Loading...
HomeMy WebLinkAbout3002- 164N44255 -08-C-3002 P00001 Page 2 of 2 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES SECTION I - CONTRACT CLAUSES The following have been added by full text: CLAUSE CHANGE This modification changes FAR 52.241-6 (b)(1) to read as follows: b) Meter Test 1) The Contractor, at its expense, shall periodically inspect and test Contractor installed meters larger than 3" diameter every two years, meters 1 '/z " to 2" diameter at intervals not exceeding 4 years. Meters 1" diameter and smaller shall be inspected and tested at intervals not exceeding 5 years. The government has the right to have representation during the inspection and test. All other terms and conditions remain unchanged. End of Summary of Changes)