HomeMy WebLinkAbout05/05/2021 4DAGENDA BILL
CITY OF BREMERTON
CITY COUNCIL
SUBJECT:
Agreement with Long Painting Company for
the Reservoir 19 Exterior Coating
Replacement
Study Session Date
COUNCIL MEETING Date
Department:
Presenter:
Phone:
April 28, 2021
May 5, 2021
PW&U - Engineering
Robert Endslev
(360) 473-2348
SUMMARY: Reservoir 19 is a 2.0 million gallon steel water reservoir located at 2628 Ash St. An
exterior coating assessment report was prepared by Northwest Corrosion Engineering in early 2019
which included recommendations for recoating the exterior. The exterior of the reservoir will be
abrasive blasted to remove the existing coating and a new coating system will be applied.
Seven (7) bids were received. Bids were opened on April 5, 2021. Long Painting Company was the
lowest responsible, responsive bidder in the amount of $337,881.47 (which includes sales tax).
ATTACHMENTS: 1. Agreement 2. Location Map 3. Bid Tabulation
FISCAL IMPACTS (Include Budgeted Amount): This project is included in the 2021 Water Capital
Budget.
STUDY SESSION AGENDA: 0 Limited Presentation ❑Full Presentation
STUDY SESSION ACTION: ❑x Consent Agenda ❑ General Business ❑ Public Hearing
RECOMMENDED MOTION: Move to award the construction contract for Reservoir 19 —Exterior
Coating Replacement to Long Painting Company; and authorize the Mayor to finalize and execute
the agreement with substantially the same terms and conditions as presented.
COUNCIL ACTION
Form Updated 01/02/2018