Loading...
HomeMy WebLinkAbout05/05/2021 4DAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Agreement with Long Painting Company for the Reservoir 19 Exterior Coating Replacement Study Session Date COUNCIL MEETING Date Department: Presenter: Phone: April 28, 2021 May 5, 2021 PW&U - Engineering Robert Endslev (360) 473-2348 SUMMARY: Reservoir 19 is a 2.0 million gallon steel water reservoir located at 2628 Ash St. An exterior coating assessment report was prepared by Northwest Corrosion Engineering in early 2019 which included recommendations for recoating the exterior. The exterior of the reservoir will be abrasive blasted to remove the existing coating and a new coating system will be applied. Seven (7) bids were received. Bids were opened on April 5, 2021. Long Painting Company was the lowest responsible, responsive bidder in the amount of $337,881.47 (which includes sales tax). ATTACHMENTS: 1. Agreement 2. Location Map 3. Bid Tabulation FISCAL IMPACTS (Include Budgeted Amount): This project is included in the 2021 Water Capital Budget. STUDY SESSION AGENDA: 0 Limited Presentation ❑Full Presentation STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing RECOMMENDED MOTION: Move to award the construction contract for Reservoir 19 —Exterior Coating Replacement to Long Painting Company; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION Form Updated 01/02/2018 Approve ❑Deny ❑Table ❑Continue ❑ No Action