Loading...
HomeMy WebLinkAbout1 - Original Submission_ Contract Modification No. 4 with PMX_NLPage 1 of 2 Contract Modification No. 4 Oyster Bay Beach Sewer Upgrades CONTRACT MODIFICATION AGREEMENT NO. 4 BETWEEN THE CITY OF BREMERTON AND PARAMETRIX, INC. PROJECT: Oyster Bay Beach Sewer Upgrades CONSULTANT: Parametrix, Inc. DATE: April 5, 2022 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Oyster Bay Beach Sewer Upgrades AGREEMENT (the "Contract") entered into between the City of Bremerton and Parametrix, Inc. on August 13, 2019). All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows: See Amendment 4 Scope of Work attached as Exhibit A. Section II. Term , is modified as follows: The term of the contract is not changed. Section III. Compensation , is modified as follows: The original contract amount was $437,006. Contract Modification No. 1 increased the contract amount by $164,490.96, resulting in an amended contract amount of $601,496.96. Contract Modification No. 2 increased the contract amount by $71,210, resulting in a revised contract amount of $672,706.96. Contract Modification No. 3 increased the contract amount by $49,711.71, resulting in a revised contract amount of $722,418.67. This current Contract Modification No. 4 increases the contract amount by $22,862.90, resulting in a revised contract amount of $745,281.57. Exhibit B shows the increased fees for the respective tasks. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. DocuSign Envelope ID: 918F7787-3146-4C37-8E5E-51A308854626 Page 2 of 2 Contract Modification No. 4 Oyster Bay Beach Sewer Upgrades The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _________________________ (Initials and Date) PARAMETRIX, INC, THE CITY OF BREMERTON By: By: Print Name: ____________________ Print Name: Greg Wheeler Its ___________________________ Its: Mayor Date: Date: APPROVED AS TO FORM: ATTEST: By: By: KYLIE FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Parametrix, Inc Attn: Angela Hoover Attn: Cedar Simmons City of Bremerton 60 Washington Ave, Suite 390 345 6th Street, Suite 100 Bremerton, WA 98337 Bremerton, WA 98337-1891 Ned Lever Digitally signed by Ned LeverDN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned LeverDate: 2022.05.18 13:11:23-07'00' DocuSign Envelope ID: 918F7787-3146-4C37-8E5E-51A308854626 EP&C Division Manager 5/26/2022 Jenifer Young 5/26/2022 City of Bremerton 233-1896-162 Oyster Bay Beach Sewer Upgrades 1 February 1, 2022 Amendment 4 SCOPE OF WORK City of Bremerton Oyster Bay Beach Sewer Upgrades Amendment 4 – Supplement to Services During Construction PROJECT BACKGROUND This project includes the design and installation of grinder pump stations to approximately 53 properties as well as upland gravity and low-pressure collection system improvements to eliminate sewage backups into Oyster Bay from failed backflow prevention devices and broken laterals. The overall goal of the project is to reduce the fecal coliform bacteria pollution and other pollution associated with sewage in Oyster Bay by moving the wastewater collection system out of marine waters and into an upland system. This project is funded by an SRF loan for $3,800,000 from the Department of Ecology that expires on December 31, 2022. The City is anticipated to receive additional funding from Department of Ecology once bids are received. This amendment is a supplement to existing Task 8, Services During Construction. The scope of work (SOW) includes services to be executed during the construction phase of this project and outlines additional task objectives, activities, assumptions, and exclusions. The complete project SOW includes the following tasks, with additional budget and scope added to Task 8 as presented in this Amendment: Task 1: Alternatives Analysis Task 2: Survey Task 3: Preliminary Design Task 4: Detailed Design Task 5: Outreach Task 6: Environmental Analysis and Permitting Task 7: Bidding Assistance Task 8: Services During Construction Task 9: Project Management Task 10: Management Reserve Task 11: Geotechnical Support Task 12: Electrical Support Task 13: Force Main Design and Support AMENDMENT 4 - DETAILED WORK BREAKDOWN Task 8: Services During Construction Subtask 8.1: Services During Construction Provide support to the City’s Project Manager and staff during the construction phase of the project. This is a supplement to the original contract. All Activities, Assumptions, and Deliverables for this subtask remain the EXHIBIT A (2 pages)DocuSign Envelope ID: 918F7787-3146-4C37-8E5E-51A308854626 SCOPE OF WORK (continued) City of Bremerton 233-1896-162 Oyster Bay Beach Sewer Upgrades 2 January 2022 Amendment 4 same except that this supplement provides approximately110 hours of services for approximately a 9-month duration to be used at the City’s direction on an as-needed basis. Subtask 8.2: Record Documents Preparation Objective Provide project drawings to conform with the Contractor’s construction records. Activities • Revise CADD drawings to conform with markups kept by the Contractor during construction. Assumptions • Parametrix will not verify completeness and accuracy of the Contractor’s marked up drawing set. • This task will be started after Contractor has provided a complete marked up drawing set. • No other record documents besides the Record Drawings will be provided. Deliverables • One 22”x34” mylar and two 11”x17” bond hardcopy sets of the Record Drawings. • CADD files for the project, including sheets and base files (x references), submitted via cloud-based file transfer site of City’s choice. • PDF copies of the Record Drawings submitted via cloud-based file transfer site of City’s choice. DocuSign Envelope ID: 918F7787-3146-4C37-8E5E-51A308854626 Parametrix Oyster Bay Beach Sewer Upgrades Contract Modification #4, amount estimated to complete remaining work Cedar Simmons Joel Linke Jacob Stolle Conner Whitman TOTAL PM Sr. Engr Engineer II EE Rate $230.24 $203.01 $111.27 $227.33 Task 8 - Services During Construction 11 40 75 17 $22,862.90 Item Date Executed Amount Revised Contract Amt. Council Approval Required? Original Contract 8/13/2019 437,006.00$ --Yes Contract Modification #1 12/28/2020 164,490.96$ 601,496.96$ Yes Contract Modification #2 1/26/2021 71,210.00$ 672,706.96$ No Contract Modification #3 7/13/2021 49,711.71$ 722,418.67$ Yes Contract Modification #4 May 2022 22,862.90$ 745,281.57$ No Summary of Contract Modifications *Includes hours for field and office support for construction and record drawings ** Management Reserve task is replenished due to additional cost that may be required to complete beach permitting or other tasks identified EXHIBIT B - RATES AND FEES DocuSign Envelope ID: 918F7787-3146-4C37-8E5E-51A308854626