Loading...
HomeMy WebLinkAbout4553 Contract Number: 4553 Vendor: PARAMETRIX INC Subject: Pt Washington Narrows Beach Sewer /Public Access Department: Engineering File Class: LEG 12 -1 Begin Date: 05/09/2006 End Date: 12/30/2010 Review Date: 11/01/2010 Vault Date: Comments: Amendment #1 -1/08 Term extended by letter dated 8/08 I ' . qr�t N. rur' 2.'=.i'•Ts:i,3e- +ti,:�.:.— ,!'` :':11'' -(�i { 1`fj• i t'?.,..k1l q - f•� �2" • `- ,fi � RECEIVED - AUG 1 1 2008 ENGINEERING DIVISION f _ PUBLIC WORKS & UUL®TYES ®Irecto s off7 @ fi3 316 3 August 6, 2008 Ms. Diane Lenius, P.E. Parametrix 1002 15"' Street S.W., Suite 220 Auburn, WA 98001 Subject: Bremerton Boardwalk Project — Modification of Term of Professional Services Agreement Dear Diane: This letter is a confirmation of our earlier agreement to extend the term of the Professional Services Agreement for the Bremerton Boardwalk Project (City Contract No. 4553 dated May 9, 2006, and modified by Amendment No. 1 on January 7, 2008.) As discussed, the expiration of the agreement is extended to December 30, 2010, as shown on the attached excerpt from Exhibit A of the contract. ' ., If you have any questions regarding this issue, please contact me at (360) 473 -5315. 7 , 'y Phil Williams Director of Public Works and Utilities Enc. cc: Tom Knuckey, Managing Engineer — Utilities Bill Webb, Parametrix EXHIBIT A - SCOPE OF WORK City of Bremerton Beach Sewer Replacement and Public Access BACKGROUND This Scope of Work identifies engineering services for the City of Bremerton (City) for the period of May 1, 2006 through May 30,2008December 31, 2010. This scope of work represents a best estimate of level of effort required to pursue funding, apply for permits, and design an approximately 3,200 -foot sewer line replacement and boardwalk along the Port Washington Narrows between Evergreen Park and the Louis Mentor Boardwalk. Work will proceed on a task by task basis only with authorization from the City to the Consultant. The City will establish annual expenditure limits throughout the term of this agreement. Specific work elements are defined by the following tasks: • Task 01 Project Management • Task 02 Planning • Task 03 Survey • Task 04 Sewer Design • Task 05 Boardwalk Design • Task 06 Architectural Design • Task 07 Mitigation Plan and Design • Task 08 Funding Assistance • Task 09 Permitting • Task 10 Community Outreach and Public Involvement • Task 11 Procurement and Bid Assistance • Task 12 Construction Management • Task 13 Evergreen Park Expansion • Task 14 Directed Services A list of anticipated deliverables for this project is included as Exhibit D. TASK 01 PROJECT MANAGEMENT This task consists of coordination, design quality control, and client communication. City of Bremerton 255- 1896.808 Beach Sewer Replacement and Public Access 1 March 2006 Scope of Work I Contract Number: 4553 Vendor: PARAMETRIX INC Subject: Pt Washington Narrows Beach Sewer/Public Access Department: Engineering File Class: LEG 12-1 Begin Date: 05/09/2006 End Date: 04/30/2009 < Review Date: 02/15/2011 Vault Date: Ol/Ol/2011 Comments: Amendment #1-1/08 � AMENDMENT NO.1 TO PROFESSIONAL SERVICES AGREEMENT FOR BREMERTON BOARDWALK PROJECT The City of Bremerton, Washington, (the "City"), and Parametrix, ("Consultant") have entered into a PROFESSIONAL SERVICES AGREEMENT for the project identified as the as the Port Washington Narrows Beach Sewer and Public Access Project, more commonly known as the Bremerton Boardwalk Project. This AMENDMENT NO.1 modifies the Scope of Work and Budget set forth in the AGREEMENT dated May 9, 2006, as follows: The Scope of Work shall be modified to add additional scope items as outlined in the attached Exhibit A. The Compensation for services shall be increased by $413,000 and the total fees under this Agreement shall not exceed Two Million, Nine Hundred Thirteen Thousand and Ninety Six Dollars ($2,913,096.) Except as herein modified, the terms of the AGREEMENT shall remain in full force and effect. In WITNESS WHEREOF, the parties hereto have executed the AMENDMENT NO.1 to the Professional Services Agreement the date and year indicated. For Parametrix, dated this I day of j'NJ\1A-t\C 200r0 @ C By: For the City of Bremerton, dated this~..1"..t;;I..i day 0 By: ~T~~ ~ Phil Williams, Director of Public Works and Utilities ~~~ EXHIBIT A - SCOPE OF WORK City of Bremerton Bremerton Boardwalk Amendment No.1 to Professional Services Agreement This Scope of Work supplements the Professional Services Agreement (PSA) dated May 9, 2006. Increases to the Scope of Work in the areas of community outreach, cleanup requirements for the Former Chevron Property, and design of the Evergreen Park Expansion have made it necessary to amend the original scope of work. TASK 10.2 - PUBLIC INVOLVEMENT Introduction Obtaining public input and developing public support is critical to project success. Overwhelming public support for the project has been achieved, however, further public forums are needed to inform the public on project updates and maintain the positive public support. The project team continues to work closely with the project stakeholders (property owners along Washington Avenue, the City Parks and the City Arts Commissions, and the Suquamish Tribe) to understand their issues and obtain their input into the planning and design process, potentially minimizing future obstacles to the project. Work under original Task 10.2 is modified to include additional public forums and meetings with the project stakeholders. Measurable Task Objectives: Maintain and build upon the existing public support already obtained for this project and continue to work closely with project stakeholders to identify and mitigate their issues of concern and obtain agreement to avoid project obstacles. Approach: The following supplemental approach applies: · Attendance at one (1) public event to disseminate project information and updates, and obtain additional public support from written comment forms passed out at the event. · Conduct up to fifteen (15) property o~ner meetings. Determine their concerns and explain how the project may affect their property and use of the beach. Work with property owners to determine landing locations and amenities located at these landings. · Attendance at up to three (3) Parks Commission meetings and up to three (3) Arts Commission meetings. Discussion with both groups allows the project team to incorporate their ideas into the design and architectural features of the project. · Attendance at up to six (6) meetings with the Suquamish Tribe. These meetings will be held to discuss their issues and negotiate a mitigation strategy to minimize their concerns and objections for this project. City of Bremerton Bremerton Boardwalk - Scope of Work 235-1896-063 October 2007 Assumptions: The following supplemental assumptions apply: . Meetings may be held in the evening, weekends, or during a holiday weekend. . Meetings with the Suquamish Tribe will' follow a format agreed upon ill the Memo of Understanding negotiated between the Tribe and the City of Bremerton. . The design team will provide basic supplies needed for meeting (easels, paper, pens, refreshments, etc.). DeliverabJes: The following will be delivered: . Minutes for each meeting. . Meeting announcements and mailings, comment forms, directional signs, and sign-in sheets. . The following are examples of graphics that may be prepared and reused and/or updated for each meeting: );> Vicinity Map );> Aerial photographs );> Illustrative figures and hand-drawn illustrations . Typical boardwalk and sewer sections suitable for public presentation. . Plan and profile sheets, suitable for public presentation. . Summary of comments received from the comment forms. City Responsibility: The City will be responsible for the following: . City will contact property owners and the Suquamish Tribe to set up meetings. . The City will mail announcements to adjacent property owners and other interested parties. City of Bremer/on Bremerton Boardwalk - Scope of Work 2 235-1896-063 October 2007 TASKS 13.1 (REMEDIAL DESIGN), TASK 13.3 (PARK DESIGN) AND TASK 13.4 (CONSTRUCTION MANAGEMENT) Introduction This Scope of Work replaces Task 13.1 (Remedial Design), supplements Task 13.3 (Park Design), and adds new Task 13.4 (Construction Management - Remedial Action Oversight and Reporting) to the original Professional Services Agreement Scope of Work dated May 9, 2006. Work under original Task 13.1 is modified to include a full remedial design and feasibility study (RIfFS) Work Plan, investigation, and remedial design, a significant increase in the originally-planned level of effort. Task 13.3 is supplemented to include additional design effort needed for increased park scope. Task 13.4 is added to provide for remedial action oversight, confirmation sampling, and reporting services. The following is a summary of the tasks and the assumptions used to develop cost estimates for each task. A cost breakdown by task is presented on the last page of this submittal. Task 13.1 - Remedial Design/Feasibility Study, Pilot Test, and Shoreline Restoration/Beach Design (replaces original task scope) Goal: Develop information to delineate the nature and extent of residual petroleum contamination on the property for the purposes of designing a cleanup action. The cleanup action is referred to as an "interim action" for the purposes of the project's Agreed Order, which was negotiated with the Washington State Department of Ecology (Ecology). Use the information obtained during the remedial investigation to select preferred chemical oxidation and in-situ bioremediation technologies for site cleanup. Design and perform a pilot study to demonstrate the chemical oxidation technology selected. Develop a final interim action design for implementation of the preferred technologies. Provide a design for shoreline restoration activities to include bulkhead removal and construction of new beaches. This work supports site remediation and is eligible for reimbursement under Ecology's Remedial Action Grant Program. Approach: The following activities are included in this task: · Extended negotiations with Ecology to determine the extent of cleanup to be performed at the site and to develop an Agreed Order for work to be performed under the task. . Development of a draft and final RIfFS Work Plan. · Procurement of laboratory and drilling services. . Installation of two (2) new monitoring wells. · Sampling of soil and groundwater in ten (10) monitoring wells (including new and existing wells), nine (9) soil borings, and ten (10) push probes for contaminants of concern (primarily petroleum constituents). City of Bremerton Bremerton Boardwalk - Scope of Work 3 235-1896-063 October 2007 · Conducting a surface soil screening investigation at 25 locations. Collect up to ten (l0) surface soil samples and analyze for contaminants of conCern. · Evaluate remediation technologies based on sampling results, select preferred technologies based on effectiveness and cost, and develop pilot study program. · Prepare a Technical Memorandum (TM) describing the pilot study program. ~ This TM will be submitted to the City and Ecology for approval. · Procure laboratory and drilling services for pilot study and implement pilot study. Program will include an initial two treatment events with a follow-on confirmation sampling event. A third treatment event and second follow-on confirmation sampling event may occur. · Incorporate data from pilot study and finalize design for an interim action, assumed to include limited "hot-spot" removal and chemical in-situ treatment of the soil and groundwater contaminants · Prepare a Technical Memorandum summarizing the pilot study results and the final interim action design. Interim actions may include excavation of contaminated soil "hot spots". ~ This TM will also be submitted to the City and Ecology for approval. · Incorporate data from pilot study and finalize design for interim actions. · Conduct geo-coastal engineering studies to develop design recommendations for a new pocket beach including beach profiles, grains-size distributions for beach nourishment sands and gravels, and a hardened headland to protect the pocket beach. · Incorporate the geo-coastal engineering recommendations and prepare 30%,90%, and final design of shoreline restoration and beach construction. Design plans will be incorporated with plan set developed under Task 13.3 Park Design. Assumptions: The task budget is based on the following assumptions. · For the draft and final RIfFS Work Plan, two hardcopies will be submitted to the City and Ecology. One of the hardcopies will be unbound for ease of copying. · Only one round of comments from the City and Ecology will be required to finalize the RIfFS Work Plan. ' · For the draft and final pilot study and interim action design TMs, two hardcopies will be submitted to the City and Ecology. · Only one (I) round of comments from the City and Ecology will be required to finalize the TMs. City of Bremerton Bremerton Boardwalk - Scope of Work 4 235-1896-063 October 2007 Deliverables: The following deliverables will be submitted under this task: . Draft and final Community Relations Plan (for the Agreed Order). . Draft and final SEPA Checklist (for the Agreed Order). . Draft and final Work Plan for RI/FS, Interim Action, and Shoreline Restoration. . Draft and final pilot study TM. . Draft and final interim action design TM including up to three drawings to support the interim action (e.g., layout of injection points, grading permit). . Design of removal of derelict and failing structures along the beach, and all beach re-grading and restoration. Task 13.3 Park Design (supplements original task scope) Goal: Provide for additional design effort required for new park features not included in the original scope. Incorporate design plans originally included in Task 13.1 into a single plan set for the entire park expansIOn. Approach: The following activities are included in this task: . Provide 30%, 90%, and final design for the park expansion. New park features include a central plaza, seat walls, pervious pavements, lighting, demolition of the Plumber's Building, a stage/shelter, a trellis with interpretive displays, expanded parking, a new stormwater treatment swale, and a more robust landscaping plan using native trees and shrubs. Assumptions: The task budget is based on the following assumptions. . The City will perform over the shoulder review of work in progress prior to the 90% submittal and provide one set of comments on the 90% submittal for use in preparing the final plans. . Plan sets will be delivered for the 90% and final (for bid) plans and specifications only. . Specification format and front end administrative sections will be provided by the City. · A maximum of27 plan and detail drawings will be required, including: >- Cover sheet City of Bremerton Bremerton Boardwalk - Scope of Work 5 235-1896-063 October 2007 > Legend, abbreviations, and notes > Site preparation and TESC Plan and Details (2 sheets) > Grading and Drainage Plan, Sections, and Details (4 sheets) > Site Plan, Sections, and Details ( 2 sheets) > Plaza Plan, Sections, and Details (2 sheets) > Planting Plan and Details (2 sheets)) > Irrigation Plan and Details (2 sheets) > Site Furniture Details (1 sheet) > Lighting Plan and Details (2 sheets) > Architectural and Structural Plans and Details ( up to 8 sheets) Deliverables: The following deliverables will be submitted under this task: . Three (3) hardcopies of the 90% plans and specifications for City Review. . Six (6) electronic and hardcopies of the final plans and specifications. . Stormwater Management Report. . 30%,90% and Final Technical Memorandum on the engineer's estimate of probable cost for construction. . Bid Package. Task 13.4 task) Construction Management - Remedial Action Oversight and Reporting (new Goal: Oversee interim action implementation, perform confirmation soil and groundwater sampling to assess effectiveness of interim actions, develop a RIfFS Report, develop a Cleanup Action Plan, and negotiate with Ecology to develop a second Agreed Order for the site. Approach: The following activities are included in this task: . Oversight of interim action excavation activities and beach construction. City of Bremerton Bremerton Boardwalk - Scope of Work 6 235-1896-063 October 2007 · Oversight of interim action excavation activities and beach construction archaeologist for purposes of identitying cultural resources. · Collection and analysis of confirmation soil samples from the excavations and soil stockpiles. · General oversight and technical support of chemical oxidant and oxygen releasing compound (ORC) injections. · Collection and analysis of soil samples to confirm soil contaminant reduction resulting from the in-situ treatment. · Groundwater monitoring for three events to confirm groundwater contaminant reduction. Events will be performed at 6-, 9-, and 12-months following the ORC injection. · Development of a draft and' final RIfFS Report describing all activities performed to date including: RI sampling results, pilot study results, selected technologies, interim actions performed, and confirmation sampling results. Report will also contain an analysis of the effectiveness of the interim action and recommendations for future work including long-term groundwater monitoring. · Develop a draft and final Cleanup Action Plan (CAP) for incorporation into a second Agreed Order for the site. The CAP will describe activities to be performed at the site as follow-on to the interim actions previously performed. If the interim action is successful, the CAP will consist primarily of a long-term groundwater monitoring plan. Assumptions: The task budget is based on the following assumptions. · Soil excavations will be conducted by City or City-contracted crews. · Parametrix will provide only general oversight and technical support for chemical oxidant and ORC injection activities. Full-time supervision of these activities will be provided by a City inspector. · For the draft and final reports (RIIFS Work Plan and CAP), two (2) hardcopies will be submitted to the City and Ecology. One (1) of the hardcopies will be unbound for ease of copying. · Only one (1) round of comments from the City and Ecology will be required to finalize each report. Deliverables: The following deliverables will be submitted under this task: · Draft and final RIfFS Report. · Draft and final Cleanup Action Plan. City of Bremerton Bremerton Boardwalk - Scope of Work 7 235-1896-063 October 2007 EXHIBIT B Schedule TASK 13.1 The duration for the RIfFS and pilot test tasks is expected to be on the order of eight months. The RI/FS Work Plan public comment period will occur between October 15 and November 15, 2007. It is anticipated the task will begin in November 2007 following the public comment period and be completed by June 2008. This activity may be delayed by the City pending Department of Ecology allocation of reimbursement funding to the project. TASK 13.3 The 30% park design will be completed by November 1,2007, at which time it will be submitted with the shoreline permit (JARPA) package. JARPA review and negotiation may require 18 months. The 90% design submittal will be completed within 30 days of receipt of final JARP A review comments. Park construction is anticipated to occur in 2010. TASK 13.4 Assuming immediate allocation of reimbursement funding by the Department of Ecology, this task will be initiated upon approval of the interim action TM. Implementation of the in-situ treatment interim action may require five months. Confirmation soil and groundwater sampling will be completed within 1 year following completion of treatment. A draft RIfFS Report will be provided within four weeks of completion of confirmation sampling. Assuming a two-week review period, a final RIfFS Report will be provided within four weeks of the draft submittal. Draft and final Cleanup Action Plans will be submitted within the 4-week period following submittal of the final RIfFS Report. Total duration for the interim action implementation, RIfFS reporting, and cleanup action planning tasks is anticipated to be nineteen months, with completion in late-2009. Delays in Ecology's dedication of reimbursement funds to the City will result in delays in these activities. Beach construction is anticipated to,occur in 2010 and 2011 during the open fish window (July 15 through January). City of Bremerton Bremerton Boardwalk - Scope of Work 8 235-1896-063 October 2007 EXHIBIT C Budget TASK 10.2 The budget for this task is being increased by $28,000. Original Budget..................................................................................................................... $31 ,521 New Budget......................................................................................................................... ... $59,521 TASK 13.1 The budget for this task is being increased by $220,000 Original Budget..........:.......................................................................................................... $46,599 New Budget........................................................................................................................ . $266,599 TASK 13.3 The budget for this task is being increased by $40,000 Original Budget..................................................................................................................... $57,905 New Budget.... ........ ................. ............... ......... ......... ......... ........ ....... ........... ....................... ... $97,905 TASK 13.4 This is a new task Construction Management - Remedial Oversight and Reporting .......................................$125,000 TOT AL ........................................................................................................................................~... $413 ,000 City of Bremerton Bremerton Boardwalk - Scope of Work 9 235-1896-063 October 2007 Vendor Subject Department Status Code Amount Begin Date End Date Review Date Insurance Comments Contract Number 4553 PARAMETRIX INC pt Washington Narrows Beach Sewer/Public Access Engineering PRO $2500096.00 05/09/2006 04/30/2009 03/01/2009 GL $ AL $ E&O Insurance Total $ Insurance Review Date PROFESSIONAL SERVICES AGREEMENT PORT WASHINGTON NARROWS BEACH SEWER AND PUBLIC ACCESS PROJECT The City of Bremerton ("City") and Parametrix, Inc., ("Consultant"), referred to collectively as the "Parties," enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the servic~s more specifically described in the Scope of Work, dated March, 2006, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VILO. of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in section IX (A) of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed Two Million Five Hundred Thousand Ninety-Six Dollars and No Cents ($2,500,096 Dollars.) Consultant's charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. Bremerton/P arametrix Port Washington Narrows Beach Sewer and Public Access Proiect Page I of6 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City's employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-Consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-Consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City's administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement, except for that portion of the injuries and damages caused by the City's sole negligence. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. Bremerton/P arametrix Port Washington Narrows Beach Sewer and Public Access Proiect Page 2 of6 VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for errors and omissions and for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-Consultants. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance'evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCV) if applicable; and employer's liability; and 3. Excess Liability insurance with limits not less than $2,000,000 limit per occurrence and aggregate. 4. Professional Liability insurance with limits no less than $3,000,000 limit per occurrence/claim. Any payment of deductible or self insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an "occurrence" basis except professional liability insurance (if required), which may be provided on a "claims-made" basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. The Consultant's insurance shall be primary insurance as respects the City and the City shall be given thirty (30) days prior written notice by certified mail, return receipt requested, of any cancellation, suspension or material change in coverage. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. BremertonlParametrix Port Washington Narrows Beach Sewer and Public Access Proiect Page 3 of6 VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (GAAP) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Bremerton, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City's sole risk. C. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in. connection with the WOIT. . D. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Bremerton, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. E. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. BremertonlParametrix Port Washington Narrows Beach Sewer and Public Access Proiect Page 4 of6 F. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. G. Modification: This Agreement may only be modified by written instrument signed by both Parties. H. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1 st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. City Address Department of Public Works and Utilities 3027 Olympus drive Bremerton, W A 98310 Consultant Address Parametrix, Inc. 5700 Kitsap Way, Suite 202 Bremerton W A, 98312 1. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. J. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. K. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. L. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. M. Attorneys' Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney's fees. N. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Nondiscrimination: Consultant shall not discriminate in employment or services to the public on the basis of race, color, national origin, sex, religion, age, marital status, or disability, except for employment actions based on bona fide occupational qualification. IX. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- Bremerton/Parametrix Port Washington Narrows Beach Sewer and Public Access Proiect Page 5 of6 performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party's sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. t If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion ofthe work, the City may summarily terminate this Agreement. A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and' data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. CONSULTANT Bre BremertonlParametrix Port Washington Narrows Beach Sewer and Public Access Proiect Page 6 of6 EXHIBIT A - SCOPE OF WORK City of Bremerton Beach Sewer Replacement and Public Access BACKGROUND This Scope of Work identifies engineering services for the City of Bremerton (City) for the period of May 1,2006 through May 30, 2008. This scope of work represents a best estimate of level of effort required to pursue funding, apply for permits, and design an approximately 3,200-foot sewer line replacement and boardwalk along the Port Washington Narrows between Evergreen Park and the Louis Mentor Boardwalk. Work will proceed on a task by task basis only with authorization from the City to the Consultant. The City will establish annual expenditure limits throughout the term of this agreement. Specific work elements are defined by the following tasks: . Task 01 Project Management . Task 02 Planning . Task 03 Survey . Task 04 Sewer Design . Task 05 Boardwalk Design . Task 06 Architectural Design . Task 07 Mitigation Plan and Design . Task 08 Funding Assistance . Task 09 Permitting . Task 10 Community Outreach and Public Involvement . Task 11 Procurement and Bid Assistance . Task 12 Construction Management . Task 13 Evergreen Park Expansion . Task 14 Directed Services A list of anticipated deliverables for this project is included as Exhibit D. TASK 01 PROJECT MANAGEMENT This task consists of coordination, design quality control, and client communication. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 255-1896-808 March 2006 Task 1.1 Coordination Objective: This task will consist of project management, coordination of subcontractors, project team meetings, coordination and meetings with City staff, financial management, reporting, and scheduling. Approach: The Parametrix team will use a combination of in-house review, routine client meetings, and monthly progress reports to deliver elements of work described in this. task. The team will provide for the overview, direction, monitoring, and reporting of task activities in a manner that allows for the delivery of the project in accordance with the negotiated scope, budget, and schedule. This will include all day-to-day interaction with the City, attendance at meetings, routine correspondence, scheduling, budget management, etc. Parametrix will, within thirty (30) days of receipt of written notice to proceed, prepare a Project Management Plan (PMP) that summarizes the primary management activities. Parametrix will prepare an outline of the PMP for review by the City and the project management team. The PMP will include specific responsibilities between the City and Parametrix, a list of expected deliverables, a change management plan, and a quality control plan. A communications plan will be included in the PMP. Deliverab/es: The following will be delivered: . The team will prepare and deliver routine correspondence, schedule and budget updates, status reports on progress of work, and summary reports on meetings with agencies, property .owners and City personnel. . A Project Management and Communications Plan Assu!llptions: The following assumptions are made about this task: . One (1) report detailing progress, budget status, and projected work for the following month will be provided each month. Weekly progress will be discussed as part of ordinary correspondence. . The project manager will provide 4 hours/week, the assistant project manager will provide 2 hours/week and an administrative assistant will provide 2 hours/week for routine management of this project. · One (1) internal consultant coordination meeting will be held a minimum of once each month. These meetings will be combined with other specific City coordination and document review meetings. See the attached schedule of project meetings. · The design team and Consultant project manager will attend each meeting.' In addition, the architect will attend three (3) of these meetings, the geocoastal engineer will attend two (2) of these meetings and the geotechnical engineer will attend two (2) of these meetings. . Consultant will provide meeting summaries. . Public, stakeholder, and agency meetings are included under other tasks. . An amount will be added to each invoice to cover direct expenses such as in-house duplicating and blue printing, local mileage, telephone calls, messaging, and postage. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 2 255-1896-808 March 2006 Administrative time related to the project will be billed hourly. Allocated expenses will be billed at 6 percent of billable labor. This amount is added to Task 1, but covers all tasks. This excludes per diem and major outside printing efforts such as reproduction of the Environmental Impact Statement (EIS); final plan sets etc., but includes all minor day-to-day costs. City Responsibility:The City will be responsible for the following: . Attend monthly meetings Task 1.2 Design Quality Control Objective: Provide senior review of all design deliverables and quality assurance review of designs. Approach: Staff from Parametrix and subconsultant firms will check work and provide internal peer and technical review of all submittals. Parametrix will provide a technical editor to assure written accuracy. DeliverabJes: None; however, QC documentation will be maintained in the project files and available for review at any time. Assumptions: Design quality control costs are assumed at a maximum of 10 percent of actual design costs for purposes of budgeting. City Responsibility:The City will be responsible for the following: . Providing concurrent review of design deliverables prior to final submission TASK 02 PLANNING Objective: Ensure new project-related facilities are integrated with the surrounding downtown Bremerton planning/urban design and appropriately address the project goals including: . Provision and/or enhancement of pedestrian and non-motorized public access to the waterfront. . Provision of a Boardwalk that is an integral component of ongoing efforts to revitalize Downtown Bremerton. . Evaluate planned and existing improvements in the downtown area to assure integration of this project into the overall City development plan. . Provision of appropriately located and designed connections between the Boardwalk and adjacent commercial/residential uses as well as adjacent open spaces, trails, and similar public uses. Approach: Inventory and evaluate existing conditions as required to provide an understanding of the planning/urban design of new project-related facilities. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 3 255-1896-808 March 2006 Identify and evaluate potential locations and design concepts for connections between the Boardwalk and adjacent uplands. Specific tasks will include: . Review goals, objectives, and expectations with the Project Team, City staff, the Boardwalk Advisory Committee (BAC), and others as appropriate. . Coordinate with the Washington State Department of Transportation (WSDOT) for an access at the Manette Bridge. . Inventory and document adjacent existing conditions including: ~ Land uses. 1 ~ Open spaces, trails and similar public recreational uses. ~ Pedestrian, non-motorized, and vehicular circulation systems. ~ Potential future development. ~ Significant urban or landscape corridors, edges, nodes, landmarks, and similar features. . Evaluate existing conditions and document urban design/planning issues as well as opportunities and challenges that are relevant to the design of the Boardwalk and connections to adjacent uplands. . IdentifY, document, and evaluate alternatives for providing connections between the Boardwalk and the adjacent uplands and the Manette Bridge. DeliverabJes: Illustrated memorandum describing: . The existing planning/urban design, . Alternative access points and physical connections . Related planning/urban design goals and criteria Assumptions: This Task assumes that: . Upland connections to the boardwalk will be considered at a variety of locations including the existing Louis Mentor boardwalk, the former Chevron property, the Manette Bridge, and other locations along the route. · Conceptual design of the Boardwalk, connections to the adjacent uplands will occur as described at Task 6. . It is anticipated that one or more of the intermediate locations for connections to the Boardwalk may depend on the City acquiring land. Activities associated with land acquisition such as property surveys above mean high water (other than the work described in Task 3.1 below), title reports, and other legal documentation of, or changes to, property boundaries are outside this scope of work City of Bremer/on Beach Sewer Replacement and Public Access Scope of Work 4 255-1896-808 March 2006 City Responsibility:The City will be responsible for the following: . The City of Bremerton will provide aerial photos and electronic GIS or other base mapping materials for use in the inventory and evaluation of existing conditions. . Provide feedback and comment on planning recommendations. . City will provide land use information, plans, and regulations. TASK 03 Task 3.1 Task 3.2 Objective: Approach: SURVEY Upland Survey Upland areas are all project areas not surveyed under Task 3.2. This task assumes that 80 hours of survey fieldwork will be performed, with appropriate in-office support. If additional work is needed, funding will be added from the Directed Services task only upon the written direction of the City (Task 14). Bathymetric Provide the equipment, vessel and support services necessary to conduct a precision hydrographic survey along the Bremerton waterfront. The surveys are required for accurate mapping of the bathymetric configuration of the shoreline to support design of the proposed boardwalk facilities and evaluate alternatives for sewer main placement. A full-coverage multi beam survey is recommended to ensure complete detection and mapping of any potential underwater obstructions. To meet this requirement, a multibeam hydrographic survey using a high-resolution (0.5- meter or greater) digital terrain model (DTM) of the underwater topography of the marine waters just offshore of the site will be performed. This will include: . Multibeam Hydrographic Survey: ~ Use of the Triton-Elics Hydro Suite Multibeam survey system to map the entire shoreline area. This site encompasses an area approximately 4,000 feet along shore, extending approximately 200 feet offshore. ~ The multibeam system will be 'patch-tested' prior to surveys to insure vertical and horizontal accuracies are within survey specifications. Vertical accuracy has been verified at the current configuration within 15 cm (7 inches) at the outer beams and approximately 5 cm at nadir. Horizontal accuracy will be the best available using RTK GPS. ~ Single-beam hydrographic data will be collected concurrently to assist in verifying accuracy of multibeam soundings. Additionally, a minimum of 3 lead- line point depth measurements, precisely positioned within the survey area will be measured across the site covering the range of depths. This will be done as a supplementary verification check on the multibeam system for assessment of overall depth accuracy. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 5 255-1896-808 March 2006 >- It is expected the survey to require one day to complete, plus 1/2 day to mobilize the vessel from Seattle to Bremerton and 1/2-day to complete the patch-test requirements as described. Surveys will be conducted during high tide to capture as much of the shoreline areas as possible. . Navigation and Positioning: >- All positioning will be obtained using Real-time Kinematic (RTK) GPS. The horizontal reference datum will be in US survey feet, Washington State Plane, North Zone, NAD83. All surveys will be carried out in accordance with the U.S. Army Corps of Engineers (USACE) Class 1 guidelines, as described in USACE EM 1110-2-1003, Hydrographic Survey Manual (USACE 2003). >- Hydrographic survey navigation control will be accomplished using the Hypack survey system. Navigation data will be acquired concurrently with the Triton- Elics Hydro Suite survey system. The survey system receives data from the positioning system, performs the appropriate geodetic transformations, and stores the position information along with the data from all instrument packages. Real- time acquisition displays provide data quality control and assessments during surveys. Pre-planned survey lines will be established to provide 200% survey coverage (100% overlap) to ensure sufficient data density. A real-time DTM of bathymetric. conditions will be used during the survey to assure data quality and complete bottom coverage. All data will be stored in Triton's XTF data format for post-processing, analysis, and archiving. · Measurement of Tide and Sound Velocity: >- Tide data will be acquired in real-time during the survey with RTK GPS. Tide corrections will be delivered directly to the acquisition system and logged simultaneously with the multibeam data. Additional control checks will be conducted after the survey to verify local tide readings. >- A recording tide gage may be installed at an appropriate location near the survey area to provide backup tidal data and for verification of RTK GPS tides. All hydrographic data will be tide corrected and adjusted to the appropriate datum. >- Full water depth sound velocity casts will be performed before and after the survey using a Valeport Soundbar sing-around velocimeter. The profiles are required for accurate processing of the multibeam data to account for travel time and refraction due to changes in sound speed through the water column. . Data Processing: >- All data processing of multibeam data will be conducted using CARIS HIPS hydrographic survey data processing software. The data will be edited to remove bad or poor quality data points and corrected for tide. An output file containing spatial coordinates for all data points (e.g., easting, northing, and depth elevation in MLLW) will be for final editing and development of the Digital Terrain Model (DTM) and contours. Contouring will be accomplished using Trimble's TerraModel HDMS system and exported to CADD and GIS formats. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 6 255-1896-808 March 2006 Deliver abIes: The following will be delivered: . All data will be edited and post-processed immediately after completion of surveys. The multibeam data will be edited for bad points, sorted, and gridded at the optimum resolution. All data will be reported as XYZ with elevations reported in the appropriate vertical datum. XY locations are recommended in Washington State Plane Coordinates, North Zone, NAD83. . Plan view survey maps on D-sized sheets at a scale of 1 inch = 50 feet at 1-,2-, and 4-ft contour intervals as appropriate and/or as agreed to by the client. The mapping scale can be adjusted to meet client needs. . All XYZ data will be provided in an electronically deliverable ASCII file format. . AutoCAD plotted contours. We can also provide the final TIN models in dxfformat if desired. . Arcview shape files of the final DTM. Assumptions: All data processing and chart productions will be produced within 2 weeks of completion of surveys. . City Responsibility: None. Task 3.3 WDNR Aquatic Lands Lease Objective: . Provide documentation for the DNR aquatic land-lease to provide for use of state owned tidelands. Approach: The following tasks will be performed: . Prepare survey exhibits and property descriptions of the project area for use in application for the DNR land-lease, including property descriptions for the hillside connections. . Define property lines within the area of construction. . Assist in preparation of land-lease documentation In accordance with DNR requirements. . Coordinate with City staff and DNR to resolve Issues associated with these requirements. Deliver abIes: Letter report describing the legal description of each property within the project area. This report will include stamped survey documents. Assumptions: The following assumptions apply: . Privately held aquatic lands are included in the survey and will be annotated as such. . No fees or lease payments are included in this scope. Cily of Bremer/on Beach Sewer Replacement and Public Access Scope afWork 7 255-1896-808 March 2006 City Responsibility: The City will: . Prepare and submit final land-lease application. . Pay all fees associated with the land-lease and other acquisitions. TASK 04 SEWER DESIGN The pre-design work for this task has already been accomplished under other scope. Design criteria and alternatives analysis are in progress and are not scoped here. Task 4.1 Geologic/Geotechnical Feasibility Evaluation Objective: Provide feasibility-level geologic/geotechnical evaluation of the beach and hillside to support design of the sewer improvements. Approach: Identify, develop, evaluate, and document the existing geologic and geotechnical conditions at the site and inform other design professionals about the effects on the potential design. . Review existing published geologic literature and geotechnical reports from the [ollowing: ;, Geotechnical data associated with other local projects ;, Washington State Department of Transportation (WSDOT) . Geologic reconnaissance of bluff and beach (landslides, erosion, springs, geology, fills, shore protection). · Prepare map of existing geologic conditions. . Prepare geotechnical opportunities and constraints map indicating areas with geologic hazards or limitations and zones/corridors where designers can take advantage of the existing geologic conditions for placement of project components. . Prepare preliminary geologic/geotechnical feasibility report. . Prepare final geologic/geotechnical feasibility report to include descriptions of the topography and geology of the site, geologic hazards on and adjacent to the site, logs of existing subsurface explorations within the project boundaries, discussions of the impacts of the geologic conditions on the proposed 'project, and maps of the geology and interpreted opportunities and constraints for the project. Deliver abIes: The following will be delivered: . Preliminary and final Geologic/Geotechnical Feasibility Report. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 8 255-1896-808 March 2006 Assumptions: The following assumptions apply: · No subsurface explorations will be performed in this phase; conclusions reached at this stage will be based solely on existing boring and test pit logs and on exposures of soil observed during the geologic reconnaissance. City Responsibility:The City will be responsible for the following: . The City will provide a 5-foot contour interval topographic base map using available LIDAR information and other physical features and property lines suitable for field identification of geologic features. . The City will provide existing geologic/geotechnical information in their files. . The City will obtain right-of-entry for private properties along and adjacent to the alignment. Task 4.2 Objective: Approach: Preliminary Geotechnical Evaluation Provide preliminary engineering-level evaluation of geotechnical aspects of the beach area for incorporation in the design of the sewer. Develop, evaluate, and present subsurface information at the site for preliminary engineering design and inform other design professionals about the effects on the potential design through the following approach: . Drill and sample four borings over water (assume 70 feet deep, below mudline) . Write and obtain SEP A/SMA permits for geotechnical work directly related to subsurface explorations. . Drill and sample five borings (to an assumed maximum depth of 10 to 30 feet) in beach deposits for trenching characterization and two borings in upland for colluvium thickness, using portable hand boring equipment. . Excavate and log three test pits in the beach deposits for soils description and samples, and to assess stand-up time for the soils along the sewer alignment. . Draw one longitudinal geologic profile and four cross-sections from borings and exposures · Perform laboratory testing, consisting of water contents, gram sIze analysis, and Atterberg limits. . Comment on interception of the existing laterals on the backside of houses if vaults were installed during a grinder pump installation. . Perform Geotechnical Studies for preliminary engineering: );- Impact of Construction on slope stability and mitigation measures );- Trenching alternatives and feasibility City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 9 255-1896-808 March 2006 ~ Bluff-top and intermediate anchorage feasibility ~ Bluff toe notching and protection De/iverabJes: Preliminary Geotechnical Report that includes subsurface data, summary of geologic conditions, and engineering conclusions and recommendations for topics listed above. Assumpfjons: Borings are for joint use with boardwalk design. City Responsibility: Provide right of entry documentation from land owners impacted by this activity. Task 4.3 Objective: Approach: Final Geotechnical Evaluation Provide final engineering-level evaluation of geotechnical aspects of the beach area for incorporation in the design of the sewer. Following the 30% sewer design, final investigations will be performed to refine and ensure constructibility of the selected alternative. Develop, evaluate and present additional subsurface information at the site for final engineering design and inform other design professionals about the effects on the potential design through the following approach: . Drill and sample seven borings over water (assume 70 feet deep, below mudline) . Write and obtain SEP A/SMA permits for subsurface exploration work. . Install groundwater monitoring well in one near-bluff boring, including datalogger to evaluate the relationship between groundwater level and tidal fluctuation in a confined aquifer. . Update one longitudinal geologic profile and create 6 cross-sections from borings and exposures . The sanitary sewer lateral will transition from buried to exposed at the top of the slope. Recommendations will be provided on design criteria for this. . Perform laboratory testing, consisting of water contents, gram size analysis, and Atterberg limits. . Perform final Geotechnical Studies: ~ Beach trenching and shoring recommendations ~ Retaining wall recommendations ~ Bluff top and intermediate slope anchorage recommendations. ~ Bluff toe notching and protection ~ Dewatering evaluation City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 10 255- J 896-808 March 2006 Deliverables: Final Geotechnical Report Assumption: The following assumptions apply: . This scope does not include a Geotechnical Baseline Report (GBR) . Borings are for joint use for boardwalk design. City Responsibility: Provide right of entry documentation from land owners impacted by this activity. Task 4.4 Preliminary (30%) Engineering Objective: Develop plans for the proposed sewer improvements to a level that is sufficient to identifY impacts, mitigation measures, complete the EIS process, and submit all permit applications. Approach: Develop 30% complete plans for a beach sewer replacement alternative, and a grinder pump alternative. The preliminary plan sets for the civil drawings will include a cover sheet, legend general notes, plan and profile drawings, typical sections, lateral routing plan, and details for key elements. Conflicts and utility relocations will also be identified on the plans. Conduct a formal constructability review to identify construction impacts and determine if additional mitigation is required. Results of the constructability review will be included in a Technical Memorandum. A 30% project cost estimate will be prepared to address land acquisition, construction, and construction engineering. The cost estimate will also include a Cost Risk Analysis that includes an analysis of project elements and unknowns that have the potential to affect project costs. Deliverables: 30% plans, a draft Constructability Technical Memorandum and a project cost estimate for both alternatives. Assumptions: The following assumptions apply: . Civil modifications to pump stations (if any) will be included at a schematic level. . Electrical modifications to pump stations (if any) will not be included in the drawing set. . The cost estimate will be based on current costs escalated through projected construction date (assumed to be mid-year 2009) and will include a 30 percent construction contingency. . The work included in this step is limited to the beach sewer and appurtenances. The boardwalk elements are not included. . The design and the constructability review will be coordinated with other elements of the total project to ensure a technically feasible overall project. This will be coordinated with the design review of the boardwalk. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 11 255-1896-808 March 2006 . Temporary Erosion and Sediment Control (TESC) plans will not be included in the preliminary drawing step. . Team staff that has not had any prior involvement in the design process will perform the constructability review. City ResponsibjJity:The City will provide AutoCAD drawings of the grinder pump alternative for evaluation. Task 4.5 Intermediate (60%) Engineering Objective: Update the 30% plan for the preferred alternative as identified in the Final EIS. Approach: Prepare 60% complete plans, create draft specifications, finalize the Constructability Technical Memorandum and update the project cost estimate. DeliverabJes: 60% plans, draft specifications, final Constructability Technical Memorandum and updated project cost estimate. Assumptions: The following assumptions apply: . Civil modifications to pump stations (if any) will be included at an intermediate level. . Electrical modifications to pump stations (if any) will be included at an intermediate level in the drawing set. . TESC plans will be included in the drawing set. . Drawings and the Final Constructability Technical Memorandum will be revised based on comments received on the preliminary drawing set. A response log to track responses to comments will be developed and will be available at any time. . A draft list of technical specification sections in CSI or WSDOT format will be developed. . Ten (10) copies of the 60% plans will be submitted for City review. City Responsibility:The City will review and comment on 60% design. Task 4.6 Final (90% and 100%) Engineering Objective: Create a complete set of plans, specifications, and a cost estimate that clearly and accurately defines the improvements. Approach: Update the plans and specifications to a 90% complete level. Based on comments from the City, revise and resubmit for the 100% submittal. Update the project cost estimate for the 90% submittal, and revise as necessary for the 100% submittal DeliverabJes: 100% plans, final specifications and updated project cost estimate. Assumptions: The following assumptions apply: City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 12 255-1896-808 March 2006 . Drawings and the Final Constructability Technical Memorandum will be revised based on comments received on the intermediate drawing set, including agency comments. A response log to track responses to comments will be developed and will be available (upon request). . The cost estimate includes a 10% contingency. . Technical specification sections in CSI or WSDOT format will be developed. Bid tab assistance will be provided if requested by the City. . Bidding assistance and construction assistance is not included in this task. City ResponsibjJity:The City will provide Section 0 boilerplate of the specifications for use in preparing Contract documents. TASK 05 BOARDWALK DESIGN Task 5.1 Geotechnical Feasibility Evaluation Objective: Provide preliminary engineering-level evaluation of geotechnical aspects of the design of the boardwalk, Evergreen Park expansion, and all other upland areas. Approach: Develop, evaluate, and present subsurface information at the site for preliminary engineering design and inform other design professionals about the effects on the potential design through the following approach: . Provide preliminary input for pile foundation support options, including vertical and lateral analysis. . Seismic analysis. . Preliminary dewatering evaluation. . Retaining wall recommendations. . Upland access recommendations . Stability review/recommendations of existing seawalls (e.g. Chevron Property). DeliverabJes: Preliminary Geotechnical Report (in same package as sewer recommendations). Assumptions: The following assumptions apply: . Information data collected during the sewer line investigation will be used for this evaluation. No additional field work is proposed. No pump tests or other in-situ test~ will be performed for dewatering evaluation. . Additional borings (not in scope) may be required to provide design criteria for upland connections once locations are determined. If additional work is required, funding will be added from the Directed Services task upon written direction from the City (Task 14) City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 13 255-1896-808 March 2006 City Responsibility: Provide right of entry documentation from land owners impacted by this activity. Task 5.2 Objective: Approach: Final Geotechnical Evaluation Provide final engineering-level evaluation of geotechnical aspects of the design of the boardwalk. Following the 30% boardwalk design, final investigations will be performed to refine and ensure constructibility of the selected alternative. Develop, evaluate and present additional subsurface information at the site for final engineering design and inform other design professionals about the effects on the potential design through the following approach: . Pile foundation support recommendations . Seismic analysis update . Dewatering recommendations . Upland access recommendations . Retaining wall recommendations . Stability review/recommendations of existing seawalls (e.g. Chevron Property). Deliverables: The following will be delivered: . Final Geotechnical Report (in same package as sewer recommendations) Assumptions: The following assumptions apply: . Field data collected during the sewer line investigation will be used. for this evaluation. No additional field work is proposed. No pump tests.or other in-situ tests will be performed for dewatering evaluation. . In-situ testing for pile loads (axial and lateral) may be required, but this is unknown at this time. City Responsibility: Provide right of entry documentation from land owners impacted by this activity. Task 5.3 Objective: Approach: Geo-Coastal Engineering and Sediment Dynamics Analysis Provide an evaluation of the relevant coastal and marine physical processes in the project area for the existing condition and for two practical alternatives in order to facilitate sewer and boardwalk design, to address environmental permitting issues, and to assess long term shore and project maintenance issues related to erosion and accretion of coastal sediments. Relevant coastal and marine physical processes in the project area include wind-driven waves and vessel-generated waves in Sinclair Inlet and Port Orchard Reach, water level fluctuations associated with winds and tides, associated currents and circulation in Dyes 14 255-1896-808 March 2006 City of Bremerton Beach Sewer Replacement and Public Access Scope of Work Inlet and Sinclair Inlet, and sediment dynamics (erosion/accretion patterns) in response to water motions in the near shore of the project area. The sub task will include a site visit to assess coastal geomorphology and beach and inter-tidal sediments at the project site and to observe and document coastal process indicators, observe and document sedimentary material from the perspective of sediment dynamics and structures that may interact with sediment dynamic processes. The sub-task will include gathering existing information, including previous reports and studies and available data. from previous data collection efforts in the project vicinity. Data will include: . Wind records from Bremerton airport . Wave measurements held by Pacific International Engineering obtained during the Bremerton Marina floating breakwater study and Rich Passage studies . Current measurements from Port Orchard Reach . A vail able bathymetry from NOAA, Geodas, and other related databases . Aerial photography . Data on beach morphology (planform and profile) and sediments (grain size). A vailable information will be reviewed to assess the suitability and adequacy for the present project. Knowledge of the local area and previous project experience in this area indicates that additional surveys of bathymetry, topography and coastal structure in the project area will be required to provide adequate detail for the analysis and that such data will be acquired as part of a separate task. The additional survey data is needed to improve and refine modeling grids to be used for simulation of coastal processes in the project area. A one month deployment of one acoustic Doppler current profiler will be required as part of this task for development of additional data for local (site specific) validation of a regional tidal circulation model of the area. Deployment of a wave gauge may be required for verification of wind wave climate depending on the adequacy of existing data. The work includes evaluation of nearshore hydrodynamic conditions associated with tides and tidal currents, wind waves, and vessel wakes. Analysis will involve development of statistics on typical and extreme water levels, development of local wind wave climatology, a vessel wake climatology and assessment of currents and circulation. Analysis and tools developed for other studies including the Seattle-Bremerton Passenger Fast Ferry Research study will be applied to the project area. A circulation model for Dyes Inlet, Sinclair Inlet, Port Orchard Reach, and Rich Passage has been established. The model will be used to simulate tidal currents and water levels for a typical spring tide and neap tide condition. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 15 255-1896-808 March 2006 A wave hind-casting approach and an appropriate wave transformation model will be used to examine selected combinations as needed to assess local wind-wave climate. A vessel-wake climatology developed for studies in Port Orchard Reach and Rich Passage will be used to assess local wake conditions in the project area and a wake transformation model will be applied to selected cases if necessary. Statistics of the wave, current, and water level climatologies will be used to develop combinations for evaluating alternatives relative to the existing condition. The analysis of nearshore hydrodynamics is to provide the information required for an assessment of sediment transport potential for existing conditions. Results of the geomorphic assessment and the coastal process analysis will be synthesized to provide an assessment of existing sediment and beach dynamics relevant to the project. . The coastal processes analysis tools will be applied to the evaluation of two preliminary concept level alternatives to identify potential impacts to sediment dynamics and circulation in the project area and to identify any potential physical issues relevant to the project design such as wave loading, water levels, or current induced stresses. DeliverabJes: The following will be delivered: . Field measurements will be edited and post processed after recovery of instruments. All final data will be available as electronically delivered ASCII files of water surface elevations, and depth-averaged velocities (speed and direction) and metadata. . The results of the computer modeling will be provided in digital format. Due to the size, complexity, and proprietary nature of some of the models proposed to be applied here, input control files and detailed simulation results will not be provided, however, digital summaries of key controls will be provided. . Draft and final reports of the Geo-coastal analysis for the existing condition and two alternatives evaluating design criteria and mitigation requirements associated with the selected alternative. Assumptions: The task assumes that additional current measurements are required to verify the predictive models for the project area. 3-dimensional survey data required to augment the modeling grids will be acquired as part of a separate task. Work performed under this task will be used for design evaluation of the beach sewer and sewer laterals as needed. No additional work is assumed to support those tasks. City Responsibility: None. Task 5.4 Boardwalk Design Criteria Objective: Develop goals and objectives and purpose and need for the boardwalk. Define the boardwalk structural requirements (e.g. width, height, shoreline alignment, construction materials, light transmission issues, utilities, load rating, future shoreline access, etc.) and design requirements (e.g. enlarged areas, connections, access for boats/barges, etc.). City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 16 255-1896-808 March 2006 Approach: The consultant team will work together with the City, Agencies, and the public to develop preliminary design criteria and to prepare a Design Criteria Memorandum, including a purpose and need statement. The design criteria will be presented to the BAC along with the sewer design criteria at a meeting for review and comment. The criteria will establish any requirements imposed by environmental, technical, and operational consideration, lighting requirements, physical requirements to accommodate maintenance equipment (vactors, etc.) and emergency vehicles, and the need or desire for benches, shelters, trash receptacles or other amenities Deliverab/es: The following will be delivered: . Ten (10) copies of the draft Design Criteria Memorandum. · Ten (10) copies of the final Design Criteria Memorandum. Assumptions: The following assumptions are made about this task. . The draft design criteria will be reviewed at the initial BAC workshop, together with the design criteria for the sewer. . The Final Design Criteria Memorandum will incorporate comments from the BAC and public meetings. City ResponsibjJity:The City will be responsible for the following: · The City will provide input on design criteria. Task 5.5 Objective: Approach: Boardwalk Alternatives Analysis and Pre-Design Develop the boardwalk design alternative for the beach sewer preferred alternative identified under Task 4.4 to a preliminary level. Evaluate constructibility and cost impacts for the preferred alternative. Based on the design criteria and purpose and need statement approved by the City under Task 5.4, develop and evaluate up to three boardwalk concepts for the alternative identified under Task 4.4 to the preliminary structural design level. These concepts will be presented to the BAC, together with the sewer replacement alternatives at a BAC workshop. The concepts will include options for the boardwalk such as enlarged areas, removable or heightened sections, connections and amenities with order of magnitude cost estimates for consideration by the BAC. Based on feedback from the BAC, a boardwalk design alternative, including optional architectural features and amenities will be developed. A cost estimate and schedule for construction of the boardwalk, with cost breakouts for optional features will be included. Constructibility will be evaluated for the selected alternative including in-water (barge) and linear methods. Deliverab/es: The following will be delivered: . Letter report for the three (3) boardwalk concepts. . Ten (10) copies A Iternatives Analysis Report. City of Bremer/on Beach Sewer Replacemen/ and Public Access Scope of Work 17 255-1896-808 March 2006 . Ten (10) copies of the Constructibility Report. Assumptions: The following assumptions apply to this scope: . Three (3) boardw:alk concepts will be presented at a BAC meeting. . Cost estimates for boardwalk construction will include sufficient detail to quantify additive costs for the various architectural features and related impacts to mitigation costs. . Significant changes to the sewer or boardwalk alternative after completion of the 30% design may be justification for change in project scope and budget. . Structural alternatives for consideration are assumed to include an enlarged plaza area, connection to the new Manette Bridge, 2 additional upland connections to Washington Avenue, locations where the boardwalk rises or contains removable sections to accommodate boat traffic following construction and two (2) locations where the boardwalk changes significantly to accommodate an architectural or function variation. · One (1) meeting will be held with WSDOT to discuss the new Manette Bridge design. . The design features will be coordinated with necessary maintenance requirements related to operation and maintenance of the beach sewer. City Responsibility:The City will be responsible for the following: . The City will help identify the boardwalk concept to be developed into an alternative. . The City will help identify architectural amenities and features to be considered for cost estimates. Task 5.6 Lighting Design Electrical Engineering Objective: To provide engineering services for lighting the boardwalk to provide for 24-hour access and safety requirements. Approach: Develop, evaluate and present additional information at the site for final engineering design and inform other design professionals about the effects on the potential design through the following approach: . New service at each end of boardwalk including meter, service disconnect, and power distribution panel. . Load and voltage drop calculations. . Coordinate specification of lighting fixture ballast voltage and fixture junction box and/or hand hole with architectural design. . General electrical specification including utility service, lighting panel, grounding, lighting contactor, timer, photo-eye, conduit, ducts, wire and hand holes. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 18 255-1896-808 March 2006 . Control interface to City's energy management system. This prOVISiOn will be limited to connection of a dry relay contacts to the lighting contactor control circuit. Design and installation of energy management equipment and wiring will be performed by others. . Provide drawings including: conduit / cable interconnect diagram including service, lighting panel schedules, and electrical details . Preparation of construction cost estimates for all electrical work. DeliverabJes: The following will be delivered: . Final Lighting Plan · 30%, 60%, 100% and final design plans . Specifications package for bid documents Assumptions: The following assumptions apply: · Boardwalk is 3200 ft long - assume simple, low-density lighting plan with no more than 30 fixtures. . Kiosks or some other aesthetically appropriate structures for electrical meter and lighting panel are provided. · Assume 480V, 3-phase, 4-wire utility electrical power is available at each end of the boardwalk and will be provided by the City. Therefore, assume 277V lighting ballast voltage · Up to 2 site visits and meetings with electrical utilities are provided for. City ResponsibjJity:The City will provide approval for or selects fixtures. Task 5.7 Preliminary (30%) Structural Engineering Objective: Support development of the project alternatives. Alternatives evaluation will involve development of structural concepts, preparation of concept sketches. Approach: Once selected, the preferred concept will be refined to an approximately 30% level of completion. Scope of work elements for the 30% level of design will include: . Preparation of structural section of draft Constructibility Technical Memorandum (see Task 4). · Preliminary structural analysis and design of preferred concept. · Preparation of the structural preliminary plans, 30% level of completion. . In conjunction with the Task 4 series, provide complete preparation of the construction cost estimates and schedule for all work. . Preparation of outline structural specification City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 19 255-1896-808 March 2006 " . Support preparation of EIS Document as well as provide information required through EIS process to facilitate establishment of the preferred alternative. . Support preparation of Permit Documentation . The design features shall be coordinated with necessary maintenance access facilities related to the operation and maintenance of the new beach sewer. Deliverables: The following will be delivered: structural section of Constructibility Technical Memorandum, preliminary plans, construction cost estimate and schedule, and outline-of structural specification. Assumptions: The following assumptions apply regarding boardwalk features: . The structure is approximately 3200 feet long, pile supported, and IS intended to provide pedestrian and maintenance access. . No staircase connection design to the Manette Bridge and no more than 2 hillside connection structures to the upland hillside are included. . The structure will accommodate access to the toe of the slope throughout the length of the boardwalk for barges or other construction equipment required for stabilization of the slope. The accommodation will be by elevated segments, removable sections, or other. . Two locations where the boardwalk changes significantly to accommodate architectural variation or functional variation are included. . An underwater support structure to support transverse elements will be assessed, but design is not included. . Beach Excavation and Shoring for the new sewer line is included. . Retaining Walls required for construction are included. City Responsibility:The City will review and provide input into all design alternatives. Task 5.8 Final Structural Engineering (60%, 90% and 100%) Objective: Develop preferred concept final design drawings, specifications, construction cost estimate and schedule for the structural items of work. Approach: Once selected, the preferred concept will be refined to a final design for construction. Scope of work elements for the design will include: . Respond to City and Agency comments on the preliminary and permit set structural drawings . Final structural analysis and design of preferred concept . Preparation of structural section of final Constructibility Technical Memorandum (as an addendum to the memorandum specified in Task 4). City of Bremerton Beach Sewer Replacement and Public Access Scope ofWor~ 20 255-1896-808 March 2006 . Preparation of the 60% permit structural plan set . Preparation of the 90% and 100% final structural plan sets . In conjunction with the Task 4 series, prepare the 90% and 100% final construction cost estimate and schedule for all the work. . Preparation of 90% and 100% final structural specification Deliverab/es: The following will be delivered: 60%, 90% and 100% final plans, final construction cost estimate and schedule, and final structural specification section. Assumptions: The following assumptions apply: · Drawings and the Final Constructibility Technical Memorandum will be revised based on comments received on the intermediate drawing set, including agency comments. A response log to track responses to comments will be developed and will be available (upon request). . The cost estimate includes a 10% contingency. · Technical specification sections in CSI or WSDOT format will be developed. Bid tab assistance will be provided if requested by the City. · Bidding assistance and construction assistance is not included in this task. City ResponsibjJity:The City will provide Section 0 boilerplate of the specifications for use in preparing Contract documents. TASK 06 Task 6.1 Objective: Approach: ARCHITECTURAL DESIGN Landscape Architectural Design for the Boardwalk Provide landscape architectural and architectural design input required to describe the physical character of publicly accessible components of the Boardwalk as well as to ensure the Boardwalk is designed to be safe, pedestrian-friendly, rich in passive recreational opportunities, and physically appropriate to the Bremerton Waterfront. Identify, develop, evaluate, and document alternative landscape architectural design options for the Boardwalk. Specific sub-tasks will include: · Identify, document, and evaluate up to three (3) alternative landscape architectural design options for the boardwalk layout and present for review at a BAC meeting. · Identity alternative concepts for miscellaneous architectural features and estimated costs for optional structures for consideration at the third BAC meeting. . Identity, document, and evaluate alternative concepts for miscellaneous architectural features and structures (e.g. shelters, pavilions, etc.) selected by the City of Bremerton for evaluation following BAC comment. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 21 255-1896-808 March 2006 . Develop the architectural concept for the boardwalk alternative to be evaluated in the EIS. . Attendance at relevant meetings with City staff, attendance at relevant Design Team meetings and routine project management and coordination. . Coordinate with City maintenance staff to ensure that needs are met. Deliverables: Illustrated memorandum describing: . Up to three alternative landscape architectural design options for the Boardwalk. . Alternative concepts for miscellaneous structures located on the Boardwalk. . Related physical design goals and criteria for landscape architectural features. . Cut sheets for boardwalk materials and other aesthetic features. . Cost estimates of the design options for the boardwalk concepts. Assumptions: The following assumptions apply: . Alternative landscape architectural design options will be developed to the 15 percent design level. . Alternative concepts for miscellaneous architectural structures will be portrayed at the conceptual level. City ResponsibjJity:The City will be responsible for the following: . The City will identifY the preferred architectural approach to be used in the selected boardwalk alternative. . The City will identify architectural amenities and features to be considered. . City maintenance staff will provide input on vehicle and equipment needs, access points, and other logistical considerations. Task 6.2 Landscape Architectural Design of Connections to the Boardwalk Objective: Provide landscape architectural design input required to describe the physical character of connections between the Boardwalk, the adjacent uplands and ensure such connections are designed to be safe, pedestrian-friendly, and physically appropriate to the Bremerton Waterfront. Approach: Identify, develop, evaluate, and document alternative landscape architectural or architectural concepts for connecting the Boardwalk with the adjacent uplands, Manette Bridge, existing boardwalk and park. Specific sub-tasks will include: . Review, evaluate, and comment upon options for the Sewer Lateral Design, as it relates to aesthetics City oj Bremerton Beach Sewer Replacement and Public Access Scope oJ Work 22 255-1896-808 March 2006 . Identify, document, and evaluate up to three (3) alternative landscape architectural or architectural design options for consideration in the analysis of alternatives for connecting the Boardwalk with the adjacent upland at 2 locations, at the existing boardwalk, and at the former Chevron Property. . Coordinate with the Design Team, BAC, and City staff regarding the evolution and selection of alternative Connections to be addressed by the EIS. DeliverabJes: Illustrated memorandum describing: . Alternative landscape architectural or architectural design options for connections between the Boardwalk and the adjacent uplands, the Manette Bridge, existing boardwalk and Chevron Property. . Related physical design goals developed in Tasks 4 and 5 and criteria for abovementioned connections. Assumptions: The following assumptions apply: . There will be a maximum of five (5) connections to the Boardwalk at the following locations: ~ South end of Boardwalk ~ North end of Boardwalk ~ Manette Bridge ~ Potential for two intermediate locations to be determined. . The connection to the Manette Bridge will be assessed. . The work of this Task may include conceptual architectural design for the abovementioned stair tower. . Alternative landscape architectural concepts will be developed to the 15 percent design level. City Responsibility:The City will be responsible for the following: . The City will select the number and location of connections to be included, based on consultant recommendations. Task 6.3 Architectural Design of Miscellaneous Structures Objective: Provide architectural design input as required to ensure that miscellaneous project-related structures (e.g. pavilions, shelters, etc.) are: 1) visually integrated with components of the whole project as well as with the visual character of the larger surrounding context; 2) physically integrated with underlying or adjacent landscape architectural or engineering components; and 3) appropriately documented for inclusion in the EIS / Facility Plan. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 23 255-1896-808 March 2006 Park structures will be evaluated under Task 13. This task will ensure that the structures at the park are coordinated with the boardwalk in terms of aesthetics. Approach: Identify, develop, evaluate and document alternative architectural concepts for miscellaneous architectural structures to be included within the project. Specific sub- tasks will include: . Coordinate with the Design Team and City of Bremerton staff regarding identification of the types and general locations of miscellaneous architectural structures to be included within the project. . Identify, document and evaluate (2) alternative architectural concepts for preliminary evaluation of alternatives for each type of architectural structure to be included within the project. . Coordinate with the Design Team and City of Bremerton staff regarding selection of (1) preferred architectural concept for each type of structure to be advanced for inclusion in the EIS / Facility Plan. . Advance design of (1) preferred architectural concept to work with the related engineering or landscape architectural context. Document related physical design goals and criteria. DeliverabJes: Illustrated memorandum (formatted for inclusion in the EIS / Facility Plan) describing the (1) preferred concept for each type of architectural structure to be incorporated in the project as well as related physical design goals and criteria for each type of structure Assumptions: The following assumptions apply: . Types of miscellaneous architectural structures to be incorporated into the project include the following: (3) shelters to be located on the Boardwalk and (1) free- standing stair tower to be integrated with improvements to the Manette Bridge. . Alternative architectural concepts will be developed to the 15% design level. . The preferred architectural concepts will be developed to the 30 % design level. City Responsibility: The City will be responsible for assisting the architect in selection of structures. TASK 07 MITIGATION PLAN AND DESIGN Task 7.1 Identify Mitigation Requirements and Options Objective: Identify and evaluate mitigation requirements, options and potential costs based on project design alternatives, and regulatory input. Approach: The following activities will be conducted for this task: . Identify potential mitigation requirements, options, and costs concurrent with development of design alternatives. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 24 255-1896-808 March 2006 . Identify properties that may need to be taken to meet mitigation needs and produce a map showing the locations and owners oftarget properties. . Contact the Army Corps of Engineers (Corps) and the Washington Department of Fish and Wildlife (WDFW) and other agencies, as required, to verify mitigation requirements. . Prepare a technical memorandum describing potential mitigation goals and objectives, options in the project vicinity, property acquisition/easement needs, costs, and recommended strategy for securing mitigation sites. · Meet with the City to review mitigation options and costs, and develop a preferred mitigation strategy. . Identify impacts to mitigation from design alternatives. Deliverables: The following deliverables will be submitted under this task: . Technical memorandum identifying potential project impacts, probable mitigation requirements, mitigation options, and mitigation costs. Prepare a recommended mitigation strategy including regulatory justification, scope of work, schedule, and cost estimate. . Records of communication with regulatory agency staff. . Meeting minutes and summaries. Assumptions: The following assumptions are associated with this task. . One (I) meeting each with the WDFW and the Corps. . Up to two (2) meetings with the City. . Mitigation sites will be evaluated in the Sinclair and Dyes Inlet areas if required by agencies. City Responsibility:The City will be responsible for the following: · The City will obtain right-of-entry agreements. . The City will provide for title search information for affected properties. Task 7.2 Mitigation Plan Objective: Prepare a Mitigation Plan that describes compensation for project impacts and that meets the requirements of the Corps of Engineers, WDFW, and City of Bremerton. Approach: The following activities will be conducted for this task: · Prepare a draft Mitigation Plan that includes the following components: ).> Project Description City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 25 255-1896-808 March 2006 ~ Environmental Baseline Condition ~ Project Impacts ~ Mitigation Goals and Objectives ~ . Mitigation Plan and Performance Standards ~ Monitoring and Maintenance ~ Contingency Plan ~ Communication Records, Photographs and Schematic Plans . Prepare schematic mitigation design to the approximate 15 percent complete level. . Prepare an order of magnitude cost estimate for mitigation plan implementation, including monitoring and maintenance. . Submit the draft Mitigation Plan to the City for review and prepare a final Mitigation Plan for submittal to permitting agencies. . Follow up with permitting agencies to provide supplemental project information to facilitate timely Mitigation Plan review. · Prepare one (1) addendum to the Mitigation Plan to respond to agency questions and comments. Deliver abIes: The following deliverables will be prepared under this task: . Meeting minutes and summaries from the agency meetings. . Draft and final Mitigation Plan. . Draft and final Mitigation Plan Addendum. Assumptions: The budget for this task is based on the following assumptions: II Up to five (5) separate mitigation sites or actions will be evaluated in the Mitigation Plan. Each mitigation site or action will require a preliminary field assessment. . No wetland delineation reports will be required. . Property acquisition, if necessary, will be performed by the City. . No additional survey work will be required beyond that noted in Task 3. . Schematic design will consist of up to eight (8) figures in JARP A format (8.5"x 11 "). . One (1) meeting with regulatory agencies is included in this task. . One (1) addendum to the Mitigation Plan will be prepared and will consist of up to ten (10) pages and two (2) figures. . The scope for this task includes two (2) meetings with City staff. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 26 255-1896-808 March 2006 . Required permit applications will be prepared under a separate scope. City Responsibility: None. Task 7.3 Mitigation Design Objective: Prepare construction plans, specifications and cost estimates to implement the approved mitigation plan. Approach: The following activities will be conducted for this task: . Prepare base map for mitigation design. . Verify location of utilities and determine if additional mappmg is required of manholes, catch basins and other underground utilities. . Develop up to ten plan sheets (not including cover sheet) showing mitigation design to the 30, 60, 90 and 100 percent complete levels. It is anticipated that the plans will include the following elements: ~ Beach cleanup and restoration within the construction corridor. ~ Piling removal and disposal at the former Chevron site. ~ Shoreline restoration at the former Chevron site. ~ An estuary restoration site to be determined in the Gorst vicinity of Sinclair Inlet. . Prepare special provisions at the 60 and 90 perc~nt complete level and with the final plans. . Prepare an opinion of construction costs at the 30, 60 and 90 percent levels, and at the final plans level. · Assumes a bid package concurrent with other construction to be performed. DeliverabJes: The following deliverables are included under this task: . Prepare 30, 60 and 90 percent plans, and final plans and cost estimates. The 60 and 90 percent and final plans will include special provisions. Ten (10) full-scale and one (1) half-scale copy of the plans and special provisions will be transmitted to the City. Assumptions: The following assumptions were used in deriving the task budget. . Scope does not cover intrusive investigation or sampling and assumes that cleanup plans, if applicable, are covered under a separate task. . Specifications will be prepared in WSDOT or CSI format. . No ownership, easement or right-of-way work is included in the scope of this task. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 27 255-1896-808 March 2006 . No hydraulic, hydrologic, water quality or coastal processes modeling will be required. . No construction observation or post construction monitoring is included in the scope of this task. City Responsibility: None. TASK 08 Task 8.1 Objective: Approach: FUNDING ASSISTANCE Coord i nation Parametrix will coordinate with Grant Solutions to develop a funding matrix identifying the various sources of funds available, the criteria/components that the grant can fund, and the application schedule. This matrix will be updated and maintained throughout the project. Grant Solutions will further develop and submit the various applications for the grants and loans. Parametrix will work with Grant Solutions to review and approve the funding approach prepared and recommended by Grant Solutions as a method of funding the overall project. This will include coordination associated with grant application review. Deliverables: The following deliverables are included under this task: . Schedule and spend plan for grants identified . Review comments on grant submittals Assumptions: Work will be completed under the following assumptions: . Parametrix and Grant solutions will jointly attend 3 meetings with City Staff to review/coordinate this effort. . Parametrix will provide the schedule identifying the cost expenditure rate and the program eligibility for the various funding sources identified by Grant Solutions. . Grant Solutions will be the lead for pursuing State and Local Grants and will prepare all documentation required to support these efforts City Responsibility: The City will contract Grant Solutions independently from this contract. Task 8.2 Objective: Approach: Federal Assistance The team will assist the City of Bremerton in the procurement of funds to assist the City with the costs of permitting, engineering and construction of the project. The team will assist the City of Bremerton in the procurement offunds to assist the City with the costs of permitting, engineering and construction of the project. Services will include preparation of Congressional briefing documents and meetings with 28 255-1896-808 March 2006 City of Bremerton Beach Sewer Replacement and Public Access Scope of Work Congressional delegation members and staff both in the state and in Washington DC to provide project information and strategies necessary to support annual funding requests. De/iverab/es: The following deliverables are included under this task: . Presentation materials including PowerPoint presentations, white boards, and briefing documents as needed. Assumptions: The following assumptions were used in deriving the task budget. . Includes at least one trip for up to 2 staff to Washington DC annually. City Responsibility: All visits to Washington DC or meetings with Congressional delegation members will include representation from the City. TASK 09 PERMITTING This task covers environmental documentation, compliance with the Endangered Species Act (ESA); and other federal laws and statutes, and permitting. This process will meet the procedural and documentation compliance requirements for the Bremerton Sewer/Boardwalk project under the National Environmental Policy Act (NEPA) (42 U.S.C. 4321 et seq. and 40 CFR part 1500), State Environmental Policy Act (SEPA) (RCW 43.21C and WAC 197-11), and other applicable federal, state, and local environmental laws, statutes, executive orders, codes, regulations, and policies. Future scope will define EIS and permitting schedule. The permitting strategy technical memorandum submitted under Phase 1 of this project provides the processes to be followed. Task 9.1 EIS and Permitting Coordination Objective: Provide for the overview, direction, monitoring, and reporting of task activities 10 a manner that allows for the delivery of the EIS products and permits. Approach: Prepare an EIS consistent with the requirements of NEPA, SEPA, and the City's environmental ordinance, and any other applicable statutes, regulations, or guidance. Assumptions: The team will explore the potential to prepare a NEPA Environmental Assessment (EA) instead of an EIS. The reason for pursuing this option is to cut down on the amount of time it will take to complete the environmental documentation for the project, and to reduce costs. Under this option, the EA would be adopted to satisfy SEPA. We believe that it is unlikely that this option would be acceptable to the agencies. Therefore, for the purposes of the scope and budget, it is assumed that we would prepare an EIS. . Work under this task includes attendance at meetings and coordination with the overall project team. Up to four (4) EIS coordination meetings attended by two (2) staff are included. . The team will be responsible for maintaining a public record for the project, including records of public and agency comments and correspondence. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 29 255-/896-808 March 2006 . The team will maintain an administrative record for the EIS. An administrative record is typically required of federal projects and includes all reference materials used in the preparation of the EIS. DeliverabJes: The following will be delivered: . EIS program schedule and workflow inputs and monitoring. . Action item tracking and reporting. . Prepare environmental compliance work plan and schedule to be incorporated into the overall project work plan and schedule. Task 9.2 EIS Scoping Objective: To meet the procedural requirements under NEP A and SEP A for public notice to affected agencies, Indian Tribes, and the public, and to use the scoping process to focus or limit the range of analysis in the EIS to only those issues that may have a significant impact on the environment. Approach: The team will prepare scoping materials and develop a draflPurpose and Need Statement. DeliverabJes: The following will be delivered: . Publish Determination of Significance and Scoping notice and a short list of alternatives. . Five (5) copies of the draft scoping notice for review and comment. . Two hundred (200) copies of the final scoping notice that will be mailed to agencies, individuals, and organizations on the distribution/mailing list. . One (1) copy of the final scoping notice will be sent to the Paper of Record (Kitsap Sun). \ . Materials for the public scoping meeting. Assumptions: The following assumptions apply: . National Oceanic & Atmospheric Administration (NOAA) Fisheries and the City will review and provide comments on all scoping materials. . The team will be responsible for publishing the scoping notice and mailing public notices to NOAA Fisheries, other public agencies, tribes, and the public, as well as the paper of record. . The project team, as a whole, will help to produce materials such as handouts, exhibits, or displays for the public scoping meeting. . Staff will attend one (1) public scoping meeting and set up and facilitate the meeting. · Up to seven (7) staff will attend the public scoping meeting. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 30 255-1896-808 March 2006 . For budgeting purposes, it was assumed that there will be two hundred (200) copies of the scoping notice prepared for mailing. City Responsibility:The City will be responsible for the following: . The City will provide space for the public scoping meeting. . The mailing list for the scoping notice and distribution of the EIS and other related notices would be developed in association with the City, NOAA Fisheries, and the project team. Task 9.3 DEIS Preparation Objective: Prepare Draft Environmental Impact Statement Approach: The approach will include: . Develop and document the project proposal and alternatives including the No Action Alternative as required by the Lead Agency(s) (City and NOAA Fisheries). . Gather information necessary to characterize the existing environmental conditions in the project area for the elements of the environment analyzed in the EIS. . Produce a comparative assessment of the environmental impacts of the proposal and each of the alternatives considered. . Prepare a DEIS for public issuance that meets the requirements ofNEPA and SEPA. De/iverabJes: The following will be delivered: . Twenty copies of the preliminary DEIS will be prepared for review. . Twenty copies of the draft DEIS will be prepared for review. Assumptions: The following assumptions apply: . The scope of the EIS will cover the following elements of the environment (these may change after consideration of public, tribal, and agency comments during scoping): topography, geology and soils, water resources, vegetation and wetlands, fish and wildlife including threatened and endangered species, hazardous materials, noise, land use (including displacements), social (including environmental justice) and economic, historic resources, cultural and archaeological resources, recreation, visual resources and aesthetics, transportation, public services and utilities, and construction impacts. . There will be three alternatives analyzed in the EIS - two action alternatives and the no action alternative, and that once technical work on the EIS begins there will be no major changes to the alternatives. . Two rounds of review and revision for the DEIS, thus a preliminary DEIS will be prepared for initial review, a draft OBIS will be prepared for a second round of review, and a final DEIS will be prepared for issuance. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 31 255-1896-808 March 2006 . The team will prepare the distribution list in coordination with the City and NOAA Fisheries. City Responsibility: The City will: . Provide review and comment on the DEIS . Copy and distribute the DEIS Task 9.4 Public Comment Period/Response to Comments Objective: To meet the public involvement requirements ofNEPA and SEPA, respond to comments on the EIS, and determine where revisions to the DEIS are necessary. Approach: The following approach applies: . Prepare a draft Notice of EIS Availability and a draft notice for the EIS public comment meeting for review by the City and NOAA Fisheries. Parametrix will revise the Notice of ElS Availability and notice for the public meeting and prepare a final version for issuance in the paper. . Set up and facilitate the public comment meeting on the DEIS in coordination with the City. . Catalogue, organize, and distribute the written comments and transcripts of the public meeting and the written comments received during the public and agency comment period for response by the technical staff. Parametrix will prepare a response to comments section for review by the City and NOAA Fisheries. Deliver abIes: The following deliverables apply: . Five copies of the draft Notice of EIS Availability. . One camera-ready copy of the final Notice ofEIS Availability. . Five copies of the draft notice for the public meeting. · 120 copies of the final public meeting notice to be mailed out . 40 copies of the of the review drafts of the Response to Comments section of the Final EIS. Assumptions: The following assumptions apply: . The team will prepare draft and final versions of the Notice ofEIS Availability. · The City will be responsible for publishing the Notice of Availability in the Paper of Record. . There will be two rounds of review and revisions of the response to comments section. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 32 255-1896-808 March 2006 . Up to 150 substantive comments on the DEIS will be received. (A substantive comment is a comment that requires a technical response. A non-substantive comment is one where the comment is noted or the response directs the reader to a previous response.) . The City will be responsible for publishing the notice for the public meeting. . Staff will attend one public comment meeting on the DEIS and set up and facilitate the meeting. . Up to seven staff will attend the public comment meeting on the DEIS. . The City will provide space for the public comment meeting. . Parametrix will print and mail out notices for the public comment meeting. City Responsibility:The City will be responsible for the following: . The City will provide space for the public meeting. . The mailing list for the public meeting and distribution of the EIS and other related notices would be developed in association with the City, NOAA Fisheries, and the project team. Task 9.5 Final EIS (FEIS) Preparation Objective: Revise the DElS in response to the comments received from the public and agencies and prepare a FEIS for issuance. Incorporate public and agency comments and concerns expressed during the comment period on the DEIS. Approach: Perform additional analysis as necessary and revise the DElS according to public and agency comments. To prepare a FEIS for public issuance that meets the requirements of NEP A and SEP A. Deliver abIes: The following will be delivered: . Twenty (20) copies of the preliminary FEIS will be prepared for review. . Twenty (20) copies of the draft FEIS will be prepared for review. . Two hundred copies (200) of the FEIS. Assumptions: The following assumptions apply: . There will be two rounds of review and revision for the FEIS, thus a preliminary FEIS will be prepared for initial review, a draft FEIS will be prepared for a second round of review, and a final FEIS will be prepared for issuance. · This scope of work does not include any effort related to appeals of the EIS. In the event of a NEPA or SEPA appeal of the EIS, Parametrix would prepare a supplemental scope and budget as requested to assist in responding to the appeal. This work may include, but is not limited to, preparation of additional materials, supplying copies of work products, and providing expert testimony at hearings. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 33 255-1896-808 March 2006 . Parametrix will print copies of the review drafts ofthe FEIS. City ResponsibjJity:The City will be responsible for the following: . Printing copies of the FEIS. . Mailing copies of the FEIS to the listed agencies and public on the distribution list. Task 9.6 Objective: Approach: Biological Evaluation (BE) To meet the procedural and documentation compliance requirements for the Bremerton Boardwalk project under Section 7 of the Endangered Species Act (ESA). The approach will be as follows: . Prepare federal permits (Section 10/404 US Army Corps of Engineers) for in-water work providing a nexus to the Endangered Species Act. Section 7 of the ESA requires federal agencies to ensure that their actions do not jeopardize listed species or their habitats. The BE will be produced based on the project description provided by the preferred alternative through the NEP A EIS process. It will be prepared following standards in the U.S. Fish and Wildlife's Biological Assessment Preparation and Review standards, the National Marine Fisheries Services Guide to Preparing Biological Assessments. The BE will include an assessment of the potential effects of the project on the Essential Fish Habitat (EFH) of Pacific Coast Salmon, Groundfish, and Coastal Pelagic Species. . Contact federal agencies for information on threatened and endangered (T &E) species. For those species that occur in the project vicinity, descriptions of habitat and information on those species will be prepared including wintering, roosting, foraging, and nesting habitat, species life histories, designated and proposed critical habitat, and existing species use of the area. The BE will include an impact assessment including direct and indirect effects, interdependent and interrelated effects. A determination will be made concerning the potential to adversely affect any T&E species. There will also be a section of the BE describing proposed conservation measures. De/iverables: The following will be delivered: . Twenty (20) copies of the preliminary BE. . Twenty (20) copies of the draft BE. . One (1) camera-ready copy of the final BE will be prepared for printing. Assumptions: The following assumptions apply: . It is assumed that the project will not require preparation of a Biological Assessment. . It is anticipated that the Biological Evaluation will result in a determination of No Effect or Not Likely to Adversely Affect. (Biological Evaluations are required when a determination of No Effect or Not Likely Affect determination is anticipated. 34 255-1896-808 March 2006 City of Bremerlon Beach Sewer Replacement and Public Access Scope of Work Biological Assessments are required when a determination of Likely Will Affect or Will Affect determination is expected. Biological Assessments typically require an indirect effects analysis and formal consultation.) . There will be two rounds of review and revision for the BE, thus a preliminary BE will be prepared for initial review, a draft BE will be prepared for a second round of review, and a final BE will be prepared for issuance to the federal agencies. We also assume that we will be provided one set of consolidated comments after each review. . The BE budget does not include formal consultation with the U.S. Fish and Wildlife Service (USFWS) or NOAA Fisheries, although it does include time for two staff to attend two (2) pre-application meetings with the US Army Corps and other Federal and State agencies. . Information on Threatened and Endangered species will be obtained from the NOAA Fisheries and USFWS websites, and the National Heritage database. . Parametrix will also consult with the Washington Department of Fish and Wildlife including a query of the Priority Habitat and Species database. . The BE will address designated and proposed critical habitat for listed and proposed listed species. . We assume the BE will need to address two species of wildlife (bald eagles and marbled murre lets) and three species of fish (Puget Sound Chinook, Hood Canal summer-run chum salmon, and bull trout). In addition, the BE will include the Southern Resident killer whales because NOAA Fisheries has proposed to list this species as threatened under the ESA (NMFS 2004). . It is assumed that there are no rare, threatened, or endangered plant species that would occur in the project vicinity or be affected by the project. . The City will submit the BE to the federal regulatory agencies (USFWS and NMFS). . This effort does not include developing mitigation measures to reduce potential impacts that may be identified in the BE. . The BE would be prepared 30 days after receiving the 60% engineering plans. · No underwater habitat assessment is required. Should this be required, it will be handled under additional scope. City ResponsibjJity:The City will be responsible for review and approval of the BE. Task 9.7 Objective: Permitting To prepare permit applications for the proposed improvements, to develop and maintain close working relationships between the engineering design team, environmental specialists (EIS team), and the permitting authorities, to initiate early agency contact and coordination, to respond quickly to requests for additional information from the permit agencies, and to monitor the environmental review process. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 35 255-1896-808 March 2006 Approach: Parametrix will prepare applications for the following permits/approvals: . u.s. Army Corps of Engineers Section 10 and 404 permits . Washington Department ofFish and Wildlife Hydraulic Project Approval . Washington Department of Ecology NPDES Notice of Construction and Section 401 Water Quality Certification . City of Bremerton Shoreline Substantial Development Permit . City of Bremerton Site Development Permit . Access permits for pre-design work including geotechnical investigations. In addition Parametrix will also complete the following tasks: . Attend one site visit. . Attend a pre-application conference with the City ofBremerton. . Submit completed permit applications for the permits listed above. . Attend the hearing on the Shoreline Substantial Development Permit and provide the City with support (i.e., presentation materials, supporting documents, etc.). . Respond to requests for additional information or clarification from the permitting authorities. Deliverables: Draft and Final SEPA checklist and JARPA. Assumptions: The following assumptions apply: . The City will be responsible for all fees associated with the permit applications. · Parametrix will respond to requests for additional information for up to 24 hours of response time (at a Planner level). Additional time needed to respond to requests will be on a time and materials basis. · Support to the City at the Shoreline Permit hearing will be limited to providing presentation materials such as graphics boards (up to $500 in value), providing copies of supporting documents, or helping to present information to the hearing examiner (typically the City presents the staff report and related information to the hearing examiner, however Parametrix staff could assist in this effort if requested by the City). . For budgeting purposes, it is assumed that there will be up to 30 two-hour agency coordination meetings related to the permitting effort, a site visit, and attendance at the public hearing on the shoreline permit. TASK 10 COMMUNITY OUTREACH AND PUBLIC INVOLVEMENT This program will be intended to build broad based community wide support for the project. The goal will be to provide the opportunity for impacted property owners, City of Bremer/on Beach Sewer Replacement and Public Access Scope of Work 36 255-1896-808 March 2006 concerned cItIzens, community groups, 'stakeholders, regulatory agencies, elected officials, and City staff to provide input into the design at the appropriate time in the process. The public involvement process will include meetings with individual property owners along the corridor, community open house type meetings, the creation of a computer slide presentation that can be presented to the planning commission, City Council, and community group and follow-up newsletters. This process will also include the creation of a Boardwalk Advisory Committee (BAC). The roles of the BAC, public, City and consultant team are defined below. Additional detail is provided below, and will be further developed under Task 10.3 in the community relations plan: BAC: Advise the project team on design criteria, project purpose and need and selection of concepts and alternatives. PUBLIC: Provide input to the project team and comment on alternatives. CONSULTANT TEAM: Develop preliminary design criteria, concepts and alternatives, receive input and comments from the BAC and public, and take direction from the City of Bremerton. CITY OF BREMERTON: Provide input to the consultant team, approve design criteria and purpose and need statement, select concepts and alternatives to carry forward. Task 10.1 Boardwalk Advisory Committee (BAC) Objective: Establish a Boardwalk Advisory Committee (BAC) to advise and support the design team. The BAC will include representatives from City departments, key stakeholders; such as WSDOT, the Port of Bremerton, the local Tribes, and environmental regulatory agencies. The purpose of this committee is to resolve conflicting requirements between agencies and City departments, and to ensure that design solutions have acceptance of the approval authorities. The specific members of the committee will be selected by the City. Approach: The following tasks will be performed: . Coordinate with the City's project manager to establish the BAC. . Facilitate up to three (3) BAC meetings per year. . Review and selection of architectural features of the boardwalk and Evergreen Park. . Prepare meeting agendas, take and distribute meeting minutes. Deliver abIes: The following will be delivered: . Meeting minutes from each session. Assumptions: The following assumptions apply: . The BAC will meet three (3) times per year. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 37 255-1896-808 March 2006 . The Architect will attend and contribute presentation materials for two (2) of these meetings. City Responsibility:The City will be responsible for the following: . City Public Works will make all principal decisions affecting design of this project, and will direct Parametrix in all tasks. Task 10.2 Objective: Approach: · The City will develop a list of BAC personnel and provide materials to members. Public Involvement This is a facility that is designed for the general public to use. Obtaining public input and developing public support is critical to project success. Through interaction with the local community, we will educate interested citizens about the project in order to build broad based community wide support. Through a series of public forums, we will engage those individuals and groups who have concerns to develop an understanding of their issues, and seek solutions that minimize or eliminate these concerns. Additionally, work closely with property owners who are directly connected to the beach sewer, and who will be impacted by a new boardwalk to ensure the design team has a complete understanding of how the project will affect them. Use this information to develop solutions that minimize impacts to property and build support for the project and identifY acquisition needs early in the process. This will allow for those individuals most affected by the construction to participate in the planning and design process, potentially minimizing acquisition costs. The following approach applies: · Conduct up to three (3) open houses with the public, and up to twelve (12) individual property owners meetings. Determine their concerns and explain how the project may affect their property and use of the beach. These meetings will include: ~ At the start of process. ~ At the 30% design stage to review & comment on alternatives ~ Review & comment on preferred alternative at the 60% design stage. · Meet with City staff to prepare for the first Public Meeting. Discuss Issues and confirm the City's position on expected concerns. · Conduct one (I) public open house meeting during the initial stage of the alternatives analysis. This meeting will be at the 30% Design level, prior to construction. This is in addition to meetings performed as part of the EIS (Section 9) Provide staff from the design team to answer questions, and if requested make a general presentation. . Compile the comment forms and provide a written summary of the comments. Deliver abIes: The following will be delivered: · Meeting minutes for each meeting. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 38 255-1896-808 March 2006 . Meeting announcements and mailings, comment forms, directional signs, and sign-in sheets . The following are examples of graphics may be prepared and reused and/or updated for each meeting: ~ Vicinity Map. ~ Aerial photographs. ~ Illustrative figures and hand-drawn illustrations. . Typical boardwalk and sewer sections suitable for public presentation. . Plan and profile sheets, suitable for public presentation. Assumptions: The following assumptions apply: . Meetings may be held in the evening. . The Architect will attend and contribute presentation materials for one (I) of these meetings. . The design team will provide basic supplies needed for the meeting (easels, paper, pens, refreshments, etc.). · One (1) representative from KPFF will attend and contribute presentation materials for three (3) of these meetings. City ResponsibjJity:The City will be responsible for the following: . City will contact property owners to set up meetings. . The City will mail announcements to adjacent property owners and other interested parties Task 10.3 Presentation Materials and Other Public Support Objective: Provide the City with a power point presentation and other promotional materials that staff can use when making presentations to community groups, other organizations, for general distributions, and press releases. Approach: The following tasks will be performed: . Provide the City with a Power Point presentation about the project. Graphics provided would be the same figures, sketches, and drawings developed for the community meeting, and as part of other tasks. KPFF will translate the graphics into Power Point format. · Develop a Community Relations Plan for this project. This will include a schedule, timeline of events and will be modified as conditions change. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 39 255-1896-808 March 2006 . Provide technical information and graphics developed as part of other tasks for one (4) newsletters. The newsletters will be a two-sided 8 1/2 X 11 tri-fold. . Prepare content/project updates and meeting notices to be posted on the City's website. . Prepare press releases to announce the public meetings. . Prepare information to post to Bremerton Kitsap Access Television (BKA T) to announce public meetings.. DeliverabJes: The following will be delivered: . Three (3) power point presentations that will be updated after the preferred alternative is selected. . Four (4) newsletters. · Prepare the content and graphic layout (l page/front and back) and provide a PDF for printing. . Fact Sheets - Designed to provide an update on the progress of the project as well as can serve as notification to the public meetings. Content will be determined as required. . Draft and Final Community Relations Plan identifying sample agenda and timelines for all Public Meetings related to the project; including General Public meetings, meetings with affected property owners, BAC meetings, and meetings required for the EIS. The community relations plan will detail roles and functions of the different committees and community groups, the goals, approach, tools and milestones that will be used during the community involvement process. Assumptions: None City Responsibi/ity:The City will be responsible for the following: . The City will lead the process and take responsibility for creating the project mailing list and distributing all notices. This list should include local activist groups, local chamber, rotary, special interest, libraries, etc. Parametrix will maintain the interested parties list once developed through the life of the project. . City staff will post website content. · City staff will send out press releases on City letterhead to The Sun and Bremerton Patriot newspapers. · The City will work with The Sun and pay for ad placement/cost. . City staff will submit information to BKA T for posting. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 40 255-1896-808 March 2006 TASK 11 Objective: Approach: PROCUREMENT/BID ASSISTANCE Develop bid documents and provide assistance during the bid phase. Assist City staff in responding to requests for clarification (RFC) from contractors, and issue addenda. The team will assist in review of bids and review contractor qualifications. Deliverab/es: The team will prepare the following work products: . Electronic bid documents . Up to 10 RFCs as needed to facilitate the bid process. . Up to 4 addenda based on the RFCs. . A memorandum making a recommendation for selection of a contractor. Assumptions: The Scope of Work is based on the following assumptions: . The City will publish the notice inviting bids and coordinate and manage advertisements and plan distribution. . The team will attend up to three meetings at the site with prospective bidders to answer final questions after the release of the notice inviting bids. . The team will make up to three presentations to the City Council. . There wil\ be a maximum of 2 bid options TASK 12 TASK 13 Task 13.1 Objective: Approach: CONSTRUCTION MANAGEMENT Construction management effort is currently undefined, as specifics of design and permit requirements are not yet fully understood. Construction management will be tasked and budgeted separately. EVERGREEN PARK EXPANSION Remedial Design To develop plans, specifications and cost estimates for site remediation. Activities will include: . Develop a Cleanup Action Plan to be incorporated as part of the Agreed Order. . Develop a brief (2-3 page) Work Plan for groundwater sampling. . Sample up to six (6) existing monitoring wells. . Prepare a I~tter report summarizing groundwater sampling results. . Develop a stormwater plan for the site. 41 255-1896-808 March 2006 City of Bremerton Beach Sewer Replacement and Public Access Scope of Work . Development of 60% and 90% and final engineering plans and specifications to allow the City to contract site construction of the remedial system and the park expansiOn. . Development of a bid package for the City to use in a solicitation to hire a contractor to perform the construction of the remedial design and the park expansion. Assumptions: The budget for this task is based on the following assumptions. Changes to these assumptions may require modification of the budget. The following assumptions are made: . Redevelopment of this property will occur in two phases: ~ First phase will include remediation/cleanup and installation of a cap and cover system consistent with Ecology requirements. ~ Second phase will be constructed. in coordination with the boardwalk and will include any in-water work, permanent pavement, lighting or aboveground structures. . Groundwater sampling will include the collection of up to eight (8) groundwater samples, including quality control samples from up to six (6) wells. Samples will be analyzed for benzene, ethylbenzene, xylenes and tolune (BTEX), HCID, TPH-Dx, TPH-G and Lead. . The agreed order will include only onshore areas and will require a cleanup action plan and design of a cap and cover system similar to that used at the existing Evergreen Park. . No plans or specifications will be provided for the Plumber's Union Building . No improvements to adjacent roadways are anticipated. . The Cleanup Action Plan will be included in the Agreed Order. . Four (4) meetings will be held with City and/or Ecology; all other communications will be handled by phone or written communication. . The City will perform over the shoulder review of work in progress prior to the 90% submittal and provide one set of comments on the 90% submittal for use in preparing the final plans. . Preliminary plan set will be submitted with the Cleanup Action Plan. . Plan sets will be delivered for the 90% and final (for bid) plans and specifications only. . Specification format and front end administrative sections will be provided by the City. . A maximum of 11 plan and detail drawings will be required, including: ~ Cover Sheet City of Bremerton Beach Sewer Replacement and Public Access Scope afWork 42 255-/896-808 March 2006 );> Legend, abbreviations and notes );> Existing site survey and demolition plan, including well abandonment and vapor extraction system removal );> Erosion control plan );> Grading plan (2 sheets) );> Storm water plan and detail (2 sheets) );> Cap and cover system plan and detail (3 sheets) De/iverab/es: Parametrix anticipates the following work products for this task: . Draft and Final Cleanup Action Plan . Work Plan for Groundwater Sampling . Letter Report Summarizing Groundwater Sampling Results . Erosion Control Plan . Three (3) hard copies of the 90% plans and specifications for City Review. . Six (6) electronic and hard copies of the final plans and specifications. . Stormwater management report. . Technical memorandum on the engineer's estimate of probable cost for construction. . Technical memorandum on the engineer's estimate of probable cost for construction. . Bid Package. Task 13.2 Agency Negotiations and Permitting Objective: Meet with the City staff and Ecology to establish cleanup requirements and approach to negotiate an amendment to the existing Agreed Order of Consent (#DE-OOTCPNR-835) between Ecology and the City of Bremerton for Evergreen Park. Additionally, this task includes preparation of SEPA checklist and JARPA, and negotiations with permitting agencies to resolve issues associated with permit applications. This scope of work is limited to the upland portion above the site; above Mean Higher High Water (MHHW).It is possible that agencies may require mitigation below, which would require a delay in this phase of work. In this case, the Park Improvement will be handled under Task 9.7, and construction will occur concurrently with the rest of the project. Approach: Activities will include: . A Park Development Plan, including selection and design of the park and surrounding area, coordination with grading/staging requirements of the boardwalk, remediation and soft construction of the park, incorporation of the Plumber's Union property and planned final (post Boardwalk construction). City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 43 255-1896-808 March 2006 . Meet with Ecology and City staff to discuss current environmental status of properties and discuss cleanup requirements based on the existing agreed order. . Negotiate a cost allocation for park components which are potentially reimbursable from Ecology as part of the site remediation. . Conduct one site visit with regulatory agency staff to identify areas of concern and resolve issues associated with permits prior to submission of permits. . Prepare SEP A and JARP A for the upland portion of the site. . Assist City staff in preparation of an amendment to the existing agreed order to include the additional areas of park expansion. . Respond to comments on the SEP A and JARP A permits from regulatory agencies and the public. . Attend public hearing on permit approval. Assumptions: The budget for this task is based on the following assumptions. Changes to these assumptions may require modification of the budget. The following assumptions are made: . The agreed order will be amended to include the park expansion, and no, new agreed order will be composed. . Assumes no work or mitigation will be required below the MWWH line. . Assumes no biological assessment or EIS is required. . Assumes no US Corps of Engineers permits are required. . Two (2) meetings will be held with City and Ecology; all other communications will be handled by phone or written communication. . One (1) public hearing is included for permitting. . Assumes one round of comments from agencies on SEPA and JARPA. . Two meetings with regulatory staff (including one site walk) are included. . Assumes building, grading, and erosion control permits will be obtained by contractor. Deliver abIes: Parametrix anticipates the following work products for this task: . Draft and Final SEPA and JARPA permits. . Cost Allocation Summary . Meeting minutes from meetings with agencies. Task 13.3 Park Design Objective: To develop up to three (3) conceptual designs and one (1) final design for the expansion of Evergreen Park and terminus of the proposed Port Washington Narrows boardwalk at City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 44 255-1896-808 March 2006 the former Chevron Bulk Fuel Facility. The park layout and amenities will be coordinated to assure similar look and feel with the boardwalk. Approach: Parametrix will perform the following elements: . Prepare basic materials to facilitate a discussion of the conceptual design at a Conceptual Design Kickoff meeting. . One (1) site visit followed by a Conceptual Design Kickoff meeting with City staff (not included in the public meetings described in Task 6). . Prepare up to three (3) sketches showing design alternatives based on input from the Conceptual Design Kickoff meeting. . Meet with the City to select one final design approach from among the three conceptual approaches. . Prepare one revised final conceptual design drawing. . Prepare 30% and 90% design to include grading and drainage and landscape architecture. Deliver abIes: Parametrix anticipates the following work products for this task: . Meeting Notes from conceptual design meeting. . Up to three (3) sketches showing conceptual design alternatives. . One final conceptual design drawing based on the City's selection. . 30%, 90%, and final plans for the selected design approach. . 60% and final plans for irrigation. Assumptions: The budget for this task is based on the following assumptions. Changes to these assumptions may require modification to the budget: . Parametrix will prepare basic materials for discussion purposes at the Conceptual Design Kickoff meeting. . Two (2) landscape architects and two (2) additional Parametrix staff will attend the site visit and the Conceptual Design Kickoff meeting. Parametrix will record ideas developed at the meeting. One (1) landscape architect may be subcontracted from Hewitt Architects. . Up to three (3) conceptual design sketches will be developed based on concepts identified at the Conceptual Design Kickoff meeting. . No electrical design is included in this task. Lighting will be evaluated under Tasks 5 and 9. . No plans or specifications will be provided for the Plumber's Union Building, but the site plan drawings and features may include the area in which the building is located following its demolition. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 45 255-1896-808 March 2006 Task 14 Objective: . No above-ground structures are included. · Four (4) meetings will be held with City; all other communications will be handled by phone or written communication. . The City will perform over the shoulder review of work in progress prior to the 90% submittal and provide one set of comments on the 90% submittal for use in finalizing the plans. . A maximum of eight (8) plan and detail drawings (cap and cover and soft improvements) will be required, including: ~ Cover Sheet ~ Legend, abbreviations and notes ~ Irrigation (2 sheets) ~ Landscape Architecture (2 sheets) ~ Sidewalk, Curb and Gutter (2 sheets) ~ Plan sets will be delivered for the 90% and final (for bid) plans and specifications only. ~ Specification format and front end administrative sections will be provided by the City. . Final design for the park and the redevelopment of the southern expansIOn of Evergreen Park and tie-in to the boardwalk are included. . Redevelopment of the Plumbers Union Building site and integration into the park is also included; however, no structural or final design of the Plumbers Building area is included. · No offsite improvements are included. Directed Services This task consists of a reserve fund to cover unanticipated work outside of the defined scope. Expenditures from this task will only be allowed with prior written authorization from the City. City of Bremerton Beach Sewer Replacement and Public Access Scope of Work 46 255-1896-808 March 2006 ..ms. -6 ...mim. 01 Project Mgt ,... ........ Task fT"Coo"rdlna"il"on" mm Task 1 :2 besignQuaiity Control Task Oiiilanning Task of Survey if Upland Survey 3:iSathyriieiric Survey 3.3 DNRAquaticLandLeasem 14 IS.m 17 -.,-a- 19 "20ml rE3 mm2f] rE3 '22 mm23m m"24m; rE3 25 m2S : rE3 27liBB m28 j 8 ~ mm30 ...... iiBB Task""4.1 Geotech Evaluation Task4:iGeotech Eval Field Phase mtask 43 Geotech 1'.vaiFinaiPhase Task 4.7 Preliriiina,y(30%j1'.ngineering Task '4.8In'termediate (60%) Engineering Task"~(9 Final Engineeriri"g "(9bo/~' arld"1"o6%Y'" Task 05 BoardWalk Structural Design Task 5;1 Geotech Eval Iniiial Phase "Task 5.2 GeotechEvaiField Phase Start Thu 6/1/06 ThuSi1ios EXHIBIT B Port Narrows Beach Sewer Replacement & Public Access Phase 2 Schedule Friii25i08 . ~~u:r .f1~_ ~;'imIr~~ fi .~%1~r'1~flir~', 5~~Y <~:;m:~[ . .. .. "-rTiu' 6i1 iD6 . .. ........ Fri' 12/29/06 iJx ~~m!,;"..l.t1\l~ r ~,i~~'l i~ ~:~ 'f:~mMj,):. ~1;,~~,~ti;)~;;.i~~:[o4t~J'; :~r1~.J1~;~ff~J:..~ . .. Thu611/06Fn 'ii1S/09 I!i'~'l!!!ft,!. iriWn,!i" m:Jijif~i,"!il\llml;"llW;if;,'1~{ ,~. ~~,i{;;lQ'ij.)1lp:7'ii~f,~'f'-i!;\'~' i' Fri 9/1/06 Task 5.4 Boardwalk Design Criteria "Ti3"s'i< 5.5 Boardwalk" Aiternatlves 'Ari"alysls" . mm . Task 5.3Geo~oastaiEngandsedjment Dynamics" 'Tuel1iii06 Wedi Oi4i06 Thu 6/1/06 . Fri911ios . FrI8/24io'7 Task 5.7 Preliminary 30% SiruCturaiEngineering Fri 3i9i07 Taskf3 Mitigation Design : Task 08 Funding Assistance T ask 8:1iAc Grant Task'8.2 Federal Assisiance mmTask 813 Other GraniOpportuniiies 'Task"1'1.1 "bevEiiop"pia'ns"~iiicfs'pecHI'ciition's"" Task 11.iRFPisidAssistance/RFfs ""Ta'sk""1'2""ConstrUcti'on'Ma'naiie"ment . .. . Taski31'.vergreellParkExpansloll' T askhfRemediai 'Design .' Task 13TparkOesign mTask 133 Pern1ittingm "'T"ask 13.4 ConstructJon...Mo.ri"itonng.... ....... ~ 'Contra.ctor'selection Project: Phase 2 Schedule 02.25-05 Date: Wed 3/22/06 Task . Task 5.8 Final Structural Engineering" Fri8724io'7 "Task 06 ArchitecturaiDesign mMan 7/10/06 Task6:1Landscape Arch DesignSoardwalkm Mon ihoios ..~.. Task 6.2 Landscape Arch Design Connections to Be: Task S;4 ArchlieCturta Design Misc. . "'TaskOiMitigatioIlPiallalld Desigll m .mTask 7.1ideniiiYMiiigaiion Req. and Options . Task7.iMitigation Plan . . mTue3111i08. 'M'onai4ioa Man 4/20/09 Thu 6/1/06 Tue 7/11/06 Thu 6/1/06 Thu 3/1/07 Tue 1/6/09 ,;;Jli.i Jim 'fAmJ!!l2'lt~; ~~ ~,.:;a;Jjci~~.,~\'~JmlW. ;..r~Tli1t11F1f..i1..?;1@i~":,-.ii~';;~j~T~'J;;'~~.f ~i1irw ~11ft>.~::~~~".14-J.R1' ~ ~ ;;~,-~ Thu 8/2107 Tue 8/1/06 Tue 10/3/06 mmMen12i4i06 m . mm Wed3iiioi i5;-~ Ii; Task9;fEISand PermittlngCoerdinaiionm m Task 9.21'.IS Seeping m . Task 913 o1'.is Preparaiion Task 9,4 Public Comment Period/Response .. Task9;5FEIS Preparation Task 9.6 Biologicaf1'.vaiuation Task9,fPern1iiiingm "'Task" 1"O"Community ()utreaC"tl'an<fiiLibi'lc i'n'yoIVernel1 ... m mmmTask 10.1 BoardwaikAdVisoryCommiiiee . . 'Taskl0.2 Ceerdinaiion Wiih'ihe PUbiic Task10.3 Presentation Materials and OtherPubiicn Fri 9/1/06.m Task 1fProcurementlBid Assistance Wed 11/1/06 31 "32 33 34 : 8m '3518 36 '-18 37 ..38.......1.~. 39 i rE3 .....'4o-....t. I 411 -42'! I 43 !iBB 44-.<mm .... 45 '-49 50 -'51 ~ !i:tiIli!::f"I"~;il ;::i.lfIif' .'~~!!.'~:~1f!~~f~~:,~ db;iii,[0~~ :~'i~l~~ ~~j,-~~::FiiitfLt:l'it~ ,~l:~li 'w.~t~J'1 ~1m1'~:; it~;~i t~~~ "~'kAt!:ffiiti);fF,f;t~~Ltr~ttf,f{t0J;zt;t.::itr~1J~~'1Qjff~rw~;,1::ffJ>t.,,;t:l.f~~':~~j~~~ .m. Thu 1111i07 , . mfhu11i30i06: . mmmFriiiiiii06 . . Fri 10127/06 m Thul1/30i06 Man 3/10/08 .... ... \;rjii~:hl!lll~"1;~r'f;:.I~l'j'l!flGikT~F{'.:!liJi!i.~ :!'P~~i.il!1\t,!;tji! .~'iil!f;::'!;;tl!i!!f::~:lI!ir Mon 7/3/06 ~it,'!!iI"~'f4jjil~~1:1:~ mm . mm . Thul2isio'7 I Man 3/10/08 I ,f&~ t~~b,i,~~~;,\;}l~~'rliI~:,ii'~~>~'{~~.~~-d','~i,t\4J.~bhi~1~~ i~!~~t! ~~~~If '1:<llIr,:,tl'Ii!j"l1il:i,,*'~J,:\l1: '!:;jf:.;'1:~tIi~;r lHli!ii~'m,i:.liitililillfJJ,i~ll\i ~~~~R:fill;iI'r~J~~J1.@~~~~h~:~4ihi~)~~ifinfl'irMl~ ~~fi_~ii.~~=~rYr~1~1l!:,~'~~P{j:,< ,Mt~ Fri 3/30/07 1 Fri 8/3/07 : Thu10i4/oil Mon i 6i23i06 : m Wed loi29i08 : Fri 6/5/09 ;'!'~JI~J7J':~1m!~jff;:~~w.!i li~~~~~:~mI~r~~~~;',~~~~~i~,"fPSf:~f.:i1i.1*!~1iJm~:filtf5~n~9~~':':,~J=f~,:~~c~i~!~fM~~,:l ~' ~ii;r~I[;~fi~l~t;klliiym!FMtJfi",:~~,~~~:~'ij~~e1l"{~lt.fl~j~1IJ~:!~~,' ~~;ril,I~~,!mL~r~t's~:!j. ~,~~iiiX~"~~~:I!~H~~~:!ij;~;II_~!;ilii:~ft~t~~~~~gitm;ni l~!!m:~;~;lififfmffi~lf;f-li$W: ~~~TiJF~fi} >'Si~ftmIT~~:;&fi> ~_~J"~t!"1~~~!!!I~} '~~:Ii~~l~~~~~$lf'rIJfi~rt"'.$jf~i > 1!IllI:1!:~!iiJ!!itI!lii:iiI ' . Fri6i5/09 1 Fri 8/1/08 : . . Tue3hl/oii : -. Moni75/09 i Fri 10/30/09 : Tiiu 5/31/07 . !i.l,~m":1..:Filli!'J~'l!f':~rnIl'Jll'tv;;lIiI{ri,jlli External Milestone + Deadline {j .. y . Summary External Tasks Project Summary Split Progress Milestone Page 1 Wed 3/22/06 10 EXHIBIT B Port Narrows Beach Sewer Replacement & Public Access Phase 2 Schedule 6 Task Name .........._'_.~.---..-N.ov..._...-r---- Dec Oct Task 01 Project Mgt 8 Task"i':2 besign Quality'Control ~~,,~;,..~~~,t'~;+r~~\~~~~'~ ;'''''=~~1l!l!r~' ~;~~~:';,\j~t~"C;~T~;;::~-; ~c ""'.. :iIllE'fm'~ .~.~. ~~'~1iiiE' rliIf"'~"~'. mr'~':~~f,,~"~...,,'~~~"ilG ~. 'lio""', !ili;'.~'.1il]I',,,,"=. ~"~>,!il!i;,:,1 t'~ :..- ~;_~-.~'~ :~,:,-:.,~'-:-a ~~~-';~;)-:':::-~;~~.-'&:- ~ _...0....::-'- "--~:~ ~~.. '0__' ::~ T~,~ :--im mr't i~,;r~'. illliF' .~.- f!=~,i',~.~. ~_.~:~~:;,~ ~. ')1!j!i;E':e':,;:~~" ~ ;,~.~~. 'iWi ~~ '-C ~:, ~ .~--~ ~:t ~; ~-~'~~ ^-;:~f;-- "if$ 'l._~kru" "~"-?",,';;J'fii'''' 'Iiil'\"'c'l!!!" .,.., ~' ~~~?V'":;~ ....:~#.- -~ : 3.iBaihymeincSuiVeym ~ .. 3:3 bNR AquatlcLandLease I~I ..........13... 'Tlisko~fPr,iii"mina';Y--S-ewer--be'sTgn"Servi'c'es'" 10m '!R3 11' mii 13 14 mm15 is Tas'k'-4~-1'-'G'liofe.Ch"E.va.iu.aii-on .... Task 4.2 GeoieCii-E:vaiF'ieid"Phase m'Task'UGeoiechEvaiF'inai"Phase ...........t:isk.~f;(P-reifmjnary--(3b%) Engineering Task 4:sTniermediate (60o/,)'Engineenng'" .... .......Task4:9Finai.Engin.eering(90"I,.and..iOO%) 16 .... .... mmm "'TaskOSBoardwaikSlruclliraiOeslgn .. Task 5:i' Geotech"Evai initiai'Phase Task s:2GeoieCh EvaiFieldPhase 'Task5:3'Geo:GoastatEng"and'Sedimenl'Oynamics' 29 m--TTask ii7iiifugation Plan andOes'lgnm 30 "'lli!m Task7:fldeniitj' Miiigal;onReq: andOplions 3imTaskf2Mitigaiion'Pian . 21 "'22 mm 23 24 . 25 26 27 28 32' 33 Task 5.4 Boardwalk Design Criteria Task 5:5 BoardWaikAitematlvesAnaiysis T ask 5.6 Ughiing besign EieciiiCiiiE:ngineenng !iii:i "-~ I ... . .......................... ..Task"5:7"Pre.llmjil"a-ry-j-O%--S'trudu'r~ii"E'ngln'een.ri'goo. ~ i'ask5:8 Finiii Strl.JduI:aiEiiQineeii"gm j~:,o'j!l'-~,.~r1 ~ ~ m3 i Ta.sk"06..Arch.tte.cturarOe-sfgn- .. .. ..................... ........... j .Task-S:T..Candsca,ie--AiCfi-t'-eslg-il-'"Ei.o'ardwa"ij(. "'1 .......m..._m...._......................__..m.m..mmm_.__.m............m..m.................i Task 6.2 Landscape Arch Design Connections to B(! . --Task 6.4 ArChiteCtu-r1a'tles;'gn Misc: K~i;m;:: ,'Iil'.J\t ..'~'~.,~ "n'" ".L~,:'.k'li1J1.F ._.~ T ask'r.'3'Mitigal;on'besign : Task 08 Funding Assistance .;_~,~~.~-:~_~~--~~_ ~~~~~f~~it-~_;:'~:t~~:,~~__i~J,:~~t}r;; ~_:;-~~cr:~,?~jt:.~,~,.;:_:'~~,~~~~-_~~~~.~~~;~,,~:~~;7"',',~~~-"l~"~~~,~~~"; ~;~.~-~.~-'-~-~~ r:~.~~_~~~k~{~~'~,~~.,S~1 ,~:r:,:;;;:::'~,{:.'i!i!ii.~..,''''''I~~J'',_t~,'f:;;El1'~fJlililli.~~iii! ;~;,~':~:f~'~-~ ~':..F' " ~;'-~.""~l:;!1111l::':.fiii!!!b':i=~'C:D'~,_~{;:!il!II\.~.;;~':~.,.~.~:~";-':~~:;_:~'-~ ;.1!:",,",-!'~;:'~,~ -~'i~ ~...; ~i-~11lJjj!,j,S":"'tr~ :':.;~'~':;;lE"'~~~ ~1-t!iE ';~:~:"ii!&, :':iC;;,~i i,;r'f,'~1:~~:I'''lili:;Z;:'~~1.1l!F'~;' F~~:l!!F'.~::.:~';3ir!t~'L~~~I'~i-;.,~ ,E'f~~1:t!l!!l:"fiji!l',"~~'~;~;1! ..... Yask s.TfAC GraiiCm .mYasks,iFederaiAssistanCii task Ei5iiierGraniOpportunities Task 09 Pennitting Task 9.TEISandPermiitiiigCoordinatioii m39 ~ ... mm m m Task9:2EisScoping '40 ....mmm' mTask!f3bE:lspreparation 41 .. 'Tas'k 9,4 Public Comment PeliodlResponse 42 . mTask9.5FETSPr.'paral;onm "'43 .. ... mmm . Task 9.6 B!oiogicaiEvaiuation 55 mm56 mm5i 5S ~~"'1li!i'1':,~~~"~"'!!iilii'\"~"'!!!!l'l!!~;~!ii!'ldj~~~~'!!! !"':'5':I~lM":~.':JU;?~..;.~,,:~.......:,_~",_"'t~~'m'f'~:,;<_"'m",1D'~i~'~W"';~"~'-S''''''_': "'Task10:fi3oardwaikAdVlsoryCommitlee . 'task 10.-2-Coo-rdfnal;onWiiiiiiie' Public' ''''.''''.'''.Ta-sk'1.cf?3""Prese.i'-ts.ifon''t.ii"ai"t:i"nai"s'.a.ri.d''6the'i-.'Pub'ilc'-~ ....j..TiiI.s.i(."i1"--iiroc-ure-me.ntlBi.(j."j;.ss.isianc.e.... .. ......... ','TaskTi:i"OeveiopPians'aiid"SpeCifiCiiiions , Task"11:iRFPiBid'As-sisianceIRFls ~"'i :~ J:~.~~'~ ,:'lli"i' :!!!I!t':iijlljiffi5;!l!!;t"~4!!llJ:~:;;;~~",-"5:_i:'1;.=~;,~ .~~'~";!fi>iiiE[':;jli!!l'J:~',jjijr,r'~':\5C1>~~-=~~~~~~.jjJ!!I;;r;.iilli~~. '" ~.~.~ 1E,;;;gj "."~'1;;;F~':'~"~;E!l'-liF-itW"'F:.,,_j,,~'FIi\i41i; rl:!!'ll!i\lJl!!;,~!\~,=,,~,'!i!iii"'~~~~:'~~"'1!!if' ~(".'i'~~; ~_f~{;:~'1~__!:ii!llliiA""~;~.J;~i.~.~7~i;~!,..'~.~~_ !""'1:-li!l f3-'i~-vergrEien--Park--Eipa-ns.io'n"" Task 13.(RemediaiOe's;gn .~ ~ ~ ~ Tiisk-f3.2 Pa~rk Deslgn--"-"~----"-'._' m.....Task.ii3Permiiting. . . 'Yask13XConstrl.JCIi-onMonitonng ..... .. .Con.tractor.Selectlo-n-.-. ~:~p_ ~SJ"lliiE~' ~ '1!L'-'=.~-1 Task Il!i'.fl,,_'~~}jl Split . ... ... Project Summary V v External Milestone + .!} Progress Milestone Summary External Tasks Deadline Project Phase 2 Schedule 02.25-05 Date: Wed 3122/06 Page 2 Wed 3122/06 EXHIBIT C Fee Schedule Parametrix..................... .............. ..... ...... ........ ..................... ............................................... ........... $1,269,692 Subconsultants KPFF . ........... ............ ....... ................ ............................................... ........................ $670,415 Shannon & Wilson ............. ............ .................................................... .................... $328,286 Pacific International Engineering .......................................................................... $115,500 Hewitt Architects ...................... ................... ........ ................ ................... ........ ......... $84,944 GRS Bathymetry.......................................................................... ....$31,259 Subco nsultant Total............................................................................. $1, 230,404 TOT AL ........ ................ ....................................... ............... ...... $2,500,096 Exhibit C Fee Sched ule Parametrix PROJECT: City of Bremerton CLIENT: City of Bremerton I PMX# I I PHASE I TASK I BILUNG I I t.lULTIPUER: ORGCoC€1 3.10 I $5<100 Adminislratil Sr~~.,"',~~ PR I SIaff I ve Managfri ';B~= SpecillHst ~:=' SUrvey Qew &rvey Chief I $3200 I ,,"00 1,",00 I $3200 1",,00 $35.00 I CADOI Qaeoo Coordmatioo Project STAFF Manager/51' Eo I $4700 I 576 24 12 ~- , ManagingPrinc;ipal $27.00 TOTAL I $2400 I $21.00 I HOURS Technician ClericalfAdmi o n 288 I 24 I 120 6ll 16 I 40 40 I ~ 8 I -+---;- I 24 I 16 I 288 1224.0 46,512 $144,187 _1.2 ~~gnQualityConlrQ 2 ~~Plannin!!l 3 __Survey _ ~~ ~_~ ~pland~~ _~_Bathymetric -~ WDNR Aquatic Lands Lease 40~~~ 132.0 4,460 $13,826 $38,602 __~_ 80 _~--1..._~~~_.~~ 8 ~~~ 16 80 3,048 $9,449 $24,422 ___~________________ 8 __._!______~ _~~_~~_ 4 I 6 4 16 528 $1,637 4 ~~~~ 120 24 16 4 _ _ SewerOesign 4.1 ___ Geologic/Geotechnical Feasbility Evaluation 4.2 Preliminary GeoIechnica/EvaJuation 4.3 Final Geolechnical Evaluation _ ~_ __ Prelimi~ry_(~_~g~~ng_______~__ ~___ 24 i---'-- 4 ~~_~,~ 4.5 InlemJediale (60%) Engineering 18 8 24 4 54 1,954 $6,057 ~4.6 ~Final(~O%andl00%)~gineering 16 8 24 __ 40 ~~~ 5 _ ~ Boardwalk Design $84,295 __?J_~~~~~~echnicaIFeasllmty_~~~~_________ 4 --+-~~f--------~-- ~---;-~ $1,637 __5-29 Final Geote<:hnical Evalualion 4 8 4 16 528 $1,637 5.3 Geo-Coastal Engineering aoo Sediment Dynamics Analysis 24 40 4 _~ ~ ~ =~--==:~:~::d~,;;--~~~---~~------,;----~-~----I------ :~-:: :;:;;--- ~ lighting Design Electrical Engineering 8 24 180 I 40" L~_~~ 7,860 - $24,426 _~_~~;;i~~StrucllJ"al~n~ineering 40 40 I I 24 i 48 1 40 192 ~~ _5_6 ____l!~(60%90%and100%)Stru~~~g~~ng________ 36 _______~____~___________1~_24__ 24 ___ 40 148 ~_ _ $14,620 _ ~___~hitecturaIOesign -~-- I _____~ _6.1 ~landscapeArchite<:htuaIDesignfor8o<<ctwaIk _~ 12 I 24 I 60 ~~ 62 ~h_itechtlfllIDeslgnofConnectlonsIoBoardwalk 24 12 1 24 60 24n $7663 _~__^,,,,""""'D".oofM,,,,"'''''''''S'''',",'' 16 -I , I 16 40 1848---"-'-"-- ~ _ ~gatlonPlanandDeslgn ==--.--..-.:c=r= _ ~_ $58292 _ ~__ldenllfy~grahonRequrements&Opttons _~6 I~_~ 18 T 8 ~ _~~~ 72 MltigallOnP!an 4 8 ~ 4 I 40 60 ___ 136 4940 $15314 · ;=~ ~~ ~ ;+1 ~~'---" rt I+- ~; ; 7?:~ 9 _ P,nni';og " 1==1= I =t== $JIl7,743 :: = ~~:~~::g~.o&.~___________________!:=~j=-=====~ -;:: ~=,__ ~:~I===~ t 1~ -1=~2~- : ::: ::':: ::;:- ~_ = ';;;;;~,"","'IPoiodlR'""",~~~mm""'_=====-= =~ 24 I BO --+--;-r--r--I -~--;- '-;;- ~ -~-;-,;;;-- 9.5 ___FinaIEIS(F~}Prep<l1ltion ___._______~_ _________ .48 I 64 _ ~-E~__J I I 80 l------.;--;;-- 12,232 $37,919- ___96 __~ICaIEvaluation(~)_~~___12 24 I 60 --1-~-I-t=~~ 64 364 11696 ~ 97 Perrmtting 40 48 I 64 I 112 I 80 I 40 I 108 I 16 __ 36 544 19208 $59545 10:- ~=;::~~::::':b1"'",o'''m'm~_ ------ --~ - 12 =+' "I ~ :-1- ---t-r=- -=- -=- --=- . ::: 102 _C~d'""''''hP~-------- 64 ~----- 64 I, BO ----I --I 8 I -; l~ 12 --"'-- 10,188 --;-;;- "!E2- Presen~tiOnMatenalsandPublJcSpp~______~j---==-~~~-~~- I-_-r-~ 126 J--~~--~~-~ ~;- ~~o::::::~::::" -=--====::::~::::--~::::l=--=--=::::-:.--==I---l 16______ _ 3::::==L':=J~J ----- -~ 1888 --'"'~'-- ~ ::: ::::..,,-~=-===:' :r=---=4~t~,_- i:: 1 ~-=- I.; P u: ;.: :.: :-:: ~ ParkDe~~~_~____ 24 I 50-1--86 __I 280 1_ r 120 11 573 18679 $57905 14 DlrectedSeMces I I I --r-I I I I I In-House Expense liem Number I Unit Cost I --~-------------~~::;-:J-- $:::~---I Salary Escalalloo 1 I 4% r Outside Expenses Description Other Expenses 1-----+----1--j-+-t------- -- ~- ~ 1370 I 1542 I 16ll I 1840 Unit I Direct Cost I LS I 58.347 I LS I 200,000 I "I 3B,B9' I I ____~athym___=_tric contra=-~___l 29,770 J~ __~______~~J_'_" I ' _______._!fif...__ I 638,490 -i-5% ------ shann:~~~~----.----~-I---:10;~;---i.~~-- I I ..., .- ~ /(4:471',,/ <--- $56,347 labor Subtotal at CUrrent Salary Rates 1438.3 I 344 BO 156 1006 155 999 9090 318,153 $972,449 ~ Direct Cost $38,898 $297,245 (Project Manager) (Division Memager) JECLIaf.AlJ Ap~Bv j)J ~-t '\ \ _~ _._.EJ25.:9___ ~~ _670,41~ $670,41~._ -~- -~~-- 328.286 $328.286 $1,230,403 It,5Il0,096 ''-Too, '\;''''1 J \0 Expenses Subtotal Prepared By A / ! r-v I Reviewed By: ~ PAGE 1 OF5 File Name: Port Naffl)<W< Beach Sewer Fee St:hedule 03-27.06_xJs Date Printed: 51112006 Exhibit C Fee Schedule KPFF PROJECT: City of Bremerton CLIENT: City of Bremerton PMX# BILUNG I STAFF ProjectPmc. Ptoj. I".struct Sr. Civil CMIEn!1. CADDI Clerical I I MULTIPUER Manager Eng. En!7. Technical Admin TOTAL '"'" TASK """'" 3W I 61LLRATES ..." """ I """ "'.. """ $2258 $1613 I HOURS BASE COST TOTAL COST 1 Project Management I 11 Coordination I -- ~ ---- g~g~~!!y~~_________ --- --t-- ~ ~ --- - - --- 2 - - Planning ~ - r--- Survey - ~ - ~plandArea I - ~-~ -- ~ebic_ - --------- ==t--- -- --- ---- --- f--- -- -- ~ -- - - - - 33 r--- W'DNR Aquatic Lands Lease ~ - - Sewer Design Services -+- _'.1 Geotechnical Evaluation - ~ Geolech Evaluation - Field Phase - - ~ f--- Geolech Evaluation - Final Phase -- \ ... PreUminal)' (30%) Engineering ~~ I--- 390 528 552 1684 $48,574.18 $150,580 '.5 Inlemtedlale (60"A.) Engineering 14 50 ~ 122 176 192 . 562 $15.993.58 $49,580 - ~ - Final(90%andl00%)~~ineering -;-r~ f---- 260 ~- 208 I ~ ~ $26,986.78 ~ --L Boardwalk Structural Design ==r= - 5.1 - Geotechnical I..valuation - Preliminary - ~ Geotech Evaluation - Final Phase - - 5.3 Geo-Coastat Engineering aoo Sediment Dynamics Analysis - ~ -- ~!kDesil!nCriteria 10 . 16 - ~ 30 ~ ~ - 5.5 - Boardwalk ~llematives and prlHlesign 17 10 76 10. 20 25 "2 $7,635.87 $23,671 - 5.6 -- ,=-~~I1{!!l~~nElectricatEngineerin9___~_ -- t- - ~ - Prelimi~ry~~lICturatEngjneering :: I ! :: 480 210 8 1063 _~?79.04 ~~ 58 Final Strucllral Engineering 1070 800 4ll ~ 2480 $68,938.85 $213,710 ~ -- - Architectural De!!gn -- - 6.1 r--- Landscape Arch. Desi.!]" fa" Boardv.elk - ~ - LandscapeArch.De~gnofConnectionsto8oa'"dwalk I r -- - 8.3 - Arch. Design of Miscellaneous Slruclures I -- - I - .-- --1- - 1--- ~gation Plan and De:!!~n I I ___ ~t----:: --t- - Z:L- ~~~9~n Requrements & Options --~-+= ~ --------t-==r== - ~- ~.!!ig~nPlan________________ -E -~~ -- 7.3 ~~alionD~~~________~___ ~--- ~ -------, --L ~undingAssistance ~ 8.1 lAC Grants I 8.2 f~~~~~~~____~__~___ I -b --+------- --- -- -~-~- ~--- 8.3 f--- ~GrantOppatunjties ~ PellTlitting__~~__~~~__ _I Pt-+i ~~ - ~!_- ~lSand!:ermillingCoor~!!..~~__~____ ===r=E -~--~- --- ~- ~ISScop~g ==F - 9.3 g~SPrep~________ --+-~ ----- - ~----- -- ~- !:~~mmelltf'eriodl~onset~~~____ I I - 9.5 f!!!~S_(~~)~~<ration _ _ --~- --- . -~~ H-= .~ ~ ~gicaIEva~ation(~)_______ ~.2..--. ~ermitll..nll.___~__________ ---+-- -- -~-----~r--I~ - ~ Community Outreach and Public Involvement --~~-~. I ~ ~~~kAdvistr)'~millee ._________ ==FF -1.=r=_1 F--- I !!!:.~- CoordinateWllh~~____~_~ --1- -- - ~- PresentailonMalerialsa~~Public~_~__.~____ --~~--'~-~- T'-+- __L_ -- - - ~ ---- ~rocuremenUBjdAssistance______.______~___ I ~ ~,522.51_ ~- -- --- -.---I~ ==c= 12 ~~~~~~~!!~g~~n.!......___________.__~~_ I- ._ _~+___l~__ --~ 13 ~greenPark_________..____ ~-~- ~j= __L- -~ 13.1 RemedialD~iQ~_________ __L__ __L- -- 112 ~efmilling~~g:..n.9'!i.~~~____._.__ - I-r-- --+-- - ~~ - 13.3 Park Design -+-+~ I I 14 Directed Services ~--r-- I -- ---.- --..- -_..~---_._-~~--_._-~---_._------- --+--I-~---I----~---I~t-I.-~- ~j---- -- --- - labor Subtotal at Current Salary Rates 2"' 3T7 945 I 796 I 2598 1982 85 7070 5205,556.61 5637,225 In-House Expense Item Number I UnilCost I Unit I DirectCos! I ___________~.______~_______._______.___ Expenses ~=='::~~-- $1~500_~~-- ~--- --.!!~ . . Managemeri Reserve - -.- Sal<IyEscalatlOll Outside Expenses Description Direct Cost I Other Expenses f 5% ~- --- ----------- ~~-~ --- - ---.----1 :: - ~_. ---- -~T-;;; ~.-~ - Expenses Subtotal I 51,265 PROJECT TOTAL $638,490 Prepared By Reviewed By: Approved By: (Project Manager) (Division Manager) (Office Manager) File Name: Port Nam7\Wi Beach SeIWr Fee Schedule 03-27.06.)(1$ DalePrinled:511120C6 Exhibit C Fee Sched ule PIE PROJECT: City of Bremerton CLIENT: City of Bremerton PMX' I BrLUNG I STAFF Sr.Engr1 Sro Engr' I Eng/Sci 1 Engr/Sci2 T"'" Amnl I I I tdULTIPUER S02 Grnph AocIg TOTAL PHASE TASK ORGCOllEl 3" I BrlLRATES I 57961 .." I 13720 $3365 ".., ","' I I HOURS BASE COST TOTAL COST 1 I I - 1.1 Coordination I I - 1.2 - ~gnQuaijlyCOl1tro1 I I I 2 - --- ~Ianning ~ ~+- ~ - ~-- ---- - -- --- ~ - Survey - 3.1 Upland Survey 32 Bathymeiic - f'1- - WDNR Pq.satic lands Lease I . - - Sewer Design I I - '.1 - GeoID9idGeotechnical Feasibtlity Evaluation I I '.2 Preliminary Geotechnical Evaluation I I - - =+= t=f= I ~ Final Geoted1nical Evalualion - - ... ~liminary_(~!!tgineering________ -- -- ---- -- ~ ~ ~ - '.5 Intennediate(~!.....ngineering --- '.6 - ~J90%and10~!~L~g~~g_______~_ --- ---t ~ -- ---- --- ---- - ---- ~- ~ Boardwalk Design - - - ~ - GeologidGeotechnical Feasibility Evaluation I t-- I - 5.2 .---- ~aIGeolech~~~~____ ~ ~-- --- -- ~- --- -- --~-- ---- -+- - --- ~-- - 5.3 Geo-Coastal Engineering and Sedmenl Dynamics Ana~s 2' 120 100 160 80 40 52. $19,510.24 $60,482 - 5A - Boardwalk Design Criteria I 1- 5.5 Boarmvalk Alternatives and ~e-design 1 - - - 5.6 - ~9~g_~n Electrical En~ineering -I I - 5.7 - PreliminaryJ~ Structural Engineering ~ - -- --.--- ~-- ----. ~~~(~~~~-!~~~)~~ttxal Eng~.~~_~g. -- --..-------- ---..-- ---.-- --- -I ------- ---- ==i=---- -1--- --- -------- "-------- ------- - ----- ---~----- ------ 6 - - Architectural Design - - 6.1 Landscape hchilechtural Design for Boardwalk I I I 1 I -- 6.2 .- ~~_hchilechluraID~g~fConnections~!l~~__ ~ -- ------ f---- ---1- --- --t--t-- -- ---- ~- - 63 --- kchileclLral Design of Miscellaneous Structures 7 M1tiaation Plan and Desi9!l --1 I _~:= ~--H= - - -- ~- ~.!!!tj~!r<llion Requiremen~9Ptions 72 ~~ationPlan 73 ~iligationD~!!_______________ ~F : --=f.. -1-1- 8 ~unding~slance ___.~___.__.______ 81 Coordination == ====~ 8.2 Federal Assistance 10080 1=1= --25-I--t I I 215 $12,487.20 ~~ 9 Permitting --I~ 9.1 ~andP_ermittin9~oordina~______ ==t =t=== ==l_--L_____l I 9.2 EISScop~___________.__ ---+--B-- --~I--+--+-+- 9.3 DEISPreparalion _ _ 9. Public Corrment PeriotVResponse to Corrments I-T-~- ~r I I I 1--- ~~- f~~~~(I!!~)f~~ation____________ ---t-t----- -- --~==r--__.:~~_B - 9.6 ~og~Evaluationl~~~.__________ ~ ~itting______~__~_ -1-+--+- -++--~ +- 10 ~mmunityOulrea~ndPubl!:.!!!volveme~._ 10.1 Boardwalk Misery Committee ---1--- -1--- ==l==r---=-__~_ _.J______~_ 10.2 Coordinalewith.~~________________ ---~I----t----=::i~ --L---1---- ===1----+---- 10.3 Presentation Ma~~sand Pu~~l I I 1- ~I-l-- --1-- 11 ProcurementlBidAssislance f--- 12 ~m,;tf1.lcti~~~~_~~..'!!...____._.__ I -t---,~I-- I I I 1 13 ~!"9reenPar1l. __________ ==J=--=-J--===I~==-t= 13.1 RemediaIDesig!!__~___.___ =--li=r [- =i-L----L~ 13_2 Pennitting-!.~ge...!!9'~goliations _~____ . ----L-~i--t- ~ Park Design --[----+-I-~I I 14 Directed Services -----I~-----[- -- - --- -------1--t-- ~l_ ---+------1---I~~I-+-- --- -- - 1 labor Subtotal at Current Salary Rates 124 200 100 160 I 60 75 739 $31,997.44 $99,192 In.House Expense Item Number I u"Cootl u,. Direct Cost ------- -~--_._--_._._---~~~ --I-t----t--~~~-- --- ~~ -- I Outside Expenses Description Direct Cost Other Expenses 5% -~ -- . $== ------------ - 5% ---- - 5% -~ --- 5% -- , ----, 5% ExpensesSublotal $10,808 PROJECT TOTAL $110,000 Prepared By Reviewed By Approved By: (Project Manager) (Division Manager) (Office Manager) PAGE 3 OF 5 File Name: Port Narrows Beach Sewer Fee Schedule 03-27.0fbc/$ DalePrinled:51112006 Exhibit C Fee Schedule Hewitt Architects PROJECT: City of Bremerton CLIENT: City of Bremerton PMX' BIWNG I MULTIPUER 310 I land STAFF Principal I $5161 I "'''' Principal, 1$5967 ""'i. I Senior LA anager $37.10 I $37.10 tAllJ I Archil I ~'" Graphics I "''' Mni" I """' I TOTAL _~ Coordination _1.2 I---DesignaualityConfrol 2 ___~~~g 53 19 79 54____ 44 _~_____.___ 253.0 ~~~ 31 SUlVey Upland Survey ---- 3.2 Bathymetric _3.3 _WDNRAq.:aticLandsLease 4 _ _ Sewer Design _ ~_ GeologidGeotechnicalFeasibilittEvaluation _ ~ _ Preliminary Geolechnical Evaluation I I ~4.3 Final Geolechnical Evaluation I I _~ ::-:==~~;:~~~~g --===C= --r--f-- ------ 5 4.6 c-::~~~::"~9i""';"9---------t--~==t== --t . ------r- --- ~5.1 _Q.~og_jcJGeolechnicaIFeasibilityEvaluation I I I T ~ 5.2 ___ Final Geotechnical Evalualion _ ~L__------t--_- ~____ __+_._ __ 5.3 Geo-Coastal En ineering and Seelmenl Dvnamics Ana~s I I __ 5.4 _ Boant.valk Design Criteria I I I I i - --*=___ ---- ---- 58 ____ ~!_(~~% 9O~_"!'_~..)~~"!'-'-'-"9i~,,'i~g________ I 1 ~ ;:;-=::::~:::"D"i ",O<So,,"",,----- --- 46--T-~-- ~--~8---:-~ -=ul-~34-- 16 ~-.--== 254 19,03814 $28016 _ 6.2 __ L'""",pe"'chilech,","D~g",'Con"e<:tio"'toBoardw.l"_____ __"-- ~~ __'" __ _--"--_ __-"-- ---'--t--- _ ___ 200 ~ $6,9722'.._ -1'1E~ ---;-:'-=::~~:::~:O~~i:'.n"",sUuc,"," - T I I --1--- _ 7.1 ~ 1~.ntify~g~tiOnRe<fJiremenls&OPlionS _ I ~ I ----4-~-== ~ 7.2 ___~tigationPlan. _ __r- __-!__ I i J- I 8 7.3 -;~::.:"Ass.~.::" -1 - '-i ---I---f _1_ + · ~ =~=--~=-=1~t - ~I-f -l T " -"~------+=- __n--+- "-----i- r :.: -~~::~:r~~------r--------t----t--I-i-- -1- ~~ =PUbliccommentPerlo~e~nsetocoomen~ I _ j---!--.-I-~ --r- :: =~;~~~.)~::~----~----------F~ t-t- r t- 1- '1- -- "","-","9 --t----=1 ---1____ _-L_____ 1--- 10 __ Comm~tyOutreachandPubliclnvolveme~_____-----L---__ _~_ _ ___ 10.1 ~_ ~rdwalkMJlSOI}'Committee I I_-----L__ __ i _______!__ 11 :::-= ::::~~:=::":~.-;;.~------------- r==i----t--- -t----=I=--=F~-==~-= ;; ," .. -=""---==---- -+=-~=-l-~} -11- -b - 14 ::: =~~:~~:~CY-"'90ti'tio"'--====--====i=~_=i=_~==---1__+ -~- I I _ 5.5 r--------- BoardwalkAlternativesandpre-design _~__!:!g~gDesignElec1ricaIEngineel'ing _ ~ _PreliminaJ)'J30%lSlrucbJr~9~9 labor Subtotal at Current Salary Rates In-House Expense I I 52 I 235 Number I Unit Cost Unit I ------~- ","",,,.:::--+---1---1 I I I I 131 I 8 -1--- --- --- ---- I Sa~Escalati I I 112 I 85 I ~- I I -------.J----t-~ I -+5% =--===--j I ~~-- 5% I 5% I 72 12 707 $24,741.51 $76,699 Item Oj~Cost $4,200.00 ~~- -~~~~ Outside Expenses Description Direct Cost Other Expenses Expenses Subtotal PROJECT TOTAL I 14,200 $80,899 Prepared By Reviewed By Approved By: (Project Manager) (Division Manager} (Office Manager) PAGE40F5 Fil9 Name: Pot't Narrows Beach Se~rFee &:hedlJlt:t 03-27.06_ds Date Printed: 51112006 Exhibit C Fee Schedule Shannon arid Wilson PROJECT: City of Bremerton CLIENT: City of Bremerton PMX' I BlLUNG I I MUL T1PUER TASK OOGCOOEI 310 I STAFF Chief Engr'l Ma.na~ing I Asst Sr.EngI I Staff Staff Engl I Technician Clerical Scientist' Biologi~' Planner I CADD (capped) Prirq::ll:lI ProjectMg Planner Geoh..ist Scietist Admin I $6451 "'OS I '"'' $2800 $28," """ $2870 I $19X "''' I TOTAL HOURS 1.1 Coordination - !1...._~__~g~Qualily~.________ ___+--~ _________ _ ____~__~____ ~ Planning I I 3 __Survey 3.1 Upland&lvey _ 3.2 ___~thymelric _~_WDNRAquaticlandsLease ~ _ _ Sewer Design - ----1--'-- --I--- --- ---- 4.1 GeobgldGeolechni::a1 Feasilility Evaluation Pre~minaryGeotechnicalEvaluation 12 12 8 32 40 I 24 24 46 124 140 115 200 160 24 24 16 32 40 224 460 423 $8,012.60 $15,532.60 $13,591.16 $24.839 $48,151 $42,133 -~ I--- 4.3 Final Geotechnical Evaluation _4.4 _Prelimjnary~~gineering 30 +---------- 40 $1,639.64 SS,083 26$987.82~ 26 $987.82 $3,062 r-------r--I -- 5 _ _ Boardwalk Design t--------t _5.1 _GeoIogiclGeolec:hnicaIFeasiJi~tyEvaluatiOfl 10 8 I 12 60 ~I -1~_._~~~ -~ Final Geotechnical Evaluation 10 18120 40 ~_~~ I 4 90 $3,374.34 $10,460 5.3 Geo-Coastal Engineering aOO Sediment Dynamics Analysis I I _~_Bo5rlwalkDesignCrileria 4 8 I 8 48 ~* 88 $302268 $9370 _5.5 Soa"dwalkAllemativesandpre-design ~~_~~__~,_G=r~1 4 __ 88 $302268 $9370 -~~ _~iQ~I1I}DesignEIeclri:aIEngineering --t~- 1= _5_7 __Preliminaryj30%LStrucllnlIEn9ineering 8 20 --r ~ - 28 $107608 $3336 5.8 Fina/(60%, 9O"AJand 100%) SlrucluralEngineering 4 I 8 ,L, ___..__~---;;~~~ 6 __~rchitecturaIDesjgn r----:--- ___ 6.t landscape Archilechllnll Design fct Soa"dwalk __ ==Ejl 1_ 6.2 landscape Archilechllnll Design cI Connections to BoarttNalk --r J ==_~C-~ - 6.3 ---- ArchitechJ"aIDes~nofMiscellaneousSlruclures --L--- _' I ~-r---==c= 7 Miligation Plan and Design I -~- I ~ .- ~ ~~~~9ralionReq::-mentS&Op~-~~- ~__~I _ I I_---L- I~_-t ;--.: ~~:~.:.::g"----~----------~ ------l=.- ~I. -~ 1 +-=1_.-_-. ~ ----~I- _~=c:____L_~:=[___~_ _ ---'- 81 ::;,::'1"'"00 1- -t-- -f-- -~I t---I- --1- -,-" :--- ~ ~.. .~~I~ d=- ~I- :f=-r- - . .~ f ~~~~=.=-~ =~f~= l=f-T t~~I-=F= ~ ==~~:: =-I-=t-f I~h- ~ ~ 1- 10 ~ :::~1yO"'~"h,"dP"b1I"""".-';;;;;;----- -+--H---f------ --- ------f---- -10.1 B""''''''~<M'''Yc''''mltl''______ l-=- t- T . I I [--------- ~ CocrdinalewilhPublic i I ------L-~_____ ~ C~ ::~:::~:::::"Spp",~-====__ ~--+----I-t=I==I. ~+=--i--==r== -----"- . constr.uctlon.Manag~_____ 1~--1---I-=+=--t--t-----t-----!-- ~ . ~g.,,,,,. p,,. . . _____I~L__I~ 1___L__~_I~__I__ 131 R,moo,'O"." ------i- t=-I--- --L---+__~I.----l- ::: ;,;;~::~~9~'Y"'~"'OO' _---==-===--=I-j---1 I I--~t--~I---~- 14 OI'''',dS,'''''''' I I I I I I I I ---------------1-t--I----I--I-~I----+--I~-I____i- Labor Subtotal at Current Salary Rates 80 I 150 I 158 559 456 I In-House Expense Item Number I Unit Cost I Unit I Direct Cost I ~===___==__=====_=_-;;~=~~ == -=-~~~-==l= $141103.0~1==~~ Outside Expenses Description DlRict Cost I Oth.,Exponm -~-----...1.-- I ::-- -------J-------L~ ---------I---~I :: I I 20 _~_Inlermediale(~)~gineui~ 16 _ ~ _Fmal(90%and100%)Engmeenng 16 112 72 40 1627 $55,338.60 ;;'8IT.8 $171,550 ~~O~ ~~~~_ Expenses Subtotal PROJECT TOTAL $141,103 $J12,~ PrepilredBy: R,eviewedBy: Approved By. {Project Manager) (DJvisionManager) (Office Manager) PAGE50F5 File Name: Port Narrows Besch SelWr Fee Schedule O~27-05.)(1s DalePrin!ed:5I112006 EXHIBIT D Task 1 Task 2 Task 3.2 Task 3.3 Task 4. I Task 4.2 Task 4.3 Task 4.4 List of Deliverables · The team will prepare and deliver routine correspondence, schedule and budget updates, status reports on progress of work, and summary reports on meetings with agencies, property owners and City personnel. . A Project Management and Communications Plan Illustrated (planning) memorandum describing: . The existing planning/urban design, . Alternative access points and physical connections . Related planning/urban design goals and criteria · Plan view survey maps on D-sized sheets at a scale of 1 inch = 50 feet at 1-, 2-, and 4-ft contour intervals as appropriate and/or as agreed to by the client. The mapping scale can be adjusted to meet client needs. . Arcview shape files of the final DTM. · Letter report describing the legal description of each property within the project area. This report will include stamped survey documents. · Ten (10) copies of the Preliminary and final Geologic/Geotechnical Feasibility Report. . Ten (10) copies of the Preliminary Geotechnical Report . Ten (10) copies of the Final Geotechnical Report . Ten (l0) copies of the 30% plans, a draft Constructability Technical Memorandum and a project cost estimate for both alternatives. Task 4.5 Task 4.6 Task 5.1 Task 5.2 Task 5.3 Task 5.4 Task 5,.5 Task 5.6 Task 5.7 . Ten (10) copies of the 60% plans, draft specifications, final ConstructabiIity Technical Memorandum and updated project cost estimate. . Ten (10) copies of the 100% plans, final specifications and updated project cost estimate . Ten (10) copies of the Preliminary Geotechnical Report (in same package as sewer recommendations). . Ten (10) copies of the Final Geotechnical Report (in same package as sewer recommendations) . Ten (10) copies of the Draft and final geocoastal analysis report of the existing and alternatives. . Ten (10) copies of the draft Design Criteria Memorandum. · Ten (10) copies of the final Design Criteria Memorandum. . Letter report for the three (3) boardwalk concepts. . Ten (10) copies of the Alternatives Analysis Report. . Ten (10) copies of the Constructibility Report. . Ten (10) copies of the Final Lighting Plan . Ten (10) copies of the 30%, 60%, 100% and final design plans . Specifications package for bid documents . Structural section of Constructability Technical Memorandum, . Preliminary plans, . Construction cost estimate and schedule, . Out! ine of structural specification. Task 5.8 Task 6.1 Task 6.2 Task 6.3 Task 7.1 Task 7.2 Task 7.3 The following will be delivered: Ten (10) copies of the 60%, 90% and 100% final plans, final construction cost estimate and schedule, and final structural specification section . Alternative landscape architectural design options for the Boardwalk. · Alternative concepts for miscellaneous structures located on the Boardwalk. . Related physical design goals and criteria for landscape architectural features. Ten (10) copies of the illustrated memorandum describing: · Alternative landscape architectural or architectural design options for connections between the Boardwalk and the adjacent uplands and the Manette Bridge. . Related physical design goals and criteria for abovementioned connections. Ten (10) copies of the 1IIustrated memorandum (formatted for inclusion in the EIS / Facility Plan) describing the (1) preferred concept for each type of architectural structure to be incorporated in the project as well as related physical design goals and criteria for each type of structure . Technical memorandum identifYing potential project impacts, probable mitigation requirements, mitigation options, and mitigation costs. Prepare a recommended mitigation strategy including regulatory justification, scope of work, schedule, and cost estimate. · Records of communication with regulatory agency staff. . Meeting minutes and summaries. . Meeting minutes and summaries from the agency pre-application workshop. . Draft and final Mitigation Plan. . Draft and final Mitigation Plan Addendum. · Ten (10) copies of the 30, 60 and 90 percent plans, and final plans and cost estimates. The 60 and 90 percent and final plans will include special provisions. Ten (10) full- scale and one (1) half-scale copy of the plans and special provisions will be transmitted to the City. Task 8.2 Task 9.1 Task 9.2 Task 9.3 Task 9.4 Task 9.5 · Presentation materials including PowerPoint presentations, white boards, and briefing documents as needed. · EIS program schedule and workflow inputs and monitoring. . Action item tracking and reporting. · Prepare environmental compliance work plan and schedule to be incorporated into the overall project work plan and schedule. · Publish Determination of Significance and Scoping notice and a short list of alternatives. · Ten (10) copies of the draft scoping notice for review and comment. · Two hundred (200) copies of the final scoping notice that will be mailed to agencies, individuals, and organizations on the distribution/mailing list. · One (1) copy of the final scoping notice will be sent to the Paper of Record (Kitsap Sun). · Materials for the public scoping meeting. · Twerity copies of the preliminary DEIS will be prepared for review. · Twenty copies of the draft DEIS will be prepared for review. · Ten (10) copies of the draft Notice ofEIS Availability. · One (1) camera-ready copy of the final Notice ofEIS Availability. · Ten (10) copies of the draft notice for the public meeting. · One (1) camera-ready copy of the final public meeting notice. · 200 copies of the final public meeting notice to be mailed out. · 40 copies of the of the review drafts of the Response to Comments section of the Final EIS. · Twenty (20) copies of the preliminary FEIS will be prepared for review. · Twenty (20) copies of the draft FEIS will be prepared for review. · Two hundred (200) copies of the FEIS. Task 9.6 Task 9.7 Task 10.1 Task 10.2 Task 10.3 Task 11 · Twenty (20) copies of the preliminary BE. · Twenty (20) copies of the draft BE. . One (1) camera-ready copy of the final BE will be prepared for printing. · Meeting minutes from each (BAC) session. · Meeting minutes for each (public open house) meeting. · Meeting announcements, comment forms, directional signs, and sign-in sheets . The following graphics will be prepared and reused and/or updated for each meeting: >- Vicinity Map. >- Aerial photographs. >- 1llustrative figures and hand-drawn illustrations. . Typical boardwalk and sewer sections suitable for public presentation. . Plan and profile sheets, suitable for public presentation. · One (1) power point presentation that will be updated after the preferred alternative is selected. · One (1) newsletter. · Prepare the content and graphic layout (1 page/front and back) and provide a PDF for printing. · Fact Sheets - Designed to provide an update on the progress of the project as well as can serve as notification to the public meetings. Approximate content include: >- Fact Sheet #1 A project definition, scope, and overall goals and objectives ofthe project. >- Fact Sheet #2 Project alternatives analysis · Electronic copies of the plans and specifications. · Up to ten (10) RFCs in written form. · Up to four (4) written plan addenda Task 12 Task 13.1 Task 13.2 . Technical evaluation memorandum recommending a contractor for selection. . Trip reports will be provided each day that (construction) support is requested . Draft and Final Cleanup Action Plan . Work Plan for Groundwater Sampling . Letter Report Summarizing Groundwater Sampling Results . Erosion Control Plan . Ten (10) copies of the 90% plans and specifications for City Review. . Ten (10) copies of the electronic and hard copies of the final plans and specifications. . Stormwater management report. . Technical memorandum on the engineer's estimate of probable cost for construction. . Technical memorandum on the engineer's estimate of probable cost for construction. . Bid Package. . Meeting Notes from conceptual design meeting. . Up to three (3) sketches showing conceptual design alternatives. . One final conceptual design drawing based on the City's selection. . Ten (10) copies of the 30% and 90% and final plans for the selected design approach. . Traffic Study.