5251
WA ST DEPT OF ENTERPRISE SERVICES
WWTP Upqrades Contract No. 2013-111G(1-1)
Public Works
LEG 12-1
5/1/2013
0
COP N0. 2 5/16/13
�
m
� �� S! Sef'VICe8
' �i�e cmeroi+ CI of
Bncua�n►�o a Aaaursctunu semnc�s � AGEN�
ENERQIY CONTRACT CHANGE ORDER
PROPOSAL (COP) Wastawater Troatment Plant
PROJECT TITLE
�� ��� � .�
CONiRACT
No. sm�-,,,att.,)
COP No. 2
T0: Trane U8, Ino. � (CONTRACTOF� pRO� peGU�r oAre: q/yZp�
You are dU�ed to prepere a cast propasal tor 1he work descdbed belaw and/cr detaAed on the attachmer� referred to:
Supply end Inetall psrmanetniy a�4" S8 Knife Oate 8 Bypaes Plping.
Supply and ineteil en addltlo�e130° 88 Knifa t3ets lnstallatlon downetroem ad flow metsr fcN futuro aervlcing.
REA80N FOR CHANQB O DE4qi ENbDRS Q OF � p�,y Q tATENT CONDIfIONS O CODE RE�RBYIEN�S O VAWE ENG�I�RU1G
EXPLANATION• Cuelomer-Dlroeted chan9a In aoope to malFS temporary bypees yalve� and Plping permanent
DATE PROP09AL RE�UIRED: 5M/2013 CHANQH ORIQINATE� BY: Scott A Etsenhauer, PM
(14 deys (rom Reque� Date, unlese othar dete agreed b)
PROP�SAL REQUE3TED BY. P8t Coxon, WWTF Mgr
TO: Trane US, Inc. (A/E) TO: Doug Kllpetrick pM
WE AaREE TO PERFORM ALL CHANOE IN THE WORK DESCRIBED IN TNE PROPOSAL RECUEST FOR:
CONTAACT SUN:
❑ ra ain� 81xty EIgM Thousand Elght Hundred Rorly'IV�ro end
0� OF 77/100 dollero $ 88,842.77
�� (WA3HINQTON STATE SALE9 TAX NOT INCLUDED)
In aoaordanae with the Gsneral Condltlons, Coat Estlmate Dstall 8hest(s) aro atteohed Mreto.
CONTRACT TWE:
a ��
� � OF 0 CALENDAR DAYS
O�
The toregoinp emount c�rers everything required In connectlon with the at�nge. All other provisions af the contrecl remafn in (ull
force and eftect.
We underatand that this praposal does not constitute autho►ization to proceed with the specllled chanpes in the wo�lc umll
Incorpor�I�,�g�enge OMer by the De nt of Enterp�ise 9ervl�es,
Trens US, Ino.�?RIJCTION PROJlCT 1A�NA�OER �
BY --�------- �i"i/�v�L�
CONTRACTOR 81GNATU DAl'E'��
TO: The Departmerd oi Enterprise 3ervicea' Authorizing Slgnator
s havs caref�lly esamined thls proposai end flnd the cost to be roeaoaabls. Therefors, yre reoommend ae�eptenea
�-'--'—""_ `/�'� J
E AT 08T RI ICATION DATE
� �'f l.3 � � ���
AQENCY TE E&A E MANAOER D TE
RoRM aas-eaapAo t�+.ea ��a}
�����U��
State of Washington
MAY 14 2013
Department cf Enterpns� Serwces
Engmeenng and Architectural Serwces
t
{
i
i
�
f
�
z
�
i
�
I
>
I
;
�
i
�
,,
t
�
f
Percent
0% $
3�0 �
18% $
$
s.so�io s
2,065 29
12,391.70
14�456.99
1,243.31
__
15.70�.30
,
DES Energy Program COP-FA Coversheet ,
Cltent Name City of Bremerton
ProjectNumber 2013-111 G (1-1)
Project Title Wastewater Treatment Facilttv Upgrades
Total Cost of Change
Acknowledgement of T
CNent Agency _
ESCO
st of
-- - - - ,
$ �� 90,463.55 S
PROJECT MANAGER
�
i
Date
�3' � �3
3� /
�������
Professional Services
Subcontractor Cast Breakdown
C��rt Name City of Bremerton �,� � ,,,�, 13
Pro�ect Number 2Q13-111 G (t-1) - -
Project Tdte Wastewater Treatment Facil' U rades
Name of Subcontracccr PeaSe 8� SOns,lnc.
8920 Bremerton WVYi'P Final Effluent Pumps Replacerv9ent
Change Proposal - Lump Sum Basis ,
contract nfo r30Q03zs23 �
DESCRIP710N: Supply S Install Additional Z4-Ifd SS Knife Gate & Permanent 8ypass Pipir�g '
WORK AREA: All Areffi '
CQBT CODE PEASE iSSUE �- OOS dwner Chng # 002 RFI NIA
PEABE 8� SONS LABOR HOURS HOURLY RATE EST COST
Prqed Menager Q 0$ 320 00 S -
Project SupedntendeM o o S 120 00 S -
Cary�eriter Foreman 0 0 S -
Carperder 0 0 $ -
Laborer 0 0 $ -
MNwrIgM 0 0 $ -
Fitter 0 0 $ 78.00 $ -
� -
rornt - �e a sons �no� -
TERIAL AND M06lOR EQUIPMENT SUPPUERS ESY. COST
ionel, Permanent 24-IN SS Bypese Knde Gate w/Bevel Gear Operator a 10,83T 00
Permanent Bypass Mstetials tn VauR Roof Deck, Also Indudes Flow Meter Spool S 8,9T0 dQ
S -
S -
S -
S -
TOTAL - Materfal and MeJor Eqaipment Suppllers $ 18,567 OD
4/29l2013
Page 1 0} 2 815 AM
I
I
TOTAL - Pease & Sons Equipment $ -
TOTAL - Subcontraeto�a E -
8920 Bremerton WWTP Final Effluent Pumps Replacement
Change Proposal - Lump Sum Basis
Co A lo. Y300Q326Z3
DESCRIPi10N: Supply 8 Install Addibona1241M SS KnNe Gate & Permanent Bypass Pfptng
WORK AREA• All Areas
COST CODE PEASE lSSUE 1k 003 Ovmer Chng � 002
CONTIN(lED FRObJ PAGE t of 2
BTOTAL - DIRECT COSTS EST COST
SUBTOTAL - P&S Labor, Equip�netd & Matenais $ 19,55T Od
SUBTOTAL - 3ubeontraclors $ -
SUBTOTAI. - DIRECT COSTS $ 19,557 00
Profit on P&S Work 1596 $ 2,933 55
Proflt � SubcoMractorc Wwk 5% S -
5ubto�l $ 22,480 55
Bond � Insurance 2% $ 448 81
TOTAL - Dtred Casts $ 22,940.36
ME EXTENSION AND RELA7ED COSTS EST. COST
TIME EXTENSION REQUESTED - WORKING DAYS
TIME EXTENSION REQUESTED - CALENDAR DAYS
CPM ACTIVtTY NUM$ERS AFFECTED
EXTENDED FIEID OVERHEAD (rate per work day}
AIUE OF IXTENDED FIELD OVERHEAD $ -
HOME OFFICE OVERHEAD, BONDS AND INSURANCE � t6 596 $ -
SUBTOTAL $ -
PROFIT � 1046 S -
TOTAL - TEme Extenslon and Related Coats $ -
TOTAL CHANGE �RDER REQUEST: $ 22�940.36
RPI WA
This cost proposel fs based on ihe cost elementa ide�fied Pease 8 Sons reserves all rights to addi6wiial compensation and Ume exter►sTon tor �rk
elements IdeM�ied, unleas soeclflcalM neaotieted aa part of this Change Proposal Worlt wUl proceed tn acoordazu;a wdh the cantract documents uMU the
Owner eHher provldes w�ltan acceptance of this ehenge proposei or a written diredrve to proeaed m aceordar►ce with thts propo�L Fellure to accept this
proposei wHhin the proposal time may resuft in coat esealabon and possible addNi�al deleys This chenge proposal must be �nduded as en attachrneM to
Owner d�enge order NOTICE Es hereby provlded ihat the Cor�tractor reserves any and elf �ighfs to recover direet, ind�rect, end wnaequentlal oosts,
Indudl� but not pmited to the coat ot delay and unpad related to any work cover by this chenge or othervnse aflected by this change unless the cost andlor
dme have been speaticaily thduded and nega8ated
PEASE & SONS
26-Apr.73
RATE SUBMIITTED
13•May-43
PitOPOSAL VALID UPR'IL
Harr�cn Hotdikias
ProJed Manager
Pape 2 oT 2
4@912019
8.15 A�R
�
TAB #24" K(3V
Page #1 of 1
KG�NORTH�EST LLC
�
MA1dU�'ACTURER'S REPRESENTATIVE
12509 BBL RED ROAD
SUITE 202
� BELLEVt1E, WA 98005
(425) 45I-0667 : FAX (42S) 431-4668
Page 1 of 3
QUOTATION
DATE: Apri13, 2013
TO: Pease and Sons
BID DATE: MIA
QUOTAT�ON NUMBER: 13Q304
REFERENCE: Bremerton
ENGINEER:
QUANTITY MODEL NUMBER & DESCRIPTION NET PRICE EA
WE ARE PLEASED TO OFFER THE FOLLOWING
QUOTATION FOR YQUR CONSIDERATION
18" LINED VALVE Figure 93-A4B-EMA F3 Knife Gate Vaive
-Cast 304 stsinless steel body
Ftanges drifled and tapped to ANSI B16.5/150
—304 SS gate
--304 SS metel to metel seat with Buna aring
--F3 - 270° backing ring for bi-direcEional drip tight seal
—TLSP packing rated to 500 deg F, 3-11 PH
--C�st 304 SS packing gland wnth 304 SS bolts
--Handwheel operator
$',150.37
24" LINED VALVE Figure 93-A46-BGO-F3 Knlfe Gate Valve
-Cast 304 staintess steef body
Flanges drilled and tapped to ANSI B96.5/150
�304 SS gate
—304 SS metal fio metal seat with Buna o-ring
—F3 - 270° badang ring for bi-directional drip filght seal
—TLSP padcing rated to 500 deg F, 3-91 PH
—Cast 304 SS packing gland with 304 SS bolts
--4:1 baval gear actuator with 20" diameter handwheei
— w�4h 2" square drive (ratchet operator by others)
—304 SS Stem
$10,637.37
VALVES —PiPING—RELATED PRODUCI'S FOR THE WATER TRF.ATMENT : WASIEWATSR'TREAT1��Nf : MUN[CIPAL MARKB'fS
Page 2 of 3
Quotatian No. 130304
QU�►►NT[TY MODEL NUMBER 8� DESCRIPTION NET PRICE EA
3U" LINED VAL.VE Figure F93-A4B-BG4 Knife Gate Vaive $35,422.61,
-Fabricated body with 304 SS flanged and gussets
- 304 SS Liner ad raised faces
150 PSI CWP design
Flanges drilled and tappeci to ANSI B16 47/1996
Class 150 Series A
--304 SS gate
—304 SS metal to metal seat w�th Buna o-ring
—270° badang n�g for bi-directional drip tight seai
—TLSP padcing rated #0 500 deg F, 3-11 PH
--Cast 304 SS packing gland with 304 SS boits
—4:1 b�v�l gear actuator with 20" diameter handwheel
-- witl� �" square drive (ratchet operator by others)
—304 SS Stem
NOTES:
1— CONTRACTOR TO VERIFY QUANTITIES, SIZES AND DESCRIPTIONS. THIS tS NOT A
GUARANTEED BlLL OF MATERIALS.
2-�ALL ITEMS INCLUDE MANUFACTURER'S STANDARD AWWA COATING. NO SPECIAL
PAINTING iS INCLUDED, UNLESS SO STATED IN B�DY OF QUOTATION.
3— FLANGE BOLTS, NUTS, GASKETS OR MECHANICAL J�INT ACCESSORIES ARE NOT
INCLUDED, UNLESS SO STATED IN BODY OF QUOTATION.
4--NO SPARE PARTS ARE INCLUDED UNLESS SO STATED IN BODY OF QUOTATION.
5— NO STAINLESS STEEL OR BROMZE VALVE TAGS ARE lNCLUDED UNLESS SO STATED IN
BOOY OF QUOTATION
8—THIS QU�TATION tNCLUDES NO ADDENDA SHOULD ADDCfIONALADDENDUM'S BE
ISSUED, PLEASE CHECK FOR VARIATIONS AIVD/OR CHANGES
7— SUBMITTAL DATA CAN BE SUPPLIED WITHIN FOUR (4) WEEKS AFTER RECEIPT OF
ORDER.
$— PRICES QUOTED INCLUDE A FORTY FIVE (45) DAY ALLOWANCE FOR RETURN OF
SUBAAITTALS W[TH MATERIALS RELEASED FOR SHIPMENT AS QUOTED ANY DELAYS
IN SHIPPING lfdCURRED BY LATE RETURN OF SUBMITTAE.S OR AT THE REQUEST OF
ANY PARTIES INVOLVED, OTHER THAN MANUFACTURER ANDlOR MANUFACTURER'S
AGENT, MAY BE CAUSE F�R CHANGES IN THE PRICES QUOTED.
VALYBS — PIPING — EtFsi.A1ED PRODUCTS FOR THE WATER TRF„ATMENT :11VA.STEWATER TREATMENT : M[JMCIPAL NfARKL�TS
Page 3 of 3
Quotation No. 13Q304
QUANTITY AAC>DEL NUMBER � DESCRIPTION NET PR10E EA
9— SHIPPIPIG DATES QUOTED ARE BASED ON AVAILABILITY OF MATERIAL AT THE TIME OF
THIS QUOTATIOIV AND NORMAL FACTORY LEAD TIMES. ACTUAL SHtPP1NG DATES WILl.
BE ADVISED AT TIME OF RELEASE. EVERY ATTEMPT WILL BE MADE TO SCHEDULE
AAATERIAL FOR SHIPAAENT TO MEET CONTRACTORS REQUIREMENTS.
F.O.B. POINT: Woodland WA w/ Fneight Allowed to Jobsite
�
DELIVERY: 4 ta 6 weeks after recefpt of approvai
TERMS: Net 30 Days
PRICES FIRAA FOR 60 DAYS
THIS QUOTATION IS OFFERED ON THE BASIS OF SUPPLYING ESSENTIALLYALL THE
AAATERiALS QUOTED. IT IS OUR INTERPRETATION 4F THE MATERIALS AND QUANTITIES
REQUIRED, AS WELL AS OUR INTERPRETATION OF THE SPECIFICATIONS FOR THIS PROJECT.
WE DO NOT GUARANTEE THE SIZES, QUANTITIES OR COMPLIANCE WETH THE
SPECIF[CATIONS. WE CAUTION THE CONTRACTOR TO CHECK ALL SIZES, QUANTITIES AND
COMPLIANCE WITH THE SPECIFICATIDNS. PRICES QUOTED ARE BASED ON QUANTITlES AND
ITEMS SHOWN AND ARE SUBJECT TO REVISION IF VARIATIONS OCCUR.
AIdY PURCHASE ORDER lSSUED AS A RESULT OF THIS QUOTATIQN IS SUBJECT TU ALL THE
MANUFACTURER'S C�NDITIONS SET FORTH ON THE REVERSE SIDE HEREOF AND FINAL
ACCEPTANCE BY SAID MANUFACTURER.
Gregg Can�oll
STEEL SCOPE
aaa�a ie�:
24�nCh R�SO Flanged OutleR irtito 30-b�ch bYeef P(pe CMNI' X RWME
24-inch RI=$O l=lange � Groove Spoal With alatom tniter CMNT X PRiME
2q-lnch Vrctaulfc Groove Flan� Adepter
30-Inc� Flg x Flg SpQOI for n�w me� CMNT X PRIME
PRIC� FOR AB01/E REMS:
Q�
_...... - -----
$ '10,�60
WESTF�3N WATERWORI�3
Scop� Pega 1 4/46t204312:09 PM
�TEEL SCQPE
�,�� ��:
24tnch RF30 Flange x�roo�ve spoal wNh custom mfter CMNT X PRINIE
241r�ti Vlct�u0c Groove Flange Adapter
30-ind� Elg x Flg 8pool for nsw mebar CAANT X PRIME
PRlCE �aR AgOV� ITEAAS:
aty
$ 8,920
WE8TERN WATERWORiC3
Scop� Pege 1 4/16/2�1� 2.01 PM
8920 sremerton UVWTP Finaf Efftuent Pumps Repiacement
Change Proposa! - Lump Sum B�sis
Co�ac! Na Y300032623
DESCRtP'TION: Supply 8 lnstall Additfonal 3U-IN SS Knife Gate - REV 2
WORK AREA• All Ateas
CpST CODE PEASE 139UE � OOd Ovme� Chng i� 003 - REV 2 RFI N!A
PEASE 8 SONS LABOR HOURS HOURLY RAYE EST. COST
Jece M�er o o$ �zo 00 $ -
roJect Superintendent 0 0$ 120 00 S -
nter Fareman 0 0 S -
CarpeMer 0 0 $ -
Laborer 0 0 $ -
N{Ohvright 0 0 S -
Flt[� 10 0$ 78 00 $ 780 00
$ -
TOTAL - Pease 8 Sons Lebor 760.00
NWTERlAI. AND bAA.IOR EQUIPMENT SUPPLtERS EST COST
ditlonal 30-IN S3 Knite C3ate w/ Bevel Gear Operetor a 35,422 61
d�ional SO-IN Flanges tor Addfionel3pool to iCeep KOV from WaU $ 2,948 88
$ -
$ -
$ -
$ �
ioTAL - Matenal er� MaJor equtpment suppuers � �e.slz.aa
4/29/2013
Page 1 ot 2 82S AM
TOTAL - P�se 8 Sons Equ�pment S -
TOTAL - SuDwMraGors S -
8920 Bremerton WWTP Final Efifluent Pumps Replacement
Change Proposal - Lump Sum Basls
Contract No. Y300032B23
DESCRIPTION: Supply & Instan Addltionat 30-IN SS Knife Gate - REV 2
WORK AREA All Aroeas
COST CODE PEASE ESSUE # 004 Owner Chng # 003 - REV 2
CONTlNUED FROM PAGE 1 ofY
SUBTOTAL - DIRECT COSTS EST COST
SUBTOTAL - P8S Lab�, Eqwpment 8� Matenals S 39,132.49
UBTOTAL - Subcontracbars S -
SUBTOTAL - DIRECT COST3 $ 39,13249
Proiff on P&S Work 1546 $ 5,8$9 87
Profrt on Subsontradors Work 595 S -
Subtotal $ 45,002.36
Bond 3 Insurance 2g5 S 900 05
T�TAL - Direct Costs a 46,902.41
dl� EXIENSION AND RELATED C�STS EST COST
iME IXTENSfON REQUES'I'ED - WORKING DAYS
ME EXTENSION REQUESTED - CALENDAR DAYS
CPM ACTNITY NUMBERS APFECTEQ
EXTENDED Fl�b OVERHEAD (rate per work day)
VALUE OF EXTENDED FIELD OVERHEAD $ -
HQME OFFICE OVERHEAD, BONOS ANI] IN5URANCE � 18 596 $ -
SUBTOTAL $ .
PROFIT � 1Q96 $ .
TOTAL - Time Extension and Related Coats s
TOTAL CHANGE ORDER REQUEST: $ 45,902.41
RFI FUA
This cost proposal �s basod on the wst elements rdentlfied Pea� & Sons resenres atl righis to eddwonel compensation and time exterfs�on for work
elemeMs fderAlfied, unless soedflcallv nes�ot(ated es part oi ttus Change Proposal Work vwn proceed in aeoordanee with the coMrae! dxuments uMA ffte
Oam� eiffier provides w+itten aeceptanee of thk eNanga proposel or a wrHten dueeWe to proceed in accordance wNh this proposal Failure to acoept �Is
Ptoposal w�hin the proposal thne may result m oost escataL� and pos�6le additlonal detsys This ehange proposal mast be uroluded as an attaehm�t to
Ovmer ehange order NOTICE ia hereby provided tliat 6�e Contradar reserves any end ali nghts to reeover direet, Mdfrs�t, end consequen6al eo�s,
Indudfne but not Rmked to the coai ot delay and impact related to er»r work eover by this dtange a otherxnse aftected by this change unless the cost endlor
Ume have been spacl9cally (nctuded snd nago6ated
PEASE 8 SONS
26,Apr-13
DATE SUBMITTED
13-May-13
PRBPOSAL VALID UNTIL
Hardeon Hotchkisa
Pro�ect Manager
Page 2 of 2
4t2912018
8.28 AM
TAB #30° KGV
Page #1 of 1
4l29I2013 821 AM �
�G� NORTHWEST LL C ��A� REPRFSENTATNE
,
t2509 BEL RED ROAD
surrE zoz
BELLBWE, �IIA 98005
(425) 451-0667 : FAX (425} 451-0668
Page 1 of 3
QUC)TATI�N
DATE: April 3, 2013
TO: Pease and Sons
BID DAT�: N/A
t�UOTATION NUMBER: 130304
REFERENCE: Bremerton
EPlGINEER:
QUANTITY MODEL NUMBER & DESCRIPTION NET PRICE EA
WE AI�E PLEASED TO OFFER THE FOLLOWI9VG
QUOTATION F'4R YOUR CONSIDER�►►TI�N
18" LINED VALVE Figure 93-A4B-EMA-F3 Knife Gate Valve
-Cast 304 stainless steel body
Flanges drilled and tapped to ANSI 816.5/150
--304 SS gate
--304 SS me#al to metal seat w�h Buna a-ring
--F3 - 270° backing ring for bi-directional drip tight seal
-TLSP packing rated to 50a deg F, 3-11 PH
-Cast 3U4 SS packing gland with 304 SS bolts
--Handwheei operator
24" LINED VALVE Flgure 93-A4B-BGO-F3 Knife Gate Valve
-Cast 304 stainless steet body
Flanges drilled and tap�d to ANSI B18.5/150
-304 SS gate
-304 SS metal fio me#al seat with Buna o-r�ng
-F3 - 270° backing ring for bi-directional drip tight seal
-TLSP packing rated to 500 deg F� 3-11 PH
-Cast 304 SS packing gland with 304 SS bolts
-4:1 b�vel gear actuafi�r wi� 20" diame�er handwhe�l
-� witl� 2" square drive (ratchefi operator by ot�ers)
- SS Stem
$7,160.37
$10,637.37
VALdES - PIPING - RELATED PRODUCT3 FOR TAL� WATSR TREATMEN'T : WASTEWAT� TRF.ATM�Nf : MtR�TICIPAL MARKE7'S
Page 2 of 3
Quotation No.130304
CpUANTITY MODEL NUMBER � DESCRIPTION NET PRICE EA
34" LINED VAL.VE F(gune F93-A�46-BG4 Kntfe Gate Valve $35�422.61
-Fabricated body with 304 SS flanged and gussets
- 304 SS Liner ad raised faces
150 PSI CWP design
Ftanges drilled and tapped to ANSI B16.47/1996
Class 150 Series A
—304 SS gate
—304 SS me�E to metal seat with Buna o-ring
—270° backing ring for bi-directional drip tight seal
—TLSP packing rated fio 5Q0 deg F� 3-11 PH
—Cast 304 SS packmg gland with 304 SS bolts
—4:1 bevel gear actuator with 20" diame�er handwheel
— with 2" square drive (ratchst oparator by others)
—304 SS Stem
NOTES:
1— CONTRACTOR TO VERIFY QUANTITIES, SIZES AND DESCRtPTIONS. THlS (S NOT A
GUARANTEED BtL� OF MATERfALS.
2-,ALL ITEMS INCLUDE MANUFACTURER'S STANDARD AWWA COATING. NO SPECIAL
PAINTING IS INCLUDED, UNLESS SO STATED IN BODY OF QUOTATION.
3— FLANGE BOLTS, NUTS, GASKETS OR MECHANICAL JOINT ACCESSORIES ARE NOT
IPICLUDED, UNLESS SO STATED IN BODY OF QUOTATION.
4—NO SPARE PARTS ARE INCLUDED UNLESS SO STATED IN BQDY OF QUOTATlON.
5— NO STAINLESS STEEL OR BRONZE VALVE TAGS ARE INCLUDED UNLESS SO STATED IN
BODY OF QUOTATION.
6— THIS QUOTATION INCLUDES NO ADDENDA SHOULD ADDITIONAL ADDENDUM'S BE
ISSUED, PLEASE CHECK FOR VARIATIONS AND/OR CHANGES.
7— SUBMITTAL DATA CAN BE SUPPLIED WiTHIN FOUR (4) WEEKS AFTER RECEIPT OF
ORDER
8— PRICES QUOTED INCLUDE A FORTY-FIVE (45) DAY ALLOWANCE FOR RETURN OF
SUBMITTALS WITH MATERIALS RELEASED FOR SHIPMENTAS QUOTED. ANY DELAYS
IN SHIPPING INCURRED BY LATE RETUR1d OF SUBMITTALS OR AT THE REQUEST OF
ANY PARTIES INVOLVED, OTHER THAN MANUFACTURER AIdDlOR AAANUFACTURER'S
AGENT, MAY BE CAUSE FOR CHANGES IN THE PRICES QUOTED.
VALVES - PEPING-RE[.ATED PRODUCfS POR TF1E WATER TRF.ATMENT : WASTEWAT'ER TtLBATMENT : Ar[IJNIC�AL MARKETS
Page3of3
Quofiation No. 130304
QUANTITY MODEL NUMBER 8� DESCRiPTION NET PRDCE EA
9— SHIPPING DATES QUOTED ARE BASED ON AVAILABILlTY OF MATERIAL AT THE TIME OF
THIS QUOTATION AND N�RAAAL FACTORY LEAD TIMES. ACTUAL SHIPPIPIG DATES WILL
BE ADVISED AT TIME OF RELF�►SE. EVERYATTEMPT WILL BE MADE TO SCHEDULE
MATERiAL FOR SHIPMENT TO MEET CONTRACTORS REQUIREMENTS.
F.O.B. POINT: Woodland WA w/ Freight ANowed to Jobsite
DELlVERY: 4 to 6 weeks after receipt of approva[
TERAIIS: Net 30 Days
PRICES FIRM F�R 60 DAYS �
THIS QUOTATION IS OFFERED ON THE BASIS OF SUPPLYIfdG ESSENTIALLY ALI. THE
MATERIALS QUOTED. IT IS OUR INTERPRETATiON OF THE MATERIALS AND QUANTlTIES
REQUiRED, AS WELL AS OUR tNTERPRETATION OF THE SPEClFICATIONS FOR THiS PROJECT.
WE DQ NOT Gl1ARANTEE THE SIZES, QUANTITIES OR COMPLIANCE WITH THE
SPECIFtCl4TI0NS. WE CAUTION THE C�NTRACTOR TO CHECK ALL SIZES, QUANTITIES AND
COMPLIANCE WITH THE SPECIFICATIONS. PRICES QUOTED ARE BASED ON QUANTITfES AND
ITEMS SHOWN AND ARE SUBJECT TQ REVIS(ON IF VARIATIDNS �CCUR.
ANY PURCHASE QRDER ISSUED AS A RESULT OF THIS QUOTATION IS SUBJECT TO A!L THE
MANUFACTURER'S CONDITIONS SET FORTH ON THE REVERSE SIDE HEREOF AND FINAL
ACCEPTANCE BY SAID MANUFACTURER
Gregg Carroll
Harr�on
Frofi: Sern CIe99 E�889�9r�afl.com]
$ent: F[rday, Ma�tl 29, 20131•dQ PM
To: Her�ison
Sub�ecf: Brerrtertan ChanAe
Price for tE�e add(tipnal 30" Flang� and labq� would be $1,�50. The 30dnch B-N-G sets woul� be $Z24.94 each.
The total for both flanges and BN6 sets would come out to be $1,69$.88
Let me know tf yoq need a�nytfiing else.
Sam qegg
wmeam wso�worlu su�y
IY�IRa, idairo
Ph. Z�.q6�.2�8 ext 304