Loading...
HomeMy WebLinkAbout08/04/2021 5BAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Professional Services Agreement with SCJ Alliance for Design of the Warren Avenue Bridge Pedestrian Improvements Project Study Session Date COUNCIL MEETING Date Department: Presenter: Phone: July 28, 2021 August 4, 2021 PW&U - Engineering Shane Weber (360) 473-2354 SUMMARY: On September 18, 2020 the City accepted State grant funding in the amount of $1,500,000 to complete the engineering and permitting for pedestrian and bike improvements on the Warren Avenue Bridge and multimodal improvements on Warren Avenue north and south of the bridge. Four consultants were interviewed and SCJ Alliance was selected based on qualifications. The SCJ Alliance design work includes civil and structural design of improvements off the bridge. WSDOT is under contract to perform the bridge structural design. The civil design work will be completed in two phases: Phase 1 will be an alternatives feasibility study with selection of a preferred alternative and Phase 2 will be the final design and permitting. A future amendment to this contract will be prepared for Phase 2 upon selection of a preferred alternative. ATTACHMENTS: 1) Professional Services Agreement FISCAL IMPACTS (Include Budgeted Amount): The consultant fee is $255,435.38. The budget is included in the Transportation Capital Fund and is 100% grant funded with no city match. STUDY SESSION AGENDA: � Limited Presentation ❑Full Presentation STUDY SESSION ACTION: ❑ Consent Agenda ❑x General Business ❑ Public Hearing 17X��7Jil►�il��l■ � ►�[��[�7�A Move to approve the Professional Services Agreement with SCJ Alliance for design of the Warren Avenue Bridge Pedestrian Improvements Project in the amount of $255,435.38; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve ❑Deny ❑Table ❑Continue ❑ No Action Form Updated 01/02/2018