Loading...
HomeMy WebLinkAbout08/03/2022 5A AGENDA BILL CITY OF BREMERTON 5A CITY COUNCIL SUBJECT:Study SessionDate: July 27, 2022 Public Works Agreement with Sound Pacific COUNCIL MEETING Date: August3, 2022 th Construction, LCC for the East 11Street Department: PW&U Engineering and Perry Avenue Reconstruction Project Presenter: Vicki Grover Phone: (360) 473-2317 SUMMARY: E11th Street and Perry Avenue are arterials in East Bremerton and have been documented to have poor pavement and sidewalk condition.The project reconstructs both roadway and sidewalks on E11th Street from Pitt Ave to Perry Avenue and Perry Avenue from E11th Street to E17th Street. The project also provides pedestrian lighting, stormwater improvements, utility improvements and other amenities. Bids for the construction of the project were openedon July 6, 2022 and 4bids were received. The apparent low bidder was rejected as the bid was nonresponsive. Sound Pacific Construction, LLC, was the lowest responsive, responsible bidderwith a bid of $5,575,580.40, including sales tax. Staff th recommends award of the East 11Street and Perry Avenue Reconstruction Project Contract to Sound Pacific Construction, LLC. ATTACHMENTS: 1)Site Plan; 2) Fiscal Summary, 3) Bid Tabulation; 3) Public Works Agreement FISCAL IMPACTS(Include Budgeted Amount): The total project costs areestimated at $7.4M, and remaining costs (2022 through completion in 2023) are $6,675,000. The project was originally funded by a grant from the Transportation Improvement Board (TIB) in the amount of $3,941,916,TIB has agreed to provide an additional grant amount of $400,000. A $75,000 grant was also awarded from the Department of Ecology. Remaining project funding is provided from REET,other revenue tothe Transportation Capital Projects fund, and Water, Wastewater and StormwaterUtility Fundsas outlined in the attached Fiscal Summary.Expenses through 2022 will not exceed the 2022 budgetauthority,therefore a budget adjustment is not required. STUDY SESSION AGENDA: LimitedPresentationFull Presentation STUDY SESSION ACTION:Consent AgendaGeneral BusinessPublic Hearing RECOMMENDED MOTION: th Move to award theContract toSound Pacific Construction, LLCfor the East 11Street and Perry Avenue Reconstruction Projectin the amount of $5,575,580.40, including sales tax; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. X COUNCIL ACTION:Approve Deny Table Continue No Action Form Updated 11/09/2021