HomeMy WebLinkAbout1 - Original Submission_ 20210823_869_Contract Modification No. 3 with ParametrixCONTRACT MODIFICATION AGREEMENT NO. 3 BETWEEN THE CITY OF BREMERTON AND PARAMETRIX, INC. PROJECT:Ostrich Creek Culvert Replacements CONSULTANT:Parametrix, Inc. DATE: August 23, 2021 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Ostrich Creek Culvert Replacements AGREEMENT (the "Contract") entered into between the City of Bremerton and Parametrix, Inc. on November 15, 2018 and as modified on August 6, 2020 on Contract Modification No. 1 and as modified on March 5, 2021 on Contract Modification No. 2). All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: I. Section I. Scope , is modified as follows:See Amendment 3 Scope of Work attached as Exhibit A. Section II. Term , is modified as follows: The schedule to accomplish the work is attached as Exhibit B. Section III. Compensation , is modified as follows: The original contract amount was $421,400. Contract Modification No. 1 increased the contract amount by $65,588, resulting in an amended contract amount of $489,988. Contract Modification No. 2 increased the contract amount by $95,660, resulting in a revised contract amount of $585,648. This Contract Modification No. 3 increases the contract amount by $60,656, resulting in a revised contract amount of $646,304. Exhibit C shows the hours and fees for the respective tasks. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. Page 1 of 2 Contract Modification No. 3 Ostrich Creek Culvert Replacements DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F Page 2 of 2 Contract Modification No. 3 Ostrich Creek Culvert Replacements The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _________________________ (Initials and Date) PARAMETRIX, INC, THE CITY OF BREMERTON By:By: Print Name: John Perlic Print Name: Greg Wheeler Its: Principal Consultant Its: Mayor Date:Date: APPROVED AS TO FORM: ATTEST: By:By: KYLIE FINNELL, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Parametrix, Inc Attn: Gunnar Fridriksson Attn: David Dinkuhn City of Bremerton 60 Washington Ave, Suite 390 345 6 th Street, Suite 100 Bremerton, WA 98337 Bremerton, WA 98337-1891 Ned Lever Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Date: 2021.09.13 15:19:41-07'00' DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F 9/16/2021 9/16/2021 City of Bremerton 233-1896-153 Ostrich Creek Culvert Replacements 1 August 2021 Scope of Work EXHIBIT A – SCOPE OF WORK Contract Modification No. 03 City of Bremerton Ostrich Creek Culvert Replacements INTRODUCTION This scope of work (SOW) presents Parametrix’s proposed tasks for providing additional services under our existing project contract. Additional services consist of the following: 1.Additional project management to accommodate extending the project schedule from December 2022 to December 2023. The schedule extension is a contingency to account for an expected lengthy permitting period for the US Corps of Engineers (USACE) permit. Typical permitting periods of 12 to 18 months have been experienced due to staffing shortages at the agency. 2.Modelling and design for modifying the existing design for the Kitsap Way Culvert Replacement project so that stormwater that currently crosses Kitsap Way at approximately 5424 Kitsap Way can be rerouted to discharge to Ostrich Bay Creek at a location just upstream of the new Kitsap Way culvert. This work included the following: a.Perform hydrologic and hydraulic modelling to determine the 100-year design storm flow rates to be diverted and to upsize conveyance elements. b.Perform backwater analysis to confirm hydraulic design. c.Provide topographic survey to support design as described above. d.Revise plan sheets for the Kitsap Way Culvert Replacement project to reflect the design changes. e.Revise the project engineer’s opinion of probable cost. 3.Design effort for modifying the existing design for the Price Road Bridge as requested by the Washington Department of Fish and Wildlife (WDFW). The WDFW request is to lengthen the bridge by 3 feet to provide more scour protection for the eastern abutment. 4.Perform engineering services during construction of the Price Road Bridge and Brentwood Drive Bridge. 5.Perform geotechnical services during construction. 6.Provide technical support for public outreach activities. Work activities are described by task below. A detailed spreadsheet showing a breakdown of individual work elements is provided in attached Exhibit C. TASK 1 – PROJECT MANAGEMENT AND MEETINGS Objective Continue to obtain project data; monitor and manage scope, schedule, and budget; and periodically meet with the City of Bremerton (City) and other members of the design team to review project status. Activities The following activities will be performed: DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F SCOPE OF WORK (continued) City of Bremerton 233-1896-153 Ostrich Creek Culvert Replacements 2 August 2021 Scope of Work •Schedule and attend regular project meetings via conference call, on-line, or at City offices. •Manage and direct the project technical team. •Provide routine project management and communications (scope, schedule, budget, invoicing, etc.). •Prepare detailed monthly progress reports and progress billings, and submit to the City for approval and payment. Deliverables The following deliverables are associated with this task: •Routine correspondence including monthly progress reports •Meeting agendas and notes Assumptions The following assumptions apply to this task: •Regular project meeting will be attended by the Parametrix project manager (PM). •Project duration for additional project management will be 12 months (January 2023 through December 2023). TASK 2 – FINAL DESIGN Objective Prepare revised Bid Set plans, specifications, and estimate (PS&E) package for abandonment of the 18-inch pipe crossing Kitsap Way and revise design to widen the Price Road Bridge in response to comments from WDFW. Activities The following activities will be performed: •Perform topographic survey to fill gaps in the existing project basemap. •Perform modelling and conveyance design for rerouting stormwater and eliminating the 18-inch concrete crossing. •Revise plan sheets for the Kitsap Way Culvert Bid Set to include the updated design. •Revise plan sheets for the Ostrich Bay Creek Stormwater Treatment Construction Bid Set to include the revised design. •Prepare updated engineer’s estimate of probable cost •Confirm existing girder design for Price Road Bridge will accommodate lengthening by 3 feet. •Revise four structural sheets. •Re-run design corridors for Ostrich Creek at the Price Road crossing and for Price Road to accommodate lengthening the bridge. DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F SCOPE OF WORK (continued) City of Bremerton 233-1896-153 Ostrich Creek Culvert Replacements 3 August 2021 Scope of Work •Revise two civil plan sheets to accommodate the change. Deliverables The following deliverables are associated with this task: •Updated topographic base map. •Updated Kitsap Way Culvert Replacement Bid Set plan sheets consisting of the following: C2, C4, & C6 (3 sheets) •Updated Ostrich Bay Creek Stormwater Treatment Bid Set plan sheets consisting of the following: A2, C4, C5, & 2 details sheets (5 sheets) •Updated Bid Set engineer’s opinion of probable cost •Revised structural plan sheets for the Price Road Bridge •Revised civil plan sheets for the Price Road Bridge. Assumptions The following assumptions apply to this task: •Revised plans for the Kitsap Way Culvert project will be provided as part of Change Order 01 to the existing construction contract •Revisions to the Price Road Bridge plan set will be incorporated into the 60%-complete submittal Task 7 – Subconsultants Objective Parametrix will procure a geotechnical engineer for (Shannon & Wilson, Inc.) for on-call services during construction. A detailed subconsultant SOW is attached to this SOW. Activities The following activities will be performed: •Shannon & Wilson, Inc. (S&W) will perform field observation of subgrade soil conditions for all three crossing sites in-order to confirm design recommendations provided in the project’s geotechnical report. Recommendations to address changed conditions will be provided as needed. Deliverables The following deliverables are associated with this task: •S&W will provide email communications and field notes as required. DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F SCOPE OF WORK (continued) City of Bremerton 233-1896-153 Ostrich Creek Culvert Replacements 4 August 2021 Scope of Work Assumptions The following assumptions apply to this task: •S&W effort will not exceed $15,000 without prior approval by the City. TASK 8 – ENGINEERING SERVICES DURING CONSTRUCTION Objective Provide engineering support during the construction phases of the project for the Price Road bridge and Brentwood Drive bridge. Activities The following activities are associated with this task: •Attend construction meetings as requested. •Review Contractor’s submittals for compliance with the specifications. •Respond to applicable Contractor’s Requests for Information (RFIs). •Attend site walks at the request of the City. Deliverables The following deliverables are associated with this task: •Hard copies and electronic copies of responses to material submittals, cut sheets, and shop drawing review. Assumptions The following assumptions apply to this task: •Parametrix will attend up to ten construction meetings or site walks at an estimated 2 hours each. •Parametrix will review and respond to a total of six structural shop drawing submittals at an estimated 4 hours each, ten material (or other) submittals at an estimated 1 hour each, and eight RFIs at an estimated 2 hours each. TASK 9 – PUBLIC OUTREACH SUPPORT (NEW TASK) Objective Provide 3D graphics for the Price Road and Brentwood Drive bridges for the City’s use in public outreach. Activities The following activities are associated with this task: •Develop color 3D schematics of both bridges using SketchUp software. DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F SCOPE OF WORK (continued) City of Bremerton 233-1896-153 Ostrich Creek Culvert Replacements 5 August 2021 Scope of Work Deliverables The following deliverables are associated with this task: •Two draft and final schematics in 11x17 format. Assumptions The following assumptions apply to this task: •Schematics will require up to 24 hours of landscape architect time. DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F City of Bremerton 233-1896-153 Ostrich Creek Culvert Replacements 1 August 2021 Scope of Work Exhibit B - Schedule Work Element Completed By Notice to Proceed (verbal) April 23, 2021 Final Design Task May 28, 2021 3D Graphics November 15, 2021 Services During Construction December 30, 2023 Project Closeout December 30, 2023 NOTE: The assumed turnaround time for City review of deliverables is 1 week. DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F PARAMETRIX EXHIBIT C - BUDGET 8/23/2021 Kitsap Way Culvert Mod 03 Budget 081721 Page 1 Kitsap Way Culvert Replacement Modification No. 03 City of Bremerton Public Works and Utilities TOTAL BASE TOTAL Task Subtask 3.00 Billing Rate $231.57 $209.13 $260.01 $114.96 $147.21 $111.12 $124.71 $108.06 $128.61 $71.61 $77.79 $90.00 $118.11 $124.23 $111.96 HOURS Cost COST 1 1 Project Management and Meetings Project Meetings with City (up to 2)4 4 $308.76 $926 Additional Project Management - 12 months (January through December 2023)12 12 12 36 $1,895.64 $5,687 Subtotal 16 12 12 40 $1,895.64 $6,613 1 2 Design to Abandon 18-Inch Concrete Pipe Basin Modelling for Abandonment of 18-inch Concrete Pipe 2 9 1 12 $473.07 $1,419 Hydraulic Modelling for Abandonment of 18-inch Concrete Pipe (Ditch & Culverts)2 12 1 15 $640.43 $1,921 Backwater Analysis for Revised Conveyance 4 4 $308.76 $926 Revised Kitsap Way Culvert Bid Set Plans (3 sheets)3 24 27 $1,120.53 $3,362 Revised Kitsap Way Culvert Bid Set Estimate 1 4 5 $225.35 $676 QC 2 2 $139.42 $418 Additional Survey for Abandon 18-inch Concrete Pipe 6 10 12 8.5 37 $1,062.08 $3,186 Survey Expenses (4 hrs APS & Equip Fees)$699 Design to Lengthen Price Road Bridge by 3 Feet 10 2 2 49 2 6 10 12 9 102 $3,969.64 $12,608 Confirm Girder Design and Revise Four Structural Sheets 2 24 26 $1,093.02 $3,279 Re-run Stream and Roadway Corridors and Revise 2 Civil Sheets 2 12 14 $598.86 $1,797 Subtotal 2 2 24 12 40 $1,691.88 $5,076 1 6 Subconsultants Geotechnical Support During Construction (Shannon and Wilson)$15,000 5% Markup $750 Subtotal $15,750 1 8 Services During Contsruction Site Visits (up to 10 at 2 hrs each) 12 8 20 $1,318.84 $3,957 Structural Submittal Review (up to 6 at 4 hrs each) 24 24 $2,080.08 $6,240 Materials Submittal Review (up to 10 at 1 hr each) 5 5 10 $819.30 $2,458 RFIs (up to eight at 2 hrs each)4 12 16 $1,348.80 $4,046 Mileage $58 Subtotal 21 41 8 70 $5,567.02 $16,759 1 9 Public Outreach Support 3D graphics for public outreach (2 total in 11x17 format)1 24 25 $941.67 $2,825 Subtotal 1 24 25 $941.67 $2,825 1 ESC Salary Escalation (3%/yr) Salary Escalation $1,025 Subtotal $1,025 PROJECT TOTAL 10 2 2 49 2 6 10 12 9 102 $3,970 $60,656 David Dinkuhn, P.E. Reviewed By:Jenifer Young, P.E.(Project Manager)(Division Manager) Eng IIC. Odegard LAJ, Ceralde WPA.Lucas PAL.Gilbertson Sr. EngineerJ. Wright Eng IVR.Sayles Eng IIS. Sokol Sr. SurveyK. Allinson Survey 1B. Macchione Survey 1A. Desplanches Eng. IIA. Mendoza Str. Eng.B. Murray Project: STAFFPMX #BILLING MULT.: Final Design (100%) Prepared By: PM D. Dinkuhn Client: 233-1896-153 PCS. HarrisSurvey TechN. Short DocuSign Envelope ID: D7742733-99E2-4C04-BB49-6061EA51CC0F