HomeMy WebLinkAboutBAYVIEW DR., 1327
.' ,,,.~'
-"_,,~_!,J
B R EM E R TON
B () I L DIN G
D E PAR T MEN T
P E MOL I T r 0 N
PER M I T
A P P LIe A T ION
_._------._---------,-------------------~----,---~-~--------------------
--------~--------------.-----_._---------------------------------------
Application Date
Issue Date
Assessor Acct :It
Site Location
Owner - Last Name
- street
- City
- phone
Tenant's Name
Agent's Name
Archi teet.' s Name
[ ] Building
[ ] Mechani cal
( ] Plumbing
11/18/1992
11/18/1992
Application Number 92AP06098
Permit Number 14150
Pro ject .Group
1327 BAYVIEW DRIVE
CITY OF BREMERTON
1327 BAYVIEW DRIVE
BREMERTON
(206)
First MI
state WA Zip 98310
Phone(206)
Phone(206)
[ ] Grading
[ ] Move Building
[ ] Mobile Home
r. ]
[ ]
[ ]
Sign
Burning
I.and CI ear
( ] Paving
[ ] Undergrou.nd
[X] Demolition
--~--'--_._------------------_._-------------------------------.---------
Nature of Work:
Work will be completed by owner.
Demolition permit, 1000 square feet.
. " '. ,.
----'------------~------------~-'---~---------------~--_.
:rt}~"j.
Sewer Cap Permit Number
Issue Date
SEPA Review
Demolition Footage
Counci 1 District
Census Track
status Code
2423
1.1/17/1992
1000
9
8
----------~----~-~-----------~-,---.----------.--------~~-----------,----
" .. '. "
...
..
__. _~.__________.__-~_.:::-... A.. I /~~__. __1. !_~J_f. J_IJJ~__
-----~--_._~-----,----=~----------~-,--~--
" .
BRHMBRTON BUILDING DIIPARTMIINT
Inspection Report
Scope of won:
Ad.....: .
OWnen
Contradon
demolition
] 1?-7 RAVVTFW nRTIrn
CITY OF BREMERTON
SELF
Penult Nmnben
141S0
~
I
Phone:
Phone:
FOUNDATION
COMMENTS:
FOOTINGS APPROVED:
COMMENTS:
APPROVED:
WALlS APPROVED:
6ne
uired
10'
DElISI CODE COMPLIANCE
COMMENTS:
UNDER FLOOR/FOUNDATION INSUlATION APPROVED:
WAlL INSULATION APPROVED:_
CEILING INSULATION APPROVED:__
MECHANICAL
App6aDClC location and aa:ess, p~ support
Venting: cIearanc:1e to combustibles
Vent termination
Ducts: size &: support
Gas pipe: size &: support
Gas pipe: within 6" or underground--coated
Gas logs: safety shut-off
Woodstoves: EPA ClCrtified.
Woodstaves &: fueplaCleS: p~ hearth
Chimney 6oer: when required.
App6aDClC cIearuwe to combustibles
Venting: size &: support
Combustion air
Gas pipe under test
Gas pipe: underground min. 12" below grac:Ie
Gas shutoff within 3' of app6aDClC
Gas logs: damper permanently open
Woodstaves &: fireplaa:s: Tight-fitting doors
Manufactwa"s specs on si~
Chimney: separa~ flues when required.
'":
COMMENTS:
GAS PIPING APPROVED:
FURNACE APPROVED:
OTHERAPPUANCFS APPROVED:
DWV &: watu piping under test
DWV: p~ sizing
DWV &: watu piping: proper support
Vent tennination
Watu supply: p~ sizing
Watu heatu: ga~ valve on cold watu supply
Watu heatu re6efvalve drain ta outside
R-l0 pad under watu hea.tu when required.
Gcease traps/interceptors: where required.
PLUMBING
DWV: praper grac:Ie
DWV: proper drainage fittings wLere required.
DWV: required. deanouts
AD fixtures vented properly
Shut-oft'valves on all fixtures
VaalUID bledas: where required.
Water heatu: siesmic strap
Watu-piping insulated as required.
Proper indirect wastes: where required.
COMMENTS:
PLUMBING GROUNDWORK APPROVED:
PLUMBING ROUGH-IN APPROVED
SDEIfI"ROCK
Proper fastening: nails -7" a.c. horiz. plane
Proper f:ur.ening: _12" Od:. hoftz. pIane(1I2")
p~ fasteniing:saews-16" a.Co vert. plane (112")
Proper fastening:saews-12" a.Co h0ri7.. plane (5/S")
Proper fastening:sa:ews-16" a.Co vert. plane(5/S")
Ami &: oa:upanc:y separation walls
Usable space under stairs (5/S" required.)
Corridors
nails-8" a.Co vertic:al plane
_12" Od:. Loris. p1ane(1I2") 24" Od:. fuming
saews-12" a.Co vert. pIane(1I2")-U" a.Co fuming
saews-12" a.c. horiz; plane{5/S")-24" a.Co framing
saews-12" a.Co horiz. plane(5/S")-U" a.Co framing
Draftstops where required.
Watuboard where required. (not on cei6ng)
COMMENTS:
SHEETROCK APPROVED:
Energy code requirements met, exhaust fans
Garageichvdling door self dosing solid <:ore
Handrails &: guardrails, as required.
EDt signs when ftlCluired.
OcalpaDt load posted when app6cable
Wood siding ta earth separatian (6")
Radon monitor when ftlCluired.
COMtJENTS:
FINAL APPROVED: