Track Liner (power) _Y _ _ $44_76 7A _ _31 ___� � Kitsap Laborers Traffic Control Laborer $39.84 7A 31 8R Kitsap �Laborers Traffic Control Supervisor____ $39.84 7A_ 31 8R_ - Kitsap Laborers Truck Spotter $43.95 7A 31 Kitsap �Laborers Tugger Operator $44.76 7A 31 _ Kitsap Laborers Tunnel Work-Compressed Air Worker 0-30 psi $74.29 7A 31 8�C S'_____, Kitsap i Laborers � V Tunnel Work-Compressed Air Worker 30.01- $79.32 7A 31 8�C _ 44.00 psi Kitsap �Laborers Tunnel Work-Compressed Air Worker 44.01- $83.00 7A 31 8�( 54.00 psi I Kitsap Laborers Tunnel Work-Compressed Air Worker 54.01- $88.70 7A 31 8�C � _ 60.00 psi Kitsap Laborers Tunnel Work-Compressed Air Worker 60.01- $90.82 7A 31 8�C 64.00 psi --------- '--�---------�---------- ---- ------� -- �- - -- - �Kitsap Laborers Tunnel Work-Compressed Air Worker 64.01- � $95.92 7A 31 8�C �---------- -��-------------- --�68.00 psi -�-- - - about:blank �9 M25/2016 about:blank Kitsap Laborers ITunnel Work-Compressed Air Worker 68.01- $97.82 7A 31 8�( � 70.00 psi Kitsap Laborers � Tunnel Work-Compressed Air Worker 70.01- $99.82 7A 31' ! 8�t 72.00 psi Kitsap Laborers Tunnel Work-Compressed Air Worker 72.01- $101.82 7A 31� 8� 74.00 psi Kitsap Laborers ' � Tunnel Work-Guage and Lock Tender � $45.42 7A� 31 8� Kitsap Laborers Tunnel Work-Miner $45.42 7A 31 8� 'Kitsap Laborers ' 'Vibrator $44.76 7A 31 Kitsap Laborers Vinyl Seamer $43.95 7A 31 Kitsap Laborers � �� � Watchman � $33.86 �7A 31 � Kitsap Laborers Welder $44.76 7A 31 Kitsap �Laborers ^ Well Point Laborer ' $44.76 � ' 7A 31 Kitsap Laborers Window Washer/cleaner $33.86 7A 31 Kitsap .Landscape Construction Irrigation Or Lawn Sprinkler Installers $9.47 1 Kitsap Landscape Construction Landscape Equipment Operators Or Truck $10.05 1 Drivers Kitsap Landscape Construction Landscaping Or Planting Laborers $12.92 1 Kitsap � �Power Equipment Operators Asphalt Plant Operators $56.94 7A 3C 8P � Kitsap Power Equi�ment Operators Assistant Engineer $53.57 7A 3C 8P Kitsap Power Equipment Operators Barrier Machine (zipper) $56.44 7A 3C 8P Kitsap Power Equi�ment Operators Batch Plant Operator, Concrete $56.44 7A 3C 8P Kitsap Power Equipment Operators Bobcat $53.57 7A 3C 8P Kitsap Power Equipment O�erators Brokk - Remote Demolition Equipment $53.57 7A 3C 8P Kitsap Power EQuioment Operators Brooms $53.57 7A 3C 8P Kitsap� Power Eauipment Operators Bump Cutter ` i $56.44 7A 3C � 8P Kitsap Power Equipment Operators Cableways $56.94 7A 3C 8P Kitsap Power Equinment Operators Chipper iV� $56.44 7A� 3C 8P Kitsap Power Equiament Operators Compressor $53.57 7A 3C 8P Kitsap �Power Equipment Operators� Concrete Pump: Truck Mount With Boom $56.94 7A 3C 8P Attachment Over 42 M Kitsap Power Equioment Operators Concrete Finish Machine -laser Screed $53.57 7A 3C 8P Kitsap Power Equipment Operators Concrete Pump - Mounted Or Trailer High $56.00 7A 3C 8P Pressure Line Pump, Pump High Pressure. about:blank 5/9 M25/2016 about:blank �Kitsap Power Equipment Operators�---_--� Concrete Pump: Truck Mount With Boom �$56.44 -_ 7A�— 3C � 8P __ _ _ IAttachment Up To 42m Kitsap Power Equipment O�erators Conveyors $56.00 7A 3C 8P Kitsap ,Power Equipment Operators Cranes Friction: 200 tons and over $58.67 7A 3C 8P Kitsap I Power Eauiament Operators !� Cranes: 20 Tons Through 44 Tons With $56.44! 7A 3C ` ' 8P Attachments �-------_�-___.--�------�----------------- -------- - Kitsap !Power Equipment Operators Cranes: 100 Tons Through 199 Tons, Or 150' $57.51 7A 3C 8P __I __� __�__ Of Boom (Including Jib With Attachments) _ #Kitsap 'Power EQuipment Operators Cranes: 200 tons- 299 tons, or 250' of boom $58.10 7A 3C 8P _� I including jib with attachments ' —{--- 'Kitsap !Power Equipment Operators Cranes: 300 tons and over or 300' of boom $58.67 7A 3C 8P including jib with attachments Kitsap Power EQuipment Operators Cranes: 45 Tons Through 99 Tons, Under 150' $56.94 7A 3C 8P Of Boom (including Jib With Attachments) Kitsap Power Equipment Operators Cranes: A-frame - 10 Tons And Under $53.57 7A 3C . 8P Kitsap Power Equipment Operators Cranes: Friction cranes through 199 tons $58.10 7A 3C 8P Kitsap Power Equipment Operators Cranes: Through 19 Tons With Attachments $56.00 7A 3C 8P A-frame Over 10 Tons � Kitsap Power Equipment Operators Crusher ' $56.44 7A 3C 8P � Kitsap_ Power Equipment O�erators ` ___ Deck Engineer/deck Winches (power) _ _ $56.44 _ _ 7A_,_ 3C __ 8P__ Kitsap Power EcLuiament Operators Derricks, On Building Work ^ $56.94 7A 3C 8P � Kitsap Power Equipment Operators Dozers D-9 �t Under $56.00 7A 3C 8P Kitsap Power Eauipment Operators Drill Oilers: Auger Type, Truck Or Crane $56.00 7A 3C 8P Mount Kitsap Power Equipment Operators Drilling Machine $57.51 7A 3C 8P Kitsap Power Equipment Operators Elevator And Man-lift: Permanent And Shaft $53.57 7A 3C 8P Type Kitsap :Power Eauipment Operators Finishing Machine, Bidwell And Gamaco £t $56.44 7A � 3C 8P Similar Equipment Kitsap i Power Eauipment Operators Forklift: 3000 Lbs And Over With $56.00 7A 3C 8P Attachments Kitsap�Power Equipment Operators Forklifts: Under 3000 Lbs. With Attachments $53.57 7A 3C 8P Kitsap iPower Equipment Operators Grade Engineer: Using Blue Prints, Cut $56.44 7A 3C 8P Sheets, Etc Kitsap �Power Equiament O�erators Gradechecker/stakeman � $53i57 _ 7A 3C 8P --�— _ — - - — - - - - ---�-�------- about:blank �9 M25/2016 about:blank �Kitsap �Power Equiament Operators Guardrail Punch $56.44 7A 3C 8P Kitsap Power Equipment Operators Hard Tail End Dump Articulating Off- Road $56.94 7A 3C 8P Equipment 45 Yards. £t Over Kitsap Power Equi�ment Operators Hard Tail End Dump Articulating Off-road $56.44 7A 3C 8P �� � E ui ment Under 45 Yards --_...-�- -- —�---------�----------�--- -� q P --- — - - ------ � Kitsap Power Equioment Operators Horizontal/directional Drill Locator $56.00 7A 3C 8P Kitsap Power Equipment Operators Horizontal/directional Drill Operator $56.44 7A 3C 8P ------��_.... ------..__...---�------------------------__ ------------ ----------- ------ --�---� - Kitsap Power Equipment Operators Hydralifts/boom Trucks Over 10 Tons $56.00 7A 3C 8P Kitsap iPower Equipment Oaerators Hydralifts/boom Trucks, 10 Tons And Under $53.57 7A 3C 8P Kitsap Power EQuipment Operators � Loader, Overhead 8 Yards. £t Over $57.51 7A 3C 8P Kitsap Power Equipment Operators Loader, Overhead, 6 Yards. But Not $56.94 7A i 3C 8P Including 8 Yards Kitsap Power Equipment Operators Loaders, Overhead Under 6 Yards $56.44 7A 3C 8P Kitsap Power Equi�ment Operators Loaders, Plant Feed $56.44 7A 3C 8P Kitsap Power Equipment Operators Loaders: Elevating Type Belt $56.00 7A 3C 8P Kitsap Power EquiQment Operators Locomotives, All $56.44 7A 3C � 8P Kitsap Power Equioment Operators Material Transfer Device $56.44 7A 3C 8P Kitsap Power Equipment Operators Mechanics, All (leadmen - $0.50 Per Hour $57.51 7A 3C 8P � Over Mechanic) Kitsap Power Equioment Operators Motor Patrol Graders $56.94 7A 3C 8P Kitsap Power Eauipment Oaerators Mucking Machine, Mole, Tunnel Drill, $56.94 7A � 3C 8P � Boring, Road Header And/or Shield Kitsap ^ Power Equipment Operators Oil Distributors, Blower Distribution £t Mulch $53.57 7A 3C 8P Seeding Operator ' -�-------�.._ --�--------------- ----�— ---- — ---- - ----- Kitsap Power Equiament Operators Outside Hoists (elevators And Manlifts), Air $56.00 7A � 3C 8P �Tuggers,strato � 3 _._..__ _.�._-�------------------ -..- - -- --- .._..---�._--- ---..-------- ---- ---------�� Kitsap �Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons $56.44 7A 3C k 8P � Through 44 Tons Kitsap �Power Equipment O�erators ! EOverhead, Bridge Type: 100 Tons And Over $57.51 7A 3C 8P Kitsap Power Equipment Operators Overhead, Bridge Type: 45 Tons Through 99 $56.94 7A 3C 8P ,Tons Kitsap Power Equi�ment O�erators � Pavement Breaker ` � $53.57 7A 3C 8P ,Kitsap Power Equipment Operators Pile Driver (other Than Crane Mount) $56.44 7A ; 3C 8P Kitsap Power Equipment Operators Plant Oiler - Asphalt, Crusher $56.00 7A � 3C 8P — -�-� ---- Kitsap ,Power Equipment Operators �Posthole Digger, Mechanical $53.57 7A � 3C ; 8P about:blank 7/9 4/25/2016 about:blank Kitsap Power Equipment Operators Power Plant $53.57 7A 3C 8P Kitsap Power Equiament Operators Pumps - Water $53.57 7A 3C 8P Kitsap Power Equipment Operators Quad 9, Hd 41, D10 And Over $56.94 7A 3C 8P Kitsap IPower Equi�ment Operators �Quick Tower - No Cab, Under 100 Feet In $53.57� 7A � 3C 8P _ _ �Height Based To Boom _� Kitsap Power Equi�ment Operators Remote Control Operator On Rubber Tired $56.94 7A 3C 8P Earth Moving Equipment � Kitsap Power E�ui�ment Operators Rigger And Bellman $53.57 7A � 3C 8P ------<--- -..._..------- -�--------------. ._..-----------------�--- ------------- ---------- - --- --- — --� Kitsap Power Equipment 0[�erators Rigger/Signal Person, Bellman (Certified) $56.00 7A 3C 8P Kitsap Power Equipment Operators Rollagon $56.94 7A 3C 8P . _-----+ ----�-. .�----�-------_ ......�-------------------------- Kitsap I Power Equipment Operators Roller, Other Than Plant Mix $53.57 ��7A � 3C 8P .}�— Kitsap � �Power Eauipment Operators Roller, Plant Mix Or Multi-lift Materials $56.00 7A 3C 8P Kitsap Power Equipment Operators Roto-mill, Roto-grinder $56.44 7A 3C 8P Kitsap Power Equi�ment Operators � Saws - Concrete � $56.00 7A 3C 8P Kitsap Power Equipment Operators Scraper, Self Propelled Under 45 Yards $56.44 7A 3C 8P Kitsap ^ Power Equiament Operators Scrapers - Concrete �t Carry All $56.00 7A 3C 8P _ Kitsap Power Equipment Operators Scrapers, Self-propelled: 45 Yards And Over $56.94 7A 3C 8P � � , Kitsap i Power Equipment Operators Service Engineers - Equipment $56.00 7A 3C 8P � Kitsap Power Equipment Operators Shotcrete/gunite Equipment $53.57 7A 3C 8P ' Kitsap Power Equipment Operators ' Shovel , Excavator, Backhoe, Tractors $56.00 7A 3C 8P ' Under 15 Metric Tons. Kitsap Power Eauipment Operators Shovel, Excavator, Backhoe: Over 30 Metric $56.94 7A � 3C 8P • Tons To 50 Metric Tons Kitsap �Power Eauipment Operators Shovel, Excavator, Backhoes, Tractors: 15 $56.44 7A 3C 8P To 30 Metric Tons Kitsap Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 $57.51 7A 3C 8P Metric Tons To 90 Metric Tons Kitsap Power Equipment Operators Shovel, Excavator, Backhoes: Over 90 $58.10 7A 3C 8P Metric Tons Kitsap Power Eauipment Operators Slipform Pavers $56.94 7A 3C 8P Kitsap Power Equipment Operators Spreader, Topsider £t Screedman $56.94 7A 3C 8P Kitrap _ Power Ec�uipment Operators _ Subgrader Trimmer_ $56.44 7A 3C 8P Kitsap Power Equipment Operators Tower Bucket Elevators $56.00 7A 3C 8P Kitsap Power EcLuipment Operators Tower Crane Up To 175' In Height Base To $57.51 7A 3C �8P about:blank �9 M25/2016 about:blank � � Boom Kitsap Power Equioment O�erators Tower Crane: over 175' through 250' in $58.10 7A 3C 8P � _ height, base to boom _ � Kitsap IPower Equipment Operators Tower Cranes: over 250' in height from base $58.67 7A 3C 8P to boom .�---I---- --- ---------- - - - — -- — Kitsap �Power Equipment Operators Transporters, All Track Or Truck Type $56.94 7A 3C 8P Kitsap Power Equipment Operators Trenching Machines $56.00 7A 3C 8P Kitsap IPower Equiament Operators Truck Crane Oiler/driver - 100 Tons And $56.44 7A 3C 8P Over ..-------'�-----�----�----�------- ------ -�----- --------------- - -� --- -- Kitsap Power Equipment Operators Truck Crane Oiler/driver Under 100 Tons $56.00 7A 3C 8P Kitsap Power Equipment Operators Truck Mount Portable Conveyor $56.44 7A 3C 8P Kitsap 'Power Equipment Operators Welder $56.94 7A � 3C 8P Kitsapu�Power Equipment Operators __ _____ Wheel Tractors, Farmall Type _ $53.57 7A 3C 8P Kitsap �Power Equipment Operators Yo Yo Pay Dozer $56.44 7A 3C 8P Kitsap Street And Parkin� Lot Sweeper Workers Journey Level $16.00 1 Kitsap Surveyors Assistant Construction Site Surveyor $56.00 7A � 3C � 8P Kitsap Surveyors Chainman $55.47� 7A 3C 8P Kitsap �Surveyors Construction Site Surveyor $56.94 7A 3C 8P Kitsap �Traffic Control Stripers Journey Level $43.73 7A 1K Kitsap �ruck Drivers i Asphalt Mix Over 16 Yards (W. WA-Joint $51.25 5D � 3A 8L Council 28) --. _. _..._.. - ---- - --- — -- - - _......_.....-- - - Kitsap Truck Drivers Asphalt Mix To 16 Yards (W. WA-Joint $50.41 5D � 3A 8L �-� Council 28) _ ___ �Kitsap �T� ruck Drivers Dump Truck i $19.60 1 Kitsap Truck Drivers Dump Truck And Trailer $19.60 1 Kitsap �Truck Drivers Other Trucks $18.37` � 1 Kitsap �Truck Drivers Transit Mixer $20.79 1 about:blank 9/9 Page � 1 General Decision Number: WA160001 03/04/2016 WA1 Superseded General Decision Number: WA20150001 State: Washington Construction Type: Highway Counties: Washington Statewide. HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin Counties) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10�.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 20�5. If this ccntract is covered by the E0, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 O1/08/2016 1 02/19/2016 2 02/26/2016 3 03/04/2016 CARP0001-00.8 06/O1/2015 Rates Fringes CARPENTER GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 27.61 14 .00 GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 41 .86 14 .49 GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 32. 97 14.00 GROUP 4. . . . . . . . . . . . . . . . . . . . .$ 31. 99 14 .00 GROUP 5. . . . . . . . . . . . . . . . . . . . .$ 73.44 14 .00 GROUP 6. . . . . . . . . . . . . . . . . . . . .$ 35.02 14.00 GROUP 7. . . . . . . . . . . . . . . . . . . . .$ 36.72 14.00 GROUP 8. . . . . . . . . . . . . . . . . . . . .$ 33.27 14 .00 GROUP 9. . . . . . . . . . . . . . . . . . . . .$ 35.02 19 .00 WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 2 CARPENTER & DIVER CLASSIFICATIONS: GROUP 1: Carpenter GROUP 2: Millwright, machine erector GROUP 3: Piledriver - includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling GROUP 4 : Bridge carpenters GROUP 5: Diver Wet GROUP 6: Diver Tender, Manifold Operator, ROV Operator GROUP 7: Diver Standby, Bell/Vehicle or Submersible operator Not Under Pressure GROUP 8: Assistant Tender, ROV Tender/Technician GROUP 9: Manifold Operator-Mixed Gas ZONE PAY: ZONE 1 0-40 MILES FREE ZONE 2 91-65 MILES $2.25/PER HOUR ZONE 3 66-100 MILES $3.25/PER HOUR ZONE 4 OVER 100 MILES $4 .75/PER HOUR DISPATCH POINTS: CARPENTERS/MILLWRIGHTS: PASCO (515 N Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite) . CARPENTERS/PILEDRIVER: SPOKANE (127 E. AUGUSTA AVE. ) or Main Post Office of established residence of employee (Whichever is closest to the worksite) . CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite) . CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite) . CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite) . WA160001 Modification 3 Federal Wage Determinations for Highway Construction � Page � 3 DEPTH PAY FOR DIVERS BELOW WATER SURFACE: 50-100 feet $2 .00 per foot 101-150 feet $3.00 per foot 151-220 feet $4.00 per foot 221 feet and deeper $5.00 per foot PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT: 0-25 feet Free 26-300 feet $1.00 per Foot SATURATION DIVING: The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. HAZMAT PROJECTS: Anyone working on a HAZMAT job (task) , where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows: LEVEL D + $.25 per hour - This is the lowest level of protection. No respirator is used and skin protection .is mir:imal. LEVEL C + $.50 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B + $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit" . LEVEL A +$1 .00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line. ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 4 CARP0003-006 10/O1/2011 SOUTHWEST WASHINGTON: CLARK, COWLITZ, KLICKITAT, LEWIS (Piledriver only) , PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the Pacific Ocean) , SKAMANIA AND WAHKIAKUM COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY SEE ZONE DESCRIPTION FOR CITIES BASE POINTS ZONE 1: Rates Fringes Carpenters: CARPENTERS. . . . . . . . . . . . . . . . . .$ 32.04 14.18 DIVERS TENDERS. . . . . . . . . . . . . .$ 36.34 19 .18 DIVERS. . . . . . . . . . . . . . . . . . . . . .$ 77.08 14.18 DRYWALL. . . . . . . . . . . . . . . . . . . . .$ 27.56 14 .18 MILLWRIGHTS. . . . . . . . . . . . . . . . .$ 32.19 14 .18 PILEDRIVERS. . . . . . . . . . . . . . . . .$ 33.04 14 .18 DEPTH PAY: 50 TO 100 FEET $1.00 PER FOOT OVEF. 50 FEET 101 TO 150 FEET $1 .50 PER FOOT OVER 101 FEET 151 TO 200 FEET $2.00 PER FOOT OVER 151 FEET Zone Differential (Add up Zone 1 rates) : Zone 2 - $0.85 � Zone 3 - 1 .25 Zone 9 - 1 .70 Zone 5 - 2.00 Zone 6 - 3.00 BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND VANCOUVER, (NOTE: All dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point. ) ZONE 1: Projects located within 30 miles of the respective city hall of the above mentioned cities ZONE 2: Projects located more than 30 miles and less than 90 miles of the respective city of the above mentioned cities ZONE 3: Projects located more than 40 miles and less than 50 miles of the respective city of the above mentioned cities ZONE 4 : Projects located more than 50 miles and less than 60 miles of the respective city of the above mentioned cities. ZONE 5: Projects located more than 60 miles and less than 70 miles of the respective city of the above mentioned cities ZONE 6: Projects located more than 70 miles of the respected city of the above mentioned cities ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 5 CARP0770-003 06/Ol/2015 Rates Fringes CARPENTER CENTRAL WASHINGTON: CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN) , KITTITAS, OKANOGAN (WEST OF THE 120TH MERIDIAN) AND YAKIMA COUNTIES CARPENTERS ON CREOSOTE MATERIAL. . . . . . . . . . . . . . . . . . .$ 40.46 13.66 CARPENTERS. . . . . . . . . . . . . . . . .$ 40.36 13.66 DIVERS TENDER. . . . . . . . . . . . . .$ 35.02 14.00 DIVERS. . . . . . . . . . . . . . . . . . . . .$ 73.94 14 .00 MILLWRIGHT AND MACHINE ERECTORS. . . . . . . . . . . . . . . . . . .$ 41.86 13.66 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING. . . . . . .$ 40.61 13.66 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeer.-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend Zone Pay: 0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1 .15/hour 46-55 radius miles $1.35/hour Over 55 radius miles 51.55/hour (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 6 ---------------------------------------------------------------- CARP0770-006 06/O1/2015 Rates Fringes CARPENTER WESTERN WASHINGTON: CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS (excludes piledrivers only) , MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean) , PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES BRIDGE CARPENTERS. . . . . . . . . .$ 90.36 13.66 CARPENTERS ON CREOSOTE MATERIAL. . . . . . . . . . . . . . . . . . .$ 40.46 13.66 CARPENTERS. . . . . . . . . . . . . . . . .$ 40.36 13.66 DIVERS TENDER. . . . . . . . . . . . . .$ 44.67 13. 66 DIVERS. . . . . . . . . . . . . . . . . . . . .$ 93.56 13.66 MILLWRIGHT AND MACHINE ERECTORS. . . . . . . . . . . . . . . . . . .$ 41.86 13.66 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING. . . . . . .$ 40.61 13.66 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend Zone Pay: 0 -25 radius miles Free 26-35 radius miles $1 .00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Ha11, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour WA160001 Modification 3 Federal Wage Determinations for Highway Construction • Page � 7 ---------------------------------------------------------------- ELEC0046-001 02/O1/20i6 CALLAM, JEFFERSON, KING AND KITSAP COUNTIES RaLes Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 46.87 3%+15.96 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 45.77 30+17.91 ---------------------------------------------------------------- * ELEC0048-003 O1/O1/2016 CLARK, KLICKITAT AND SKAMANIA COUNTIES Rates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 44 .22 21.50 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 40.20 21.11 HOURLY ZONE PAY: Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria Zone Pay: Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour *These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus. ---------------------------------------------------------------- ELEC0048-029 O1/O1/2016 COWLITZ AND WAHKIAKUM COUNTY Rates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 44 .22 21.50 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 40.20 21 .11 ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 8 ELEC0073-001 07/O1/2015 ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN COUNTIES Rates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 34 .10 16.68 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 31.00 16. 68 ---------------------------------------------------------------- ELEC0076-002 09/O1/2014 GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON COUNTIES Rates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 37.94 23.36 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 34.99 23.36 ---------------------------------------------------------------- ELEC0112-005 06/O1/2015 ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA WALLA, YAKIMA COUNTIES Rates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 40.79 18.65 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 38.80 18.59 ---------------------------------------------------------------- ELEC0191-003 06/O1/2014 ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES R.ates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 49 .23 17.73 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 40.21 17 .73 ---------------------------------------------------------------- ELEC0191-004 06/O1/2014 CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES Rates Fringes CABLE SPLICER. . . . . . . . . . . . . . . . . . . .$ 40.82 17.63 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 37.11 17.63 ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 9 ENGI0302-003 06/Ol/2014 CHELAN (WEST OF TFIE 120TH MERIDIAN) , CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN) , GRAYS HARBOR, ISLAND, JEFFERSOIQ, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120`PH MERIDIAN) , SAN JUNA, SKAGIT, SNOHOMISH, WHFITCOM AND YAKIT�IA (WEST OF THE 120TH MERIDIAN) COUNTIES PROuECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS SHOWN BELOW) Zone 1 (0-25 radius miles) : Rates Fringes Power equipment operators: Group lA. . . . . . . . . . . . . . . . . . .$ 38.39 17.39 Group lAA. . . . . . . . . . . . . . . . . .$ 38. 96 17.39 Group lAAA. . . . . . . . . . . . . . . . .$ 39.52 17.39 Group 1. . . . . . . . . . . . . . . . . . . . .$ 37.84 17.39 Group 2. . . . . . . . . . . . . . . . . . . . .$ 37.35 1?.39 Group 3. . . . . . . . . . . . . . . . . . . . .$ 36.93 17.39 Group 4 . . . . . . . . . . . . . . . . . . . . .$ 34 .57 17.39 Zone Differential (Add to Zone 1 rates) : Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1 .30 BASEPOINTS: Aber.deer., Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, . Shelton, Wenatchee, Yakima POGdER EQUIPMENT OPER.ATORS CLASSIFICATIONS GROUP lAAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP lAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments) ; Tower crane over 175 ft in height, base to bocm GROUP lA - Cranes, 100 tons thru ?99 tons, or 15C ft of boom (includ.ing jib with attachments) ; Crane-overhead, bridge type, 100 toris and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and cver; Shovels, excavator, backl:oes-6 yards and over with attachments GROUP 1 - Cableway; Crar.es 45 tons thru 99 tor.s, under 150 ft of boom (incl.uding jib with attacYtments) ; Crane-overhead, bridge type, 45 tons tnru 99 tons; Derricks or. building work; Excavator, shovel, backhoes over 3 yards anci under 6 yards; Hard tail end dump articulatinq off-road equipment 45 yards and over; Load2r- overl:ead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rabber tired earth moving equipment; Rollagon; Scrapers-self propelled 45 yards and over; Slipform pavers; T�ansporters, a'1 truck or track type WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 10 GROUF 2 - Barrier machine (zipper) ; Batcl: Plant Oneraor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 49 tons; Chipper; Concrete Pump-truck mount with boom attachment; Crusher; Deck Engi�eer/Deck Winches (pow2r) ; Drilling machine; Excavator, shovel, backhoe-3yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directior.al drill operator; Loaders-overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics-all; Mixe�s-asphalt plant; Motor patrol graders-finishing; Piledriver (other than crane meunt) ; Roto-mill, roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar_ Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self propelled, hard tail end dump, articulating off-ioad equipment-under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine-shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer GROUP 3 - Conveyors; Crar:es-thru 19 tons with attachments; A-frame crane over 10 tons; Drill oilers-aug2r type, truck or crane mount; Dozers-D-9 and urider; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists- (elevators and manlifts) , air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader-elevat�ng type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps-concrete; Roller, plant mix or multi-lift materials; Saws-concrete; Scrpers-concrete and carry-all; Service engineer-equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes-A frame-10 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and rnulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power olant; Pumps, water; Rigger and Bell:nan; Roller-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator WA160001 Modification 3 � Federal Wage Determinations for Highway Construction - . ,•., . .. . Page � 11 Category B Projects: 95=� of the basic hourly reate for each group plus full fringe benefits applicable to category A projects shall apply to the following projects. A Reduced rates may be paid on the following: 1 . Projects involving work on structures such as buildings and bridges whose total value is less than $1 .5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded. 3. Marine projects (docks, wharfs, etc. ) less than $150, 000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing H-2 Class "C" Suit - Base wage rate plus $ .25 per hour. H-3 Class "B" Suit - Base wage rate plus $ .50 per hour. H-4 Class "A" Suit - Base wage rate plus $ .75 per hour. Zone Differential (Add to Zone 1 rates) : Zone 2 (26-45 radius miles) - $ .70 Zone 3 (Over 45 radius miles) - $1.00 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 12 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP lAAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) GROUP lAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments) ; Tower crane over 175 ft in height, base to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments) ; Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GRCUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments) ; Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers-self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type GROUP 2 - Barrier machine (zipper) ; Batch Plar.t Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 49 tons; Chipper; Concrete Pump-truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power) ;. Drilling machine; Excavator, shovel, backhoe-3 yards a:�d under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders-overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics-all; Mixers-asphalt plant; Motor patrol graders-finishing; Piledriv2r (other than crane mount) ; Roto-mill, roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self propelled, hard tail end dump, articulating off-road equipment-under 95 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine-shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 13 GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; A-frame crane over 10 tor.s; Drill oilers-auger tyne, truck or crane mount; Dozers-D-9 and un�e�; Forklift-3000 lbs. and over with attachmer.ts; Horizontal/directionai drill locator; Outside hoists- (elevators and manlifts) , air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader-elevating type, belt; Motor patrol grader-nonfinishing; Plar,t oiler- asphalt, crusher; Pumps-cor.crete; Roller, plant mix or multi-lift mar.erials; Saws-concrete; Scrpers-concrete ar.d carry-all; Service engineer-equipment; Trenching r�achines; Truck Crane Oi1er/Driver under 1C0 �ons; Tractors, backhoe 75 hp and under GROUP 4 - Assistant Engineer; Bobcat; Broo:ns; Compressor; Concrete finish manine-'aser screed; Cranes-A frame-10 tons and under; Eievator and Manlift-permanent or s�aft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. witl-i attachments; Hydralifts/boom trucks, 10 tons ar.d under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; Pumps, water; Ri�ger ar.d Bellman; Roiler-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator CATEGORY B PROJECTS: 9�°; Or THE BASIC HOURLY RATE FOR EACH GROJP PLUS FULL FRINGr BENEFITS APPLICABL� TO CATEGCRY A PROJECTS SHALL APPI�Y TO THE FOLLOWING PROJErTS. REDUCED RAI'ES MAY BE PAID ON THE FOLLOWING: 1. Projects invoiving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mecnanical, electrical, and utility portions of the contracr, 2. Projects of less than $1 million where no building is invoived. Surfacing a:�d paving including, but utilities er,cluded. 3. Marine projects (docks, wharfs, ect. ) less than $150, 000. HP.NDLING OF HAZARDOUS WASTE MAiERIALS: Personnel in a11 craft classifications subject to working inside a federally designed hazardous perimeter shall be el.a�ble for compensation in accordance with th2 following group schedule relative to t::e level of hazardous waste as outlined i� Lhe specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site whe=� not outfitted with protective clothing. H-2 Class "C" Suit - Base wage rate plus $.25 per hour. H-3 Class "B" Suit - Base wage rate plus 5.50 per hour. H-4 Class "A" Suit - Base wage rate plus 5.75 per hour. ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 14 ENGI0370-002 06/O1/201� ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN) , COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN) , FERRY, FRANKLIN, GARFIELD, GRAVT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN) , PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST Or THE 120TH MERIDIAN) COUNTIES ZONE 1: Rates Fringes PCWER EQUIPMENT OPERATOR GROUP i. . . . . . . . . . . . . . . . . . . . .$ 20.16 13.55 GROUP 2 . . . . . . . . . . . . . . . . . . . . .$ 2b.48 13.55 GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 27.09 13.55 GROUP 4 . . . . . . . . . . . . . . . . . . . . .$ 27.25 13.55 GROUP 5. . . . . . . . . . . . . . . . . . . . .5 27.41 13.55 GROUP 6. . . . . . . . . . . . . . . . . . . . .$ 2`7 .59 13.55 GROUP 7. . . . . . . . . . . . . . . . . . . . .$ 2'7. 96 13.55 GROUP 8. . . . . . . . . . . . . . . . . . . . .$ 29.06 13.55 ZONE DIFFERFNTIAL (Add to Zone 1 rate) : Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROJP 1: Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel, or eiectric power) ; Deck Hand; Firer�an & Heater Tender; Hydro-seeder, Mulcher, Nezzleman; Oiler Driver, & Cab12 Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or Compacting Vibrator) , except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler-Dri�rer (CLD required) & Cable Tender, Mucking Machine WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 15 GROUP 2: A-frame Tr�:ck (sing�e drum) ; Assistant Refrigeration Plant (under 1C00 ton) ; Assistant Plant Operator, Fireman or Pugmixer (asphalt) ; Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement) ; Cement Hog; Compressor (2000 CFM or over, 2 or more, gas diesel or � electric power) ; Concrete Saw (mult�ple cut) ; Distribu�or Leverman; Ditch Witch or similar; Elevator Hoisting Materials; Dope Pots (power agitated) ; Fork Lift or Lumber Stacker, hydra-lift & similar; Gin Trucks (pipeline) ; Hoist, single drum; Loaders (bucket elevators and conveyors) ; Longitudinal Float; Mixer (portable-conc�ete) ; Pavement Breaker, Hydra-Hammer & similar; Power Broom; Railroad Ballast Regulation Operator (self-prcpel].ed) ; Railroad Power Tamper Operator (self-propelled) ; Railroad Tamper Jack Operator (self-propelled; Spray Curing Machine (concrete> ; Spreader Box (self-propelled) ; Straddle Buggy (Ross & similar on construction job only) ; Tractor (rarm type �/T with attachme:�t, except Backhoe) ; Tugger Operator GROUP 3: A-frame Truck (2 or more drums) ; Assistant Refrige=a�ion Plant & Chiller Operator (over 1000 ton) ; Backfillers (Cleveland & si.milar) ; Batch Plant & Wet Mix Operator, single unit (concrete) ; Belt-Cr�te Conveyors with power pac'.{ or similar; Belt Loader (Kocal or similar) ; Eending Machine; Bob Cat (Skid Steer) ; Boring Machine (earth) ; Borinq t�lachine (rock under 8 inch bit) (Quarry Master, Joy or similar) ; Bump Cutter (Wayne, Saginau or . similar) ; Car.al Lining Machine (concrete) ; Chipper (without crane) ; C�eaning & Doping Machine (pipeline) ; Deck Engineer; Elevating Belt-type Loader (Euclid, Barber Green & similar) ; Elevating Grader-type Loader (Dumor, Adams or simiiar) ; Generator Plant Engineers (diesel or electric) ; Gunnite Combination Mixer & Compressor; Locomotive Engineer; P�lixermobil_e; Mucking Machine; Posthole Auqer or Punch; Pump (grcut or jet) ; Soil Stabilizer (P & H or similar) ; Spreade� Machine; Dozer/Tractor (up to D-6 or equivalent) and Traxcavator; Traverse Finish Machine; Turnhead Operator GRCUP 4 : Concrete Pumps (squeeze-crete, flow-crete, pump- crete, ��Thitman & similar) ; Curb Extruder (asphalt or concrete) ; Drills (chur:�, core, calyx or diar.lond) ; Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist) ; Loaders (ov2rhead & fron`-end, under 4 yds. R/T) ; R.ef.r.igeration Plant Engineer (under 1000 ton) ; Rubber-tired Skidders (R/T with or without attachments) ; Surface Heate� & Plant Machir.e; Trenching Machines (under 7 ft. depth capacity) ; Turnhead (with re-scree:�inq) ; Vacuum Drill (reverse circuiatior dr,_11 under 8 inch bit) WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 16 GROUP 5: Backhoe (under 45, 000 gw) ; Backnoe & Hoe Ram (under 3/9 yd. ) ; Carrydeck & Boom Truck (under 25 tons) ; Cranes (25 tons & under) , all attachments including clamshell, dragline; Derricks & Stifflegs (under 65 tons) ; Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar) ; Hoe Ram; Piledriving Fngineers; Paving (dual drum) ; Railroad Track Liner Operaotr (self-propeiled) ; Refrigeration Plant Eng�neer (1000 tons & over) ; Signalman (Whirleys, Highline Hammerheads or similar) ; Grade Checker GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches & Trimmers) (Autograde, ABC, R.A. Hansen & similar on grade wire) ; Backhoe (45, 000 gw and over. to 110, 000 gw) ; Backhoes & Hoe Ram (3/4 yd. to 3 yd. ) ; Batch Plant (over 4 units) ; Batcn & Wet Mix Operator (multiple units, 2 & inr1. 4) ; Blade Operator (motor patrol & attachments) ; Cable Controller (dispatcher) ; Compactor (self-propelled with blade) ; Concrete Pump Boom Truck; Concrete Slip Form Paver; Cranes (over 25 tons, to and including 45 tons) , all attachments including clamshe'_l, d�agline; Crusher, Grizzle & Screening Plant Ooerator; Dozer, 834 R/T & similar; Drill Doctor; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds. ) ; Multiple Dozer Units with si�gle blade; Paving Machine (asphalt and concrete) ; Quad-Track or similar equipment; Rollerman (fir.ishing asphalt pavement) ; Roto Mill (pavemert grinder) ; Scrapers, all, rubber-tired; Screed Operator; Shovel (under 3 yds. ) ; Trenching Machines (7 ft. depth & over) ; Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Operator (REcycle Train) ; Lime Brain Operator (Recycle Train) ; Mobile Crusher Operator (Recycle Train) GROiJP 7: Backhoe (over 110, G00 gw) ; Backhoes & Hoe Ram (3 yds & over) ; Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic; Cableway Operatcrs; Concrete Cleaning/Decontamination machine operator; Crar.es (over 45 tons to but not including 85 tons) , all attachments including clamshell and dragine; Derricks & Stiffleys (65 tons & over.) ; Elevating Belr (Holland type) ; Heavy equipment robotics oper.ator; Loader (360 degrees revolving Koehring Scooper or s_milar) ; Loaders (overhead & front-end, over 8 yds. to 10 yds. ) ; Rubber-tired Scrapers (muitiple engine with three or more scrapers) ; Shovels (3 yds. & over) ; Whirleys & Hammerheads, ALL; H.D. Mecharic; H.D. Welder; Hydraulic Platform Trailers (Goidhofer, Shaurerly andSimilar) ; Ultra High Pressure Wateriet Cutting Tool System Operator (30, 000 psi) ; Vacuum Blasting Machine Operator WA160001 Modification 3 � Federal Wage Determinations for Highway Construction � ' ` Page � 17 GR.OUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower) , all attacnments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over) ; Helicopter Pilot BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale NOTE: In computing the length of the boom on Tower Cranes, they s;�all be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone wo�king on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ---------------------------------------------------------------- ENGI0612-012 06/O1/2014 LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line extending west from the northerri boundary of Wa'�kaikum County to the sea) AND Ti-IURSTON COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUF SHALL BE 90� OF THE BASE RATE PLUS FULL FRINGE BENEFITS. ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. Zone 1 (0-25 radius miies) : Rates Fringes POWER EQUIFMENT OFERATOR GROUP lA. . . . . . . . . . . . . . . . . . .$ 38.39 17.40 GROUP 1P.A. . . . . . . . . . . . . . . . . .$ 38.96 17 .40 GROUP lAFA. . . . . . . . . . . . . . . . .$ 39.52 17.40 GROUP 1. . . . . . . . . . . . . . . . . . . . .5 37 .84 17.40 GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 37.35 17.40 GROUF 3. . . . . . . . . . . . . . . . . . . . .$ 36.93 1"/ .40 GROUP 4 . . . . . . . . . . . . . . . . . . . . .$ 34 .57 17.40 Zone Differential (Add to Zone 1 rates) : Zone 2 (26-45 radius miies) _ $1 .00 Zor.e 3 (Over 45 radius miles) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 18 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1 AAA - Cranes-over 300 tons or 300 ft of boom (iilcluding jib with attachMents) GROUP lAA - Cranes- 200 tonsto 300 tons, or 250 ft of boom (including jib with attachments; Tower crane over 175 ft in height, bas to boom GROUP iA - Cranes, 100 tons thru ].99 tons, or 150 ft of boom (including jib with attachments) ; Crar.e-over'�ead, bridge type, 100 tons and over; Tower crane up tc 175 ft in height base to boom; Loaders-overhead, 8 yards and over; Shovels, excavator, backhoes-o yards and over with attachments GROTIP 1 - Cableoray; Cranes 45 tons thru 99 tons under 150 ft of boom (including jib with attacnments) ; Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulatinq off-road equipment 45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers- self-propelled 45 yards and over; Slipform pavers; Transporters, all track or truck t.ype GROJP 2 - Barrier machine (zipper) ; Batch Plant Operator- concrete; Bump Cutter; Cra:�es, 20 tons thru 44 tons with attachments; Crane-Overhead, bridge type, 20 tons through 44 tons; Chipper; Concrete pump-trtick mount �aith boom attachment; Crusher; Deck engineer/deck winches (power) ; Drilling machine; Excavator, shovel, backhoe-3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders-plant feed; Locomotives-all; Mechanics- all; Mixers, asphalt plant; Motor patrcl graders, finishing; Piledriver (other than crane mount) ; Roto-mill, roto- grinder; Screedman, spreader, tops_de operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper-self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader triruner; Tractors, backhoe over 75 hp; Transfer material service machine-shuttle buggy, Blaw Knox- Roadtec; Truck Crane oiler/driver-100 tons and over; Truck Mount Portable Conveycr; Yo Yo pay WA160001 Modification 3 Federal Wage Determinations for Highway Construction ` Page � 19 GROUP 3 - Conveyors; Cranes through 19 tons witn attachments; Crane-A-frame over 10 tons; Drill oilers-auger type, truck or cran2 mount; Dozer-D-9 and under; Forklift-3000 lbs. and over with attachments; Horizontal/directional drill locator; Outs:�le Hoists- (elevators and manlifts) , air tuggers, strato tower bucket elevatcrs; Hydralifts/boom trucks over 10 tons; Loaders-elevating type, belt; Motor pa�rol grader-nonfinishing; Plant oiler- asphalt, crusher; Pump-Concrete; Roller, plant mix or multi-lfit materials; Saws-concrete; Scrapers, concrete and carry all; Service engineers-equipment; Trenching mach�nes; Truck crane ei'er/driver under 100 tons; `�'ractors, backhoe under 75 hp GROUF 4 - Ass�stant Engineer; Bobcat; Brooms; Compressor; Concrete Finish Machine-laser screed; Cranes A-frame 10 tons and under; Elevator and manlift (permanent and shart type) ; Forklifts-unde� 3000 lbs. with attachments; Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger-mechanical; Power plant; Pumps-water; Rigger and Beliman; Roller-other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator FOOTNOTE A- Reduced rates may be paid on the fo'lcwing: 1. Projects involving work on structures such as buildings and bridges whose tcta'_ va1Le is l.ess than $1.5 m��llion excluding mechanical, electrical, and utility portions of t:�e contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utiiities excluded. 3. Marine projects (docks, wharfs, etc. ) less than 5150, 000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classificatior,s subject to working inside a federally designated 'nazardous perimerer shall be elgible for compensation in accordance with tYie tollowinq group sc'�edule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plar.�. I�-1 Base wage rate w:�en on a hazardous wasLe site wheri not outfitted with protective clothi.ng, Class "D" Suit - Base �aage rate plus S .50 per hour. H-2 Class "C" Suit - Base wage rate plus $1.00 per hour. H-3 Ciass "B" Suit - Base wage rate plus $1.50 per hour. H-4 Class "A" Suit - Base wage rate plus $2.00 per hour. ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction P � ge � 20 ENGI0701-002 O1/O1/2015 CLARK, rOWLITZ, KLICKKITAT, PACIFIC (SOUTH) , SKAMANIA, ANll WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1 �ates Fringes PO�nIER EQUIFMENT OPERATOR GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 39.47 19 .10 GROUP lA. . . . . . . . . . . . . . . . . . . .$ 41 .44 14 .10 GROUP 1B. . . . . . . . . . . . . . . . . . . .$ 43.42 14.10 GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 37.58 14.10 GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 36.94 14.10 GROUP 4 . . . . . . . . . . . . . . . . . . . . .$ 35.36 19 .10 GROUP 5. . . . . . . . . . . . . . . . . . . . .$ 34 .13 14 .10 GROUP 6. . . . . . . . . . . . . . . . . . . . .$ 30.99 14.10 Zone Differential (add to Zone 1 rates) : Zone 2 - $3.00 Zone 3 - $6.00 WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 21 For the following metropolitan counties: MULTNOMAH; c:LACKFIMAS; MARION; 'vVASHINGTON; YAMHILL; AND COLli2'iBIA; CLAR:�; AND COWLITZ COUNTY, VdASHINGION WITH MODIFICAiIONS AS INDICATED: All jobs or projects lccated in MLltnomah, Clackamas and Marior, Counties, West of the western boundary cf Mt. Hood National Fo~�est and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or orojects located in Yamhill County, Gdashington �ounty and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens "Blast Zone" shall receive Zone I pay for all classifications. All jobs or prcjects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications. For the following cities: ALIIANY; BEND; COOS BAY; EUGEPdE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG All jobs or projects located �aithin 30 miles of the respective city hall of the above men�ioned cities shall receive Zone I pay for all c'assifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities sha'_1 receive Zone II pay for ali class:ifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 22 POWER EQUIPMENT CPERATORS CLASSIFICATIONS Group 1 Concrete Batch Plan and or Wet mix three (3) units or more; Crane, Floating one hundred and fifty (150) ton but less than two hundred and fifty (250) ton; Crane, two hundred (200) ton through two hundred ninety nine (299) �on with two hundred foot (200' ) boom or less (including jib, inserts ard/or attachments) ; Crane, ni:�ety (90) ton through one hundred ninety nine (199) ton with over two hundred (200' ) boom Including jib, inserts and/or attachmerts) ; Crane, Tower Crane with one hundred seventy five foot (175' ) tower or less and with less than two hundred foot (200 ' ) jib; Crane, Whirley ninety (90) ton and over; Helicopter when used in erecting work Group lA Crane, floating two hundred fifty (250) ton and over; Crane, two hundred (200) }on through two hundred ninety nine (299) ton, with over two hundred foot (200' ) boom (including ;ib, inserts and/or attachments) ; Crane, three hundred (300) ton through three hundred ninety nine (399) ton; Crane, Tower Crane with over one hundred seventy five foot (175' ) tower or over twc hur.dred foot (200' ) jib; Crane, tower Crane on rail system or 2nd tower or moie in work radius Group 1B Crane, three hundred (300) ton tllrough three hundred ninety nine (399) ton, with over two hundred foot (20C' ) boom (including jib, inser�s and/or attachments) ; Floating craze, three hundred fifty (350) tor.• and over; Crane, four hundred (400) ton and over Group 2 Asphalt Plant (any type) ; Asphalt Roto-Mill, pavement profiler eight foot (8' ) iateral c.ut and over; Auto Grader or "Trimmer"; Blade, Robotic; Buildozer, Robotic Equipment (any type) ; Bulldozer, over cne hundred twenty thousand (120, 000) 1bs. and above; Cor.crete Batch Plant and/or Wet Mix one (1) and two (2) drum; Concrete Diamond Head Profiler; Canal Trimmer; Concrete, Automatic Siip Form Paver (Assistant to the Operator r2quired) ; Crane, Boom Tr��ck fifty (50) ton and with over one hundred fi�ty foot (150' ) boom and over; Crane, Floating (derrick barge) thirty (30) ton but less than one Y:undred fifty (150) ton; Crane, Cableway twenty-five (25) ton and over; Crane, Floating Clamshell three (3) cu. Yds. And over; Crane, ninety (90) ton thrcugh one hundred nir.ety nine (199) ton up to and including twc handred foot (200' ) of boom (including jib inserts and/or attachments) ; Crane, fifty (50) ton through eighty nine (89) ton with over one hundred fifty foot (150' ) boom (including jib inserts and/or attachments) ; Crar.e, Whirley under ninety (90) ton; Crusher Plant; Excavator over one hundred thirty thousand (].30, OOC) lbs. ; Loader one hundred twenty thousand (120,000) 'k�is. and above; Re:note Controlled Earth Moving Equipment; Shovel, Dragline, Clamshell, fi-ve (5) cu. Yds. And over; Underwater Equipment remote or otherwise, when used in construction work; Wheel Excavator any size WA160001 Modification 3 ' Federal Wage Determinations for Highway Construction . ,.. . ., i: , .... � � Page � 23 Group 3 Bulidozer, ove� seventy thousand (7G, 000) lbs. up to and including one hundred Cwenty thousand (120, 000) lbs. ; Crane, Boom Truck fiity (50) ton and over with less than one hundred fifty foot (150' ) boom; Crane, fifty (50) ton through eighty r.ir.e (89) ron with one hundred fifty foot (150' ) boom or less (including jib inserts and/or attachments) ; Crane, Shovel, Dragline or Clamshell three (3) cu. yds. but less than five (5) cu. Yds. ; Excavator over eighty thousand (80,000) lbs. through or.e hundred thirty tno�asa�d (130, 000) lbs. ; Loader sixty thousand (60, 000) lbs. and less than one hundred twenty thousand (120, 000) lbs. Group 4 Asphalt, Screed; Asphalt Paver; Asphalt Roto-Mill, pavemer.t prcfiler, under eight foot (8 ' ) lateral cut; Asphalt, Material Transfer Vehicl.e Operator; Back Filling Machine; Backhoe, Robotic, track and wheel type up te and including twenty thousand (20, OOC) lbs. wit'r� any attachments; Blade (any type) ; Boatman; Boring Machine; Bulldozer over twenty thousand (20, 000) ibs. and more than one hundred (100) horse up to seventy thousand (70, 000) lbs. ; Cable-Plow (any type) ; Cableway up to twenty five (25) ton; Cat Drill (John Henry) ; Chippers; Compactor, multi-engine; Compactor, Robotic; Comnactor with blade self-propelled; Concrete, Breaker; Concrete, Grout Plant; Concrete, Mixer Mobile; Concr2te, Paving Road Mixer; Concrete, Reinforced Tank Banding Machine; Crane, Boom Truck twer.ty (20) ton and under fifty (50) ton; Crane, Bridge Locomotive, Gantry and Overhead; Crane, Carry Deck; Crane, Chicago Boom and sim.ilar types; Crane, Der�ick Operator, under one hundred (100) ton; Crane, Floating Clamshell, Draqline, etc. Operator, under three (3) cu. yds. Or less thar thirty (30) ton; Crane, ur,der fifty (5G) ton; Crane, Quick Tower under one hur.dred foot (100' ) in height and less than one hundred fifty foot (150' ) jib (on rail included) ; Diesel-Electric Engineer (Plant or F�oating) ; Directional Drill over T_wenty thousand (20, 000) lbs. pullback; Drill Cat Operator; Drill Doctor and/or Bit Grinder; Drilier, Percussion, DiaMond, Core, Cable, Rotary and similar type; Excavator Operator over twenty thousand (20, 000) lbs. througr eighty thousand (80, OOG) 1bs. ; Ger.erator Operator; Grade-all; �:�uardrail Macnines, i.e. punch, auger, etc. ; Hammer Operator (Piledriver) ; Hoist, stiff 1eg, guy derrick or similar type, fifty (50) ton a�1d over; Hoist, two (2) drums or more; Hydro Axe (loader mounted or similar type) ; Jack Operator, Elevating Barges, Barge Operator, self-unloading; Loader Operator, front end and overhead, twenty five thousand (25, C00) 1bs. and less than sixty thcusand (60, 000) lbs. ; Log Skidders; Piledriver Operator (not crane type) ; Pipe, Bending, Clean-_ng, Doping and Wrapping Machines; Rail, Ballast Tamper Multi-Purpose; Rubber-tired Dozers and Pushers; Scraper, al1 types; Side-Boom; Skip Loader, Drag Box; Strump Grinder (loader mounted or simil.ar type) ; Surface Heater and Plar�er; Tractor, .rubber-tired, over fifty (50) HP Flywheel; Trenching Machine three foot (3' ) depth and deeper; Tub Grinder (used for wood debris) ; WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 24 Tunnel Bo�ing Machine Mechanic; Tunnel, Mucking Machine; Ultra High Pressure Water Jet Cutting Tool System Operator; Vacuum Blasting Machine Operator; Water pulls, Water wagons Group 5 Asphalt, Extrusion Machine; Asphalt, Roller (any asphalt mix) ; Asphalt, Roto-Mill pavement profiler ground ma:�; Bulldozer, twenty thousand (20, 000) lbs. or less, cr one hundred (100) horse or less; Cemerit Pump; Chip Spreading Machine; Churn Drill and Earth Boring Machine; Compactor, self-propelled without blade; Compressor, (any power) one thousand two hundred fifty (1,250) cu. ft. and over, total capacity; Concrete, Batch Plant Quality control; Concrete, Combination Mixer and compressor operator, gunite work; Concrete, Curb Mach�ne, Mechanical Berm, Curb and/or Curb and Gutter; Concrete, Finishing Machine; Concrete, Grouting Machine; Concrete, Internal Full Slab Vibrator Operator; Concrete, Joint Machine; Concrete, Mixer single drum, any capacity; Concrete, Paving Machine eight foot (8' ) or less; Concrete, Planer; Concrete, Pump; Concrete, Pump Truck; Concrete, Pumperete Operator (any type) ; Concrete, Slip Form Pumps, power driven hydraul_c lifting device for concrete forms; Conveyored Material Hauler; Crane, Boom Truck under twenty (20) tons; Crane, Boom Type iifting device, five (5) ton capacity or less; Drill, Directional type less than twenty thousand (20,000) lbs. pullback; Fork Lift, over ten (10) ton or Robotic; Helicopter Hoist; Hoist Operator, single drum; Hydraulic Backhoe track type up to and including twenty thousand (20, 000) lbs. ; Hydraulic Backhoe wheel type (any make) ; Laser Screed; Loaders, rubber-tired type, less than twenty five thousand (25, 000) lbs. ; Pavement Grinder and/or Grooving Machine (riding type) ; Pipe, cast in place Fipe Laying Machine; Pulva-Mixer or similar types; Pump Operator, more than five (5) pumps (any size) ; Rail, Ballast Compactor, Regulator, or Tamper • machines; Service Oiler (Greaser) ; Sweeper Self-Propelled; Tractor, Rubber-Tired, fifty (50) HP flywhee� and under; Trenching Machine Operator, maximum digging capacity three foot (3' ) depth; Tunnel, Locomotive, Uinkey; Tunnel, Power Jumbo setting slip forms, etc. Group 6 Asphalt, Pugmill (any type) ; Aspr�alt, Raker; Asphalt, Truck Mounted Asphalt Spreader, with Screed; Auger Oiler; Boatman; Bobcat, skid steed (less than one (1) yard) ; Broom, self-propelled; Compressor Operator (any power) under 1,250 cu. ft. total capacity; Concrete Curing Machine (ridina type) ; Concrete Saw; Conveyor Operator or Assistant; Crane, Tugger; Crusher reederman; Crusher Oiler; Deckhand; Drill, Directional Locator; Fork Lift; Grade Checker; Guardrail Punch Oiler; Hydrographic Seeder Machine, straw, pulp or seed; �?ydrostatic Pump Operator; Mixer Box (CTB, dry batch, etc.) ; Oiler; Plant Oiler; Pump (any power) ; Rail, Brakeman, Switchman, �Iotorman; Rail, Tamping Machine, mechani.cal, self-propelled; R:gger; Roller grading (not asphalt) ; Truck, Crane Oiler-Driver ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction � Page � 25 IRON0014-005 07/Ol/2Q15 ADAMS, ASCTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND CRIELLE, SPCKANE, STEVENS, WALLA WALLA AND WhITMAN COUNTIES Rates Fringes IRCNWOP.KER. . . . . . . . . . . . . . . . . . . . . . .$ 32.76 23.19 ---------------------------------------------------------------- IRON0029-002 C7/O1/2015 CLAP.K, COWLITZ, KLICKITAT, PACIFIC, SKAi�lANIA, AND WANKAIKUM COUNTIES Rates Fringes TRONWORKER. . . . . . . . . . . . . . . . . . . . . . .$ 34.12 23.04 ---------------------------------------------------------------- IRGNC086-002 07/O1/2015 YAKIMA, KIT"_'ITE3S AND CHELAN COUNTIES Rates Fringes IRONWORKEP.. . . . . . . . . . . . . . . . . . . . . . .$ 32.76 23.19 ---------------------------------------------------------------- IRON0086-004 C7/O1/2015 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEW�S, • MASON, PIERCE, SKAGIT, SNOHOMISH, THURSTON, AND WHATCOM COUNTIES Rates Fringes IRONWORKER. . . . . . . . . . . . . . . . . . . . . . .$ 40.04 23.19 ---------------------------------------------------------------- WA160001 Modification 3 , Federal Wage Determinations for Highway Construction Page � 26 LAB00001-002 06/O1/2014 ZONE 1: Rates Fringes Laborers: CALLAc�I, GRAYS HARBOR, ISLAND, 3EFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (NORTH OF STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) , PIERCE, SAN JUAN,SKAGIT, SNOHOMISH,THUP.STON A�ID ��VHATCOM CO�NTIES GROUP 1. . . . . . . . . . . . . . . . . . . .$ 22.99 10.30 GROUP 2. . . . . . . . . . . . . . . . . . . .$ 25.�'9 10.30 GROUP 3. . . . . . . . . . . . . . . . . . . .$ 32.29 10.30 GROUP 4. . . . . . . . . . . . . . . . . . . .$ 33.08 10.30 GROUP 5. . . . . . . . . . . . . . . . . . . .$ 33.62 10.30 CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN) , KITTITAS AND YAKIMA COUNTIES GROUP 1. . . . . . . . . . . . . . . . . . . .$ 18.95 10.30 GROUP 2. . . . . . . . . . . . . . . . . . . .$ 2.1.76 10.30 GROUP 3. . . . . . . . . . . . . . . . . . . .S 23.85 10.30 GRCUP 4. . . . . . . . . . . . . . . . . . . .$ 24.43 10.30 GROUP 5. . . . . . . . . . . . . . . . . . . .$ 24.85 10.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEFN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - Projects withir. 25 �3CI1115 miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the - respective city hall ZONE 3 - More than 45 radius miles from the respective city hall ZONE DIFFERENTIAL (ADD TO ZONE 1 RFITES) : ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: CHELADI, SUNNYSIDE, WEDIATCHEE, AND YAKIMA ZONE 1 - Frojects within 25 radius miles of the respective city hall ZONE 2 - More than 25 radius miles from the respective ci�y hall 'LONE DIFFERENTIAL (ADD TO ZONE 1 RPTES) : ZONE 2 - $2.25 WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 27 LABORERS CLASSIFICATIONS GROUP ?: Lan�scaping and Planting; Watchman; Window Was:�er/Cleaner (detail clean-up, such as but not limited to cleaning floors, cei�ings, walls, windows, etc. , prior to final acceptance by the owner) GROUP 2: Batch Weighmar; Crusher Feeder; Fence Laborer; Flagr�an; Pilot Car GROUP 3: General Laborer; Air, Gas, or Electric Vibrating Screed; Asbestos Abatement Laborer; Ballast Regulator Machine; Brush Cutt2r; B�ush Hog Feeder; Burner; Carpenter Tender; Cement Finisher Tender; Change House or C=y Shack.; Chipping Gun (under 30 lbs. ) ; Choker Setter; Chuck Tender; Clean-up Laborer; Concrete �orm Stripper; Curing Laborer; Demolition (wrecking and moving including charred material) ; Ditch Digger; Dump Person; Fine Graders; Firewatch; Form Setter; Gabian Basket Buiiders; Grout Machine Tender; Grinders; G�ardrail Erector; Haza�dous Waste Worker (Level C: uses a chemical "splash suit" and air purifying respirator) ; Maintenance Person; Material Yard Person; Pot Tender; Rip Rap Person; Riggers; Scale Person; Sloper Sprayer; Signal Person; Stock Piler; Stake Hopper; Toolroom Man (at job site) ; Topper-Tailer; Track Laborer; Truck Spotter; Vinyl Seamer GROUP 4: Cement Dumper-Paving; Chipping Gun (over 30 lbs. ) ; Clary Power Spreader; Co:�crete Dumoer/Cnute Operator; Concrete Saw Operator; Drill Operator (hydraulic, diamond, aiartrac) ; Faller ar:d Bucker Chain Saw; Grade Checker and Transit Person; Groutmen (pressure) including pcst tension beams; Hazardous Gdaste Worker (Level B: uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit") ; High Scaler; Jackhammer; Laserbea�n Operator; Mar.hole Builder-Mudman; Nozzleman (concrete pump, green cutter when using combination of high pressure air and water on concrete and rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster) ; Pavement Breaicer; Pipe Layer and Caulker; Pipe Pct Tender; Pipe Re�iner (not insert type) ; Pipe Wrapper; Power Jacks; Railroad Spi;ce Puller-Power; Raker-Asphalt; Rivet Buster; Rodder; Sloper (over 20 ft) ; Spreader (concrete) ; Tar.iper and Similar electric, air and glas operated tooi; Timber Person-se�aer (lagger shorer and cribber) ; Track Liner Pewar; Tugger Operator; Vibrator; Well Point Laborer GROUP 5: Caisson Pdor;cer; Miner; Mortarman and Hodcarrier; Powdermar; Re-Timberman; Ha�ardous Waste Worker (Level A: utilizes a fully encapsula�ed suit with a self-contained breathing apparatus or a supplied air line) . ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 28 LAB00238-004 06/O1/20?4 PASCO AREA: ADAMS, BENTUN, COLUMBIA,DOUGLAS (East of 120th Meridian) , FERRY, rRANKLIN, GRANT, OKANOGAN, WALLA WALLA SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS & WHITMAN COUNTIES Rates Frinqes LABORER (PASCO) GROUP 1. . . . . . . . . . . . . . . . . . . . .$ 22.25 10. 95 GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 24.35 10. 95 GRCUP 3. . . . . . . . . . . . . . . . . . . . .$ 24 . 62 10.95 GROUP 4 . . . . . . . . . . . . . . . . . . . . .5 24.89 10. 95 GROUP 5. . . . . . . . . . . . . . . . . . . . .$ 25. 17 10.95 LABORER (SPOKANE) GROUP 1. . . . . . . . . . . . . . . . . . . . .S 21.95 10. 95 GROUP 2. . . . . . . . . . . . . . . . . . . . .$ 24.05 10.95 GROUP 3. . . . . . . . . . . . . . . . . . . . .$ 24 .32 10.95 GROUP 4. . . . . . . . . . . . . . . . . . . . .$ 24 .59 10.95 GROUP 5. . . . . . . . . . . . . . . . . . . . .$ 29 .87 10. 9� Zone Diiferential (Add to Zone 1 rate) : $2.00 BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office. WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 29 LABORERS CLASSIFICATIONS GROUP 1: Flagman; Landscape Laborer; Scaleman; Traffic Control Maintenance Laborer (to include erection and maintenance of barricades, signs and relief of flagperson) ; Window Washer/Cleaner (detail cleanup, such as, but not limited to cleaning floors, ceilings, walls, windows, etc. prior to final acceptance by the owner) GROUP 2: Asbestos Abatement Worker; Brush Hog Feeder; Carpenter Tender; Cement Handler; Clean-up Laborer; Concrete Crewman (to include stripping of forms, hand operating jacks on slip form construction, application of concrete curing compounds, pumperete machine, signaling, handling the nozzle of squeezcrete or similar machine, 6 inches and smaller) ; Confined Space Attendant; Concrete Signalman; Crusher Feeder; Demolition (to include clean-up, burning, loading, wrecking and salvage of all material) ; Dumpman; Fence Erector; Firewatch; Form Cleaning Machine Feeder, Stacker; General Laborer; Grout Machine Header Tender; Guard Rail (to include guard rails, guide and reference posts, sign posts, and right-of-way markers) ; Hazardous Waste Worker, Level D (no respirator is used and skin protection is minimal) ; Miner, Class "A" (to include all bull gang, concrete crewman, dumpman and pumperete crewman, including distributing pipe, assembly & dismantle, and nipper) ; Nipper; Riprap Man; Sandblast Tailhoseman; Scaffold Erector (wood or steel) ; Stake Jumper; Structural Mover (to include separating foundation, preparation, cribbing, shorinq, jacking and unloading of structures) ; Tailhoseman (water. nozzle) ; Timber Bucker and Faller (by hand) ; Track Laborer (RR) ; Truck Loader; Well-Point Man; All Other Work Classifications Not Specially Listed Shall Be Classified As General Laborer GROUP 3: Asphalt Roller, walking; Cement Finisher Tender; Concrete Saw, walking; Demolition Torch; Dope Pot Firemen, non-mechanical; Driller Tender (when required to move and position machine) ; Form Setter, Paving; Grade Checker using level; Hazardous Waste Worker, Level C (uses a chemical "splash suit" and air purifying respirator) ; Jackhammer Operator; Miner, Ciass "B" (to include brakeman, finisher, vibrator, form setter) ; Nozzleman (to include squeeze and flo-cre�e nozzle) ; Nozzlemar., water, air or steam; Pavement Breaker (under 90 lbs. ) ; Pipelayer, corrugated metal culvert; Pipelayer, multi- plate; Pot Tender; Power Buggy Operator; Power Tool Operator, gas, electric, pneumatic; Railroad Equipment, power driven, except dual mobile power spiker or puller; Railroad Power Spiker or Puller, dual mobile; Rodder and Spreader; Tamper (to include operation of Barco, Essex and similar tampers) ; Trencher, Shawnee; Tugger Operator; Wagon Drills; Water Pipe Liner; Wheelbarrow (power driven) WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 30 GROUP 4: Air and Hydraulic Track Drill; Aspahlt Raker;Brush Machine (to include horizontal construction joint cleanup brush machine, power propelled) ; Caisson Worker, free air; Chain Saw Operator and Faller; Concrete Stack (to include laborers when laborers working on free standing concrete stacks for smoke or fume control above 40 feet high) ; Gunite (to include operation of machine and nozzle) ; Hazardous Waste Worker, Level B (uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit") ; High Scaler; Laser Beam Operator (to include grade checker and elevation control) ; Miner, Class C (to include miner, nozzleman for concrete, laser beam operator and rigger on tunnels) ; Monitor Operator (air track or similar mounting) ; Mortar � Mixer; Nozzleman (to include jet blasting nozzleman, over 1,200 lbs. , jet blast machine power propelled, sandblast nozzle) ; Pavement Breaker (90 1bs. and over) ; Pipelayer (to include working topman, caulker, collarman, jointer, mortarman, rigger, jacker, shorer, valve or meter installer) ; Pipewrapper; Plasterer Tender; Vibrators (all) GROUP 5 - Drills with Dual Masts; Hazardous Waste Worker, Level A (utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line) ; Miner Class "D", (to include raise and shaft miner, laser beam operator on riases and shafts) ---------------------------------------------------------------- LAB00238-006 06/O1/2014 COUNTIES EAST OF THE 120TH MERIDIAN: ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND OREILLE, STEVENS, SPOKANE, WALLA WALLA, WHITMAN Rates Fringes Hod Carrier. . . . . . . . . . . . . . . . . . . . . .$ 24.32 10. 95 ---------------------------------------------------------------- LAB00335-001 06/O1/2013 CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN) , SKAMANIA AND WAHKIAKUM COUNTIES R.ates Fringes Laborers: ZONE 1: GROUP 1. . . . . . . . . . . . . . . . . . . .$ 28. 65 10.05 GROUP 2. . . . . . . . . . . . . . . . . . . .$ 29.25 10.05 GROUP 3. . . . . . . . . . . . . . . . . . . .$ 29. 69 10.05 GROUP 4 . . . . . . . . . . . . . . . . . . . .$ 30.07 10.05 GROUP 5. . . . . . . . . . . . . . . . . . . .$ 26. 15 10.05 GROUP 6. . . . . . . . . . . . . . . . . . . .$ 23.73 10.05 GROUP 7. . . . . . . . . . . . . . . . . . . .$ 20.53 10.05 WA160001 Modification 3 Federal Wage Determinations for Highway Construction ' Page � 31 Zone Differential (Add to Zcne 1 rates) : Zone 2 $ 0.65 Zcne 3 - 1.15 Zone 4 - 1.70 Zone � - 2.75 BASE POINTS: GOLDENDALE, LONGVIEW, AND VANCOUVER ZONE 1: Projects within 30 miles of the respective city all. ZONE 2: More than 30 miles but less than 40 miles froM the respective city hall. ZONE 3: More than 4C miles but less than 50 miles fro�n the respective city nall. ZONE 4 : More than 50 miles but iess than 80 miles from the respective city hall. ZONE 5: More than 80 miles from tne respective city ha11. LABORERS CLASSIFICATIONS GROUP 1 ; Asphalt Plant Laborers; Asphalt Spreaders; Batch Weighman; Broomers; Brush Burn2rs and Cutters; Car and Truck Loaders; Carpenter Tender; Change-House Man or Dry Shack Man; Choker Setter; Clean-up Laborers; Curing, Concrete; Demolition, Wreckir�g and Moving Laborers; Dumpe*-s, road oiling crew; Dumpmen (f.or grading crew) ; Elevator Feeders; Median Rail Reference Post, Guide Post, Right of Way Marker; Fine Graders; Fire Watch; Form Strippers (not swinging stages) ; General Labo�ers; Hazardous 6ti'aste Worker; Leverman or Aggregate Spreader (Flaherty and similar types) ; Loading Spctters; Material Yard Man (including electrical) ; Pittsburgh �hipper Operator or Similar Types; R.ailroad Track Laborers; Ribboil Setters (including steel forms) ; Rip Rap Man (har.d placed) ; • Road Pump Tender; Sewer Labor; Signalman; Skipman; Slopers; Spraymen; Stake Chaser; Stockpiler; Tie Back Shorir.g; Timber Faller and Bucker (hand labor) ; Toolroom Man (at job site) ; Tunnel Bullgang (above ground) ; Weight-Man- Crusher (aggregate when used) GROUP 2: Applicator (includi:�g pot power tender for same) , applying nrotective material by 1-hand or nozzle on utility lines or storage tanks on project; Brush Cutters (power saw) ; Burners; Choker Splicer; Clary Power Spreader and similar types; Clean- up Nozzleman-Green Cutter (concrete, rock, etc. ) ; Concrete Power Buggyman; Concrete Laborer; Crusher Feeder; Demo'_ition and Wrecking Charred Ma�erials; Gunite Nozzleman Tender; Gunite or Sand Blasting Pot Tender; Handlers or Mixers of all Materials of an irritating nature (including cement and lime) ; Tco1 Operators (includes but not limited to: Dry Pack Machine; Jack;ammer; Chipping Guns; Paving Breakers} ; Pipe Doping and Wrapping; Post Hole Digger, air, gas or electric; Vibrating Screed; Tampers; Sand Biasting (Wet) ; Stake-Setter; Tunn21-Muckers, I3rakemen, Concrete Crew, Bullgang (underground) WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 32 GROUP 3: Asbestos Removal; Bit Grinder; Drill Doctor; Drill Operators, air tracks, cat drills, wagon drills, rubber-mounted drills, and other similar typ2s including at crusher p'an�s; Gunite Nozzleman; High Scalers, Strippe�s and Drillers (covers work in swingir.g stages, chairs or belts, under extreme conditions unusual to normal driiling, blasting, barring-down, or sloping ar.d stripping) ; Mar.hole Builder; Powdermen; Concrete Saw Operator; Pwdermen; Power Saw Operators (Bucking and Faliing) ; Pumperete Nozzlemen; Sand Blasting (Dry) ; Sewer Timberman; Track Liners, Anchor Machines, Ballast Regulators, Multiple Tampers, Power Jacks, Tugger Operator; Tunnel-Chuck Tenders, Nippers and Timbermen; Vibrator; Water Blaster GROUP 4: Asphalt Raker; Concrete Saw Cperator (walls) ; Concrete Nozzelman; Grade Checker; Pipelayer; Laser Beam (pipelaying)-applicable when employee assigned to move, set up, align; Laser Beam; Tunnel Miners; Motorman-Dinky Locomotive-Tunnel; Powderman-Tunnel; Shield Operator-Tunnel GROUP 5: Traffic Flaggers GROUP 6: Fence Builders GROUP 7: Landscaping or Planting Laborers ---------------------------------------------------------------- LAB00335-019 09/O1/2013 Rates Fringes Hod Carrier. . . . . . . . . . . . . . . . . . . . . .$ 30.97 10.05 ---------------------------------------------------------------- PAIN0005-002 07/0�/2015 STATEWIDE EXCEFT CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH) , SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Painters: STRIPERS. . . . . . . . . . . . . . . . . . . .$ 27.49 14 .09 ---------------------------------------------------------------- PAIN0005-004 03/G1/2009 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AIvD WHATCOM COUNTIES Rates Frir.ges PAINTER. . . . . . . . . . . . . . . . . . . . . . . . . .$ 20.82 7.44 ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction , Page � 33 PAIN0005-006 07/O1/2015 ADAP�IS, ASOTiN; BENTON AND E'RANKLIN (EXCEPT HANFOP.D SI'I'E) ; CHELAN, CULUMBIA, DOliGLAS, FERRY, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PFND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA COLNTIES Rates Fringes PAINTER Application of Cold Tar Products, Epoxies, Polyure thanes, Acids, Radiaticn Resistant Material, Water and Sandblasting. . . . . . . . . . . .$ 28. 15 10.35 Over 30'/Swing Stage Work. .$ 22.20 7.98 Brush, Roller, Striping, Steam-cleaning and Spray. . . .$ 23.05 10.85 Lead Abatement, Asbestos Abatement. . . . . . . . . . . . . . . . . . .5 21.�0 7.98 *$.70 shali be paid over and above the basic wage rates listed for work cn swing stages and high work of over 30 feet. ---------------------------------------------------------------- PAIN0055-003 10/O1/2015 CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes PAINTER Brush & Roller. . . . . . . . . . . . . .$ 22 .97 9.85 High work - All work 60 ft. or higher. . . . . . . . . . . . . . .$ 23.72 9.85 Spray and Sandblastir.g. . . . . .$ 23.57 9.85 ---------------------------------------------------------------- PAIN0055-006 11/Oi/2014 CLARK, �OWLITZ, KLICKITAT, SKAMANIA and "WAHKIAKUM COL'�IT=ES Rates Fringes Painters: HIGHWAY & PARKING LOT STRiPER. . . . . . . . . . . . . . . . . . . . .$ 33.43 11.08 ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 34 PLAS0072-004 06/O1/2015 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND ORE�LLE, SPOKANE, STEV�NS, WALLA WALLA, WHITMAN, AND YAKIMA COUNTIES Rates Fringes CEMENT MASON/CUNCRETE FINISHER ZONE 1. . . . . . . . . . . . . . . . . . . . . .$ 27.01 12.59 Zone Differential (Add to Zone 1 rate) : Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston; W2natchee Zone 1 : 0 - 45 radius miles from tne main post office Zone 2: Over 45 radius miles from the main post office ---------------------------------------------------------------- PLAS0528-001 06/O1/2015 CLALLAM, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON, WAHiCIAKUM AND WI'ATCOM COUNTIES Rates Fringes CEMENT MASON CEMENT MASON. . . . . . . . . . . . . . . .$ 38.52 15.43 COMPOSITION, TROWEL MACHINE, GRINDER, POWER TOOLS, GUNNIT� NOZZLE. . . . . . .$ 39.02 15.43 TROWLING MACHINE OPERATOR ON COMPOSITION. . . . . . . . . . . . . .$ 39.02 15.43 ---------------------------------------------------------------- PLAS0555-002 06/O1/2015 CLARK, KLICKITAT AND SKA�IANIA COUNTIES ZONE 1 : Rates Fringes CEMENT MASON CEMENT MASONS DOING BOTH COMPOSITION/POWER � MACHINERY AND SUSPENDED/HANGING SCAFFOLD. .$ 30.�8 18.18 CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD. . . . . . . . . . . .$ 3U.58 18.18 CEMENT MASONS. . . . . . . . . . . . . . .$ 29. 98 18.1�3 COMPOSITION WORKERS AND POWER MACfIINERY OPERATORS. . .$ 31 .18 la.ia WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 35 Zone Differential (Add To Zone 1 Rates) : Zone 2 - $O.b5 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 3.00 BASE POINTS: BEND, COF.VALLiS, EUGENE, M�llF'ORD, PORTLANU, SALEP�1, THE DALLES, VANCOUVER ZONE l: Projects with_n 30 miles of the respective city hali ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respect'_ve city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city ha11. ZONE 5: More than 80 miles from the respective city hall ---------------------------------------------------------------- TEAM0037-002 C6/O1/2014 CLARK, COWLITZ, KLICKITAT, PACI�'IC (South of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean) , SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Truck drivers: ZONE 1 GROUP 1. . . . . . . . . . . . . . . . . . . .$ 26.90 14.37 GROUP 2. . . . . . . . . . . . . . . . . . . .$ 27.02 14.37 GROUP 3. . . . . . . . . . . . . . . . . . . .$ 27.15 14.37 GROUP 4 . . . . . . . . . . . . . . . . . . . .$ 27.41 14 .37 GROUP 5. . . . . . . . . . . . . . . . . . . .$ 27.03 14.37 GROUP 6. . . . . . . . . . . . . . . . . . . .$ 27.i9 14.37 GROUP 7. . . . . . . . . . . . . . . . . . . .$ 27.99 14 .37 Zone Differential (Add to Zone 1 Rates) : Zone 2 - $0.65 Zor:e 3 - 1 .15 Gone 4 - 1..70 2one 5 - 2.75 BASE POINTS: ASTORIA, THE DALLES, LGNGVIEW AND VANCOUVER ZONE i: Projects witr.in 30 miles or the respective city hall. ZONE 2: More than 30 miles but less than 40 miles f�om the respective city hall. ZONr� 3: More than 90 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than ^00 m�les from the respective city ha] l.. ZONE 5: More than 80 miles from the respective city hall. WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 36 TRUCK DRIVERS CLASSIFICATIONS GROUP 1: A Frame or Hydra lifrt truck w/load bearing surface; Articulated Dump Truc;c; Battery Rebui�ders; Bus or Manhaul Driver; Concrete Buggies (power operated) ; Concrete Pump Truck; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations there of: up to and including 10 cu. yds. ; Lift Jitneys, Fork Lifts (all sizes in loading, unioadi:�g and transporting material on job site) ; Loader and/or Leverman on Concrete Dry Batch Plant (manually operated) ; Pilot Car; Pickup Truck; Solo Flat Bed and misc. Body Trucks, 0-i0 tons; Truck Tender; Truck Mechar.ic Tender; Water Wagons (rated capacity) up to 3,000 gallons; Transit Mix and Wet or Dry Mix - 5 ci:. yds. and under; Lubr_cation Man, Fuei Truck Driver, Tireman, Wash Rack, Steam Cleaner or combir.ations; Team Driver; Slurry Truck Driver or Leverman; Tiremar, GROUP 2: Boom Truck/Hydra-lift or Retracting Crane; Challenger; Dumpsters or similar equipment all sizes; Dump Trucks/Articulated Dumps 6 cu to 10 cu. ; Flaherty Spreader Driver or Leverman; Lowbed Equipment, Flat Bed Semi-trailer o� doubles transporting equipmert or wet or dry materials; Lumber Carrier, Driver-Straddle Carrier (used in loading, unloading and transporting of materials on job site) ; Oil Distributor Driver or Leverman; Transit mix and wet or dry mix trcuks: over 5 cu. yds. and including i cu. yds. ; Vacuum Trucks; Water truck/Wagons (rated capacity) over 3, 000 to 5, 000 gallons GROUP 3: Ammonia Nitrate Distributor Driver; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains or combi�ations thereof: over 10 cu. yds. and includinq 30 cu. yds. includes Articulated Dur�p Trucks; Self-Propelled Street Sweeper; Transit mix and wet or dry mix truck: over 7 cu yds. and including 11 cu yds. ; Truck Mechanic-Welder-Body Repairman; Utility and Clean-up Truck; Water Wagons (rated capacity) over 5, 000 to 10,000 gallons GROUP 4: Asphalt Burner; Dump Trucks, side, end and botLom cumps, including Semi-Trucks and Trains or combinations thereof: over 30 cu. yds. and inc:lud�r.g �0 cu. yds. includes Articulated Dump Trucks; Fire Guard; Transit Mix and Wet or Dry Mix Trucks, over l.l cu. yds. and including 15 cu. yds. ; Water Wagon (rated ca�acity) over 10, 000 gallons to 15, 000 gallons GROUP 5: Composite Crewman; Dump Trucks, side, end and bottom dumps, including Semi Trucks ar,d Trains or combinations thereof: over 50 cu. yds. and including 60 cu. yds. includes Articulated Dump Trticks GROUP 6: Bulk Cement Spreader w/o Auger; Dry Pre-Batch concrete Mix Trucks; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains of combinations thereof: over 60 cu. yds. and including 80 cu. yds. , and includes Articulated Dump Trucks; Skid Truck WA160001 Modification 3 Federal Wage Determinations for Highway Construction . . r . . .. � �.V • Page � 37 GROUP 7: Dump Trucks, side, e:1d and bottom du7:ps, including Semi Trucks and Trains or combinations thereof: over 80 cu. yds. and incl_uding 100 cu. yds. , includes Articulated Dump Trucks; Industrial Lift Truck (mechanical tailgate) ---------------------------------------------------------------- * TEAM0179-001 06/O1/2015 CLALLAM, GRAYS HARBOP., ISLAND, JErFERSON, KING, KITSAP, LEGv'IS, MASON, PACIFIC (Nortr. of a straight line made by extending the north boundary line of GJa�kiakum County west to the Pacific Ocean) , PIERCE, SAN JUAN, SKAGIT, SNGHOMISH, THURSTON AND WHATCOM COUNTIES Rates Fringes Truck drivers: ZONE A: GROUP 1: . . . . . . . . . . . . . . . . . . .$ 32.18 17.27 GROUP 2: . . . . . . . . . . . . . . . . . . .$ 31.34 17 .27 GROUP 3: . . . . . . . . . . . . . . . . . . .$ 28.53 17 .27 GROUP 4: . . . . . . . . . . . . . . . . . . .$ 23.56 17.27 GROUP 5: . . . . . . . . . . . . . . . . . . .$ 31.73 17.27 ZONE B (25-45 miles from cen�er of listed cities*) : Add $.70 per hour to Zone A ra�es. ZONE C (over 45 miles from centr of listed cities*) : Add $1 .00 per hour to Zone A rates. *Zone pay will be calculated f.rom the city center of the following listed cities: BELLINGHAM CENTRALIA RAYMOND OLYMPIA EVERETT SH�LTON ANACORTES BELLEVUE SEATTLE PORT ANGELES MT. VERNON KENT TACOMA PORT TOWNS�ND ABERDEEN BREMERTON TRiTCK DRIVEP.S CLASSIFICATIONS GROUP 1 - "A-frame or �3ydralift" trucks and Boom trucks or sim�lar equ�prne�t when "A" frame or "Hydrali.ft" and Boom truck or similar equipment is used; Buggymobile; Bulk CemenL Tanker; Dumpsters and similar equipmer.t, Tournorockers, Tournowagon, Tournotrailer, Cat GW series, Terra Cobra, Le Tourneau, Westinghouse, I�thye Wagon, Euciid Two and Fcur-Wheeled power �ractor with trailer and similar top-load2d equipment transport=ng material: Dump Trucks, side, end and bettom duMp, including semi-trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional f.or each 10 yard increment; Explos�ve Truck (field mi.x) and similar equipment; Hyster Operators (ha:ldling bulk loose aggregates) ; Lo�abed and �ieavy Duty Trailer; Road Oil Distributor Driver; Spreader, Flaherty Transit mix used exclusively in heavy construction; Water U7agon and Tank WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 38 Truck-3, 000 gallons and over capacity GROUP 2 - Bulllifts, or simil.ar equipment used in loading or unlcading trucks, transporting materials on job site; Dumpsters, and similar equipment, Tournorockers, Tournowagon, Turnotrailer, Cat. D.W. Series, Terra Cobra, Le Tourneau, Westinghouse, Athye wagon, Euclid two and four-wheeled power tractor with trailer and similar top-loaded equipment transporting material: Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations �hereof with less than 16 yards capacity; Flatbed (Dual Rear Axl2) ; Grease Truck, Fuel Truck, Greaser, Battery Service Man and/or Tire Service Man; Leverman and loader at bunkers and batch plants; Oil tank transport; Scissor truck; Slurry Truck; Sno-Go and similar equipment; Swampers; Straddler Carrier (Ross, Hyster) ar,d similar equipment; Team Driver; Tractor (small, rubber-tired) (when used within T2amster jurisdiction) ; Vacuum truck; Water Wagon and Tank trucks-less than 3, 000 gallons capacity; Winch Truck; Wrecker, Tow truck and similar equipment GROUP 3 - Flatbed (single rear axle) ; Pickup Sweeper; Pickup Truck. (Adjust Group 3 upward by $2.00 per hour for onsite work only) GRCUP 4 - Escort or Pilot Car GROUP 5 - Merhanic HAZi�IAT PROJECTS Anyone working on a f?AZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit." LEVEL A: +$.75 per hour - This level utilizes a fully- encapsulated suit with a self-contained breathing apparatus or a supplied air 1ine. -------------=-------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction � Page � 39 TEx�o6ao-oo4 oi�oi�2oi4 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPCKANE, STEVENS, WALLA WAL,LA, WHITMAN AND YAF:IMA COUNTIES Rates Fringes Truck dr-vers: (AREA 1: SPOKANE ZONE C�NTER: P.dams,Chelan, Douglas, Ferry, Grant, Kittitas, Lincoln, Okanogan, Fen Oreille,Spokane, Stevens, and Whitman Counties AREA l: LEWISTON ZONE CENT�R: Asotin, Columbia, and Garfield Count�es AR�A 2: PASCO ZUNE CENTER: Benton, Franklin, Walla Walla and Yakima Counties AREA 1: GROUP 1 . . . . . . . . . . . . . . . . . . . .$ 20.17 15.19 CROUP 2. . . . . . . . . . . . . . . . . . . .$ 22.44 15.19 GRCUP 3. . . . . . . . . . . . . . . . . . . .$ 22. 94 15.i9 GROJP 4. . . . . . . . . . . . . . . . . . . .$ 23.27 15.19 GROUP 5. . . . . . . . . . . . . . . . . . . .$ 23.38 15.19 GROUP 6. . . . . . . . . . . . . . . . . . . .$ 23.55 15.19 GRCtiP 7. . . . . . . . . . . . . . . . . . . .$ 24 .08 15.19 GROUP 8. . . . . . . . . . . . . . . . . . . .$ 24.44 15.19 AREA 2 GP.CUP 1. . . . . . . . . . . . . . . . . . . .$ 21.77 15.19 GROUP 2. . . . . . . . . . . . . . . . . . . .$ 29 .31 15.19 GROUP 3. . . . . . . . . . . . . . . . . . . .$ 24 .42 15.19 GROUP 4. . . . . . . . . . . . . . . . . . . .$ 29 .75 15.19 GROUP �. . . . . . . . . . . . . . . . . . . .$ 24 .�6 15.19 GROUP 6. . . . . . . . . . . . . . . . . . . .$ 25.02 15.19 GROUP 7. . . . . . . . . . . . . . . . . . . .$ 25.56 15.19 GROUP 8. . . . . . . . . . . . . . . . . . . .$ 25.88 15.19 Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00) BASE PCIi�TS: Spokane, Pasco, Lewiston Zone 1 : 0-4� radius miles from the main post office. Zone 2: Outside 45 radius miles fr_om the main post office TRUCK DRIVERS CLASSIFIC.ATIONS GROUP 1: Escort Driver or Pilot Car; Employee Haul; Power Boat Haulir�g Empioyees or Material GROUP 2: Fish Tr�ack; Flat Bed Truck; Fork Lift (3000 lbs. and under) ; Leverperson (loading trucks at bunkers) ; Trailer Mounted Hydro Seeder and Mulcher; Seeder & Mulcher; Stationary Fue1 Opera`or; Tractor (small, rubber-tired, pulling trailer or similar equipment) WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 40 GROUP 3: Auto Crane (2000 lbs. capacity) ; Buggy Mebile & Similar; Bulk Cem2nt Tanics & Spreader; Dumptor (6 yds. & under) ; Flat Bed Truck with Hydraullic System; Fork Lift (3001-16,000 lbs. ) ; Fuel Truck Griver, Steamcleaner & Washer; Power Operated Sweeper; Rubber-tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driv?r; Straddle Carrier (Ross, Hyster, & similar) ; Tireperson; Transit Mixers & Truck Hauling Concrete (3 yd. to & including 6 yds. ) ; Trucks, side, end, bottom & articulated end dump (3 yards to and including 6 yds. ) ; Warehouseperson (to include shipping & receiving) ; Wrecker & Tew Truck GROUP 4: A-Frame; Burner, Cutter, & Welder; Service Greaser; Trucks, side, end, bottom & articulated end dump (over o yards to and including 12 yds. ) ; Truck Moun�ed Hydro Seeder; Warehouseperson; Water Tank truck (0-8,000 gallons) GROUP 5: Dumptor (over 6 yds. ) ; Lowboy (50 tons & ander� ; Self- loading Roll Off; Semi-Truck & Trailer; Tractor with Steer Trailer; Transit Mixers and Trucks Hauling Concrete (over 6 yds. to and including 10 yds. ) ; Trucks, side, end, bottom and er.d dump (over 12 yds. ro & including 20 yds.) ; Truck-Mounted Crane (with load bearing surface either mounted or pulled, up to 14 ton) ; Vacuum Truck (super sucker, guzzler, etc. ) �ROUP 6: Flaherty Spreader Box Driver; Flowboys; Fork Lift (over 16, 000 lbs. ) ; Durr,ps (Semi-end) ; Mechanic (Field) ; Semi- end Dumps; Transfer Truck & Trailer; Transit Mixers & Trucks Haulir.g Concrete (over 10 yds. to & including 20 yds. ) ; Trucks, side, end, bo*tom and articulated end dump (over 20 yds. to & including 40 yds. ) ; Truck and Pup; Tournarocker, DWs & similar with 2 or more 4 wheel-power tractor with trailer, gallonage or yardage scaie, whichever is greater Water Tank Truck (8, OOi- 14, 000 ga�lons) ; Lowboy(over 50 tons) GROUP 7: Oil Distributor Driver; Stringer Truck (cable oeprated trailer) ; Transit Mixers & Trucks Hauling Concrete (over 20 yds. ) ; Truck, side, er.d, bottom end dump (over 40 yds. to & includi:�g 100 yds. ) ; Truck Mounted Crane (with load bearing surface either mounted cr pulled (16 through 25 tons) ; GROUP 8: Prime Movers and Stinger Truck; Trucks, side, end, bottom and articulated end dump (over 100 yds. ) ; Helicopter Pilot Hauling Employees or Mater�als Footnote A - Anyone working on a HAZMAT job, where i�AZN�T certi.fication is required, shall be compensa~ed as a premium, in additon to the classification working in as follows: LEVEL C-D: - $.50 PER HOUR (This i.s the lowest level of protection. This level may use an air purifying respirator or additionai protective clothing. WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 41 LEVEL A-B: - $1.00 PER HOUR (Uses supplied air is conjunction with a chemical spash suit or fully encapsulated suit with a self-contained breathing apparatus. Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours. NOTE: Trucks Pulling Equipment Trailers: shall receive $. 15/hour , over applicable truck rate ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the ci�ed type (s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "ident�fiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local) , a survey rate (weighted average rate) or a union averaqe rate (weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SJ" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/O1/2014 . PLUM is an abbreviation identifier of the union which prevailed in the survey for this class'fication, whi��h in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e. , Plumbers Loca1 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/O1/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 42 Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on ali the rates reported in tne survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014 . SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that ider,tifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier ir.dicate that no single majority rate prevailed for those classifications; however, 100� of the data reported for the classifications was union data. EXAr1PLE: UAVG-OH-0010 08/29/2019 . UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The rext number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 43 WAGE DETERMINATION APPEALS PROCESS 1 . ) Has there been an initial decision in the matter? This can be. * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If tY:e response from this initial contact is not satisfactory, then the process described in 2. ) and 3. ) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Bra:�ch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Div�sion U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2. ) If the answer to the question in 1. ) is yes, then an inte�ested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 WA160001 Modification 3 Federal Wage Determinations for Highway Construction Page � 44 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc. ) that the requestor considers relevant to the issue. 3. ) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. -------------------- ----------------------------�---------------- ---------------------------------------------------------------- END OF GENERAL DECISION WA160001 Modification 3 Federal Wage Determinations for Highway Construction ADDENDiJM NO. 1 To Contract Documents For Austin Drive Pavement Preservation (Federal Aid Project#STPUS-6639(001) Page 1 of 1 Issued: August 2, 2016 Contents: This Addendum No. 1 contains revision to the Proposal. Revisions are made by re- issuing a specification page, plan sheet, OR by directing a change in writing. All revisions are listed below; bidders are cautioned to check the addendum contents carefully for the presence of all listed revisions. Distribution: This Addendum No. 1 is distributed to all planholders of record by e-mail to e- mail addresses or facsimile to numbers given when documents were purchased. The planholder will be asked to confirm receipt when e-mailed. Integration: The following changes, additions, deletions and attachments are hereby made a part of the Contract Documents for Austin Drive Pavement Preservation Proiect as fully and completely as if the same were fully set forth therein. Acknowledgment of Receipt of Addendum: All prospective bidders are instructed to incorporate this revision into their bids and to acknowledge receipt of the Addenda in the Proposal. Failure to do so may result in the Bid being rejected as not responsive. Enclosures to Addendum 1: Proposal. REVISIONS TO PROPOSAL Replace the Proposal in the Contract Documents with the attached. B Gus Brandon Garcia Project Manager City of Bremerton - END OF ADDENDUM NO. 1 - ADDEI�ID�JM NO. 2 To Contract Documents For Austin Drive Pavement Preservation (Federal Aid Project#STPUS-6639(001) Page 1 of 1 Issued: Augast 3, 2016 Contents: This Addendum No. 2 contains revisions to the contract documents, including the Notice Inviting Bids, Proposal, Plans, and the Special Provisions. Revisions are made by re- issuing a specification page, plan sheet, OR by directing a change in writing. All revisions are listed below; bidders are cautioned to check the addendum contents carefully for the presence of all listed revisions. Distribution: This Addendum No. 2 is distributed to all planholders of record by e-mail to e- mail addresses or facsimile to numbers given when documents were purchased. The planholder will be asked to confirm receipt when e-mailed. Inte�ration: The followin� changes, additions, deletions and attachments are hereby made a part of the Contract Documents for (Austin Drive Pavement Preservation Proiect) as fully and completely as if the same were fully set forth therein. Acknowledeenent of Receipt of Addendum: All prospective bidders are instructed to incorporate this revision into their bids and to acknowledge receipt of the Addenda in the Proposal. Failure to do so may result in the Bid being rejected as not responsive. Enclosures to Addendum 2: Plan Sheet PP1 REVISIONS TO PLANS Item: 1 Page: Sheet 21 Description: Add permanent signing(sign W17-1) to sheet PP1 for speed hump advanced warning REVISYONS TO CON'PRACT �OOK Item: 2 Page: SP 15 and SP 16 Description: I)elete section 1-05.18 "Record Drawings" in iks entirety. Item: 3 Page: SP 47 Description: Revise the sections Measurement and Payment of 8-22 Pavement Markings to read "Per Lineal Foot" � Gus randon Garcia Project Manager City of Bremerton - END OF ADDENDUM NO. 2 - : � Client#: 12492 PUGEPAVI . ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE�MM/DD/YYYY) 8/19/2016 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Propel Insurance PHONE Casondra Mossuto F� ac,No,Exi:$00 499-0933 �ac,No�: 866 577-1326 Tacoma Commercial Insurance E-MAIL casondra.mossuto@propelinsurance.com 1201 Pacific Ave,Suite 1000 aooRess: INSURER�S)AFFORDING COVERAGE NAIC# Tacoma,WA 98402 iNsuReR n:West American Insurance Company 44393 INSURED ;INSURER B:TIl@ OI710 C8SU8It)/IfISUfBfIC@ 24074 Puget Paving 8 iNsuReR c:Homeland Insurance Company 34452 Construction Inc. 10817 26th Ave.S. ir+suReR o:Ohio Security Insurance Company 24082 Lakewood,WA 98499 INSURERE: I INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN RE�UCED BY PAID CLAIMS. TRR TYPE OF INSURANCE ADDL SUBR� POLICY EFF POLICY EXP INSR NND POLICY NUMBER MMIDDIYYYY MM/DDIWYY LIMITS A GENERAL LIABILITY X X BKW56813034 6N 0/2016 06/10/201 EACH OCCURRENCE $��OOO�OOO X COMMERCIAL GENERAL LIABILITY PREMISES Ea oocur°nce $1 OOO OOO CLAIMS-MADE �OCCUR MED EXP(Any one person) $�rJ���� X PD Ded: $250 PERSONAL 8 ADV INJURY $��OOO�OOO GENERALAGGREGATE $Z,OOO,OOO GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $Z�OOO�OOO POLICY X jE� LOC g p AUTOMOBILE LIABILITY X X BAS56071416 6/10/2016 06/10/201 EOM�BcIN�BD�SINGLE LIMIT ,�r000,o00 X ANY AUTO BODILY INJURY(Per person) $ ALLOWNED SCHEDULED i AUTOS AUTOS BODILY INJURY(Per acadenl) 5 X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS � Per accident $ S B X UMBRELLALIAB X OCCUR X X •US056071416 sI�O/LO�s OG/�O/ZO�T EACHOCCURRENCE $5 Q��QQQ EXCESS LIAB CLAIMS-MADE AGGREGATE $5 OOO OOO DED X RETENTION S�O OOO $ A WORKERS COMPENSATION BKW56813034 s����20�6 Os����20� WC STATU- OTH- AND EMPLOYERS'LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE Y�N 'WA StOF1 G8p E.L EACH ACCIDENT $� OOO OOO OFFICERIMEMBER EXCLUDED7 ❑ N/A (Mandatory In NH) E L DISEASE-EA EMPLOYEE $�,OOO�OOO If yes,describe under DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT $�,OOO,OOO C Pollution Liab. X X 7930016910002 12/04/2015 12/04/2016 Occ: $2MM Agg: $2MM I Deductible:$5,000 I. A Install Floater BKVV56813034 6/10/2016 06/10/201T $100,000/Ded: $500 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(Attach ACORD 701,Additlonal Remarks Schedule,If more space Is required) RE: Project#42102;Austin Drive Pavement Preservation. The City of Bremerton and its officers,elected officials,employees,agents,and volunteers are additional insured per the attached endorsement. CERTIFICATE HOLDER CANCELLATION City of Bremerton SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 3027 Olympus rive NE ACCORDANCE WITH THE POLICY PROVISIONS. Bremerton,WA 98310 AUTHORIZED REPRESENTATIVE O 1988-2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010/05) � pf� The ACORD name and logo are registered marks of ACORD #S2338856/M2241108 KTR00 . This page has been left blank intentionally. . � COMMERCIAL GENERAL LIABILITY CG 85 83 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED CONTRACTORS - PRODUCTS/COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Paragraph 2. under Section II -Who Is An Insured is amended to include as an insured any person or organization whom you have agreed to add as an additional insured in a written contract or written agreement. Such person or organization is an additional insured but only with respect to liability for "bodily injury" or "property damage": 1. Caused by "your work" performed for that additional insured that is the subject of the written contract or written agreement; and 2. Included in the "products-completed operations hazard". However: a) The insurance afforded to such additional insured only applies to the extent permitted by law; and b) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured The insurance provided by this endorsement applies only if the written contract or written agreement is signed prior to the "bodily injury" or "property damage". We have no duty to defend an additional insured under this endorsement until we receive written notice of a "suit" by the additional insured as required in Paragraph b. of Condition 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit under Section IV -Commercial General Liability Conditions. B. With respect to the insurance provided by this endorsement, the following are added to Paragraph 2. Exclusions under Section I -Coverage A-Bodily Injury And Property Damage Liability: This insurance does not apply to: � 1. "Bodily injury" or "property damage" that occurs prior to you commencing operations at the ° location where such "bodily injury" or "property damage" occurs. 2. "Bodily injury" or "property damage" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services including: a. The preparing, approving or failure to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawing and specifications; and b. Supervisory, inspection, architectural or engineering activities. � 2013Liberty Mutual Insurance CG 85 83 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission . Page 1 of 2 : . C. With respect to the insurance afforded by this endorsement, exclusion I. Damage To Your Work of Paragraph 2. Exclusions under Section I - Coverage A -Bodily Injury And Property Damage Liability is replaced by the following: I. Damage To Your Work "Property damage" to "your work" arising out of it or any part of it and included in the "products- completed operations hazard". D. With respect to the insurance afforded to these additional insureds, the following is added to Section II - Limits of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by contract or agreement; or � 2. Available under the applicable Limits of Insurance shown in the Declaration. whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declaratio ns. E. With respect to the insurance afforded by this endorsement, Section IV -Commercial General Liability � Conditions is amended as follows: 1. The following is added to Paragraph 2. Duties In The Event Of Occurrence, Offense, Claims Or Suit: An additional insured under this endorsement will as soon as practicable: a. Give written notice of an "occurrence" or an offense that may result in a claim or "suit" under this insurance to us; � b. Tender the defense and indemnity of any claim or "suit" to all insurers whom also have insurance available to the additional insured; and c. Agree to make available any other insurance which the additional insured has for a loss we . cover under this Coverage Part. d. We have no duty to defend or indemnify an additional insured under this endorsement until we receive written notice of a"suit" by the additional insured. 2. Paragraph 4. of Section IV -Commercial General Liability Conditions is amended as follows: a. The following is added to Paragraph a. Primary Insurance: If an additional insured's policy has an Other Insurance provision making its policy excess, and you have agreed in a written contract or written agreement to provide the additional insured coverage on a primary and noncontributory basis, this policy shall be primary and o we will not seek contribution from the additional insured's policy for damages we cover. b. The following is added to Paragraph b. Excess Insurance: n When a written contract or written agreement, other than a premises lease, facilities rental contract or agreement, an equipment rental or lease contract or agreement, or permit issued by a state or political subdivision between you and an additional insured does not require this insurance to be primary or primary and non-coniributory, this insurance is excess over any other insurance for which the additional insured is designated as a Named Insured. Regardless of the written agreement between you and an additional insured, this insur- ance is excess over any other insurance whether primary, excess, contingent or on any other basis for which the additional insured has been added as an additional insured on other policies. � 2013 Liberty Mutual Insurance CG 85 83 04 13 Includes copyrighted material of Insurance Services Office,Inc.,with its permission . Page 2 of 2 . COMMERCIAL GENERAL LIABILITY CG 88 10 0413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY EXTENSION This endorsement modifies insurance provided under the foilowing: COMMERCIAL GENERAL LIABILITY COVERAGE PART INDEX SUBJECT PAGE NON-OWNED AIRCRAFT 2 NON-OWNED WATERCRAFT 2 PROPERTY DAMAGE LIABILITY—ELEVATORS 2 EXTENDED DAMAGE TO PROPERTY RENTED TO YOU (Tenant's Property Damage) 2 MEDICAL PAYMENTS EXTENSION 3 EXTENSION OF SUPPLEMENTARY PAYMENTS—COVERAGES A AND B 3 ADDITIONAL INSUREDS—BY CONTRACT,AGREEMENT OR PERMIT 3 PRIMARY AND NON-CONTRIBUTORY—ADDITIONAL INSURED EXTENSION 5 ADDITIONAL INSUREDS—EXTENDED PROTECTION OF YOUR"LIMITS OF INSURANCE" 6 WHO IS AN INSURED—INCIDENTAL MEDICAL ERRORS/MALPRACTICE AND WHO IS AN INSURED— 6 FELLOW EMPLOYEE EXTENSION —MANAGEMENT EMPLOYEES NEWLY FORMED OR ADDITIONALLY ACQUIRED ENTITIES 7 �� FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES 7 KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT 7 LIBERALIZATION CLAUSE 7 BODILY INJURY REDEFINED 7 EXTENDED PROPERTY DAMAGE 8 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US— 8 WHEN REQUIRED IN A CONTRACT OR AGREEMENT WITH YOU O 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Page 1 of 8 With respect to coverage afforded by this endorsement,the provisions of the policy apply unless modified by the endorsement. A. NON-OWNED AIRCRAFT Under Paragraph 2. Exclusions of Section I—Coverage A-Bodily Injury And Property Damage Liability, exclusion g.Aircraft,Auto Or Watercraft does not apply to an aircraft provided: 1. It is not owned by any insured; 2. It is hired, chartered or loaned with a trained paid crew; 3. The pilot in command holds a currently effective certificate, issued by the duly constituted authority of the United States of America or Canada, designating her or him a commercial or airline pilot; and 4. It is not being used to carry persons or property for a charge. However,the insurance afforded by this provision does not apply if there is available to the insured other valid and collectible insurance,whether primary, excess (other than insurance written to apply specifically in excess of this policy), contingent or on any other basis,that would also apply to the loss covered under this provision. B. NON-OWNED WATERCRAFT Under Paragraph 2. Exclusions of Section I—Coverage A—Bodily Injury And Property Damage Liability, Subparagraph (2) of exclusion g.Aircraft,Auto Or Watercraft is replaced by the following: This exclusion does not apply to: (2) A watercraft you do not own that is: (a) Less than 52 feet long; and (b) Not being used to carry persons or property for a charge. C. PROPERTY DAMAGE LIABILITY—ELEVATORS 1. Under Paragraph 2. Exclusions of Section I—Coverage A—Bodily Injury And Property Damage Liability, Subparagraphs(3), (4)and (6)of exclusion j. Damage To Property do not apply if such "property damage" results from the use of elevators. For the purpose of this provision, elevators do not include vehicle lifts. Vehicle lifts are lifts or hoists used in automobile service or repair operations. 2. The following is added to Section IV—Commercial General Liability Conditions, Condition 4. Other Insurance, Paragraph b. Excess Insurance: The insurance afforded by this provision of this endorsement is excess over any property insurance, whether primary, excess, contingent or on any other basis. D. EXTENDED DAMAGE TO PROPERTY RENTED TO YOU (Tenant's Property Damage) If Damage To Premises Rented To You is not otherwise excluded from this Coverage Part: 1. Under Paragraph 2. Exclusions of Section I -Coverage A-Bodily Injury and Property Damage Liability: a. The fourth from the last paragraph of exclusion j. Damage To Property is replaced by the following: Paragraphs(1), (3) and (4)of this exclusion do not apply to"property damage" (other than damage by fire, lightning, explosion, smoke, or leakage from an automatic fire protection system) to: (i) Premises rented to you for a period of 7 or fewer consecutive days; or (ii) Contents that you rent or lease as part of a premises rental or lease agreement for a period of more than 7 days. Paragraphs(1), (3)and (4)of this exclusion do not apply to"property damage"to contents of premises rented to you for a period of 7 or fewer consecutive days. A separate limit of insurance applies to this coverage as described in Section III—Limits of Insurance. O 2013 Liberty Muival Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Page 2 of 8 b. The last paragraph of subsection 2. Exclusions is replaced by the following: Exclusions c.through n. do not apply to damage by fire, lightning, explosion, smoke or leakage from automatic fire protection systems to premises while rented to you or temporarily occupied by you with permission of the owner.A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III—Limits Of Insurance. 2. Paragraph 6. under Section III—Limits Of Insurance is replaced by the following: 6. Subject to Paragraph 5. above,the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of"property damage"to: a. Any one premise: (1) While rented to you; or (2) While rented to you or temporarily occupied by you with permission of the owner for damage by fire, lightning, explosion, smoke or leakage from automatic protection systems; or b. Contents that you rent or lease as part of a premises rental or lease agreement. 3. As regards coverage provided by this provision D. EXTENDED DAMAGE TO PROPERTY RENTED TO YOU (TenanYs Property Damage) -Paragraph 9.a. of Definitions is replaced with the following: 9.a. A contract for a lease of premises. However,that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion, smoke, or leakage from automatic fire protection systems to premises while rented to you or temporarily occupied by you with the permission of the owner, or for damage to contents of such premises that are included in your premises rental or lease agreement, is not an "insured contracY'. E. MEDICAL PAYMENTS EXTENSION If Coverage C Medical Payments is not otherwise excluded,the Medical Payments provided by this policy are amended as follows: Under Paragraph 1. Insuring Agreement of Section I—Coverage C—Medical Payments, Subparagraph (b)of Paragraph a. is replaced by the following: ' (b) The expenses are incurred and reported within three years of the date of the accident; and F. EXTENSION OF SUPPLEMENTARY PAYMENTS—COVERAGES A AND B 1. Under Supplementary Payments—Coverages A and B, Paragraph 1.b. is replaced by the following: b. Up to$3,000 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 2. Paragraph 1.d. is replaced by the following: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or"suit", including actual loss of earnings up to$500 a day because of time off from work. G. ADDITIONAL INSUREDS-BY CONTRACT,AGREEMENT OR PERMIT 1. Paragraph 2. under Section II—Who Is An Insured is amended to include as an insured any person or organization whom you have agreed to add as an additional insured in a written contract,written agreement or permit. Such person or organization is an additional insured but only with respect to liability for"bodily injury", "property damage"or"personal and advertising injury" caused in whole or in part by: a. Your acts or omissions, or the acts or omissions of those acting on your behalf, in the pertormance of your on going operations for the additional insured that are the subject of the written contract or written agreement provided that the"bodily injury"or"property damage" occurs, or the"personal and advertising injury" is committed, subsequent to the signing of such written contract or written agreement; or O 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Page 3 of 8 b. Premises or facilities rented by you or used by you; or c. The maintenance, operation or use by you of equipment rented or leased to you by such person or organization; or d. Operations perFormed by you or on your behalf for which the state or political subdivision has issued a permit subject to the following additional provisions: (1) This insurance does not apply to"bodily injury", "property damage", or"personal and advertising injury" arising out of the operations performed for the state or political subdivision; (2) This insurance does not apply to"bodily injury° or"property damage" included within the "completed operations hazard". (3) Insurance applies to premises you own, rent, or control but only with respect to the following hazards: a) The existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoist away openings, sidewalk vaults, street banners, or decorations and similar exposures; or (b) The construction, erection, or removal of elevators; or (c) The ownership, maintenance, or use of any elevators covered by this insurance. H owever: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement,the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. With respect to Paragraph 1.a. above, a person's or organization's status as an additional insured under this endorsement ends when: (1) All work, including materials, parts or equipment furnished in connection with such work, on the project(other than service, maintenance or repairs)to be performed by or on behalf of the additional insured(s)at the location of the covered operations has been completed; or (2) That portion of"your work"out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. With respect to Paragraph 1.b. above, a person's or organization's status as an additional insured under this endorsement ends when their written contract or written agreement with you for such premises or facilities ends. With respects to Paragraph 1.c. above, this insurance does not apply to any"occurrence"which takes place after the equipment rental or lease agreement has expired or you have returned such equipment to the lessor. The insurance provided by this endorsement applies only if the written contract or written agreement is signed prior to the"bodily injury"or"property damage". We have no duty to defend an additional insured under this endorsement until we receive written notice of a"suit" by the additional insured as required in Paragraph b.of Condition 2. Duties In the Event Of Occurrence, Offense, Claim Or Suit under Section IV—Commercial General Liability Conditions. OO 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Page 4 of 8 2. With respect to the insurance provided by this endorsement, the following are added to Paragraph 2. Exclusions under Section I -Coverage A-Bodily Injury And Property Damage Liability: 0 This insurance does not apply to: a. "Bodily injury"or"property damage"arising from the sole negligence of the additional insured. b. "Bodily injury"or"property damage"that occurs prior to you commencing operations at the location where such"bodily injury" or"property damage"occurs. c. "Bodily injury", "property damage"or"personal and advertising injury"arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys,field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the"occurrence"which caused the"bodily injury" or"property damage", or the offense which caused the"personal and advertising injury", involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. d. "Bodily injury"or"property damage"occurring after: (1) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be perFormed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or (2) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. e. Any person or organization specifically designated as an additional insured for ongoing operations by a separate ADDITIONAL INSURED—OWNERS, LESSEES OR CONTRACTORS endorsement issued by us and made a part of this policy. 3. With respect to the insurance afforded to these additional insureds, the following is added to Section III— Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement,the most we will pay on behalf of the additional insured is the amount of insurance: a. Required by the contract or agreement; or b. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. H. PRIMARY AND NON-CONTRIBUTORY ADDITIONAL INSURED EXTENSION This provision applies to any person or organization who qualifies as an additional insured under any form or endorsement under this policy. Condition 4. Other Insurance of SECTION IV—COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: a. The following is added to Paragraph a. Primary Insurance: If an additional insured's policy has an Other Insurance provision making its policy excess, and you have agreed in a written contract or written agreement to provide the additional insured coverage on a primary and noncontributory basis, this policy shall be primary and we will not seek contribution from the additional insured's policy for damages we cover. O 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. Page 5 of 8 b. The following is added to Paragraph b. Excess Insurance: When a written contract or written agreement, other than a premises lease, facilities rental contract or agreement, an equipment rental or lease contract or agreement, or permit issued by a state or political subdivision between you and an additional insured does not require this insurance to be primary or primary and non-contributory, this insurance is excess over any other insurance for which the additional insured is designated as a Named Insured. Regardless of the written agreement between you and an additional insured, this insurance is excess over any other insurance whether primary, excess, contingent or on any other basis for which the additional insured has been added as an additional insured on other policies. I. ADDITIONAL INSUREDS -EXTENDED PROTECTION OF YOUR"LIMITS OF INSURANCE" This provision applies to any person or organization who qualifies as an additional insured under any form or endorsement under this policy. 1. The following is added to Condition 2. Duties In The Event Of Occurrence, Offense, Claim or Suit: An additional insured under this endorsement will as,soon as practicable: a. Give written notice of an"occurrence"or an offense that may result in a claim or"suit" under this insurance to us; b. Tender the defense and indemnity of any claim or"suiY'to all insurers whom also have insurance available to the additional insured; and c. Agree to make available any other insurance which the additional insured has for a loss we cover under this Coverage Part. d. We have no duty to defend or indemnify an additional insured under this endorsement until we receive written notice of a "suiY'by the additional insured. 2. T h e l i m i t s o f i n s u r a n c e a p p l i c a b l e t o t h e a d d i t i o n a l i n s u r e d a r e t h o s e s p e c i f i e d i n a w r i tt e n c o n t r a c t o r written agreement or the limits of insurance as stated in the Declarations of this policy and defined in Section III—Limits of Insurance of this policy,whichever are less. These limits are inclusive of and not in addition to the limits of insurance available under this policy. J. WHO IS AN INSURED-INCIDENTAL MEDICAL ERRORS/MALPRACTICE WHO IS AN INSURED-FELLOW EMPLOYEE EXTENSION -MANAGEMENT EMPLOYEES Paragraph 2.a.(1)of Section II -Who Is An Insured is replaced with the following: (1) "Bodily injury"or"personal and advertising injury": (a) To you,to your partners or members (if you are a partnership or joint venture),to your members (if you are a limited liability company), to a co-"employee"while in the course of his or her employment or performing duties related to the conduct of your business, or to your other "volunteer workers"while performing duties related to the conduct of your business; (b) To the spouse, child, parent, brother or sister of that co-"employee"or"volunteer worker"as a consequence of Paragraph (1) (a) above; (c) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in Paragraphs (1) (a)or(b)above; or (d) Arising out of his or her providing or failing to provide professional health care services. However, if you are not in the business of providing professional health care services or providing professional health care personnel to others, or if coverage for providing professional health care services is not otherwise excluded by separate endorsement, this provision (Paragraph (d))does not apply. O 2013 Liberty Mutual Insurance CG 88 10 0413 Includes copyrighted material of Insurance Services Office, Inc,with its permission. Page 6 of 8 Paragraphs(a) and (b) above do not apply to"bodily injury° or"personal and advertising injury"caused by an "employee"who is acting in a supervisory capacity for you. Supervisory capacity as used herein means the "employee's"job responsibilities assigned by you, includes the direct supervision of other"employees"of yours. However, none of these"employees" are insureds for"bodily injury" or"personal and advertising injury"arising out of their willful conduct,which is defined as the purposeful or willful intent to cause"bodily injury"or"personal and advertising injury°, or caused in whole or in part by their intoxication by liquor or controlled substances. The coverage provided by provision J. is excess over any other valid and collectable insurance available to your "employee". K. NEWLY FORMED OR ADDITIONALLY ACQUIRED ENTITIES Paragraph 3. of Section II-Who Is An Insured is replaced by the following: 3. Any organization you newly acquire or form and over which you maintain ownership or majority interest, will qualify as a Named Insured if there is no other similar insurance available to that organization. However: a. Coverage under this provision is afforded only until the expiration of the policy period in which the entity was acquired or formed by you; b. Coverage A does not apply to"bodily injury"or"property damage"that occurred before you acquired or formed the organization; and c. Coverage B does not apply to"personal and advertising injury"arising out of an offense committed before you acquired or formed the organization. d. Records and descriptions of operations must be maintained by the first Named Insured. No person or organization is an insured with respect to the conduct of any current or past partnership,joint venture or limited liability company that is not shown as a Named Insured in the Declarations or qualifies as an insured under this provision. L. FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES Under Section IV—Commercial General Liability Conditions,the following is added to Condition 6. Representations: Your failure to disclose all hazards or prior"occurrences"existing as of the inception date of the policy shall not prejudice the coverage afforded by this policy provided such failure to disclose all hazards or prior"occurrences" is not intentional. M. KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT Under Section IV—Commercial General Liability Conditions,the following is added to Condition 2. Duties In The Event of Occurrence, Offense, Claim Or Suit: Knowledge of an"occurrence", offense, claim or"suiY' by an agent, servant or"employee"of any insured shall not in itself constitute knowledge of the insured unless an insured listed under Paragraph 1. of Section II—Who Is An Insured or a person who has been designated by them to receive reports of "occurrences", offenses, claims or"suits" shall have received such notice from the agent, servant or "employee". N. LIBERALIZATION CLAUSE If we revise this Commercial General Liability Extension Endorsement to provide more coverage without additional premium charge, your policy will automatically provide the coverage as of the day the revision is effective in your state. O. BODILY INJURY REDEFINED Under Section V—Definitions, Definition 3. is replaced by the following: 3. "Bodily Injury" means physical injury, sickness or disease sustained by a person. This includes mental anguish, mental injury, shock, fright or death that results from such physical injury, sickness or disease. O 2013 Liberty Mutual Insurance CG 88 10 0413 Includes copyrighted malerial of Insurance Services Office, Inc,with its permission. Page 7 Of 8 P. EXTENDED PROPERTY DAMAGE Exclusion a. of COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE LIABILITY is replaced by the following: a. Expected Or Intended Injury "Bodily injury"or"property damage"expected or intended from the standpoint of the insured. This exclusion does not apply to"bodily injury"or"property damage" resulting from the use of reasonable force to protect persons or property. Q. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US—WHEN REQUIRED IN A CONTRACT OR AGREEMENT WITH YOU Under Section IV—Commercial General Liability Conditions, the following is added to Condition 8. Transfer Of Rights Of Recovery Against Others To Us: We waive any right of recovery we may have against a person or organization because of payments we make for injury or damage arising out of your ongoing operations or"your work"done under a contract with that person or organization and included in the"products-completed operations hazard"provided: 1. You and that person or organization have agreed in writing in a contract or agreement that you waive such rights against that person or organization; and 2. The injury or damage occurs subsequent to the execution of the written contract or written agreement. O 2013 Liberty Mutual Insurance CG 88 10 04 13 Includes copyrighted material of Insurance Services Office, Inc.,with its permission Page 8 Of 8 COMMERCIAL GENERAL LIABILITY CG 88 70 12 08 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONSTRUCTION PROJECT(S) - GENERAL AGGREGATE LIMIT (PER PROJECT) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. For all sums which the insured becomes legally obligated to pay as damages caused by"occurrences" under Section I—Coverage A-Bodily Injury And Property Damage Liability, and for all medical � expenses caused by accidents under Section I—Coverage C Medical Payments,which can be attributed only to ongoing operations at a single construction project away from premises owned by or rented to you: 1. A separate Construction Project General Aggregate Limit applies to each construction project, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under Coverage A, except damages because of"bodily injury"or"property damage" included in the"products-completed operations hazard", and for medical expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or"suits"brought; or c. Persons or organizations making claims or bringing "suits". 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Construction Project General Aggregate Limit for that construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Construction Project General Aggregate Limit for any other construction project. i 4. The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Construction Project General Aggregate Limit. B. For all sums which the insured becomes legally obligated to pay as damages caused by"occurrences" under Section I—Coverage A-Bodily Injury And Property Damage Liability, and for all medical expenses caused by accidents under Section I—Coverage C Medical Payments,which cannot be attributed only to ongoing operations at a single construction project away from premises owned by or rented to you: 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products-Completed Operations Aggregate Limit,whichever is applicable; and 2. Such payments shall not reduce any Construction Project General Aggregate Limit. C. When coverage for liability arising out of the"products-completed operations hazard" is provided, any payments for damages because of"bodily injury"or"property damage" included in the"products- completed operations hazard"will reduce the Products-Completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Construction Project General Aggregate Limit. D. If the applicable construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. The provisions of Section III -Limits Of Insurance not otherwise modified by this endorsement shall continue to apply. CG 88 70 12 08 Includes copyrighted material of ISO Properties,Inc.,with its permission. Page 1 of 1 This page has been left blank intentionally. COMMERCIAL AUTO CA 8810 01 10 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO COVERAGE ENHANCEMENT ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage afforded by this endorsement, the provisions of the policy apply unless modified by the endorsement. COVERAGEINDEX SUBJECT PROVISION NUMBER ADDITIONAL INSURED BY CONTRACT,AGREEMENT OR PERMIT 3 ACCIDENTAL AIRBAG DEPLOYMENT 12 AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS 18 AMENDED FELLOW EMPLOYEE EXCLUSION 5 AUDIO, VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE 13 BROAD FORM INSURED 1 BODILY INJURY REDEFINED 21 EMPLOYEES AS INSUREDS (including employee hired auto) 2 EXTENDED CANCELLATION CONDITION 22 EXTRA EXPENSE—BROADENED COVERAGE 10 GLASS REPAIR—WAIVER OF DEDUCTIBLE 15 HIRED AUTO PHYSICAL DAMAGE(including employee hired auto) 6 HIRED AUTO COVERAGE TERRITORY 20 LOAN/LEASE GAP 14 PARKED AUTO COLLISION COVERAGE (WAIVER OF DEDUCTIBLE) 16 PERSONAL EFFECTS COVERAGE 11 PHYSICAL DAMAGE—ADDITIONAL TRANSPORTATION EXPENSE COVERAGE 8 RENTAL REIMBURSEMENT 9 SUPPLEMENTARY PAYMENTS 4 TOWING AND LABOR 7 UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS 17 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US 19 SECTION II—LIABILITY COVERAGE is amended as follows: 1. BROAD FORM INSURED SECTION II —LIABILITY COVERAGE, paragraph A.1.—WHO IS AN INSURED is amended to include the following as an insured: d. Any legally incorporated entity of which you own more than 50 percent of the voting stock during the policy period. However, "insured"does not include any organization that: (1) Is a partnership orjoint venture; or (2) Is an insured under any other automobile policy; or (3) Has exhausted its Limit of Insurance under any other automobile policy. Paragraph d. (2) of this provision does not apply to a policy written to apply specifically in excess of this policy. e. Any organization you newly acquire or form, other than a partnership or joint venture, of which you own more than 50 percent of the voting stock. This automatic coverage is afforded only for 180 days from the date of acquisition or formation. However, coverage under this provision does not apply: (1) If there is similar insurance or a self-insured retention plan available to that organization; 02010 Liberty Mutual Insurance Company.All rights reserved CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission. Page 1 of 7 ' (2) If the Limits of Insurance of any other insurance policy have been exhausted; or (3) To "bodily injury" or "property damage" that occurred before you acquired or formed the organization. 2. EMPLOYEES AS INSUREDS SECTION II—LIABILITY COVERAGE, paragraph A.1.—WHO IS AN INSURED is amended to include the following as an insured: f. Any"employee" of yours while using a covered "auto"you do not own, hire or borrow but only for acts within the scope of their employment by you. Insurance provided by this endorsement is excess over any other insurance available to any"employee". g. An "employee" of yours while operating an "auto" hired or borrowed under a written contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business and within the scope of their employment. Insurance provided by this endorsement is excess over any other insurance available to the"employee". 3. ADDITIONAL INSURED BY CONTRACT, AGREEMENT OR PERMIT SECTION II—LIABILITY COVERAGE, paragraph A.1.—WHO IS AN INSURED is amended to include the following as an insured: h. Any person or organization with respect to the operation, maintenance or use of a covered "auto", provided that you and such person or organization have agreed in a written contract, agreement, or permit issued to you by governmental or public authority, to add such person, or organization, or governmental or public authority to this policy as an"insured". However, such person or organization is an "insured": (1) Only with respect to the operation, maintenance or use of a covered "auto"; (2) Only for"bodily injury" or"property damage" caused by an "accidenY'which takes place after you executed the written contract or agreement, or the permit has been issued to you; and (3) Only for the duration of that contract, agreement or permit 4. SUPPLEMENTARY PAYMENTS SECTION II —LIABILITY COVERAGE, Coverage Extensions, 2.a. Supplementary Payments, paragraphs (2)and (4)are replaced by the following: (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic violations) required because of an "accidenY'we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the insured at our request, including actual loss of earnings up to$500 a day because of time off from work. 5. AMENDED FELLOW EMPLOYEE EXCLUSION In those jurisdictions where, by law, fellow employees are not entitled to the protection afforded to the employer by the workers compensation exclusivity rule, or similar protection, the following provision is added: SECTION II —LIABILITY, exclusion B.S. FELLOW EMPLOYEE does not apply if the"bodily injury" results from the use of a covered "auto"you own or hire. SECTION III—PHYSICAL DAMAGE COVERAGE is amended as follows: 6. HIRED AUTO PHYSICAL DAMAGE Paragraph A.4. Coverage Extensions of SECTION III — PHYSICAL DAMAGE COVERAGE, is amended by adding the following: If hired "autos" are covered "autos" for Liability Coverage, and if Comprehensive, Specified Causes of Loss or Collision coverage are provided under the Business Auto Coverage Form for any"auto°you own, then the Physical Damage coverages provided are extended to"autos": a. You hire, rent or borrow; or 02010 Liberty Mutual Insurance Company All rights reserved. CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission. Page 2 of 7 � b. Your"employee" hires or rents under a written contract or agreement in that"employee's" name, but only if the damage occurs while the vehicle is being used in the conduct of your business, subject to the following limit and deductible: A. The most we will pay for"loss" in any one"accidenY'or"loss" is the smallest of: (1) $50,000; or (2) The actual cash value of the damaged or stolen property as of the time of the"loss"; or (3) The cost of repairing or replacing the damaged or stolen property with other property of like kind and quality, minus a deductible. B. The deductible will be equal to the largest deductible applicable to any owned "auto" for that coverage. C. Subject to the limit, deductible and excess provisions described in this provision, we will provide coverage equal to the broadest coverage applicable to any covered "auto"you own. D. Subject to a maximum of $750 per "accidenY', we will also cover the actual loss of use of the hired "auto" if it results from an "accidenY', you are legally liable and the lessor incurs an actual financial loss. E. This coverage extension does not apply to: (1) Any"auto"that is hired, rented or borrowed with a driver; or (2) Any"auto"that is hired, rented or borrowed from your"employee". For the purposes of this provision, SECTION V—DEFINITIONS is amended by adding the following: "Total loss" means a "loss" in which the cost of repairs plus the salvage value exceeds the actual cash value. 7. TOWING AND LABOR SECTION III — PHYSICAL DAMAGE COVERAGE, paragraph A.2. Towing, is amended by the addition of the following: We will pay towing and labor costs incurred, up to the limits shown below, each time a covered "auto" classified and rated as a private passenger type, "light truck"or"medium truck"is disabled: a. For private passenger type vehicles, we will pay up to$50 per disablement. b. For "light trucks", we will pay up to $50 per disablement. "Light trucks" are trucks that have a gross vehicle weight(GVW)of 10,000 pounds or less. c. For"medium trucks" , we will pay up to$150 per disablement. "Medium trucks"are trucks that have a gross vehicle weight(GVW)of 10,001 —20,000 pounds. However,the labor must be performed at the place of disablement. 8. PHYSICAL DAMAGE-ADDITIONAL TRANSPORTATION EXPENSE COVERAGE Paragraph A.4.a., Coverage Extension of SECTION III— PHYSICAL DAMAGE COVERAGE, is amended to provide a limit of$50 per day and a maximum limit of$1,500 02010 Liberty Mutual Insurance Company.All rights reserved. CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission. Page 3 of 7 � 9. RENTAL REIMBURSEMENT SECTION III—PHYSICAL DAMAGE COVERAGE, A. COVERAGE, is amended by adding the following: a. We will pay up to $75 per day for rental reimbursement expenses incurred by you for the rental of an "auto" because of "accidenY' or "loss", to an "auto" for which we also pay a "loss" under Comprehensive, Specified Causes of Loss or Collision Coverages. We will pay only for those expenses incurred after the first 24 hours following the"accidenY' or"loss"to the covered"auto." b. Rental Reimbursement will be based on the rental of a comparable vehicle,which in many cases may be substantially less than $75 per day, and will only be allowed for the period of time it should take to repair or replace the vehicle with reasonable speed and similar quality, up to a maximum of 30 days. c. We will also pay up to $500 for reasonable and necessary expenses incurred by you to remove and replace your tools and equipment from the covered "auto". d. This coverage does not apply unless you have a business necessity that other "autos" available for your use and operation cannot fill. e. If"loss" results from the total theft of a covered"auto"of the private passenger type,we will pay under this coverage only that amount of your rental reimbursement expenses which is not already provided under Paragraph 4. Coverage Extension. f. No deductible applies to this coverage. For the purposes of this endorsement provision, materials and equipment do not include "personal effects"as defined in provision 11. 10. EXTRA EXPENSE -BROADENED COVERAGE Under SECTION III —PHYSICAL DAMAGE COVERAGE, A. COVERAGE, we will pay for the expense of returning a stolen covered"auto"to you. The maximum amount we will pay is$1,000. 11. PERSONAL EFFECTS COVERAGE A. SECTION III — PHYSICAL DAMAGE COVERAGE, A. COVERAGE, is amended by adding the following: If you have purchased Comprehensive Coverage on this policy for an "auto" you own and that "auto" is stolen, we will pay, without application of a deductible, up to $600 for"personal effects" stolen with the"auto." The insurance provided under this provision is excess over any other collectible insurance. B. SECTION V—DEFINITIONS is amended by adding the following: For the purposes of this provision, "personal effects" mean tangible property that is worn or carried by an insured." "Personal effects"does not include tools, equipment,jewelry, money or securities. 12. ACCIDENTAL AIRBAG DEPLOYMENT SECTION III—PHYSICAL DAMAGE COVERAGE, B. EXCLUSIONS is amended by adding the following: If you have purchased Comprehensive or Collision Coverage under this policy, the exclusion for "loss" relating to mechanical breakdown does not apply to the accidental discharge of an airbag. Any insurance we provide shall be excess over any other collectible insurance or reimbursement by manufacturer's warranty. However, we agree to pay any deductible applicable to the other coverage or warranty. 13. AUDIO,VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE SECTION III — PHYSICAL DAMAGE COVERAGE, B. EXCLUSIONS, exception paragraph a. to exclusions 4.c. and 4.d. is deleted and replaced with the following: 02010 Liberty Mutual Insurance Company.All rights reserved. CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission. Page 4 Of 7 � Exclusion 4.c. and 4.d. do not apply to: a. Electronic equipment that receives or transmits audio, visual or data signals, whether or not designed solely for the reproduction of sound, if the equipment is permanently installed in the covered "auto" at the time of the "loss" and such equipment is designed to be solely operated by use of the power from the "auto's" electrical system, in or upon the covered "auto" and physical damage coverages are provided for the covered"auto"; or If the "loss" occurs solely to audio, visual or data electronic equipment or accessories used with this equipment, then our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by a $100 deductible. 14. LOAN/LEASE GAP COVERAGE A. Paragraph C., LIMIT OF INSURANCE of SECTION III — PHYSICAL DAMAGE COVERAGE is amended by adding the following: The most we will pay for a "total loss" to a covered "auto" owned by or leased to you in any one "accidenY'is the greater of the: 1. Balance due under the terms of the loan or lease to which the damaged covered "auto" is subject at the time of the"loss" less the amount of: a. Overdue payments and financial penalties associated with those payments as of the date of the"loss", b. Financial penalties imposed under a lease due to high mileage, excessive use or abnormal wear and tear, c. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease, d. Transfer or rollover balances from previous loans or leases, e. Final payment due under a "Balloon Loan", f. The dollar amount of any unrepaired damage which occurred prior to the "total loss" of a covered "auto", g. Security deposits not refunded by a lessor, h. All refunds payable or paid to you as a result of the early termination of a lease agreement or as a result of the early termination of any warranty or extended service agreement on a covered "auto", i. Any amount representing taxes, j. Loan or lease termination fees; or 2. The actual cash value of the damage or stolen property as of the time of the"loss". An adjustment for depreciation and physical condition will be made in determining the actual cash value at the time of the"loss". This adjustment is not applicable in Texas. B. ADDITIONAL CONDITIONS This coverage applies only to the original loan for which the covered "auto" that incurred the loss serves as collateral, or lease written on the covered "auto"that incurred the loss. C. SECTION V—DEFINTIONS is changed by adding the following: As used in this endorsement provision, the following definitions apply: "Total loss" means a "loss" in which the cost of repairs plus the salvage value exceeds the actual cash value. A"balloon loan" is one with periodic payments that are insufficient to repay the balance over the term of the loan, thereby requiring a large final payment. 02010 Liberty Mutual Insurance Company.All rights reserved. CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission Page 5 of 7 ' 15. GLASS REPAIR-WAIVER OF DEDUCTIBLE Paragraph D. Deductible of SECTION III — PHYSICAL DAMAGE COVERAGE is amended by the addition of the following: No deductible applies to glass damage if the glass is repaired rather than replaced. 16. PARKED AUTO COLLISION COVERAGE (WAIVER OF DEDUCTIBLE) Paragraph D. Deductible of SECTION III — PHYSICAL DAMAGE COVERAGE is amended by the addition of the following: The deductible does not apply to "loss" caused by collision to such covered "auto" of the private passenger type or light weight truck with a gross vehicle weight of 10,000 Ibs. or less as defined by the manufacturer as maximum loaded weight the"auto"is designed to carry while it is: a. In the charge of an "insured'; b. Legally parked; and c. Unoccupied. The"loss" must be reported to the police authorities within 24 hours of known damage. The total amount of the damage to the covered "auto" must exceed the deductible shown in the Declarations. This provision does not apply to any "loss" if the covered "auto" is in the charge of any person or organization engaged in the automobile business. SECTION IV—BUSINESS AUTO CONDITIONS is amended as follows: 17. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS SECTION IV-BUSINESS AUTO CONDITIONS, Paragraph 6.2. is amended by adding the following: If you unintentionally fail to disclose any hazards, exposures or material facts existing as of the inception date or renewal date of the Business Auto Coverage Form, the coverage afforded by this policy will not be prejudiced. However, you must report the undisclosed hazard of exposure as soon as practicable after its discovery, and we have the right to collect additional premium for any such hazard or exposure. 18. AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT, OR LOSS SECTION IV — BUSINESS AUTO CONDITIONS, paragraph A.2.a. is replaced in its entirety by the following: a. In the event of"accidenY', claim, "suiY'or"loss", you must promptly notify us when it is known to: 1. You, if you are an individual; 2. A partner, if you are a partnership; 3. Member, if you are a limited liability company; 4. An executive officer or the "employee" designated by the Named Insured to give such notice, if you are a corporation. To the extent possible, notice to us should include: (1) How,when and where the"accidenY' or"loss"took place; (2) The"insureds" name and address; and (3) The names and addresses of any injured persons and witnesses. 19. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US SECTION IV— BUSINESS AUTO CONDITIONS, paragraph A.S., Transfer of Rights of Recovery Against Others to Us, is amended by the addition of the following: If the person or organization has waived those rights before an "accidenY' or "loss", our rights are waived also. 02010 Liberty Mutual Insurance Company.All rights reserved. CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission. PBge 6 Of 7 ' 20. HIRED AUTO COVERAGE TERRITORY SECTION IV — BUSINESS AUTO CONDITIONS, paragraph 6.7., Policy Period, Coverage Territory, is amended by the addition of the following: f. For "autos" hired 30 days or less, the coverage territory is anywhere in the world, provided that the insured's responsibility to pay for damages is determined in a "suiY', on the merits, in the United States, the territories and possessions of the United States of America, Puerto Rico or Canada or in a settlement we agree to. This extension of coverage does not apply to an "auto" hired, leased, rented or borrowed with a driver. SECTION V—DEFINITIONS is amended as follows: 21. BODILY INJURY REDEFINED Under SECTION V—DEFINTIONS, definition C. is replaced by the following: "Bodily injury" means physical injury, sickness or disease sustained by a person, including mental anguish, mental injury, shock,fright or death resulting from any of these at any time. COMMMON POLICY CONDITIONS 22. EXTENDED CANCELLATION CONDITION COMMON POLICY CONDITIONS, paragraph A.—CANCELLATION condition applies except as follows: If we cancel for any reason other than nonpayment of premium, we will mail to the first Named Insured written notice of cancellation at least 60 days before the effective date of cancellation. This provision , does not apply in those states which require more than 60 days prior notice of cancellation. 02010 Liberty Mutual Insurance Company All rights reserved. CA 88 10 01 10 Includes copyrighted material of Insurance Services Office,with its permission. Page 7 of 7 This page has been left blank intentionally.