Loading...
HomeMy WebLinkAbout6448 Docusign Envelope ID: 1 F313B7C-2032-46FC-8824-E5BBA6FE2FDE Washington State WI Department of Transportation Supplemental Agreement Organization and Address Number 02 DKS Associates Original Agreement Number 719 2nd Ave, Suite 1250 Seattle,WA 98104 315042 Phone: 206-328-9800 Project Number Execution Date Completion Date HSIP-000S(629) 11/02/2022 12/31/2026 Project Title New Maximum Amount Payable Systemic Pedestrian Treatments-Rectangular Rapid Flashing Beacons $ 317,017.95 Description of Work The project will install Rectangular Rapid Flashing Beacons (RRFB) systems at eight locations throughout the city of Bremerton. The project will include thermoplastic marked crosswalks and ADA curb ramps associated with the RRFB enhanced marked crosswalks. The Local Agency of City of Bremerton desires to supplement the agreement entered in to with DKS Associates and executed on 11/02/2022 and identified as Agreement No. 315042 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See Exhibit A attached I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Time of Completion is 12/31/2026 III Section V, PAYMENT, shall be amended as follows: See Exhibit D attached. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: Richard HutchinDocuSoni'gned by:s DKS Associates By: Greg Wheeler, Mayor City of Bremerton Signed by: PILO,,_ onsu an Signature pprtAfitfij 9A ffaiity Signature 9/26/2024 Date DOT Form 140-063 Revised 09/2005 Docusign Envelope ID: 1 F313B7C-2032-46FC-8824-E5BBA6FE2FDE Exhibit "A" Summary of Payments Basic Agreement Supplement#2 Total +Supplement#1 Direct Salary Cost 53,778.98 7,898.42 61,677.40 Overhead 97,807.84 14,364.84 112,172.68 (Including Payroll Additives) Direct Non-Salary Costs 119,898.20 6,000.00 125,898.20 Fixed Fee 15,058.11 2,211.57 17,269.67 Total 286,543.12 30,474.83 317,017.95 DOT Form 140-063 Revised 09/2005 Docusign Envelope ID: 1 F313B7C-2032-46FC-8824-E5BBA6FE2FDE EXHIBIT A SCOPE OF WORK City of Bremerton-Systemic Pedestrian Treatments- RRFB Bremerton,WA Supplement#2 September 11,2024 Project Description The City of Bremerton (CITY) requested the DKS team (CONSULTANT) re-design the southwest corner of the Perry Ave and Holman Street intersection for a direct-powered Rectangular Rapid Flashing Beacon (RRFB) pole on the west side of Perry to work with the solar-powered RRFB on the east side of the street.The power will come from the utility pole south of the intersection. A new conduit will be installed under the sidewalk, and an electric service cabinet will not be required. The contract amendment will also cover the following changes in scope: additional efforts in development of traffic control plans,additional effort in response to city comments received at 100% design,and the preparation of Division 1 specifications for WSDOT review and addressing WSDOT comments.The original contract assumed typical traffic control plans, not site-specific ones. As the project progresses and according to comments from the CITY and WSDOT,the CONSULTANT will develop detailed site-specific traffic control plans. Task 1: Project Management The CONSULTANT will perform project management and monitor project budget,scope, and schedule. The contract duration was extended from 7 months to two years. WSDOT has requested the Consultant to track all the invoices on the DCMS website,which was not included in the original scope of work. The CONSULTANT will perform QC review on added scope of work. Task 6: 100% Design and Bid Documents The CONSULTANT will re-design the southwest corner of the Perry Ave and Holman Street intersection for a direct-powered RRFB pole on the west side of Perry to work with the solar-powered RRFB on the Page 1 of 2 Systemic Pedestrian Treatments-RRFB Bremerton,WA DKS Associates Docusign Envelope ID: 1 F313B7C-2032-46FC-8824-E5BBA6FE2FDE east side of the street.The power source is an existing utility pole south of the intersection. A new electric service will not be required. The sidewalk will be replaced between the wood pole and the new curb ramps at the southwest corner of the Perry Ave and Holman Street intersection.The new conduit will be installed under the new sidewalk with associated handholes. The CONSULTANT will update the project specifications and cost estimate for the new design of this project site. The amendment will cover the extra effort required to address the large number of comments received on 100%design submittal.The original contract assumed that CITY comments on the 100%design would be minimal,estimated as a minor effort. The CONSULTANT will develop detailed site-specific traffic control plans, respond to WSDOT comments on traffic control plans, and address those comments. The original scope assumed typical TCP plans. The CONSULTANT will prepare project Division 1 specifications for WSDOT review and address WSDOT comments on Division 1 specifications. Deliverables • The redesign of Perry and Holman Street will be part of the 100%design and final bid documents. • Site-specific traffic control plans to be included in the 100%design and final bid documents. • Division 1 specifications in WSDOT track change format. Task 11: Management Reserve Fund Additional funds will supplement existing task 11.The Management Reserve Fund (MRF) (dollar amount per contract) will be utilized only for unforeseen added work that is not included in this AGREEMENT. The CONSULTANT shall obtain written authorization from the CITY prior to doing any work under MRF. CONSULTANT compensation for work done under MRF must be approved by the CITY prior to doing the work. Page 2 of 2 Systemic Pedestrian Treatments-RRFB Bremerton,WA DKS Associates Docusign Envelope ID: 1 F313B7C-2032-46FC-8824-E5BBA6FE2FDE HOUR AND FEE ESTIMATE EXHIBIT D Supplement#2 Project: City of Bremerton Systemic Pedestrian Treatments RRFB 11-Sept-24 DKS Associates Labor Hour Estimate Total Fee Principal Project Project 1 Assistant CAD Project Effective Task Descnption Engineer Manager Engineer Engineer Technician Coordinator Admin Direct Overhead Profit multiplier $ 98.00 $ 92.00 $ 50A8 $ 01.87 $ 31.68 $ 38.00 $ 30.10 Hours Labor Cost 181.87% 28% 3.0987 Task 1-Project Management 1.1 General Project Management 4 1 5 402.14 73137 11260 1,246.11 Extend project and 0CM S reporting 8 4 12 87256 1,58692 24432 2,70380 12 QA/QC 4 4 36800 66928 10304 1,14032 0 Task Totals 0 16 0 0 0 0 5 21 1,602.70 2,987.57 059.96 lim5,090.23 Task 6:100%Design Redesign or Perry and Holman St 2 10 12 10 34 1,54804 2,81542 43345 4,79691 Amount of comments on 90%and 100% 1 4 12 8 8 33 1,70820 3,10670 47830 529320 Detailed traffic control Plan 1 5 18 16 40 2,04556 3,72026 57276 6,33858 WSDO T Specifications and Review 8 4 12 95392 1,73489 267.10 295591 0 Task Total 2 19 00 20 30 0 0 119 $ 6,255.72 $ 11,377.27 $ 1,751.61 $ 19,380.60 Task 11-Management Reserve Fund Task Total I I I I I I I I I I I I 6,000.00 I SUM 2 35 00 20 30 0 5 100 $ 7,898A2 $ 10,360.80 $ 2,211.57 $ 30,070.83 ODC: Milage/Print $ - Grand Total $ 30,474.83 City of Bremerton Pagel of 1 DKS 9/10/2024