Loading...
HomeMy WebLinkAbout04_07_2021 4EAGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Sole Source Public Works Agreement with Seton Construction, Inc. for the 2"d Street Stormwater Treatment Project Study Session Date: COUNCIL MEETING Date: Department: Presenter: Phone: 3/24/2021 4/7/2021 PW&U K. Ketterer 360) 473-5334 SUMMARY: The 2"d Street Stormwater Treatment Project will install a stormwater treatment unit called a continuous defection unit into the existing storm system just upstream of an outfall into Sinclair Inlet. The outfall at 2"d Street, adjacent to the Bremerton Marina and Boardwalk, serves a 16-acre drainage basin that includes a large portion of Bremerton's downtown. The unit will filter out debris and some oils preventing those contaminants from reaching Sinclair Inlet. This environmental stewardship project meets goals of our stormwater permit and is strongly supported by the Suquamish Tribe. Due to the location of project site and on -going construction at the Marina Square Project the Public Works Director authorized a sole source procurement method for the construction of the project. Additional details regarding the justification of the sole source procurement are attached. Staff negotiated a lump sum cost for the project at $97,153.00. ATTACHMENTS: 1) Public Works Agreement 2) Sole Source FISCAL IMPACTS (Include Budgeted Amount): This project is included in the 2021 Stormwater Capital Fund; the total project budget is $150,000. STUDY SESSION AGENDA: x Limited Presentation Full Presentation STUDY SESSION ACTION: x Consent Agenda General Business Public Hearing RECOMMENDED MOTION: Move to award the sole source public works agreement in the amount of $97,153.00 to Seton Construction for the construction of the 2"d Street Stormwater Treatment Project and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION iApprove Deny Table Continue No Action Form Updated 01/02/2018