Loading...
HomeMy WebLinkAbout09/07/2022 3D AGENDA BILL CITY OF BREMERTON 3D CITY COUNCIL SUBJECT:Study SessionDate: August 24, 2022 Contract Modification Agreement No. 4 with COUNCIL MEETING Date: September 7, 2022 KPFF Consulting Engineers for Design of Department: PW&U Engineering th the East 11Street & Perry Avenue Presenter: Vicki Grover Complete Streets Reconstruction Project Phone: (360) 473-2317 SUMMARY: th In April 2019, the City executed a contract with KPFFto design the East11Street and Perry Avenue Reconstruction projectfor $534,002.58. Three supplement agreements have been executed: Supplement No. 1 was in the amount of $53,282.50 for additional design services including water/sewer utility design support, potholing, stormwater downstream impact analysis, utility coordination, and other engineering design supportservices. The amendment also increased the contract time by extending the time through December 2021.Supplement No. 2 wasin the amount of $156,631.65; the additional design work includedright-of-way acquisition services, formation of small works roster contract for residential electrical work required by PSE for overhead electrical relocations, additional survey, and design of additional watermain and drainage improvements. SupplementNo. 3 was in the amount of $20,045.54andwas for support during the bid phase of the project. The proposed Supplement No. 4 increases the contract value by $88,795.97to a new total of $852,758.24; thework includes construction engineering supportservices and extendsthe term of the contract to December31,2023. ATTACHMENTS: 1)Contract Modification AgreementNo. 4with KPFF FISCAL IMPACTS(Include Budgeted Amount): Theproject is in the Transportation Capital Fund, no budget adjustment is required. STUDY SESSION AGENDA: LimitedPresentationFull Presentation STUDY SESSION ACTION:Consent AgendaGeneral BusinessPublic Hearing RECOMMENDED MOTION: th Move to approve Contract Modification Agreement No. 4 with KPFF, for the East11Street and Perry Avenue Reconstruction Project, inan amount not to exceed $88,795.97 for a totalamended contract amount of $852,758.24,andauthorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. X COUNCIL ACTION:Approve Deny Table Continue No Action Form Updated 11/09/2021