HomeMy WebLinkAbout1 - Original Submission_ 315026 Supplement no. 03 Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 City of Bremerton Skillings, Inc. 11/26/2019 315026 See Exhibit A attached. contract extended thru December 31, 2024 See Exhibit B-2, attached. 03 LA 9630 Skillings, Inc. 5016 Lacey Boulevard SE Lacey, WA 98503 360-491-3399 STPUL-9918 (017)November 26, 2019 December 31, 2024 Washington & 11th Improvements Project $ 756,241.27 This project will design and construct a roundabout in the intersection of Washington Avenue and the Manette Bridge, and will include full street reconstruction (including sidewalks and bike lanes) on 11th Street and Washington Avenue between the new roundabout and Pacific Avenue. Thomas Skillings, P.E., Skillings Inc.Greg Wheeler, Mayor DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 4/1/2022 Skillings, Inc. Page 1 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  EXHIBIT A  SCOPE OF WORK     Prepared for:    CITY OF BREMERTON  WASHINGTON & 11TH IMPROVEMENTS  SUPPLEMENT NO. 3 DESIGN MODIFICATIONS, BID & CONSTRUCTION SUPPORT  CITY PROJECT NO. 315026  FEDERAL AID NO. STPUL‐9918(017)  March 17, 2022    Introduction:  The following Scope of Work delineates supplemental tasks to be performed in addition to the original  agreement between Skillings, Inc. (Consultant) and the City of Bremerton (City).    Skillings, Inc. has been selected by the City of Bremerton to provide design engineering, environmental, and  right‐of‐way acquisition services for the reconstruction of Washington / 11th from the Manette Bridge to  Pacific. In addition to that project, the City previously added work to improve the existing sidewalk adjacent  to the lower portion of Washington Avenue (Lower Sidewalk). Northbound Washington Avenue splits into  an upper and lower section after the Washington Avenue/Manette Bridge intersection. The City also  intends to upgrade the water mains within the vicinity of the two intersections of 11th Street at Pleasant  Avenue and Highland Avenue.    Based on comments from residents adjacent to the project, the City intends to revise the previously  completed alignment of the Washington / 11th Street, redesign of the roadway, and replacement of the  existing rockery wall on the west side of Washington Avenue with a new CIP or soldier pile wall. Work along  the lower portion of Washington Avenue will consist of redesign to reflect the parallel parking option  presented to the community which includes improvements to curbs, road surface, a 4‐ft sidewalk with ADA  turnouts, and storm drainage.    Project Assumptions:  This scope of work is based on the following general assumptions:   The project will be developed as a single package. Bid alternates, bid additives, or subsequent  repackaging of the project into separate phases is not included.   Landscaping and irrigation design are not included in this scope of work or fee.    It is assumed that there are no contaminated soils within the project limits.     WORK ELEMENTS    Task 301 – Geotechnical Investigations for Wall  Consultant will contract with HWA GeoSciences, Inc. (HWA), Subconsultant, to provide supplemental  geotechnical investigation and design parameters for the new wall replacing the existing rockery wall along  the west side of Washington Avenue.      PROJECT BACKGROUND   At this time HWA has submitted a draft report for which most of our scope was completed, except for the  design of the wall that was proposed along the eastern side of the roadway alignment. At this time, we  understand that the wall along the east side will be instead consist of widening the sidewalk and  DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 2 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  reconstructing retaining walls along the west side of the sidewalk. Walls are anticipated to have exposed  wall heights between 4 to 7.5 feet. Geotechnical services associated with evaluating suitable wall types for  wall construction are desired to complete the design for the sidewalk. To provide these support services,  we propose the following tasks:      HWA Internal QA/QC for Geotechnical and Pavement Tasks: HWA will have all design calculations  and recommendations reviewed by a senior principal prior to distribution to the design team.    Task Coordination and Management: HWA will provide geotechnical task management to all  geotechnical related aspects of the project and will correspond with Skillings and the design team  in the form of emails, fax, and telephone calls, as necessary. HWA will also prepare monthly  invoices, and progress reports for the duration of the design phase of the project.   Site Reconnaissance: HWA will make one site visit to observe the existing site conditions along the  sidewalk alignment where the proposed walls will be installed.    Review Proposed Wall Cross‐Sections and Evaluate Constructability of Wall Alternatives: Based  on data supplied to HWA for proposed wall locations, heights, and roadway proximity, HWA will  evaluate the suitability of using either cantilever walls or soldier pile walls. Recommendations for  each suitable option will be provided to be incorporated into design of the proposed  improvements.    Wall Alternative 1, Cantilever Wall Design Parameters: For walls determined to be constructed as  cantilever walls, HWA will develop design active and seismic earth pressures, nominal and service‐ level bearing capacities, sliding resistances, and perform global stability checks.    Wall Alternative 2, Soldier Pile Design Parameters: For walls determined to be constructed as  soldier pile walls, HWA will develop design earth pressure diagrams and minimum  recommendations for pile spacing and widths for passive pressures.    Provide Recommendations for Temporary Excavations and Shoring: HWA will provide input for  temporary excavations and shoring, as they relate to wall construction.    Provide Earthwork Considerations for Construction: HWA will provide input for earthwork  considerations as it relates to subgrade preparation and type and placement of backfill behind  walls.    Provide Miscellaneous Consultation for Implementing Geotechnical Recommendations: HWA will  provide additional support as needed for the implementation of geotechnical recommendations  during design and construction.    Update Existing Geotechnical Report for Wall Alternatives: HWA will update the existing draft  geotechnical report with proposed recommendations for the wall alternative described. Once we  receive comments, we will incorporate them into a Final Geotechnical Report for the Project.    Review PS&E Documents: HWA will review PS&E documents for design consistency with our  geotechnical recommendations.     DELIVERABLES   One deliverable is anticipated for the new scope of work:    Revised Draft and Final versions of the Geotechnical Report     DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 3 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  ASSUMPTIONS    No explorations will be performed in the project area for retaining wall evaluation as the data from  the previous borings performed for the project will provide design information.    HWA will respond to one (1) round of comments on the revisions to the draft geotechnical report.    The scope of work is related solely to geotechnical engineering evaluation of site soil and ground  water, as they relate to geotechnical design for the project improvements. Neither identification  nor evaluation of contaminants that may be present in the soil or ground water is included in this  scope of work.     CONSULTANT will complete the following tasks in support of the geotechnical investigation task:    Tasks:  1. Consultant will review the Draft Geotechnical Report and provide one set of comments to HWA.    Deliverables (Consultant):   Comments on Draft Geotechnical Report.      Task 302 – Structural Wall Design   Consultant will contract with Sargent Engineers, Inc. (Sargent), Subconsultant, to provide typical  wall sections, pile spacing, and other structural details needed for the wall along the west side of  Washington Avenue.    Sargent will provide the structural design of the new retaining wall as a subconsultant to Skillings.   The retaining wall is anticipated to be a soldier‐pile wall with concrete fascia, with height ranging  from 4‐8ft.    Sargent will perform the structural design of the soldier pile wall per the requirements of the  project geotechnical report, AASHTO LRFD Specification for Bridge Design, the WSDOT Bridge  Design Manual, and the WSDOT Geotechnical Design Manual.   Sargent will prepare the retaining wall elevation sheet and structural detail sheets needed to  construct the wall, including up to two typical wall sections. The typical wall sections will show the  maximum retained soil height, pile size and spacing, and concrete fascia thickness and reinforcing.   Skillings will prepare the wall plan sheets and will provide the surface profile for finish grade at the  back of wall, which Sargent will use to prepare the wall elevation sheets.   Sargent will prepare the quantities, cost estimate, and technical special provisions for the structural  items in WSDOT format. Sargent will also respond to Skillings, City of Bremerton, and WSDOT  review comments.  CONSULTANT will complete the following tasks in support of the structural wall design task:    Tasks:  1. Consultant will provide coordination with Sargent.      Task 303 – Redesign and 100% PS&E    This task consists of revising the previously completed alignment of the Washington / 11th Street, redesign  of the roadway, storm drainage, illumination, channelization, signage, and replacement of the existing  DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 4 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  rockery wall on the west side of Washington Avenue with a new CIP or soldier pile wall. Work along the  lower portion of Washington Avenue will consist of redesign to reflect the parallel parking option presented  to the community which includes improvements to curbs, road surface, a 4‐ft sidewalk with ADA turnouts,  and storm drainage.    Assumptions:   Engineer’s Estimate of Probable Costs to Construct will be prepared using WSDOT Unit Bid Price  format.   Special provisions will be prepared utilizing WSDOT specifications format.   City will provide their “boiler plate” format for contract bid package.   Draft Contract Bid Package to contain placeholder items. Depending on when the project is  advertised for construction, the documents may require updating to include the latest information  just prior to advertising.    Tasks:  1. Revise alignment of Washington / 11th Street. The following plan sheets will require revisions:  a. Cover Sheet  b. Horizontal Control Plan Sheet  c. Demo & TESC Plans  d. Typical Roadway Sections  e. Roadway Plan & Profile Sheets  f. Storm Plan & Profile Sheets  g. Roundabout Layout Sheets  h. Curb Ramp Sheets  i. Illumination Plan and Detail Sheets  j. Signing Plan Sheets  k. Channelization Sheets  l. All Lower Sidewalk Sheets  m. Traffic Control Plan Sheets  2. Prepare wall plan, profile, and detail sheets.  3. Update Quantities Notebook.  4. Prepare 100% Engineer’s Estimate of Probable Costs to Construct.  5. Prepare Draft Contract Bid Package:  a. Front end documents, draft invitation to bid, proposal sheets.  b. Required Federal‐aid documents.  c. GSPs and Special Provisions.  d. State and Federal prevailing wage documents.  6. Complete Basis of Design Notebook.  7. Provide internal QA and QC and project coordination.    Deliverables:   Final Basis of Design Memo   Draft Contract Bid Package   One (1) electronic set of 100% PS&E to City and WSDOT for review.    Final Quantity calculation notebook    DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 5 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  Task 304 – Complete Bid Set    This task consists of addressing City and WSDOT’s 100% comments and preparing a Complete Bid Set.      Assumptions:   WSDOT will provide comments on the 100% PS&E.   City will provide one set of comments on the 100% PS&E.    ROW lines will be delineated on the construction drawings.   Consultant will supply the bid proposal form for the bid package.     Consultant will provide only one update to any portion of the Complete Bid Set.   An Engineer’s Estimate for the Probable Cost to Construct will be prepared that lists all of the  project bid items, showing contract item number, unit of measurement, estimated unit price,  estimated quantity, and total estimated cost for each.    o The total project cost will be shown on this estimate.    o This estimate will be used as the basis of review for the lowest responsive responsible bidder.    Tasks:  1. Phone conference with City to discuss 100% PS&E comments from City and WSDOT.  2. Incorporate 100% PS&E comments.  3. Prepare Complete Bid Set.  4. Complete Contract Bid Package:  a. WSDOT Amendments and GSP “run list” and fill‐ins.   b. Special Provisions.  c. Required Federal‐aid documents.  d. State and Federal prevailing wage documents.  5. Update Engineer’s Estimate of Probable Costs to Construct.  6. Submit Complete Bid Set package to City and WSDOT for their review and approval as necessary.  7. Review City comments on Complete Bid Set.   8. Make minor adjustments to Complete Bid Set as reviewed by the City up to one time.    Deliverables:   Final Basis of Design Notebook   Final Contract Bid Package   Final and signed 100% PS&E    1. One (1) electronic set of 100% PS&E to City.  2. All documents will be submitted as pdf’s, Cad Files, Word Files (.docx), and Estimate in Excel.   Final Quantity calculation notebook    Task 305 – Bid Support Services    Consultant will assist the City through the bidding and award process.      Assumptions:    The City will:   Prepare Advertisement for Bids.   Advertise the project.   Provide Bid Documents and addenda to Builders Exchange for distribution  DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 6 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support   Host the bid opening.   Prepare bid tabulation.   Prepare notice of award.    The Consultant will:   Provide support to City in responding to bidder’s questions.   Prepare up to four (4) addenda.   Attend Bid Opening   Review Bid Tabulation.    Tasks:  1. Consultant will provide assistance through bidding and award. This work is expected to include:  a. Responding to bidder’s questions.  b. Prepare up to four (4) addenda.  c. Attend Bid Opening.  d. Review Bid Tabulation.    Task 306 – Construction Support Services    Consultant will provide construction support consisting of attending the pre‐construction meeting,  reviewing Contractor’s submittals, responding to RFIs, preparing change orders, attending construction  meetings when attendance is requested by City, site visits, reviewing the punch list items.    Assumptions:    City will provide overall construction administration, inspection, and management.    Consultant will attend one pre‐construction meeting (estimated at 2 hours per attendee).    Consultant will review Contractor’s submittals and provide recommendations/comments  (estimated level of effort to not exceed 16 hours).   Consultant will review and respond to Contractor’s RFIs (estimated level of effort to not exceed 24  hours).   Consultant will assist with the drafting, review, and responses to Change Orders (estimated level of  effort to not exceed 32 hours).   Consultant will attend construction meetings at the request of the City (estimated level of effort to  not exceed 40 hours).   Consultant will conduct field visits at the request of the City (estimated level of effort to not exceed  45 hours).   Consultant will participate in the final project walkthrough, review the punch list, and review work  to ensure punch list items are completed (estimated level of effort to not exceed 16 hours).   Compaction testing is not included in the scope of work.   Construction inspection services are not included in this scope of work.   Construction surveying and staking are not included in this scope of work.     Task Description:   1. Attend pre‐construction meeting.   2. Review Contractor’s submittals.   3. Review and respond to Contractor’s RFIs.   4. Prepare Change Orders.   5. Attend construction meetings at the request of the Client or City.   DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 7 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  6. Conduct field visits at the request of the Client or City.   7. Participate in final project walkthrough, develop punch list, review work for punch list completion.     Deliverables:   Pre‐construction meeting notes.    Contractor submittal reviews responses.    Contractor RFI reviews and responses.    Change Orders.    Construction meeting notes.    Field visit notes.    Punch list.    Verified punch list completion.      END SCOPE OF WORK    DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 8 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  EXHIBIT B‐1  CONSULTANT COMPUTATION – MAN‐HOURS    PROJECT NO. 19149 PROJECT MANAGER PROJECT ENGINEER ENGINEER TECHNICIAN PROJECT ADMINISTRATOR CITY OF BREMERTON  WASHINGTON & 11TH IMPROVEMENTS  CITY PROJECT NO. 315026  FEDERAL AID NO. STPUL‐9918(017)  SUPPLEMENT NO. 3  DESIGN MODIFICATIONS, BID, AND CONSTRUCTION SUPPORT              TASK # TASK DESCRIPTION                301 GEOTECHNICAL INVESTIGATIONS FOR WALL            1 Consultant will review the wall design letter and provide one  set of comments to HWA. 4          302 STRUCTURAL WALL DESIGN            1 Consultant will provide coordination with Sargent Engineers. 4          303 REDESIGN AND 100% PS&E            1 Revise alignment of Washington / 11th Street.  The following  plans sheets will require revisions.                a Cover     2 2    b Horizontal Control Plan Sheet.     2 2    c Demo & TESC Plans.   4 12 12    d Typical Roadway Sections.   2 8 8    e Roadway Plan & Profile Sheets.   8 12 12    f Storm Plan & Profile Sheets.   8 12 12    g Roundabout Layout Sheets.   4 8 8    h Curb Ramp Sheets.   4 8 8    i Illumination Plan & Detail Sheets.   4 8 8    j Signing Plan Sheets.   4 8 8    k Channelization Sheets.   4 8 8    l All Lower Sidewalk Sheets.   24 40 40    m Traffic Control Plan Sheets.   4 8 8    2 Prepare wall plan, profile, and detail sheets.   4 24 24    3 Update Quantities Notebook.   4 8       4 Prepare 100% Engineer's Estimate of Probable Costs to  Construct.      4       5 Prepare Draft Contract Bid Package;            a Front end documents, draft invitation to bid, proposal  sheets. 2   4       b Required Federal‐aid documents.     2        c GSPs and Special Provisions. 4   16       d State and Federal prevailing wage documents.     2       6 Complete Basis of Design Notebook.   2 2       8 Provide internal QA and QC and project coordination. 12       4  304 COMPLETE BID SET            1 Phone conference with City to discuss 100% PS&E comments  from City and WSDOT. 2 2         2 Incorporate 100% PS&E comments.   4 8 8    3 Prepare Complete Bid Set.   4 16 16    DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 9 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  PROJECT NO. 19149 PROJECT MANAGER PROJECT ENGINEER ENGINEER TECHNICIAN PROJECT ADMINISTRATOR CITY OF BREMERTON  WASHINGTON & 11TH IMPROVEMENTS  CITY PROJECT NO. 315026  FEDERAL AID NO. STPUL‐9918(017)  SUPPLEMENT NO. 3  DESIGN MODIFICATIONS, BID, AND CONSTRUCTION SUPPORT              TASK # TASK DESCRIPTION                4 Complete Control Bid Package:            a WSDOT Amendments and GSP "run list" and fill‐ins.   2         b Special Provisions.   2         c Required Federal‐aid documents.   2         d State and Federal prevailing wage documents.   2         5 Update Engineer's Estimate of Probable Costs to Construct.     2       6 Submit Complete Bid Set package to City and WSDOT for  their review and approval as necessary. 1   2 2    7 Review City comments on Complete Bid Set. 1 1 4 4    8 Make minor adjustments to Complete Bid Set as reviewed by  the City up to one time.   1 4 4    305 BID SUPPORT SERVICES            1 Consultant will provide assistance through bidding and  award.  this work is expected to include:                a Responding to bidder's questions. 4 8         b Prepare up to four (4) addenda. 2 8 16       c Attend Bid Opening. 2          d Review Bid Tabulation. 2            HOURS PER DISCIPLINE 40 116 250 194 4  DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Skillings, Inc. Page 10 of 10 Project No. 19149‐Supp No 3    City of Bremerton    Design Modifications, Bid, & Construction Support  EXHIBIT B‐2  CONSULTANT COMPUTATION – SUMMARY      NEGOTIATED HOURLY RATE (NHR):  Classification  Man  Hours x Rate = Cost    PROJECT MANAGER 40 x $198.65 = $7,945.82     PROJECT ENGINEER 116 x $130.76 = $15,168.16     ENGINEER 250 x $98.07 = $24,517.50     TECHNICIAN 194 x $96.72 = $18,763.64     PROJECT ADMINISTRATOR 4 x $122.32 = $489.29     Total Hours = 604   Total NHR = $66,884.41          REIMBURSABLES:                             Mileage 0  x $0.585  = $0.00      Miscellaneous Expenses $0.00  x 0% = $0.00          SUB  TOTAL  Reimbursables =  $0.00          SUBCONSULTANT COST (See Exhibit E):                     HWA GeoSciences, Inc. $9,175.00  x 0% = $9,175.00     Sargent Engineers, Inc. $14,758.00  x 0% = $14,758.00        SUB  TOTAL Subconsultants =  $23,933.00          MANAGEMENT RESERVE FUND                     SUB TOTAL $90,817.41  x 5% =  $4,540.87          GRAND TOTAL             GRAND TOTAL = $95,358.28                                    PREPARED BY: Ian Lee, PE   DATE: 3/17/2022                 REVIEWED BY: Patrick E. Skillings, PMP   DATE: 3/17/2022               DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 21312 30th Dr. SE, STE. 110, Bothell, WA 98021 | 425.774.0106 | hwageo.com March 7, 2022 Skillings, Inc. 5016 Lacey Boulevard SE Lacey, WA 98503 Attention: Ian Lee, P.E. Subject: SUPPLEMENTAL SCOPE OF WORK GEOTECHNICAL ENGINEERING SERVICES Bremerton Roundabout at Washington and Manette with Improvements on 11th Street Bremerton, Washington Dear Mr. Lee, Thank you for the opportunity to present this proposal for HWA GeoSciences Inc. (HWA) consulting services. As requested, HWA has prepared the following supplemental scope of work and associated cost estimate for geotechnical engineering services in support of the Bremerton Roundabout and 11th Street Improvements project in Bremerton, Washington. The work scope and cost estimate are based on our present understanding of the work to be accomplished, established in our prior correspondence regarding the project. PROJECT BACKGROUND At this time HWA has submitted a draft report for which most of our scope was completed, except for the design of the wall that was proposed along the eastern side of the roadway alignment. At this time, we understand that the wall along the east side will be instead consist of widening the sidewalk and reconstructing retaining walls along the west side of the sidewalk. Walls are anticipated to have exposed wall heights between 4 to 7.5 feet. Geotechnical services associated with evaluating suitable walls types for wall construction are desired to complete the design for the sidewalk. To provide these support services, we propose the following tasks: • HWA Internal QA/QC for Geotechnical and Pavement Tasks: HWA will have all design calculations and recommendations reviewed by a senior principal prior to distribution to the design team. • Task Coordination and Management: HWA will provide geotechnical task management to all geotechnical related aspects of the project and will correspond with Skillings and the design team in the form of emails, fax, and telephone calls, as DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 March 7, 2022 HWA Proposal No. 2019-149-21 2019-149-21 Bremerton Roundabot Supp Scope Western Wall 2 HWA GEOSCIENCES INC. necessary. HWA will also prepare monthly invoices, and progress reports for the duration of the design phase of the project. • Site Reconnaissance: HWA will make one site visit to observe the existing site conditions along the sidewalk alignment where the proposed walls will be installed. • Review Proposed Wall Cross-Sections and Evaluate Constructability of Wall Alternatives: Based on data supplied to HWA for proposed wall locations, heights, and roadway proximity, HWA will evaluate the suitability of using either cantilever walls or soldier pile walls. Recommendations for each suitable option will be provided to be incorporated into design of the proposed improvements. • Wall Alternative 1, Cantilever Wall Design Parameters: For walls determined to be constructed as cantilever walls, HWA will develop design active and seismic earth pressures, nominal and service-level bearing capacities, sliding resistances, and perform global stability checks. • Wall Alternative 2, Soldier Pile Design Parameters: For walls determined to be constructed as soldier pile walls, HWA will develop design earth pressure diagrams and minimum recommendations for pile spacing and widths for passive pressures. • Provide Recommendations for Temporary Excavations and Shoring: HWA will provide input for temporary excavations and shoring, as they relate to wall construction. • Provide Earthwork Considerations for Construction: HWA will provide input for earthwork considerations as it relates to subgrade preparation and type and placement of backfill behind walls. • Provide Miscellaneous Consultation for Implementing Geotechnical Recommendations: HWA will provide additional support as needed for the implementation of geotechnical recommendations during design and construction. • Update Existing Geotechnical Report for Wall Alternatives: HWA will update the existing draft geotechnical report with proposed recommendations for the wall alternative described. Once we receive comments, we will incorporate them into a Final Geotechnical Report for the Project. • Review PS&E Documents: HWA will review PS&E documents for design consistency with our geotechnical recommendations. DELIVERABLES One deliverable is anticipated for the new scope of work: • Revised Draft and Final versions of the Geotechnical Report DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 March 7, 2022 HWA Proposal No. 2019-149-21 2019-149-21 Bremerton Roundabot Supp Scope Western Wall 3 HWA GEOSCIENCES INC. ASSUMPTIONS • No explorations will be performed in the project area for retaining wall evaluation as the data from the previous borings performed for the project will provide design information. • HWA will respond to one (1) round of comments on the revisions to the draft geotechnical report. • The scope of work is related solely to geotechnical engineering evaluation of site soil and ground water, as they relate to geotechnical design for the project improvements. Neither identification nor evaluation of contaminants that may be present in the soil or ground water is included in this scope of work. PROJECT COST ESTIMATE We estimate that the scope of the new services proposed herein will require a budget of $22,705 to accomplish, as detailed on the attached project cost estimate spreadsheet. HWA currently has a remaining budget of $13,530. Subtracting the remaining budget from the budget of new and remaining work, we get a total supplement request of $9,175. We will not exceed the above cost estimate without your prior authorization. However, if during the evaluation of the available data or during our field reconnaissance unanticipated subsurface conditions are revealed which would require a level of effort beyond the scope of our study, we will contact you immediately to discuss any necessary modifications to our scope of services and/or budget estimate. The budget presented in this proposal reflects an estimate based on our current understanding of the project requirements for a scope of work developed from information provided. HWA reserves the right to transfer hours and budget dollars between tasks to satisfy project requirements. HWA may also transfer funds allocated for direct costs to professional/technical hours or vice versa, to satisfy project requirements.    DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 March 7, 2022 HWA Proposal No. 2019-149-21 2019-149-21 Bremerton Roundabot Supp Scope Western Wall 4 HWA GEOSCIENCES INC. Thank you again for the opportunity to provide this proposal for geotechnical and pavement design services. Should you have any questions regarding this proposal, or require additional services, please contact us at your convenience. If you agree with the scope of services, budget, and general conditions described herein, please indicate your concurrence by returning one signed copy of this letter. Sincerely, HWA GeoSciences, Inc. JoLyn Gillie, P.E. Geotechnical Engineer, Principal Enclosures: Project Cost Estimate (1 sheet) DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Project Cost Estimate - Supplemental Work for Wall Design HWA Ref: 2019-149-21 Bremerton Roundabout at Washington and Manette with Improvements on 11th Street Date: 25-Feb-22 Geotechnical Engineering Services Bremerton, Washington Prepared By: JLG PROPOSED WORK SCOPE: ESTIMATED HWA LABOR: Principal IX Geotechnical Engineer VIII Geotechnical Engineer I Geologist III Controller/Admin CAD TOTAL DESCRIPTION $315.00 $265.00 $120.00 $130.00 $133.00 $100.00 HOURS AMOUNT Geotechnical and Pavement Evaluation and Reporting 2 10 0 0 6 0 18 $4,078 HWA Internal QA/QC for Geotechnical and Pavement Tasks 2 4 6 $1,690 Task Coordination and Management 6 6 12 $2,388 Geotech Support for Wall Design 2 38 58 0 2 6 106 $18,526 Site Reconnaissance 6 6 $1,590 Review Proposed Wall Cross-Sections and Evaluate Constructability of Wall Alternatives 2 4 6 $1,010 Wall Alternative 1: Cantilever Wall Design Parameters Alt 1: Active and Seismic Earth Pressures 2 6 8 $1,250 Alt 1: Develop Bearing Capacities (Nominal and Service-Level) and Sliding Resistance 2 4 6 $1,010 Alt 1: Global Stability Checks 2 8 10 $1,490 Wall Alternative 2: Soldier Pile Design Parameters Alt 2: Develop Earth Pressure Diagrams 2 8 2 12 $1,690 Alt 2: Develop Minimum Recommended Pile Spacings and Width of Passive Pressure 2 2 $530 Provide Recommendations for Temporary Excavation and Shoring 2 4 6 12 $2,410 Miscellaneous Consultation for Implementing Geotechnical Recommendations 6 6 $1,590 Provide Earthwork Considerations for Construction 2 4 6 $1,010 Review of Plans and Specifications regarding geotechnical aspects of the design.2 6 8 $1,250 Update Existing Geotechnical Report for Wall Alternatives (Revised Draft and Final)6 12 2 4 24 $3,696 TOTAL LABOR:4 48 58 0 8 6 124 $22,604 DIRECT EXPENSES Mileage @ 0.56/mile; 1 visit @180 miles $101 TOTAL DIRECT EXPENSES:$101 ESTIMATED TOTALS FOR REMAINING AND NEW WORK: $22,604 $101 ESTIMATED PROJECT TOTAL:$22,705 ESTIMATED SUPPLEMENT REQUEST: Total Remaining + New Work $22,705 Remaining Approved Budget ($13,530) Assumed Conditions:ESTIMATED TOTAL SUPPLEMENT:$9,175 1. All costs are estimated, and may be increased or decreased within the limits of the total budget at the discretion of HWA's project manager. Provide geotechnical design parameters for walls proposed along west side of Washington and 11th Street. Design to include consideration of two wall alternatives including a CIP wall option and a Soldier Pile option. Includes consideration of wall types based on excavation needed to install the proposed new wall. Includes update of the geotechnical report, review of the plans and Specs and miscellaneous consulting associated with implementing the geotechnical design recommendations into the project documents. 2. The scope of work is related solely to geotechnical engineering evaluation of site soil and ground water, as they relate to geotechnical design for the project improvements. Neither identification nor evaluation of contaminants that may be present in the soil or ground water is included in this scope of work. Direct Expenses TOTAL Total Labor Cost 2022 PERSONNEL & HOURLY BILLING RATES Budget 1 of 1 HWA GeoSciences Inc. DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 JSS/encl. \\192.168.0.204\Files\22Files\Proposals\Skillings - Washington Ave Wall\Prop-Washington Ave Wall.doc Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, Washington 98502 Tel 360 867-9284 Fax 360 867-9318 www.sargentengineers.com March 7, 2022 Mr. Ian Lee, PE Skillings, Inc. Via Email to: ilee@skillings.com RE: Washington Avenue Retaining Wall - Structural Engineering Services Proposal Project No.: A22100.00 Dear Ian: On behalf of Sargent Engineers, I am pleased to present to you our proposal for providing structural engineering services for the retaining wall that will be part of the Washington Ave & 11th Street Intersection Improvements that Skillings is designing for the City of Bremerton. As part of the improvements, the City would like to replace a rockery wall that currently runs along the east edge of the corridor. Sargent will provide the structural design of the new retaining wall as a subconsultant to Skillings. The retaining wall is anticipated to be a soldier-pile wall with concrete fascia, with height ranging from 4-8ft. We will perform the structural design of the soldier pile wall per the requirements of the project geotechnical report, AASHTO LRFD Specification for Bridge Design, the WSDOT Bridge Design Manual, and the WSDOT Geotechnical Design Manual. We will prepare the retaining wall elevation sheet and structural detail sheets needed to construct the wall, including up to two typical wall sections. The typical wall sections will show the maximum retained soil height, pile size and spacing, and concrete fascia thickness and reinforcing. Skillings will prepare the wall plan sheets and will provide the surface profile for finish grade at the back of wall, which Sargent will use to prepare the wall elevation sheets. We will prepare the quantities, cost estimate, and technical special provisions for the structural items in WSDOT format. We will also respond to Skillings, City of Bremerton, and WSDOT review comments. To complete the scope of work described above, I propose a maximum fee of $14,758 to be billed at our approved hourly rates. If the scope and fee are acceptable, we can begin working on the design as soon as we receive the geotechnical information and wall profile from Skillings. Assuming we receive this information by March 18, 2022, we anticipate being able to provide the completed wall plans, specifications, and cost estimate for you to include in your April submittal to WSDOT. Thank you for this opportunity to be of assistance to you, and we look forward to another successful project working with Skillings. Respectfully, Sargent Engineers, Inc. Jessica Soward, PE, SE Principal DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Mr. Lee Page 2 March 7, 2022 Principal Senior Project Engineer Project Engineer Design Engineer Task Cost Rate: $184.40 $144.45 $132.15 $95.27 Plans, Specifications and Estimate 1. Project Coordination 4 $738 2. Wall Layout (based on Skillings profiles) 2 8 $1,346 3. Soldier Pile Wall Design 2 4 12 $2,532 4. Plan Preparation 4 8 32 $4,684 5. Cost Estimate & Technical GSP's 4 8 $1,635 6.Review Comments & Minor Revisions 2 4 16 8 $3,823 Subtotal 8 18 52 40 $14,758 Direct Costs Mileage $0.00 $0 Subconsultants $0.00 $0 $0 Total for Plans, Specifications and Estimate $14,758 Structural Engineering Services Proposal Washington Ave. Retaining Wall DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 Overhead NTE* Fixed Fee NTE152.47% 30.00%PRINCIPAL-IN-CHARGE $84.25 $128.46 $25.28 $237.98SENIOR PROJECT MANAGER $79.80 $121.67 $23.94 $225.41PROJECT MANAGER $69.73 $106.32 $20.92 $196.97SENIOR PROJECT ENGINEER $69.73 $106.32 $20.92 $196.97PROJECT ENGINEER $54.60 $83.25 $16.38 $154.23ENGINEER$46.50 $70.90 $13.95 $131.35ENVIRONMENTAL MANAGER $47.25 $72.04 $14.18 $133.47SENIOR PROJECT SCIENTIST $40.00 $60.99 $12.00 $112.99PROJECT SCIENTIST $36.75 $56.03 $11.03 $103.81STAFF SCIENTIST$28.00 $42.69 $8.40 $79.09STRUCTURAL ENGINEER $44.00 $67.09 $13.20 $124.29TRAFFIC ENGINEER - II $39.00 $59.46 $11.70 $110.16TECHNICIAN$44.50 $67.85 $13.35 $125.70ENGINEERING INTERN $22.00 $33.54 $6.60 $62.14COMMUNICATIONS SPECIALIST $55.29 $84.30 $16.59 $156.18RIGHT OF WAY NEGOTIATOR $45.15 $68.84 $13.55 $127.54SURVEY MANAGER$63.53 $96.86 $19.06 $179.45SURVEY PARTY CHIEF $43.05 $65.64 $12.92 $121.60SURVEYOR$43.05 $65.64 $12.92 $121.60CHAINMAN$24.00 $36.59 $7.20 $67.79INSPECTOR$51.00 $77.76 $15.30 $144.06PROJECT ADMINISTRATOR $47.25 $72.04 $14.18 $133.47ADMINISTRATIVE ASSISTANT $47.25 $72.04 $14.18 $133.47Job ClassificationsDirect Labor Rate  NTE*All Inclusive Hourly Billng Rate NTEActuals Not To Exceed Table (ANTE)SKILLINGS CONNOLLY, INC.5016 LACEY BLVD. SELACEY, WA  98503CITY OF BREMERTON MARCH 17, 2022DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51 July 16, 2021 Skillings, Inc. 5016 Lacey Blvd SE Lacey, WA 98503 Subject: Acceptance FYE 2020 ICR Risk Assessment Review Dear Alysa Cushman: Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2020 ICR of 152.47% of direct labor (rate includes 0.12% Facilities Capital Cost of Money). This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:ah DocuSign Envelope ID: A6A79D2F-08F8-4BAD-8C16-8E0222062D51