Loading...
HomeMy WebLinkAbout1 - Original Submission_ 210524_5858_Change Order No. 1_AIMS Companies_NL signedCITY OF BREMERTON CHANGE ORDER CONTRACT CHANGE ORDER NO: 1 PROJECT NAME: Burwell/Warren Sewer Pipe Cleaning and Video Inspection PROJECT NO: 5858 CONTRACTOR: AIMS Companies ORIGINAL CONTRACT AMOUNT: 57,970.56 DAYS: 40 PREVIOUSLY APPROVED CHANGES: DAYS: 0 THIS CHANGE: DAYS: 44 REVISED CONTRACT AMOUNT: DAYS: 84 This Change Order covers changes to the subject contract as described herein. The Contractor shall construct, furnish equipment and materials, and perform all work as necessary or required to complete the Change Order Items. The increase or decrease in contract price shown below includes any applicable taxes. ________________________________________________________________________________ Rule 170 Rule 171 DESCRIPTION OF CHANGES INCREASE IN CONTRACT AMOUNT ($) (DECREASE) IN CONTRACT AMOUNT ($) X X NET CHANGE IN CONTRACT AMOUNT INCREASE OR (DECREASE) ESTIMATED SALES TAX AT 9% TOTAL INCLUDING SALES TAX Contractor acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, on-site or home office 0 0 57,970.56 This is a no-cost change. Additional days were added to the contract due to a pipe repair that the City needed to perform near the intersection of 11th and Warren in order for the Contractor to complete the camera and cleaning work. AIMS demobilized, then returned to the site to complete the work during the week of May 17, 2021. DocuSign Envelope ID: 1082861F-DDE3-492B-A2EF-70C7AA18AF0A CONTRACT CHANGE ORDER NO: _1_ PROJECT NAME: Burwell/Warren Sewer Pipe Cleaning and Video Inspection Page 2 of 2 overhead, or lost profits. Nothing in this Change Order shall limit the City’s right to bring a claim for past performance. The undersigned Contractor approves the foregoing Change Order as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Change Order. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Change Order shall be effective when approved by the City of Bremerton. The parties whose names appear below warrant that they are authorized to enter into a change order that is binding on the parties of this contract. In addition, Contractor warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. CONTRACTOR Accepted: DATE: PROJECT MANAGER Recommended: DATE: CITY ENGINEER Council action is required as project cost will exceed approved budget.  Yes  No Council action is required as change exceeds Mayors authority per BMC 2.76.110.  Yes  No Recommended: DATE: DIRECTOR OF PUBLIC WORKS AND UTILITIES Recommended: DATE: MAYOR Approved: DATE: APPROVED AS TO FORM: ATTEST: ROGER A. LUBOVICH, City Attorney ANGELA HOOVER, City Clerk 5/20/21 5/28/2021 6-7-21Ned Lever Digitally signed by Ned Lever DN: C=US, E=ned.lever@ci.bremerton.wa.us, O=City of Bremerton, OU=Engineering, CN=Ned Lever Date: 2021.06.07 14:26:54-07'00' Thomas Knuckey Digitally signed by Thomas Knuckey Date: 2021.06.07 15:09:19 -07'00' DocuSign Envelope ID: 1082861F-DDE3-492B-A2EF-70C7AA18AF0A 6/11/2021