HomeMy WebLinkAboutFCS Group Salinity Study Mod. 1.docxPage 1 of 2
Wastewater Salinity Impact Study
Contract Modification 1
CONTRACT MODIFICATION AGREEMENT NO. 1
BETWEEN THE CITY OF BREMERTON AND FCS GROUP
PROJECT Wastewater Salinity Impact Study
CONSULTANT FCS Group
DATE May 13, 2021
THIS CONTRACT MODIFICATION AGREEMENT SPECIFICALLY AMENDS THE
Professional Services Agreement entered into between the City of Bremerton and FCS
Group on October 23, 2020.
All provisions in the Contract shall remain in full force and effect except as expressly modified
by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the
Contract are as follows:
Section I. Scope , is modified as follows:
No change to Scope of Work.
Section II. Term , is modified as follows:
The contract end date is extended to April 30, 2022.
Section III. Compensation , is modified as follows:
No change to contract compensation.
II.
Consultant accepts all requirements of this Contract Modification by endorsing below.
Consultant further agrees that this Contract Modification constitutes full and final
settlement of all of the Consultant’s claims for contract time and for all costs of any kind,
including without limitation, costs of delays related to any work either covered or affected
by this Contract Modification, claims related to on-site or home office overhead, or lost
profits. This Contract Modification does not limit the City’s right to bring a claim for past
performance.
The undersigned consultant approves the foregoing Contract Modification as to the changes,
if any, in the contract price specified for each item, including any and all supervision costs
and other miscellaneous costs relating to the change in work, and as to the extension of time
allowed, if any, for completion of the entire work due to said Contract Modification.
This document will become a supplement of the contract and all provisions will apply hereto.
It is understood that this Contract Modification shall be effective when approved by the City
of Bremerton.
DocuSign Envelope ID: 85AA9887-2652-4874-AFF3-C5D4FD91790D
Page 2 of 2
Wastewater Salinity Impact Study
Contract Modification 1
The parties whose names appear below warrant that they are authorized to enter into a
contract modification that is binding on the parties of this contract. In addition, Consultant
warrants that it has or will inform the surety of this change, and shall take appropriate action
to modify any bonds required under the contract to address this change.
IN WITNESS WHEREOF, the parties have executed this Contract Modification on the day
and year first written above.
City Engineer / Public Works Director approved to process _________________________ (Initials and Date)
FCS Group THE CITY OF BREMERTON
By: By:
Print Name: ____________________ Print Name: Tom Knuckey
Its: Its: Director, Public Works& Utilities
Date: Date:
APPROVED AS TO FORM: ATTEST:
By: By:
ROGER A. LUBOVICH, Bremerton City Attorney ANGELA HOOVER, City Clerk
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
Angie Sanchez Virnoche Thomas Knuckey
FCS Group Public Works Director
Redmond Town Center City of Bremerton Engineering Dept.
7525 166th Ave. NE, Suite D-215 345 6th St. Ste 100
Redmond, WA 98052 Bremerton, WA 98337
360-473-5306
DocuSign Envelope ID: 85AA9887-2652-4874-AFF3-C5D4FD91790D
5/24/2021
5/25/2021
Angie Sanchez Virnoche
Vice President