CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Contract with SCI Infrastructure, LLC for the
Ostrich Bay Creek Stormwater Retrofit
Project
��111�ihi/s1T
Study Session Date:
COUNCIL MEETING Date:
Department:
Presenter:
Phone:
September 22, 2021
October 6, 2021
PW&U- Engineering
Gunnar Fridriksson
(360) 473-5758
The Ostrich Bay Creek stormwater basin is approximately 423 acres and has been documented as
the most polluted stream in Kitsap County. This project concentrates on 15.29 acres of heavily
urbanized area which currently has no stormwater treatment. Stormwater treatment will be provided
by the installation of 14 Biopods at multiple locations on Kitsap Way, Bruenn Avenue, and Auto
Center Way.
Bids for the construction of the project were opened on September 2, 2021, and 11 Bids were
received. SCI Infrastructure, LLC is the lowest responsive, responsible bidder with their base bid
totaling $ 1,025,002.25 including sales tax. Staff recommends award of the Ostrich Bay Creek
Stormwater Retrofit Project Contract to SCI Infrastructure, LLC.
ATTACHMENTS: 1) Site Plan; 2) Bid Tabulation; 3) Contract
FISCAL IMPACTS (Include Budgeted Amount):
The Ostrich Bay Creek stormwater Retrofit Project is included in the 2021 budget in the amount of
$115355292 and is funded by a Washington State Department of Ecology Water Quality Program
Grant in the amount of $ 802,367.00; the remaining to be funded from the Stormwater Utility Fund.
STUDY SESSION AGENDA: ❑x Limited Presentation ❑Full Presentation
STUDY SESSION ACTION: ❑ Consent Agenda Fx General Business ❑ Public Hearing
RECOMMENDED MOTION:
Move to award the contract to SCI Infrastructure, LLC for the Ostrich Bay Creek stormwater Retrofit
Project, in the amount of $ 1,025,002.25, and authorize the Mayor to finalize and execute the
agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION:
Approve ❑Deny ❑Table ❑Continue ❑ No Action