SUBJECT:Study SessionDate: N/A
Change Order No. 1 to Contract with Pape COUNCIL MEETING Date: June 15, 2022
and Sons Construction, Incfor Oyster Bay
Department: PW&U
Avenue ForceMain Replacement Project
Presenter: Bill Davis
Phone: (360) 473-2312
SUMMARY:The project is replacement of 2,200-ft of failing cast iron pressure sewer along Oyster
Bay Avenue between Kitsap Way and Arsenal Way.The construction began in April and is nearly
complete.The contract assumed the roadway would be restored with a trench patch; however,the
existing pavement is failing and so a full roadway restoration is more appropriate. This change order
for $223,149.11will provide for a combination of grind and overlay and pavement replacement
beyond the trench area for full width surface restorationof Oyster Bay Avenue.
ATTACHMENTS:1) Change OrderNo. 1; 2) Photographsof Site
FISCAL IMPACTS(Include Budgeted Amount): The Change Order increases the contract total by
$223,149.11; the project is included in the Wastewater Fund. A budget adjustment is not required.
STUDY SESSION AGENDA:LimitedPresentationFull PresentationN/A
STUDY SESSION ACTION:Consent Agenda General BusinessPublic Hearing
RECOMMENDED MOTION:
Move to approve Change Order No. 1 with Papeand SonsConstruction, Inc.for the Oyster Bay
Avenue ForceMain Replacement Project ;and authorize the Mayor to finalize and execute the
agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION:Approve Deny Table Continue No Action