Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1 - Original Submission_ 08_03_2022 3I
AGENDA BILL CITY OFBREMERTON 3 ICITYCOUNCIL SUBJECT:Study SessionDate: July27, 2022 Supplemental AgreementNo. 4with COUNCIL MEETING Date: August 3, 2022 Skillings, Inc. forthe Design ofthe Department: PW&UEngineering thWashington &11Street Roundabout Presenter: Shane Weber Project Phone: (360) 473-2354 SUMMARY: InNovember 2019, theCityexecuted acontract withSkillings, Inc. todesign theWashingtonand th11Street Roundabout projectfor $530,000.00. Threesupplement agreements havebeen executed: Supplement No. 1wasanocostchangetoremove asurvey subconsultant fromthe designcontract. Supplement No. 2wasintheamount of $130,882.99andaddedadditional design worktoreplacesidewalks onlower Washington Avenue andreplacetwowatermaincrossings on th11Street. SupplementNo. 3wasintheamount of $95,358.28andaddedscope toredesign the mainline alignment andreplaceanexisting walltoaddress neighborhood concerns. Supplement No. 3alsoaddedtimebyextendingthe contract through December 21, 2024. Theproposed Supplement No. 4increases thecontract valueby $167,369.09toanew totalof 923,610.36; theworkincludes landscaping design, ad-bidsupport services and construction engineering supportservices. ATTACHMENTS: 1)LocalAgency Supplemental AgreementNo. 4with Skillings, Inc. FISCAL IMPACTS(Include Budgeted Amount): This project isintheTransportation Capital Fund, no budget adjustment isrequired. STUDY SESSION AGENDA: LimitedPresentationFull Presentation STUDY SESSION ACTION:Consent AgendaGeneral BusinessPublic Hearing RECOMMENDED MOTION: thMovetoapproveSupplementalAgreementNo. 4withSkillings, Inc. fortheWashington& 11Street Roundabout Project; andauthorize theMayortofinalize andexecute theagreement with substantially thesameterms andconditions aspresented. COUNCIL ACTION:Approve Deny Table Continue NoActionX FormUpdated 11/09/2021 DocuSign Envelope ID: 8D96EB7D-A7C8-4A74-9013-D446753FDBF4