Loading...
HomeMy WebLinkAbout03/24/2021 STUDY SESSION AGENDA PACKET______________________________________________________________ CITY COUNCIL 345 6th Street, Suite 100, Bremerton, WA 98337 Phone (360) 473-5280 * * * 2nd A M E N D M E N T * * * WEDNESDAY, MARCH 24, 2021 CITY COUNCIL STUDY SESSION AGENDA 5:00 PM – Via Zoom Webinar To help reduce the spread of COVID-19, the City Council is conducting a Study Session via Zoom Webinar. The Council Conference Room 603 will be closed, and all Council Members and staff will be participating remotely. The Study Session is open to the public to listen in, but except for Item B1, there will be no opportunities for input; no action is anticipated; and the content of these items is subject to change. If approved by the Council, these items will be placed on the April 7, 2021 City Council Virtual Meeting Agenda… Members of the public are invited to join the Zoom webinar by clicking on the following link: https://us02web.zoom.us/j/84084350535?pwd=L0NWMmFFeTAzenZYUVZyR3NiOVRkdz09 Or iPhone one-tap: US: +12532158782,,84084350535#,,,,*209823# or +16699006833,,84084350535#,,,,*209823# Or Telephone: Dial (for higher quality, dial a number based on your current location): US: +1 253 215 8782 or +1 669 900 6833 or +1 346 248 7799 or +1 301 715 8592 Webinar ID: 840 8435 0535 Passcode: 209823 Public questions or comments may be submitted ahead of time to City.Council@ci.bremerton.wa.us A.BRIEFINGS ON AGENDA ITEMS 1.Electronic Business Machines Maintenance Agreement for a Canon Image Runner Copier for the Police Department Item pulled 2.Bremerton Kitsap Access Television (BKAT) Service Contract with the Kitsap Public Health District 3.Accept Federal Highway Administration (FHWA) Transportation Grant; and Approve Local Agency Agreement for the 6th Street Preservation Phase III Project 4.Sole Source Public Works Agreement with Seton Construction, Inc. for the 2nd Street Stormwater Treatment Project 5.Sole Source Professional Services Agreement with Stantec Consulting Services, Inc. for the McDougal Creek/Wheaton Way Culvert Repair Permit Support 6.Local Agency Preliminary Engineering Participating Agreement with Washington State Department of Transportation (WSDOT) for Warren Avenue Pedestrian Improvements Project 7.Master Services and Purchasing Agreement with Axon Enterprise, Inc. for Body Cameras and In- Car Recording Equipment for the Police Department 8.Authorize three additional positions (3 FTEs) in the 2021 City Budget to support Bremerton’s Permitting Development Review and Inspection Services Continued on next page… 9. Confirm Appointment of Ashley Walchok to the Lodging Tax Advisory Committee 10. Confirm Appointment of Ash Printy to the Lodging Tax Advisory Committee 11. Confirm Appointment of Mike Huey to the Lodging Tax Advisory Committee 12. Confirm Appointment of Virgil Valdez to the Lodging Tax Advisory Committee B. GENERAL BUSINESS – Action is anticipated... 1. Setting Salary for Karen Wikle as the Budget Analyst at Pay Band 12 Rate 6 of the 2021 Management, Professional, Confidential & Fiduciary Salary Plan Item Added C. GENERAL COUNCIL BUSINESS o Race Equity Advisory Committee Briefing (3/11/21 Meeting) – Leslie Daugs o Public Works Committee Briefing (3/16/21 Meeting) – Chair Eric Younger o Finance, Investment & Parking Committee Briefing (3/23/21 Meeting) – Chair Michael Goodnow o Other General Council Business D. ADJOURNMENT OF STUDY SESSION Immediately following adjournment of the Study Session, an EXEMPT CLOSED SESSION as allowed under RCW 42.30.140(4)(b), will be held to discuss Labor Negotiations… AMENDED AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Electronic Business Machines Maintenance Agreement for a Canon Image Runner Copier for the Police Department COUNCIL MEETING Date: April 7, 2021 Department: Police Presenter: Kevin Crane Phone: 360.473.5480 SUMMARY: The 5-year lease agreement for a Ricoh MPC 4501 copier has expired, and the department continues with a month-to-month lease. Replacing this unit with a Canon Image Runner color copier/printer will provide faster output and better image quality. The provider, Electronic Business Machines, is an agent of Canon Financial Services and is listed on the State of Washington’s NASPO list of contracts (No. 06619). IT has been consulted on the copier. Bremerton PD requests approval to enter into a 5-year lease agreement with Electronic Business Machines. ATTACHMENTS: Electronic Business Machines Agreement FISCAL IMPACTS (Include Budgeted Amount): No impact to the budget as the monthly rate is approximately the same as the current monthly lease for the Ricoh MPC 4501. The amount to lease a copier is in the Department’s 2021 budget under the Investigations Unit. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the agreement and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A1 Pulled 802 134th ST SW, Suite 170, Everett, WA 98204 Sales Rep Phone: 425-742-2244 Fax: 425-743-3117 PO # Address Address Suite Suite City City State State Zip Zip Meter Contact Contact Meter Phone Phone Email Email Item Overage Rate Overage Billed B&W 0.0074 Monthly Color 0.05 Monthly B&W Printer Color Printer FP Equipment Not Applicable Not Applicable Make Equipment ID All Inclusive B&W Start Meter Color Start Meter Canon 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 President Date Title Date 1025 Burwell St Bremerton WA 98337 barbara.forbes@ci.bremerton.wa.us Agreeement # 06619 Model Serial Number Maintenance Agreement Not Applicable Monthly iR-C5750i This maintanance agreement is in Bremerton Police Department Bill To Barbara Forbes Bremerton Police Department Ship To 1025 Burwell St Bremerton WA 98337 Barbara Forbes (360) 473-5227 (360) 473-5227 Monthly Base Rate 0.05 0.0074 Maintenance Agreement Coverage Contract Length (months) Install Date 60 barbara.forbes@ci.bremerton.wa.us 0 Paul Fisher Monthly Base Billed Brian Landgren Printed Name 0 0 0 0 0 0 0 0 0 MA 140595 0 TitlePrinted Name By executing this agreement, I acknowledge that I have read and understand this agreement and I certify that I am authorized to execute this agreement on behalf of customer. Authorized signature acknowledges terms & conditions, expiration dates and meter readings. Authorized Signature Customer Acceptance Manager's Signature Electronic Business Machines Acceptance Base Allowance 0 0 Where term & conditions vary the NASPO agreement shall take presidence. 0 0 0 compliance with WA State NASPO 0 0 0 0 0 0 0 0 0 0 0 Customer Initials Exceptions- 1) This Agreement does not include coverage of third party software support or cabling issues not listed unless mutually agreed upon in writing by Customer and EBM. 2) EBM is not responsible for any software licensing issue. 3) Performance of normal operator functions, system(s) backups, virus scans and network security are the responsibility of the Customer. DISCLAIMER – EBM EXPRESSLY DISCLAIMS ANY DUTY AS AN INSURER OF THE EQUIPMENT AND MAKES NO WARRANTIES WHATSOEVER UNDER THIS AGREEMENT CONCERNING THE EQUIPMENT’S PERFORMANCE INCLUDING WARRANTIES OF MECHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. EBM will not be liable for monetary damages of any kind, direct, indirect or consequential for any loss by the Customer as a result of the Agreement, even if EBM has been advised of the possibility of such damages. For Equipment Maintenance Agreement, EBM will be responsible for providing only that service which is reasonable, normal and practical and only that service which is in accordance with the manufacturer’s specifications and recommendations.Assignment – The Customer without the express written consent of EBM, which will not be unreasonably withheld, may not assign this Agreement. The Customer will assume full responsibility to inform any proposed assignee of the price, rates, terms and conditions of this Agreement and of the results of the transfer of title, ownership, or possession of the Equipment. Entire Agreement – This Agreement contains the entire sales/service agreement between the parties and no persons are authorized to modify any of the terms and conditions contained herein. Any amendments made by customer will not be valid. Electronic Business Machines Maintenance Agreement Terms and Conditions Definitions –The following terms are defined for purposes of the Equipment Maintenance Agreement. 1) Agreement – This Sales/Maintenance Contract. 2) Customer – the person who is the purchaser, owner or party in possession of Equipment. 3) Electronic Business Machines, Inc - EBM. 4) Consumable – any item which is consumed in the process of making copies or prints in Equipment, for example: toner, developer, etc. 5) Equipment – Copier, Facsimile, Printer, FP Products, Scanner and options specified on page 1 for this Agreement. 6) Effective Date – the date which this Agreement is accepted and EBM will begin maintenance coverage. This date is indicated on page 1 of this Agreement. 7) Part – any assembly, component or device contained in Equipment which does not have predetermined life expectancy and which is not ordinarily replaced on a prearranged schedule, for example; switch, seal, electronic components, etc. 8) Supply – any items used in the Equipment, which has a predetermined life expectancy and is ordinarily replaced on a prearranged schedule, for example; master, drums POC heat roller, etc. 9) EBM Officer – An EBM officer is the CEO, President, VP of Sales or Director of Service. 10) All Inclusive Agreement - Includes Parts, Labor and Consumables, excludes paper and staples (State Contract Includes Staples). Equipment Purchase Terms and Conditions - 1) Customer understands that EBM is not bound by any written or oral representations made by its salespeople that are not reflected on the face of this Agreement. 2) This Agreement is effective and binding only when read and signed off by an EBM Officer. 3) Customer assumes all responsibility if equipment is not operated under manufacturer specifications. 4) If this document is used in conjunction with a leased piece(s) of equipment; the leasing company is not bound to service the equipment, but EBM is. 5) Payment of this agreement is acceptance of all terms and conditions. 6) In the case of an MPS program any device that uses like toner to a device currently on the program shall be automatically added to the MPS program. 7) Customer agrees to allow EBM to install imageWARE Remote, KFS or FM Audit that will report; meters, service concerns or supply warnings back to EBM. If the Customer denies this service a $5 service fee will be added per month to recover meters manually. 8) FP Equipment maintenance is inclusive of parts and labor, but excludes supply items like ink, sealing solution and labels. 9) Additional terms and conditions and exclusions are printed below. EBM’s Responsibility – During the terms of this Agreement, EBM will: 1) Provide maintenance, cleaning and lubrication of the Equipment as reasonably requested by Customer, during our regularly scheduled business hours (8:00 a.m. to 5:00 p.m. Monday – Friday PST). 2) Replace parts which have failed through normal use and which are necessary for proper operation or maintenance of this Equipment. Includes labor provided this is an All Inclusive Agreement. Customer’s Responsibility – During the terms of this Agreement, the Customer will: 1) Promptly notify EBM service department of any problems or malfunctions with the Equipment and cease usage if so advised by EBM until corrections are made. 2) Provide suitable personnel for special key operator training in order to promote better equipment performance and inform EBM when a new key operator is appointed. 3) Provide electrical service, working areas and environmental conditions suitable for normal operations of Equipment as specified by equipment manufacturer. 4) Provide access to EBM personnel to clean, inspect, service, repair or make alterations to Equipment at any time during EBM’s normal business hours. 5) Provide EBM with true and accurate meter readings as requested. If such meter readings are not received within 3 days, we may estimate the number of images used. Adjustments for estimated charges for additional images will be made upon receipt of actual meter readings. 6) Use only those Parts, Supplies and Consumables provided or approved by EBM. 7) Approval shall be based upon generally accepted industry and manufacturer’s standards. 8) Inform EBM of any change in business location and assume responsibility for damage incurred as a result of changing the location of the Equipment. 9) Pay all invoices within 20 days of issuance. 10) The Customer shall pay all attorneys’ fees incurred by EBM to collect any sum due hereunder and to enforce any of its rights under this Agreement. 11) Non-payment of invoices may result in EBM’s withholding services under this contract. 12) Pay any applicable tax now or hereafter assessed, levied, or imposed by any federal, state or local authority. 13) The Customer may be required to provide a dedicated electrical circuit for the equipment under contract if electricity has been found to be a problem by EBM or a licensed Electrician chosen by EBM. 14) I understand all meter counts are based on 8.5 x 11 single sided images unless otherwise noted. Term and Rate – 1) The term of the Agreement shall be for the length of 12 months. In the case of a cost per copy lease; the agreement will automatically renew for consecutive 12 month periods to the end of the lease. 2) This Agreement shall automatically be extended for successive one (1) year periods and/or conditions set forth on the front of this Agreement, unless the customer gives at least thirty (30) days written notice prior to the renewal date with intent to terminate. 3) If the contract is cancelled by EBM or the Customer, EBM may pick up any spare toners unused by the Customer. 4) EBM may increase the rate up to 10% on or near the annual anniversary date of this Agreement. 5) Billing after annual anniversary will reflect change in rate, and payment of invoice shall be considered acceptance of the new contract rates. 6) No refunds will be given if the Agreement is voided due to the limitations stated below, misuse, non-use of Equipment, or non-payment. 7) Payment of maintenance is due in advance of the coverage period. If customer does not pay, EBM may refuse to continue service or furnish service on a C.O.D. “per call” basis. 9) Maintenance contracts are subject to applicable sales tax. Additional Charges – Below are charges for which the Customer will be responsible: 1) If at any time there is a break in coverage of over thirty (30) days, an inspection fee and service call charges, if applicable, will be charged before equipment can be re-established under an Agreement. 2) A written estimate of the service call charges will be given to the Customer before any work is performed. 3) Moving Equipment to a new location will be billed at EBM’s prevailing service rates. 4) Repairs to Equipment caused by misuse, environmental issues, or a delivery move not handled by EBM, electrical issues or due to abnormal usage will be billed at EBM’s stated price for parts and prevailing service rates. Limitations – This Agreement shall not apply to: 1) Servicing Equipment located in an unsafe or hazardous environment, as determined by EBM. 2) Painting or refinishing Equipment or furnishing materials for such purpose. 3) EBM shall not be responsible for parts and/or labor on Equipment, which has been operated above the manufacturer’s stated usage ratings for copies/prints per cycle. 4) Electrical work external to Equipment. 5) Repairs necessitated by atmospheric conditions not suitable for normal office work, repairs due to deviations in electrical power supply due to ungrounded or unshielded electrical outlets, acts of God, water damage, neglect, theft, vandalism, fire or moving Equipment, unless moved by EBM personnel. 6) Repairs necessitated by the servicing of the Equipment by any person not authorized by EBM to provide service. 7) Repairs necessitated by the use of non-approved Supplies or Consumables. 8) Repairs necessitated by the improper performance of operators whether or not such operators were trained by EBM. 9) Servicing Equipment that is moved outside the geographic area covered by EBM. 10) If a customer chooses not to purchase supplies from EBM, the customer’s maintenance agreement can be terminated by an EBM Officer at any time throughout the contract. 11) If a customer exceeds manufacturer toner/parts yield by more than 10% on B&W or Color usage due to operating the machine outside of manufacturer specifications, the customer can be charged at EBM’s discretion for any and all toner/parts used above suggested consumption yield. 12) IT support is not included in this maintenance contract. 13) If after we connect your system to your network, issues arise, they will be examined on a case by case basis. If this issue is caused by your network it will result in a billable network call at prevailing IT rates. 14) By signing this document Customer releases EBM from any problems created by installing any/all drivers associated with this equipment on the customer’s network. 15) Labels, transparencies, paper or other consumable items not marked specifically for copiers is hazardous to the heating element and could potentially cause damage not covered under the maintenance agreement. 16) Customer errors will be handled on a case by case basis and may result in a charge if the solution is in a manual or the customer was found to have done something wrong. 17) Failure to register correct paper types in the equipment that cause damage will not be covered in this agreement. 18) Watch your copy jobs closely, because EBM doesn’t reimburse for bad copies made. 19) Firmware upgrades, repairs, service/network labor due to a malfunctioning imagePASS unit or maintenance for imagePASS units will not be covered unless stated on the front of the agreement. 20) Incorrect installation of toner could result in damage to the copier not covered under this agreement. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Bremerton Kitsap Access Television (BKAT) Service Contract with the Kitsap Public Health District COUNCIL MEETING Date: April 7, 2021 Department: BKAT Presenter: Jon Rauch Phone: (360) 473-5012 SUMMARY: BKAT will provide services to the Kitsap Public Health District in the form of recording and airing their board meetings and programming. ATTACHMENTS: Service Agreement FISCAL IMPACTS (Include Budgeted Amount): Generates $5040.00 in Revenue. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the Bremerton Kitsap Access Television Service Agreement with the Kitsap Public Health District; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A2 Page 1 of 3 BREMERTON KITSAP ACCESS TELEVISION SERVICE CONTRACT This Bremerton Kitsap Access Television Service Contract (“Agreement”) is made and executed by and between the City of Bremerton (“Bremerton”), which operates Bremerton Kitsap Access Television (“BKAT”), and Kitsap Public Health District hereinafter referred to individually as KPHD Bremerton and KPHD hereby agree as follows: Section 1. Scope of Services. Bremerton, through BKAT, shall provide governmental access television services, including but not limited to video production and program scheduling related to the KPHD commitments as outlined in this Agreement. BKAT will post the KPHD Board meeting agendas on the BKAT reader board. BKAT shall provide consultation, pre-production and post-production services, and properly trained staff. BKAT’s specified numbers of service commitments covered by this Agreement are set forth in the following “BKAT Service Commitments to KPHD” table: BKAT Service Commitments to KPHD Description Location Schedule Number per Year Kitsap Public Health Department Board meetings Norm Dicks Government Center First Tuesday of the month 11 Extra Board Meeting, Public Hearing, and/or Special Meeting Norm Dicks Government Center As Requested 1 Total 12 All meeting hours include portal to portal charges. KPHD shall retain control over program content and designate one person to authorize and schedule programs produced under this Agreement. BKAT shall provide production and playback of regularly-scheduled Board Meetings and provide a video on demand link. BKAT will work with KPHD to establish regular, consistent playback times for programs produced under this Agreement. Once scheduled, program times shall not be moved, altered, or deleted without the consent of KPHD. Section 2. Payment Obligations. In consideration of the services provided pursuant to this Agreement, KPHD shall pay Bremerton an annual amount of $5,040.00. Effective on January 1, 2021 and each year thereafter, the amount will be adjusted by the June to June Seattle-Tacoma- Bremerton Consumer Price Index-Urban. In no instance shall the recalculated fee drop below $5040.00. Services rendered beyond the scope of this Agreement, as set forth in Section 1, shall be billed in addition to the annual amount at the rates established and published by BKAT. Page 2 of 3 KPHD shall make funds available to Bremerton as follows: On a monthly basis, and no later than the last claims batch of each month, KPHD shall pay Bremerton 1/12 of the current annual amount as specified herein. If Bremerton provides additional services to KPHD beyond those listed in the Scope of Services in Section 1, a separate invoice will be provided. Section 3. Term. This Agreement shall be for a period of three (3) years commencing January 1, 2021, and terminating December 31, 2024. Section 4. Termination. Either party to this Agreement may terminate the Agreement without cause upon giving ninety (90) days written notice to the other party. Section 5. Severability. Should any part of the Agreement be found invalid, the balance of the Agreement shall remain in full force and effect. Section 6. Indemnify and Hold Harmless. The Parties shall each indemnify, defend, and hold the other harmless from and against any and all claims, suits, actions, causes of action, losses, damage, or liabilities arising or resulting from any alleged negligent or intentional acts or omissions arising out of the performance or non-performance of their respective responsibilities as set out in this Agreement. In the event of litigation to enforce any of the terms or provisions of the Agreement herein, each party shall pay its own costs and attorney’s fees. Section 7. Notices. All notices and other communications to be given by either party may be given in writing to the appropriate party as follows: Public Access Manager Administrator BKAT Kitsap Public Health District (Bremerton Kitsap Access Television) 345 6th St Ste 300 7266 Tibardis Rd NW Bremerton, WA 98337 Bremerton, WA 98311 Section 8. Compliance with Laws. The Parties shall comply with all applicable federal, state, and local laws in performing their obligations under this Agreement. Section 9. Choice of Law and Venue. This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in the Kitsap County Superior Court. Section 10. Assignment. Any assignment of any portion of this Agreement shall not be made without the written consent of both Parties. Section 11. Waiver. Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right of power arising out of this Agreement shall not be deemed waiver of any other right or power. Page 3 of 3 IN WITNESS WHEREOF, the parties have executed this Agreement as of the later of the signature dates included below. CITY OF BREMERTON KITSAP PUBLIC HEALTH DISTRICT ____________________________ ____________________________ Greg Wheeler, Mayor Keith Grellner, Administrator APPROVED AS TO FORM ____________________________ Date ____________________________ Roger A. Lubovich, City Attorney AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Accept Federal Highway Administration (FHWA) Transportation Grant; and Approve Local Agency Agreement for the 6th Street Preservation Phase III Project Study Session Date: March 24, 2021 COUNCIL MEETING Date: April 7, 2021 Department: Engineering Presenter: Chris Dimmitt Phone: (360) 473-2307 SUMMARY: The City has been offered a Federal Highway Administration (FHWA) transportation grant through the Puget Sound Regional Council (PSRC) to construct a grind and overlay of 6th Street between Naval Avenue and Warren Ave. The project includes a new traffic signal and ADA accessible ramps at the intersection of 6th Street and Veneta Avenue. The grant funds total $1,772,838 and require a City match of $397,162 for a total of $2,170,000. The offered grant will be in WSDOT Standard Forms, with their standard terms and conditions. Additional project work that is not grant funded includes securing right-of-way at the intersection of Veneta Avenue and 6th Street for the traffic signal. In addition, revised channelization of the corridor will be evaluated prior to design and all resulting work outside of the project limits is not included in the current project estimate. ATTACHMENTS: 1) Award letter from PSRC 2) Vicinity Map, 3) Local Agency Agreement (blank) FISCAL IMPACTS (Include Budgeted Amount): Total project cost is estimated at $2,210,000. Current match is estimated at $437,162. Match source is projected as REET and is included in the 2021-2025 REET projection. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to accept the FHWA Grant and approve the Local Agency Agreement with WSDOT for the 6th Street Preservation Phase III Project; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A3 Page 1 Revised 12/2020 Local Agency Agreement Agency CFDA No. 20.205 (Catalog or Federal Domestic Assistance) Address Project No. Agreement No. For OSC WSDOT Use Only The Local Agency having complied, or hereby agreeing to comply, with the terms and conditions set forth in (1) Title 23, U.S. Code Highways, (2) the regulations issued pursuant thereto, (3) 2 CFR Part 200, (4) 2 CFR Part 180 – certifying that the local agency is not excluded from receiving Federal funds by a Federal suspension or debarment, (5) the policies and procedures promulgated by the Washington State Department of Transportation, and (6) the federal aid project agreement entered into between the State and Federal Government, relative to the above project, the Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification. Federal funds which are to be obligated for the project may not exceed the amount shown herein on line r, column 3, without written authority by the State, subject to the approval of the Federal Highway Administration. All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency. Project Description Name Length Termini Description of Work Project Agreement End Date Claiming Indirect Cost Rate Yes NoProposed Advertisement Date Type of Work Estimate of Funding(1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated Federal FundsPE %a. Agency b. OtherFederal Aid Participation Ratio for PE c. Other d. State e. Total PE Cost Estimate (a+b+c+d)Right of Way %f. Agency g. OtherFederal Aid Participation Ratio for RW h. Other i. State j. Total R/W Cost Estimate (f+g+h+i)Construction %k. Contract l. Other m. OtherFederal Aid Participation Ratio for CN n. Other o. Agency p. State q. Total CN Cost Estimate (k+l+m+n+o+p) r. Total Project Cost Estimate (e+j+q) DOT Form 140-039 Washington State Department of Transportation By Director, Local Program Agency Official By Title Date Executed 0 0 0 0 0 0 0 0 0 0 0 0 DOT Form 140-039 Page 2 Revised 12/2020 Construction Method of Financing (Check Method Selected) State Ad and Award Method A - Advance Payment - Agency Share of total construction cost (based on contract award) Method B - Withhold from gas tax the Agency’s share of total construction coast (line 5, column 2) in the amount of $ at $ per month for months. Local Force or Local Ad and Award Method C - Agency cost incurred with partial reimbursement The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition to payment of the federal funds obligated, it accepts and will comply with the applicable provisions set forth below. Adopted by official action on , , Resolution/Ordinance No. Provisions I. Scope of Work The Agency shall provide all the work, labor, materials, and services necessary to perform the project which is described and set forth in detail in the “Project Description” and “Type of Work.” When the State acts for and on behalf of the Agency, the State shall be deemed an agent of the Agency and shall perform the services described and indicated in “Type of Work” on the face of this agreement, in accordance with plans and specifications as proposed by the Agency and approved by the State and the Federal Highway Administration. When the State acts for the Agency but is not subject to the right of control by the Agency, the State shall have the right to perform the work subject to the ordinary procedures of the State and Federal Highway Administration. II. Delegation of Authority The State is willing to fulfill the responsibilities to the Federal Government by the administration of this project. The Agency agrees that the State shall have the full authority to carry out this administration. The State shall review, process, and approve documents required for federal aid reimbursement in accordance with federal requirements. If the State advertises and awards the contract, the State will further act for the Agency in all matters concerning the project as requested by the Agency. If the Local Agency advertises and awards the project, the State shall review the work to ensure conformity with the approved plans and specifications. III. Project Administration Certain types of work and services shall be provided by the State on this project as requested by the Agency and described in the Type of Work above. In addition, the State will furnish qualified personnel for the supervision and inspection of the work in progress. On Local Agency advertised and awarded projects, the supervision and inspection shall be limited to ensuring all work is in conformance with approved plans, specifications, and federal aid requirements. The salary of such engineer or other supervisor and all other salaries and costs incurred by State forces upon the project will be considered a cost thereof. All costs related to this project incurred by employees of the State in the customary manner on highway payrolls and vouchers shall be charged as costs of the project. IV. Availability of Records All project records in support of all costs incurred and actual expenditures kept by the Agency are to be maintained in accordance with local government accounting procedures prescribed by the Washington State Auditor’s Office, the U.S. Department of Transportation, and the Washington State Department of Transportation. The records shall be open to inspection by the State and Federal Government at all reasonable times and shall be retained and made available for such inspection for a period of not less than three years from the final payment of any federal aid funds to the Agency. Copies of said records shall be furnished to the State and/or Federal Government upon request. V. Compliance with Provisions The Agency shall not incur any federal aid participation costs on any classification of work on this project until authorized in writing by the State for each classification. The classifications of work for projects are: 1. Preliminary engineering. 2. Right of way acquisition. 3. Project construction. Once written authorization is given, the Agency agrees to show continuous progress through monthly billings. Failure to show continuous progress may result the Agency’s project becoming inactive, as described in 23 CFR 630, and subject to de-obligation of federal aid funds and/or agreement closure. If right of way acquisition, or actual construction of the road for which preliminary engineering is undertaken is not started by the close of the tenth fiscal year following the fiscal year in which preliminary engineering phase was authorized, the Agency will repay to the State the sum or sums of federal funds paid to the Agency under the terms of this agreement (see Section IX). If actual construction of the road for which right of way has been purchased is not started by the close of the tenth fiscal year following the fiscal year in which the right of way phase was authorized, the Agency will repay to the State the sum or sums of federal funds paid to the Agency under the terms of this agreement (see Section IX). DOT Form 140-039 Page 3 Revised 12/2020 The Agency agrees that all stages of construction necessary to provide the initially planned complete facility within the limits of this project will conform to at least the minimum values set by approved statewide design standards applicable to this class of highways, even though such additional work is financed without federal aid participation. The Agency agrees that on federal aid highway construction projects, the current federal aid regulations which apply to liquidated damages relative to the basis of federal participation in the project cost shall be applicable in the event the contractor fails to complete the contract within the contract time. VI.Payment and Partial Reimbursement The total cost of the project, including all review and engineering costs and other expenses of the State, is to be paid by the Agency and by the Federal Government. Federal funding shall be in accordance with the Federal Transportation Act, as amended, 2 CFR Part 200. The State shall not be ultimately responsible for any of the costs of the project. The Agency shall be ultimately responsible for all costs associated with the project which are not reimbursed by the Federal Government. Nothing in this agreement shall be construed as a promise by the State as to the amount or nature of federal participation in this project. The Agency shall bill the state for federal aid project costs incurred in conformity with applicable federal and state laws. The agency shall minimize the time elapsed between receipt of federal aid funds and subsequent payment of incurred costs. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead shall not be eligible for federal participation unless a current indirect cost plan has been prepared in accordance with the regulations outlined in 2 CFR Part 200 - Uniform Admin Requirements, Cost Principles and Audit Requirements for Federal Awards, and retained for audit. The State will pay for State incurred costs on the project. Following payment, the State shall bill the Federal Government for reimbursement of those costs eligible for federal participation to the extent that such costs are attributable and properly allocable to this project. The State shall bill the Agency for that portion of State costs which were not reimbursed by the Federal Government (see Section IX). 1. Project Construction Costs Project construction financing will be accomplished by one of the three methods as indicated in this agreement. Method A – The Agency will place with the State, within (20) days after the execution of the construction contract, an advance in the amount of the Agency’s share of the total construction cost based on the contract award. The State will notify the Agency of the exact amount to be deposited with the State. The State will pay all costs incurred under the contract upon presentation of progress billings from the contractor. Following such payments, the State will submit a billing to the Federal Government for the federal aid participation share of the cost. When the project is substantially completed and final actual costs of the project can be determined, the State will present the Agency with a final billing showing the amount due the State or the amount due the Agency. This billing will be cleared by either a payment from the Agency to the State or by a refund from the State to the Agency. Method B – The Agency’s share of the total construction cost as shown on the face of this agreement shall be withheld from its monthly fuel tax allotments. The face of this agreement establishes the months in which the withholding shall take place and the exact amount to be withheld each month. The extent of withholding will be confirmed by letter from the State at the time of contract award. Upon receipt of progress billings from the contractor, the State will submit such billings to the Federal Government for payment of its participating portion of such billings. Method C – The Agency may submit vouchers to the State in the format prescribed by the State, in duplicate, not more than once per month for those costs eligible for Federal participation to the extent that such costs are directly attributable and properly allocable to this project. Expenditures by the Local Agency for maintenance, general administration, supervision, and other overhead shall not be eligible for Federal participation unless claimed under a previously approved indirect cost plan. The State shall reimburse the Agency for the Federal share of eligible project costs up to the amount shown on the face of this agreement. At the time of audit, the Agency will provide documentation of all costs incurred on the project. The State shall bill the Agency for all costs incurred by the State relative to the project. The State shall also bill the Agency for the federal funds paid by the State to the Agency for project costs which are subsequently determined to be ineligible for federal participation (see Section IX). VII. Audit of Federal Consultant Contracts The Agency, if services of a consultant are required, shall be responsible for audit of the consultant’s records to determine eligible federal aid costs on the project. The report of said audit shall be in the Agency’s files and made available to the State and the Federal Government. An audit shall be conducted by the WSDOT Internal Audit Office in accordance with generally accepted governmental auditing standards as issued by the United States General Accounting Office by the Comptroller General of the United States; WSDOT Manual M 27-50, Consultant Authorization, Selection, and Agreement Administration; memoranda of understanding between WSDOT and FHWA; and 2 CFR Part 200.501 - Audit Requirements. If upon audit it is found that overpayment or participation of federal money in ineligible items of cost has occurred, the Agency shall reimburse the State for the amount of such overpayment or excess participation (see Section IX). VIII.Single Audit Act The Agency, as a subrecipient of federal funds, shall adhere to the federal regulations outlined in 2 CFR Part 200.501 as well as all applicable federal and state statutes and regulations. A subrecipient who expends $750,000 or more in federal awards from all sources during a given fiscal year shall have a single or program-specific audit performed for that year in accordance with the provisions of 2 CFR Part 200.501. Upon conclusion of the audit, the Agency shall be responsible for ensuring that a copy of the report is transmitted promptly to the State. DOT Form 140-039 Page 4 Revised 12/2020 IX. Payment of Billing The Agency agrees that if payment or arrangement for payment of any of the State’s billing relative to the project (e.g., State force work, project cancellation, overpayment, cost ineligible for federal participation, etc.) is not made to the State within 45 days after the Agency has been billed, the State shall effect reimbursement of the total sum due from the regular monthly fuel tax allotments to the Agency from the Motor Vehicle Fund. No additional Federal project funding will be approved until full payment is received unless otherwise directed by the Director, Local Programs. Project Agreement End Date - This date is based on your projects Period of Performance (2 CFR Part 200.309). Any costs incurred after the Project Agreement End Date are NOT eligible for federal reimbursement. All eligible costs incurred prior to the Project Agreement End Date must be submitted for reimbursement within 60 days after the Project Agreement End Date or they become ineligible for federal reimbursement. X. Traffic Control, Signing, Marking, and Roadway Maintenance The Agency will not permit any changes to be made in the provisions for parking regulations and traffic control on this project without prior approval of the State and Federal Highway Administration. The Agency will not install or permit to be installed any signs, signals, or markings not in conformance with the standards approved by the Federal Highway Administration and MUTCD. The Agency will, at its own expense, maintain the improvement covered by this agreement. XI. Indemnity The Agency shall hold the Federal Government and the State harmless from and shall process and defend at its own expense all claims, demands, or suits, whether at law or equity brought against the Agency, State, or Federal Government, arising from the Agency’s execution, performance, or failure to perform any of the provisions of this agreement, or of any other agreement or contract connected with this agreement, or arising by reason of the participation of the State or Federal Government in the project, PROVIDED, nothing herein shall require the Agency to reimburse the State or the Federal Government for damages arising out of bodily injury to persons or damage to property caused by or resulting from the sole negligence of the Federal Government or the State. XII. Nondiscrimination Provision No liability shall attach to the State or Federal Government except as expressly provided herein. The Agency shall not discriminate on the basis of race, color, national origin, or sex in the award and performance of any USDOT- assisted contract and/or agreement or in the administration of its DBE program or the requirements of 49 CFR Part 26. The Agency shall take all necessary and reasonable steps under 49 CFR Part 26 to ensure nondiscrimination in the award and administration of USDOT-assisted contracts and agreements. The WSDOT’s DBE program, as required by 49 CFR Part 26 and as approved by USDOT, is incorporated by reference in this agreement. Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as a violation of this agreement. Upon notification to the Agency of its failure to carry out its approved program, the Department may impose sanctions as provided for under Part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S. C. 3801 et seq.). The Agency hereby agrees that it will incorporate or cause to be incorporated into any contract for construction work, or modification thereof, as defined in the rules and regulations of the Secretary of Labor in 41 CFR Chapter 60, which is paid for in whole or in part with funds obtained from the Federal Government or borrowed on the credit of the Federal Government pursuant to a grant, contract, loan, insurance, or guarantee or understanding pursuant to any federal program involving such grant, contract, loan, insurance, or guarantee, the required contract provisions for Federal-Aid Contracts (FHWA 1273), located in Chapter 44 of the Local Agency Guidelines. The Agency further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in federally assisted construction work: Provided, that if the applicant so participating is a State or Local Government, the above equal opportunity clause is not applicable to any agency, instrumentality, or subdivision of such government which does not participate in work on or under the contract. The Agency also agrees: (1) To assist and cooperate actively with the State in obtaining the compliance of contractors and subcontractors with the equal opportunity clause and rules, regulations, and relevant orders of the Secretary of Labor. (2) To furnish the State such information as it may require for the supervision of such compliance and that it will otherwise assist the State in the discharge of its primary responsibility for securing compliance. (3) To refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, government contracts and federally assisted construction contracts pursuant to the Executive Order. (4) To carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the State, Federal Highway Administration, or the Secretary of Labor pursuant to Part II, subpart D of the Executive Order. In addition, the Agency agrees that if it fails or refuses to comply with these undertakings, the State may take any or all of the following actions: (a) Cancel, terminate, or suspend this agreement in whole or in part; (b) Refrain from extending any further assistance to the Agency under the program with respect to which the failure or refusal occurred until satisfactory assurance of future compliance has been received from the Agency; and (c) Refer the case to the Department of Justice for appropriate legal proceedings. DOT Form 140-039 Page 5 Revised 12/2020 XIII. Liquidated Damages The Agency hereby agrees that the liquidated damages provisions of 23 CFR Part 635, Subpart 127, as supplemented, relative to the amount of Federal participation in the project cost, shall be applicable in the event the contractor fails to complete the contract within the contract time. Failure to include liquidated damages provision will not relieve the Agency from reduction of federal participation in accordance with this paragraph. XIV. Termination for Public Convenience The Secretary of the Washington State Department of Transportation may terminate the contract in whole, or from time to time in part, whenever: (1) The requisite federal funding becomes unavailable through failure of appropriation or otherwise. (2) The contractor is prevented from proceeding with the work as a direct result of an Executive Order of the President with respect to the prosecution of war or in the interest of national defense, or an Executive Order of the President or Governor of the State with respect to the preservation of energy resources. (3) The contractor is prevented from proceeding with the work by reason of a preliminary, special, or permanent restraining order of a court of competent jurisdiction where the issuance of such order is primarily caused by the acts or omissions of persons or agencies other than the contractor. (4) The Secretary is notified by the Federal Highway Administration that the project is inactive. (5) The Secretary determines that such termination is in the best interests of the State. XV. Venue for Claims and/or Causes of Action For the convenience of the parties to this contract, it is agreed that any claims and/or causes of action which the Local Agency has against the State of Washington, growing out of this contract or the project with which it is concerned, shall be brought only in the Superior Court for Thurston County. XVI. Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying The approving authority certifies, to the best of his or her knowledge and belief, that: (1) No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. (2) If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit the Standard Form - LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subgrants, and contracts and subcontracts under grants, subgrants, loans, and cooperative agreements) which exceed $100,000, and that all such subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification as a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. XVII. Assurances Local agencies receiving Federal funding from the USDOT or its operating administrations (i.e., Federal Highway Administration, Federal Transit Administration, Federal Aviation Administration) are required to submit a written policy statement, signed by the Agency Executive and addressed to the State, documenting that all programs, activities, and services will be conducted in compliance with Section 504 and the Americans with Disabilities Act (ADA). Additional Provisions Instructions 1.Agency Name and Billing Address – Enter the Agency of primary interest which will become a party to the agreement. 2.Project Number – Leave blank. This number will be assigned by WSDOT. 3.Agreement Number – Leave blank. This number will be assigned by WSDOT. 4. a.Project Description – Enter the project name, total length of the project (in miles), and a brief description of the termini. Data entered here must be consistent with the name, length, and termini noted in the STIP and Project Prospectus Example: (Name) “Regal Road”, (Length) “1.2 miles”, (Termini) “Smith Road to Main Street” b.Description of Work – Enter a concise statement of the major items of work to be performed. Statement must be consistent with the description of work noted in the STIP and Project Prospectus. Example: “Overlay Regal Road; install curb, gutter, and sidewalk; illumination; and traffic signal at the intersection of Regal Road and Dakota Avenue.” c.Project Agreement End Date – Enter your Project Agreement End Date. This date is based on your projects Period of Performance (2 CFR 200.309). For Planning Only projects – WSDOT recommends agencies estimate the end of the project’s period of performance and add three years to determine the “Project Agreement End Date”. For PE and RW – WSDOT recommends agencies estimate when the phase will be completed and add three years to determine the “Project Agreement End Date”. For Construction – WSDOT recommends agencies estimate when construction will be completed and add three years to determine the “Project Agreement End Date”. d.Proposed Advertisement Date – At construction authorization only, enter the proposed project advertisement date. e.Claiming Indirect Cost Rate – Check the Yes box if the agency will be claiming indirect costs on the project. For those projects claiming indirect costs, supporting documentation that clearly shows the indirect cost rate being utilized must be provided with the local agency agreement. Indirect cost rate approval by your cognizant agency or through your agency’s self-certification and supporting documentation is required to be available for review by FHWA, WSDOT and /or State Auditor. Check the No box if the agency will not be claiming indirect costs on the project. See section 23.5 for additional guidance. 5.Type of Work and Funding (Round all dollar amounts to the nearest whole dollar) a.PE – Lines a through d show Preliminary Engineering costs for the project by type of work (e.g., consultant, agency, state services, etc.). *Federal aid participation ratio for PE – enter ratio for PE lines with amounts in column 3. Line a – Enter the estimated amount of agency work in columns 1 through 3. Line b & c – Identify user, consultant, etc., and enter the estimated amounts in columns 1 through 3. Line d – State Services. Every project must have funding for state services. Enter the estimated amounts in columns 1 through 3. Line e – Total of lines a + b + c + d. b.Right of Way – If a Right of Way phase is authorized on the project, the appropriate costs are shown in lines f through i. *Federal aid participation ratio for RW – enter ratio for RW lines with amounts in column 3. Line f – Enter the estimated amount of agency work in columns 1 through 3. Line g & h – Identify user, consultant, etc., and enter the estimated amounts in columns 1 through 3. Line i – State Services. Every project must have funding for state services. Enter the estimated amounts in columns 1 through 3. Line j – Total of lines f + g + h + i. c.Construction – Lines k through p show construction costs for the project by type of work (e.g., contract, consultant, agency, state services, etc.). *Federal aid participation ratio for CN – enter ratio for CN lines with amounts in column 3. Line k – Enter the estimated cost of the contract. Lines l, m, & n – Enter other estimated costs such as utility and construction contracts or non‑federally matched contract costs. Line o – Enter estimated costs of all construction related agency work. Line p – State Services. Every project must have funding for state services. Enter the estimated amounts in columns 1 through 3. Line q – Total Construction Cost Estimate. Total of lines k + l + m + n + o + p. d.Total Project Cost Estimate Line r – Total Cost Estimate of the Project. Total of lines e + j + q. *Please remember, if the federal aid participation rate entered is not the maximum rate allowed by FHWA, then the participation rate entered becomes the maximum rate allowed. 6.Signatures – An authorized official of the local agency signs the agreement, and writes in their title. Note: Do NOT enter a date on the Date Executed line. 7.Method of Construction Financing – Choose the method of financing for the construction portion of the project. a.Method “A” is used when the state administers the contract for the agency. b.Method “B” is also used when the state administers the contract for the agency. c.Method “C” is used with projects administered by the local agency. The agency will submit billings monthly through the state to FHWA for all eligible costs. The billings must document the payment requests from the contractor. If state-force work, such as audit and construction engineering, is to receive federal participation, it will be billed to the agency and FHWA simultaneously at the indicated ratio. To show continuous progress agencies should bill monthly until agreement is closed. 8.Resolutions/Ordinances – When someone other than the County Executive/Chairman, County Commissioners/Mayor is authorized to sign the agreement, the agency must submit to WSDOT with the agreement a copy of the Resolution/Ordinance designating that individual. 9.Parties to the Agreement – Submit one originally signed agreement form to the Region Local Programs Engineer. It is the responsibility of the local agency to submit an additional, originally signed agreement form if they need an executed agreement for their files. The agreement is first executed by the agency official(s) authorized to enter into the agreement. It is then transmitted to the state for execution by Local Programs. The agreement is dated at the time of final execution by Local Programs. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: 3/24/2021 Sole Source Public Works Agreement with Seton Construction, Inc. for the 2nd Street Stormwater Treatment Project COUNCIL MEETING Date: 4/7/2021 Department: PW & U Presenter: K. Ketterer Phone: (360) 473-5334 SUMMARY: The 2nd Street Stormwater Treatment Project will install a stormwater treatment unit called a continuous defection unit into the existing storm system just upstream of an outfall into Sinclair Inlet. The outfall at 2nd Street, adjacent to the Bremerton Marina and Boardwalk, serves a 16-acre drainage basin that includes a large portion of Bremerton’s downtown. The unit will filter out debris and some oils preventing those contaminants from reaching Sinclair Inlet. This environmental stewardship project meets goals of our stormwater permit and is strongly supported by the Suquamish Tribe. Due to the location of project site and on-going construction at the Marina Square Project the Public Works Director authorized a sole source procurement method for the construction of the project. Additional details regarding the justification of the sole source procurement are attached. Staff negotiated a lump sum cost for the project at $97,153.00. ATTACHMENTS: 1) Public Works Agreement 2) Sole Source FISCAL IMPACTS (Include Budgeted Amount): This project is included in the 2021 Stormwater Capital Fund; the total project budget is $150,000. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to award the sole source public works agreement in the amount of $97,153.00 to Seton Construction for the construction of the 2nd Street Stormwater Treatment Project and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A4 PUBLIC WORKS AGREEMENT – Page 1 of 10 (between City of Bremerton and Seton Construction Inc.) PUBLIC WORKS AGREEMENT THIS AGREEMENT is entered into between the City of Bremerton, a Washington Municipal Corporation (“City”), and Seton Construction Inc. (“Contractor”), whose mailing address is 4640 S Discovery Rd, Port Townsend, WA 98368. The parties agree as follows: 1. CONTRACTOR SERVICES. The Contractor shall perform the following services for the City: Installation of stormwater treatment unit on 2nd Street east of Washington Blvd, including excavation, construction, TESC, backfill, traffic control, restoration, and testing as described in the project plans and specifications. 2. TIME OF COMPLETION. Contractor shall complete the work within 30 calendar days from the date of issuance of the City’s Notice to Proceed. 3. COMPENSATION. The City shall pay the Contractor the total amount of $ 97,153.00. Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this agreement. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City payment shall not constitute a waiver of the City’s right to final inspection and acceptance of the project. A. Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor shall provide the City a performance bond for the full contract amount to be in effect until thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor and Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Retainage. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this agreement; and extra work and materials furnished without the City’s written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion PUBLIC WORKS AGREEMENT – Page 2 of 10 (between City of Bremerton and Seton Construction Inc.) of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. “Additional costs” shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE MAKING OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL PRECLUDE ALL CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. 4. INDEPENDENT CONTRACTOR. Contractor is and shall be at all times acting as an independent contractor and not as an employee of the City. The Contractor shall secure at its expense, and shall be responsible for all payments of income tax, social security, state disability insurance compensation, unemployment compensation, and all other payroll deductions for the Contractor, officer, agents, employees and sub-contractors. The Contractor shall also secure all applicable business licenses, if required, in connection with the contract services, including all required licenses for Contractor's officers, agents, employees and sub- contractors. 5. TERMINATION. The City may terminate this agreement for good cause. “Good cause” shall include, without limitation, any one or more of the following events: A. The Contractor’s refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor’s failure to complete the work within the time specified in this agreement. C. The Contractor’s failure to make full and prompt payment to sub- contractors or for material or labor. D. The Contractor’s persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor’s filing for bankruptcy or becoming adjudged bankrupt. If the City terminates this agreement for good cause, the Contractor shall not receive any further monies due under this agreement until the Contract work is completed. PUBLIC WORKS AGREEMENT – Page 3 of 10 (between City of Bremerton and Seton Construction Inc.) 6. PREVAILING WAGES. Contractor shall file a “Statement of Intent to Pay Prevailing Wages” with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. 7. CHANGES. The City may issue a written work change directive for any change in the Contract work during the performance of this agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the City’s project manager within two (2) business days of the date the Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor’s costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deem s appropriate. The Contractor shall proceed with the change order work upon receiving a written work change directive or change order from the City. If the Contractor fails to require a change order within the time allowed, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided below: A. Procedure and Protest by the Contractor. If the Contractor disagrees with anything required by a work change directive or change order, including any direction, instruction, interpretation, or determination by the City, the Contractor shall: 1. Immediately give a signed written notice of protest to the City; 2. Supplement the written protest within fourteen (14) calendar days with a written statement that provides the following information: a. The date of the Contract’s protest. b. The nature and circumstances that caused the protest. c. The provisions in this agreement that support the protest. d. The estimated dollar cost, if any, of the protested work and how that estimate was determined. e. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. The Contractor shall keep complete records of extra costs and time incurred as a result of the protested work. The City shall have access to any of the Contractor’s records needed for evaluating the protest. PUBLIC WORKS AGREEMENT – Page 4 of 10 (between City of Bremerton and Seton Construction Inc.) 3. The City will evaluate all protests, provided the procedures in this section are followed. If the City determines that a protest is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. B. Contractor’s Duty to Complete Protested Work. In spite of any protest, the Contractor shall proceed promptly with the work as the City has ordered. C. Contractor’s Acceptance of Changes. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts form the City any written order (including directions, instructions, interpretations, and determination). 8. CLAIMS. The Contractor shall give written notice to the City of all claims other than change orders within fourteen (14) calendar days of the occurrence of the events giving rise to the claims. Any claim for damages, additional payment for any reason, or extension of time, whether under this agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this agreement; or, if (and only if) no such provision is applicable, unless that claim is set forth in detail in writing and received by the Cit y within seven (7) calendar days from the date Contractor knew, or should have known, of the facts giving rise to the claim. At a minimum, a Contractor’s written claim must include the information set forth regarding protests in Section 7.A.2.a.-e. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. Contractor must, in any event, file any claim or bring any suit arising from or connected with this agreement within 120 calendar days from the date the contract work is complete. PUBLIC WORKS AGREEMENT – Page 5 of 10 (between City of Bremerton and Seton Construction Inc.) 9. WARRANTY. The Contractor shall correct all defects in workmanship and materials within one year from the date of the City’s acceptance of the Contract work. When defects are corrected, the warranty for that portion of the work shall extend for one year form the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time, the City may complete the corrections and the Contractor shall pay all costs incurre d by the City in order to accomplish the correction. 10. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officer, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits including all legal costs and attorney fees, arising out of or in connection with the performance of this agreement, except for injuries and damages caused by the City’s sole negligence. The City’s inspection or acceptance of any of Contractor’s work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officials, employees, agents and volunteers, the Contractor’s liability hereunder shall be only to the extent of the Contractor’s negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THIS INDEMNIFICATION CONSTITUTES THE CONTRACTOR’S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSE OF THIS INDEMNIFICATION. THE PARTIES ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this agreement. 11. INSURANCE. The Contractor shall procure and maintain for the duration of this agreement insurance of the types and in the amounts described below against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work by the Contractor, its agents, representative, employees, sub-consultants or sub- contractors. Before beginning work on the project described in this agreement, the Contractor shall provide a Certificate of Insurance evidencing: A. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and PUBLIC WORKS AGREEMENT – Page 6 of 10 (between City of Bremerton and Seton Construction Inc.) B. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and $2,000,000 general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU); and C. Excess Liability insurance with limits not less than $1,000,000 per occurrence and aggregate; and B. Workers Compensation insurance as statutorily required by the Industrial Insurance Act of the State of Washington, Title 51, Revised Code of Washington and employer's liability with limits not less than $1,000,000. Any payment of deductible or self-insured retention shall be the sole responsibility of the Contractor. The City, its officials, employees, agents and volunteers shall be named as an additional insured on the insurance policy, as respects work performed by or on behalf of the Contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The Contractor’s insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer’s liability. The Consultant's insurance shall be primary and non-contributory insurance as respects the City and shall contain a waiver of subrogation against the City for claims arising out of any operations, liabilities and obligations to which coverage applies. It shall be an affirmative obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by certified mail, return receipt requested to City of Bremerton, attn: Risk Ma nagement, 345 6th Street, Suite 100, Bremerton, WA 98337 within two days of the cancellation, suspension or substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement. The City reserves the right to receive a certified copy of all the required insurance policies. 12. MISCELLANEOUS. A. Equal Employment Opportunity Statement. In the hiring of employees for the performance of work under this Agreement, the Contractor, its subcontractors, or any person acting on behalf of Contractor shall not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental or sensory disability. PUBLIC WORKS AGREEMENT – Page 7 of 10 (between City of Bremerton and Seton Construction Inc.) B. ADA Statement. The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. C. Compliance with Laws. Contractor shall comply with all federal, state and local laws, rules and regulations throughout every aspect in the performance of this agreement. D. Work Performed at Contractor’s Risk. Contractor shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of this agreement. All work shall be done at Contractor’s own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. E. Nonwaiver of Breach. The failure of the City to insist upon strict performance of any of the terms and rights contained herein, or to exercise any option herein conferred in one or more instances, shall not be constructed to be a waiver or relinquishment of those terms and rights and they shall remain in full force and effect F. Governing Law. This agreement shall be governed and construed in accordance with the laws of the State of Washington. If any dispute arises between the City and Contractor under any of the provisions of this agreement, resolution of that dispute shall be available only through the jurisdiction, venue and rules of the Kitsap County Superior Court, Kitsap County, Washington. G. Attorney’s Fees. To the extent not inconsistent with RCW 39.04.240, in any claim or lawsuit for damages arising from the parties’ performance of this agreement, each party shall be responsible for payment of its own legal costs and attorney’s fees incurred in defending or bringing such claim or lawsuit; however, nothing in this subsection shall limit the City’s right to indemnification under Section 10 of this agreement. H. Written Notice. All communications regarding this agreement shall be sent to the parties at the addresses listed on the signature page of this agreement, unless otherwise notified. Any written notice shall become effective upon delivery, but in any event three (3) calendar days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated on this agreement. I. Assignment. Any assignment of this agreement by the Contractor without the written consent of the City shall be void. J. Modification. No waiver, alteration, or modification of any of the provisions of this agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. PUBLIC WORKS AGREEMENT – Page 8 of 10 (between City of Bremerton and Seton Construction Inc.) K. Severability. If any one or more sections, sub-sections, or sentences of this agreement are held to be unconstitutional or invalid, that decision shall not affect the validity of the remaining portion of this agreement and the remainder shall remain in full force and effect. L. Entire Agreement. The written provisions and terms of this agreement, together with any attached Exhibits, supersede all prior verbal statements by any representative of the City, and those statements shall not be construed as forming a part of or altering in any manner this agreement. This agreement and any attached Exhibits contain the entire agreement between the parties. Should any language in any Exhibit to this agreement conflict with any language contained in this agreement, the terms of this agreement shall prevail. J. Conflict and Precedence. In the event of a conflict between the contract documents, the document which rates higher on the following list shall take precedence: 1. Amendments / Change Orders to Public Works Agreement 2. Public Works Agreement 3. Plans 4. 2020 WSDOT Standard Specifications 5. City of Bremerton Standard Plans N. Documents Incorporated by Reference. The following documents are incorporated by reference, including but not limited to: 1. Plans 2. 2020 WSDOT Standard Specifications 3. City of Bremerton Standard Plans 4. Non-Collusion Affidavit. IN WITNESS WHEREOF, the parties below have executed this agreement. CONTRACTOR THE CITY OF BREMERTON Print Name: Print Name: Title: Title: DATE DATE Notices to be sent to: Notices to be sent to: CONTRACTOR: CITY OF BREMERTON: 345 6th Street, Suite 100 Bremerton, WA 98337 (360) (360) (facsimile) PUBLIC WORKS AGREEMENT – Page 9 of 10 (between City of Bremerton and Seton Construction Inc.) APPROVED AS TO FORM: Roger A. Lubovich Bremerton City Attorney ATTEST: Angela Hoover, City Clerk R:\Legal\Legal\Forms\FORMS ON COBWEB\Public Works Agreement (short form) Rev. 06 2020.DOC PREVAILING WAGES Public Works and Utilities Department 100 Oyster Bay Ave. N. · Bremerton, WA 98312 · (360) 473-5920 · FAX (360) 473-5360  Page 1 Seton Construction Inc. March 15, 2021 DATE: March 15, 2021 TO: Procurement File FROM: Katie Ketterer SUBJECT: Sole Source Determination In accordance with Bremerton Municipal Code 2.76.090, Sole Source Purchases, the purpose of this memorandum is to document the necessity of sole source procurement methodology for the 2nd Street Stormwater Treatment Project. Reasoning (check all supporting options below): ☐ Compatibility to existing City standard or to existing equipment, inventory, systems, data, programs or service. (Attach the business case for the standard and attach a copy of the standard if it is written). ☐ Licensed or patented product with only one dealer. (Include a vendor signed statement/Affidavit explaining why this particular licensed or patented product is the only one suitable for your purpose) ☐ Authorized service provider, repair and/or warranty services. The City requires service or repair support for products or equipment owned by the City, and the vendor is either a factory authorized warranty service provider or that particular vendor is required for warranty services according to the conditions of a current City contract. (Include a vendor signed statement/Affidavit explaining and certifying to the relationship between the vendor and service provider). ☐ Unique design: Requires unique features that are essential aesthetic requirements, or not practical to match to existing design or equipment, such as artwork. Describe. ☐ Special bargain: This might include a surplus item, an auction sale, used equipment, returned “open box” purchase, or other similar one-time bargains. Describe. ☐ Delivery date: Only one supplier can meet required delivery date. Explain why this delivery date is essential. This can only be used in limited circumstances, for delivery deadlines that are the result of an unanticipated situation, and not a circumstance that could have been reasonably anticipated or averted by advance City planning. Public Works and Utilities Department 100 Oyster Bay Ave. N. · Bremerton, WA 98312 · (360) 473-5920 · FAX (360) 473-5360  Page 2 Seton Construction Inc. March 15, 2021 ☐ Project or research continuity: Product, systems, services or data must comply with an ongoing project, research, data, testing or analysis without a compromise in the integrity of the project. Also, this should be a situation that cannot be replicated by another company because there is a legal or physical obstruction to disclosing the project information to allow another company the opportunity to replicate. Examples include situations where a company has legal and/or proprietary rights to customization such as software code, or to data; or testing or data is collected through a unique measuring instrument that cannot be accurately duplicated and offered by another vendor. ☐ Requirement by funding source: Lender, grantor (such as federal government) or other provider of funds requires the specific product, service or system. Attach a copy of the document that clearly shows such a requirement is imposed by the funding source. ☐ Legal monopoly: Only one supplier, such as electricity, water, or sewage. ☐ Trial and evaluation projects: A limited duration, limited scope pilot, trial or evaluation of a product, range of products or services. A trial or evaluation project would typically be part of establishing a standard for a City department, or to pilot a particular product or services for a City need. Describe the pilot, specify the scope of the pilot, and attach information to confirm that the pilot is part of a purposeful department pilot initiative. ☒ Other: Describe why this is the only company that can provide the sole source product or service. Provide the support document that explains why a particular product, manufacturer, or service is necessary and provide support for why the company you requested is the only available company. The construction procurement method for the 2nd Street Stormwater Treatment Project was direct negotiation with a contractor. This procurement method is allowable under RCW 35.22.625, and under BMC 2.76.090 and was approved by the Department Director. RCW 35.22.625 exempts water pollution control facilities from competitive bidding requirements. The RCW was reviewed by the City’s Legal Department for concurrence with this interpretation of the provision. https://apps.leg.wa.gov/rcw/default.aspx?cite=35.22.625 BMC 2.76.090 provides execptions to the City’s bid requirements. The project site on 2nd Street, adjacent to the Marina Square development, presents numerous challenges to obtaining a competitive bid. It is urban, has no lay down yard, and no staging area making it costly for a contractor to conduct work and complete the project. Additionally, the Marina Square construction has further limited access to 2nd Street, and is maintaining a special stormwater collection system that will impact the project work. Seton Construction is currently working on the Marina Square development as a utility subcontractor to general contractor Compass Construction. They have site control, the ability to use laydown Public Works and Utilities Department 100 Oyster Bay Ave. N. · Bremerton, WA 98312 · (360) 473-5920 · FAX (360) 473-5360  Page 3 Seton Construction Inc. March 15, 2021 storage on the Marina Square site, and access to the stormwater collection system. That makes construction efficient and more cost effective for Seton to mobilize for the project and provides opportunity to and leverage the materials and manpower already on site. It also disadvantages other contractors who might bid on the project because they would need to work with/around Compass’ site and schedule. Therefore, the Public Works Director authorized direct negotiation with Seton. Cost/Quote support: $97,153.00 Our staff believes this is a fair and reasonable price. Therefore, it is my determination that it is in the City’s best interests to purchase the 2nd Street Stormwater Treatment project through direct negotiation, pursuant to BMC 2.76.090 and 2.76.010, and that sole source purchase of this public works project is justified for this procurement. Recommended by: ________________________________ Katie Ketterer, Administrative Project Manager Approved by: ________________________________ Tom Knuckey, PW & U Director Thomas Knuckey Digitally signed by Thomas Knuckey Date: 2021.03.15 11:32:48 -07'00' AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Sole Source Professional Services Agreement with Stantec Consulting Services, Inc. for the McDougal Creek/Wheaton Way Culvert Repair Permit Support COUNCIL MEETING Date: April 7, 2021 Department: Engineering Presenter: Gunnar Fridriksson Phone: (360) 473-5758 SUMMARY: McDougal Creek has been classified as a Type F (potential fish habitat) stream by the Washington Department of Fish and Wildlife (WDFW) with the culvert listed as a known obstruction to fish passage. The culvert is required to be replaced with a structure that is fish passable, unless the City can demonstrate a lack of habitat in the downstream section, infeasibility of a restoration, and the difficulties associated with a restoration due to the canyon walls and native materials here. Stantec Consulting Services, Inc. (Stantec) previously assisted the City with an upstream habitat assessment of McDougal Creek and comparison to Anderson Creek in 2018. The City wishes to expand on the 2018 report and provide the additional documentation required by WDFW to allow a long-term repair of the existing culvert and not require the downstream restoration and replacement of the culvert at this time. The contract amount is $94,999.22. ATTACHMENTS: 1. Professional Services Agreement with Exhibit A, B, C and D 2. Memo on Design Consultant Selection 3. Site Plan FISCAL IMPACTS (Include Budgeted Amount): This project is included in the 2021 Stormwater Capital Budget. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☒ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement with Stantec Consulting Services, Inc. for McDougal Creek/Wheaton Way Culvert Repair Permit Support Plan in the amount of $94,999.22 and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A5 City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 PROFESSIONAL SERVICES AGREEMENT McDougal Creek/Wheaton Way Culvert Repair Permit Support The City of Bremerton (“City”) and Stantec Consulting Services, Inc (“Consultant”), referred to collectively as the “Parties,” enter into the following Agreement for professional services: I. Scope: The Consultant agrees to perform the services more specifically described in the Scope of Work, dated March 3, 2021, including any attachments thereto, attached hereto as Exhibit A, which is incorporated by reference herein. The Scope of Work may be modified only pursuant to Section VII.H of this Agreement. If the Scope of Work provides for unspecified additional services such services shall only be performed upon the express written request of the City. Consultant further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. Term: The City and the Consultant agree that work will begin on the tasks described in Exhibit A immediately upon execution of this Agreement. The parties agree that the work described in Exhibit A is to be completed as provided for in the work schedule attached hereto as Exhibit B; provided however, that additional time shall be granted by the City for excusable delays or extra work as provided for in Section IX.A of this agreement. III. Compensation: In consideration of the services provided pursuant to this Agreement, the City shall pay Consultant in an amount not to exceed $94,999.22. Consultant’s charges and bills shall conform to the fee schedule attached hereto as Exhibit C and incorporated herein by this reference. The Consultant shall submit regular billing statements detailing work performed and amount charged on each task or portion thereof. The descriptions shall conform to and fall within the categories set out in the Scope of Work and/or Fee Schedule. Upon receipt of a conforming billing statement, the City shall promptly process payment. PROVIDED, HOWEVER, the City reserves the right to prioritize scoped work and accelerate and/or delay work tasks under the time frame set forth in Section II herein. The Consultant's labor rates and billing fees shall be as delineated in Exhibit C. Consultant shall not perform work beyond the Scope of Work, nor shall be compensated for such work, unless the Scope of Work or amount of compensation is modified pursuant to this Agreement. Consultant shall only be compensated for additional services if requested pursuant to Section I and, if not otherwise provided, such compensation shall be in accordance with Exhibit C. If a billing statement does not conform to this Agreement, the City may withhold payment until the statement is brought into compliance. Such withholding does not relieve Consultant of its obligations under this Agreement. City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 IV. Relationship of Parties: Consultant represents that it is skilled in the matters addressed in the Scope of Work and is performing independent functions and responsibilities within its field of expertise. Consultant and its personnel are independent Consultants and not employees of the City. Consultant and its personnel have no authority to bind the City or to control the City’s employees and other Consultants. None of the benefits provided by the City to its employees, including, but not limited to, compensation, insurance, and unemployment insurance are available from the City to the employees, agents, representatives, or sub-consultants of the Consultant. Consultant will be solely and entirely responsible for its acts and for the acts of Consultant's agents, employees, representatives and sub-consultants during the performance of this Agreement. The City may, during the term of this Agreement, engage other independent Consultants to perform the same or similar work. As an independent Consultant, Consultant is responsible for its own management. The City’s administration and enforcement of this Agreement shall not be deemed an exercise of managerial control over Consultant or its personnel. As an independent Consultant, Consultant is responsible for payment of all taxes and licensing fees necessary to perform its obligations under this Agreement. These taxes and fees include but are not limited to State industrial insurance, Business & Occupation, State professional licensing, and City business licensing. If any taxes or fees due the City have been declared delinquent, the City may withhold the delinquent amount, plus any additional charges arising from the delinquency, from any payments due Consultant. V. Indemnification: A. Consultant shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the performance of this Agreement except for that portion of the injuries and damages caused by the City’s sole negligence, unless Consultant is conducting work pursuant to Subsection B below. The City's review or acceptance of any of the work when completed shall not be grounds to avoid any of these covenants of indemnification. B. Architects, Engineers and Any Other Professional Listed In and Performing Services Defined in RCW 4.24.115. Should a court of competent jurisdiction determine that Consultant’s services provided pursuant to this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, agents and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONSULTANT'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. VI. Insurance: The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, employees, sub-consultants or sub-contractors. Before beginning work on the project described in this Agreement, the Consultant shall provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and 3. Excess Liability insurance with limits not less than $1,000,000 limit per occurrence and aggregate; and 4. Professional Liability insurance with limits no less than $1,000,000 limit per occurrence/claim; and 5. Workers Compensation insurance as statutorily required by the Industrial Insurance Act of the State of Washington, Title 51, Revised Code of Washington and employer's liability with limits not less than $1,000,000. Any payment of deductible or self-insured retention shall be the sole responsibility of the Consultant. All required policies shall be provided on an “occurrence” basis except professional liability insurance (if required), which may be provided on a “claims-made” basis. The City shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of the Consultant and a copy of an endorsement that is acceptable to the City, which names the City as an additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all the required insurance policies and endorsements. The City further reserves the right to reject any unacceptable policies and/or endorsements. The Consultant's Commercial General Liability insurance shall contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 The Consultant's insurance shall be primary and non-contributory insurance as respects the City and shall contain a waiver of subrogation against the City for claims arising out of any operations, liabilities and obligations to which coverage applies. It shall be an affirmative obligation upon Consultant to advise the City’s Risk Manager by fax at (360) 473-5161, or by certified mail, return receipt requested to City of Bremerton, Attn: Risk Management, 345 6th Street, Suite 100, Bremerton, WA 98337 within two days of the cancellation, suspension or substantive change of any insurance policy set out herein, and failure to do so shall be construed to be a breach of this Agreement. The City also reserves its unqualified right to require at any time and for any reason, proof of coverage in the form of a duplicate of the insurance policy with all endorsements as evidence of coverage. In the event that the Consultant employs other consultants or contractors (sub-consultants or sub-contractors) as part of the work covered by this Agreement, it shall be the Consultant’s responsibility to require and confirm that each sub-consultant or sub-contractor meets the minimum insurance requirements specified above. The Consultant shall, upon demand of the City, deliver to the City copies of such policy or policies of insurance and the receipts for payment of premiums thereon. VII. General Conditions: A. Reports and Information: When requested by the City, Consultant shall furnish periodic reports and documents on matters covered by this Agreement. The reports and documents shall be furnished in the time and form requested. Consultant shall maintain accounting records in accordance with Generally Accepted Accounting Principles (“GAAP”) to substantiate all billed amounts. B. Ownership and Use of Records and Documents: Original documents, drawings, designs and reports, including those in electronic format, developed under this Agreement are the property of the City. All written information submitted by the City to the Consultant in connection with the services performed by the Consultant under this Agreement will be safeguarded by the Consultant to at least the same extent as the Consultant safeguards like information relating to its own business. If such information is publicly available or is already in Consultant's possession or known to it, or is rightfully obtained by the Consultant from third parties, Consultant shall bear no responsibility for its disclosure, inadvertent or otherwise. All data, documents and files created by Consultant under this Agreement may be stored at Consultant's office in Bellevue, Washington. Consultant shall make such data, documents, and files available to the City upon its request at all reasonable times for the purpose of editing, modifying and updating as necessary until such time as the City is capable of storing such information in the City's offices. Duplicate copies of this information shall be provided to the City upon its request, and at reasonable cost. All documents, including all reports, drawings, specifications, computer software or other items prepared or furnished by Consultant pursuant to this Agreement, are instruments of service City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 with respect to the project and are the property of the City. Any reuse by the City for other than the specific purpose intended will be at City’s sole risk. C. Use of Photographs and Images. Consultant shall not use or distribute photographs or images depicting City officials, personnel, property, or equipment whether prepared by Consultant or provided by City without prior written consent of the City. The City will not unreasonably withhold its consent. D. Work Performed at Consultant's Risk: Consultant shall take all precautions necessary and shall be responsible for the safety of its employees, agents, and sub-consultants in the performance of the work hereunder and shall utilize all protection necessary for that purpose. All work shall be done at Consultant's own risk, and Consultant shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. E. Place of Work: The Consultant shall perform the work authorized under this Agreement at its offices in Bellevue, Washington. Meetings with the City staff as described in Exhibit A, Scope of Work, shall take place at the City's offices, or at locations mutually agreed upon by the parties. F. Entire Agreement: This Agreement and its Exhibits constitutes the entire agreement between the Parties, and the Parties acknowledge that there are no other agreements, written or oral, that have not been set forth in the text of this Agreement. G. Severability: Should any part of this Agreement be found void, the balance of the Agreement shall remain in full force and effect. H. Modification: This Agreement may only be modified by written instrument signed by both Parties. I. Written Notices: All communications regarding this Agreement shall be sent to the parties at the addresses listed below by registered or 1st class mail, or by personal service, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. Notices to be sent to: Notices to be sent to: CITY: CONSULTANT: Attn: Gunnar Fridriksson Attn: Dan Eggers City of Bremerton Stantec 345 6th Street, Suite 100 1687 114th Avenue SE Suite 100 Bremerton, WA 98337-1891 Bellevue WA 98004-6964 J. Waiver: Failure to enforce any provision of this Agreement shall not be deemed a waiver of that provision. Waiver of any right or power arising out of this Agreement shall not be deemed waiver of any other right or power. City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 K. Non-Waiver of Breach: The failure of the City to insist upon strict performance of any of the covenants and agreements contained herein, or to exercise any option herein conferred in one or more instances shall not be construed to be a waiver or relinquishment of said covenants, agreements or options, and the same shall be and remain in full force and effect. L. Compliance with Laws: Consultant shall comply with all applicable Federal, State, and local laws in performing its obligations under this Agreement. M. Choice of Law and Venue: This Agreement shall be interpreted according to the laws of the State of Washington. Any judicial action to resolve disputes arising out of this Agreement shall be brought in Kitsap County Superior Court. N. Attorneys’ Fees: In the event of litigation to enforce any of the terms or provisions herein, each party shall pay all its own costs and attorney’s fees. O. Assignment: Any assignment of this agreement by the Contractor without the written consent of the City shall be void. VIII. Equal Employment Opportunity Statement: In the hiring of employees for the performance of work under this Agreement, the Consultant, its subcontractors, or any person acting on behalf of Consultant shall not discriminate in any employment practice on the basis of age (40+), sex, race, creed, color, national origin, sexual orientation/gender identity, marital status, military status, or the presence of any physical, mental or sensory disability. IX. ADA Statement: The City of Bremerton does not discriminate on the basis of disability in programs and activities, which it operates pursuant to the requirements of the Americans with Disabilities Act of 1990, and ADA Amendments Act. This policy extends to both employment and admission to participation in the programs, services and activities of the City of Bremerton. Reasonable accommodation for employees or applicants for employment will be provided. X. Termination: This Agreement shall remain in force until completion and acceptance of the services, terminated by written instrument upon mutual consent, or by the City of Bremerton for convenience. This Agreement may be immediately terminated for cause by a Party if the other Party substantially fails to perform through no fault of the terminating Party, and the non- performing Party does not commence correction of the failure of performance within thirty (30) days of the terminating Party’s sending notice to the non-performing Party. Any Notice by Consultant shall include a report showing the status of all items listed in the Scope of Work current through the termination date. If the City receives reimbursement by any federal, state, or other source for work described in Section I herein, and that funding is withdrawn, reduced or limited in any way, or the project is cancelled or substantially reduced after the execution date of this Agreement and prior to the completion of the work, the City may summarily terminate this Agreement. City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 A. Excusable Delays: The right of Consultant to proceed shall not be terminated nor shall Consultant be charged with liquidated damages for any delays in the completion of the work due to: 1) any acts of the federal government in controlling, restricting, or requisitioning materials, equipment, tools, or labor by reason of war, national defense, or other national emergency; 2) any acts of the City, its consultants, or other public agencies causing such delay; and 3) causes not reasonably foreseeable by the parties at the time of the execution of the Agreement that are beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God, fires, floods, strikes, or weather of unusual severity. PROVIDED, HOWEVER, that the Consultant must promptly notify the City within ten (10) calendar days in writing of the cause of the delay. If, on the basis of the facts and the terms of this Agreement, the delay is properly excusable, the City shall, in writing, extend the time for completing the work for a period of time commensurate with the period of excusable delay. B. Rights Upon Termination: In the event of termination, the City shall pay for all services performed by the Consultant to the effective date of termination, as described on a final invoice submitted to the City. After termination, the City may take possession of all records and data within the Consultant's possession pertaining to this project which may be used by the City without restriction. Any such use not related to the project which Consultant was contracted to perform shall be without liability or legal exposure to the Consultant. XI. Suspension & Debarment. For contracts involving Federal funding, Consultant hereby certifies, by signing this agreement, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. Consultant shall provide immediate written notice to the City if at any time it learns that it is or has become ineligible for certification. Should Consultant enter into a covered transaction with another firm, Consultant agrees by signing this agreement that it will verify that the firm with whom it intends to do business is not debarred, suspended, ineligible, excluded or disqualified. IN WITNESS WHEREOF, the parties below have executed this Agreement. CITY : CONSULTANT: CITY OF BREMERTON STANTEC CONSULTING SERVICES, INC. By: By: ______________________________ Print Name: Print Name: Its: Its: ______________________________ Date: Date: ______________________________ APPROVED AS TO FORM: ATTEST: By: By: ______________________________ Roger A. Lubovich, Bremerton City Attorney Angela Hoover, City Clerk City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 1 of 8 Exhibit A - SCOPE OF WORK McDougal Creek/Wheaton Way Culvert Repair Permit Support The City of Bremerton (City) has a failing stormwater culvert on McDougal Creek which runs under Lower Wheaton Way at Schley Canyon, a designated fish stream. Stantec Consulting Services, Inc. (Stantec) previously assisted the City with an upstream habitat assessment of McDougal Creek and comparison to Anderson Creek in 2018. The City wishes to update and build on this previous work to better understand the effectiveness of making this stream reach fish passable with the culvert repairs. This additional work includes: • Understanding the stability of the existing roadway and embankment • Understanding the quality of the existing fish habitat downstream from the culvert crossing • The feasibility of restoring the downstream channel to promote fish passage to the culvert location. • Utilizing this feasibility in determining the best repair options for the culvert • The capacity of the culvert post-repair and its impacts on water surface elevations Representatives from Stantec, City, Washington Department of Fish and Wildlife (WDFW), and Shannon And Wilson met on site January 14, 2021 to review the site, discuss the project, research multiple options and coordinate the scope of work development with city staff. The goal of this work effort is to revise the 2018 report to provide additional planning level information to the City that evaluates the fish habitat of McDougal Creek and to assess the hydraulics of a repaired culvert condition. Task 1 – Project Management Project management tasks will include work planning, meetings and communicating with the City and Stantec’s subconsultant, Shannon and Wilson, and project QA/QC process. This task also includes routine correspondence, billing, and incidental costs unassociated with other tasks. Assumptions 1. Stantec’s Sub Consultant mark-up of 10% is covered under this task to account for Stantec-Sub Consultant communications, coordination of work, invoicing, and QA/QC procedures. Deliverables 1. Monthly Invoices 2. Meeting minutes for meetings or conference calls where minutes are deemed necessary, jointly, by the City and Stantec. City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 2 of 8 Cost – Time and Materials not to exceed $8,332 Task 2 – Field Assessment and Data Collection Stantec will complete a habitat assessment of the stream segment downstream of the Wheaton Way culvert at McDougal Creek in Schley Canyon. Habitat assessment methodology will be the same for the entire reach and will match the methodology previously used for portions of Anderson and McDougal Creeks by Stantec staff in the “Comparative Habitat Assessments of Anderson and McDougal Creeks” (Stantec 2018). The habitat assessment will utilize established regional protocols to collect basic measurements of stream habitat structure and conditions with the three stream segments. Initial desktop analysis of the stream segments will be conducted to establish preliminary stream reaches, based on topography and stream features. An inventory of stream habitat types (riffle, pool, side channels, cascades, etc.) will quantified within each of the three stream segments, along with bankfull widths, quantities of Large Wood Debris (LWD), streamflow measurements for discharge estimation, and Wolman pebble counts to estimate substrate compositions. Field efforts will be photographed and geo-referenced, data recorded (digitally if possible), and information obtained added to a GIS map depicting location, observations, and associated relevant information. Stantec will update the previously generated habitat assessment report (Stantec 2018) to include the assessment of the reach of McDougal Creek through Schley Canyon, downstream of Wheaton Way. Assumptions 2. City will obtain any required permissions for land access to avoid trespassing. 3. Stantec biologists will conduct stream assessments over a two-day period. 4. GIS documents and technical memorandum will be delivered electronically for review, and hardcopy Deliverables 3. GIS Map with overlays as described above 4. Update of 2018 Stantec Habitat Assessment Report presenting the field effort and data collected Exclusions 1. Professional land survey – this effort is for planning purposes only and not to generate construction drawings for culvert repair. Professional land survey may be necessary at a later phase of the project. Schedule – task will be completed within 45 calendar days of receipt of notice to proceed and associated City documents (and electronic files). Cost— Time and Materials not to exceed $9,123 City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 3 of 8 Task 3 – Hydraulic Analysis of Existing and Repaired Culvert Condition Stantec will analyze the hydraulics of the existing culvert and one (1) repaired culvert condition. The repair will consist of a slip-lining the existing culvert in the same location as the existing culvert. The diameter of the slip-lined repair is assumed to be approximately 30 inches, however, the diameter of the slip-lined repair will be determined during the final design process for the slip-lining. This evaluation will consist of the following work elements: Task 3.1 - Hydrologic Analysis: Peak flows will be computed for flows ranging from the 50 to 0.2 percent annual chance exceedance events. The analysis will build upon previous hydrologic analyses performed by or for the City. The analysis will be refined by incorporating the effects of stormwater infrastructure on drainage basin area draining to the location of the culvert crossing. Task 3.2 - Hydraulic Analysis: Culvert hydraulics will be computed using a steady-state, one-dimensional, HEC-RAS model of the culvert and McDougal Creek in the vicinity of the crossing. Peak flows developed in Task 3.1 will be simulated in the hydraulics model. Assumptions 1. The City will provide stormwater infrastructure features as a GIS layer. 2. The City will provide any previously developed hydraulic models or analyses. These are assumed to be the models and analyses documented in the Schley Canyon Feasibility Evaluation (Cardno 2016). 3. The City will provide all readily available survey and topographic data in the vicinity of the project that will be used to develop and/or refine the hydraulic model. 4. GIS data and technical memorandum will be delivered electronically for review, and final Deliverables 1. Drainage Basin GIS files 2. HEC-RAS files of the two (2) modeled culvert scenarios. 3. Technical Memorandum summarizing the results of the hydrologic and hydraulic analyses, particularly noting the simulated water surface elevations of the various percent-annual-chance exceedance flows at the upstream Wheaton Way roadway fill. Exclusions Schedule – the final technical memorandum will be provided to the City within 75 days of notice to proceed. Cost – Time and Materials not to exceed $8,228 City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 4 of 8 Task 4 – Assessment of Feasibility of Downstream Channel Restoration Stantec will investigate the feasibility of restoring the McDougal Creek channel downstream of the Wheaton Way culvert to promote fish passage to the culvert location. The investigation will use the results and conclusions of the habitat assessment performed in Task 2, the hydraulic conditions simulated in Task 3, and the geotechnical investigations performed by Shannon and Wilson for the City. In conjunction with City staff, and Shannon and Wilson, Stantec will consider up to three (3) restoration methodologies/techniques from which to develop one (1) conceptual scenario for downstream channel restoration that has the goal of promoting fish passage up Schley Canyon to the culvert location. Stantec will research restoration methodologies/techniques applicable to the Schley Canyon setting and present up to three (3) to the City for consideration to be used to develop the one (1) channel restoration concept. The investigation will examine the feasibility of the conceptual restoration by considering site opportunities, constraints, and risks. The investigation will be documented in a report that incorporates the technical memoranda developed in Tasks 2 and 3. Assumptions 1. The feasibility assessment will incorporate the findings of Sub Consultant’s Task 2: Geotechnical Slope Evaluation. (Sub Consultant Scope of Services attached as Exhibit D). 2. Channel restoration methodologies/techniques will be informally presented to City staff in a meeting; no technical memoranda or detailed documentation of the potential techniques shall be developed beyond a summary of the techniques/methodologies that were investigated and the reasoning for advancing the one (1) restoration concept. 3. The City will choose one (1) restoration methodology/technique to advance for use in the development of one (1) restoration concept. 4. A study report will be delivered electronically for review, and final. Deliverables 1. Study report summarizing the results of Tasks 2 - 4. Exclusions Schedule – the final study report will be provided to the City within 90 days of notice to proceed. Cost – Time and Materials not to exceed $17,616 Task 5 – Management Reserve Fund (MRF) The City may desire to establish a MRF to provide the Agreement Administrator with the flexibility to authorize additional funds to the Agreement for allowable unforeseen costs, or reimbursing the Consultant for additional work beyond that already defined in this SOW. Such authorization(s) shall be in writing and shall not exceed $4,270. This fund may not be City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 5 of 8 replenished. Any changes requiring additional costs in excess of the MRF shall be made in accordance with the Agreement. Conclusion Stantec’s total proposed budget for this work is not to exceed $43,300. Our proposed schedule is to complete the work effort and produce the described documents within 90 days from notice to proceed. The total proposed budget for this work (including Sub Consultant tasks, but exclusive of Optional Tasks) is not to exceed $90,729. This work scope is subject to the terms and conditions of the attached Professional Services Agreement between the City of Bremerton and Stantec Consulting Services Inc. Exhibit B - Work Schedule Description Timeline Task 1 Project Management Beginning to Closeout Task 2 Field Assessment and Data Collection 45 days Task 3 Hydraulic Analysis of Existing and Repaired Culvert Condition 75 days Task 4 Assessment of Feasibility of Downstream Channel Restoration 90 days Task 5 Management Reserve Fund (MRF) Beginning to Closeout Total Final Study Report 90 days City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 6 of 8 Exhibit C – Estimated Fee Task 1 Project Management Role Hours x Rate = Junior Engineer/EIT 12 131.24$ Field Technician/Biologist - 110.90$ Field Technician/Scientist - 121.64$ Senior Hydraulic Engineer 8 251.79$ Senior Technical Advisor - 263.70$ Total Hours Total Labor Direct Non-Salary Cost Miscellaneous Costs Task 2 Field Assessment and Data Collection Role Hours x Rate = Junior Engineer/EIT - 131.24$ Field Technician/Biologist 32 110.90$ Field Technician/Scientist 26 121.64$ Senior Hydraulic Engineer 4 251.79$ Senior Technical Advisor 4 263.70$ Total Hours Total Labor Direct Non-Salary Cost Mileage 648 miles at $0.54 per mile Miscellaneous Costs Task 3 Hydraulic Analysis of Existing and Repaired Culvert Condition Role Hours x Rate = Junior Engineer/EIT 32 131.24$ Field Technician/Biologist - 110.90$ Field Technician/Scientist - 121.64$ Senior Hydraulic Engineer 16 251.79$ Senior Technical Advisor - 263.70$ Total Hours Total Labor Direct Non-Salary Cost Mileage 0 miles at $0.54 per mile Miscellaneous Costs Estimate of Probable Cost McDougal Creek/Wheaton Way Culvert Repair Permit Support Estimated Cost $1,574.88 $0.00 $0.00 $2,014.32 $0.00 $3,589.20 $0.00 $0.00 $0.00 $0.00 $3,589.20 Total Non-Salary Cost Total Estimate of Task 1 Cost Estimated Cost $0.00 $3,548.80 $3,162.64 $1,007.16 $1,054.80 $8,773.40 Total Non-Salary Cost $0.00 $349.92 Estimated Cost $4,199.68 $0.00 $0.00 $4,028.64 $0.00 Total Non-Salary Cost $349.92 Total Estimate of Task 2 Cost $9,123.32 $0.00 $8,228.32 $0.00 $0.00 $0.00 Total Estimate of Task 3 Cost $8,228.32 City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 7 of 8 Task 4 Assessment of Feasibility of Downstream Channel Restoration Role Hours x Rate = Junior Engineer/EIT 48 131.24$ Field Technician/Biologist - 110.90$ Field Technician/Scientist - 121.64$ Senior Hydraulic Engineer 24 251.79$ Senior Technical Advisor 20 263.70$ Total Hours Total Labor Direct Non-Salary Cost Mileage 0 miles at $0.54 per mile Miscellaneous Costs Task 5 Management Reserve Fund (MRF) Role Hours x Rate = Junior Engineer/EIT 131.24$ Field Technician/Biologist 110.90$ Field Technician/Scientist 121.64$ Senior Hydraulic Engineer 251.79$ Senior Technical Advisor 263.70$ Total Hours Total Labor Direct Non-Salary Cost Mileage 0 miles at $0.54 per mile Miscellaneous Costs Total Estimate of Task 5 Cost $4,270.00 $47,429.00 $4,742.90 Estimate of Cost for All Non-Optional Sub Consultant Tasks Consultant mark-up of Cost Sub Consultant Non-Optional tasks (10 percent) $0.00 $0.00 $4,270.00 Total Non-Salary Cost $4,270.00 $0.00 Estimated Cost $6,299.52 $0.00 $0.00 $6,042.96 $5,274.00 $17,616.48 $0.00 $0.00 Total Estimate of Cost for All Non-Optional Sub Consultant Tasks $52,171.90 Total Estimate of Cost for All Non-Optional Consultant and Sub Consultant Tasks $94,999.22 Total Non-Salary Cost $0.00 Total Estimate of Task 4 Cost $17,616.48 Total Estimate of Cost for All Consultant Tasks $42,827.32 Estimated Cost $0.00 $0.00 $0.00 $0.00 $0.00 City of Bremerton/Stantec Consulting Services Inc. McDougal Creek/Wheaton Way Culvert Repair Permit Support Rev 02-22 Page 8 of 8 Exhibit D – Shannon and Wilson Scope of Services, Estimated Fee, and Schedule 400 North 34th Street  Suite 100  PO Box 300303  Seattle, Washington 98103-8636  206 632-8020  Fax 206 695-6777  www.shannonwilson.com  February 19, 2021 Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities 100 Oyster Bay Avenue N Bremerton, WA 98312 RE: PROPOSAL FOR GEOTECHNICAL EVALUATION AND MONITORING OF SCHLEY CANYON CULVERT, BREMERTON, WASHINGTON Dear Mr. Fridriksson: We are pleased to submit this proposal to provide geotechnical engineering and monitoring services for the Schley Canyon Culvert in Bremerton, Washington. This letter presents our project understanding, proposed scope of services, and estimated fee for our geotechnical services. Our proposed scope of services is based on conversations with you and a site visit on January 14, 2021. PROJECT UNDERSTANDING The Schley Canyon Culvert is in the City of Bremerton (City) where McDougal Creek crosses under Wheaton Way through a 3-foot-diameter concrete culvert. McDougal Creek flows from north to south is approximately 3,100 feet in length from the Port Washington Narrows north to the headwaters. The culvert at Wheaton Way is a total barrier to fish passage, located approximately 840-feet upstream of the Port Washington Narrows juncture. An in-depth analysis of the upstream habitat and creek from Wheaton Way north is included in a study completed for the City by Stantec, Inc. in December of 2018. The creek flows through an incised canyon, with mostly vertical sandy walls, and is mapped as a high landslide and erosion geologic critical area. McDougal Creel was classified a Type F (potential fish habitat) stream, as defined by Washington Administrative Code (WAC) 222-16-031 and Bremerton Municipal Code (BMC) 20.14.720, by WDFW in 2014. The culvert was installed in 1926 by Kitsap County and is buried about 30 to 40 feet below Wheaton Way in a sloped embankment. Erosion of the steep canyon led to a culvert failure in 2010, sweeping a portion of the road and several sections of the pipe downstream. In 2010, gabion baskets were used to stabilize the roadway embankment and the culvert outlet was repaired and extended with high-density polyethylene pipe. We understand the concrete culvert is damaged; the bottom of the culvert is gone and water appears to flow through the roadway embankment as well as the culvert. The gabion baskets below the Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 2 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P culvert outlet are rotating outward and bulging. The City is concerned that water flow through the embankment could be causing voids to develop in the road embankment and creating the potential for sinkholes to occur in the roadway and embankment instability. In 2016, Shannon & Wilson teamed with Cardno to assist the City with a feasibility evaluation for culvert repair and habitat restoration. We provided conceptual alternatives for culvert replacement, which are included in Cardno’s Culvert Repair & Fish Habitat Improvement at Wheaton Way Stream Crossing report dated March 24, 2016. We understand Stantec is updating their 2018 report to evaluate creek restoration to allow fish passage and provide recommendations for culvert replacement. We understand the culvert will likely be repaired in the summer of 2021 with a liner and void grouting to address immediate safety concerns. After the culvert is lined, the City will likely repair/stabilize the embankment. The City may also regrade the channel at the culvert outlet. The City requested that we evaluate the stability of the existing embankment and the proposed alternatives for repairing the embankment. The City also request alternatives for monitoring the road for damage and the slope for movement. The following sections describe our proposed scope of services. SCOPE OF SERVICES We based our scope of services on conversations with you, Chance Berthiaume, and Dan Eggers (Stantec). We included optional tasks that can be authorized if the City decides to move forward with those items. Our scope of services will include the following tasks: Task 1 – Project Management and Meetings Task 2 – Geotechnical Slope Evaluation Task 3 – Geotechnical Explorations and Void Evaluation (Optional) Task 4 – Slope Movement Monitoring (Optional) Task 5 – Pavement Monitoring (Optional) Task 6 – Plans and Specification Review Task 7 – Engineering Support During Bidding and Construction (Optional) Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 3 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P Task 1 - Project Management and Meetings Project management tasks will involve planning the work, communicating with the City and its project consultant, Stantec, and executing the project. We will coordinate with the City and Stantec as needed throughout the project. We anticipate we will participate in four 1-hour, virtual meetings. Deliverables:  Monthly Invoices. Assumptions:  The slope stability evaluation will be completed in August 2021 and optional tasks will not be authorized. Task 2 - Geotechnical Slope Evaluation This task includes performing geotechnical engineering analyses to evaluate the stability of the existing embankment, evaluate options to stabilize the existing embankment, and to evaluate the erodibility/stability of the downstream canyon sidewalls. Our analyses will be based on available existing information. Our scope of services for this task includes:  Visit the site to assess the condition of the existing slope and gabions and observe the condition of and the materials exposed in the canyon sidewalls.  Review available existing information including previous reports, as-built drawings, and geologic maps.  Determine the Site Class for seismic design and select the appropriate the design spectral acceleration parameters in accordance with the American Association of State Highway and Transportation Officials Specifications for Road and Bridge.  Perform preliminary global stability analyses to evaluate the stability of the existing embankment. We will perform 3 dimensional (3D) coupled seepage and slope stability analyses and perform a parametric study to evaluate the location where water is flowing and potential for void development. We will evaluate static and seismic conditions.  Develop and evaluate three conceptual alternatives to stabilize the embankment. After evaluating the conceptual alternatives, we will meet with the City and Stantec to discuss the alternatives and select an option to move forward to final design. We will provide final design recommendations for the preferred alternative in our report.  Qualitatively evaluate the potential for slope instability of the canyon sidewalls due to erosion. Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 4 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P  Provide a draft Geotechnical Engineering Report (GER) summarizing our observations, analyses, and recommendations. After receiving comments from the City and other reviewing agencies, we will address those comments and submit a final GER. Deliverables:  Draft and Final GER. Assumptions:  Two people from Shannon & Wilson will attend the site visit.  Our analyses will be based on available existing information gathered from the site reconnaissance, previous reports, as-built drawings, and geologic maps.  Stantec will provide a topographic survey of the embankment.  We will provide our deliverables in electronic PDF format only. Task 3 – Geotechnical Explorations and Void Evaluation (Optional) To evaluate the subsurface conditions and the location and extent of the voids within the embankment, we will drill exploratory borings and perform cross-hole seismic tomography. Cross-hole seismic tomography is a geophysical method that measures the travel time of seismic waves between an external source and a series of geophones placed in the boreholes. The cross-hole seismic surveys will be performed between borings to develop a profile between borings, which will identify anomalous velocity zones between boreholes and imaging of individual velocity layers. This information can be utilized to evaluate the presence of voids. Our scope of services for Task 3 includes the following:  Prior to conducting the field explorations, we will prepare a Geotechnical Exploration Plan (GEP) and submit it to the City for review and approval. The GEP will detail the type, location, and extent of proposed field explorations along with logistics necessary to perform the work such as traffic control plans and staging areas. The work plans will be used for utility locating clearances and for permitting that may be necessary to access the exploration locations and to perform the work.  We will mark the proposed boring locations and arrange for utility locates using the Utility Notification Center. Prior to drilling, we will visit the site to confirm the planned exploration locations are clear of utilities.  We will drill four borings using sonic drilling methods. One boring will be located on each side of the culvert on the north and south sides of the road. The borings will extend a minimum of 20 feet below the bottom of the culvert. We assume this will be 60 feet below ground surface (bgs) on the inlet side of the culvert and 65 feet bgs on the outlet side of the culvert. The borings will be capped with 8-inch-diameter flush- Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 5 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P mounted, steel monuments. The borings on the south side of the road will be drilled in the sidewalk. We will attempt to drill the borings on the north side of the road in the sidewalk; however, due to overhead power lines, the borings may have to be drilled in the road.  We will install a 4-inch-outside-diameter polyvinyl chloride (PVC) casing in each boring, which will be used to perform the cross-hole seismic tomography and can be used in the future for void grouting. If voids are encountered during drilling, the casing will be secured in place with bentonite chips, sand, or pea gravel, depending on the amount and size of the voids encountered during drilling.  We will install a vibrating wire piezometer (VWP) in one of the borings to monitor groundwater levels. The VWP will be connected to a datalogger and set to record data every six hours. We will return to the site twice to collect the datalogger and download groundwater level measurements.  We will return the soil cores, collected from the sonic core drilling effort, to our warehouse where we will review the field soil classification, prepare summary boring logs, and select samples for geotechnical laboratory testing.  We will perform as many as 40 moisture contents and 8 grain-size analyses on samples collected from the soil core.  We will subcontract Global Geophysics, LLC to perform cross-hole seismic tomography.  We will prepare a Geotechnical Data Report (GDR) summarizing the field explorations and testing, boring logs, laboratory test results, and the cross-hole seismic tomography. The GDR can be included with the construction contract bid documents. Deliverables:  Draft and Final GEP.  Draft and Final GDR. Assumptions:  The subsurface exploration spoils will be non-hazardous. Analysis, testing, storage, and handling of potentially contaminated soil and groundwater (either sampled or spoils from drilling) are beyond this scope of services. If contaminated soils and/or groundwater are encountered, the material will be properly contained on-site for disposal as mutually agreed upon without additional cost to Shannon & Wilson.  All field work will be completed between the hours of 9:00 a.m. and 3:00 p.m., Monday through Friday.  The drilling will be completed in eight days.  The seismic cross-hole tomography will be completed in two days. Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 6 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P  Drilling and cross-hole seismic tomography will require closing one lane of traffic. The traffic control subcontract is included in this scope of services.  No street use permits will be required.  The drill rig and support truck can be staged at the City’s Engineering offices at 3027 Olympus Drive overnight, i.e., it does not need to be mobilized to the site each day.  The installed VWP will be abandoned by the Contractor during culvert repair construction.  Prevailing wage is not required for the subcontractors.  We will dispose of the soil core after the final GDR is submitted. Shannon & Wilson can store the soil core beyond that date for an additional fee.  We will provide our deliverables in electronic PDF format only. Task 4 – Slope Movement Monitoring (Optional) An in-place-inclinometer (IPI) could be installed to monitor slope movement. The IPI would be installed in a 2.75-inch-diameter PVC casing and connect to an automated data acquisition system (ADAS), which would transmit data remotely to Shannon & Wilson. The IPI would be installed in a 75-foot-deep boring on the south side of the road. The ADAS will require an enclosure and power source (solar panel and battery). The cable from the IPI in the hole would need to be routed to the ADAS. The details of where the datalogger will be mounted and the best way to route the cables to the datalogger will be determined during a site visit and based on discussions with the City. For planning purposes, we assume the ADAS enclosure and power source can be mounted on the fence or a nearby light pole. Deliverables:  IPI installation information will be included in the GDR.  Interim monitoring data via email.  Final monitoring summary letter. Assumptions:  The slope movement monitoring will be performed from March through August 2021.  Shannon & Wilson will remove the IPI and ADAS system when monitoring is complete.  The boring for the IPI will be drilled at the same time as the explorations in Task 3. The IPI installation plan will be included with the GEP as part of Task 3. A separate drill rig mobilization will not be required. Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 7 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P  The boring for the IPI will be completed in two days.  The IPI and ADAS installation will be completed in one day, after the explorations are complete. Task 5 – Pavement Monitoring (Optional) We understand there is currently no observable distress at the pavement surface; however, the City is concerned that sink holes could occur. To regularly observe the pavement surface for cracking and signs of distress, we will set up a high definition camera mounted to a light pole or other post at the site. The camera would be set to take photographs of the pavement four times daily. The photos would be sent to the City and Shannon & Wilson remotely via cellular service. Shannon & Wilson will prepare a monitoring plan describing the installation location and details for approval by the City. After the plan has been approved by the City, we will install the camera and connect it to cellular service. We will set up and test the system to confirm it is working properly. Deliverables:  Draft and Final installation plan.  Letter documenting the installation and components installed. Assumptions:  The pavement monitoring will be performed from February through August 2021.  Shannon & Wilson will remove the system when monitoring is complete.  The City will be responsible for reviewing the photographs for signs of pavement distress. Task 6 – Plans and Specification Review Shannon & Wilson will review geotechnical aspects of the proposed repair plans and specifications to confirm that our recommendations have been properly incorporated into the project documents. Task 7 – Engineering Support During Bidding and Construction (Optional) Shannon & Wilson assist the City during bidding and construction by responding to questions from prospective contractors, reviewing contractor submittals, and responding to Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 8 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P contractor requests for information (RFIs). Shannon & Wilson will visit the site one time during construction. We anticipate this site visit will occur during the gabion wall repair. After our site visit, we will document our observations in a field activity report and submit it to you. Deliverables:  Responses to questions and RFIs via e-mail.  Review comments on submittals.  Field activity report. Assumptions:  Additional engineering analyses will not be required.  Shannon & Wilson will not provide construction observation services.  We will visit the site once during construction. ESTIMATED FEE AND SCHEDULE We propose to provide the services described in this proposal on a time-and-expense basis. Our rates will be billed at our direct rate times a multiplier of 3.1. The enclosed Tables 1 and 2 summarize our Estimate of Probable Cost and provide a summary of estimate hours for each task. The table below shows a summary of our estimated fee for each task. Task No. Estimated Fee Task 1 - Project Management and Meetings $6,537 Task 2 – Geotechnical Slope Assessment $36,033 Task 3 – Geotechnical Explorations and Void Evaluation (Optional) $158,846 Task 4 – Slope Movement Monitoring (Optional) $60,133 Task 5 – Pavement Monitoring (Optional) $17,665 Task 6 – Plans and Specification Review $4,859 Task 7 – Engineering Support During Bidding and Construction (Optional) $8,822 We will begin our services upon receipt of written notice to proceed (NTP). We anticipate the draft report for Task 2 could be completed within four weeks of NTP, if Task 3 explorations are not incorporated into the draft GER. Task 3 depends on driller and geophysical subcontractor availability. We will begin coordination after NTP for Task 3. We anticipate the drilling will take eight days to Mr. Gunnar Fridriksson City of Bremerton Public Works and Utilities February 19, 2021 Page 9 of 9 Shannon and Wislon SOW 2021-02-19.docx/wp/lkn 106531-P complete and the geophysics will take two days. We will complete the laboratory testing and boring logs within two weeks after drilling is complete. We will complete the draft GDR within three weeks after the drilling and geophysics have been completed. Shannon & Wilson has prepared the enclosed "Important Information About Your Geotechnical/Environmental Proposal" to assist you and others in understanding the use and limitations of our proposals. We appreciate this opportunity to be of service to you and look forward to working with you on this project. Please contact me if you have any questions. I can be reached at (206) 695-6719 or by email at wlm@shanwil.com. Sincerely, SHANNON & WILSON Wendy L. Mathieson, PE Vice President WLM:BSR/wlm Enc: Table 1 – Estimate of Probable Cost (3 pages) Table 2 – Summary of Estimated Hours (2 pages) Important Information About Your Geotechnical/Environmental Proposal Schley Canyon Culvert Bremerton, Washington Proposal for Geotechnical Evaluation and Monitoring Classification Hours x Rate1 =Cost Vice President 22 $240.68 $5,295.05 Senior Professional I 4 $139.00 $556.02 Professional IV 2 $126.70 $253.39 Instrumentation Specialist 0 $146.07 $0.00 Senior Office Services 4 $108.16 $432.64 Total Hours 32 $6,537.09 Direct Non-Salary Cost COST $0.00 $6,537.09 Classification Hours x Rate1 =Cost Vice President 37 $240.68 $8,905.31 Senior Professional II 8 $143.16 $1,145.26 Senior Professional I 148 $139.00 $20,572.59 Professional IV 6 $126.70 $760.18 Senior Technical Services 20 $149.20 $2,984.06 Senior Office Services 3 $108.16 $324.48 Total Hours 228 $35,776.45 Direct Non-Salary Cost COST Quantity Unit Price Mileage 280 $0.56 $156.80 Miscellaneous copy costs, etc.1 $100.00 $100.00 $256.80 $36,033.25 Classification Hours x Rate1 =Cost Vice President 16 $240.68 $3,850.94 Senior Professional II 24 $143.16 $3,435.79 Professional IV 256 $126.70 $32,434.43 Instrumentation Specialist 3 $146.07 $438.22 Senior Technical Services 9 $149.20 $1,342.83 Senior Office Services 9 $108.16 $973.43 Total Hours 317 $42,475.64 Direct Non-Salary Cost COST Task 2 Geotechnical Slope Evaluation Total Labor Total Direct Non-Salary Cost TOTAL ESTIMATE OF TASK 2 PROBABLE COST Task 3 Geotechnical Explorations and Void Evaluation (Optional) TOTAL ESTIMATE OF TASK 1 PROBABLE COST Table 1 - Estimate of Probable Cost Total Labor Total Direct Non-Salary Cost Miscellaneous copy costs, etc. Task 1 Project Management and Meetings Total Labor 106531-P Page 1 of 3 106531-P-L1-T1-T2rev2.xlsx - 2/19/2021/wp/lkn Schley Canyon Culvert Bremerton, Washington Proposal for Geotechnical Evaluation and Monitoring Table 1 - Estimate of Probable Cost Quantity Unit Price Mileage 2000 mi $0.56 $1,120.00 Drilling Subcontract 1 ls $66,400.00 $66,400.00 Traffic Control Plan 1 ls $300.00 $300.00 Traffic Control 7 dy $3,000.00 $21,000.00 Geophysics 1 ls $24,000.00 $24,000.00 Vibrating Wire Piezometer 1 ea $650.00 $650.00 Datalogger 1 ea $850.00 $850.00 Geotechnical Laboratory testing 1 ls $2,000.00 $2,000.00 Miscellaneous copy costs, etc.1 ls $50.00 $50.00 $116,370.00 $158,845.64 Classification Hours x Rate1 =Cost Vice President 12 $240.68 $2,888.21 Senior Professional II 8 $138.78 $1,110.24 Senior Professional I 32 $139.00 $4,448.13 Professional IV 24 $126.70 $3,040.73 Instrumentation Specialist 46 $146.07 $6,719.31 Senior Technical Services 4 $149.20 $596.81 Senior Office Services 2 $108.16 $216.32 Total Hours 128 $19,019.75 Direct Non-Salary Cost COST Quantity Unit Price Mileage 560 mi $0.56 $313.60 Drilling Subcontract 1 ls $12,200.00 $12,200.00 Traffic Control 2 dy $3,000.00 $6,000.00 In-place-Inclinometer 1 ls $15,000.00 $15,000.00 ADAS 1 ls $5,400.00 $5,400.00 Mounting Equipment and supplies 1 ls $2,200.00 $2,200.00 $41,113.60 $60,133.35 Total Direct Non-Salary Cost Total Direct Non-Salary Cost TOTAL ESTIMATE OF TASK 3 PROBABLE COST TOTAL ESTIMATE OF TASK 4 PROBABLE COST Task 4 Slope Movement Monitoring (Optional) Total Labor 106531-P Page 2 of 3 106531-P-L1-T1-T2rev2.xlsx - 2/19/2021/wp/lkn Schley Canyon Culvert Bremerton, Washington Proposal for Geotechnical Evaluation and Monitoring Table 1 - Estimate of Probable Cost Classification Hours x Rate1 =Cost Vice President 3 $240.68 $722.05 Instrumentation Specialist 36 $146.07 $5,258.59 Senior Technical Services 2 $149.20 $298.41 Senior Office Services 1 $108.16 $108.16 Total Hours 42 $6,387.21 Direct Non-Salary Cost COST Quantity Unit Price Mileage 140 $0.56 $78.40 Camera and Monitoring System 1 $9,000.00 $9,000.00 Mounting Equipment and supplies 1 ls $2,200.00 $2,200.00 $11,278.40 $17,665.61 Classification Hours x Rate1 =Cost Vice President 12 $240.68 $2,888.21 Senior Professional I 14 $139.00 $1,946.06 Instrumentation Specialist 0 $146.07 $0.00 Total Hours 26 $4,834.26 Direct Non-Salary Cost COST Quantity Unit Price Miscellaneous copy costs, etc.1 $25.00 $25.00 $25.00 $4,859.26 Classification Hours x Rate1 =Cost Vice President 19 $240.68 $4,573.00 Senior Professional I 30 $139.00 $4,170.12 Total Hours 49 $8,743.12 Direct Non-Salary Cost COST Mileage 140 $0.56 $78.40 $78.40 $8,821.52 $292,895.72TOTAL ESTIMATE OF PROBABLE COST FOR ALL TASKS Task 6 Plans and Specification Review Total Labor Total Direct Non-Salary Cost TOTAL ESTIMATE OF TASK 6 PROBABLE COST Task 7 Engineering Support During Bidding and Construction (Optional) Total Labor Total Direct Non-Salary Cost TOTAL ESTIMATE OF TASK 7 PROBABLE COST Task 5 Pavement Monitoring (Optional) Total Labor Total Direct Non-Salary Cost TOTAL ESTIMATE OF TASK 5 PROBABLE COST 106531-P Page 3 of 3 106531-P-L1-T1-T2rev2.xlsx - 2/19/2021/wp/lkn Schley Canyon Culvert Bremerton, Washington Proposal for Geotechnical Evaluation and Monitoring Vice President Associate Senior Professional II Senior Professional I Professional IV Instrumentat ion Specialist Senior Technical Services Senior Office Services Task and/or Deliverable Rate $240.68 $180.76 $143.16 $139.00 $126.70 $146.07 $149.20 $108.16 1.0 Project Management and Meetings Project management 16 4 20 Meetings 6 4 2 0 12 1.0 Subtotal 22 0 0 4 2 0 0 4 32 2.0 Site visit 6 6 12 Review existing information 4 8 12 Seismic hazard evaluation 2 4 8 14 3D Seepage Analyses 2 4 16 22 Slope stability analysis (1-cross section)4 2 16 22 Canyon sidewall stability/erosion evaluation 2 8 10 Evaluate alternatives to stabilize gabions 8 24 6 38 Final design of selected alternative 4 16 2 22 Draft Geotechnical Engineering Report 4 4 40 8 2 58 Final Geotechnical Engineering Report 1 12 4 1 18 2.0 Subtotal 37 6 8 148 6 0 20 3 228 3.0 Prepare draft Geotechnical Exploration Plan 2 10 2 2 1 17 Prepare final Geotechnical Exploration Plan 1 4 1 1 1 8 Mark boring locations and call utility locates 8 8 Coordination and preparation 2 16 18 Log borings 96 96 Review soil, prepare logs, select samples for lab testing 4 24 30 4 62 Collect groundwater measurements and process data 16 16 Geophysics 1 24 25 Prepare draft Geotechnical Report 4 40 4 2 50 Prepare final Geotechnical Report 2 12 2 1 17 3.0 Subtotal 16 0 24 0 256 3 9 9 317 Table 2 - Summary of Estimated Hours Geotechnical Slope Evaluation Geotechnical Explorations and Void Evaluation (Optional) TOTAL HOURSTask No. 106531-P Page 1 of 2 106531-P-L1-T1-T2rev2.xlsx - 2/19/2021/wp/lkn Schley Canyon Culvert Bremerton, Washington Proposal for Geotechnical Evaluation and Monitoring Vice President Associate Senior Professional II Senior Professional I Professional IV Instrumentat ion Specialist Senior Technical Services Senior Office Services Task and/or Deliverable Rate $240.68 $180.76 $143.16 $139.00 $126.70 $146.07 $149.20 $108.16 Table 2 - Summary of Estimated Hours TOTAL HOURSTask No. 4.0 Log additional boring, prepare log, review soil 1 8 24 1 34 Site visit to develop ADAS plan 6 6 Order parts, coordinate, testing 1 6 7 Install system 12 12 Review data 8 20 8 36 Maintenance 6 6 Summary letter 2 12 8 4 1 27 4.0 Subtotal 12 0 8 32 24 46 4 2 128 5.0 Order parts, coordinate, testing 4 4 Install camera 10 10 Review photos 4 4 Maintenance 6 6 Summary letter 3 12 2 1 18 5.0 Subtotal 3 0 0 0 0 36 2 1 42 6.0 Review Plans and Specifications 8 8 16 Provide comments to City of Bremerton 4 6 10 6.0 Subtotal 12 0 0 14 0 0 0 0 26 7.0 Respond to Contractor questions during bidding 8 4 12 Respond to Contractor Requests for Information 6 6 12 Review Contractor Submittals 4 8 12 Site Visit 1 12 13 7.0 Subtotal 19 0 0 30 0 0 0 0 49 TOTAL HOURS 121 6 40 228 288 85 35 19 822 NOTE: ADAS = automated data acquistion system Engineering Support During Bidding and Construction (Optional) Pavement Monitoring (Optional) Plans and Specification Review Slope Movement Monitoring (Optional) 106531-P Page 2 of 2 106531-P-L1-T1-T2rev2.xlsx - 2/19/2021/wp/lkn Schley Canyon Culvert – McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 VICINITY MAP McDougal Creek/Wheaton Way Culvert Repair Permit Support Schley Canyon Culvert – McDougal Creek/Wheaton Way Culvert Repair Permit Support March 2021 LOCATION MAP McDougal Creek/Wheaton Way Culvert Repair Permit Support AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Local Agency Preliminary Engineering Participating Agreement with Washington State Department of Transportation (WSDOT) for Warren Avenue Pedestrian Improvements Project COUNCIL MEETING Date: April 7, 2021 Department: PW&U- Engineering Presenter: Shane Weber Phone: (360) 473-2354 SUMMARY: On September 18, 2020 the City accepted State grant funding in the amount of $1,500,000 for the design of the SR 303 Warren Avenue Bridge Pedestrian Improvements Project. Staff have coordinated with WSDOT to complete the structural design of the bridge which will be incorporated into the full design package which is being completed under a separate consultant civil design contract. The WSDOT design work includes preliminary engineering and permitting for pedestrian and bike improvements on the bridge and multimodal improvements to the north and south of the bridge. The contract is with WSDOT HQ Bridge Design Office and is for the structural design of the bridge modifications. The City entered into direct negotiations with WSDOT for this work because they have a working knowledge of the bridge and are the best qualified to perform the work. There are also efficiencies and cost savings if the State to performs the work. The estimated design fee is $252,000. The contract allows for a 25% increase for extra work, increasing the contract amount by $63,000 for a total amount of $315,000. ATTACHMENTS: 1) Local Agency Preliminary Engineering Participating Agreement with WSDOT, including Exhibits A, B and C FISCAL IMPACTS (Include Budgeted Amount): The budget is included in the Transportation Capital Fund and is 100% grant funded with no city match. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the Professional Services Agreement with WSDOT for design of the Warren Avenue Bridge Pedestrian Improvements Project; and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A6 Local Agency Preliminary Engineering Participating Agreement Work by WSDOT - Actual Cost Local Agency Name & Address Agreement Number Section/Location State Route Control Section Number Region Surety Bond Attachments made a part of this agreement Exhibit A Estimate of Costs Exhibit B Description of Work Exhibit C Plan / Vicinity Map Advance Payment Amount This Agreement is made and entered into between the Washington State Department of Transportation (WSDOT) and the above named governmental entity (Local Agency), individually the ‘Party’ and collectively the ‘Parties’. Recitals 1. The Local Agency has requested that WSDOT perform certain work as described herein, and/or is responsible for a portion of the work as provided for under WAC 468-18-040(5)(d). 2. The Local Agency is obligated for the cost of work described herein. Now Therefore, by virtue of RCW 47.28.140 and in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, It Is Mutually Agreed As Follows: 1. General a. WSDOT, as agent acting for and on behalf of the Local Agency, agrees to perform the work as shown in Exhibit B Description of Work. and amendments thereto, and adopted design standards, unless otherwise noted. c. The Local Agency agrees, upon satisfactory completion of the work involved, to deliver a letter of acceptance to WSDOT which shall include a release and waiver of all future claims or demands of any nature resulting from the performance of the work under this Agreement. d. If a letter of acceptance is not received by WSDOT within 90 days following completion of the work, the work will be considered accepted by the Local Agency and shall release WSDOT from all future claims and demands of any nature resulting from the performance of the work under this Agreement. acceptance. DOT Form 224-701 Revised 03/2019 Page 1 of 3 City of Bremerton 345 6th Street, Suite 100 Bremerton, WA 98337 GCB 3453 SR 303 SR 303 in Bremerton - MP 0.62 to MP 1.57 Legislative Districts 23, 26, 35 Olympic N/A 37,800 2. PAYMENT a. The Local Agency, in consideration of the faithful performance of the work to be done by WSDOT, agrees to reimburse WSDOT for the actual direct and related indirect cost of the work as shown in Exhibit A Estimate of Cost. b. Partial payments shall be made by the Local Agency, upon request of WSDOT, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and payment. c. The Local Agency agrees to make payment for the work to be done by WSDOT within thirty (30) days from receipt of billing from WSDOT. d. The Local Agency agrees that if payment for the work is not made within ninety (90) days after receipt of billing WSDOT may withhold any tax monies which the Local Agency is entitled to receive from the Motor Vehicle Fund until payment for the work is received by WSDOT. If the Local Agency is not entitled to receive Motor Vehicle Funds, a surety bond in the amount shown above written by a surety company authorized to do business in the state of Washington shall be furnished to WSDOT prior to execution by WSDOT of this agreement. The bond shall remain in force until written release by WSDOT. e. Payment not made within thirty (30) days after receipt of billings shall be considered “Past Due” and bear interest at the rate of one percent per month or fraction thereof until paid pursuant to RCW 43.17.240. f. The Local Agency agrees to pay WSDOT the “Advance Payment Amount” stated above within 20 3. EXTRA WORK a. In the event unforeseen conditions require an increase in the cost of 25 percent or more from that increase. b. In the event it is determined that any change from the description of work contained in this Agreement is required, approval must be secured from the Local Agency prior to the beginning of such work. Where the change is substantial, written approval must be secured. c. Reimbursement for increased work and/or a substantial change in the description of work shall be the Local Agency. 4. RIGHT OF ENTRY The Local Agency hereby grants and conveys to WSDOT the right of entry upon all land which the Local the preliminary engineering under this Agreement. 5. LEGAL RELATIONS No liability shall attach to WSDOT or the Local Agency by reason of entering into this Agreement except as expressly provided herein. DOT Form 224-701 Revised 03/2019 Page 2 of 3 In Witness Whereof, the Parties hereto have executed this Agreement as of the Party’s date signed last below. LOCAL AGENCY Signature: By: Print Name Title: Date: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION Signature: By: Print Name Title: Date: DOT Form 224-701 Revised 03/2019 Page 3 of 3 Greg Wheeler Mayor Exhibit A Estimate of Costs For WSDOT Preliminary Engineering Services Agency: Date: Comments Estimate of work to be done by WSDOT Bridge Office Indirect Cost Rate Cost (in percent) 0.00%$0.00 Fix Fee (in percent)0.00%$0.00 Reimbursable A.Travel and Per Diem $5,000.00 B. Reproduction Expenses $2,000.00 C. Computer Expense D.Communication E.Sampling and Testing F. Outside Consultants G. Other Total: $7,000.00 Total Estimate of Cost $252,000.00 *Contingency for Extra Work (25%)$63,000.00 Total Authorized by Contract $315,000.00 Advance Payment Amount (15% of Total Estimate of Cost)37,800.00$ SR 303 Warren Avenue Bridge Pedestrian Improvements Shane Weber, P.E. 3/1/21 $245,000.00Subtotal Project Name: Prepared By: City of Bremerton Type of Services Bridge Structural Engineering & Design Estimated Cost $245,000.00 Federal Project No.: GCB 3453 Funding is set up with Agreement LA 9922 and State line charge number is TA 6989 GP19   GCB 3453  Exhibit B  Description of Work  March 2021    The Work includes preparing structural design for improvements to the Warren Avenue Bridge (WSDOT  Bridge No. 303/12), consisting of the following:  1. Widen existing sidewalk on both sides of the bridge as much as possible, while still allowing for  the WSDOT UBIT to deploy over the sidewalk from the adjacent traffic lane. See WSDOT BDM  Fig. 2.3.11‐1. The widened sidewalks will also include overlooks on each side of the bridge, at or  near mid‐channel.  2. Replace existing center raised median with traffic barrier.    The work also includes structural design required for on‐bridge ancillary elements required for the  above improvements, including utility hangers, luminaire foundations, pedestrian barriers, pedestrian  and bridge rail, utility ducts, architectural features (if required), small post‐mounted signs, approach  slabs, abutment widening, and other elements as required to design the improvements listed above.  WSDOT Bridge Design Office will perform the following work:   Review and comment on the Maintenance of Traffic (MOT) schedule prepared by the City of  Bremerton   Structural design and bridge strengthening design required for the improvements listed above.   Create bridge plans in the MicroGDS software package used in the Bridge Office   Design of any associated retaining walls/abutment widening at the bridge ends   QA/QC of all structural design work created by the Bridge Office   Provide a revised load rating of the bridge.   Provide PS&E package for all bridge structural design work created by the Bridge Office.    The work for WSDOT Bridge Design office is confined to on‐bridge structural elements only, including  end of bridge features necessary for the bridge structural design.  The City of Bremerton is contracting  with a consultant to design off‐bridge civil and structural improvements.  Warren Avenue BridgeProject AreaPark Ave17th Street 16th Street Warren Ave / SR 303Lebo Blvd Callahan DrSheridan RdW h e a t o n W a y OlympicCollege18th StreetBegin ProjectEnd ProjectClare AveEast SideUnemployment CenterJuniper StLOCATIONPROJECTNB Lane NB Lane Sidewalk 11.0'11.0'4.9'Raised MedianBridge Rail (Typ)Traffic BarrierWarren Ave. BridgeTypical Existing SectionLooking North2.0'℄4.0'1.0'Shoulder Shy SB LaneSB LaneSidewalk 11.0'11.0'Varies 3.2' to3.9' (Typ)4.0'1.0'Shoulder Shy NB Lane NB Lane Shared Use Path "*"*"*Bridge Rail (Typ)Traffic BarrierWarren Ave. BridgeTypical Proposed SectionLooking North2.0'℄"*"*Shoulder Shy SB LaneSB Lane "*"*"*"*"*Shoulder Shy Shared UsePath Traffic Barrier1"=400'LOCATION MAPN.T.S.SHEETVERT.HORIZ.SCALEBYDATENO.CITY OF BREMERTONREVISIONSDESCRIPTIONDEPARTMENT OF PUBLIC WORKS & UTILITIESENGINEERING DIVISIONIF NOT SCALE ACCORDINGLYTWO INCHES AT FULL SCALE1"02"PN:Warren Avenue BridgePedestrian Improvements ProjectVicinity Map11Notes"*Widths to be determined duringdesign 18th st. Callahan D ri v e Lebo Blvd Lower Wheaton Elizabeth AvenuePark Ave.Warren Ave.Clare Ave.Olympic College Shared use path Potential neighborhood greenway Bremerton Overview Viewpoint Roto-Vista Park A shared use path on the west side of the Warren Avenue bridge, a tunnel under Warren Avenue, and a shared use path in the Callahan underpass provide the foundation for a north-south bike and pedestrian corridor linking north Bremerton to Downtown. It is also a solution to the limitations current bridge inspection equipment pose to building a shared use path at WSDOT’s recommended width. 1 1 As residents of the Kitsap Peninsula we are very concerned about the safety of the Warren Avenue Bridge for cyclists and pedestrians. Bremerton’s SR 303 Corridor Study was undertaken to resolve this and other transportation concerns. The final plan adopted a 10-foot wide shared use path on both sides of the bridge. The WSDOT design manual states the desirable paved width of a shared- use path is 12 feet, and the minimum paved width is 10 feet. West Sound Cycling Club recommends a 12-, and preferably 14-foot wide path on just the west side of the bridge to reflect newer practice and safety recommendations. We want to accommodate the needs of PSNS and Olympic College commuters well into the future, and not have the new facility be outdated the day it is completed. On March 16th, during the monthly Public Works Committee meeting we learned that Bremerton plans to narrow these paths to 8-feet. The professed rational for doing so is the inability of WSDOT’s bridge inspection truck to reach over a 10-foot wide path to inspect the underside of the mid-bridge steel supports. Since WSDOT’s current inspection truck can reach over an 8-foot path, WSDOT recommends substituting an “8-foot sidewalk” for the shared use path. The term “sidewalk” is used presumably because a path of 8-feet no longer qualifies as a shared use path. An 8-foot path is unacceptable for many of us. Bikes and pedestrians don’t mix well in such a constricted space. The implication is that cyclists may be relegated to the roadway. It should be pointed out that there isn’t room for a 5 or 6 foot bike lane on the bridge deck - a minimum requirement in this location. Motorists would approach cyclists from behind at several times their speed, separated from them by a painted line. Overcoming obstacles to a wide, safe, shared use path across the Warren Avenue Bridge 2 Bikes crossing the bridge should not be relegated to the roadway. Sixty-five percent of cyclist fatalities occur on arterial roads (like SR 303) with speed limits of 30 to 45 mph. The most common type of crash is being struck from behind. This carnage can be avoided through better policy and design. Cities with an improved built environment for cyclists, like protected and separated bike facilities, are safer for all road users. WSDOT’s problem with bridge inspection can be solved by adopting WSCC’s proposal to widen only the west side of the bridge. Their current inspection truck can extend its bucket 60 feet under the bridge - just shy of the full width of the bridge. Newer inspection trucks can extend their inspection bucket 75 feet, allowing inspection of the entire under-structure from the east side of the bridge. This approach (no construction on the east side of the bridge) will probably save 2 million dollars, enough to buy a 75 foot- capable inspection truck if needed. A shared use path on only one side of the I-90 and SR 520 floating bridges works well, and can work for the Warren Avenue Bridge as long as a tunnel is built under Warren Avenue at Olympic College to connect both sides of the bridge to one another. The WSCC proposal creates a north-south bike-pedestrian corridor entirely separated from traffic on SR 303 by using parallel slower and lower volume streets, or by physically separating active transportation users from the highway. A single separated path 12 to 14 feet wide on the bridge is all that is needed to keep active transportation users safe and increase bike mode share by commuters. When the city authorizes a design contract with WSDOT, we recommend that you set parameters for possible design alternatives. Do not accept 8-foot “sidewalks” as an option for the bridge design - they are not recommended for a path shared by cyclists and pedestrians by WSDOT or federal guidelines. 3 Existing Warren Avenue Bridge Cross Section The blue rectangles represent lateral bridge supports. West East 4 https://aspenaerials.com/wp-content/uploads/2019/03/a75II_brochure.pdf A brief internet search found this truck capable of inspecting the entire bridge infrastructure from one side of the bridge deck. 5 6 WSCC proposed 12-foot shared use path on only the west side of bridge. 12’ West East The blue rectangles represent lateral bridge supports. 75 feet 60 feet 7 A shared use path accommodates pedestrians, wheelchair users, bicycles, and strollers at the same time. It is defined as being 10 feet wide or wider, however newer designs and upcoming guidelines suggest minimum widths of 12 to 14 feet, especially on bridges where hand rails can hook handlebars. The following images show 8-, 10-, and 14-foot wide shared use paths. 8 East Channel Bridge at Mercer Island 8 feet Pedestrians won’t feel safe on an 8-foot path shared with cyclists. 9 This shared use path, on one side of the I-90 floating bridge across Lake Washington, was built in 1993. 10 feet 10 This shared use path, on one side of the SR 520 floating bridge across Lake Washington, was completed in 2017. Safety issues with the 10-foot width of the I-90 shared use path influenced WSDOT to widen this shared use path to 14 feet. The curvature of the hand rails gives additional room for handlebars. Pedestrians and cyclists can safely share this space. 14 feet 11 Rest stops /viewing platforms along the SR 520 floating bridge are an additional 14 feet wide. 12 13 The Johnson Street Bridge in Victoria is an example of a bridge with shared use paths of different widths. This side is for pedestrians only. This side is for all users, is much wider, and connects directly to a regional trail. On a crowded path, cyclists feel more comfortable riding closer to the edge of pavement when there is no adjacent vertical fencing. 14 A 12-foot shared use path on the west side of the bridge could be widened considerably to create an exceptional viewing platform where the bridge’s pillar footings can support the added width. This image shows how that might look. Bremerton Steel bridge spans The best view of the Olympic Mountains is situated here, on the reinforced concrete section of the bridge 15 The final draft SR-303 Corridor Study adopted a roundabout concept for the north end of the Warren Avenue Bridge. With or without a roundabout, neighborhood connectivity is significantly better using the west side of the bridge than the east side since existing non- motorized infrastructure extends NE and NW as well as south to Lebo Blvd. Clare Avenue obstructs northward movements from the bridge with a roundabout or without. Usage will be much greater on the west side of the bridge under any scenario or phase of construction. A shared use path on the west side of the bridge should be substantially wider than the east side. Existing Infrastructure Clare Ave.ClareLeb o B l v d Callaha n D ri v e Support for a shared use path on only the west side of the Warren Avenue Bridge. The City of Bremerton paid the firm Exeltech to evaluate engineering solutions to help Olympic College Students safely cross Warren Avenue in 2016. The introduction to the study report states, “Warren Avenue has a high volume of daily traffic. Olympic College resides at the south end of the Warren Avenue Bridge and utilizes building facilities on both sides of Warren Avenue. Students and local pedestrians currently cross Warren Avenue at 16th street signal or at unmarked crossings. There currently is a safety concern due to the high traffic volume and limited pedestrian crossing locations and time.” A year later, the City of Bremerton and Olympic College shared costs for a $50,000 study to develop a “frontage concept” along adjacent SR-303, hopefully to include a safer way to cross Warren Avenue. OC President Marty Cavalluzzi is quoted as saying it was “uncomfortable, at the least, for students to cross SR-303”. None of the three Exeltech suggestions were adopted due to aesthetic and practical considerations. The City adopted a tunnel concept for crossing under Warren Avenue during the 2020 SR-303 Corridor Study. Users crossing Warren Avenue through a tunnel located at RotoVista Park could do so safely without waiting for traffic lights or interacting in any way with vehicular traffic on Warren Avenue. The need for a safe crossing in this location is greater now than when the initial study was requested 5 years ago, and the need will become greater still as traffic increases. Unfortunately, this project was given a priority of phase 12 of 12 phases in the SR-303 Corridor plan - possibly moving its construction 20 years out. Even after a roundabout at the north end of the bridge is constructed (during phase 9 of 12), a tunnel under Warren Avenue at the south end of the bridge will be needed to allow everyone, on either side of Warren Avenue at Olympic College, to access Callahan Drive and the North-South Bike-Pedestrian Corridor safely. Support for a tunnel under Warren Avenue at Olympic College The proposed tunnel is not just a local Olympic College safety issue, it is integral to the success of non-motorized connectivity across the retrofitted Warren Avenue Bridge, which is phase 1 of 12. The tunnel is necessary to assure safe community access to and from the bridge. There is little benefit to a bridge shared use path otherwise. Bridge improvements may only show increased use by pedestrians and cyclists when accompanied by low stress access to both ends of the bridge from surrounding communities. The urgent need for a safe crossing of Warren Avenue at Olympic College was already a high priority before the SR-303 Corridor Study began. Tunnel construction is a high priority, not least because a shared use paths on the bridge will increase non-motorized usage. The fastest and shortest route to PSNS for commuters north of the Warren Avenue bridge will be through this tunnel. This route has 20% less elevation gain than riding through Manette. Ped tunnel under Warren at S bridge approach, and RABs N of Riddell Tunnel phase 12 Bridge phase 1 Roundabout phase 9 SR-303 Corridor Project Priority List. Lights in tunnel 9th Street Bridge Tunnel, Boise Idaho Four one-way vehicle lanes and two sidewalks above A tunnel under Warren Avenue at 18th street might resemble this shared use path in Idaho. 19 This simpler tunnel under Highway 19 in Port Townsend is part of the Larry Scott Trail. 20 18th st. Callahan D ri v e Lebo Blvd Lower Wheaton Elizabeth AvenuePark Ave.Warren Ave.Clare Ave.Olympic College Shared use path Potential neighborhood greenway Bremerton Overview Viewpoint Roto-Vista Park A shared use path on the west side of the Warren Avenue bridge, a tunnel under Warren Avenue, and a shared use path in the Callahan underpass provide the foundation for a north-south bike and pedestrian corridor linking north Bremerton to Downtown 21 21 AMENDED AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Master Services and Purchasing Agreement with Axon Enterprise, Inc. for Body Cameras and In-Car Recording Equipment for the Police Department COUNCIL MEETING Date: April 7, 2021 Department: Police Presenter: Tom Wolfe Phone: 360.473.5481 SUMMARY: The Bremerton Police Department requests approval to purchase fifty (50) body cameras and in-car recording equipment. Body-worn cameras can serve both the department and the community as an accountability function. They wish to purchase the equipment from Axon Enterprises, Inc., a participating contractor on the State of Washington’s NASPO list of contracts, No. OK-MA-145-015. ATTACHMENTS: Axon Master Services and Purchasing Agreement, Quote from Axon Enterprises for Body-Worn Cameras, Quote from Axon Enterprises for In-Car Recording Equipment FISCAL IMPACTS (Include Budgeted Amount): Purchase amount of $184,223.23 was approved in BPD’s 2021 budget. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to approve the agreement and authorize the Mayor to finalize and execute the agreement with substantially the same terms and conditions as presented. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A7 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 1 of 17 This Master Services and Purchasing Agreement (“Agreement”) is between Axon Enterprise, Inc., a Delaware corporation (“Axon”), and the agency on the Quote (“Agency”). This Agreement is effective as of the later of the (a) last signature date on this Agreement or (b) signature date on the Quote (“Effective Date”). Axon and Agency are each a “Party” and collectively “Parties”. This Agreement governs Agency’s purchase and use of the Axon Devices and Services detailed in the Quote Appendix (“Quote”). It is the intent of the Parties that this Agreement act as a master agreement governing all subsequent purchases by Agency for the same Axon products and services in the Quote, and all such subsequent quotes accepted by Agency shall be also incorporated into this Agreement by reference as a Quote. The Parties therefore agree as follows: 1 Definitions. “Axon Cloud Services” means Axon’s web services for Axon Evidence, Axon Records, Axon Dispatch, and interactions between Evidence.com and Axon Devices or Axon client software. Axon Cloud Service excludes third-party applications, hardware warranties, and my.evidence.com. “Axon Device” means all hardware provided by Axon under this Agreement. “Quote” means an offer to sell and is only valid for devices and services on the quote at the specified prices. Any terms within Agency’s purchase order in response to a Quote will be void. Orders are subject to prior credit approval. Changes in the deployment estimated ship date may change charges in the Quote. Shipping dates are estimates only. Axon is not responsible for typographical errors in any offer by Axon, and Axon reserves the right to cancel any orders resulting from such errors. “Services” means all services provided by Axon under this Agreement, including software, Axon Cloud Services, and professional services. 2 Term. This Agreement begins on the Effective Date and continues until all subscriptions hereunder have expired or have been terminated (“Term”). All subscriptions including Axon Evidence, Axon Fleet, Officer Safety Plans, Technology Assurance Plans, and TASER 7 plans begin after shipment of the applicable Axon Device. If Axon ships the Axon Device in the first half of the month, the start date is the 1st of the following month. If Axon ships the Axon Device in the second half of the month, the start date is the 15th of the following month. For purchases solely of Axon Evidence subscriptions, the start date is the Effective Date. Each subscription term ends upon completion of the subscription stated in the Quote (“Subscription Term”). Upon completion of the Subscription Term, the Subscription Term will automatically renew for an additional 5 years (“Renewal Term”). For purchase of TASER 7 as a standalone, Axon may increase pricing to its then-current list pricing for any Renewal Term. For all other purchases, Axon may increase pricing on all line items in the Quote up to 3% at the beginning of each year of the Renewal Term. New devices and services may require additional terms. Axon will not authorize services until Axon receives a signed Quote or accepts a purchase order, whichever is first. 3 Payment. Axon invoices upon shipment. Payment is due net 30 days from the invoice date. Payment obligations are non-cancelable. Agency will pay invoices without setoff, deduction, or withholding. If Axon sends a past due account to collections, Agency is responsible for collection and attorneys’ fees. 4 Taxes. Agency is responsible for sales and other taxes associated with the order unless Agency provides Axon a valid tax exemption certificate. 5 Shipping. Axon may make partial shipments and ship Axon Devices from multiple locations. All shipments are FOB shipping point via common carrier. Title and risk of loss pass to Agency upon Axon’s delivery to the common carrier. Agency is responsible for any shipping charges in the Quote. 6 Returns. All sales are final. Axon does not allow refunds or exchanges, except warranty returns or as provided by state or federal law. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 2 of 17 7 Warranty. 7.1 Hardware Limited Warranty. Axon warrants that Axon-manufactured Devices are free from defects in workmanship and materials for 1 year from the date of Agency’s receipt, except Signal Sidearm, which Axon warrants for 30 months from the date of Agency’s receipt. Axon warrants its Axon-manufactured accessories for 90-days from the date of Agency’s receipt. Used conducted energy weapon (“CEW”) cartridges are deemed to have operated properly. Extended warranties run from the expiration of the 1-year hardware warranty through the extended warranty term. Non- Axon manufactured D evices are not covered by Axon’s warranty. Agency should contact the manufacturer for support of non-Axon manufactured Devices. 7.2 Claims. If Axon receives a valid warranty claim for an Axon manufactured Device during the warranty term, Axon’s sole responsibility is to repair or replace the Device with the same or like Device, at Axon’s option. A replacement Axon Device will be new or like new. Axon will warrant the replacement Axon Device for the longer of (a) the remaining warranty of the original Axon Device or (b) 90-days from the date of repair or replacement. If Agency exchanges a device or part, the replacement item becomes Agency’s property, and the replaced item becomes Axon’s property. Before delivering a Axon Device for service, Agency must upload Axon Device data to Axon Evidence or download it and retain a copy. Axon is not responsible for any loss of software, data, or other information contained in storage media or any part of the Axon Device sent to Axon for service. 7.3 Spare Axon Devices. For qualified purchases, Axon may provide Agency a predetermined number of spare Axon Devices as detailed in the Quote (“Spare Axon Devices”). Spare Axon Devices are intended to replace broken or non-functioning units while Agency submits the broken on non- functioning units , through Axon’s warranty return process. Axon will repair or replace the unit with a replacement Axon Device. Title and risk of loss for all Spare Axon Devices shall pass to Agency in accordance with shipping terms under Section 5. Axon assumes no liability or obligation in the event Agency does not utilize Spare Axon Devices for the intended purpose. . 7.4 Limitations. Axon’s warranty excludes damage related to: (a) failure to follow Axon Device use instructions; (b) Axon Devices used with equipment not manufactured or recommended by Axon; (c) abuse, misuse, or intentional damage to Axon Device; (d) force majeure; (e) Axon Devices repaired or modified by persons other than Axon without Axon’s written permission; or (f) Axon Devices with a defaced or removed serial number. 7.4.1 To the extent permitted by law, the above warranties and remedies are exclusive. Axon disclaims all other warranties, remedies, and conditions, whether oral, written, statutory, or implied. If statutory or implied warranties cannot be lawfully disclaimed, then such warranties are limited to the duration of the warranty described above and by the provisions in this Agreement. 7.4.2 Axon’s cumulative liability to any Party for any loss or damage resulting from any claim, demand, or action arising out of or relating to any Axon Device or Service will not exceed the purchase price paid to Axon for the Axon Device, or if for Services, the amount paid for such Services over the 12 months preceding the claim. Neither Party will be liable for direct, special, indirect, incidental, punitive or consequential damages, however caused, whether for breach of warranty or contract, negligence, strict liability, tort or any other legal theory. 8 Statement of Work. Certain Axon Devices and Services, including Axon Interview Room, Axon Channel Services, and Axon Fleet, may require a Statement of Work that details Axon’s Service deliverables (“SOW”). In the event Axon provides an SOW to Agency, Axon is only responsible to perform Services described in the SOW. Additional services are out of scope. The Parties must document scope changes in a written and signed change order. Changes may require an equitable adjustment in fees or schedule. The SOW is incorporated into this Agreement by reference. 9 Axon Device Warnings. See www.axon.com/legal for the most current Axon Device warnings. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 3 of 17 10 Design Changes. Axon may make design changes to any Axon Device or Service without notifying Agency or making the same change to Axon Devices and Services previously purchased by Agency. 11 Bundled Offerings. Some offerings in bundled offerings may not be generally available at the time of Agency’s purchase. Axon will not provide a refund, credit, or additional discount beyond what is in the Quote due to a delay of availability or Agency’s election not to utilize any portion of an Axon bundle. 12 Insurance. Axon will maintain, at Axon’s own expense and in effect during the Term, and provide a Certificate of Insurance evidencing: 1. Automobile Liability insurance with limits no less than $1,000,000 combined single limit per accident for bodily injury and property damage; and 2. Commercial General Liability insurance written on an occurrence basis with limits no less than $1,000,000 combined single limit per occurrence and general aggregate for personal injury, bodily injury and property damage. Commercial General Liability insurance for Taser 7 may be written on a claims-made basis. Coverage shall include but not be limited to: blanket contractual; products/completed operations/broad form property damage; explosion, collapse and underground (XCU) if applicable; and 3. Excess Liability insurance with limits not less than $1,000,000 limit per occurrence and aggregate; and 4. Cyber Liability insurance with limits not less than $1,000,000 limit per occurrence or claim; and 5. Workers Compensation insurance as statutorily required by the Industrial Insurance Act of the State of Washington, Title 51, Revised Code of Washington and employer's liability with limits not less than $1,000,000. The Agency shall be named as an additional insured on the Commercial General Liability insurance policy, as respects work performed by or on behalf of Axon. Axon’s insurance shall be primary and non- contributory insurance as respects the Agency and shall contain a waiver of subrogation against the Agency for claims arising out of any operations, liabilities and obligations to which coverage applies. 13 Indemnification. Axon will indemnify Agency’s officers, directors, and employees (“Agency Indemnitees”) against all claims, demands, losses, and reasonable expenses arising out of a third-party claim against an Agency Indemnitee resulting from any negligent act, error or omission, or willful misconduct by Axon under this Agreement, except to the extent of Agency’s negligence or willful misconduct, or claims under workers compensation. 14 IP Rights. Axon owns and reserves all right, title, and interest in Axon devices and services and suggestions to Axon, including all related intellectual property rights. Agency will not cause any Axon proprietary rights to be violated. 15 IP Indemnification. Axon will indemnify Agency Indemnitees against all claims, losses, and reasonable expenses from any third-party claim alleging that the use of Axon Devices or Services infringes or misappropriates the third-party’s intellectual property rights. Agency must promptly provide Axon with written notice of such claim, tender to Axon the defense or settlement of such claim at Axon’s expense and cooperate fully with Axon in the defense or settlement of such claim. Axon’s IP indemnification obligations do not apply to claims based on (a) modification of Axon Devices or Services by Agency or a third-party not approved by Axon; (b) use of Axon Devices and Services in combination with hardware or services not approved by Axon; (c) use of Axon Devices and Services other than as permitted in this Agreement; or (d) use of Axon software that is not the most current release provided by Axon. 16 Agency Responsibilities. Agency is responsible for (a) Agency’s use of Axon Devices; (b) breach of this Agreement or violation of applicable law by Agency or an Agency end user; and (c) a dispute between Agency and a third-party over Agency’s use of Axon Devices. 17 Termination. 17.1 For Breach. A Party may terminate this Agreement for cause if it provides 30 days written notice DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 4 of 17 of the breach to the other Party, and the breach remains uncured at the end of 30 days. If Agency terminates this Agreement due to Axon’s uncured breach, Axon will refund prepaid amounts on a prorated basis based on the effective date of termination. 17.2 By Agency. If sufficient funds are not appropriated or otherwise legally available to pay the fees, Agency may terminate this Agreement. Agency will deliver notice of termination under this section as soon as reasonably practicable. 17.3 Effect of Termination. Upon termination of this Agreement, Agency rights immediately terminate. Agency remains responsible for all fees incurred before the effective date of termination. If Agency purchases Axon Devices for less than the manufacturer’s suggested retail price (“MSRP”) and this Agreement terminates before the end of the Term, Axon will invoice Agency the difference between the MSRP for Axon Devices received, including any Spare Axon Devices, and amounts paid towards those Axon Devices. Only if terminating for non-appropriation, Agency may return Axon Devices to Axon within 30 days of termination. MSRP is the standalone price of the individual Axon Device at the time of sale. For bundled Axon Devices, MSRP is the standalone price of all individual components. 18 Confidentiality. “Confidential Information” means nonpublic information designated as confidential or, given the nature of the information or circumstances surrounding disclosure, should reasonably be understood to be confidential. Each Party will take reasonable measures to avoid disclosure, dissemination, or unauthorized use of the other Party’s Confidential Information. Unless required by law, neither Party will disclose the other Party’s Confidential Information during the Term and for 5-years thereafter. Axon pricing is Confidential Information and competition sensitive. If Agency is required by law to disclose Axon pricing, to the extent allowed by law, Agency will provide notice to Axon before disclosure. Axon may publicly announce information related to this Agreement. 19 General. 19.1 Force Majeure. Neither Party will be liable for any delay or failure to perform due to a cause beyond a Party’s reasonable control. 19.2 Independent Contractors. The Parties are independent contractors. Neither Party has the authority to bind the other. This Agreement does not create a partnership, franchise, joint venture, agency, fiduciary, or employment relationship between the Parties. 19.3 Third-Party Beneficiaries. There are no third-party beneficiaries under this Agreement. 19.4 Non-Discrimination. Neither Party nor its employees will discriminate against any person based on race; religion; creed; color; sex; gender identity and expression; pregnancy; childbirth; breastfeeding; medical conditions related to pregnancy, childbirth, or breastfeeding; sexual orientation; marital status; age; national origin; ancestry; genetic information; disability; veteran status; or any class protected by local, state, or federal law. 19.5 Export Compliance. Each Party will comply with all import and export control laws and regulations. 19.6 Assignment. Neither Party may assign this Agreement without the other Party’s prior written consent. Axon may assign this Agreement, its rights, or obligations without consent: (a) to an affiliate or subsidiary; or (b) for purposes of financing, merger, acquisition, corporate reorganization, or sale of all or substantially all its assets. This Agreement is binding upon the Parties respective successors and assigns. 19.7 Waiver. No waiver or delay by either Party in exercising any right under this Agreement constitutes a waiver of that right. 19.8 Severability. If a court of competent jurisdiction holds any portion of this Agreement invalid or unenforceable, the remaining portions of this Agreement will remain in effect. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 5 of 17 19.9 Survival. The following sections will survive termination: Payment, Warranty, Axon Device Warnings, Indemnification, IP Rights, and Agency Responsibilities. 19.10 Governing Law. The laws of the state where Agency is physically located, without reference to conflict of law rules, govern this Agreement and any dispute arising from it. The United Nations Convention for the International Sale of Goods does not apply to this Agreement. 19.11 Notices. All notices must be in English. Notices posted on Agency’s Axon Evidence site are effective upon posting. Notices by email are effective on the sent date of the email. Notices by personal delivery are effective immediately. Contact information for notices: Axon: Axon Enterprise, Inc. Agency: Attn: Legal Attn: 17800 N. 85th Street Street Address Scottsdale, Arizona 85255 City, State, Zip legal@axon.com Email 19.12 Entire Agreement. This Agreement, including the Appendices and any SOW(s), represents the entire agreement between the Parties. This Agreement supersedes all prior agreements or understandings, whether written or verbal, regarding the subject matter of this Agreement. This Agreement may only be modified or amended in a writing signed by the Parties. Each representative identified below declares they have been expressly authorized to execute this Agreement as of the date of signature. Axon Enterprise, Inc. Agency Signature: Signature: Name: Name: Title: Title: Date: Date: DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 VP, Assoc. General Counsel 3/16/2021 | 1:33 PM MST Robert Driscoll Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 6 of 17 Axon Cloud Services Terms of Use Appendix 1 Definitions. “Agency Content” is data uploaded into, ingested by, or created in Axon Cloud Services within Agency’s tenant, including media or multimedia uploaded into Axon Cloud Services by Agency. Agency Content includes Evidence but excludes Non-Content Data. “Evidence” is media or multimedia uploaded into Axon Evidence as 'evidence' by an Agency. Evidence is a subset of Agency Content. “Non-Content Data” is data, configuration, and usage information about Agency’s Axon Cloud Services tenant, Axon Devices and client software, and users that is transmitted or generated when using Axon Devices. Non-Content Data includes data about users captured during account management and customer support activities. Non-Content Data does not include Agency Content. “Personal Data” means any information relating to an identified or identifiable natural person. An identifiable natural person is one who can be identified, directly or indirectly, in particular by reference to an identifier such as a name, an identification number, location data, an online identifier or to one or more factors specific to the physical, physiological, genetic, mental, economic, cultural or social identity of that natural person. 2 Access. Upon Axon granting Agency a subscription to Axon Cloud Services, Agency may access and use Axon Cloud Services to store and manage Agency Content. Agency may not exceed more end users than the Quote specifies. Axon Air requires an Axon Evidence subscription for each drone operator. For Axon Evidence Lite, Agency may access and use Axon Evidence only to store and manage TASER CEW and TASER CAM data (“TASER Data”). Agency may not upload non- TASER Data to Axon Evidence Lite. 3 Agency Owns Agency Content. Agency controls and owns all right, title, and interest in Agency Content. Except as outlined herein, Axon obtains no interest in Agency Content, and Agency Content are not business records of Axon. Agency is solely responsible for uploading, sharing, managing, and deleting Agency Content. Axon will have limited access to Agency Content solely for providing and supporting Axon Cloud Services to Agency and Agency end users. 4 Security. Axon will implement commercially reasonable and appropriate measures to secure Agency Content against accidental or unlawful loss, access or disclosure. Axon will maintain a comprehensive information security program to protect Axon Cloud Services and Agency Content including logical, physical access, vulnerability, risk, and configuration management; incident monitoring and response; encryption of uploaded digital evidence; security education; and data protection. Axon agrees to the Federal Bureau of Investigation Criminal Justice Information Services Security Addendum. 5 Agency Responsibilities. Agency is responsible for (a) ensuring Agency owns Agency Content; (b) ensuring no Agency Content or Agency end user’s use of Agency Content or Axon Cloud Services violates this Agreement or applicable laws; and (c) maintaining necessary computer equipment and Internet connections for use of Axon Cloud Services. If Agency becomes aware of any violation of this Agreement by an end user, Agency will immediately terminate that end user’s access to Axon Cloud Services. Agency will also maintain the security of end user names and passwords and security and access by end users to Agency Content. Agency is responsible for ensuring the configuration and utilization of Axon Cloud Services meet applicable Agency regulation and standards. Agency may not sell, transfer, or sublicense access to any other entity or person. Agency shall contact Axon immediately if an unauthorized party may be using Agency’s account or Agency Content, or if account information is lost or stolen. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 7 of 17 To the extent Agency uses the Axon Cloud Services to interact with YouTube®, such use may be governed by the YouTube Terms of Service, available at https://www.youtube.com/static?template=terms. 6 Privacy. Axon will not disclose Agency Content or information about Agency except as compelled by a court or administrative body or required by law or regulation. If Axon receives a disclosure request for Agency Content, Axon will give Agency notice, unless legally prohibited from doing so, to allow Agency to file an objection with the court or administrative body. Agency agrees to allow Axon access to certain information from Agency to (a) perform troubleshooting services upon request or as part of regular diagnostic screening; (b) enforce this Agreement or policies governing the use of Axon Evidence; or (c) perform analytic and diagnostic evaluations of the systems. 7 Axon Body 3 Wi-Fi Positioning. Axon Body 3 cameras offer a feature to enhance location services where GPS/GNSS signals may not be available, for instance, within buildings or underground. Agency administrators can manage their choice to use this service within the administrative features of Axon Cloud Services. If Agency chooses to use this service, Axon must also enable the usage of the feature for Agency’s Axon Cloud Services tenant. Agency will not see this option with Axon Cloud Services unless Axon has enabled Wi-Fi Positioning for Agency’s Axon Cloud Services tenant. When Wi-Fi Positioning is enabled by both Axon and Agency, Non-Content and Personal Data will be sent to Skyhook Holdings, Inc. (“Skyhook”) to facilitate the Wi-Fi Positioning functionality. Data controlled by Skyhook is outside the scope of the Axon Cloud Services Privacy Policy and is subject to the Skyhook Services Privacy Policy. 8 Storage. For Axon Unlimited Device Storage subscriptions, Agency may store unlimited data in Agency's Axon Evidence account only if data originates from Axon Capture or the applicable Axon Device. Axon may charge Agency additional fees for exceeding purchased storage amounts. Axon may place Agency Content that Agency has not viewed or accessed for 6 months into archival storage. Agency Content in archival storage will not have immediate availability and may take up to 24 hours to access. 9 Location of Storage. Axon may transfer Agency Content to third-party subcontractors for storage. Axon will determine the locations of data centers for storage of Agency Content. For United States agencies, Axon will ensure all Agency Content stored in Axon Cloud Services remains within the United States. Ownership of Agency Content remains with Agency. 10 Suspension. Axon may temporarily suspend Agency’s or any end user’s right to access or use any portion or all of Axon Cloud Services immediately upon notice, if Agency or end user’s use of or registration for Axon Cloud Services may (a) pose a security risk to Axon Cloud Services or any third-party; (b) adversely impact Axon Cloud Services , the systems, or content of any other customer; (c) subject Axon, Axon’s affiliates, or any third-party to liability; or (d) be fraudulent. Agency remains responsible for all fees incurred through suspension. Axon will not delete Agency Content because of suspension, except as specified in this Agreement. 11 Axon Cloud Services Warranty. Axon disclaims any warranties or responsibility for data corruption or errors before Agency uploads data to Axon Cloud Services. 12 Axon Records. Axon Records is the software-as-a-service product that is generally available at the time Agency purchases an OSP 7 bundle. During Agency’s Axon Records Subscription Term, Agency will be entitled to receive Axon’s Update and Upgrade releases on an if-and-when available basis. An “Update” is a generally available release of Axon Records that Axon makes available from time to time. An “Upgrade” includes (i) new versions of Axon Records that enhance features and DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 8 of 17 functionality, as solely determined by Axon; and/or (ii) new versions of Axon Records that provide additional features or perform additional functions. Upgrades exclude new products that Axon introduces and markets as distinct products or applications. New or additional Axon products and applications, as well as any Axon professional services needed to configure Axon Records, are not included. If Agency purchases Axon Records as part of a bundled offering, the Axon Record subscription begins on the later of the (1) start date of that bundled offering, or (2) date Axon provisions Axon Records to Agency. 13 Axon Cloud Services Restrictions. Agency and Agency end users (including employees, contractors, agents, officers, volunteers, and directors), may not, or may not attempt to: 13.1 copy, modify, tamper with, repair, or create derivative works of any part of Axon Cloud Services; 13.2 reverse engineer, disassemble, or decompile Axon Cloud Services or apply any process to derive any source code included in Axon Cloud Services, or allow others to do the same; 13.3 access or use Axon Cloud Services with the intent to gain unauthorized access, avoid incurring fees or exceeding usage limits or quotas; 13.4 use trade secret information contained in Axon Cloud Services, except as expressly permitted in this Agreement; 13.5 access Axon Cloud Services to build a competitive device or service or copy any features, functions, or graphics of Axon Cloud Services; 13.6 remove, alter, or obscure any confidentiality or proprietary rights notices (including copyright and trademark notices) of Axon’s or Axon’s licensors on or within Axon Cloud Services; or 13.7 use Axon Cloud Services to store or transmit infringing, libelous, or other unlawful or tortious material; to store or transmit material in violation of third-party privacy rights; or to store or transmit malicious code. 14 After Termination. Axon will not delete Agency Content for 90-days following termination. There will be no functionality of Axon Cloud Services during these 90-days other than the ability to retrieve Agency Content. Agency will not incur additional fees if Agency downloads Agency Content from Axon Cloud Services during this time. Axon has no obligation to maintain or provide Agency Content after these 90-days and will thereafter, unless legally prohibited, delete all Agency Content. Upon request, Axon will provide written proof that Axon successfully deleted and fully removed all Agency Content from Axon Cloud Services. 15 Post-Termination Assistance. Axon will provide Agency with the same post-termination data retrieval assistance that Axon generally makes available to all customers. Requests for Axon to provide additional assistance in downloading or transferring Agency Content, including requests for Axon’s data egress service, will result in additional fees and Axon will not warrant or guarantee data integrity or readability in the external system. 16 U.S. Government Rights. If Agency is a U.S. Federal department or using Axon Cloud Services on behalf of a U.S. Federal department, Axon Cloud Services is provided as a “commercial item,” “commercial computer software,” “commercial computer software documentation,” and “technical data”, as defined in the Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement. If Agency is using Axon Cloud Services on behalf of the U.S. Government and these terms fail to meet the U.S. Government’s needs or are inconsistent in any respect with federal law, Agency will immediately discontinue use of Axon Cloud Services. 17 Survival. Upon any termination of this Agreement, the following sections in this Appendix will survive: Agency Owns Agency Content, Storage, Axon Cloud Services Warranty, and Axon Cloud Services Restrictions. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 9 of 17 Professional Services Appendix 1 Utilization of Services. Agency must use professional services as outlined in the Quote and this Appendix within 6 months of the Effective Date. 2 Body-Worn Camera Starter Service (BWC Starter). BWC Starter includes advance remote project planning and configuration support and one day of on-site Services and a professional services manager to work closely with Agency to assess Agency’s deployment and determine which Services are appropriate. If Agency requires more than 1 day of on-site Services, Agency must purchase additional on-site Services. The BWC Starter options include: System set up and configuration (Remote Support) • Instructor-led setup of Axon View on smartphones (if applicable) • Configure categories & custom roles based on Agency need • Troubleshoot IT issues with Axon Evidence and Axon Dock (“Dock”) access Dock configuration • Work with Agency to decide the ideal location of Dock setup and set configurations on Dock • Authenticate Dock with Axon Evidence using “Administrator” credentials from Agency • Does not include physical mounting of docks Axon instructor training (Train the Trainer) Training for Agency’s in-house instructors who can support Agency’s Axon camera and Axon Evidence training needs after Axon’s has fulfilled its contracted on-site obligations End user go-live training and support sessions • Assistance with device set up and configuration • Training on device use, Axon Evidence, and Evidence Sync Implementation document packet Axon Evidence administrator guides, camera implementation guides, network setup guide, sample policies, and categories & roles guide 3 Body-Worn Camera Virtual 1-Day Service (BWC Virtual). BWC Virtual includes all items in the BWC Starter Service Package, except one day of on-site services. 4 Out of Scope Services. Axon is only responsible to perform the professional services described in the Quote and this Appendix. Any additional professional services are out of scope. The Parties must document scope changes in a written and signed change order. Changes may require an equitable adjustment in the charges or schedule. 5 Delivery of Services. Axon personnel will work Monday through Friday, 8:30 a.m. to 5:30 p.m., except holidays. Axon will perform all on-site tasks over a consecutive timeframe. Axon will not charge Agency travel time by Axon personnel to Agency premises as work hours. 6 Access Computer Systems to Perform Services. Agency authorizes Axon to access relevant Agency computers and networks, solely for performing the Services. Axon will work to identify as soon as reasonably practicable resources and information Axon expects to use and will provide an initial itemized list to Agency. Agency is responsible for and assumes the risk of any problems, delays, losses, claims, or expenses resulting from the content, accuracy, completeness, and consistency of all data, materials, and information supplied by Agency. 7 Site Preparation. Axon will provide a hardcopy or digital copy of current user documentation for the Axon Devices (“User Documentation”). User Documentation will include all required environmental specifications for the professional Services and Axon Devices to operate per the DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 10 of 17 Axon Device User Documentation. Before installation of Axon Devices (whether performed by Agency or Axon), Agency must prepare the location(s) where Axon Devices are to be installed (“Installation Site”) per the environmental specifications in the Axon Device User Documentation. Following installation, Agency must maintain the Installation Site per the environmental specifications. If Axon modifies Axon Device User Documentation for any Axon Devices under this Agreement, Axon will provide the update to Agency when Axon generally releases it. If Axon modifies Axon Device User Documentation for any Axon Devices under this Agreement, Axon will provide the update to Agency when Axon generally releases it 8 Acceptance. When Axon completes professional Services, Axon will present an acceptance form (“Acceptance Form”) to Agency. Agency will sign the Acceptance Form acknowledging completion. If Agency reasonably believes Axon did not complete the professional Services in substantial conformance with this Agreement, Agency must notify Axon in writing of the specific reasons for rejection within 7 calendar days from delivery of the Acceptance Form. Axon will address the issues and re-present the Acceptance Form for signature. If Axon does not receive the signed Acceptance Form or written notification of reasons for rejection within 7 calendar days of delivery of the Acceptance Form, Axon will deem Agency to have accepted the professional Services. 9 Agency Network. For work performed by Axon transiting or making use of Agency’s network, Agency is solely responsible for maintenance and functionality of the network. In no event will Axon be liable for loss, damage, or corruption of Agency’s network from any cause. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 11 of 17 Technology Assurance Plan Appendix If Technology Assurance Plan (“TAP”) or a bundle including TAP is on the Quote, this appendix applies. 1 TAP Warranty. The TAP warranty is an extended warranty that starts at the end of the 1-year Hardware Limited Warranty. 2 Officer Safety Plan. If Agency purchases an Officer Safety Plan (“OSP”), Agency will receive the deliverables detailed in the Quote. Agency must accept delivery of the TASER CEW and accessories as soon as available from Axon. 3 OSP 7 Term. OSP 7 begins after Axon ships the Axon Body 3 or TASER 7 hardware to Agency. If Axon ships in the first half of the month, OSP 7 starts the 1st of the following month. If Axon ships in the second half of the month, OSP 7 starts the 15th of the following month (“OSP 7 Term”). 4 TAP BWC Upgrade. If Agency has no outstanding payment obligations and purchased TAP, Axon will provide Agency a new Axon body-worn camera (“BWC Upgrade”) as scheduled in the Quote. If Agency purchased TAP Axon will provide a BWC Upgrade that is the same or like Axon Device, at Axon’s option. Axon makes no guarantee the BWC Upgrade will utilize the same accessories or Axon Dock. 5 TAP Dock Upgrade. If Agency has no outstanding payment obligations and purchased TAP, Axon will provide Agency a new Axon Dock as scheduled in the Quote (“Dock Upgrade”). Accessories associated with any Dock Upgrades are subject to change at Axon discretion. Dock Upgrades will only include a new Axon Dock bay configuration unless a new Axon Dock core is required for BWC compatibility. If Agency originally purchased a single-bay Axon Dock, the Dock Upgrade will be a single-bay Axon Dock model that is the same or like Axon Device, at Axon’s option. If Agency originally purchased a multi-bay Axon Dock, the Dock Upgrade will be a multi-bay Axon Dock that is the same or like Axon Device, at Axon’s option. 6 Upgrade Delay. Axon may ship the BWC and Dock Upgrades as scheduled in the Quote without prior confirmation from Agency unless the Parties agree in writing otherwise at least 90 days in advance. Axon may ship the final BWC and Dock Upgrade as scheduled in the Quote 60 days before the end of the Subscription Term without prior confirmation from Agency. 7 Upgrade Change. If Agency wants to change Axon Device models for the offered BWC or Dock Upgrade, Agency must pay the price difference between the MSRP for the offered BWC or Dock Upgrade and the MSRP for the model desired. If the model Agency desires has an MSRP less than the MSRP of the offered BWC Upgrade or Dock Upgrade, Axon will not provide a refund. The MSRP is the MSRP in effect at the time of the upgrade. 8 Return of Original Axon Device. Within 30 days of receiving a BWC or Dock Upgrade, Agency must return the original Axon Devices to Axon or destroy the Axon Devices and provide a certificate of destruction to Axon including serial numbers for the destroyed Axon Devices. If Agency does not return or destroy the Axon Devices, Axon will deactivate the serial numbers for the Axon Devices received by Agency. 9 Termination. If Agency’s payment for TAP, OSP, or Axon Evidence is more than 30 days past due, Axon may terminate TAP or OSP. Once TAP or OSP terminates for any reason: 9.1 TAP and OSP coverage terminate as of the date of termination and no refunds will be given. 9.2 Axon will not and has no obligation to provide the Upgrade Models. 9.3 Agency must make any missed payments due to the termination before Agency may purchase any future TAP or OSP. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 12 of 17 TASER 7 Appendix This TASER 7 Appendix applies to Agency’s TASER 7, OSP 7, or OSP 7 Plus purchase from Axon. 1 Duty Cartridge Replenishment Plan. If the Quote includes “Duty Cartridge Replenishment Plan”, Agency must purchase the plan for each CEW user. A CEW user includes officers that use a CEW in the line of duty and those that only use a CEW for training. Agency may not resell cartridges received. Axon will only replace cartridges used in the line of duty. 2 Training. If the Quote includes a training voucher, Agency must use the voucher within 1 year of issuance, or the voucher will be void. Axon will issue Agency a voucher annually beginning on the start of the TASER Subscription Term. The voucher has no cash value. Agency cannot exchange it for another device or service. Unless stated in the Quote, the voucher does not include travel expenses and will be Agency’s responsibility. If the Quote includes Axon Online Training or Virtual Reality Content Empathy Development for Autism/Schizophrenia (collectively, “Training Content”), Agency may access Training Content. Axon will deliver all Training Content electronically. 3 Extended Warranty. If the Quote includes an extended warranty, the extended warranty coverage period warranty will be for a 5-year term, which includes the hardware manufacturer’s warranty plus the 4-year extended term. 4 Trade-in. If the Quote contains a discount on CEW-related line items, including items related to OSP, then that discount may only be applied as a trade-in credit, and Agency must return used hardware and accessories associated with the discount (“Trade-In Units”) to Axon. Agency must ship batteries via ground shipping. Axon will pay shipping costs of the return. If Axon does not receive Trade-In Units within the timeframe below, Axon will invoice Agency the value of the trade- in credit. Agency may not destroy Trade-In Units and receive a trade-in credit. Agency Size Days to Return from Start Date of TASER 7 Subscription Less than 100 officers 30 days 100 to 499 officers 90 days 500+ officers 180 days 5 TASER 7 Subscription Term. The TASER 7 Subscription Term for a standalone TASER 7 purchase begins on shipment of the TASER 7 hardware. The TASER 7 Subscription Term for OSP 7 begins on the OSP 7 Start date. 6 Access Rights. Upon Axon granting Agency a TASER 7 Axon Evidence subscription, Agency may access and use Axon Evidence for the storage and management of data from TASER 7 CEW devices during the TASER 7 Subscription Term. Agency may not upload any non-TASER 7 data or any other files to Axon Evidence. Agency may not exceed the number of end users than the Quote specifies. 7 Privacy. Axon will not disclose Agency Content or any information about Agency except as compelled by a court or administrative body or required by any law or regulation. Axon will give notice if any disclosure request is received for Agency Content, so Agency may file an objection with the court or administrative body. Agency acknowledges and agrees that Axon may access Agency Content to: (a) perform troubleshooting services upon request or as part of Axon’s maintenance or diagnostic screenings; (b) enforce this Agreement or policies governing use of Axon Evidence; (c) generate aggregated data, excluding information that can be used to distinguish or trace an individual's identity, either alone or when combined with other personal or identifying DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 13 of 17 information that is linked or linkable to a specific individual (collectively, “PII”), to improve, analyze, support, and operate Axon’s current and future devices and services. 8 Termination. If payment for TASER 7 is more than 30 days past due, Axon may terminate Agency’s TASER 7 plan by notifying Agency. Upon termination for any reason, then as of the date of termination: 8.1 TASER 7 extended warranties and access to Training Content will terminate. No refunds will be given. 8.2 Axon will invoice Agency the remaining MSRP for TASER 7 products received before termination. If terminating for non-appropriations, Axon will not invoice Agency if Agency returns the CEW, rechargeable battery, holster, dock, core, training suits, and unused cartridges to Axon within 30 days of the date of termination. 8.3 Agency will be responsible for payment of any missed payments due to the termination before being allowed to purchase any future TASER 7 plan. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 14 of 17 Axon Auto-Tagging Appendix 1 Scope. Axon Auto-Tagging consists of the development of a module to allow Axon Evidence to interact with Agency’s Computer-Aided Dispatch (“CAD”) or Records Management Systems (“RMS”). This allows end users to auto-populate Axon video meta-data with a case ID, category, and location- based on data maintained in Agency’s CAD or RMS. 2 Support. For thirty days after completing Auto-Tagging Services, Axon will provide up to 5 hours of remote support at no additional charge. Axon will provide free support due to a change in Axon Evidence, so long as long as Agency maintains an Axon Evidence and Auto-Tagging subscription. Axon will not provide support if a change is required because Agency changes its CAD or RMS. 3 Changes. Axon is only responsible to perform the Services in this Appendix. Any additional Services are out of scope. The Parties must document scope changes in a written and signed change order. Changes may require an equitable adjustment in fees or schedule. 4 Agency Responsibilities. Axon’s performance of Auto-Tagging Services requires Agency to: 4.1 Make available relevant systems, including Agency’s current CAD or RMS, for assessment by Axon (including remote access if possible); 4.2 Make required modifications, upgrades or alterations to Agency’s hardware, facilities, systems and networks related to Axon’s performance of Auto-Tagging Services; 4.3 Provide access to the premises where Axon is performing Auto-Tagging Services, subject to Agency safety and security restrictions, and allow Axon to enter and exit the premises with laptops and materials needed to perform Auto-Tagging Services; 4.4 Provide all infrastructure and software information (TCP/IP addresses, node names, network configuration) necessary for Axon to provide Auto-Tagging Services; 4.5 Promptly install and implement any software updates provided by Axon; 4.6 Ensure that all appropriate data backups are performed; 4.7 Provide assistance, participation, and approvals in testing Auto-Tagging Services; 4.8 Provide Axon with remote access to Agency’s Axon Evidence account when required; 4.9 Notify Axon of any network or machine maintenance that may impact the performance of the module at Agency; and 4.10 Ensure reasonable availability of knowledgeable staff and personnel to provide timely, accurate, complete, and up-to-date documentation and information to Axon. 5 Access to Systems. Agency authorizes Axon to access Agency’s relevant computers, network systems, and CAD or RMS solely for performing Auto-Tagging Services. Axon will work diligently to identify as soon as reasonably practicable resources and information Axon expects to use and will provide an initial list to Agency. Agency is responsible for and assumes the risk of any problems, delays, losses, claims, or expenses resulting from the content, accuracy, completeness, and consistency of all data, materials, and information supplied by Agency. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 15 of 17 Axon Fleet Appendix 1 Agency Responsibilities. Agency must ensure its infrastructure and vehicles adhere to the minimum requirements to operate Axon Fleet 2 or Axon Fleet 3 (collectively, “Axon Fleet”) as established by Axon during the qualifier call and on-site assessment at Agency and in any technical qualifying questions. If Agency’s representations are inaccurate, the Quote is subject to change. 2 Cradlepoint. If Agency purchases Cradlepoint Enterprise Cloud Manager, Agency will comply with Cradlepoint’s end user license agreement. The term of the Cradlepoint license may differ from the Axon Evidence Subscription. If Agency requires Cradlepoint support, Agency will contact Cradlepoint directly. 3 Third-party Installer. Axon will not be liable for the failure of Axon Fleet hardware to operate per specifications if such failure results from installation not performed by, or as directed by Axon. 4 Wireless Offload Server. 4.1 License Grant. Axon grants Agency a non-exclusive, royalty-free, worldwide, perpetual license to use Wireless Offload Server (“WOS”). “Use” means storing, loading, installing, or executing WOS solely for data communication with Axon Devices for the number of licenses purchased. The WOS term begins upon the start of the Axon Evidence Subscription. 4.2 Restrictions. Agency may not: (a) modify, alter, tamper with, repair, or create derivative works of WOS; (b) reverse engineer, disassemble, or decompile WOS, apply any process to derive the source code of WOS, or allow others to do so; (c) access or use WOS to avoid incurring fees or exceeding usage limits; (d) copy WOS in whole or part; (e) use trade secret information contained in WOS; (f) resell, rent, loan or sublicense WOS; (g) access WOS to build a competitive device or service or copy any features, functions or graphics of WOS; or (h) remove, alter or obscure any confidentiality or proprietary rights notices (including copyright and trademark notices) of Axon or Axon’s licensors on or within WOS. 4.3 Updates. If Agency purchases WOS maintenance, Axon will make updates and error corrections to WOS (“WOS Updates”) available electronically via the Internet or media as determined by Axon. Agency is responsible for establishing and maintaining adequate Internet access to receive WOS Updates and maintaining computer equipment necessary for use of WOS. The Quote will detail the maintenance term. 4.4 WOS Support. Upon request by Axon, Agency will provide Axon with access to Agency’s store and forward servers solely for troubleshooting and maintenance. 5 Axon Vehicle Software. 5.1 License Grant. Axon grants Agency a non-exclusive, royalty-free, worldwide, perpetual license to use ViewXL or Dashboard (collectively, “Axon Vehicle Software”.) “Use” means storing, loading, installing, or executing Axon Vehicle Software solely for data communication with Axon Devices. The Axon Vehicle Software term begins upon the start of the Axon Evidence Subscription. 5.2 Restrictions. Agency may not: (a) modify, alter, tamper with, repair, or create derivative works of Axon Vehicle Software; (b) reverse engineer, disassemble, or decompile Axon Vehicle Software, apply any process to derive the source code of Axon Vehicle Software, or allow others to do so; (c) access or use Axon Vehicle Software to avoid incurring fees or exceeding usage limits; (d) copy Axon Vehicle Software in whole or part; (e) use trade secret information contained in Axon Vehicle Software; (f) resell, rent, loan or sublicense Axon Vehicle Software; (g) access Axon Vehicle Software to build a competitive device or service or copy any features, functions or graphics of Axon Vehicle Software; or (h) remove, alter or obscure any confidentiality or proprietary rights notices (including copyright and trademark notices) of Axon or Axon’s licensors on or within Axon Vehicle Software. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 16 of 17 6 Axon Fleet Upgrade. If Agency has no outstanding payment obligations and has purchased the “Fleet Technology Assurance Plan” (Fleet TAP), Axon will provide Agency with the same or like model of Fleet hardware (“Fleet Upgrade”) as schedule on the Quote. If Agency would like to change models for the Axon Fleet Upgrade, Agency must pay the difference between the MSRP for the offered Axon Fleet Upgrade and the MSRP for the model desired. The MSRP is the MSRP in effect at the time of the upgrade. Agency is responsible for the removal of previously installed hardware and installation of the Axon Fleet Upgrade. Within 30 days of receiving the Axon Fleet Upgrade, Agency must return the original Axon Devices to Axon or destroy the Axon Devices and provide a certificate of destruction to Axon, including serial numbers of the destroyed Axon Devices. If Agency does not destroy or return the Axon Devices to Axon, Axon will deactivate the serial numbers for the Axon Devices received by Agency. 7 Privacy. Axon will not disclose Agency Content or any information about Agency except as compelled by a court or administrative body or required by any law or regulation. Axon will give notice if any disclosure request is received for Agency Content, so Agency may file an objection with the court or administrative body. Agency acknowledges and agrees that Axon may access Agency Content to: (a) perform troubleshooting services upon request or as part of Axon’s maintenance or diagnostic screenings; (b) enforce this Agreement or policies governing use of Axon Evidence; (c) generate aggregated data, excluding information that can be used to distinguish or trace an individual's identity, either alone or when combined with other personal or identifying information that is linked or linkable to a specific individual (collectively, “PII”), to improve, analyze, support, and operate Axon’s current and future devices and services. 8 Axon Fleet Termination. Axon may terminate Agency’s Fleet subscription for non-payment. Upon any termination: 8.1 Axon Fleet subscription coverage terminates, and no refunds will be given. 8.2 Axon will not and has no obligation to provide the Axon Fleet Upgrade. 8.3 Agency will be responsible for payment of any missed payments due to the termination before being allowed to purchase any future Fleet TAP. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Master Services and Purchasing Agreement Title: Master Services and Purchasing Agreement between Axon and Agency Department: Legal Version: 12.0 Release Date: 12/18/2020 Page 17 of 17 Axon Respond Appendix This Axon Respond Appendix applies to both Axon Respond and Axon Respond Plus. 1 Axon Respond Subscription Term. If Agency purchases Axon Respond as part of a bundled offering, the Axon Respond subscription begins on the later of the (1) start date of that bundled offering, or (2) date Axon provisions Axon Respond to Agency. If Agency purchases Axon Respond as a standalone, the Axon Respond subscription begins the later of the (1) date Axon provisions Axon Respond to Agency, or (2) first day of the month following the Effective Date. The Axon Respond subscription term will end upon the completion of the Axon Evidence Subscription associated with Axon Respond. 2 Scope of Axon Respond. The scope of Axon Respond is to assist Agency with real-time situational awareness during critical incidents to improve officer safety, effectiveness, and awareness. In the event Agency uses Axon Respond outside this scope, Axon may initiate good- faith discussions with Agency on upgrading Agency’s Axon Respond to better meet Agency’s needs. 3 Axon Body 3 LTE Requirements. Axon Respond is only available and usable with an LTE enabled body-worn camera. Axon is not liable if Agency utilizes the LTE device outside of the coverage area or if the LTE carrier is unavailable. LTE coverage is only available in the United States, including any U.S. territories. Axon may utilize a carrier of Axon’s choice to provide LTE service. Axon may change LTE carriers during the Term without Agency’s consent. 4 Axon Fleet 3 LTE Requirements. Axon Respond is only available and usable with a Fleet 3 system configured with LTE modem and service. Agency is responsible for providing LTE service for the modem. Coverage and availability of LTE service is subject to Agency’s LTE carrier. 5 Axon Respond Service Limitations. Agency acknowledges that LTE service is made available only within the operating range of the networks. Service may be temporarily refused, interrupted, or limited because of: (a) facilities limitations; (b) transmission limitations caused by atmospheric, terrain, other natural or artificial conditions adversely affecting transmission, weak batteries, system overcapacity, movement outside a service area or gaps in coverage in a service area and other causes reasonably outside of the carrier’s control such as intentional or negligent acts of third parties that damage or impair the network or disrupt service; or (c) equipment modifications, upgrades, relocations, repairs, and other similar activities necessary for the proper or improved operation of service. With regard to Axon Body 3, Partner networks are made available as-is and the carrier makes no warranties or representations as to the availability or quality of roaming service provided by carrier partners, and the carrier will not be liable in any capacity for any errors, outages, or failures of carrier partner networks. Agency expressly understands and agrees that it has no contractual relationship whatsoever with the underlying wireless service provider or its affiliates or contractors and Agency is not a third-party beneficiary of any agreement between Axon and the underlying carrier. 6 Termination. Upon termination of this Agreement, or if Agency stops paying for Axon Respond or bundles that include Axon Respond, Axon will end Aware services, including any Axon-provided LTE service. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Bremerton Police Dept. -WA ISSUED 3/12/2021 AXON SALES REPRESENTATIVE Robbie Taylor (480) 502-6274 rtaylor@axon.com Q-290737-44267.883RT 1 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Payment Terms: Net 30 Delivery Method: Fedex -Ground Q-290737-44267.883RT Year 1 -Core Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Axon Plans & Packages 20248 TASER 7 EVIDENCE.COM ACCESS LICENSE 60 1 0.00 0.00 0.00 73746 PROFESSIONAL EVIDENCE.COM LICENSE 60 50 0.00 0.00 0.00 73686 EVIDENCE.COM UNLIMITED AXON DEVICE STORAGE 60 50 0.00 0.00 0.00 73683 10 GB EVIDENCE.COM A-LA-CART STORAGE 60 150 0.00 0.00 0.00 20248 TASER 7 EVIDENCE.COM ACCESS LICENSE 60 50 0.00 0.00 0.00 20246 TASER 7 DUTY CARTRIDGE REPLACEMENT ACCESS LICENSE 60 50 0.00 0.00 0.00 73449 RESPOND DEVICE LICENSE 60 50 0.00 0.00 0.00 73682 AUTO TAGGING LICENSE 60 50 0.00 0.00 0.00 73746 PROFESSIONAL EVIDENCE.COM LICENSE 60 9 0.00 0.00 0.00 73686 EVIDENCE.COM UNLIMITED AXON DEVICE STORAGE 60 9 0.00 0.00 0.00 73683 10 GB EVIDENCE.COM A-LA-CART STORAGE 60 36 0.00 0.00 0.00 73449 RESPOND DEVICE LICENSE 60 9 0.00 0.00 0.00 73682 AUTO TAGGING LICENSE 60 9 0.00 0.00 0.00 Hardware 20160 TASER 7 HOLSTER -SAFARILAND, RH+CART CARRIER 50 0.00 0.00 0.00 Issued: 03/12/2021 Quote Expiration: 06/15/2021 Account Number: 107761 Axon Enterprise, Inc. 17800 N 85th St. Scottsdale, Arizona 85255 United States Phone: (800) 978-2737 Protect Life. PRIMARY CONTACT Randy Plumb Phone: (360) 473-5974 Email: randy.plumb@ci.bremerton.wa.us BILL TO Bremerton Police Dept. -WA 1025 Burwell Street Bremerton, WA 98337 US SHIP TO Randy Plumb Bremerton Police Dept. -WA 1025 Burwell Street Bremerton, WA 98337 US SALES REPRESENTATIVE Robbie Taylor Phone: (480) 502-6274 Email: rtaylor@axon.com Fax: Q-290737-44267.883RT 2 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Year 1 -Core (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 75015 SIGNAL SIDEARM KIT 50 0.00 0.00 0.00 70112 AXON SIGNAL UNIT 8 0.00 0.00 0.00 20008 TASER 7 HANDLE, YLW, HIGH VISIBILITY (GREEN LASER), CLASS 3R 50 0.00 0.00 0.00 20040 TASER 7 HANDLE WARRANTY, 4-YEAR 50 0.00 0.00 0.00 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 150 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 150 0.00 0.00 0.00 73202 AXON BODY 3 -NA10 50 0.00 0.00 0.00 71044 BATTERY, SIGNAL SIDEARM, CR2430 SINGLE PACK 100 0.00 0.00 0.00 70033 WALL MOUNT BRACKET, ASSY, EVIDENCE.COM DOCK 8 0.00 0.00 0.00 74210 AXON BODY 3 -8 BAY DOCK 8 0.00 0.00 0.00 22179 TASER 7 INERT CARTRIDGE, STANDOFF (3.5-DEGREE) NS 50 0.00 0.00 0.00 22181 TASER 7 INERT CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 50 0.00 0.00 0.00 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 22177 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, STANDOFF NS 100 0.00 0.00 0.00 22178 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, CLOSE QUART NS 100 0.00 0.00 0.00 20018 TASER 7 BATTERY PACK, TACTICAL 60 0.00 0.00 0.00 20041 TASER 7 BATTERY PACK WARRANTY, 4- YEAR 60 0.00 0.00 0.00 20042 TASER 7 DOCK & CORE WARRANTY, 4- YEAR 1 0.00 0.00 0.00 70033 WALL MOUNT BRACKET, ASSY, EVIDENCE.COM DOCK 1 0.00 0.00 0.00 74200 TASER 7 6-BAY DOCK AND CORE 1 0.00 0.00 0.00 11534 USB-C to USB-A CABLE FOR AB3 OR FLEX 2 50 0.00 0.00 0.00 20050 HOOK-AND-LOOP TRAINING (HALT) SUIT 1 0.00 0.00 0.00 80090 TARGET FRAME, PROFESSIONAL, 27.5 IN. X 75 IN., TASER 7 1 0.00 0.00 0.00 Protect Life.Q-290737-44267.883RT 3 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Year 1 -Core (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 74020 MAGNET MOUNT, FLEXIBLE, AXON RAPIDLOCK 55 0.00 0.00 0.00 73202 AXON BODY 3 -NA10 9 699.00 699.00 6,291.00 74210 AXON BODY 3 -8 BAY DOCK 1 1,495.00 1,495.00 1,495.00 70033 WALL MOUNT BRACKET, ASSY, EVIDENCE.COM DOCK 1 43.90 43.90 43.90 74020 MAGNET MOUNT, FLEXIBLE, AXON RAPIDLOCK 10 0.00 0.00 0.00 11534 USB-C to USB-A CABLE FOR AB3 OR FLEX 2 9 0.00 0.00 0.00 Other 20320 AXON CORE + PLAN WITH T7 CERT HEADER 50 0.00 0.00 0.00 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 73827 AB3 CAMERA TAP WARRANTY 60 50 0.00 0.00 0.00 73828 AB3 8 BAY DOCK TAP WARRANTY 60 8 0.00 0.00 0.00 71019 NORTH AMER POWER CORD FOR AB3 8- BAY, AB2 1-BAY / 6-BAY DOCK 8 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 80087 TASER 7 TARGET, CONDUCTIVE, PROFESSIONAL (RUGGEDIZED)1 0.00 0.00 0.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,068.00 9,612.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73827 AB3 CAMERA TAP WARRANTY 60 9 0.00 0.00 0.00 73828 AB3 8 BAY DOCK TAP WARRANTY 60 1 0.00 0.00 0.00 71019 NORTH AMER POWER CORD FOR AB3 8- BAY, AB2 1-BAY / 6-BAY DOCK 1 0.00 0.00 0.00 Services 80129 SIGNAL OR ROUTER ONLY INSTALLATION (PER VEHICLE)8 0.00 0.00 0.00 79999 AUTO TAGGING / PERFORMANCE IMPLEMENTATION SERVICE 1 0.00 0.00 0.00 85144 AXON STARTER 1 2,750.00 2,750.00 2,750.00 Protect Life.Q-290737-44267.883RT 4 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Year 1 -Core (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Services (Continued) 79999 AUTO TAGGING / PERFORMANCE IMPLEMENTATION SERVICE 1 0.00 0.00 0.00 Subtotal 117,103.90 Estimated Shipping 0.00 Estimated Tax 10,539.37 Total 127,643.27 Year 1 -Fleet Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Axon Plans & Packages 80410 FLEET, EVIDENCE LICENSE, 1 CAMERA STORAGE, ACCESS 60 78 0.00 0.00 0.00 80400 FLEET, VEHICLE LICENSE, ACCESS 60 39 0.00 0.00 0.00 Hardware 72036 FLEET 3 STANDARD 2 CAMERA KIT 39 0.00 0.00 0.00 80486 EXT WARRANTY, FLEET 3, 2 CAMERA KIT, 4 YEARS 39 0.00 0.00 0.00 11634 CRADLEPOINT IBR900-1200M-B-NPS+5YR NETCLOUD 39 0.00 0.00 0.00 71200 FLEET ANT, AIRGAIN, 5-IN-1, 2LTE, 2WIFI, 1GNSS, BL 39 0.00 0.00 0.00 74110 FLEET ETHERNET CABLE, CAT6, 25 FT 39 0.00 0.00 0.00 Other 73391 FLEET 3 NEW INSTALLATION (PER VEHICLE)39 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,330.98 51,908.22 Subtotal 51,908.22 Estimated Tax 4,671.74 Total 56,579.96 Spares -BWC Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 20008 TASER 7 HANDLE, YLW, HIGH VISIBILITY (GREEN LASER), CLASS 3R 1 0.00 0.00 0.00 73202 AXON BODY 3 -NA10 1 0.00 0.00 0.00 20040 TASER 7 HANDLE WARRANTY, 4-YEAR 1 0.00 0.00 0.00 74028 WING CLIP MOUNT, AXON RAPIDLOCK 1 0.00 0.00 0.00 Protect Life.Q-290737-44267.883RT 5 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Spares -BWC (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 11534 USB-C to USB-A CABLE FOR AB3 OR FLEX 2 1 0.00 0.00 0.00 Other 73827 AB3 CAMERA TAP WARRANTY 60 1 0.00 0.00 0.00 Subtotal 0.00 Estimated Tax 0.00 Total 0.00 Year 2 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Other 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Year 3 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Protect Life.Q-290737-44267.883RT 6 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Year 3 (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 22177 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, STANDOFF NS 100 0.00 0.00 0.00 22178 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, CLOSE QUART NS 100 0.00 0.00 0.00 Other 73309 AXON CAMERA REFRESH ONE 50 0.00 0.00 0.00 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 73689 MULTI-BAY BWC DOCK 1ST REFRESH 8 0.00 0.00 0.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 73309 AXON CAMERA REFRESH ONE 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 73309 AXON CAMERA REFRESH ONE 9 0.00 0.00 0.00 73689 MULTI-BAY BWC DOCK 1ST REFRESH 1 0.00 0.00 0.00 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Year 4 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Other 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 Protect Life.Q-290737-44267.883RT 7 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Year 4 (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Other (Continued) 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Year 5 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Other 73310 AXON CAMERA REFRESH TWO 50 0.00 0.00 0.00 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 73688 MULTI-BAY BWC DOCK 2ND REFRESH 8 0.00 0.00 0.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 73310 AXON CAMERA REFRESH TWO 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 73310 AXON CAMERA REFRESH TWO 9 0.00 0.00 0.00 73688 MULTI-BAY BWC DOCK 2ND REFRESH 1 0.00 0.00 0.00 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Grand Total 921,116.27 Protect Life.Q-290737-44267.883RT 8 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Summary of Payments Payment Amount (USD) Year 1 -Core 127,643.27 Year 1 -Fleet 56,579.96 Spares -BWC 0.00 Year 2 184,223.26 Year 3 184,223.26 Year 4 184,223.26 Year 5 184,223.26 Grand Total 921,116.27 Protect Life.Q-290737-44267.883RT 9 DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Notes NASPO Contract No. OK-MA-145-015 used for pricing and purchasing justification Purchase of TASER 7 are governed by the TASER 7 Agreement located at https://www.axon.com/legal/sales-terms-and-conditions and not the Master Services and Purchasing Agreement referenced below. Tax is subject to change at order processing with valid exemption. Axon’s Sales Terms and Conditions This Quote is limited to and conditional upon your acceptance of the provisions set forth herein and Axon’s Master Services and Purchasing Agreement (posted at www.axon.com/legal/sales-terms-and-conditions), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable.Any purchase order issued in response to this Quote is subject solely to the above referenced terms and conditions. By signing below, you represent that you are lawfully able to enter into contracts. If you are signing on behalf of an entity (i ncluding but not limited to the company, municipality, or government agency for whom you work), you represent to Axon that you have legal authority to bind t hat entity. If you do not have this authority, please do not sign this Quote. Signature:CustSIG Date:CustDate Name (Print):CustName Title:CustTitle PO# (Or write N/A):CustPo Please sign and email to Robbie Taylor at rtaylor@axon.com or fax to Thank you for being a valued Axon customer. For your convenience on your next order, please check out our online store buy.axon.com The trademarks referenced above are the property of their respective owners. Protect Life.Q-290737-44267.883RT 10 ***Axon Internal Use Only*** Review 1 Review 2 SFDC Contract #: Order Type: RMA #: Address Used: SO #: Comments: DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Protect Life.Q-290737-44267.883RT 11 Bremerton Police Dept. -WA What is the contact name and phone number for this shipment? What are your receiving hours? (Monday-Friday) Is a dock available for this incoming shipment? Are there any delivery restrictions? (no box trucks, etc.) AT T E N T I O N This order may qualify for freight shipping, please fill out the following information. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 STATEMENT OF WORK & CONFIGURATION DOCUMENT Axon Fleet In-Car Recording Platform This document details a proposed system design Agency Created For: Bremerton PD Sold By: Robbie Taylor Designed By: Jake Borro Installed By: Axon Professional Services DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 VEHICLE OVERVIEW SITE NAME CUSTOMER NAME Headquarters Bremerton PD Total Configured Vehicles Axon Camera Fleet Hub In-Car Router • 39 Total Vehicles with this Configuration Video Capture Sources • 78 • 1 Total Cameras Deployed Fleet Hub(s) Per Vehicle Mobile Data Terminal Per Vehicle • 1 Located In Each Vehicle Mobile Router Per Vehicle • 1 IBR900-1200M-B Offload Mechanism • 4G LTE Cellular Evidence Management System • Evidence.com SYSTEM CONFIGURATION DETAILS The following sections detail the configuration of the Axon Fleet In-Car System Vehicle Hardware Vehicle Hardware 2 Axon Fleet Cameras will be installed in each vehicle 1 Axon Fleet Hub will be installed in each vehicle 1 5-in-1 Antenna will be installed in each vehicle 1 3-in-1 Antenna will be installed in each vehicle 1 IBR900-1200M-B router will be installed in each vehicle Signal Activation Methods 5 Triggers will be configured per vehicle The following devices will be configured for Signal activation: Light-Bar, Gunlock, Crash, Speed, Siren. When triggered, the Axon Signal technology in the Fleet 3 Hub will activate the recording mechanism for all configured Axon cameras within Bluetooth range of the vehicle. Mobile Data Computer Each vehicle will be equipped with a Mobile Data Computer provided by the customer, which meets or exceeds the specifications provided by Axon. Mobile Data Computer Requirements Operating System: Windows 7 SP1 or Windows 10 (version 1909 or higher) - x32 or x64 with the most current service packs and updates Hard Drive: Must have 25GB+ of free disk space RAM/Memory: for x32: 4GB | for x64: 8GB or greater Ethernet Port: It is recommended that the MDC have one dedicated and available Ethernet port reserved for an Ethernet cable from router. The Ethernet port can be located on an electronic and stationary mobile docking station. If a docking station is used, it is the preferred location for the Ethernet port. Wi-Fi Card: If the MDC is not connected to the router via Ethernet LAN, a WiFi card is required in the MDC. In this case, the WiFi card should meet or exceed the router's minimum WiFi radio compatibility requirements. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Additional Considerations The Cradlepoint router includes the antenna(s) and Cradlecare. For agencies that use a VPN, Axon traffic must be passed through; such that it does not use the VPN tunnel. Customer must provide IT and / or Admin resources at time of installation to ensure data routing if functional for Axon Fleet operation. In the event an Agency is unable to support the IT requirements associated with the installation, Axon reserves the right to charge the Agency for additional time associated with on -site work completed by an Axon Personnel. Hardware Provisioning Axon will provide the following router for all vehicles: IBR900-1200M-B The customer will provide an MDC for each vehicle. If the customer chooses to provide their own SIM, they must be activated and available at time of installation SIM Location SIM will be located in router and can be inserted in router by Cradlepoint if carrier is specified by agency. 4G / Cellular Offload Considerations Network Considerations The IBR900-1200M-B will be the connection which allows 4G upload of recorded video The customer will ensure that their cellular contract does not allow for data throttling, or service denial, once a set data threshold is met. Throttling or denial of service will negatively affect Fleet upload capabilities. Network Consideration Agreement Network Consideration Agreement Customer acknowledges the minimum requirements for the network to support this Statement of Work. Axon employees performing services under this SOW are CJIS certified. If the network provided by Customer does not meet the minimum requirements, or in the event of a requested change in scope of the project, a Change Order will be required and additional fees may apply. Additional fees would also apply if Axon is required to extend the installation time for reasons caused by the customer or the customer network accessibility. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Professional Services & Training Project Management Axon will assign a Project Manager that will provide the expertise to execute a successful Fleet camera deployment and implementation. The Project Manager will have knowledge and experience with all phases of the project management lifecycle and with all application modules being implemented. He/she will work closely with the customer's project manager and project team members and will be responsible for completing the tasks required to meet all contract deliverables. Vehicle Installation Customer agrees to have the above mentioned number of intended vehicles available at the time of deployment. Axon will be performing the installation of all Axon Fleet vehicle hardware. Installation services included with Axon Fleet system include a “clip” and removal of existing in-car system hardware, if applicable. This does not include “full removal” of existing wiring. A “full removal” of all existing hardware and wiring is subject to additional fees. Axon provides basic Fleet operation overview to the customer lead and/or Admin at the time of install. o It is necessary to differentiate between the type of equipment removal to be provided by Axon. Standard Fleet Installation includes hardware removal in a fashion considered “Clip” which means Axon cuts the wires from the old system without removing multiple panels, removing all wiring and parts from the old system. In the case Axon removes the hardware Axon is not responsible for the surplus of hardware or any devices that may have been physically integrated with the removed system. In some situations, radar systems are integrated with the in-car video system and have a cable that connects to the system, if Axon removes the old in car system then Axon is not responsible for the radar system as part of the removal. o A “Rip” removal should be contracted through ProLogic directly. The Rip would be similar to a complete and full removal, which is more common when they retire a vehicle from service. Chosen installation site must have internet access for the Hub, through the router,and MDC for configuration and testing of Fleet 3. Customer must have a resource onsite during installation with Axon Evidence Device Administration permissions to assist with logging into customer MDCs and configuring vehicle software. Custom Trigger Installation The Fleet 3 Hub has multiple trigger configuration options. Any trigger configurations that include a door or magnetic door switch are considered “custom” and may be subject to additional fees. An Axon representative has discussed with the Agency the standard triggers of the Fleet System. Those no-cost triggers include Light-bar,Siren, Speed, Motion Activation and Gun-lock activation. The light-bar must have a controller to allow Axon to interface for the desired position, gun -locks must be installed with existing hardware in the vehicle. Doors are considered “CUSTOM” since they required additional hardware and time for installation, typically requiring the door may need to be taken apart for the installation. Training End-user go-live training provides individual device set up and configuration assistance, training on device use, Evidence.com and AXON Fleet Dashboard. This is included at no additional cost. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 No tes Tax is subject to change at order processing with valid exemption. Axon’s Sales Terms and Conditions This Quote is limited to and conditional upon your acceptance of the provisions set forth herein and Axon’s Master Services a nd Purchasing Agreement (posted at www.axon.com/legal/sales-terms-and-conditions), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable. Any purchase order issued in response to this Quote is subject solely to the above referenced t erms and conditions. By signing below, you represent that you are lawfully able to enter into contracts. If you are signing on behalf of an entity (i ncluding but not limited to the company, municipality, or government agency for whom you work), you represent to Axo n that you have legal authority to bind that entity. If you do not have this authority, please do not sign this Quote. Signature: Date: Name (Print): Title: PO# (Or write N/A): Thank you for being a valued Axon customer. For your convenience on your next order, please check out our online store buy.axon.com The trademarks referenced above are the property of their respective owners. ***Axon Internal Use Only*** SFDC Contract #: Order Type: RMA #: Address Used: SO #: Review 1 Review 2 Comments: Protect Life. DocuSign Envelope ID: 82C4FB73-5470-4582-8BBD-19336864AD04 Bremerton Police Dept. -WA ISSUED 3/12/2021 AXON SALES REPRESENTATIVE Robbie Taylor (480) 502-6274 rtaylor@axon.com Q-290737-44267.883RT 1 Payment Terms: Net 30 Delivery Method: Fedex -Ground Q-290737-44267.883RT Year 1 -Core Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Axon Plans & Packages 20248 TASER 7 EVIDENCE.COM ACCESS LICENSE 60 1 0.00 0.00 0.00 73746 PROFESSIONAL EVIDENCE.COM LICENSE 60 50 0.00 0.00 0.00 73686 EVIDENCE.COM UNLIMITED AXON DEVICE STORAGE 60 50 0.00 0.00 0.00 73683 10 GB EVIDENCE.COM A-LA-CART STORAGE 60 150 0.00 0.00 0.00 20248 TASER 7 EVIDENCE.COM ACCESS LICENSE 60 50 0.00 0.00 0.00 20246 TASER 7 DUTY CARTRIDGE REPLACEMENT ACCESS LICENSE 60 50 0.00 0.00 0.00 73449 RESPOND DEVICE LICENSE 60 50 0.00 0.00 0.00 73682 AUTO TAGGING LICENSE 60 50 0.00 0.00 0.00 73746 PROFESSIONAL EVIDENCE.COM LICENSE 60 9 0.00 0.00 0.00 73686 EVIDENCE.COM UNLIMITED AXON DEVICE STORAGE 60 9 0.00 0.00 0.00 73683 10 GB EVIDENCE.COM A-LA-CART STORAGE 60 36 0.00 0.00 0.00 73449 RESPOND DEVICE LICENSE 60 9 0.00 0.00 0.00 73682 AUTO TAGGING LICENSE 60 9 0.00 0.00 0.00 Hardware 20160 TASER 7 HOLSTER -SAFARILAND, RH+CART CARRIER 50 0.00 0.00 0.00 Issued: 03/12/2021 Quote Expiration: 06/15/2021 Account Number: 107761 Axon Enterprise, Inc. 17800 N 85th St. Scottsdale, Arizona 85255 United States Phone: (800) 978-2737 Protect Life. PRIMARY CONTACT Randy Plumb Phone: (360) 473-5974 Email: randy.plumb@ci.bremerton.wa.us BILL TO Bremerton Police Dept. -WA 1025 Burwell Street Bremerton, WA 98337 US SHIP TO Randy Plumb Bremerton Police Dept. -WA 1025 Burwell Street Bremerton, WA 98337 US SALES REPRESENTATIVE Robbie Taylor Phone: (480) 502-6274 Email: rtaylor@axon.com Fax: Q-290737-44267.883RT 2 Year 1 -Core (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 75015 SIGNAL SIDEARM KIT 50 0.00 0.00 0.00 70112 AXON SIGNAL UNIT 8 0.00 0.00 0.00 20008 TASER 7 HANDLE, YLW, HIGH VISIBILITY (GREEN LASER), CLASS 3R 50 0.00 0.00 0.00 20040 TASER 7 HANDLE WARRANTY, 4-YEAR 50 0.00 0.00 0.00 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 150 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 150 0.00 0.00 0.00 73202 AXON BODY 3 -NA10 50 0.00 0.00 0.00 71044 BATTERY, SIGNAL SIDEARM, CR2430 SINGLE PACK 100 0.00 0.00 0.00 70033 WALL MOUNT BRACKET, ASSY, EVIDENCE.COM DOCK 8 0.00 0.00 0.00 74210 AXON BODY 3 -8 BAY DOCK 8 0.00 0.00 0.00 22179 TASER 7 INERT CARTRIDGE, STANDOFF (3.5-DEGREE) NS 50 0.00 0.00 0.00 22181 TASER 7 INERT CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 50 0.00 0.00 0.00 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 22177 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, STANDOFF NS 100 0.00 0.00 0.00 22178 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, CLOSE QUART NS 100 0.00 0.00 0.00 20018 TASER 7 BATTERY PACK, TACTICAL 60 0.00 0.00 0.00 20041 TASER 7 BATTERY PACK WARRANTY, 4- YEAR 60 0.00 0.00 0.00 20042 TASER 7 DOCK & CORE WARRANTY, 4- YEAR 1 0.00 0.00 0.00 70033 WALL MOUNT BRACKET, ASSY, EVIDENCE.COM DOCK 1 0.00 0.00 0.00 74200 TASER 7 6-BAY DOCK AND CORE 1 0.00 0.00 0.00 11534 USB-C to USB-A CABLE FOR AB3 OR FLEX 2 50 0.00 0.00 0.00 20050 HOOK-AND-LOOP TRAINING (HALT) SUIT 1 0.00 0.00 0.00 80090 TARGET FRAME, PROFESSIONAL, 27.5 IN. X 75 IN., TASER 7 1 0.00 0.00 0.00 Protect Life.Q-290737-44267.883RT 3 Year 1 -Core (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 74020 MAGNET MOUNT, FLEXIBLE, AXON RAPIDLOCK 55 0.00 0.00 0.00 73202 AXON BODY 3 -NA10 9 699.00 699.00 6,291.00 74210 AXON BODY 3 -8 BAY DOCK 1 1,495.00 1,495.00 1,495.00 70033 WALL MOUNT BRACKET, ASSY, EVIDENCE.COM DOCK 1 43.90 43.90 43.90 74020 MAGNET MOUNT, FLEXIBLE, AXON RAPIDLOCK 10 0.00 0.00 0.00 11534 USB-C to USB-A CABLE FOR AB3 OR FLEX 2 9 0.00 0.00 0.00 Other 20320 AXON CORE + PLAN WITH T7 CERT HEADER 50 0.00 0.00 0.00 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 73827 AB3 CAMERA TAP WARRANTY 60 50 0.00 0.00 0.00 73828 AB3 8 BAY DOCK TAP WARRANTY 60 8 0.00 0.00 0.00 71019 NORTH AMER POWER CORD FOR AB3 8- BAY, AB2 1-BAY / 6-BAY DOCK 8 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 80087 TASER 7 TARGET, CONDUCTIVE, PROFESSIONAL (RUGGEDIZED)1 0.00 0.00 0.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,068.00 9,612.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73827 AB3 CAMERA TAP WARRANTY 60 9 0.00 0.00 0.00 73828 AB3 8 BAY DOCK TAP WARRANTY 60 1 0.00 0.00 0.00 71019 NORTH AMER POWER CORD FOR AB3 8- BAY, AB2 1-BAY / 6-BAY DOCK 1 0.00 0.00 0.00 Services 80129 SIGNAL OR ROUTER ONLY INSTALLATION (PER VEHICLE)8 0.00 0.00 0.00 79999 AUTO TAGGING / PERFORMANCE IMPLEMENTATION SERVICE 1 0.00 0.00 0.00 85144 AXON STARTER 1 2,750.00 2,750.00 2,750.00 Protect Life.Q-290737-44267.883RT 4 Year 1 -Core (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Services (Continued) 79999 AUTO TAGGING / PERFORMANCE IMPLEMENTATION SERVICE 1 0.00 0.00 0.00 Subtotal 117,103.90 Estimated Shipping 0.00 Estimated Tax 10,539.37 Total 127,643.27 Year 1 -Fleet Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Axon Plans & Packages 80410 FLEET, EVIDENCE LICENSE, 1 CAMERA STORAGE, ACCESS 60 78 0.00 0.00 0.00 80400 FLEET, VEHICLE LICENSE, ACCESS 60 39 0.00 0.00 0.00 Hardware 72036 FLEET 3 STANDARD 2 CAMERA KIT 39 0.00 0.00 0.00 80486 EXT WARRANTY, FLEET 3, 2 CAMERA KIT, 4 YEARS 39 0.00 0.00 0.00 11634 CRADLEPOINT IBR900-1200M-B-NPS+5YR NETCLOUD 39 0.00 0.00 0.00 71200 FLEET ANT, AIRGAIN, 5-IN-1, 2LTE, 2WIFI, 1GNSS, BL 39 0.00 0.00 0.00 74110 FLEET ETHERNET CABLE, CAT6, 25 FT 39 0.00 0.00 0.00 Other 73391 FLEET 3 NEW INSTALLATION (PER VEHICLE)39 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,330.98 51,908.22 Subtotal 51,908.22 Estimated Tax 4,671.74 Total 56,579.96 Spares -BWC Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 20008 TASER 7 HANDLE, YLW, HIGH VISIBILITY (GREEN LASER), CLASS 3R 1 0.00 0.00 0.00 73202 AXON BODY 3 -NA10 1 0.00 0.00 0.00 20040 TASER 7 HANDLE WARRANTY, 4-YEAR 1 0.00 0.00 0.00 74028 WING CLIP MOUNT, AXON RAPIDLOCK 1 0.00 0.00 0.00 Protect Life.Q-290737-44267.883RT 5 Spares -BWC (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 11534 USB-C to USB-A CABLE FOR AB3 OR FLEX 2 1 0.00 0.00 0.00 Other 73827 AB3 CAMERA TAP WARRANTY 60 1 0.00 0.00 0.00 Subtotal 0.00 Estimated Tax 0.00 Total 0.00 Year 2 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Other 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Year 3 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Protect Life.Q-290737-44267.883RT 6 Year 3 (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware (Continued) 22177 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, STANDOFF NS 100 0.00 0.00 0.00 22178 TASER 7 HOOK-AND-LOOP TRN (HALT) CARTRIDGE, CLOSE QUART NS 100 0.00 0.00 0.00 Other 73309 AXON CAMERA REFRESH ONE 50 0.00 0.00 0.00 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 73689 MULTI-BAY BWC DOCK 1ST REFRESH 8 0.00 0.00 0.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 73309 AXON CAMERA REFRESH ONE 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 73309 AXON CAMERA REFRESH ONE 9 0.00 0.00 0.00 73689 MULTI-BAY BWC DOCK 1ST REFRESH 1 0.00 0.00 0.00 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Year 4 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Other 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 Protect Life.Q-290737-44267.883RT 7 Year 4 (Continued) Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Other (Continued) 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Year 5 Item Description Term (Months)Quantity List Unit Price Net Unit Price Total (USD) Hardware 22175 TASER 7 LIVE CARTRIDGE, STANDOFF (3.5- DEGREE) NS 100 0.00 0.00 0.00 22176 TASER 7 LIVE CARTRIDGE, CLOSE QUARTERS (12-DEGREE) NS 100 0.00 0.00 0.00 Other 73310 AXON CAMERA REFRESH TWO 50 0.00 0.00 0.00 20321 AXON CORE + PLAN WITH T7 CERT PAYMENT 12 50 1,908.00 1,908.00 95,400.00 73688 MULTI-BAY BWC DOCK 2ND REFRESH 8 0.00 0.00 0.00 20119 TASER 7 MASTER INSTRUCTOR SCHOOL VOUCHER 1 0.00 0.00 0.00 73310 AXON CAMERA REFRESH TWO 1 0.00 0.00 0.00 20120 TASER 7 INSTRUCTOR COURSE VOUCHER 1 0.00 0.00 0.00 80457 FLEET 3 BASIC PAYMENT 12 39 1,548.00 1,548.00 60,372.00 73835 AUTO TAGGING LICENSE PAYMENT 12 9 108.00 108.00 972.00 73665 RESPOND DEVICE PAYMENT 12 9 60.00 60.00 540.00 73842 UNLIMITED EVIDENCE.COM TAP BUNDLE PAYMENT 12 9 1,068.00 1,303.13 11,728.17 73310 AXON CAMERA REFRESH TWO 9 0.00 0.00 0.00 73688 MULTI-BAY BWC DOCK 2ND REFRESH 1 0.00 0.00 0.00 Subtotal 169,012.17 Estimated Tax 15,211.09 Total 184,223.26 Grand Total 921,116.27 Protect Life.Q-290737-44267.883RT 8 Summary of Payments Payment Amount (USD) Year 1 -Core 127,643.27 Year 1 -Fleet 56,579.96 Spares -BWC 0.00 Year 2 184,223.26 Year 3 184,223.26 Year 4 184,223.26 Year 5 184,223.26 Grand Total 921,116.27 Protect Life.Q-290737-44267.883RT 9 Notes NASPO Contract No. OK-MA-145-015 used for pricing and purchasing justification Purchase of TASER 7 are governed by the TASER 7 Agreement located at https://www.axon.com/legal/sales-terms-and-conditions and not the Master Services and Purchasing Agreement referenced below. Tax is subject to change at order processing with valid exemption. Axon’s Sales Terms and Conditions This Quote is limited to and conditional upon your acceptance of the provisions set forth herein and Axon’s Master Services and Purchasing Agreement (posted at www.axon.com/legal/sales-terms-and-conditions), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable.Any purchase order issued in response to this Quote is subject solely to the above referenced terms and conditions. By signing below, you represent that you are lawfully able to enter into contracts. If you are signing on behalf of an entity (i ncluding but not limited to the company, municipality, or government agency for whom you work), you represent to Axon that you have legal authority to bind t hat entity. If you do not have this authority, please do not sign this Quote. Signature:CustSIG Date:CustDate Name (Print):CustName Title:CustTitle PO# (Or write N/A):CustPo Please sign and email to Robbie Taylor at rtaylor@axon.com or fax to Thank you for being a valued Axon customer. For your convenience on your next order, please check out our online store buy.axon.com The trademarks referenced above are the property of their respective owners. Protect Life.Q-290737-44267.883RT 10 ***Axon Internal Use Only*** Review 1 Review 2 SFDC Contract #: Order Type: RMA #: Address Used: SO #: Comments: Protect Life.Q-290737-44267.883RT 11 Bremerton Police Dept. -WA What is the contact name and phone number for this shipment? What are your receiving hours? (Monday-Friday) Is a dock available for this incoming shipment? Are there any delivery restrictions? (no box trucks, etc.) AT T E N T I O N This order may qualify for freight shipping, please fill out the following information. STATEMENT OF WORK & CONFIGURATION DOCUMENT Axon Fleet In-Car Recording Platform This document details a proposed system design Agency Created For: Bremerton PD Sold By: Robbie Taylor Designed By: Jake Borro Installed By: Axon Professional Services VEHICLE OVERVIEW SITE NAME CUSTOMER NAME Headquarters Bremerton PD Total Configured Vehicles Axon Camera Fleet Hub In-Car Router • 39 Total Vehicles with this Configuration Video Capture Sources • 78 • 1 Total Cameras Deployed Fleet Hub(s) Per Vehicle Mobile Data Terminal Per Vehicle • 1 Located In Each Vehicle Mobile Router Per Vehicle • 1 IBR900-1200M-B Offload Mechanism • 4G LTE Cellular Evidence Management System • Evidence.com SYSTEM CONFIGURATION DETAILS The following sections detail the configuration of the Axon Fleet In-Car System Vehicle Hardware Vehicle Hardware 2 Axon Fleet Cameras will be installed in each vehicle 1 Axon Fleet Hub will be installed in each vehicle 1 5-in-1 Antenna will be installed in each vehicle 1 3-in-1 Antenna will be installed in each vehicle 1 IBR900-1200M-B router will be installed in each vehicle Signal Activation Methods 5 Triggers will be configured per vehicle The following devices will be configured for Signal activation: Light-Bar, Gunlock, Crash, Speed, Siren. When triggered, the Axon Signal technology in the Fleet 3 Hub will activate the recording mechanism for all configured Axon cameras within Bluetooth range of the vehicle. Mobile Data Computer Each vehicle will be equipped with a Mobile Data Computer provided by the customer, which meets or exceeds the specifications provided by Axon. Mobile Data Computer Requirements Operating System: Windows 7 SP1 or Windows 10 (version 1909 or higher) - x32 or x64 with the most current service packs and updates Hard Drive: Must have 25GB+ of free disk space RAM/Memory: for x32: 4GB | for x64: 8GB or greater Ethernet Port: It is recommended that the MDC have one dedicated and available Ethernet port reserved for an Ethernet cable from router. The Ethernet port can be located on an electronic and stationary mobile docking station. If a docking station is used, it is the preferred location for the Ethernet port. Wi-Fi Card: If the MDC is not connected to the router via Ethernet LAN, a WiFi card is required in the MDC. In this case, the WiFi card should meet or exceed the router's minimum WiFi radio compatibility requirements. Additional Considerations The Cradlepoint router includes the antenna(s) and Cradlecare. For agencies that use a VPN, Axon traffic must be passed through; such that it does not use the VPN tunnel. Customer must provide IT and / or Admin resources at time of installation to ensure data routing if functional for Axon Fleet operation. In the event an Agency is unable to support the IT requirements associated with the installation, Axon reserves the right to charge the Agency for additional time associated with on -site work completed by an Axon Personnel. Hardware Provisioning Axon will provide the following router for all vehicles: IBR900-1200M-B The customer will provide an MDC for each vehicle. If the customer chooses to provide their own SIM, they must be activated and available at time of installation SIM Location SIM will be located in router and can be inserted in router by Cradlepoint if carrier is specified by agency. 4G / Cellular Offload Considerations Network Considerations The IBR900-1200M-B will be the connection which allows 4G upload of recorded video The customer will ensure that their cellular contract does not allow for data throttling, or service denial, once a set data threshold is met. Throttling or denial of service will negatively affect Fleet upload capabilities. Network Consideration Agreement Network Consideration Agreement Customer acknowledges the minimum requirements for the network to support this Statement of Work. Axon employees performing services under this SOW are CJIS certified. If the network provided by Customer does not meet the minimum requirements, or in the event of a requested change in scope of the project, a Change Order will be required and additional fees may apply. Additional fees would also apply if Axon is required to extend the installation time for reasons caused by the customer or the customer network accessibility. Professional Services & Training Project Management Axon will assign a Project Manager that will provide the expertise to execute a successful Fleet camera deployment and implementation. The Project Manager will have knowledge and experience with all phases of the project management lifecycle and with all application modules being implemented. He/she will work closely with the customer's project manager and project team members and will be responsible for completing the tasks required to meet all contract deliverables. Vehicle Installation Customer agrees to have the above mentioned number of intended vehicles available at the time of deployment. Axon will be performing the installation of all Axon Fleet vehicle hardware. Installation services included with Axon Fleet system include a “clip” and removal of existing in-car system hardware, if applicable. This does not include “full removal” of existing wiring. A “full removal” of all existing hardware and wiring is subject to additional fees. Axon provides basic Fleet operation overview to the customer lead and/or Admin at the time of install. o It is necessary to differentiate between the type of equipment removal to be provided by Axon. Standard Fleet Installation includes hardware removal in a fashion considered “Clip” which means Axon cuts the wires from the old system without removing multiple panels, removing all wiring and parts from the old system. In the case Axon removes the hardware Axon is not responsible for the surplus of hardware or any devices that may have been physically integrated with the removed system. In some situations, radar systems are integrated with the in-car video system and have a cable that connects to the system, if Axon removes the old in car system then Axon is not responsible for the radar system as part of the removal. o A “Rip” removal should be contracted through ProLogic directly. The Rip would be similar to a complete and full removal, which is more common when they retire a vehicle from service. Chosen installation site must have internet access for the Hub, through the router,and MDC for configuration and testing of Fleet 3. Customer must have a resource onsite during installation with Axon Evidence Device Administration permissions to assist with logging into customer MDCs and configuring vehicle software. Custom Trigger Installation The Fleet 3 Hub has multiple trigger configuration options. Any trigger configurations that include a door or magnetic door switch are considered “custom” and may be subject to additional fees. An Axon representative has discussed with the Agency the standard triggers of the Fleet System. Those no-cost triggers include Light-bar,Siren, Speed, Motion Activation and Gun-lock activation. The light-bar must have a controller to allow Axon to interface for the desired position, gun -locks must be installed with existing hardware in the vehicle. Doors are considered “CUSTOM” since they required additional hardware and time for installation, typically requiring the door may need to be taken apart for the installation. Training End-user go-live training provides individual device set up and configuration assistance, training on device use, Evidence.com and AXON Fleet Dashboard. This is included at no additional cost. No tes Tax is subject to change at order processing with valid exemption. Axon’s Sales Terms and Conditions This Quote is limited to and conditional upon your acceptance of the provisions set forth herein and Axon’s Master Services a nd Purchasing Agreement (posted at www.axon.com/legal/sales-terms-and-conditions), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable. Any purchase order issued in response to this Quote is subject solely to the above referenced t erms and conditions. By signing below, you represent that you are lawfully able to enter into contracts. If you are signing on behalf of an entity (i ncluding but not limited to the company, municipality, or government agency for whom you work), you represent to Axo n that you have legal authority to bind that entity. If you do not have this authority, please do not sign this Quote. Signature: Date: Name (Print): Title: PO# (Or write N/A): Thank you for being a valued Axon customer. For your convenience on your next order, please check out our online store buy.axon.com The trademarks referenced above are the property of their respective owners. ***Axon Internal Use Only*** SFDC Contract #: Order Type: RMA #: Address Used: SO #: Review 1 Review 2 Comments: Protect Life. AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Authorize three additional positions (3 FTEs) in the 2021 City Budget to support Bremerton’s Permitting Development Review and Inspection Services COUNCIL MEETING Date: April 7, 2021 Department: DCD / PW&U Presenter: A.Spencer / T.Knuckey Phone: (360) 473-5283 SUMMARY: Construction in Bremerton has been on a significant increase since 2016, and the existing staffing levels in DCD’s Community Development Building group and PW&U’s Development Engineering Section are not adequate to deal with the increased demand for review and inspection that this increase in development activity is creating. The City’s administration has evaluated options to ensure that the City can maintain a permitting level of service and has concluded that three additional staff members (3 FTE’s) need to be added to the organization as follows: 1) Building Inspector / Plans Examiner II (DCD) 2) Development Engineer, CEII (PW&U Engineering) 3) Development Inspector, Tech IV (PW&U Engineering) Revenue from permitting is greatly outpacing budget projections and will offset the cost to add these FTEs. See the attached Council Summary for further information. ATTACHMENTS: (1) Spencer/Knuckey Memo; (2) Development Staffing Needs information and PowerPoint presented to the City Council on March 10, 2021 FISCAL IMPACTS (Include Budgeted Amount): The cost to the General Fund for the requested positions is easily offset by increased revenues from permitting. The three FTEs will start mid-year, and the 2021 cost to the General Fund for the staff additions (including one-time start-up costs) is $122,500, with $82,000 for DCD, and $40,500 for Engineering. The two proposed Engineering positions are 75% funded by the utilities, with $40,500 required from the Water, $40,500 from the Wastewater, and $40,500 from the Stormwater Funds. Additional detail is included in the Spencer/Knuckey memo. STUDY SESSION AGENDA: ☐ Limited Presentation ☒ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to authorize the 2021 mid-year hire of one additional Building Inspector/Plans Examiner II, one additional Development Engineer (CEII), and one additional Development Inspector (Engineering Technician IV), and approve an increase of $82,000 to the labor budget for the Department of Community Development, and an increase of $162,000 to the labor budget for the Engineering General Fund, with revenue to the Engineering General Fund of $40,500 from Water, $40,500 from Wastewater, $40,500 from Stormwater. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 A8 MEMORANDUM TO: City Council FROM: Andrea Spencer DCD Director & Tom Knuckey PW&U Director DATE: March 24, 2021 Council Study Session / April 7, 2021 Council Meeting SUBJECT: Development Staffing Needs SUMMARY: Construction in Bremerton has been on a significant increase since 2016. Until most recently our annual housing unit production has averaged about 225 units per year. In 2021 the City has nearly 800 housing units under construction (an increase of more than 3.5 times over prior years). The staffing levels in DCD’s Community Development Building group and PW&U’s Development Engineering Section are not adequate to deal with the increased demand for review and inspection that this increase in development activity is creating. There are many more permits in the pipeline that indicate that the growth trend will continue for the next several years. At an information-only briefing the City’s Administration presented information about the permitting level increase; for easy reference that information follows this memo. Options have been evaluated to ensure that the City can maintain a permitting level of service and has concluded that three additional staff members (3 FTE’s) need to be added to the organization as follows: 1) Building Inspector / Plans Examiner II (DCD) 2) Development Engineer, CEII (PW&U Engineering) 3) Development Inspector, Tech IV (PW&U Engineering) The revenue from permitting that has resulted from the significant development increase will offset the additional cost to add these new FTEs. As of the end of February the City has collected and received permit submittals that result in receipt of more than $350,000 over anticipated 2021 revenues. It is expected that this value will increase for the remainder of 2021 as more development permits are received. FISCAL SUMMARY: The proposal is to add the three FTEs at mid-year in 2021, and the total cost to the General Fund for these staff additions, including one-time start-up costs is $122,500; with $82,000 for the DCD position, and $40,500 for the two Engineering positions. This cost is easily offset by the increased General Fund revenues received from permitting. The annual cost of these positions to the General Fund beginning in 2022 is estimated at $197,000. 2 The two proposed Engineering positions are funded at 75% by the utilities as follows; $40,500-Water, $40,500-Wastewater, and $40,500-Stormwater. The rate dashboard for the three utility funds shows that this staffing addition has no impacts to rates in the 6 - year evaluation period for Water and Stormwater, and a negligible (0.25%) one -year increase in 2024. The 2021 and 2022 costs for the three proposed positions are presented in the table below. CONTRACTED SERVICES COST COMPARISON At the March 10 Council information-only briefing Councilmembers inquired if it would be more cost effective for the City to have contracted services in lieu of FTE additions. The memo for the March 10 meeting touched on the fact that the City administration considered this option and determined it was infeasible because of limited ability of firms to take on the level of work that the City requires. In addition , contracted services is much more expensive than the City hiring its own employees for longer-term projects. As shown in the PowerPoint presentation for the study session it was demonstrated that the permitting activity is strong and the City needs a longer-term solution to ensure timely permit review and inspections. Here is the cost comparison estimate for City employee versus contracted services: By hiring our own FTE’s versus contracting for those services the City would save more than $450,000. City of Bremerton Development Staffing Needs for Community Development & PW&U Development Engineering March 2021 – Status of Bremerton Development & Needed Resources ISSUE SUMMARY: The City has been experiencing a continuous and very high volume of development construction activity with no foreseeable slowdown in sight. As the City grows and development increases this has a direct impact on the City’s ability to respond to these requests with our existing staffing levels. Construction has impacts largely on the staffing in Community Development’s Building group and Public Works & Utilities’ Development Engineering group. The increased construction activity in the City has been on a steady upward trend since 2018, with 2020 being a large record breaking year with the approval of more than $143 million in construction valuation (more than $15 million / 11.8% over 2019). Mayor Wheeler’s proposed budget for 2021 began to be shaped in August 2020 amidst the COVID crisis and even though the development activity was increasing, he made a conservative approach toward staffing levels (no new FTE’s) thereby hedging against a possible downturn due to the pandemic. Fortunately for Bremerton the development downturn did not occur, activity remains high, and the data points to another record year in 2021 above the incredible numbers established in 2020. We need to act now to ensure that we support this economic activity for our community with the appropriate staffing levels. The revenues from permitting activity offset the increased costs that these new positions will have on the General Fund. NECESSARY RESOURCES: One additional FTE in Community Development: • Building Inspector / Plans Examiner II Two additional FTE’s in Public Works & Utilities Engineering Section: • Civil Engineer II • Engineering Technician IV DEVELOPMENT ACTIVITY HISTORICAL TREND In 2020 the City experienced a record breaking year for approved permit valuations. Here is what the permit activity was for the last five years and the two months of 2021: In 2016 we were beginning to see an upward trend of increased development and permitting activity following the great recession. The City Council desired to support this increasing economic activity by authorizing an additional position within Community Development as part of the 2017 budget. At mid-year 2017 the building plan review and inspection staff went from one to two FTE’s to support the construction uptick. The City has not increased building group’s staff since 2017 despite nearly tripling the value of construction activity the department is processing. Please note that while the number of permits has remained fairly steady over the past few years, the complexity of those permits (which is reflected in the increased “total valuation”) has increased exponentially, and this has had a tremendous impact on our staffing. DEVELOPMENT ACTIVITY – HOW IS 2021 SHAPING UP? The chart below shows a comparison of what we have approved so far for permitting in 2021, what is in the queue for review (i.e. applications that have already been submitted) and compared those to the “record breaking” 2020 year total: DEVELOPMENT PERMITS – HOW DOES THAT TRANSLATE INTO STAFFING NEEDS? The permit data shows that our prior “highest” January on record occurred in January 2020 when we approved $6.3 million in construction valuation. Now in January 2021 we have approved $10.8 million in construction value – a more than 71% increase over last year’s activity. For further comparison it is important to understand what was in the permit review queue at the beginning of 2020 and today: • In January 2020 the permit queue had 77 permits submitted with a total valuation of $35.5 million • At the end of February 2021 the permit queue has 303 permits submitted with a total valuation of just over $114 million The record breaking construction trend of 2020 does not appear to be slowing down for 2021. Below is more data to demonstrate both the increase in construction activity and how this affects our staffing. We perform inspections on various construction activities from simple decks and home additions, to new single family homes, to apartment buildings and commercial construction. Here is a breakdown of our inspection activity for just new single family homes (it is not inclusive of all the other inspections that we perform): Year New SFR Permit Inspections 2020 5,299 2019 4,720 2018 3,263 2017 3,026 2016 1,847 The City has so far been able to accomplish this work with just two staff members that split duties of both building plan review and inspection with some help from contracted services (which has limited capacity to take on a high volume of work). Unfortunately the City is at a point where it can no longer keep up with the demand that is being placed on staff and additional resources are necessary to be able to respond to construction demand and ensure that permits are processed in a timely way. CURRENT WORKLOAD EXAMPLE: SINGLE FAMILY RESIDENTIAL (SFR) The table below describes the necessary staff-days to process the Single Family Residential permits currently in the 2021 queue as of February. Processing includes Plan Review and approximately 25 different inspections for each residential permit. Note that Single Family Residential is only a portion of the type of development activity that DCD process permits for; it has been pulled out a s a discreet example to demonstrate the City’s workload. Note that these tables are not reflective of all the other permit submittals for remodel, multifamily and commercial activities. PLAN REVIEW DEMAND – NEW SINGLE FAMILY RESIDENTIAL (SFR) New SFR Permits in Permit Queue Estimated Plan Review Time Estimated Total Review Time to Review new SFR Permits Days /Weeks required for SFR Plan Review 182 3 Hours 546 Hours 68 days / 9.7 weeks INSPECTION DEMAND – NEW SINGLE FAMILY RESIDENTIAL (SFR) New SFR Permits Permit Queue Approximate Inspections per Permit Total Potential Inspections Time Frame to Complete 4550 Inspections at approx. 15 per day 182 25 4550 303 days • The current required staff time to process these 182 residential units to completion is approximately 371 work days. • Human Resource estimates for average annual working staff days per FTE is 236 (261 business days minus paid holidays and assumed 2 weeks-vacation). • DCD currently has two FTE performing plan review and inspections, equating to 472 available staff days per year. • 472 available days minus 371 required days for SFR permits equals 101 remaining work days. After completing the 182 single-family residential units, DCD staff will only have 101 work days remaining to then complete all the single-family residential inspections for permits previously issued in 2020 (about 97), in addition to all the plan review and inspections for the other portion of the 303 submitted permits for Multifamily Residential, Commercial Construction, Remodels, Additions, Simple Decks, etc., as well as any ADDITIONAL permits that are submitted for new projects after February 2021. Clearly the City’s building staff level is not sufficient to process our current volume. Furthermore, the City has always strived to perform plan review services for building permits in 6 to 8 weeks, and as you can see from the table above, the single family homes alone require nearly 10 weeks before reviews will be complete. The review time in the chart above is an example, and other permit types are mixed in with the plan reviewer’s queue so in reality many permits will not be able to be approved in less than 10 weeks. The investor confidence in building projects in Bremerton will therefore drop when permits are not processed in a timely way. Pressure on development review staff does not end with just what is currently in the building permit review queue. We must also look to what is in the development entitlement pipeline (receiving land use approvals), as this has effects on other aspects of the City’s operation, specifically PW&U Development Engineering. As developers prepare sites and install necessary infrastructure (water, sewer, stormwater, roads etc.) these activities require a significant amount of plan review time, inspections, and construction oversight by Development Engineering. Development support demands were partially met in 2020 by assigning Utility Engineering staff to support permitting and plan review. While this stop-gap measure addressed the immediate need to backfill permitting, it did not address the need to support the increasing field inspection need, and also left the Utility Engineering Section without Project Management, Construction Management and Design capabilities. A few of the projects that are in the development entitlement process, undergoing site development, or are nearing building permit submittal include: • Sound Ridge Subdivision 25 SFR Lots • Bay Vista Plat 120 SFR Lots • Werner Road BLA approximately 200 SFR Lots • Sinclair Ridge Subdivision 345 SFR Lots • Kitsap Landing (old Soil Factory site) 69 SFR Lots and 4 apartment lots • Almira Apartments 323 Units • Eagle Apartment on Washington 115 units • Mills crossing 42 units • Scheel Multifamily 26 units • Best Western New Hotel on Kitsap Way Any of the projects above could within 1 to 3 months double the example cited in the single family residential workload case study presented earlier in this memo. Note that this is only a portion of the development activity that is in the entitlement process, and what this indicates is that permitting activity will remain high for the remainder of 2021 and there will only be increased pressure on staff for the remainder of the year. SNAPSHOT OF DCD BUDGETED REVENUES & ACTUALS This table illustrates the current budget and actual revenues, and also contains calculated revenues for permits that are currently under review but have not yet been paid as of February 26, 2021. This is just a snapshot as of the end of February, and the revenues will only increase throughout the year as new submittals are made. The table illustrates that between actual revenues and the permits that are in the review queue that the Community Development is ahead of budget by more than $360,000. DCD Revenue Category 2021 Budget Actual through February 26 Building Permits $825,000 $171,651 Plumbing Permits $25,000 $9,024 Mechanical Permits $30,000 $9,284 Plan Check Fees $500,000 $268,334 Permits submitted and anticipated revenue due as of 2/26/2021 - $1,285,171 Total $1.38 million $1.74 million As identified in the first page of this paper, there are three positions that need to be added to address the development review pressure in both DCD and PW&U Development Engineering. These staff costs can be offset by the revenues that are shown within DCD for permit activity, which at this point in the year is already $360,000 over expected budget revenues. The three positions are: • DCD Additional FTE: Building Inspector / Plans Examiner II • PW&U Additional FTE: Civil Engineer II • PW&U Additional FTE: Engineering Technician IV Attached is a spreadsheet of the annual costs for these three positions, and the General Fund impact can be easily offset by the development revenues coming into Community Development. PROPOSED SCHEDULE TO IMPLEMENT THIS EMERGENT STAFFING NEED 3/24 City Council Study Session & 4/7 Council Meeting to review the proposal for the addition of three staff positions to support development. ADDITIONAL DISCUSSION OF PUBLIC WORKS & UTILITIES STAFFING NEEDS In 2019 FCS Group was contracted to evaluate workload of the Engineering Division to recommend appropriate staffing levels. The report was completed in November and concluded the Engineering Division has multiple staffing needs for different Sections; the report will be discussed in depth with the City Council in the coming weeks. Specific to Development, the report identified need both in development review and inspection which would be filled with two positions identified above. CITY COUNCIL INFORMATION BRIEFINGMARCH 10, 2021DEVELOPMENT STAFFING NEEDSDCD & PW&U DEVELOPMENT ENGINEERING ANNUALNEW CONSTRUTION VALUATION INCREASINGCity of Bremerton permitting has remained strong since the Great Recession and this has resulted in an on-going increase to the City’s overall valuation.The City has limited ways to increase our annual revenues. If the City focuses on supporting revitalization, especially with an emphasis on new construction, this helps grows the tax base without effecting our existing residents and it will help fund all aspects of the City’s operations such as Police, Fire, Parks, Streets, etc. The graphic at right shows how the City’s permitting activity has resulted in increased new construction valuation and therefore more funding for our important community programs.We currently need 3 new FTE’sto support Bremerton’s continuous revitalization and development permitting.New construction is exempt from the annual 1% limit on increases to property taxes in the first year. State law limits property tax increases to 1% annually. For example, if a city received $1 million in property taxes one year, it could only receive $1.01 million the following year. However new construction is not included in this this cap for the current year –the full levy rate from the prior year can be applied to new amount. DEVELOPMENT ACTIVITY SUMMARY COMMERCIAL CONSTRUCTION•2016 to 2020 commercial production: 272,397 sq ft•Underway and in review pipeline:351,855 sq ft RESIDENTIAL & MULTI-FAMILY CONSTRUCTION•Total units completed 2016 to 2020: 1,121 units (annual production of about 224 units*)•New single-family under construction & in pipeline:1,193 units•New multi-family under construction & in pipeline:1,554 units* Note: Annual production needed to meet Comprehensive Plan growth expectations by 2035: 515 units ANNUAL BUILDINGPERMIT ACTIVITY 2021 PERMITTING ACTIVITY2021 has started strong with already $22 million in construction valuation approved and more than $114 million in the review queue.Bottom line: Two months into the year and the data shows that we are already within less than $7 million of last year’s total in the permitting pipeline and there are still ten months of the year remaining. DCD STAFFING NEEDS DEMAND FOR DCD SERVICES INCREASE AS PERMITTING INCREASESDCD staff must perform both plan review and inspection services for all City building permits.Attached to the agenda bill is a memo to that outlines the primary issues in detail:•Plan review time is increasing well beyond the set target date of 60 days (8 weeks)•Inspection load has more than doubled since the Council last added staff to the Building Section of DCD (single family inspections are shown at right –these are only a portion of DCD inspections)Investor confidence in building projects in Bremerton may drop if permits are not processed in a timely way. This would result in the City not having increases to our property values for “new construction” and therefore having relatively small increases to our revenues NEW DCD FTEAdd an additional FTE:Building Inspector / Plans Examiner IIPosition would be hired at mid-year 2021 with a first-year cost of $82,000Annual cost estimate for this FTE is $132,000 DCD GENERAL FUND REVENUES PW&UDEVELOPMENT ENGINEERINGSTAFFING NEEDS ENGINEERING DIVISION RESPONSIBILITIESReview, Approve, Inspect and Document all Improvements in the Right-of-Way:Streets:•Confirm design meets standards, review trip generation, evaluate system impacts, negotiate mitigation Utilities:•Water–evaluate system capacity and impacts. Ensure design meets standards and construction is per design•Wastewater–similar to Water •Stormwater–confirm design meets standards, evaluate system capacity, ensure construction BMPs are followed, report NPDES permit compliance PERMIT ACTIVITY AND STAFFING•Permit activity has doubled since 2016•A Permit Tech was added in 2018 to support permit processing; however, no staff were added to support engineering or inspection•Four FTEs staff Development Engineering:•Development Engineer/PM•Development Technician•Inspector•Permit Technician•The 2020 FCS Engineering Workload Evaluation identified the need to add Development Engineering Staff. ADDITIONAL POSITIONS NEEDEDDevelopment Engineer -CEII•Review/approve Stormwater Reports•Review/approve trip generation reports (TIA basis)•Review/approve Street, Water, Sewer, Stormwater Plans•Site reconnaissance to confirm legitimacy of developer proposals•Evaluate water and sewer availability & impacts•Ensure coordination between development and City projects•Coordinate with Developers, Consultants, other Departments & other Agencies on utility availability and system impacts, transportation issues, mitigation, permitting, etc. ADDITIONAL POSITIONS NEEDEDDevelopment Inspector -ETIV•Field design conflict resolution•Field coordination and problem resolution between contractors, developers, private utilities, agencies and the Development Engineer •Underground water/sewer/storm inspection to confirm backfill suitability, compaction, materials approval/rejection, pressure/video inspection and testing•Road inspection to confirm geometrics, sight distance, materials approval/rejection, compaction, pavement markings•Sidewalks, ADA ramps, driveway approaches, paths, to ensure standards are met•Tree planting to confirm root barriers, irrigation, tree suitability, tree health •Stormwater BMP inspection and NPDES reporting•Site reconnaissance to confirm legitimacy of developer proposals•Reviews/approves contractor-developed record drawings. COST OF THE POSITIONSCosts are split evenly between the 3 utilities and the General Fund similar to existing positions UTILITY FUND IMPACTS OF NEW POSITIONSDashboard (expense & revenue) Evaluation:•Previously forecast rate increases of 3% for Water & Sewer, and 8.5% for Stormwater are assumed•New positions added beginning July 1, 2021:•Water & Stormwater -no impact to rates in the 6-year evaluation period•Wastewater –negligible one-year increase in 2024 NEXT STEPS NEXT STEPSCity Council action on adding 3 FTEs to support development:•March 24 Study Session•April 7 Regular Meeting -Action AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Confirm Appointment of Ashley Walchok to the Lodging Tax Advisory Committee Study Session Date: March 24, 2021 COUNCIL MEETING Date: April 7, 2021 Department: Executive Presenter: Mayor Wheeler Phone: (360) 473-5266 SUMMARY: RCW 67.28 and BMC Chapter 2.38 outline membership requirements for the Lodging Tax Advisory Committee as follows: two (2) members from organizations that support activities which are authorized to be funded by hotel-motel tax revenue; two (2) members from businesses that collect the hotel-motel tax; and an elected official (Council Member). There is a vacancy on the Lodging Tax Advisory Committee due to the departure of Jessica Arthur, General Manager for the Fairfield Inn & Suites. The Mayor is seeking confirmation for the appointment of Ashley Walchok, General Manager for the Fairfield Inn & Suites to the Lodging Tax Advisory Committee. The appointment of Ms. Walchok relates to a committee position for businesses that collect the hotel- motel tax within Bremerton; and is for the remainder of the unexpired term expiring on May 14, 2022. ATTACHMENTS: Applications are available in the Mayor’s Office FISCAL IMPACTS (Include Budgeted Amount): None. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to confirm the appointment of Ashley Walchok to the Lodging Tax Advisory Committee for the remainder of the term expiring May 14, 2022. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/07/15 A9 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Confirm Appointment of Ash Printy to the Lodging Tax Advisory Committee Study Session Date: March 24, 2021 COUNCIL MEETING Date: April 7, 2021 Department: Executive Presenter: Mayor Wheeler Phone: (360) 473-5266 SUMMARY: RCW 67.28 and BMC Chapter 2.38 outline membership requirements for the Lodging Tax Advisory Committee as follows: two (2) members from organizations that support activities which are authorized to be funded by hotel-motel tax revenue; two (2) members from businesses that collect the hotel-motel tax; and an elected official (Council Member). There is a vacancy on the Lodging Tax Advisory Committee. The Mayor is seeking confirmation for the appointment of Ash Printy, Sales Coordinator for the Hampton Inn & Suites to the Lodging Tax Advisory Committee. The appointment of Mr. Printy relates to a committee position for businesses that collect the hotel- motel tax within Bremerton; and is for a 3-year term expiring on April 6, 2024. ATTACHMENTS: Applications are available in the Mayor’s Office FISCAL IMPACTS (Include Budgeted Amount): None. STUDY SESSION AGENDA: ☒ No Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to confirm the appointment of Ash Printy to the Lodging Tax Advisory Committee for a term expiring April 6, 2024. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/07/15 A10 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Confirm Appointment of Mike Huey to the Lodging Tax Advisory Committee Study Session Date: March 24, 2021 COUNCIL MEETING Date: April 7, 2021 Department: Executive Presenter: Mayor Wheeler Phone: (360) 473-5266 SUMMARY: RCW 67.28 and BMC Chapter 2.38 outline membership requirements for the Lodging Tax Advisory Committee as follows: two (2) members from organizations that support activities which are authorized to be funded by hotel-motel tax revenue; two (2) members from businesses that collect the hotel-motel tax; and an elected official (Council Member). Due to a vacancy, the Mayor is seeking confirmation for the appointment of Mike Huey, Washington State Science & Engineering Fair (WSSEF) to the Lodging Tax Advisory Committee. The appointment of Mr. Huey relates to a committee position for organizations that are eligible for funding which also operate and promote tourism within Bremerton; and is for a 3-year term expiring on April 6, 2024. ATTACHMENTS: Applications are available in the Mayor’s Office FISCAL IMPACTS (Include Budgeted Amount): None. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to confirm the appointment of Mike Huey to the Lodging Tax Advisory Committee for a term expiring April 6, 2024. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/07/15 A11 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Confirm Appointment of Virgil Valdez to the Lodging Tax Advisory Committee Study Session Date: March 24, 2021 COUNCIL MEETING Date: April 7, 2021 Department: Executive Presenter: Mayor Wheeler Phone: (360) 473-5266 SUMMARY: RCW 67.28 and BMC Chapter 2.38 outline membership requirements for the Lodging Tax Advisory Committee as follows: two (2) members from organizations that support activities which are authorized to be funded by hotel-motel tax revenue; two (2) members from businesses that collect the hotel-motel tax; and an elected official (Council Member). Due to a vacancy, the Mayor is seeking confirmation for the appointment of Virgil Valdez, Filipino- American Association of Kitsap County to the Lodging Tax Advisory Committee. The appointment of Mr. Valdez relates to a committee position for organizations that are eligible for funding which also operate and promote tourism within Bremerton; and is for a 3-year term expiring on April 6, 2024. ATTACHMENTS: Applications are available in the Mayor’s Office FISCAL IMPACTS (Include Budgeted Amount): None. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to confirm the appointment of Virgil Valdez to the Lodging Tax Advisory Committee for a term expiring April 6, 2024. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/07/15 A12 AGENDA BILL CITY OF BREMERTON CITY COUNCIL SUBJECT: Study Session Date: March 24, 2021 Setting Salary for Karen Wikle as the Budget Analyst at Pay Band 12 Rate 6 of the 2021 Management, Professional, Confidential & Fiduciary Salary Plan COUNCIL MEETING Date: N/A Department: Financial Services Presenter: Michael Riley Phone: (360) 473-5303 SUMMARY: BMC Chapter 2.50.032 (c)(3) requires Council approval when an employee is hired into a step higher than step A. Therefore, the City is requesting Council approval to set Karen Wikle’s salary at Rate 6 of Band 12. Ms. Wikle has a bachelor’s degree in Economics from Western Washington University and a master’s degree in Business Administration from Colorado Technical University. Karen previously was the Director of Business Services at Olympic College in Bremerton, Washington. Prior to being the Director, Karen worked as Director of Accounting Services and the Assistant Director of Business Services for the past nine years. Prior to her employment with Olympic College, Karen worked in the construction industry as a Senior account for five years. ATTACHMENTS: 1) Letter of Engagement outlining the terms of employment with the City of Bremerton; and 2) 2021 Management, Professional, Confidential & Fiduciary Salary Plan FISCAL IMPACTS (Include Budgeted Amount): Annual Salary is $94,200.96. This appointment does not require a budget adjustment. STUDY SESSION AGENDA: ☒ Limited Presentation ☐ Full Presentation ☒ With Action STUDY SESSION ACTION: ☐ Consent Agenda ☐ General Business ☐ Public Hearing RECOMMENDED MOTION: Move to authorize the initial placement of Ms. Wikle’s salary at Rate 6 of Band 12 of the Management Professional, Confidential & Fiduciary Salary Plan. COUNCIL ACTION: Approve Deny Table Continue No Action Form Updated 01/02/2018 B1 Added & Action Anticipated Michael Riley, Director of Financial Services 345 Sixth Street, Suite 600 Bremerton, WA 98337-1873 Telephone: 360-473-5303 Fax: 360-473-5200 mike.riley@ci.bremerton.wa.us March 24, 2021 Karen Wikle RE: Letter of Engagement Dear Karen: It is with great pleasure that I confirm your appointment to the position of Budget Analyst. Your position is exempt from Fair Labor Standards Act (FLSA) overtime provisions and included in the Management and Professional classifications covered under BMC 2.50 (copy attached) as follows: Position: Budget Analyst Department: Financial Services Effective Date: Rate of Pay: $3,925.04 semi-monthly (Band 12, Rate 6) Appointment/Removal: Director of Financial Services Supervisor: Michael Riley, Director of Financial Services Vacation: 20 days per year Benefits: Pursuant to BMC Chapter 2.50 Severance: Pursuant to BMC Chapter 2.50.090 You are an “at will” employee and may be terminated by the City without cause at any time with thirty (30) days’ notice. You may be terminated for cause, without notice, and no severance pay shall be paid. This letter shall constitute your terms and conditions of employment with the City and there are no other written or oral agreements that have not been set forth in this letter of engagement or covered by Chapter 2.50 of the Bremerton Municipal Code. Public Works & Utilities Please sign indicating your acceptance of our offer of employment as outlined above, and return to Debbie Klinefelter in our Human Resources Office at 345 6th Street, Suite 100, Bremerton, WA 98337. Sincerely, Michael Riley Director of Financial Services cc: Debbie Klinefelter, HR Analyst I ----------------------------------------------------------------------------------------------------------------------------- ACCEPTANCE OF JOB OFFER: I, Karen Wikle, hereby accept the appointment to position of Budget Analyst, under the terms and conditions as set forth in this Letter of Engagement. SIGNATURE: ______________________________ __________________ Karen Wikle Date