SUBJECT: US Surface Transportation
Program Grant; and Local Agency
Agreement with WSDOT for the 6th Street
Preservation Phase 2 Project
6C
Study Session Date: January 23, 2019
COUNCIL MEETING Date: February 6, 2019
Department: Engineering
Presenter: Tom Knuckev
Phone: (360) 473-2376
SUMMARY: The City has been offered a United States Surface Transportation Program (STP)
Grant through the Puget Sound Regional Council (PSRC) to construct a grind and overlay of 6'
Street between Warren Avenue and Pacific Avenue, including a new traffic signal and ADA ramps at
the intersection of 6" Street and Park Avenue. The grant funds total $877,873, and require a City
match of $147,127. The offered grant will be in WSDOT Standard Forms, with their standard terms
and conditions. Additional project work that is not grant funded includes securing right of way at the
intersection of Park Avenue and 6th Street for the curb ramps and signal. This work is currently
estimated at $40,000.
ATTACHMENTS: 1) Award letter from PSRC identifying the grant award; 2) Site Plan; 3) Local
Agency Agreement (blank)
FISCAL IMPACTS (Include Budgeted Amount): Total project cost is estimated at $1,065,000.
Current match estimated is $187,127. Match source is projected as REET; this project is listed in
2019 and 2020 on the REET 5 -year projection.
STUDY SESSION AGENDA: Z Limited Presentation Full Presentation
STUDY SESSION ACTION: Consent Agenda o General Business Public Hearing
RECOMMENDED MOTION:
Move to accept U.S. Surface Transportation Program Grant; and approve the Local Agency
Agreement with WSDOT for the 6th Street Preservation Phase 2 Project; and authorize the Mayor to
finalize and execute the agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION: Approve
Form Updated 01/02/2018
Deny Table Continue No Action
________________________________________________________________________________
Public Works & Utilities │ 100 Oyster Bay Ave. N., Bremerton, WA 98312 * Phone (360) 473-5920 * Fax (360) 473-2330
Working for and with our residents to establish Bremerton as Puget Sound’s most beautiful and livable waterfront city!
Executive Correspondence Routing Memo
Date: 05/19/20
Description: Local Agency Federal Aid Project Prospectus, and Local Agency Agreement
Supplemental Agreement # 001 with WSDOT for the 6TH Street Preservation Phase I Project.
This prospectus and supplement’s purpose is obligate construction funding.
Fiscal Impact: CA Authority requires the mayor to sign and execute the supplement.
Action Requested: Review and Signature
Originator: Chris Dimmitt, C.E. II
Approval / Recommendation:
Managing Engineer: Recommended Initials/date _______
City Engineer: Recommended Initials/date _______
Public Works Director: Recommended Initials/date _______
Contracts Administrator: LASERFICHE/DOCUSIGN
City Attorney: LASERFICHE/DOCUSIGN
Mayor: LASERFICHE/DOCUSIGN
City Clerk: LASERFICHE/DOCUSIGN
Please send to Engineering, Attn Cathy Bonsell for distribution to WSDOT for final execution-
Thank you!
Shane Weber
Digitally signed by Shane Weber
DN: C=US,
E=shane.weber@ci.bremerton.wa.us,
O=City of Bremerton, OU=Bremerton
Engineering, CN=Shane Weber
Reason: I have reviewed this document
Date: 2020.05.19 15:32:14-07'00'
Digitally signed by Ned Lever
DN: C=US,
E=ned.lever@ci.bremerton.wa.us,
O=City of Bremerton,
OU=Engineering, CN=Ned Lever
Date: 2020.05.20 07:17:10-07'00'
DocuSign Envelope ID: 950BFE9B-CEE8-45F8-86A1-A95628D97366
5/22/2020
5/22/2020
DOT Form 140-041
Revised 03/2019
Page 1
Local Agency Agreement Supplement
Agency Supplement Number
Federal Aid Project Number Agreement Number CFDA No. 20.205
(Catalog of Federal Domestic Assistance)
The Local Agency requests to supplement the agreement entered into and executed on
All provisions in the basic agreement remain in effect except as modified by this supplement.
The Local Agency certifies that it is not excluded from receiving Federal funds by a Federal suspension or debarment
(2 CFR Part 180). Additional changes to the agreement are as follows:
Project Description
Name Length
Termini
Description of Work No Change
Reason for Supplement
Are you claiming indirect cost rate? Yes No Project Agreement End Date
Does this change require additional Right of Way or Easements? Yes No Advertisement Date:
Type of Work
Estimate of Funding
(1)
Previous
Agreement/Suppl.
(2)
Supplement
(3)
Estimated Total
Project Funds
(4)
Estimated Agency
Funds
(5)
Estimated Federal
FundsPE
%a. Agency
b. Other Federal Aid
Participation
Ratio for PE
c. Other
d. State
e. Total PE Cost Estimate (a+b+c+d)Right of Way
%f. Agency
g. Other Federal Aid
Participation
Ratio for RW
h. Other
i. State
j. Total R/W Cost Estimate (f+g+h+i)Construction
%k. Contract
l. Other
m. Other Federal Aid
Participation
Ratio for CN
n. Other
o. Agency
p. State
q. Total CN Cost Estimate (k+l+m+n+o+p)
r. Total Project Cost Estimate (e+j+q)
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condition to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By By
Title Director, Local Program
Date Executed
4/3/20
6th Street Preservation 1700 LF
Callow Avenue to Naval Avenue
Pavement Preservation of 6th Street between and including the west half of the intersection of Callow Avenue through Naval
Avenue. Work includes grinding and overlay, pavement markings, and other related street improvements
Obligation of Construction Funds
12/31/23
5/29/20
Mayor
City of Bremerton 001
STPUS-6566(012)9543
22,000.00 -9,000.00 13,000.00 1,755.00 11,245.00
119,000.00 -14,000.00 105,000.00 14,175.00 90,825.0086.5
45,000.00 -39,500.00 5,500.00 5,500.00 0.00
7,000.00 7,000.00 945.00 6,055.00
193,000.00 -62,500.00 130,500.00 22,375.00 108,125.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00
585,000.00 585,000.00 78,975.00 506,025.00
Consultant 25,000.00 25,000.00 3,375.00 21,625.00
238,300.00 238,300.00 238,300.00 0.00
86.5
0.00 0.00 0.00
43,000.00 43,000.00 43,000.00 0.00
5,000.00 5,000.00 675.00 4,325.00
0.00 896,300.00 896,300.00 364,325.00 531,975.00
193,000.00 833,800.00 1,026,800.00 386,700.00 640,100.00
DocuSign Envelope ID: 65EF0570-C50B-4954-B845-3D16705B3EF8
5/26/2020
DOT Form 140-041
Revised 03/2019
Page 2
Agency Supplement Number
Federal Aid Project Number Agreement Number CFDA No. 20.205
(Catalog of Federal Domestic Assistance)
VI. Payment and Partial Reimbursement
The total cost of the project, including all review and engineering costs and other expenses of the State, is to be paid
by the Agency and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation
Act, as amended, 2 CFR Part 200. The State shall not be ultimately responsible for any of the costs of the project. The
Agency shall be ultimately responsible for all costs associated with the project which are not reimbursed by the Federal
Government. Nothing in this agreement shall be construed as a promise by the State as to the amount or nature of federal
participation in this project.
The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws.
The agency shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred
costs. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead
shall not be eligible for federal participation unless a current indirect cost plan has been prepared in accordance with
the regulations outlined in 2 CFR Part 200 - Uniform Admin. Requirements, Cost Principles and Audit Requirements for
Federal Awards, and retained for audit.
The State will pay for State incurred costs on the project. Following payment, the State shall bill the Federal Government
for reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly
allocable to this project. The State shall bill the Agency for that portion of State costs which were not reimbursed by the
Federal Government (see Section IX).
VII. Audit of Federal Consultant Contracts
The Agency, if services of a consultant are required, shall be responsible for audit of the consultant’s records to determine
eligible federal aid costs on the project. The report of said audit shall be in the Agency’s files and made available to the
State and the Federal Government.
An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental
auditing standards as issued by the United States General Accounting Office by the Comptroller General of the United
States; WSDOT Manual M 27-50, Consultant Authorization, Selection, and Agreement Administration; memoranda of
understanding between WSDOT and FHWA; and 2 CFR Part 200.501 - Audit Requirements.
If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred, the
Agency shall reimburse the State for the amount of such overpayment or excess participation.
IX. Payment of Billing
The Agency agrees that if payment or arrangement for payment of any of the State’s billing relative to the project (e.g.,
State force work, project cancellation, overpayment, cost ineligible for federal participation, etc.) is not made to the State
within 45 days after the Agency has been billed, the State shall effect reimbursement of the total sum due from the regular
monthly fuel tax allotments to the Agency from the Motor Vehicle Fund. No additional Federal project funding will be
approved until full payment is received unless otherwise directed by the Director, Local Programs.
Project Agreement End Date - This date is based on your projects Period of Performance (2 CFR Part 200.309).
Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement. All eligible costs
incurred prior to the Project Agreement End Date must be submitted for reimbursement within 90 days after the Project
Agreement End Date or they become ineligible for federal reimbursement.
VIII. Single Audit Act
The Agency, as a subrecipient of federal funds, shall adhere to the federal regulations outlined in 2 CFR Part 200.501 as
well as all applicable federal and state statutes and regulations. A subrecipient who expends $750,000 or more in federal
awards from all sources during a given fiscal year shall have a single or program-specific audit performed for that year in
accordance with the provisions of 2 CFR Part 200.501. Upon conclusion of the audit, the Agency shall be responsible for
ensuring that a copy of the report is transmitted promptly to the State.
XVII. Assurances
Local Agencies receiving Federal funding from the USDOT or its operating administrations (i.e., Federal Highway
Administration, Federal Transit Administration, Federal Aviation Administration) are required to submit a written policy
statement, signed by the Agency Executive and addressed to the State, documenting that all programs, activities and
services will be conducted in compliance with Section 504 and the Americans with Disabilities Act (ADA).
City of Bremerton 001
STPUS-6566(012)9543
DocuSign Envelope ID: 65EF0570-C50B-4954-B845-3D16705B3EF8
DOT Form 140-101
Revised 04/2015
Page 1Previous Editions Obsolete
Local Agency Federal Aid Project Prospectus
Prefix Route ( )Date
Federal Aid
Project Number DUNS Number
Local Agency
Project Number (WSDOT Use Only )Federal Employer
Tax ID Number
Agency CA Agency
Yes No
Federal Program Title
20.205 Other
Project Title Start Latitude N
End Latitude N
Start Longitude W
End Longitude W
Project Termini From-To
Nearest City Name Project Zip Code (+4)
Begin Mile Post End Mile Post Length of Project Award Type
Local Local Forces State Railroad
Route ID Begin Mile Point End Mile Point City Number County Number County Name
WSDOT Region Legislative District(s)Congressional District(s)Urban Area Number
Phase Total
Estimated Cost
Local Agency
Funding Federal Funds Phase Start
Date(Nearest Hundred Dollar)(Nearest Hundred Dollar)(Nearest Hundred Dollar)Month Year
P.E.
R/W
Const.
Total
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Local Agency Contact Person Title Phone
Mailing Address City State Zip Code
Project Prospectus
By
Approving Authority
Title Date
05/03/20
55684970
315016 91-6001231
City of Bremerton
6th Street Preservation
47.567356
47.567338
-122.653286
-122.645964
Callow Avenue Naval Avenue Bremerton 98337-1873
1700 lf
0115 18 Kitsap
Olympic Region 26 6 7
130,500 22,400 108,100 April 2019
0 0 0
896,300 364,300 532,000 July 2020
1,026,800 386,700 640,100
varies 42' to 49'varies 4 to 5
Roadway is a 4 lane facility increasing to 5 lanes at major intersections, with exiting sidewalk on both sides.
Roadway condition varies from poor to fair between Callow Avenue and Naval Avenue.
Pavement preservation of 6th Street between and including the west half of the intersection of Callow Avenue
through Naval Avenue. Work includes grinding and overlay, pavement markings and other related street
improvements.
Shane Weber, P.E.Managing Engineer (360) 473-2354
345 6th St, Suite 100 Bremerton WA 98337
Mayor, City of Bremerton
STPUS 6566 012
DocuSign Envelope ID: 950BFE9B-CEE8-45F8-86A1-A95628D97366
5/22/2020
DOT Form 140-101
Revised 04/2015
Page 2Previous Editions Obsolete
Agency Project Title Date
Type of Proposed Work
Project Type (Check all that Apply)Roadway Width Number of Lanes
New Construction
Reconstruction
Railroad
Bridge
Path / Trail
Pedestrian / Facilities
Parking
3-R
2-R
Other
Geometric Design Data
Description Through Route Crossroad
Federal
Functional
Classification
Urban
Rural
NHS
Principal Arterial
Minor Arterial
Collector
Major Collector
Minor Collector
Local Access
Urban
Rural
NHS
Principal Arterial
Minor Arterial
Collector
Major Collector
Minor Collector
Local Access
Terrain Flat Roll Mountain Flat Roll Mountain
Posted Speed
Design Speed
Existing ADT
Design Year ADT
Design Year
Design Hourly Volume (DHV)
Performance of Work
Preliminary Engineering Will Be Performed By Others
%
Agency
%
Construction Will Be Performed By Contract
%
Agency
%
Environmental Classification
Class I - Environmental Impact Statement (EIS)
Project Involves NEPA/SEPA Section 404
Interagency Agreement
Class III - Environmental Assessment (EA)
Project Involves NEPA/SEPA Section 404
Interagency Agreements
Class II - Categorically Excluded (CE)
Projects Requiring Documentation
(Documented CE)
Environmental Considerations
City of Bremerton 6th Street Preservation 05/03/20
varies 4-5varies 42'-49'
25
25
11,700
N/A
N/A
N/A
Consultant 100 0
Contractor 100 0
25
25
6,064
N/A
N/A
N/A
DocuSign Envelope ID: 950BFE9B-CEE8-45F8-86A1-A95628D97366
DOT Form 140-101
Revised 04/2015
Page 3Previous Editions Obsolete
Agency Project Title Date
Right of Way
No Right of Way Needed Right of Way Needed
* All construction required by the
contract can be accomplished
within the exiting right of way.
No Relocation Relocation Required
Utilities Railroad
No utility work required
All utility work will be completed prior to the start of the construction contract
All utility work will be completed in coordination with the construction contract
No railroad work required
All railroad work will be completed prior to the start of the construction contract
All the railroad work will be completed in coordination with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it’s
designee, and is not inconsistent with the agency’s comprehensive plan for community development.
Agency
Date By
Mayor/Chairperson
City of Bremerton 6th Street Preservation 05/03/20
Minor adjustments to storm, water, and sewer facilities may be necessary to accommodate the proposed
asphalt grinding and overlay.