Loading...
HomeMy WebLinkAboutFCS Group Salinity Study Mod. 1.docxPage 1 of 2 Wastewater Salinity Impact Study Contract Modification 1 CONTRACT MODIFICATION AGREEMENT NO. 1 BETWEEN THE CITY OF BREMERTON AND FCS GROUP PROJECT Wastewater Salinity Impact Study CONSULTANT FCS Group DATE May 13, 2021 THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE Professional Services Agreement entered into between the City of Bremerton and FCS Group on October 23, 2020. All provisions in the Contract shall remain in full force and effect except as expressly modified by this document. For valuable consideration and by mutual consent of the parties, the modifications to the Contract are as follows: Section I. Scope , is modified as follows: No change to Scope of Work. Section II. Term , is modified as follows: The contract end date is extended to April 30, 2022. Section III. Compensation , is modified as follows: No change to contract compensation. II. Consultant accepts all requirements of this Contract Modification by endorsing below. Consultant further agrees that this Contract Modification constitutes full and final settlement of all of the Consultant’s claims for contract time and for all costs of any kind, including without limitation, costs of delays related to any work either covered or affected by this Contract Modification, claims related to on-site or home office overhead, or lost profits. This Contract Modification does not limit the City’s right to bring a claim for past performance. The undersigned consultant approves the foregoing Contract Modification as to the changes, if any, in the contract price specified for each item, including any and all supervision costs and other miscellaneous costs relating to the change in work, and as to the extension of time allowed, if any, for completion of the entire work due to said Contract Modification. This document will become a supplement of the contract and all provisions will apply hereto. It is understood that this Contract Modification shall be effective when approved by the City of Bremerton. DocuSign Envelope ID: 85AA9887-2652-4874-AFF3-C5D4FD91790D Page 2 of 2 Wastewater Salinity Impact Study Contract Modification 1 The parties whose names appear below warrant that they are authorized to enter into a contract modification that is binding on the parties of this contract. In addition, Consultant warrants that it has or will inform the surety of this change, and shall take appropriate action to modify any bonds required under the contract to address this change. IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day and year first written above. City Engineer / Public Works Director approved to process _________________________ (Initials and Date) FCS Group THE CITY OF BREMERTON By: By: Print Name: ____________________ Print Name: Tom Knuckey Its: Its: Director, Public Works& Utilities Date: Date: APPROVED AS TO FORM: ATTEST: By: By: ROGER A. LUBOVICH, Bremerton City Attorney ANGELA HOOVER, City Clerk NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: Angie Sanchez Virnoche Thomas Knuckey FCS Group Public Works Director Redmond Town Center City of Bremerton Engineering Dept. 7525 166th Ave. NE, Suite D-215 345 6th St. Ste 100 Redmond, WA 98052 Bremerton, WA 98337 360-473-5306 DocuSign Envelope ID: 85AA9887-2652-4874-AFF3-C5D4FD91790D 5/24/2021 5/25/2021 Angie Sanchez Virnoche Vice President